Misplaced Pages

Pontchartrain Railroad

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Pontchartrain Rail-Road was the first railway in New Orleans , Louisiana . Chartered in 1830, the railroad began carrying people and goods between the Mississippi River front and Lake Pontchartrain on 23 April 1831. It closed more than a hundred years later.

#499500

54-522: The 6-mile (10 km) long 4 ft 8 in ( 1,422 mm ) gauge line connected the Faubourg Marigny neighborhood of New Orleans along the riverfront with the town of Milneburg on the Lakefront. When built, the majority of the distance of the route between neighborhoods at either end of the route was a mixture of farmland, woods, and swamp. The route of the railway ran down

108-404: A mine or quarry. Initially the wagons were guided by human muscle power; subsequently by various mechanical methods. Timber rails wore rapidly: later, flat cast-iron plates were provided to limit the wear. In some localities, the plates were made L-shaped, with the vertical part of the L guiding the wheels; this is generally referred to as a "plateway". Flanged wheels eventually became universal, and

162-503: A new independent line was proposed to open up an unconnected area, the gauge was crucial in determining the allegiance that the line would adopt: if it was broad gauge, it must be friendly to the Great Western railway; if narrow (standard) gauge, it must favour the other companies. The battle to persuade or coerce that choice became very intense, and became referred to as "the gauge wars" . As passenger and freight transport between

216-580: A novelty in the shape of a mixed-gauge goods train was introduced between Truro and Penzance. It was worked by a narrow-gauge engine, and behind the narrow-gauge trucks came a broad-gauge match-truck with wide buffers and sliding shackles, followed by the broad-gauge trucks. Such trains continued to run in West Cornwall until the abolition of the Broad Gauge; they had to stop or come down to walking pace at all stations where fixed points existed and

270-560: A one way trip, 25 cents for a round trip. The railroad had terminals at the two ends of the line; stops would also be made at a small station at Gentilly Road, about the midpoint of the line, by advance request. In 1871 the line was purchased by the New Orleans, Mobile and Texas Railroad . In 1880 the Louisville and Nashville Railroad leased the line, and the following year purchased it outright. The railway served passengers for

324-657: A slight variation from the nominal gauge for pragmatic reasons. The gauge is defined in imperial units , metric units or SI units. Imperial units were established in the United Kingdom by the Weights and Measures Act 1824 . The United States customary units for length did not agree with the imperial system until 1959, when one international yard was defined as 0.9144 meters and, as derived units, 1 foot (= 1 ⁄ 3  yd) as 0.3048 meter and 1 inch (= 1 ⁄ 36  yd) as 25.4 mm. The list shows

378-426: Is a stub . You can help Misplaced Pages by expanding it . Track gauge In rail transport , track gauge is the distance between the two rails of a railway track . All vehicles on a rail network must have wheelsets that are compatible with the track gauge. Since many different track gauges exist worldwide, gauge differences often present a barrier to wider operation on railway networks. The term derives from

432-484: Is also used for the suburban railway systems in South Australia , and Victoria , Australia . The term "medium gauge" had different meanings throughout history, depending on the local dominant gauge in use. In 1840s, the 1,600 mm ( 5 ft 3 in ) Irish gauge was considered a medium gauge compared to Brunel's 7 ft  1 ⁄ 4  in ( 2,140 mm ) broad gauge and

486-506: Is typically greater for track limited to slower speeds, and tighter for track where higher speeds are expected (as an example, in the US the gauge is allowed to vary between 4 ft 8 in (1,420 mm) to 4 ft 10 in (1,470 mm) for track limited to 10 mph (16 km/h), while 70 mph (110 km/h) track is allowed only 4 ft 8 in (1,420 mm) to 4 ft 9 + 1 ⁄ 2  in (1,460 mm). Given

540-410: Is undertaken when no other alternative is available. The nominal track gauge is the distance between the inner faces of the rails. In current practice, it is specified at a certain distance below the rail head as the inner faces of the rail head (the gauge faces ) are not necessarily vertical. Some amount of tolerance is necessarily allowed from the nominal gauge to allow for wear, etc.; this tolerance

594-550: Is used between China and Central Asia, and between Poland and Ukraine, using the SUW 2000 and INTERGAUGE variable axle systems. China and Poland use standard gauge, while Central Asia and Ukraine use 1,520 mm ( 4 ft  11 + 27 ⁄ 32  in ). When individual railway companies have chosen different gauges and have needed to share a route where space on the ground is limited, mixed gauge (or dual gauge) track, in which three (sometimes four) rails are supported in

SECTION 10

#1732798690500

648-494: The 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ) narrow gauge, which became the modern standard gauge . In modern usage, the term "narrow gauge" generally refers to track spaced significantly narrower than 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ). Narrow gauge is the dominant or second dominant gauge in countries of Southern, Central Africa, East Africa, Southeast Asia, Japan, Taiwan, Philippines, Central America and South America, During

702-599: The Bratislava – Lviv train, and the Romania/Moldova border on the Chișinău – Bucharest train. A system developed by Talgo and Construcciones y Auxiliar de Ferrocarriles (CAF) of Spain uses variable gauge wheelsets ; at the border between France and Spain, through passenger trains are drawn slowly through an apparatus that alters the gauge of the wheels, which slide laterally on the axles. A similar system

756-721: The Grand Junction Railway and the London and Birmingham Railway forming a huge preponderance of standard gauge . When Bristol promoters planned a line from London, they employed the innovative engineer Isambard Kingdom Brunel . He decided on a wider gauge, to give greater stability, and the Great Western Railway adopted a gauge of 7 ft ( 2,134 mm ), later eased to 7 ft  1 ⁄ 4  in ( 2,140 mm ). This became known as broad gauge . The Great Western Railway (GWR)

810-496: The Transmongolian Railway , Russia and Mongolia use 1,520 mm ( 4 ft  11 + 27 ⁄ 32  in ) while China uses the standard gauge of 1,435 mm. At the border, each carriage is lifted and its bogies are changed . The operation can take several hours for a whole train of many carriages. Other examples include crossings into or out of the former Soviet Union: Ukraine/Slovakia border on

864-403: The spacing between the rails had to be compatible with that of the wagon wheels. As the guidance of the wagons was improved, short strings of wagons could be connected and pulled by teams of horses, and the track could be extended from the immediate vicinity of the mine or quarry, typically to a navigable waterway. The wagons were built to a consistent pattern and the track would be made to suit

918-476: The "gauge", a metal bar with a precisely positioned lug at each end that track crews use to ensure the actual distance between the rails lies within tolerances of a prescribed standard: on curves, for example, the spacing is wider than normal. Deriving from the name of the bar, the distance between these rails is also referred to as the track gauge. The earliest form of railway was a wooden wagonway, along which single wagons were manhandled, almost always in or from

972-410: The 19th century, a significant portion of sea traffic to New Orleans came in not via the river but to Lake Pontchartrain. Thus the railway was important in transferring cargo between ocean-going ships docked at the lake and riverboats. Many passenger sea ships also arrived via the lake, and the railway took passengers the remainder of the way into the city. For decades the passenger fare was 15 cents for

1026-454: The GWR, there was an extended period between political intervention in 1846 that prevented major expansion of its 7 ft  1 ⁄ 4  in ( 2,140 mm ) broad gauge and the final gauge conversion to standard gauge in 1892. During this period, many locations practicality required mixed gauge operation, and in station areas the track configuration was extremely complex. This

1080-579: The Middle East, and China. In modern usage, the term "broad gauge" generally refers to track spaced significantly wider than 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ). Broad gauge is the dominant gauge in countries in Indian subcontinent, the former Soviet Union ( CIS states, Baltic states, Georgia and Ukraine), Mongolia, Finland (which still uses the original Soviet Gauge of 1524mm), Spain, Portugal, Argentina, Chile and Ireland. It

1134-402: The allowed tolerance, it is a common practice to widen the gauge slightly in curves, particularly those of shorter radius (which are inherently slower speed curves). Rolling stock on the network must have running gear ( wheelsets ) that are compatible with the gauge, and therefore the gauge is a key parameter in determining interoperability, but there are many others – see below. In some cases in

SECTION 20

#1732798690500

1188-648: The center of Elysian Fields Avenue . It was the third common carrier railroad to officially open for service to the public in the United States, following the Baltimore and Ohio and the South Carolina Canal and Rail Road Company . Meetings discussing building a railway between the river and lake began in 1828. The Pontchartrain Rail-Road was chartered on 20 January 1830. The right-of-way

1242-426: The city out to the lakefront became common, to enjoy the cooling breezes and the entertainments at Milneberg. In the early 20th century rates were 10 cents for adults, 5 cents for children one way, and double for round trip. Generations of New Orleanians fondly remembered the archaic veteran steam engine nicknamed "Smoky Mary" running on the line as late as the 1930s. The somewhat less outdated companion locomotive on

1296-561: The convenience in laying it and changing its location over unimproved ground. In restricted spaces such as tunnels, the temporary way might be double track even though the tunnel will ultimately be single track. The Airport Rail Link in Sydney had construction trains of 900 mm ( 2 ft  11 + 7 ⁄ 16  in ) gauge, which were replaced by permanent tracks of 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ) gauge. During World War I, trench warfare led to

1350-448: The earliest days of railways, the railway company saw itself as an infrastructure provider only, and independent hauliers provided wagons suited to the gauge. Colloquially the wagons might be referred to as "four-foot gauge wagons", say, if the track had a gauge of four feet. This nominal value does not equate to the flange spacing, as some freedom is allowed for. An infrastructure manager might specify new or replacement track components at

1404-609: The first decades of the 19th century; they took various forms, but George Stephenson developed a successful locomotive on the Killingworth Wagonway , where he worked. His designs were successful, and when the Stockton and Darlington Railway was opened in 1825, it used his locomotives, with the same gauge as the Killingworth line , 4 ft 8 in ( 1,422 mm ). The Stockton and Darlington line

1458-423: The imperial and other units that have been used for track gauge definitions: A temporary way is the temporary track often used for construction, to be replaced by the permanent way (the structure consisting of the rails, fasteners, sleepers/ties and ballast (or slab track), plus the underlying subgrade) when construction nears completion. In many cases narrow-gauge track is used for a temporary way because of

1512-494: The last time in 1932, with service from Milneburg to New Orleans replaced by buses. In the late 19th century, the Pontchartrain Railroad became less important for commerce, as ships too large to use the Lakefront routes became common and the extensive network of long-distance railways grew. However, at the same time, the line became more important for recreation. Especially during the long summer, excursions from

1566-541: The line obsolete. 4 ft 8 in gauge railways 4 ft 8 in gauge railways are railways with a track gauge of 4 ft 8 in  / 1,422 mm . This gauge is 1 ⁄ 2 inch (13 mm) less than 4 ft  8 + 1 ⁄ 2  in ( 1,435 mm ) standard gauge The first such railways were the Killingworth Railway and the Stockton and Darlington Railway This rail-transport related article

1620-414: The line was called "Puffing Billy". Thanks to the popularity of recreational excursions at Milneburg, business remained brisk for the Pontchartrain Railroad through the mid-1920s. After this, however, the railroad declined for two reasons. One was less demand for short-distance rail passenger service with expansion of electric streetcar routes and growth in automobile ownership. The final straw, however,

1674-429: The metal bar, or gauge, that is used to ensure the distance between the rails is correct. Railways also deploy two other gauges to ensure compliance with a required standard. A loading gauge is a two-dimensional profile that encompasses a cross-section of the track, a rail vehicle and a maximum-sized load: all rail vehicles and their loads must be contained in the corresponding envelope. A structure gauge specifies

Pontchartrain Railroad - Misplaced Pages Continue

1728-404: The narrow portion side-stepped to right or left. In rare situations, three different gauges may converge on to a rail yard and triple-gauge track is needed to meet the operational needs of the break-of-gauge station – most commonly where there is insufficient space to do otherwise. Construction and operation of triple-gauge track and its signalling, however, involves immense cost and disruption, and

1782-530: The needs of the horses and wagons: the gauge was more critical. The Penydarren Tramroad of 1802 in South Wales, a plateway, spaced these at 4 ft 4 in ( 1,321 mm ) over the outside of the upstands. The Penydarren Tramroad probably carried the first journey by a locomotive, in 1804, and it was successful for the locomotive, but unsuccessful for the track: the plates were not strong enough to carry its weight. A considerable progressive step

1836-605: The north-east of Scotland adopted 4 ft  6 + 1 ⁄ 2  in ( 1,384 mm ); the Redruth and Chasewater Railway (1825) in Cornwall chose 4 ft ( 1,219 mm ). The Arbroath and Forfar Railway opened in 1838 with a gauge of 5 ft 6 in ( 1,676 mm ), and the Ulster Railway of 1839 used 6 ft 2 in ( 1,880 mm ). Locomotives were being developed in

1890-477: The outline into which structures (bridges, platforms, lineside equipment etc.) must not encroach. The most common use of the term "track gauge" refers to the transverse distance between the inside surfaces of the two load-bearing rails of a railway track , usually measured at 12.7 millimetres (0.50 inches) to 15.9 millimetres (0.63 inches) below the top of the rail head in order to clear worn corners and allow for rail heads having sloping sides. The term derives from

1944-555: The period known as " the Battle of the gauges ", Stephenson's standard gauge was commonly known as "narrow gauge", while Brunel's railway's 7 ft  1 ⁄ 4  in ( 2,140 mm ) gauge was termed " broad gauge ". Many narrow gauge railways were built in mountainous regions such as Wales , the Rocky Mountains of North America, Central Europe and South America. Industrial railways and mine railways across

1998-416: The same track structure, can be necessary. The most frequent need for such track was at the approaches to city terminals or at break-of-gauge stations. Tracks of multiple gauges involve considerable costs in construction (including signalling work) and complexities in track maintenance, and may require some speed restrictions. They are therefore built only when absolutely necessary. If the difference between

2052-497: The space between the rails of a track is colloquially referred to as the "four-foot", and the space between two tracks the "six-foot", descriptions relating to the respective dimensions. In modern usage the term "standard gauge" refers to 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ). Standard gauge is dominant in a majority of countries, including those in North America, most of western Europe, North Africa,

2106-553: The two areas became increasingly important, the difficulty of moving from one gauge to the other—the break of gauge —became more prominent and more objectionable. In 1845 a Royal Commission on Railway Gauges was created to look into the growing problem, and this led to the Regulating the Gauge of Railways Act 1846 , which forbade the construction of broad gauge lines unconnected with the broad gauge network. The broad gauge network

2160-617: The two gauges is large enough – for example between 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ) standard gauge and 3 ft 6 in ( 1,067 mm ) – three-rail dual-gauge is possible, but if not – for example between 3 ft 6 in ( 1,067 mm ) and 1,000 mm ( 3 ft  3 + 3 ⁄ 8  in ) metre gauge – four rails must be used. Dual-gauge rail lines occur (or have occurred) in Argentina, Australia, Brazil, Japan, North Korea, Spain, Switzerland, Tunisia and Vietnam. On

2214-826: The world are often narrow gauge. Sugar cane and banana plantations are mostly served by narrow gauges. Very narrow gauges of under 2 feet (610 mm) were used for some industrial railways in space-restricted environments such as mines or farms. The French company Decauville developed 500 mm ( 19 + 3 ⁄ 4  in ) and 400 mm ( 15 + 3 ⁄ 4  in ) tracks, mainly for mines; Heywood developed 15 in ( 381 mm ) gauge for estate railways . The most common minimum gauges were 15 in ( 381 mm ), 400 mm ( 15 + 3 ⁄ 4  in ), 16 in ( 406 mm ), 18 in ( 457 mm ), 500 mm ( 19 + 3 ⁄ 4  in ) or 20 in ( 508 mm ). Through operation between railway networks with different gauges

Pontchartrain Railroad - Misplaced Pages Continue

2268-443: Was adopted, but many countries or companies chose a different gauge as their national gauge, either by governmental policy, or as a matter of individual choice. Standard gauge is generally known world-wide as being 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ). Terms such as broad gauge and narrow gauge do not have any fixed meaning beyond being materially wider or narrower than standard. In British practice,

2322-481: Was approved by the New Orleans City Council on 15 March, and construction began immediately, with a pair of parallel railroad tracks. Some of the route included swampland that required up to 4 feet of fill to create a sufficient road bed. A 150 foot wide bed was constructed along the entire route, with the rail line laid with red cypress timbers and English rolled iron rails. Construction of the line

2376-447: Was cannibalized, the boiler used to run equipment at the railroad's machine shop. At first, the passenger fare was 75 cents round trip. For some years both steam power and horse-drawn traffic ran on the line, with steam only gradually becoming dominant with the acquisition of more reliable locomotives. One horse-drawn car was kept on the line as late as 1861, although the line at the time also had five working locomotives. For much of

2430-583: Was completed on April 14, 1831, and it officially opened on the 23rd, with horse drawn railway carriages. The first steam locomotive , "the Shields", arrived on 15 June 1832. This first locomotive proved unreliable; a second locomotive "the Pontchartrain" supplied from England by Rothwell, Hick & Co. proved better, allowing the line to advertise regular steam service of 7 round trips per day (9 on Sundays) starting on 27 September 1832. "The Shields"

2484-441: Was compounded by the common rail having to be at the platform side in stations; therefore, in many cases, standard-gauge trains needed to be switched from one side of the track to the other at the approach. A special fixed point arrangement was devised for the purpose, where the track layout was simple enough. In some cases, mixed gauge trains were operated with wagons of both gauges. For example, MacDermot wrote: In November 1871

2538-519: Was eventually converted—a progressive process completed in 1892, called gauge conversion . The same Act mandated the gauge of 5 ft 3 in ( 1,600 mm ) for use in Ireland. As railways were built in other countries, the gauge selection was pragmatic: the track would have to fit the rolling stock. If locomotives were imported from elsewhere, especially in the early days, the track would be built to fit them. In some cases standard gauge

2592-445: Was made when cast iron edge rails were first employed; these had the major axis of the rail section configured vertically, giving a much stronger section to resist bending forces, and this was further improved when fish-belly rails were introduced. Edge rails required a close match between rail spacing and the configuration of the wheelsets, and the importance of the gauge was reinforced. Railways were still seen as local concerns: there

2646-566: Was no appreciation of a future connection to other lines, and the choice of track gauge was still a pragmatic decision based on local requirements and prejudices, and probably determined by existing local designs of (road) vehicles. Thus, the Monkland and Kirkintilloch Railway (1826) in the West of Scotland used 4 ft 6 in ( 1,372 mm ); the Dundee and Newtyle Railway (1831) in

2700-532: Was originally impossible; goods had to be transshipped and passengers had to change trains. This was obviously a major obstacle to convenient transport, and in Great Britain, led to political intervention. On narrow gauge lines, rollbocks or transporter wagons are used: standard gauge wagons are carried on narrow gauge lines on these special vehicles, generally with rails of the wider gauge to enable those vehicles to roll on and off at transfer points. On

2754-497: Was referred to as "narrow gauge" to indicate the contrast. Some smaller concerns selected other non-standard gauges: the Eastern Counties Railway adopted 5 ft ( 1,524 mm ). Most of them converted to standard gauge at an early date, but the GWR's broad gauge continued to grow. The larger railway companies wished to expand geographically, and large areas were considered to be under their control. When

SECTION 50

#1732798690500

2808-449: Was successful and was greatly expanded, directly and through friendly associated companies, widening the scope of broad gauge. At the same time, other parts of Britain built railways to standard gauge, and British technology was exported to European countries and parts of North America, also using standard gauge. Britain polarised into two areas: those that used broad gauge and those that used standard gauge. In this context, standard gauge

2862-458: Was the closing of the Milneburg resorts while a land reclamation project dredged earth into the shallows of lake Pontchartrain there in the late 1920s and early 1930s. The last passenger service of the line was on March 15, 1932, the line having been in business for over a century. Freight runs on the line continued to 1935, mostly servicing the Lakefront land reclamation project work which made

2916-482: Was very successful, and when the Liverpool and Manchester Railway , the first intercity line, was opened in 1830, it used the same gauge. It too was very successful, and the gauge, widened to 4 ft  8 + 1 ⁄ 2  in or 1,435 mm and named " standard gauge ", was well on its way to becoming the established norm. The Liverpool and Manchester was quickly followed by other trunk railways, with

#499500