The NHS Connecting for Health ( CFH ) agency was part of the UK Department of Health and was formed on 1 April 2005, having replaced the former NHS Information Authority . It was part of the Department of Health Informatics Directorate, with the role to maintain and develop the NHS national IT infrastructure . It adopted the responsibility of delivering the NHS National Programme for IT ( NPfIT ), an initiative by the Department of Health to move the National Health Service (NHS) in England towards a single, centrally-mandated electronic care record for patients and to connect 30,000 general practitioners to 300 hospitals, providing secure and audited access to these records by authorised health professionals.
49-593: On 31 March 2013, NHS Connecting for Health ceased to exist, and some projects and responsibilities were taken over by Health and Social Care Information Centre . Contracts for the NPfIT spine and five clusters were awarded in December 2003 and January 2004. It was planned that patients would also have access to their records online through a service called HealthSpace. NPfIT was said by NHS CFH to be "the world's biggest civil information technology programme". The cost of
98-598: A cost increase or budget overrun , involves unexpected incurred costs . When these costs are in excess of budgeted amounts due to a value engineering underestimation of the actual cost during budgeting, they are known by these terms. Cost overruns are common in infrastructure , building , and technology projects. For IT projects , a 2004 industry study by the Standish Group found an average cost overrun of 43 percent; 71 percent of projects came in over budget, exceeded time estimates, and had estimated too narrow
147-547: A cost overrun of 440% to 770%. In April 2007, the Public Accounts Committee of the House of Commons issued a damning 175-page report on the programme. The Committee chairman, Edward Leigh , claimed "This is the biggest IT project in the world and it is turning into the biggest disaster." The report concluded that, despite a probable expenditure of 20 billion pounds "at the present rate of progress it
196-545: A scope ; and total waste was estimated at $ 55 billion per year in the US alone. Many major construction projects have incurred cost overruns; cost estimates used to decide whether important transportation infrastructure should be built can mislead grossly and systematically. Cost overrun is distinguished from cost escalation , which is an anticipated growth in a budgeted cost due to factors such as inflation. Recent works by Ahiaga-Dagbui and Smith suggests an alternative to what
245-417: A basic of £280,000 per year, £100,000 per year more than then-Prime Minister Tony Blair. Granger announced on 16 June 2007 that he would leave the agency "during the latter part" of 2007. In February 2008 Granger left the programme . His credentials were questioned by his own mother, a campaigner for the preservation of local health services in her area, who expressed her amazement at his appointment, criticising
294-408: A bridge with a construction budget of $ 100 million where the actual cost was $ 150 million. This scenario could be truthfully represented by the following statement The final example is the most commonly used as it specifically describes the cost overruns exclusively whereas the other two describe the overrun as an aspect of the total expense. In any case care should be taken to accurately describe what
343-567: A silver bullet in finding solutions to the recurring problem of cost overruns in megaprojects. A newly discovered possible cause of cost overruns is value engineering , and an approach to correct value engineering cost overruns known as value-driven-design. In response to problem of cost overruns on major projects, the UK Government set up a Major Projects Authority to provide project assurance to HM Treasury and other Government departments undertaking major projects. Independent review of
392-564: A team that is providing a patient with care, that is, those having a legitimate relationship with the patient, will be able to see a patient's health record." The Spine was migrated to a new system in August 2014. The NHS in Wales was also running a national programme for service improvement and development via the use of information technology – this project was called Informing Healthcare . A challenge facing both NHS CFH and Informing Healthcare
441-438: Is traditionally seen as an overrun in the construction field. They attempt to make a distinction between the often conflated causes of construction cost underestimation and eventual cost overruns . Critical to their argument is the point of reference for measuring cost overruns. Whereas some measure the size of cost overruns as the difference between cost at the time of decision to build and final completion costs, others measure
490-557: Is unlikely that significant clinical benefits will be delivered by the end of the contract period." In September 2013, the Public Accounts Committee said that although the National Programme for IT had been effectively disbanded in 2011, some large regional contracts and other costs remained outstanding and were still costing the public dearly. It described the former National Programme for IT as one of
539-558: The Health Select Committee . On 6 October 2006 the same signatories wrote a second open letter A report by the King's Fund in 2007 also criticised the government's "apparent reluctance to audit and evaluate the programme", questioning their failure to develop an ICT strategy whose benefits are likely to outweigh costs and the poor evidence base for key technologies. A report by the Public Accounts Committee in 2009 called
SECTION 10
#1732790910409588-465: The "Most Appalling Project" Big Brother Award because of its plans to computerise patient records without putting in place adequate privacy safeguards . The balance between the right to privacy and the right to the best quality care is a sensitive one. Also there are sanctions against those who access data inappropriately, specifically instant dismissal and loss of professional registration. A January 2005 survey among doctors indicated that support for
637-524: The "worst and most expensive contracting fiascos" ever. The costs of the venture should have been lessened by the contracts signed by the IT providers making them liable for huge sums of money if they withdrew from the project; however, when Accenture withdrew in September 2006, then Director-General for NPfIT Richard Granger charged them not £1bn, as the contract permitted, but just £63m. Granger's first job
686-596: The CSE-Global group of companies, respectively. This is subject to contractual negotiation known as 'CCN2'. In September 2006, the CSC Alliance, Accenture and Connecting for Health signed a tripartite agreement that as of January 2007, the CSC Alliance would take over the responsibility for the majority of care systems the North East and Eastern clusters from Accenture, with the exception of PACS . As part of
735-586: The NHS Care Records Service that supported the summary patient record and ensure patient confidentiality and information security . As of October 2005, the NASPs were: In March 2004, EDS had their 10-year contract to supply the NHSMail service terminated. On 1 July 2004, Cable and Wireless were contracted to provide this service, which was initially renamed Contact . IDX Systems Corporation
784-458: The National Programme for IT when their £896 million contract was terminated. Substantial payments had also been made to CSC. The first trusts in the London and Southern clusters to implement the new Cerner system found it problematic, with hospital trust board minutes revealing a catalogue of errors. Difficulties with the system meant that: The NHS appointed a management team, responsible for
833-576: The Public Accounts Committee noting "patients and doctors have understandable concerns about data security", and that the Department of Health did not have a full picture of data security across the NHS. In 2000, the NHS Executive won the "Most Heinous Government Organisation" Big Brother Award from Privacy International for its plans to implement what would become the NPfIT. In 2004 the NPfIT won
882-625: The Spine is appropriately controlled. These security measures were queried during the early stages of Spine development, with leaked internal memos seen by the Sunday Times mentioning "fundamental" design flaws. In addition, government spokeswoman Caroline Flint failed to dispel concerns regarding access to patients' data by persons not involved in their care when she commented in March 2007 that " in general only those staff who are working as part of
931-533: The anti-database state pressure group and The Big Opt Out who provide patients with a letter to send to their doctor so that their records are withheld from the database. As of 5 August 2005, research carried out across the NHS in England suggested that clinical staff felt that the programme was failing to engage the clinicians fully, and was at risk of becoming a white elephant . The Public Accounts Committee observed in 2009 that "the current levels of support reflect
980-463: The chief executives of the ten strategic health authorities . The programme represented a significant shift to national priorities over local priorities. The Conservatives pledge £730 million to expand NHS mental health services in England, aiming to reduce welfare costs by helping more people return to work. Critics, including Labour and the Institute for Fiscal Studies, question the feasibility of
1029-468: The consultancy Accenture announced its intention to withdraw from £2bn of 10-year contracts with NPfIT, which were taken over in January 2007 by the CSC Alliance – both Accenture and CSC laid blame with iSOFT, although CSC has said it will be retaining iSOFT as its software provider for all its clusters. Earlier in the year Accenture had written off $ 450m from its accounts because of 'significant delays' in
SECTION 20
#17327909104091078-596: The contract with Fujitsu. The majority of the Southern Cluster care systems were subsequently transferred to BT Health except for PACS which was transferred to the CSC Alliance, aligning with the technology deployed by each company. The 2009 Public Accounts Committee (PAC) report noted, that the NPfIT had provided "little clinical functionality... to-date". The PAC report of 18 July 2011 said it failed to deliver clinical benefits. NPfIT has been criticised for inadequate attention to security and patient privacy, with
1127-503: The contracts with the LSPs. Under NLOP, staff employed by CfH in the clusters had their employment transferred to the SHAs, with some being recruited to revised national CfH posts. In addition to these LSPs the programme appointed National Application Service Providers (NASPs) who were responsible for services that were common to all users, e.g. Choose and Book and the national elements of
1176-404: The cost inflation of custom homes. A less explored possible cause of cost overruns on construction project is the escalation of commitment to a course of action. This theory, grounded in social psychology and organisation behaviour, suggests the tendency of people and organisations to become locked-in and entrapped in a particular course of action and thereby 'throw good money after bad' to make
1225-498: The delivery of the system: In October 2002, Richard Granger the former Director General of IT for the NHS, took up his post before which he was a partner at Deloitte Consulting , responsible for procurement and delivery of a number of large scale IT programmes, including the Congestion Charging Scheme for London . In October 2006, he was suggested by The Sunday Times to be the highest paid civil servant, on
1274-400: The electronic care record, services are delivered to these areas of the NHS. The programme originally divided England into five areas known as "clusters": Southern, London, East & East Midlands, North West & West Midlands, and North East. For each cluster, a different Local Service Provider (LSP) was contracted to be responsible for delivering services at a local level. This structure
1323-590: The fact that for many staff the benefits of the Programme are still theoretical". Surveys in 2008 suggested that two-thirds of doctors would refuse to have their own medical records on the system. According to the Daily Telegraph, the head of NPfIT, Richard Granger, 'shifted a vast amount of the risk associated with the project to service providers, which have to demonstrate that their systems work before being paid.' The contracts meant that withdrawing from
1372-573: The feasibility of the scheme, known to have been conducted by McKinsey , and subsequent reports by IT industry analyst Ovum among others have never been published nor made available to MPs. Originally expected to cost £ 2.3 billion (bn) over three years, in June 2006 the total cost was estimated by the National Audit Office to be £12.4bn over 10 years, and the NAO also noted that "...it
1421-480: The financial effectiveness of project assurance in reducing cost overruns found the project assurance process to be effective in reducing cost overruns and recommended an expansion of the process to cover most of the Government's project portfolio. Project assurance is now also being used by private sector companies undertaking major projects. Cost overrun can be described in multiple ways. For example, consider
1470-465: The handover process, around 300 Accenture personnel transferred under a TUPE process to CSC, and CSC took over the leases for some of Accenture's premises in Leeds . Accenture now retains only a small presence in the city for the delivery of its PACS responsibilities. In May 2008 it was announced that following the failure to conclude renegotiation of the contract for the Southern Cluster, CfH terminated
1519-407: The initiative as an 'important NHS priority' had dropped to 41%, from 70% the previous year. There have been concerns raised by clinicians that clinician engagement has not been addressed as much as might be expected for such a large project. Concerns over confidentiality, and the security of medical data uploaded to the Spine have also led to opposition from civil liberties campaigners such as NO2ID
NHS Connecting for Health - Misplaced Pages Continue
1568-462: The original contractors had dropped out of the project. As of May 2008, two IT providers were LSPs for the main body of the programme: In the first half of 2007, David Nicholson announced the "National Programme, Local Ownership programme" (known as "NLOP") which dissolved the 5 clusters and devolved responsibility for the delivery of the programme to the ten English strategic health authorities (SHAs). Connecting for Health retains responsibility for
1617-506: The programme, together with its ongoing problems of management and the withdrawal or sacking of two of the four IT providers, placed it at the centre of controversy, and the Commons Public Accounts Committee repeatedly expressed serious concerns over its scope, planning, budgeting, and practical value to patients. As of January 2009, while some systems were being deployed across the NHS, other key components of
1666-464: The programme. iSOFT announced in March 2011 that trading in its shares would be suspended pending a corporate announcement. Subsequently, in April 2011, the company announced that it was recommending a cash offer from CSC. CSC acquired iSOFT in August 2011. In September 2018 it was reported that Fujitsu was to be paid "hundreds of millions of pounds" in settlement of a legal dispute stretching back to
1715-532: The project would leave the providers liable for 50% of the value of the contract; however, as previously mentioned, when Accenture withdrew in September 2006, Granger chose not to use these clauses, saving Accenture more than £930m. The programme's largest software provider iSOFT has been seriously affected by this process and is under investigation by the UK Financial Services Authority for irregular accounting. On 28 September 2006,
1764-416: The projected savings and effectiveness of the proposed reforms. The refusal of the Department of Health to make "concrete, objective information about NPfIT's progress [...] available to external observers", nor even to MPs , attracted significant criticism, and was one of the issues which in April 2006 prompted 23 academics in computer-related fields to raise concerns about the programme in an open letter to
1813-479: The requirements or targets rises during the project, is common. Finally, political-economic explanations see overrun as the result of strategic misrepresentation of scope or budgets. Historically, political explanations for cost overrun have been seen to be the most dominant. In the USA, the architectural firm Home Architects has attributed this to a human trait they call "Psychology of Construction Cost Denial", regarding
1862-524: The risks to the successful deployment of the system "as serious as ever", adding that key deliverables at the heart of the project were "way off the pace", noting that "even the revised completion date of 2014–2015 for these systems now looks doubtful in the light of the termination last year of Fujitsu's contract covering the South", and concluding "essential systems are late, or, when deployed, do not meet expectations of clinical staff". The initial reports into
1911-539: The size of overruns as the difference between cost at contract award and final completion cost. This leads to a wide range in the size of overruns reported in different studies. Four types of explanation for cost overrun exist: technical , psychological , political - economic , value engineering . Technical explanations account for cost overrun in terms of imperfect forecasting techniques, inadequate data, etc. Psychological explanations account for overrun in terms of optimism bias with forecasters. Scope creep , where
1960-462: The spending would proceed with the Department of Health seeking for local software solutions rather than a single nationally imposed system. On 31 March 2013, NHS Connecting for Health ceased to exist, and some projects and responsibilities were taken over by Health and Social Care Information Centre . In August 2018, NHS launched a healthcare finance innovation initiative to identify solutions which could streamline financial operations. The programme
2009-420: The system were estimated to be four years behind schedule, and others had yet to be deployed outside individual primary care trusts (PCTs). The Guardian noted that the announcement from the Department of Health on 9 September, had been "part of a process towards localising NHS IT that has been under way for several years". In 2011 remaining aspects of the National Programme for IT were cancelled, and most of
NHS Connecting for Health - Misplaced Pages Continue
2058-717: The venture succeed. This defies conventional rationality behind subjective expected utility theory. Ahiaga-Dagbui and Smith explore the effects of escalation of commitment on project delivery in construction using the case of the Scottish Parliament project. Also, a recent study has suggested that principles of chaos theory can be employed to understand how cost overruns emerge in megaprojects . This paper seeks to reclassify megaprojects as chaotic systems that are nonlinear and therefore difficult to predict. Using cases of cost overruns in oil and gas megaprojects, this study makes strong argument that chaos theory can indeed be
2107-714: The whole scheme as "a gross waste of money". In 2009, overall leadership of CfH was described by the Public Accounts Committee as having been "uncertain" since the announcement that Richard Granger would be leaving the project. Health and Social Care Information Centre Too Many Requests If you report this error to the Wikimedia System Administrators, please include the details below. Request from 172.68.168.226 via cp1108 cp1108, Varnish XID 246572902 Upstream caches: cp1108 int Error: 429, Too Many Requests at Thu, 28 Nov 2024 10:48:30 GMT Cost overrun A cost overrun , also known as
2156-529: Was established in October 2002 following several Department of Health reports on IT Strategies for the NHS , and on 1 April 2005 a new agency called NHS Connecting for Health (CfH) was formed to deliver the programme. CfH absorbed both staff and workstreams from the abolished NHS Information Authority , the organisation it replaced. CfH was based in Leeds , West Yorkshire. By 2009, it was still managed nationally by CfH, with responsibility for delivery shared with
2205-629: Was intended to avoid the risk of committing to one supplier which might not then deliver; by having a number of different suppliers implementing similar systems in parallel, a degree of competition would be present which would not be if a single national contract had been tendered. Four clusters were awarded in two tranches on 8 and 23 December 2003, with the fifth on 26 January 2004. However, in July 2007 Accenture withdrew from their 2 clusters, and in May 2008 Fujitsu had their contract terminated, meaning that half
2254-477: Was not demonstrated that the financial value of the benefits exceeds the cost of the Programme". Similarly, the British Computer Society (2006) concluded that "...the central costs incurred by NHS are such that, so far, the value for money from services deployed is poor". Officials involved in the programme have been quoted in the media estimating the final cost to be as high as £20bn, indicating
2303-922: Was removed from the Southern Cluster Fujitsu Alliance in August 2005 following repeated failure to meet deadlines. They were replaced in September 2005 by Cerner Corporation . In early 2006, ComMedica's contract for supply of PACS to the North-West/West-Midlands cluster was terminated, and they were replaced by GE Healthcare. In July 2006, the London region started the contractual replacement of IDX (which had been bought out by GE Healthcare in January 2006) as its supplier. Systems for secondary care, primary care and community and mental health services are proposed by BT to be provided by Cerner , INPS (formerly in Practice Systems) and CSE Healthcare Systems, part of
2352-709: Was that the use of national systems previously developed by the NHS Information Authority were shared by both of these organisations and the Isle of Man. Separate provision needed to be made for devolution, while maintaining links for patients travelling across national borders. NPfIT was focussed on delivering the NHS Care Record Service to GPs, acute and primary hospitals, medical clinics and local hospitals and surgeries. While there were no immediate plans to include opticians or dentists in
2401-412: Was with Andersen Consulting , which later became Accenture. The programme was divided into a number of key deliverables. *NHSmail was renamed to Contact in late 2004, before being reverted to NHSmail in April 2006. The Spine is a set of national services used by the NHS Care Record Service. These include: The Spine also provides a set of security services, to ensure access to information stored on