90-848: NTPC Limited , formerly known as National Thermal Power Corporation , is an Indian central Public Sector Undertaking (PSU) under the ownership of the Ministry of Power and the Government of India , who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi . NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants . It
180-745: A greenhouse gas . According to the World Commission on Dams report, where the reservoir is large compared to the generating capacity (less than 100 watts per square metre of surface area) and no clearing of the forests in the area was undertaken prior to impoundment of the reservoir, greenhouse gas emissions from the reservoir may be higher than those of a conventional oil-fired thermal generation plant. In boreal reservoirs of Canada and Northern Europe, however, greenhouse gas emissions are typically only 2% to 8% of any kind of conventional fossil-fuel thermal generation. A new class of underwater logging operation that targets drowned forests can mitigate
270-463: A low-head hydro power plant with hydrostatic head of few meters to few tens of meters can be classified either as an SHP or an LHP. The other distinction between SHP and LHP is the degree of the water flow regulation: a typical SHP primarily uses the natural water discharge with very little regulation in comparison to an LHP. Therefore, the term SHP is frequently used as a synonym for the run-of-the-river power plant . The largest power producers in
360-456: A Miniratna and have 4 independent directors on its board before it can be made a Navratna. PSUs in India are also categorized based on their special non-financial objectives and are registered under Section 8 of Companies Act , 2013 (erstwhile Section 25 of Companies Act, 1956). Public Sector Undertakings (PSUs) can be classified as Central Public Sector Undertakings (CPSUs) or State Public Sector Undertakings (SPSUs). CPSUs are administered by
450-506: A consultancy division. In 1992, it acquired Feroze Gandhi Unchahar Thermal Power Station from Uttar Pradesh Rajya Vidyut Utpadan Nigam of Uttar Pradesh. By the end of 1994, its installed capacity crossed 15,000 MW. In 1995, it took over the Talcher Thermal Power Station from Orissa State Electricity Board. In the year 1997, the Government of India conferred it with "Navratna" status. In that same year, it achieved
540-426: A dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once a hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel -powered energy plants. However, when constructed in lowland rainforest areas, where part of
630-421: A flood and fail. Changes in the amount of river flow will correlate with the amount of energy produced by a dam. Lower river flows will reduce the amount of live storage in a reservoir therefore reducing the amount of water that can be used for hydroelectricity. The result of diminished river flow can be power shortages in areas that depend heavily on hydroelectric power. The risk of flow shortage may increase as
720-806: A joint venture vehicle named International Coal Ventures Private Limited (ICVL). In July 2014, ICVL acquired a 65 percent stake in the Benga coal mine in Mozambique from the Rio Tinto Group . In December 2022, the Market cap of NTPC limited was Rs. 1,66,249.34 crore. NTPC operates from 70 locations in India, one location in Sri Lanka and two locations in Bangladesh. In India, it has eight regional headquarters (HQ): The scheduling and dispatch of all
810-809: A large natural height difference between two waterways, such as a waterfall or mountain lake. A tunnel is constructed to take water from the high reservoir to the generating hall built in a cavern near the lowest point of the water tunnel and a horizontal tailrace taking water away to the lower outlet waterway. A simple formula for approximating electric power production at a hydroelectric station is: P = − η ( m ˙ g Δ h ) = − η ( ( ρ V ˙ ) g Δ h ) {\displaystyle P=-\eta \ ({\dot {m}}g\ \Delta h)=-\eta \ ((\rho {\dot {V}})\ g\ \Delta h)} where Efficiency
900-451: A larger amount of methane than those in temperate areas. Like other non-fossil fuel sources, hydropower also has no emissions of sulfur dioxide, nitrogen oxides, or other particulates. Reservoirs created by hydroelectric schemes often provide facilities for water sports , and become tourist attractions themselves. In some countries, aquaculture in reservoirs is common. Multi-use dams installed for irrigation support agriculture with
990-431: A long-term plan to become a 128,000 MW company by 2032. NTPC Limited is on an expansion spree to meet the power requirements of the country—the company has targeted to add 14,058 MW in 12th Plan (from FY13 to FY 17) of which it had already added 4,170 MW in 2012–2013, 1835 MW in 2013–2014, 1290 MW in 2014–2015, and 1150 MW from April–30 November 2015. As of 30 November 2015, the company has 23,004 MW under construction. NTPC
SECTION 10
#17327725336761080-549: A long-term plan to reduce its fossil fuel capacity mix to 56% by 2032. NTPC also plans to go global. The public sector company has signed a memorandum of agreement (MoU) with the Government of Sri Lanka and Ceylon Electricity Board for setting up a 500 MW (2x250) coal-based thermal power plant in the island nation. An MoU has also been signed with Kyushu Electric Power Co. Inc., Japan, for establishing an alliance for exchange of information and experts from different areas of
1170-409: A major scale to implement the solar thermal storage power as they can offer clean and cheaper electricity than fossil fuel-fired power generation plants. Rather than install emissions-cutting technologies, NTPC has chosen to lobby the government to extend pollution reduction deadlines. Loharinag Pala Hydro Power Project by NTPC Ltd: Loharinag Pala Hydro Power Project (600 MW i.e. 150 MW × 4 units)
1260-666: A milestone of generating 100 billion units of electricity in a single year. In 1998, it commissioned its first Naptha-based plant at Kayamkulam with a capacity of 350 MW. In 1999, its plant in Dadri, which had the highest plant load factor (PLF) in India of 96%, was certified with ISO-14001. During 2000, it started construction of its first hydro-electric power project, with 800 MW capacity, in Himachal Pradesh. In 2002, it incorporated 3 subsidiary companies: NTPC Electric Supply Company Limited for forward integration by entering into
1350-592: A positive risk adjusted return, unless appropriate risk management measures are put in place. While many hydroelectric projects supply public electricity networks, some are created to serve specific industrial enterprises. Dedicated hydroelectric projects are often built to provide the substantial amounts of electricity needed for aluminium electrolytic plants, for example. The Grand Coulee Dam switched to support Alcoa aluminium in Bellingham, Washington , United States for American World War II airplanes before it
1440-548: A relatively constant water supply. Large hydro dams can control floods, which would otherwise affect people living downstream of the project. Managing dams which are also used for other purposes, such as irrigation , is complicated. In 2021 the IEA called for "robust sustainability standards for all hydropower development with streamlined rules and regulations". Large reservoirs associated with traditional hydroelectric power stations result in submersion of extensive areas upstream of
1530-540: A result of climate change . One study from the Colorado River in the United States suggest that modest climate changes, such as an increase in temperature in 2 degree Celsius resulting in a 10% decline in precipitation, might reduce river run-off by up to 40%. Brazil in particular is vulnerable due to its heavy reliance on hydroelectricity, as increasing temperatures, lower water flow and alterations in
1620-515: A revenue of about ₹24,430,000,000,000 + ₹1,000,000,000,000 during the financial year 2018–19. When India achieved independence in 1947, it was primarily an agrarian entity, with a weak industrial base. There were only eighteen state-owned Indian Ordnance Factories , previously established to reduce the dependency of the British Indian Army on imported arms. The British Raj had previously elected to leave agricultural production to
1710-429: A self-sufficient, largely agrarian, communal village-based existence for India in the first half of the 20th century. Other contemporary criticisms of India's public sector targeted the lack of well-funded schools, public libraries, universities, hospitals and medical and engineering colleges; a lack seen as impeding an Indian replication of Britain's own industrialization in the previous century. Post-Independence,
1800-448: A small TV/radio). Even smaller turbines of 200–300 W may power a few homes in a developing country with a drop of only 1 m (3 ft). A Pico-hydro setup is typically run-of-the-river , meaning that dams are not used, but rather pipes divert some of the flow, drop this down a gradient, and through the turbine before returning it to the stream. An underground power station is generally used at large facilities and makes use of
1890-455: A source of low-cost renewable energy. Alternatively, small hydro projects may be built in isolated areas that would be uneconomic to serve from a grid, or in areas where there is no national electrical distribution network. Since small hydro projects usually have minimal reservoirs and civil construction work, they are seen as having a relatively low environmental impact compared to large hydro. This decreased environmental impact depends strongly on
SECTION 20
#17327725336761980-414: A start-up time of the order of a few minutes. Although battery power is quicker its capacity is tiny compared to hydro. It takes less than 10 minutes to bring most hydro units from cold start-up to full load; this is quicker than nuclear and almost all fossil fuel power. Power generation can also be decreased quickly when there is a surplus power generation. Hence the limited capacity of hydropower units
2070-581: A total of 1,500 terawatt-hours (TWh) of electrical energy in one full cycle" which was "about 170 times more energy than the global fleet of pumped storage hydropower plants". Battery storage capacity is not expected to overtake pumped storage during the 2020s. When used as peak power to meet demand, hydroelectricity has a higher value than baseload power and a much higher value compared to intermittent energy sources such as wind and solar. Hydroelectric stations have long economic lives, with some plants still in service after 50–100 years. Operating labor cost
2160-435: Is electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity , almost 4,210 TWh in 2023, which is more than all other renewable sources combined and also more than nuclear power . Hydropower can provide large amounts of low-carbon electricity on demand, making it a key element for creating secure and clean electricity supply systems. A hydroelectric power station that has
2250-452: Is hydroelectric power on a scale serving a small community or industrial plant. The definition of a small hydro project varies but a generating capacity of up to 10 megawatts (MW) is generally accepted as the upper limit. This may be stretched to 25 MW and 30 MW in Canada and the United States. Small hydro stations may be connected to conventional electrical distribution networks as
2340-635: Is also usually low, as plants are automated and have few personnel on site during normal operation. Where a dam serves multiple purposes, a hydroelectric station may be added with relatively low construction cost, providing a useful revenue stream to offset the costs of dam operation. It has been calculated that the sale of electricity from the Three Gorges Dam will cover the construction costs after 5 to 8 years of full generation. However, some data shows that in most countries large hydropower dams will be too costly and take too long to build to deliver
2430-625: Is denoted in %, as of 30 September 2024 ): Currently there are 43 Regional Rural Banks in India, as of 1 April 2020: Andhra Pradesh Arunachal Pradesh Assam Bihar Chhattisgarh Gujarat Haryana Himachal Pradesh Jammu and Kashmir Jharkhand Karnataka Kerala Madhya Pradesh Maharashtra Manipur Meghalaya Mizoram Nagaland Odisha Puducherry Punjab Rajasthan Tamil Nadu Telangana Tripura Uttar Pradesh Uttarakhand West Bengal Hydroelectricity Hydroelectricity , or hydroelectric power ,
2520-416: Is diversifying its capacity mix with much emphasis on renewable energy. As on 30 November 2015, NTPC has 110 MW Solar PV capacity under operation, 250 MW under construction, and 1260 MW under tendering. The company intends to add 10000 MW of Solar PV capacity in the next five years. On 18 July 2015, NTPC declared commercial its first Hydro Power plant at Koldam in the state of Himachal Pradesh . The company has
2610-668: Is facing tremendous opposition from the people of Bangladesh owing to the plant's dangerously close proximity to the Sundarbans . NTPC has also been allotted coal blocks, namely Pakri Barwadih, Chatti Bariatu, and Kerandari in Jharkhand as well as Talipalli, Chhattisgarh, and Dulanga in Odisha . Except for Pakri Barwadih, all other blocks were canceled by a decision of the Supreme Court of India on 24 September 2014. However,
2700-411: Is further classified into Strategic Sector and Non-Strategic Sector. Depending on their financial performance and progress, CPSUs are granted the status of Maharatna , Navaratna , and Miniratna (Category I and II). Following India's independence in 1947, the limited pre-existing industries were insufficient for sustainable economic growth . The Industrial Policy Resolution of 1956 , adopted during
2790-470: Is highest in the winter when solar energy is at a minimum. Pico hydro is hydroelectric power generation of under 5 kW . It is useful in small, remote communities that require only a small amount of electricity. For example, the 1.1 kW Intermediate Technology Development Group Pico Hydro Project in Kenya supplies 57 homes with very small electric loads (e.g., a couple of lights and a phone charger, or
NTPC Limited - Misplaced Pages Continue
2880-483: Is highly sought after in India due to high pay and its job security , with most preferring candidates with a GATE score. In 1951, there were five PSUs under the ownership of the government. By March 2021, the number of such government entities had increased to 365. These government entities represented a total investment of about ₹ 16,410,000,000,000 as of 31 March 2019. Their total paid-up capital as of 31 March 2019 stood at about ₹200.76 lakh crore. CPSEs have earned
2970-445: Is initially produced during construction of the project, and some methane is given off annually by reservoirs, hydro has one of the lowest lifecycle greenhouse gas emissions for electricity generation. The low greenhouse gas impact of hydroelectricity is found especially in temperate climates . Greater greenhouse gas emission impacts are found in the tropical regions because the reservoirs of power stations in tropical regions produce
3060-690: Is located on the river Bhagirathi (a tributary of the Ganges) in Uttarkashi district of Uttarakhand state. This is the first project downstream from the origin of the Ganges at Gangotri . The project was at the advanced stage of construction when it was discontinued by the Government of India in August 2010. Rupasiyabagar Khasiabara HPP, 261 MW in Pithoragarh, Uttarakhand State, near China Border,
3150-462: Is not an energy source, and appears as a negative number in listings. Run-of-the-river hydroelectric stations are those with small or no reservoir capacity, so that only the water coming from upstream is available for generation at that moment, and any oversupply must pass unused. A constant supply of water from a lake or existing reservoir upstream is a significant advantage in choosing sites for run-of-the-river. A tidal power station makes use of
3240-452: Is not generally used to produce base power except for vacating the flood pool or meeting downstream needs. Instead, it can serve as backup for non-hydro generators. The major advantage of conventional hydroelectric dams with reservoirs is their ability to store water at low cost for dispatch later as high value clean electricity. In 2021, the IEA estimated that the "reservoirs of all existing conventional hydropower plants combined can store
3330-410: Is often higher (that is, closer to 1) with larger and more modern turbines. Annual electric energy production depends on the available water supply. In some installations, the water flow rate can vary by a factor of 10:1 over the course of a year. Hydropower is a flexible source of electricity since stations can be ramped up and down very quickly to adapt to changing energy demands. Hydro turbines have
3420-491: Is proposed through land acquisition laws, local residents oppose the forcible acquisition, as they are not sure of proper rehabilitation. Draft National Electricity Plan (2016), prepared by GoI, states that India does not need additional coal-fired power plants until 2027 with the commissioning of various coal-based power plants which are presently under construction. India is not facing regular power shortages to purchase electricity at high prices, offering higher profit margins to
3510-1052: Is the largest power company in India with an installed capacity of 76442.78 MW. Although the company has approximately 16% of the total national capacity, it contributes to over 25% of total power generation due to its focus on operating its power plants at higher efficiency levels (approximately 80.2% against the national PLF rate of 64.5%). NTPC currently produces 25 billion units of electricity per month. NTPC Mining Ltd (NML) has mined about 100 MMT Coal in 2023-2024 FY, NML has Pakri Barwadih, Chatti Bariatu and Kerandari Coal Mines in Jharkhand, Dulanga Coal Mine in Odisha and Talaipalli Coal Mine in Chhattisgarh. NTPC currently operates 55 power stations: 24 coal, seven combined cycle gas and liquid fuel, two hydro powered, one wind turbine, and 11 solar projects. Additionally, it has 9 coal and 1 gas station, owned by joint ventures or subsidiaries. It
3600-506: Is under the ownership of the Government of India or state governments .These type of firms can also be a joint venture of multiple PSUs. These entities perform commercial functions on behalf of the government. Depending on the level of government ownership, PSUs are officially classified into two categories: Central Public Sector Undertakings ( CPSUs ), owned by the central government or other CPSUs; and State Public Sector Undertakings ( SPSUs ), owned by state governments. CPSU and SPSU
3690-572: Is yet to be given investment approval.. Badarpur Thermal Power Station has been permanently closed due to pollution issues in Delhi NCR . The total installed capacity of all of its units was 705 MW , which has been retired and fully closed since 15 October 2018. Public sector undertakings in India Public Sector Undertakings ( PSU ) in India are government-owned entities in which at least 51% of stake
NTPC Limited - Misplaced Pages Continue
3780-723: The Bombay Stock Exchange , where it is a constituent of the BSE SENSEX index, and the National Stock Exchange of India , where it is a constituent of the S&P CNX Nifty . In September 2015, the Government of India held around 74.96% equity shares in NTPC. Over 680,000 individual shareholders hold approx. 1.92% of its shares. Life Insurance Corporation of India is the largest non-promoter shareholder in
3870-679: The Bonneville Dam in 1937 and being recognized by the Flood Control Act of 1936 as the premier federal flood control agency. Hydroelectric power stations continued to become larger throughout the 20th century. Hydropower was referred to as "white coal". Hoover Dam 's initial 1,345 MW power station was the world's largest hydroelectric power station in 1936; it was eclipsed by the 6,809 MW Grand Coulee Dam in 1942. The Itaipu Dam opened in 1984 in South America as
3960-680: The Government of Sri Lanka to set up two units of 250 MW each in Trincomalee in Sri Lanka . During 2008 and 2011, NTPC entered into joint ventures with BHEL , Bharat Forge , NHPC , Coal India , SAIL , NMDC , and NPCIL to expand its business of power generation. By the end of 2010, its installed capacity crossed 31,000 MW. The company in 2009 joined forces with other state enterprises Rashtriya Ispat Nigam , Steel Authority of India , Coal India , and National Minerals Development Corporation to invest in coal mining operations through
4050-549: The Industrial Revolution would drive development as well. In 1878, the world's first hydroelectric power scheme was developed at Cragside in Northumberland , England, by William Armstrong . It was used to power a single arc lamp in his art gallery. The old Schoelkopf Power Station No. 1 , US, near Niagara Falls , began to produce electricity in 1881. The first Edison hydroelectric power station,
4140-806: The International Exhibition of Hydropower and Tourism , with over one million visitors 1925. By 1920, when 40% of the power produced in the United States was hydroelectric, the Federal Power Act was enacted into law. The Act created the Federal Power Commission to regulate hydroelectric power stations on federal land and water. As the power stations became larger, their associated dams developed additional purposes, including flood control , irrigation and navigation . Federal funding became necessary for large-scale development, and federally owned corporations, such as
4230-556: The Ministry of Heavy Industries and Public Enterprises . The Department of Public Enterprises (DPE), Ministry of Finance is the nodal department for all the Central Public Sector Undertakings (CPSUs). As of October 2021, there are 13 Maharatnas, 14 Navratnas and 72 Miniratnas (divided into Category 1 and Category 2). Currently there are 12 Nationalised Banks in India (Government Shareholding power
4320-609: The Planning Commission was formed by a cabinet resolution in March 1950 and the Industrial (Development and Regulation) Act was enacted in 1951 with the objective of empowering the government to take necessary steps to regulate industry. The first Prime Minister of India, Jawaharlal Nehru , promoted an economic policy based on import substitution industrialisation and advocated a mixed economy . He believed that
4410-602: The Private sector , with tea processing firms, jute mills (such as the Acland Mill ), railways , electricity utilities, banks, coal mines, and steel mills being just some of the economic entities largely owned by private individuals like the industrialist Jamsetji Tata . Other entities were listed on the Bombay Stock Exchange . Critics of private ownership of India's agricultural and industrial entities—most notably Mahatma Gandhi's independence movement—instead advocated for
4500-702: The Second Five-Year Plan , laid the framework for PSUs. The government initially prioritized strategic sectors, such as communication, irrigation, chemicals, and heavy industries , followed by the nationalisation of corporations . PSUs subsequently expanded into consumer goods production and service areas like contracting, consulting, and transportation. Their goals include increasing exports, reducing imports, fostering infrastructure development, driving economic growth, and generating job opportunities. Each PSU has its own recruitment rules and employment in PSUs
4590-633: The Tennessee Valley Authority (1933) and the Bonneville Power Administration (1937) were created. Additionally, the Bureau of Reclamation which had begun a series of western US irrigation projects in the early 20th century, was now constructing large hydroelectric projects such as the 1928 Hoover Dam . The United States Army Corps of Engineers was also involved in hydroelectric development, completing
SECTION 50
#17327725336764680-583: The Vulcan Street Plant , began operating September 30, 1882, in Appleton, Wisconsin , with an output of about 12.5 kilowatts. By 1886 there were 45 hydroelectric power stations in the United States and Canada; and by 1889 there were 200 in the United States alone. At the beginning of the 20th century, many small hydroelectric power stations were being constructed by commercial companies in mountains near metropolitan areas. Grenoble , France held
4770-506: The potential energy of dammed water driving a water turbine and generator . The power extracted from the water depends on the volume and on the difference in height between the source and the water's outflow. This height difference is called the head . A large pipe (the " penstock ") delivers water from the reservoir to the turbine. This method produces electricity to supply high peak demands by moving water between reservoirs at different elevations. At times of low electrical demand,
4860-400: The water frame , and continuous production played a significant part in the development of the factory system, with modern employment practices. In the 1840s, hydraulic power networks were developed to generate and transmit hydro power to end users. By the late 19th century, the electrical generator was developed and could now be coupled with hydraulics. The growing demand arising from
4950-463: The IEA released a main-case forecast of 141 GW generated by hydropower over 2022–2027, which is slightly lower than deployment achieved from 2017–2022. Because environmental permitting and construction times are long, they estimate hydropower potential will remain limited, with only an additional 40 GW deemed possible in the accelerated case. In 2021 the IEA said that major modernisation refurbishments are required. Most hydroelectric power comes from
5040-464: The ability to transport particles heavier than itself downstream. This has a negative effect on dams and subsequently their power stations, particularly those on rivers or within catchment areas with high siltation. Siltation can fill a reservoir and reduce its capacity to control floods along with causing additional horizontal pressure on the upstream portion of the dam. Eventually, some reservoirs can become full of sediment and useless or over-top during
5130-595: The balance between stream flow and power production. Micro hydro means hydroelectric power installations that typically produce up to 100 kW of power. These installations can provide power to an isolated home or small community, or are sometimes connected to electric power networks. There are many of these installations around the world, particularly in developing nations as they can provide an economical source of energy without purchase of fuel. Micro hydro systems complement photovoltaic solar energy systems because in many areas water flow, and thus available hydro power,
5220-411: The business of distribution and trading of power; NTPC Vidyut Vyapar Nigam Limited for meeting the expected rise in energy trading; and NTPC Hydro Limited to carry out the business of implementing and operating small and medium hydropower projects. Later in 2002, its installed capacity crossed 20,000 MW. NTPC got listed on BSE and NSE on 5 November 2004. Against the issue price of ₹62 per share, it closed
5310-543: The business. The company is also in the process of finalizing an MoU with Nigeria for setting up power plants against the allocation of LNG on a long-term basis for NTPC plants in India. NTPC is also developing a joint-venture coal-based power plant 1,320 MW (2x660) with the Bangladesh Power Development Board known as Bangladesh India Friendship Power Company in Rampal , Bangladesh , which
5400-763: The central government established the higher Maharatna category, which raises a public sector unit's investment ceiling from ₹1,000 crore to ₹5,000 crores. The Maharatna public sector units can now decide on investments of up to 15 per cent of their net worth in a project while the Navaratna companies could invest up to ₹1,000 crore without explicit government approval. Two categories of Miniratnas afford less extensive financial autonomy. Guidelines for awarding Ratna status are as follows: The average annual Net worth of ₹10,000 crores for three years, OR Average annual Turnover of ₹20,000 crore for three years (against Rs 25,000 crore prescribed earlier) A PSU must first be
5490-668: The company was again allotted canceled block under Section 5 of Coal Mines (Special Provision Act 2015) Besides these blocks, the Ministry of Coal has according to its press release dated 3 July 2013 allotted four more blocks namely, Banai and Bhalmuda in Chhattisgarh, Chandrabila and Kudanli Laburi in Odisha. Two more blocks namely Mandakini-II and Banhardih are expected to be allotted to NTPC soon. All these mines are having estimated geological reserves of 6.7 billion tonnes. NTPC has appointed Mining Cum Development Operator (MDO) for its Pakri Barwadih mine. The equity shares of NTPC are listed on
SECTION 60
#17327725336765580-521: The company with 10.03% shareholding. In August 2017, the GOI divested further its 5% stake in NTPC through OFS (Stock Exchange Mechanism) and reduced the holding of GOI in NTPC to 5,76,83,41,760 shares i.e. 64.96% out of total 8,24,54,64,400 shares. The balance is held by public, FIIs, Mutual Funds, and Banks. As of 31 March 2015, the company had 24,067 employees. The attrition rate for the FY 2014–2015, including
5670-429: The competing power generating companies. With the help of assured power purchase agreements (PPA) from the state-owned DisComs, NTPC was able to sell its power at higher margins on the deployed capital and higher overhead costs. Moreover, its main expertise of generating power from coal-fired stations is becoming obsolete in terms of technology and economics against non-conventional power generation like wind, solar, etc. In
5760-593: The country by Central Government and various state governments. Some of these lands have been allotted to NTPC (and other PSUs in India) through Land Acquisition Acts passed by Central and State Governments. Wherever a land acquisition law is enacted, it also places a liability on the PSUs or governments to take actions for proper rehabilitation of displaced residents of that rural or tribal area. Governments or PSUs are criticized if they do not fulfill their liability towards displaced residents. In many areas where land acquisition
5850-494: The country, (26 Coal based stations, seven gas based stations, one hydro station, one small hydro, 11 Solar PV, and one wind based Station) and 25 Joint Venture stations (nine coal based, four gas based, eight hydro-powered, one small hydro, two wind-powered, and one Solar PV). The company has also stepped up its hydroelectric power (hydel) project implementation. Some of these projects are: NTPC's current renewable power plants in solar and wind include: The company has developed
5940-423: The crisis, the government began divesting its ownership of several PSUs to raise capital and privatize companies facing poor financial performance and low efficiency. The public sector undertakings are headed by the head of board of directors also known as chairperson cum managing director cum chief executive officer and a vice chairperson cum deputy managing director cum co-chief executive officer along with
6030-404: The daily rise and fall of ocean water due to tides; such sources are highly predictable, and if conditions permit construction of reservoirs, can also be dispatchable to generate power during high demand periods. Less common types of hydro schemes use water's kinetic energy or undammed sources such as undershot water wheels . Tidal power is viable in a relatively small number of locations around
6120-505: The dams, sometimes destroying biologically rich and productive lowland and riverine valley forests, marshland and grasslands. Damming interrupts the flow of rivers and can harm local ecosystems, and building large dams and reservoirs often involves displacing people and wildlife. The loss of land is often exacerbated by habitat fragmentation of surrounding areas caused by the reservoir. Hydroelectric projects can be disruptive to surrounding aquatic ecosystems both upstream and downstream of
6210-705: The effect of forest decay. Another disadvantage of hydroelectric dams is the need to relocate the people living where the reservoirs are planned. In 2000, the World Commission on Dams estimated that dams had physically displaced 40–80 million people worldwide. Because large conventional dammed-hydro facilities hold back large volumes of water, a failure due to poor construction, natural disasters or sabotage can be catastrophic to downriver settlements and infrastructure. During Typhoon Nina in 1975 Banqiao Dam in Southern China failed when more than
6300-628: The establishment of basic and heavy industry was fundamental to the development and modernisation of the Indian economy. India's second five year plan (1956–60) and the Industrial Policy Resolution of 1956 emphasized the development of public sector enterprises to meet Nehru's national industrialisation policy. His vision was carried forward by V. Krishnamurthy , a figure known as the "Father of Public sector undertakings in India". Indian statistician Prasanta Chandra Mahalanobis
6390-399: The excess generation capacity is used to pump water into the higher reservoir, thus providing demand side response . When the demand becomes greater, water is released back into the lower reservoir through a turbine. In 2021 pumped-storage schemes provided almost 85% of the world's 190 GW of grid energy storage and improve the daily capacity factor of the generation system. Pumped storage
6480-465: The first day of listing with ₹75.55 per share. On the day of listing, it became the third largest company in India in terms of market capitalisation. In October 2005, the company's name was changed from National Thermal Power Corporation Limited to NTPC Limited. The primary reason for this change was the company's foray into hydro and nuclear based power generation along with backward integration of coal mining. In 2006, it entered into an agreement with
6570-534: The forest is inundated, substantial amounts of greenhouse gases may be emitted. Construction of a hydroelectric complex can have significant environmental impact, principally in loss of arable land and population displacement. They also disrupt the natural ecology of the river involved, affecting habitats and ecosystems, and siltation and erosion patterns. While dams can ameliorate the risks of flooding, dam failure can be catastrophic. In 2021, global installed hydropower electrical capacity reached almost 1,400 GW,
6660-737: The future, for the satisfactory growth mainly from wind and solar power projects, NTPC is ready to slash all its extra profit margins on capital deployed to bring down the power sale price at par with the IPPs to secure the projects in open competitive bidding. Government has decided to scrap the coal fired power stations which are more than 25 years old to reduce the pollution. Instead of scrapping old pulverised coal fired units, NTPC should replace coal with torrefied crops waste/biomass as fuel in these units (nearly 11,000 MW) to make them profitable and productive assets without contributing to pollution. To utilize its proven O&M expertise, NTPC may venture on
6750-439: The generating stations owned by National Thermal Power Corporation are done by respective regional load dispatch centers, which are the apex body to ensure integrated operation of the power system grid in the respective region. All these load dispatch centers come under Power System Operation Corporation Limited (POSOCO). The total installed capacity of the company is 72,304 MW (including 13,465 MW through JVs/Subsidiaries) across
6840-509: The global market so as to "support [them] in their drive to become global giants". Financial autonomy was initially awarded to nine PSUs as Navratna status in 1997. Originally, the term Navaratna meant a talisman composed of nine precious gems. Later, this term was adopted in the courts of the Gupta emperor Vikramaditya and Mughal emperor Akbar , as the collective name for nine extraordinary courtiers at their respective courts. In 2010,
6930-506: The highest among all renewable energy technologies. Hydroelectricity plays a leading role in countries like Brazil, Norway and China. but there are geographical limits and environmental issues. Tidal power can be used in coastal regions. China added 24 GW in 2022, accounting for nearly three-quarters of global hydropower capacity additions. Europe added 2 GW, the largest amount for the region since 1990. Meanwhile, globally, hydropower generation increased by 70 TWh (up 2%) in 2022 and remains
7020-519: The largest renewable energy source, surpassing all other technologies combined. Hydropower has been used since ancient times to grind flour and perform other tasks. In the late 18th century hydraulic power provided the energy source needed for the start of the Industrial Revolution . In the mid-1700s, French engineer Bernard Forest de Bélidor published Architecture Hydraulique , which described vertical- and horizontal-axis hydraulic machines, and in 1771 Richard Arkwright 's combination of water power ,
7110-750: The largest, producing 14 GW , but was surpassed in 2008 by the Three Gorges Dam in China at 22.5 GW . Hydroelectricity would eventually supply some countries, including Norway , Democratic Republic of the Congo , Paraguay and Brazil , with over 85% of their electricity. In 2021 the International Energy Agency (IEA) said that more efforts are needed to help limit climate change . Some countries have highly developed their hydropower potential and have very little room for growth: Switzerland produces 88% of its potential and Mexico 80%. In 2022,
7200-725: The members of the board of directors also known as executive director cum c-level officer who are Group 'A' gazetted officers appointed by the President of India in case of central public sector undertakings, its subsidiaries & its divisions and appointed by the Governor of States of India in case of state public sector undertakings, its subsidiaries & its divisions. All of the public sector undertakings have been awarded additional financial autonomy. Public Sector Undertakings are government establishments that have comparative advantages", giving them greater autonomy to compete in
7290-495: The national consensus turned in favor of rapid industrialisation of the economy, a process seen as the key to economic development, improved living standards and economic sovereignty. Building upon the Bombay Plan , which noted the necessity of government intervention and regulation in the economy, the first Industrial Policy Resolution announced in 1948 laid down in broad strokes such a strategy of industrial development. Later,
7380-633: The plant site. Generation of hydroelectric power changes the downstream river environment. Water exiting a turbine usually contains very little suspended sediment, which can lead to scouring of river beds and loss of riverbanks. The turbines also will kill large portions of the fauna passing through, for instance 70% of the eel passing a turbine will perish immediately. Since turbine gates are often opened intermittently, rapid or even daily fluctuations in river flow are observed. Drought and seasonal changes in rainfall can severely limit hydropower. Water may also be lost by evaporation. When water flows it has
7470-450: The rainfall regime, could reduce total energy production by 7% annually by the end of the century. Lower positive impacts are found in the tropical regions. In lowland rainforest areas, where inundation of a part of the forest is necessary, it has been noted that the reservoirs of power plants produce substantial amounts of methane . This is due to plant material in flooded areas decaying in an anaerobic environment and forming methane,
7560-484: The same year, its name was changed to "National Thermal Power Corporation Limited". In 1983, NTPC began commercial operations and earned profits of INR 4.5 crores in FY 1982–83. By the end of 1985, it had achieved power generation capacity of 2000 MW. In 1986, it completed synchronisation of its first 500 MW unit at Singrauli. In 1988, it commissioned two 500 MW units, one each in Rihand and Ramagundam . In 1989, it started
7650-766: The trainee employees and employees working for subsidiaries and JVs, was 1.35%. Man MW Ratio of the company has fallen from 0.77 in the FY11 to 0.61 in FY 15. NTPC has been awarded continuously as great places to work for in PSUs category. NTPC was ranked second among the 250 largest power producer energy traders in the world by Platts in 2015. On overall basis NTPC ranked 56th amongst Platts 250 companies. In 2009, it received ICSI National Award for Excellence in Corporate Governance. The company (and other PSUs in India) has been allotted land for setting power plants and related infrastructure in rural or tribal areas across
7740-524: The world are hydroelectric power stations, with some hydroelectric facilities capable of generating more than double the installed capacities of the current largest nuclear power stations . Although no official definition exists for the capacity range of large hydroelectric power stations, facilities from over a few hundred megawatts are generally considered large hydroelectric facilities. Currently, only seven facilities over 10 GW ( 10,000 MW ) are in operation worldwide, see table below. Small hydro
7830-539: The world. The classification of hydropower plants starts with two top-level categories: The classification of a plant as an SHP or LHP is primarily based on its nameplate capacity , the threshold varies by the country, but in any case a plant with the capacity of 50 MW or more is considered an LHP. As an example, for China, SHP power is below 25 MW, for India - below 15 MW, most of Europe - below 10 MW. The SHP and LHP categories are further subdivided into many subcategories that are not mutually exclusive. For example,
7920-586: Was allowed to provide irrigation and power to citizens (in addition to aluminium power) after the war. In Suriname , the Brokopondo Reservoir was constructed to provide electricity for the Alcoa aluminium industry. New Zealand 's Manapouri Power Station was constructed to supply electricity to the aluminium smelter at Tiwai Point . Since hydroelectric dams do not use fuel, power generation does not produce carbon dioxide . While carbon dioxide
8010-870: Was founded by Government of India in 1975, which now holds 51.1% of its equity shares after divestment of its stake in 2004, 2010, 2013, 2014, 2016, and 2017. In May 2010, NTPC was conferred Maharatna status by the Union Government of India, one of only four companies to be awarded this status. It is ranked 433rd in the Forbes Global 2000 for 2023. The company was founded on 7 November 1975 by India's former Prime Minister Indira Gandhi as National Thermal Power Corporation Private Limited. It started working on its first thermal power project in 1976 at Shaktinagar —named National Thermal Power Corporation Private Limited Singrauli —in Uttar Pradesh . In
8100-482: Was instrumental to its formulation, which was later termed the Feldman–Mahalanobis model . In 1969, Indira Gandhi 's government nationalised fourteen of India's largest private banks, and an additional six in 1980. This government-led industrial policy, with corresponding restrictions on private enterprise, was the dominant pattern of Indian economic development until the 1991 Indian economic crisis . After
#675324