The Little Current Swing Bridge is a swing bridge in the Canadian province of Ontario , located at the community of Little Current in the town of Northeastern Manitoulin and the Islands .
87-631: The bridge carries Highway 6 (formerly Highway 68 ) across a narrow channel separating Manitoulin Island from the much smaller Goat Island , forming the only land access. It consists of two 21 m (70 ft) deck plate girder approaches on the north end (Goat Island) and a single 18 m (60 ft) deck plate girder approach on the south end (Manitoulin Island), with a 112 m (368 ft) through swing bridge span. The swing bridge sits 5.3 m (17.5 ft) above mean water level, and provides
174-524: A concurrency with Highway 24. This brought the length of the route to 114.3 kilometres (71.0 mi), including the approximately 16.1 kilometres (10.0 mi) of Bloor Street and Danforth Avenue between Jane Street and Sibley Avenue, within the Toronto city limits. Below the escarpment, the highway followed what is now the Old Guelph Road, meandering into Hamilton. South of Hamilton,
261-477: A 2013 underwater discovery along the ridge. On the eve of European contact, the extent of development among Eastern Woodlands Native American societies is indicated by the archaeological evidence of a town on or near Lake Huron that contained more than one hundred large structures housing a total population of between 4,000 and 6,000. The French, the first European visitors to the region, often referred to Lake Huron as La Mer Douce, "the fresh-water sea". In 1656,
348-580: A 48 m (160 ft) opening on either side of the central pier for water passage. The width of the bridge is 15’1” for loads. Construction of the bridge was started by the Algoma Eastern Railway with the abutments and piers being built in 1912 and the bridge structure being erected in 1913. The Algoma Eastern Railway began operating trains across the bridge to the community of Little Current in October 1913. The Algoma Eastern Railway
435-452: A Parclo A2 interchange (the exits from Highway 401 are displayed as "Highway 6 South"), while through traffic on Brock Road continues as Wellington Road 46, the current Highway 6 designation is instead multiplexed with Highway 401 west of that junction. Although Wellington Road 46 (the previous alignment of Highway 6 prior to the opening of the Hanlon) does provide a more direct route to Guelph,
522-611: A fairly large drainage basin covering parts of Michigan and Ontario. Water flows through Lake Huron faster than the other Great Lakes with a retention time of only 22 years. By surface area, Lake Huron is the second-largest of the Great Lakes, with a surface area of 23,007 square miles (59,590 km )—of which 9,103 square miles (23,580 km ) lies in Michigan and 13,904 square miles (36,010 km ) lies in Ontario—making it
609-982: A fierce storm after leaving, Le Griffon ran aground before the storm. The people of Manitoulin Island say that the wreck in Mississagi Strait at the western tip of the island is that of Le Griffon . Meanwhile, others near Tobermory , say that the wreck on Russell Island , 150 miles (240 km) farther east in Georgian Bay, is that of Le Griffon . On November 9, 1913, the Great Lakes Storm of 1913 in Lake Huron sank 10 ships, and more than 20 were driven ashore. The storm, which raged for 16 hours, killed 235 seamen. Matoa—a propeller freighter measuring 2,311 gross register tons —had passed between Port Huron, Michigan, and Sarnia, Ontario, just after midnight. On November 9, just after six in
696-630: A four-lane undivided alignment for 5 km. Much of the old alignment north to near Rymal Road remains provincially maintained as unsigned Highway 7273. In Hamilton, Highway 6 now uses a new alignment from Highway 403 to south of the Hamilton Airport , connecting with the southerly leg to Caledonia and Port Dover. The new alignment opened as an undivided two-lane freeway in November 2004, with capacity to expand it to full 4-lane divided freeway, and to extend to past Caledonia, by some time in
783-532: A map by French cartographer Nicolas Sanson refers to the lake by the name Karegnondi , a Wyandot word that has been translated variously, as "Freshwater Sea", "Lake of the Hurons", or simply "lake". Generally, the lake was labeled "Lac des Hurons" (Lake of the Huron) on most early European maps. By the 1860s, many European settlements on the shores of Lake Huron were becoming incorporated , including Sarnia,
870-745: A new, shorter route was in the planning stages. Construction of the $ 33 million route was announced on May 26, 2000 by Transportation Minister David Turnbull , and began in July 2003. The new route was opened on November 26, 2004. The section through Hamilton at the time followed Upper James Street through the Claremont Access onto the one-way pairings of Wellington Street and Victoria Avenue then Main Street and King Street. It turned north on Dundurn Street and crossed Cootes Paradise via York Boulevard before turning onto Plains Road and meeting
957-435: A profound food web change that took place in 2003. Lake trout have also been stocked for decades in an attempt to rehabilitate the species and today are largely self sustaining, especially in the northern half of the lake. Lake Huron has suffered recently by the introduction of a variety of new invasive species, including zebra and quagga mussels , the spiny water flea , and round gobies . The demersal fish community of
SECTION 10
#17327827456321044-551: A row in 2020. Historic low water Lake levels tend to be the lowest in winter. The normal low-water mark is 1.00 foot (30 cm) below datum ( 577.5 ft or 176.0 m ). In the winter of 1964, Lakes Michigan and Huron reached their lowest level at 1.38 feet (42 cm) below datum. As with the high-water records, monthly low-water records were set each month from February 1964 through January 1965. During this twelve-month period, water levels ranged from 1.38 to 0.71 feet (42–22 cm) below Chart Datum. The all-time low-water mark
1131-463: A telegraph line between Lion's Head and Tobermory and opened up a large area previously accessible only by water. The latter two would not be incorporated into the original route of Highway 6. When Ontario's Department of Public Highways first established a network of provincial highways on February 26, 1920 to be eligible for federal funding, it included the Hamilton and Dover Plank Road,
1218-656: A two-lane highway. Highway 6 is both the main means of connection between Manitoulin Island and the rest of Ontario and the major highway on Manitoulin Island. Highway 540 and Highway 542 on Manitoulin Island link back to Highway 6. The section from South Baymouth to the Highway 542 junction has the least traffic on a given day, with an average of 610 vehicles passing as measured in 2010. Highway 6 continues north, passing through communities such as Manitowaning , Sheguiandah , and Little Current . At Little Current, Highway 6 crosses
1305-425: Is 577 feet (176 m) above sea level . The lake's average depth is 32 fathoms 3 feet (195 ft; 59 m), while the maximum recorded (by sonar) depth is 125 fathoms (750 ft; 229 m). It has a length of 206 statute miles (332 km ; 179 nmi ) and a greatest breadth of 183 statute miles (295 km; 159 nmi). A large bay that protrudes northeast from Lake Huron into Ontario, Canada,
1392-595: Is called Georgian Bay . A notable feature of the lake is Manitoulin Island , which separates the North Channel and Georgian Bay from Lake Huron's main body of water. It is the world's largest lake island . A smaller bay that protrudes southwest from Lake Huron into Michigan is called Saginaw Bay . Cities with over 10,000 people on Lake Huron include Sarnia , the largest city on Lake Huron, and Saugeen Shores in Canada and Bay City , Port Huron , and Alpena in
1479-907: Is concurrent with Highway 7 , from the Wellington Street interchange north to where the Hanlon Expressway ends at Woodlawn Road. At Woodlawn, Highway 7 turns west onto Woodlawn Road, while Highway 6 turns east onto Woodlawn Road. Following Woodlawn, Highway 6 then turns north onto Woolwich Street, leaving the city of Guelph. As Highway 6 leaves Guelph and heads northwards through Wellington County, it narrows to two lanes and passes through farmland. The route meanders northward for 17 kilometres (11 mi) before entering Fergus , where it meets County Road 18 and County Road 19. North of Fergus, Highway 6 winds northwest for another 17 kilometres into Arthur meeting County Road 109 (former Highway 9 ) just south of
1566-462: Is now a fully controlled-access expressway with two southbound lanes and three northbound lanes (the extra lane being for trucks climbing the steep escarpment) as well a concrete median barrier with high mast lighting. North of Clappison's Corners, most of the route is four lanes for general traffic, plus one centre lane for left turns, allowing for high travel speeds as the typical flow varies between 100 and 120 km/h (62 and 75 mph). However
1653-479: Is the largest freshwater lake by area in the world. The Huronian glaciation was named from evidence collected from Lake Huron region. The northern parts of the lake include the North Channel and Georgian Bay . Saginaw Bay is located in the southwest corner of the lake. The main inlet is the St. Marys River from Lake Superior , and the main outlet is through the St. Clair River toward Lake Erie . Lake Huron has
1740-524: The Department of Highways (DHO) took over the Department of Northern Development (DND) in 1937, Highway 6 was extended north through the Bruce Peninsula to Tobermory . In 1980, the entire length of Highway 68 on Manitoulin Island and north to Highway 17 became a northern extension of Highway 6. Small modifications were made to the route of Highway 6 in 1997, but it
1827-529: The Detroit River and Detroit , Michigan; into Lake Erie and thence – via Lake Ontario and the St. Lawrence River – to the Atlantic Ocean. Like the other Great Lakes, it was formed by melting ice as the continental glaciers retreated toward the end of the last ice age . Before this, Lake Huron was a low-lying depression through which flowed the now-buried Laurentian and Huronian Rivers;
SECTION 20
#17327827456321914-570: The Grand River , to improve capacity to the developing areas of Nanticoke near Lake Erie, and to reduce the high-volume of truck traffic passing through the town. Construction began in late 1979 on structures to cross the Grand River and to carry rail lines and three crossroads over the bypass. The bypass was completed in the fall of 1983. The old route through Caledonia is now known as Argyle Street. On April 1, 1997, Highway 6
2001-781: The Hamilton–Dover Plank Road between Port Dover and Hamilton, the Brock Road between Hamilton and Guelph, and the Garafraxa Road between Guelph and Sydenham (renamed to Owen Sound in 1851) — were opened in the 1830s and 1840s. Further north, the Southwest Diagonal and the Centre Road were built through the Bruce Peninsula in the 1840s and 1920s, respectively. In 1837, Charles Rankin
2088-797: The North Channel by the Little Current Swing Bridge , which swings open for 15 minutes of each daylight hour in the summer to allow boats to pass through the channel. As of 2021, studies by the MTO have proposed replacing the aging structure with a two-lane crossing. After crossing the North Channel, Highway 6 climbs through the La Cloche Mountains near Whitefish Falls . Eventually, it arrives in Baldwin , north of Espanola , ending at Highway 17 in
2175-518: The third-largest fresh water lake on Earth (or the fourth-largest lake, if the Caspian Sea is counted as a lake). By volume however, Lake Huron is only the third largest of the Great Lakes, being surpassed by Lake Michigan and Lake Superior . When measured at the low water datum, the lake contains a volume of 850 cubic miles (3,500 km ) and a shoreline length (including islands) of 3,827 mi (6,159 km). The surface of Lake Huron
2262-663: The 119 km (74 mi) Garafraxa Road between Guelph and Sydenham was completed. The remaining section between Hamilton and Guelph, known as the Brock Road, was constructed between 1848 and 1850 over the Guelph and Dundas wagon road. The wagon road, merely a trail through the forest, was cleared by the Canada Company in the 1820s to connect the fledgling town of Guelph with the established harbour at Hamilton, thus encouraging settlers to venture inland. Further north,
2349-577: The 1920s. The section was straightened, widened and paved with asphalt-based "penetration pavement" in 1930. On April 1, 1937, the Department of Northern Development was absorbed into the Department of Highways, which subsequently took over many development roads as provincial highways. Most of the northern sections of Highway 6 were included amongst these. Highway 68 was designated from Little Current north to Espanola on August 11, 1937. Two weeks later, on August 25, Highway 6
2436-548: The 1950s, the route continued through Guelph along what is now Gordon Street, Norfolk Street and Woolwich Street. This section has since been replaced by the Hanlon Expressway , built throughout the 1970s. North of Guelph to Owen Sound, the route also follows the same route as it did in 1920, with some small deviations. The section from Fergus north towards Arthur followed the route was of the old Fergus and Arthur Road Company. A "cheap attempt" at paving had been made in
2523-567: The 1980s; the end of tracks then being located at a ship-loading facility in Turner on the Goat Island side of the bridge. As a result, CPR transferred ownership of the bridge to the Ministry of Transportation and it has been used exclusively by road vehicle traffic ever since. CPR subsequently abandoned rail service from Espanola to Turner in the 1990s and removed the tracks, leaving only
2610-746: The 2010s. As Highway 6 meets Highway 403 at a trumpet interchange, and there is a concurrency for 17 kilometres within Hamilton. The concurrency ends at the Highway 6 junction directional-T interchange, at the Hamilton/ Burlington boundary, near the Royal Botanical Gardens where Highway 6 turns northward towards Clappison's Corners. The section of Highway 6 between Highway 403 in Hamilton and Clappison's Corners (the intersection at Highway 5 West / Dundas Street)
2697-488: The Alpena-Amberley Ridge was exposed. That land bridge was used as a migration route for large herds of caribou . Since 2008, archaeologists have discovered at least 60 stone constructions along the submerged ridge that are thought to have been used as hunting blinds by Paleo-Indians . That a trade network brought obsidian from Oregon almost ten thousand years ago to be used for toolmaking was confirmed by
Little Current Swing Bridge - Misplaced Pages Continue
2784-735: The Brock Road and the Garafraxa Road. These roads were assumed from the various counties that held jurisdiction over them – Norfolk, Haldimand, Wentworth, Wellington and Grey – throughout June, July and August 1920. Within Wentworth County, the construction of the Clappison Cut through the Niagara Escarpment was underway by 1921, with the aim of bypassing the winding old route that is known today as Old Guelph Road. The new route, which travelled straight along
2871-524: The Bruce Peninsula. The road remains as a two-lane highway for its full length up to Tobermory. Highway 6 spans 110 kilometres (68 mi) across the peninsula. It passes through communities such as Shallow Lake , Hepworth , Wiarton , and Ferndale . It is named Berford Street in Wiarton, and 10th Street in Owen Sound. Along the road, Bruce Peninsula National Park can be found. At Tobermory,
2958-530: The Governor's Road between Highway 24 and Highway 2 at Paris. The 19.0 kilometres (11.8 mi) road between Highway 8 and Highway 24, through Beverley and South Dumfries was designated on June 18, while the 6.8-kilometre (4.2 mi) section of the Governor's Road, along the boundary between South Dumfries and Brantford Township , was designated several months later on September 24. These two segments were connected by
3045-483: The Laird Road interchange. It partially opened on the week of November 11, 2013, and was fully opened on November 29, 2013, in a public ceremony attended by local officials as well as Guelph MPP Liz Sandals . Caledonia Bypass In 1976, a corridor study was completed on Highway 6 between Port Dover and Hamilton, indicating a need for a bypass of Caledonia due to the aging multi-span bridge over
3132-528: The Minister of Public Works and Highways, Frank Campbell Biggs , on August 23, 1922. The Clappison Cut was completed and paved in 1924. Highway 5 and Highway 6 travelled concurrently from Highway 8 (Main Street) in downtown Hamilton to Clappison's Corners when route numbers were assigned in 1925. Highway 5 was 127.4 kilometres (79.2 mi) long at this time. This situation
3219-543: The Old Guelph Road onto the new route into Hamilton. This configuration remained until the construction of Highway 403 during the early 1960s, which was built over the Longwoods Road Extension. Mount Hope Bypass Due to the narrow spacing of buildings in the village of Mount Hope , a bypass of the village was built in the mid- to late 1950s. The original route is now known as Homestead Drive. The bypass opened on April 26, 1957, at which point
3306-622: The Southwest Diagonal was surveyed in 1842 by Charles Rankin to provide a short route from the Sydenham townsite to the Hepworth townsite. This route passed through a large swamp and as a result remained an unimproved one lane trail into the 1920s. The Centre Road, the spine of the Bruce Peninsula, was built by the Department of Northern Development in the early 1920s, providing access to communities north of Wiarton. The route followed
3393-596: The Straits of Mackinac, La Salle made landfall on Washington Island , off the tip of the Door Peninsula on the Wisconsin side of Lake Michigan. La Salle filled Le Griffon with pelts and in late November 1679 sent Le Griffon back to the site of modern-day Buffalo, never to be seen again. Two wrecks have been identified as Le Griffon , although neither has gained final verification as the actual wreck. Blown by
3480-615: The United States. Major centres on Georgian Bay include Owen Sound , Wasaga Beach , Collingwood , Midland , Penetanguishene , Port Severn and Parry Sound . Historic high water The lake fluctuates from month to month with the highest lake levels in October and November. The normal high-water mark is 2.00 feet (0.61 m) above datum ( 577.5 ft or 176.0 m ). In the summer of 1986, Lakes Michigan and Huron reached their highest level at 5.92 feet (1.80 m) above datum. The high-water records were broken for several months in
3567-533: The boundary between East and West Flamboro , was assumed on January 12, 1921. The province and the City of Hamilton also constructed several new bridges across Cootes Paradise to create a new northwest entrance into Hamilton. The new entrance, connecting the Toronto–Hamilton Highway (later Highway 2) with the incomplete route up the escarpment to Clappison's Corners, was ceremonially opened by
Little Current Swing Bridge - Misplaced Pages Continue
3654-413: The bridge modified to permit road vehicle traffic in addition to rail traffic. As a result, operation of the swing span saw the span left in the closed position to permit both rail and road vehicle traffic to cross, although a CPR employee was stationed at the bridge to open the swing span should it be required for marine traffic. Rail service to Little Current and Manitoulin Island was abandoned by CPR in
3741-490: The bridge's mechanics have been failing and its steel deteriorating. The preferred option, announced in 2021, will see a new two-lane swing bridge built just west of the existing bridge. Highway 6 (Ontario) King's Highway 6 , commonly referred to as Highway 6 , is a provincially maintained highway in the Canadian province of Ontario . It crosses a distance of 480 km (300 mi) between Port Dover , on
3828-429: The combination of Highway 401 and the Hanlon Expressway serves as an express bypass. The section where Highway 6 is concurrent with the Highway 401 freeway has the highest AADT (Annual Average Daily Traffic), at 85,000 automobiles per day in 2002. The Highway 6 routing splits from Highway 401 at a trumpet interchange with the Hanlon Expressway (the on-ramps from Highway 401 are signed as "Highway 6 North"). In Guelph,
3915-412: The community of McKerrow , 117 kilometres (73 mi) from South Baymouth. Prior to the establishment of Ontario's provincial highway network in 1920, the route that would become Highway 6 was composed of several early wagon trails created during the early settlement of what was then known as Upper Canada . These trails carved through an otherwise barren wilderness, connecting distant townsites:
4002-449: The current route at the now-closed intersection. The responsibility for this routing was subsequently transferred to the City of Hamilton. In early 2002, it was announced that the section of Highway 6 north of Hamilton, from Highway 403 north to beyond Highway 5, would be widened to a five lane freeway, with the northbound carriageway featuring an additional truck-climbing lane. This work began in 2006, widening and dividing
4089-497: The highway travels along Carlton Road and Front Street, where motorists must queue for the Chi-Cheemaun ferry to continue onwards to Manitoulin Island . The journey by ferry traverses waters of both Georgian Bay and Lake Huron , and takes approximately 1 hour and 45 minutes. The ferry service is not available from mid-October to early May. The Chi-Cheemaun ferry docks at South Baymouth, and Highway 6 continues as
4176-449: The highway up the Clappison Cut. The York Road interchange opened on May 23, 2009, following completion of this work. The Plains Road/Northcliffe Avenue intersection was closed the night before and a new section of Plains Road opened on the same day as the interchange. The project to upgrade this segment of Highway 6 was $ 34 million. Three sections of Highway 6 are undergoing planning as of 2022. The following table lists
4263-400: The hull. To keep from being pushed aground, they kept their bow into the wind with the engines running half to full in turns, yet the ship still drifted 800 feet (240 m) before its movement was arrested. Waves breaking over the ship damaged several windows, and the crew reported seeing portions of the concrete break wall peeling off as the waves struck it. Meanwhile, fifty miles farther up
4350-434: The lake bed was criss-crossed by a large network of tributaries to these ancient waterways, with many of the old channels still evident on bathymetric maps. The Alpena-Amberley Ridge is an ancient ridge beneath the surface of Lake Huron, running from Alpena, Michigan , southwest to Point Clark , Ontario. About 9,000 years ago, when water levels in Lake Huron were approximately 100 m (330 ft) below today's levels,
4437-437: The lake by the 1930s. The major native top predator, lake trout, was virtually extirpated from the lake by 1950 through a combination of overfishing and the effects of sea lamprey. Several species of ciscos were also extirpated from the lake by the 1960s; the only remaining native ciscoes are bloater and Cisco (lake herring). Non-native Pacific salmon have been stocked in the lake since the 1960s, but are less abundant since
SECTION 50
#17327827456324524-431: The lake is derived from early French explorers who named it for the indigenous people they knew as Huron (Wyandot) inhabiting the region. Hydrologically , Lake Huron comprises the eastern portion of Lake Michigan–Huron , having the same surface elevation as Lake Michigan , to which it is connected by the 5-mile-wide (8.0 km), 20-fathom-deep (120 ft; 37 m) Straits of Mackinac . Combined, Lake Michigan–Huron
4611-432: The lake was in a state of collapse by 2006, and a number of drastic changes have been observed in the zooplankton community of the lake. Chinook salmon catches have also been greatly reduced in recent years, and lake whitefish have become less abundant and are in poor condition. These recent changes may be attributable to the new exotic species. Some native species, however were beneficiaries of these chances (principally
4698-662: The lake, Matoa and Captain Hugh McLeod had to ride out the storm without a safe harbor. Matoa was found stranded on the Port Austin reef when the winds subsided. It was noon on Monday before the winds let up and not until 11:00 p.m. that night before Captain Light determined it to be safe to continue his journey. Although Manola survived the storm, she was renamed Mapledawn in 1920, and on November 24, 1924, she became stranded on Christian Island in Georgian Bay. It
4785-540: The largest city on Lake Huron. On October 26, 2010, the Karegnondi Water Authority was formed to build and manage a pipeline from the lake to Flint, Michigan . More than a thousand wrecks have been recorded in Lake Huron. Of these, 185 are located in Saginaw Bay, and 116 are found in the 448-square-mile (1,160 km ) Thunder Bay National Marine Sanctuary and Underwater Preserve , which
4872-535: The leadership of Thomas B. McQuesten , who would soon introduce the freeway to Ontario, a new grand entrance to Hamilton was planned. It would cross the Desjardins Canal and terminate at a traffic circle, with Highway 2 continuing east and Highway 6 north. This new road, known as the Longwoods Road Extension, was built partially as a depression-relief project in the early 1930s. Upon completion in 1932, Highway 2 and Highway 6 were routed off
4959-510: The major junctions along Highway 6, as noted by the Ministry of Transportation of Ontario . Lake Huron Lake Huron ( / ˈ h jʊər ɒ n , - ən / HURE -on, -ən ) is one of the five Great Lakes of North America . It is shared on the north and east by the Canadian province of Ontario and on the south and west by the U.S. state of Michigan . The name of
5046-591: The morning, Senator pushed upstream. Less than an hour later, Manola —a propeller freighter of 2,325 gross register tons also built in Cleveland in 1890—passed through. Captain Frederick W. Light of Manola reported that both the Canadian and the American weather stations had storm flag signals flying from their weather towers. Following behind at 7:00 a.m. that Sunday, Regina steamed out of Sarnia into
5133-591: The northern section from Waterloo Avenue to Woodlawn Road began in August 1974. It and the final section south to Highway 401 were opened on November 7, 1975. Initially, the 15.4-kilometre-long (9.6 mi) road featured no interchanges. However, the MTO has long-intended to upgrade the route to a freeway. Construction of the Wellington Avenue interchange began in October 1998; it opened in July 2001. On April 30, 2012, construction began on
5220-589: The northern shore of Lake Erie , and Espanola , on the northern shore of Lake Huron , before ending at the Trans-Canada Highway ( Highway 17 ) in McKerrow . Highway 6 was one of several routes established when Ontario first introduced a highway network on February 26, 1920, following several pioneer wagon trails. The original designation, not numbered until 1925, connected Port Dover with Owen Sound via Hamilton and Guelph . When
5307-421: The northwest gale. The warnings had been up for four hours. Manola passed Regina off Port Sanilac, 22 statute miles (19 nmi; 35 km) up the lake. Captain Light determined that if it continued to deteriorate, he would seek shelter at Harbor Beach , Michigan, another 30 statute miles (26 nmi; 48 km) up the lake. There, he could seek shelter behind the breakwater. Before he reached Harbor Beach,
SECTION 60
#17327827456325394-407: The old routing was decommissioned. It was subsequently bypassed, when the new Highway 6 opened to the southwest of John C. Munro Hamilton International Airport, on November 26, 2004. Hanlon Expressway With the rapid suburban expansion of Guelph in the 1950s and 1960s, a revised transportation plan was conceived to handle the increasing traffic load. The Guelph Area Transportation Study
5481-548: The only wrong-way concurrency in Ontario (Highway 6 westbound traffic is labelled as going north, while Highway 21 westbound traffic is labelled as travelling south). The two routes pass through downtown Owen Sound and onwards into Springmount , where they disembark from one-another; Highway 21 continues west, while Highway 6 turns north into the Bruce Peninsula . At Springmount , Highway 6 ends its concurrency with Highway 21, and continues northwards into
5568-522: The railway bed and bridge structures such as the Little Current Swing Bridge as a reminder of Manitoulin Island's rail transportation heritage. Currently, operation of the swing span strongly favours highway traffic, as it stays in the closed position so that road vehicles can use it except for the first fifteen minutes of each daylight hour during the spring, summer and fall when it opens to permit marine traffic to pass. At night in
5655-446: The road to Jarvis was numbered as Highway 5 when route numbers were assigned in the middle of 1925. Highway 5 and Highway 6 travelled concurrently from downtown Hamilton to Clappison's Corners. However, on May 25, 1927, several route numbers were revised, including Highways 5 and 6. Highway 5 was redirected west from Clappison's Corners to Peter's Corners to meet Highway 8. Highway 6, in turn, assumed
5742-464: The road travels along the full length of the Hanlon Expressway (also known as the Hanlon Parkway), a four lane divided highway with mostly signalized level intersections and a couple grade-separated interchanges. The Ministry of Transportation is presently investigating the possibility of upgrading it to 400-series freeway standards by removing the remaining intersections. For 4 km Highway 6
5829-456: The route of Highway 5 south to Jarvis. Exactly two weeks prior, on May 11, the Department of Public Highways had assumed the road between Jarvis and Port Dover; this also became a section of Highway 6, establishing its southern terminus for the next seven decades. North of the escarpment to Highway 401, Highway 6 follows the same route that it did in 1920, the Brock Road. North of Highway 401, which didn't exist before
5916-471: The same lake'). Aggregated, Lake Huron-Michigan, at 45,300 square miles (117,000 km ), "is technically the world's largest freshwater lake". Lake Superior, at 21 feet higher elevation, drains into the St. Marys River which then flows into Lake Huron. The water then flows south to the St. Clair River, at Port Huron, Michigan and Sarnia, Ontario . The Great Lakes Waterway continues thence to Lake St. Clair ;
6003-434: The section in Wellington County from Puslinch to Morriston (which is also known as Brock Road) has remained a two lane road since it runs through several small towns where it lacks sufficient right-of-way for widening. As this narrow segment suffers from significant congestion, a bypass is being considered which will connect to the Hanlon Expressway at Highway 401. North of Morriston when Brock Road meets Highway 401 at
6090-402: The signals on the Little Current abutment being the only installation of traffic signals on Manitoulin Island. From mid-October to early May when the ferry MS Chi-Cheemaun is not in operation to carry passengers from the Bruce Peninsula , the bridge is the only road link to Manitoulin Island. The bridge has been designated an Ontario Heritage site. Studies for a replacement began in 2018, as
6177-462: The spring, summer, and fall as well as when the shipping channel is closed to marine traffic during the winter, the swing span remains in the closed position at all times. Originally powered by a gasoline engine, the mechanism for the swing span was upgraded by the Ministry of Transportation to an electric motor in 2003. Due to the single vehicle lane, each end of the bridge is equipped with traffic signals (7 lights northbound and 2 lights southbound);
6264-599: The tendency to build roads that were straight rather than following the natural topography. Consequently, a new line was surveyed in 1840 by the company's own surveyor, John McDonald, and construction along this new route began. Around the same time, the Van Norman Company constructed a plank road between Port Dover and Hamilton known as both the Hamilton Plank Road and the Dover Road. By 1848,
6351-858: The town. After exiting Arthur, the route continues northwest for 22 kilometres (14 mi) before entering Mount Forest and meeting an intersection with Highway 89 . The route enters Grey County as it curves and meanders northward into farmland. It progresses north for another 22 kilometres to Durham , where it intersects Highway 4 . It continues for another 31 kilometres (19 mi) to Chatsworth , where it meets Highway 10 and travels northward concurrent with Highway 10 for 13 kilometres (8.1 mi) into Owen Sound. There it encounters an intersection, where Highway 10 ends; from here, Highway 26 continues runs north and then east to Collingwood and Barrie , while Ontario Highway 21 travels east and then south towards Sarnia . Highway 6 turns west onto Highway 21, forming
6438-472: The traffic flow increases. At Caledonia , the road bypasses the former Highway 6 section (Argyle Street) that passes the town centre of Caledonia and is routed outside the urban area Caledonia. This Caledonia Bypass was opened in 1983, and is a two-lane undivided freeway. The bypass terminates at Green's Road on the north side of Caledonia and Highway 6 proceeds eastbound on Green's Road for approximately 500 metres to Argyle St. North. Highway 6 then turns north on
6525-443: The winds turned to the northeast and the lake began to rise. It was noon when he reached Harbor Beach and ran for shelter. The waves were so violent that Manola touched bottom entering the harbor. With help from a tugboat , Manola tied up to the break wall with eight lines. It was about 3:00 p.m. when Manola was secured and the crew prepared to drop anchor. As they worked, the cables began to snap from wind pressure against
6612-437: Was completed in 1967, and recommended a new controlled-access highway to allow through-traffic on Highway 6 to bypass the city. Route planning, engineering and design began on October 2, 1967 and was subsequently completed in 1969. Construction began between Waterloo Avenue and Stone Road in 1970; this section opened on June 28, 1972. The next section, from Stone Road to Clair Road, opened in October 1973. Work on
6699-473: Was converted in 2009 to a freeway with an interchange at York Road. The interchange opened on May 23, 2009, and simultaneously, the intersection where Northcliffe/Plains Road met Highway 6 was closed permanently. A new service road was built on either side to connect Plains Road and various other residential streets to the York Road interchange. Previously a four lane arterial road with a centre turning lane, it
6786-540: Was declared a total loss. Salvagers were able to recover approximately 75,000 bushels of barley. Lake Huron has a lake retention time of 22 years. Like all of the Great Lakes, the ecology of Lake Huron has undergone drastic changes in the last century. The lake originally supported a native deepwater fish community dominated by lake trout , which fed on several species of ciscos as well as sculpins and other native fishes. Several invasive species , including sea lamprey , alewife and rainbow smelt , became abundant in
6873-535: Was decommissioned south of Hepworth to Highway 21. The entire length of Highway 70 was subsequently renumbered Highway 6 to rectify the discontinuity. On the same day, the section between the southern terminus at former Highway 24 to the west side of the Lynn River . These reduced the length of Highway 6 from 488.5 kilometres (303.5 mi) to 472.4 kilometres (293.5 mi). A new 9.7-kilometre-long (6.0 mi) segment of Highway 6
6960-535: Was designated in Bruce County, from Wiarton north to Tobermory. The section within Grey County was designated several months later on November 3. The lone remaining section of what would eventually become today's Highway 6, across Manitoulin Island, was not designated until December 7, 1955. The entirety of Highway 68 eventually became part of Highway 6 in the early to mid- 1980. Under
7047-479: Was eclipsed in January 2013. Lake Huron has the largest shore line length of any of the Great Lakes, counting its 30,000 islands. It is separated from Lake Michigan, which lies at the same level, by the 5-mile-wide (8.0 km), 20-fathom-deep (120 ft; 37 m) Straits of Mackinac, making them hydrologically the same body of water (sometimes called Lake Michigan-Huron and sometimes described as two 'lobes of
7134-443: Was established in 2000. Georgian Bay contains 212 sunken vessels. Purportedly the first European vessel to sail the Great Lakes, Le Griffon also became the first ship lost on the Great Lakes. It was built in 1679 on the eastern shore of Lake Erie near Buffalo , New York . Robert Cavalier, Sieur de la Salle navigated across Lake Erie, up the Detroit River , Lake St. Clair and the St. Clair River out into Lake Huron. Passing
7221-521: Was hired by the Canada Company to survey a line between Guelph and a new town site on the southern shore of Georgian Bay known as Sydenham. The Canada Company was formed by several British investors to purchase, open, and settle the Huron Tract , a vast wilderness stretching from Guelph north to Georgian Bay and west to Lake Huron. Rankin's line crossed too many natural obstacles, a result of
7308-526: Was largely untouched by provincial downloading . Highway 6 is one of two highways in Ontario (the other being Highway 33 ) broken into two segments by a ferry. The Chi-Cheemaun ferry serves automobile traffic, connecting Tobermory with South Baymouth between May and October. Highway 6 begins at Saint Patrick Street in the community of Port Dover, and stretches northward as a two-lane, undivided highway. The road travels into Haldimand County , through communities such as Jarvis and Hagersville , and
7395-516: Was leased by Canadian Pacific Railway (CPR) in March 1930 and control of the bridge passed at this time to the CPR. Due to navigable waters protection legislation, the CPR policy was to leave the bridge's swing span in the open position at all times for marine traffic, except when a train needed to cross. In 1946, the CPR and the provincial Department of Highways of Ontario came to an agreement that saw
7482-535: Was opened to the southwest of John C. Munro Hamilton International Airport in 2004. This building of this route had been planned since the construction of the Caledonia Bypass in 1983. However, concrete plans were not announced until January 1993. However, it had already drawn criticism due to an old-growth forest located in the path of the route. The planned highway would cost a projected $ 100 million. However, these plans never came to fruition, and by 1997
7569-447: Was short lived however, as Highway 5 was redirected west from Clappison's Corners to Peters Corners to meet Highway 8 on May 25, 1927. Highway 6, in turn, assumed the route of Highway 5 south to Jarvis. The route was extended further west in 1930, when the newly-renamed Department of Highways (DHO) assumed the road from Highway 8 at Peters Corners to Highway 24 west of St. George , as well as
#631368