14-722: The Culloden Viaduct is a railway viaduct on the Highland Main Line , to the east of the city of Inverness , in the Highland council area of Scotland. It was designed by Murdoch Paterson and opened in 1898 as part of the Inverness and Aviemore Direct Railway , which was built by the Highland Railway . The 29 span viaduct crosses the wide valley of the River Nairn . At 1800 ft (549 m) in length, it
28-603: A couple of services continue through to Elgin , calling at Nairn and Forres . [REDACTED] Station usage at some stations remain stable. Overall usage on the line comparing April 2003 to April 2010 has increased 154%. In the Scottish Government 's National Transport Strategy, published in February 2020, it was stated that the line would be electrified with overhead lines by 2035. Culloden Viaduct Too Many Requests If you report this error to
42-736: A half hours. The vast majority of the line was built and operated by the Highland Railway , with a small section of the line between Perth and Stanley built by the Scottish Midland Junction Railway , amalgamated with the Aberdeen Railway to become the Scottish North Eastern Railway in 1856, and then absorbed by the Caledonian Railway in 1866. Originally, the line between Inverness and Perth went via Forres , but
56-574: Is a railway line in Scotland . It is 118 mi (190 km) long and runs through the central Scottish Highlands , mainly following the route of the A9 , and linking a series of small towns and villages with Perth at one end and Inverness at the other. Today, services between Inverness and Edinburgh , Glasgow and London use the line. At Inverness the line connects with the Far North Line ,
70-725: Is entitled the Highland Chieftain ; it departs Inverness at 08:00 and runs to London King's Cross via the East Coast Main Line , arriving in London at 16:00. The return working leaves London at 12:00 and reaches Inverness at 20:00. The Caledonian Sleeper travels overnight between Inverness and London Euston via the West Coast Main Line . The southbound train joins portions from Aberdeen and Fort William at Edinburgh Waverley, and similarly
84-808: Is known also as the Nairn Viaduct , the Culloden Moor Viaduct or the Clava Viaduct . 57°28′41″N 4°03′46″W / 57.4780°N 4.0627°W / 57.4780; -4.0627 This Scotland rail transport related article is a stub . You can help Misplaced Pages by expanding it . This article about a bridge in the United Kingdom is a stub . You can help Misplaced Pages by expanding it . Highland Main Line The Highland Main Line
98-545: Is the longest masonry viaduct in Scotland. Historic Scotland added the viaduct to its "Category A listed building" protected status on October 5, 1971. It is nearby two important sites: Culloden battlefield and the Clava cairn , a trio of Bronze Age burial cairns. Culloden Moor railway station was situated at the northern end of the viaduct, but the station was closed in the 1960s. The viaduct remains in use as of 2024. It
112-599: The Aberdeen-Inverness Line and the Kyle of Lochalsh Line . Since the line is not electrified all trains are diesel-powered. Much of the Highland Main Line is single track , and trains coming in opposite directions are often timed to arrive at stations at the same time, where crossing loops permit them to pass. Journey times between Inverness and Edinburgh or Glasgow are approximately three and
126-400: The Inverness and Aviemore Direct Railway was opened in 1898 to allow for a more direct routeing. There are two significant summits on the line: Drumochter Summit (also spelled Druimuachdar ) (elevation 1,484 feet (452 m)) between Blair Atholl and Dalwhinnie , and Slochd Summit (elevation 1,315 feet (401 m)) between Carrbridge and Inverness . Other distinct features on
140-403: The 1960s, many sections of the line were converted from double track to single track . In 1976, 23 miles from Blair Athol to Dalwhinie was redoubled. In March 2019 Network Rail completed a programme of works to increase capacity on the line and support the introduction of InterCity 125 sets on ScotRail services, with passing loops and platforms extended. As of 2020, there are stations on
154-403: The line as follows: Services on the line are provided by ScotRail and London North Eastern Railway . A roughly two-hourly ScotRail service operates between Perth and Inverness throughout the day, with 11 services in total in each direction, all running from/to either Glasgow Queen Street (via Stirling ) or Edinburgh Waverley (via Kirkcaldy ). The London North Eastern Railway service
SECTION 10
#1732782751236168-478: The northbound train divides there. South of Edinburgh it forms the longest locomotive -hauled passenger train in the United Kingdom, with 16 coaches. All trains between Perth and Inverness call at Pitlochry , Kingussie and Aviemore . Most ScotRail services call at Dunkeld & Birnam (8 north and 10 south) and at Blair Atholl (8 north and 6 south), with the stations at Dalwhinnie (5 each way), Newtonmore and Carrbridge being served less often. On Sundays,
182-469: The route include the viaducts at Culloden and Tomatin , the spectacular mountain pass at Drumochter and the severe gradients encountered in both directions, particularly the extended climb from Inverness to the Slochd summit which averages around 1 in 60 the whole way. Initially the only double track was between Inverness and Daviot and also Stanley Junction and Perth. In the 1890s the single line working
196-504: Was improved with the replacement of telegraphing orders to trains along the line with staff and tablet control instruments. This was later upgraded to automatic token-exchange apparatus. However, the main improvement came with the doubling of sections of line, designed by the engineer Alexander Newlands , beginning with Blair Atholl to Dalnacardoch (8.25 miles (13.28 km)) in 1900, extended to Druimuachdar (8.5 miles (13.7 km)) in 1901 and Dalwhinnie (5.5 miles (8.9 km)) in 1909. In
#235764