Misplaced Pages

Swanbank Power Station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#881118

11-520: The Swanbank Power Stations are located in Swanbank within South East Queensland , Australia. The original power station was coal fired, but the site has since moved to gas. By 2007 the site had consisted of the highly efficient 385 megawatts (516,000 hp) gas-fired Swanbank E Power Station and the smaller 28 megawatts (38,000 hp) gas-fired Swanbank C Power Station. Swanbank E

22-482: A power turbine which drove the generator. Middle Ridge Power Station was a similar design, with four gas generators discharging into two power turbines, one on each end of the 56 megawatts (75,000 hp) electrical generator. It was commissioned in 1969, and, in 2002, was expected to be decommissioned in December 2002. Swanbank D was a small open cycle gas turbine . Delivering only 37 megawatts (50,000 hp), it

33-458: Is used for grazing on native vegetation. The Swanbank railway line enters the locality from the north ( Blackstone ) and terminates in two balloon loops . There are two railway stations: Early settler James Foote named the locality after his wife's birthplace Swanbank in Lanarkshire , Scotland. Previous names for this area were Logan Lagoon and Josey's Lagoon. On 31 July 1972,

44-535: The 2021 census , Swanbank had "no people or a very low population". The predominant land usage in Swanbank is industrial, including the Swanbank Power Station ( 27°39′35″S 152°48′48″E  /  27.6598°S 152.8134°E  / -27.6598; 152.8134  ( Swanbank Power Station ) ). There are both current and historic mines in the area. The south-west of the locality

55-543: The Box Flat Mine experienced an explosion which took the lives of 18 men and led to the closure of the mine. In the 2016 census Swanbank had "no people or a very low population". In the 2021 census , Swanbank had "no people or a very low population". Swanbank railway station is used by a heritage and railway preservation society. The heritage train trips are operated by Queensland Pioneer Steam Railway who have steam train rides around Swanbank rail loop which

66-669: The end of its operational life. The coal for Swanbank B came from coalfields in South-East Queensland, including New Acland Mine , by road. Water is supplied from Lake Moogerah and the Western Corridor Recycled Water Scheme began to supply the power station with water in August 2007. Swanbank C was a small gas turbine generating plant, rated at 28 megawatts (38,000 hp). It had two Rolls-Royce Avon gas generators discharging into

77-520: The same day with a 10 second delay between each stack. The deconstruction and demolition project, undertaken by Trio Industries, was scheduled to be completed in February 2007. Swanbank B was commissioned in 1971 with four 120 megawatts (160,000 hp) steam turbines, powered by coal. Four units of Swanbank B were decommissioned in April 2010, June 2010, 2011, and May 2012, due to the plant reaching

88-451: The top of a 140-metre high Swanbank B smokestack for 33 hours. They descended over two hours on the next day, leaving a message for Australia's leaders – "Go Solar"- painted on the side of the smoke stack. YouTube videos of chimney demolition Swanbank, Queensland Download coordinates as: Swanbank is an industrial locality in the City of Ipswich , Queensland , Australia. In

99-473: Was installed in 1999 but was sold by CS Energy in 2003/2004 and was decommissioned by 2004. The much larger and more efficient Swanbank E was commissioned in 2002 with a single 385 megawatts (516,000 hp) combined cycle gas turbine . The gas turbine of Swanbank E was the largest of its type at the time of its commissioning. In 2011, Swanbank E set a world record for the continuous operation of an Alstom GT26 gas turbine. It had been running for 254 days when it

110-452: Was shut down on 9 July 2011 for planned maintenance. In 2021, its owner, CleanCo Queensland , wrote down the entire value of the power station to zero, and expects to receive net losses until its expected retirement in 2036. In February 2024, construction started for a 250 MW / 500 MWh grid battery at the B site, and a further 500 MW / 1000 MWh battery is planned. On 11 July 2008, four activists from Greenpeace Australia Pacific occupied

121-507: Was written off by the Queensland Audit Office as having no value, as it is uneconomical to run in 2021. Swanbank A was commissioned in 1967 and decommissioned in August 2005. It had six 66 megawatts (89,000 hp) steam turbines , and was powered by coal. The three 133-metre (436 ft) high, 7,000-tonne (6,900-long-ton; 7,700-short-ton) concrete smoke stacks were collapsed on 20 August 2006. All three were collapsed on

SECTION 10

#1732783091882
#881118