34-700: Several bridges are known as the Millennium Bridge : in the United Kingdom Gateshead Millennium Bridge Lune Millennium Bridge , Lancaster Millennium Bridge, Glasgow Millennium Bridge, London Millennium Bridge (Salford Quays) Teesquay Millennium Footbridge , Stockton-on-Tees Millennium Bridge, York in the Republic of Ireland Millennium Bridge (Dublin) ,
68-755: A gallery . The rear elevation featured a series of oculi intended to recall nautical portholes . Internally, the building was laid out to accommodate 17 courtrooms. Notable cases heard at the crown court include the trial and conviction of the nurse, Colin Norris , in March 2008, for the murder of four elderly patients and the attempted murder of another in two hospitals in Leeds , the trial and conviction of Yusuf Jama, in December 2006, and of Mustaf Jama, in July 2009, for
102-637: A crossing between new commercial buildings and housing built in Newcastle and cultural and leisure developments in Gateshead. It would also facilitate a 1-mile (1.6 km) circular promenade around the Quayside . Although river-based traffic had decreased by the 21st century, the cities of Gateshead and Newcastle still intended to retain the image of the River Tyne as a working river. The advert for
136-402: A deck which acts as the pedestrian and cycle path, and a supporting arch. The bridge was designed to be as light as possible to allow for easy opening and closing, so the two arches are lighter towards the centre span than at the hinges. The pedestrian and cycle deck is a parabolic shape with a 2.7 metres (8.9 ft) vertical camber. It is divided into two separate paths on different levels for
170-923: A footbridge across the River Liffey in Dublin in Montenegro Millennium Bridge (Podgorica) in Poland Third Millennium John Paul II Bridge , Gdansk in the United States Denver Millennium Bridge , Denver, Colorado BP Pedestrian Bridge , Chicago, Illinois in Russia Millennium Bridge (Kazan) Topics referred to by the same term [REDACTED] This disambiguation page lists articles associated with
204-402: A model of the bridge to be built and allowed analysis of buckling forces, wind, and temperature. Another software – Pertmaster Professional – was used for risk and project management and cost analysis. Watson Steel was appointed as the specialist contractor to prefabricate the bridge, and they subcontracted the design of the hydraulic system to Kvaerner Markham. The pre-fabricated sections of
238-486: A new contemporary arts centre, the Baltic Centre for Contemporary Art , and the need for a footbridge to link the two cities became more apparent. A competition was held by Gateshead Council in 1996 to design a new bridge to link Gateshead to Newcastle, the first opening bridge to be built on the River Tyne in over 100 years. The bridge would form part of the regeneration on both sides of the River Tyne, providing
272-480: Is a pedestrian and cyclist tilt bridge spanning the River Tyne between Gateshead arts quarter on the south bank and Newcastle upon Tyne 's Quayside area on the north bank. It was the first tilting bridge ever to be constructed. Opened for public use in 2001, the award-winning structure was conceived and designed by architectural practice WilkinsonEyre and structural engineering firm Gifford . The bridge
306-513: Is sometimes called the 'Blinking Eye Bridge' or the 'Winking Eye Bridge' due to its shape and its tilting method. The Millennium Bridge stands as the twentieth tallest structure in the city , and is shorter in stature than the neighbouring Tyne Bridge . Gateshead Millennium Bridge is part of a long history of bridges built across the River Tyne, the earliest of which was constructed in the Middle Ages . As quay -based industries grew during
340-424: Is used at night to attractively illuminate the bridge without causing light pollution, as the cables are too thin to be visible or reflect light at night. The lights shine white during the week and a variety of colours over the weekend. Green and red LEDs are used during the day to alert cyclists and pedestrians to the bridge's opening and closing. Gateshead Council selected Gateshead-based Harbour & General as
374-638: The BBC TV drama 55 Degrees North and the British 2005 film Goal! . On 17 July 2005, Spencer Tunick used the bridge in an art installation: 1,700 people gathered together nude and were photographed around the Millennium and Tyne Bridges and the Baltic Centre for Contemporary Art. The bridge was pictured on a first-class stamp in 2000, and a pound coin depicting the bridge was produced by
SECTION 10
#1732772603847408-497: The Industrial Revolution and Victorian era due to its accessible port, the area became more prosperous. However, industry declined along the River Tyne following World War II and the quay deteriorated into the 1980s. This prompted regeneration activities in both Newcastle and Gateshead, beginning with the construction of Newcastle Law Courts on the riverbank. In 1995, Gateshead Council devised plans to develop
442-518: The Royal Mint in 2007. Gateshead Millennium Bridge has won a total of 25 awards for design and lighting. For the construction of the bridge, the architect WilkinsonEyre won the 2002 Royal Institute of British Architects (RIBA) Stirling Prize . This was a somewhat controversial decision; although the RIBA judges described the bridge as a "truly heroic piece of engineering and construction", there
476-713: The North and the Cutty Sark Tall Ships' Race . The bridge also lights up to mark celebrations or dedications. For example, it was lit blue on 4 July 2020 as part of the 'Light it Blue' campaign celebrating the 72nd anniversary of the NHS and its contributions during the COVID-19 pandemic . It was also lit green in April 2020 in recognition of social care workers. The bridge has been featured in film and on TV including
510-420: The bridge during this manoeuvre has led to it being nicknamed the "Blinking Eye Bridge", and has solidified its reputation as being not only a functional piece of infrastructure but a spectacle in and of itself. The rotation of the bridge is also used as a self-cleaning mechanism, as rubbish collected on the deck rolls towards traps built at each end. A lighting system designed by Jonathan Spiers and Associates
544-715: The bridge received the Outstanding Structure Award from the International Association for Bridge and Structural Engineering . Newcastle Law Courts The Newcastle Law Courts is a Crown Court venue, which deals with criminal cases, as well as a magistrates' court venue, on the Quayside in Newcastle upon Tyne , England. Until the 1980s, all Crown Court cases were heard in the Moot Hall at Castle Garth. However, as
578-464: The bridge were shot-blasted and painted in Hadrian's Yard, 6.5 km (4.0 miles) from the bridge's final position. The entire structure was assembled by first welding together the nine arch sections and deck sections, and then attaching the cables to the arch and deck. Protective paintwork (Interzone 505 and Interthane 990 from International Protective Coatings ) was applied to the arch before it
612-522: The bridge would be open in September 2000, but it was not completed until September the following year. The first tilt took place on 28 June 2001 to 36,000 onlookers. It was opened to the public on 17 September 2001 to a crowd of thousands. The barrier lifted at 2 pm to allow the first public crossing, and the first people to cross received a commemorative medal gift from the Council. The bridge
646-604: The competition was published in the New Civil Engineer magazine with the brief "We are looking for design teams who can create a stunning, but practical, river level crossing which fits this historic setting, opens for shipping and is good enough to win Millennium Commission funding." There were over 150 entries and Gateshead residents voted for their favourite out of a shortlist of six architectural teams. WilkinsonEyre and Gifford and Partners claimed
680-536: The construction project team and WilkinsonEyre that they were unsightly and undermined "the finesse of the bridge". Between February and June 2000, the unsightly nature of the piles also caught the attention of the public, with multiple news articles and letters expressing discontent. Complaints pointed out that the Millennium Bridge in London did not have similar piles, and that a Newcastle University boat race had to be moved specifically to avoid potential collision with
714-470: The different modes of transport, separated by a stainless steel "hedge" with seating areas and steps interspersed throughout. The supporting arch is also a parabola, designed in such a way as to match the shape of the Tyne Bridge upstream. The two arches are joined together by 18 suspension cables which provide stability for people crossing the bridge. Six hydraulic rams (three on each side) tilt
SECTION 20
#1732772603847748-470: The entire 850,000 kg bridge as a single structure, meaning that when the supporting arch lowers, the pedestrian deck rises to create 25 metres (82 ft) of clearance for river traffic to pass underneath. The bridge takes around four minutes to rotate through the full 40° from closed to open, moving as fast as 18 mm (0.71 inches) per second. The design is so energy-efficient that, in April 2017 , it cost just £3.96 per opening. The appearance of
782-445: The hydraulic systems were installed after the bridge was in place. The transportation of the bridge took only one day and was a spectacle, attracting crowds of onlookers. The Port of Tyne Authority required the design of the bridge to incorporate a vessel collision protection system. As a result, two rows of parallel fixed piles, splaying out diagonally on each side of the bridge, were installed. However, it became clear to members of
816-588: The last two months, now I have the chance to express my gratitude to the people of the North East." Gateshead Millennium Bridge was constructed to fulfil the following main design constraints: the bridge must be 4.5 metres (15 ft) above river-level during high spring tides when closed; nothing must be built on the Gateshead Quayside ; the deck must have no more than a 1:20 slope to allow disabled access. The bridge consists of two steel arches –
850-482: The main contractor for the construction of the bridge. Harbour and General then selected over 12 sub-contractors to cover elements of construction including control systems, metalwork, lighting, and piling and river work. Consulting engineering group Ramboll provided further engineering, construction, and contract management services. The bridge's structure was modelled in LUSAS using 3D elements. LUSAS modelling allowed
884-436: The name of the bridge was still undecided. The original proposed name of 'Baltic Millennium Bridge' (in reference to the adjacent Baltic Centre for Contemporary Art on the Gateshead side) was objected to by Newcastle City Council . In response, Gateshead Council decided upon the final name of 'Gateshead Millennium Bridge' in 1998, which caused an ongoing feud between the two councils. Gateshead Council originally announced that
918-559: The number of court cases in Newcastle upon Tyne grew, it became necessary to commission a more modern courthouse for criminal matters: the site selected by the Lord Chancellor's Department had been occupied by some dilapidated shops and warehouses and formed part of a larger development by Tyne and Wear Development Corporation to re-develop the East Quayside area. Construction on the new building commenced in 1984. It
952-665: The piles. Over time, Gateshead Council and the Harbourmaster noted that the piles were not required and they were removed in 2012. This decision was ultimately less expensive than maintaining them. Gateshead Millennium Bridge has retained its status as a significant local landmark and tourist attraction, not only built to develop the local area but also to establish local pride. It is one of several cultural landmarks on Gateshead Quays, including Baltic Centre for Contemporary Art and Sage Gateshead . It opens periodically for sightseers and for major events such as The Boat Race of
986-754: The prize in February 1997 with Gateshead Councillor Mick Henry remarking that the design was "something very special." By July 1997, a final design was under preparation for submission to the Millennium Commission in order to secure funding. The bridge, which is the world's first tilting bridge , ultimately cost £22 million, with funding from the Millennium Commission, the European Regional Development Fund , English Partnerships , East Gateshead Single Regeneration Budget, and Gateshead Council. By this point,
1020-513: The title Millennium Bridge . If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=Millennium_Bridge&oldid=1250952380 " Category : Disambiguation pages Hidden categories: Short description is different from Wikidata All article disambiguation pages All disambiguation pages Gateshead Millennium Bridge The Gateshead Millennium Bridge
1054-556: Was debate among the attendees of the awards ceremony as to whether it also counted as architecture, with some claiming that it was not a building. However, Jim Eyre of WilkinsonEyre argued that the feat did cross over into the boundary of architecture. WilkinsonEyre and Gifford also won the 2003 IStructE Supreme Award . The bridge was awarded the British Constructional Steelwork Association's Structural Steel Design Award in 2002. In 2005,
Millennium Bridge - Misplaced Pages Continue
1088-528: Was dedicated by Queen Elizabeth II on 7 May 2002, during her Golden Jubilee tour. A commemorative plaque unveiled by the Queen reads: "Gateshead Millennium Bridge. Opened by Her Majesty The Queen on 7th May 2002." Before a formal dinner at the Baltic Centre for Contemporary Art, the Queen said "Today I see the tangible signs of the determination of all those within this region to create a new future. There have been so many personal acts of kindness, especially over
1122-518: Was designed by local architects, Napper Collerton, in the modern style , built by John Laing Construction in red sandstone from Dumfriesshire at a cost of £17.1 million, and was completed in 1990. The design involved a symmetrical main frontage of nine bays facing on to the Quayside. The central bay, which was projected forward, was formed by a full-height glass atrium with a curved roof. The wings featured twelve full-height columns supporting
1156-475: Was erected. The bridge was lifted into place in one piece by the Asian Hercules II , one of the world's largest floating cranes , on 20 November 2000. Whilst being transported by the crane, the bridge was rotated 90° in order to navigate narrow bends along the river. It was successfully slotted into threaded bolts in the piers with only 3 mm (0.1 inches) of tolerance. Handrails, seating, and
#846153