A box girder bridge , or box section bridge , is a bridge in which the main beams comprise girders in the shape of a hollow box. The box girder normally comprises prestressed concrete , structural steel , or a composite of steel and reinforced concrete . The box is typically rectangular or trapezoidal in cross-section . Box girder bridges are commonly used for highway flyovers and for modern elevated structures of light rail transport. Although the box girder bridge is normally a form of beam bridge , box girders may also be used on cable-stayed and other bridges.
57-599: The West Gate Bridge is a steel, box girder , cable-stayed bridge in Melbourne , Victoria , Australia, spanning the Yarra River just north of its mouth into Port Phillip . It carries the West Gate Freeway and is a vital link between the Melbourne central business district (CBD) and western suburbs , with the industrial suburbs in the west, and with the city of Geelong 80 kilometres (50 mi) to
114-551: A bridge for a road between Geelong Road ('west of Kororoit Creek') and Ingles St, Port Melbourne. Road routes between central Melbourne and the west were, however, bridged further north, and the usual method of crossing at the lower Yarra was via skiffs until 1912, when ferries were first instituted, the Newport steam ferry operated by the City of Williamstown taking prominence between 1931 and 1974. The Western Industries Association
171-426: A bridge would not be acceptable for the crossing. The tunnel, it was suggested, would carry 30 000 cars a day; differing estimates on the capacity of the 'overtaxed' ferry suggested it could only handle between 1 200 and 2 000. The Victorian Government's response to the proposal, delivered by Commissioner for Public Works Thomas Maltby , was that the government's finances were inadequate to undertake
228-461: A crossing urgently and that any such project would require private investment. In 1961 Lower Yarra Crossing Limited was formed, a non-profit company to develop the crossing. In mid-1960 it was announced that the Association would raise the money to construct the bridge with government support keeping interest rates low; the arrangement was envisaged as not, in itself, profit-making. In this year,
285-699: A freight rail line. The portals would have been north of Williamstown Road in Port Melbourne, and between Blackshaws and Melbourne roads in Altona North. In 2018, work began on the West Gate Tunnel , which is designed to provide an alternative to the West Gate Bridge. Work is expected to finish in 2025. The State Government also assessed options for the development of another east–west link in 2008. Sir Rod Eddington , Chairman of
342-519: A jetty adjacent to Scienceworks Museum – Hobsons Bay Coastal Trail . It operates on demand, from Monday to Friday in morning and evening peaks, and on weekends and public holidays from 10:00 am to 5:00 pm. The notion of a Lower Yarra River Crossing has formal origins as early as 1888, when Victoria’s Public Works Department first proposed a tunnel under the Yarra. The Metropolitan Town Planning Commission 's Plan of General Development proposed
399-646: A second deck to the bridge. Many such plans have come under fire from community groups such as the Public Transport Users Association and Environment Victoria , which advocate investment in alternative forms of transport. A private sector report, made public in February 2006, suggested building a companion tunnel to the West Gate Bridge under the Yarra River, made up of three separate bores to carry traffic in either direction and
456-557: A similar camera on the Western Ring Road . However these speed cameras were switched off in 2005, and currently remain disabled, as the sway of the bridge prevents secondary verification of the alleged speed against a fixed point. In 2006 the State Government spent $ 1.3 million on erecting railway style boom barriers at each entrance to the bridge to block traffic in the event of a terrorist attack. In March 2007,
513-525: A welded mesh fence was erected from February 2009. A permanent metal mesh barrier was subsequently installed along the length of the bridge in 2010–11 at a cost of $ 20 million. The barrier is reported to have reduced suicides from the bridge by 85 per cent. Box girder bridge In 1919, Major Gifford Martel was appointed head of the Experimental Bridging Establishment at Christchurch, Hampshire , which researched
570-594: Is constantly busy due to the number of vehicles coming in and out of the Port of Melbourne . The bridge was originally tolled but tolls were abolished in 1985 because drivers were using other routes to avoid the toll. The bridge is windswept as there are no significant obstructing terrain features for some distance, particularly in the quadrant from south to west, a common wind direction. This can lead to issues for motorbikes, trucks and other high-sided vehicles in higher wind speeds. Previously wind warning lights were present at
627-630: Is twice as long as the Sydney Harbour Bridge and is one of the highest road decks in Australia, higher than Sydney Harbour Bridge's 49 metres (161 ft). It carries up to 200,000 vehicles per day. The bridge passes over Westgate Park , a large environmental and recreational reserve created during the bridge's construction. The West Gate Bridge is a 10-lane dual-carriageway freeway bridge, carrying five lanes of motor vehicle traffic in each direction. The freeway corridor (including
SECTION 10
#1732772316048684-711: The Bailey bridge . In 1954, the Royal Commission on Awards to Inventors awarded Martel £500 for infringement on the design of his bridge by the designer of the Bailey bridge, Donald Bailey . Both the Large Box and Small Box designs would go on to see much service in World War II, especially in the case of the latter. The (non-modular) box girder bridge was a popular choice during the roadbuilding expansion of
741-682: The Maribyrnong River . Linking Dynon and Footscray Roads in the Port of Melbourne precinct to Geelong Road in West Footscray, now known as the East-West Link , its cost is estimated to be up to $ 10 billion. Owing to its height, the bridge became a popular location for suicides, with police data in the early 2000s showing up to one suicide occurring every three weeks at the West Gate Bridge. A 2004 coroner's report recommended anti-suicide fencing or barriers be erected on
798-465: The Sydney Harbour Bridge . Strong growth in suburbs along the route, and increased freight through the Port of Melbourne, means that the corridor is experiencing traffic congestion during peak periods, is vulnerable to short-term interruptions, and is rapidly approaching capacity. Proposals to abate congestion by allowing more traffic have included bridge widening, a tunnel underneath the river, or adding
855-645: The 1960s, especially in the West, and many new bridge projects were in progress simultaneously. A serious blow to this use was a sequence of three serious disasters, when new bridges collapsed in 1970 ( West Gate Bridge and Cleddau Bridge ) and 1971 ( South Bridge (Koblenz) ). Fifty-one people were killed in these failures, leading in the UK to the formation of the Merrison Committee and considerable investment in new research into steel box girder behaviour. Most of
912-526: The 2012 Institution of Structural Engineers Supreme Award for structural engineering for the project. On 11 March 2014, a 10-metre (33 ft) high artist-designed flag was raised on the western side of the bridge as part of the "Melbourne Now" exhibition, On Top of the World: Flags for Melbourne . The flag was a collaborative design between four contributing artists (Brook Andrew, Helen Johnson, Kate Daw and Jon Campbell) who shared an affinity with
969-571: The Lower Yarra Crossing Authority, a non-profit company, formed its own Directorate of Engineering. In September 1971, Hans G. Wolfram, FIEAust and a Director of Gutteridge, Haskins & Davey , was appointed the Director of Engineering. He was responsible for the re-design, supervision of construction, and contract administration of West Gate Bridge until its completion. The Chairman of the Lower Yarra Crossing Authority
1026-825: The South Bridge over the Rhine River in Koblenz on 10 November 1971. The UK government responded by setting up the Merrison Committee of Inquiry, headed by Sir Alec Merrison . The Merrison Committee provided an interim report in May 1971, and a final report in February 1973 on new design and workmanship rules for steel box-girder bridges. Following the publication of the Report of the Royal Commission in August 1971,
1083-543: The State Government announced that two flagpoles would be erected atop the main bridge pylons, to fly the Australian and Victorian flags , each being 10 by 5 metres (33 by 16 ft) in size and 135 metres (443 ft) above sea level. Costing $ 350,000 to install and $ 15,000 a year to maintain, the flags were unfurled on 24 September 2008. On 5 August 2007, it was reported that the Victorian Government
1140-492: The Victorian Major Events Company and former CEO of British Airways, was to head the assessment of the future east–west connections and recommend the best way forward for public transport, road and freight travel for the entire Monash-West Gate corridor. In December 2008, the State Government announced it was planning for such a link, anticipated to be a three-kilometre road tunnel under Footscray and
1197-453: The West Gate Bridge with her 22-month-old son Oliver, and their bodies were found on the river bank below. Seven months later on 29 January 2009, a 4-year-old girl, Darcey Freeman, was thrown off the bridge by her father, Arthur Freeman . She survived the fall but later died in hospital. Freeman was found guilty of murder and sentenced to life in prison in April 2011; the apparent trigger for
SECTION 20
#17327723160481254-533: The Western Industries Association applied to government for license to construct and operate a crossing on a toll basis. In 1961 the Association formed Lower Yarra Crossing Ltd. Test drilling began late in that year by which point the Association once again became publicly open to the construction of a bridge, rather than a tunnel. Nevertheless Danish tunnel engineering firm Christiani and Nielson were engaged as consultants. Chief amongst
1311-570: The Westgate Park below. The case was significant as Halkic was a victim of cyberbullying in the days prior to this, and reportedly became the first death resulting from cyberbullying in Victoria. In October 2011 a coronial inquest was held into the death, again recommending (among other things) the installation of anti-suicide barriers on the bridge. Following these incidents, a temporary suicide barrier of concrete crash barriers topped with
1368-439: The boxes and to carry out their sub-assembly, but with a joint venture between Redpath Dorman Long and John Holland (Constructions) completing the construction of the steel portion of the bridge. Additional strengthening of the structure had to be designed for the erection because the stresses could exceed those of the in-service condition. The joint venture contractor engaged Flint and Neill of London for this and their design
1425-434: The bridge approaches to control traffic (amber – bridge closed to motorbikes and high vehicles, red – closed to all traffic), but the former practice is to reduce the speed limit to 60 kilometres per hour (37 mph) or 40 kilometres per hour (25 mph) when the wind speed gets too high. This has since been replaced with a modern variable speed limit system as part of the 2008–11 upgrade. Cyclists are prohibited from using
1482-590: The bridge except for special bicycle events, notably the Melbourne Summer Cycle , a fundraising event for multiple sclerosis, and the Around the Bay in a Day event that raises money for The Smith Family charity. The Westgate Punt is a foot ferry that runs directly below the bridge, taking cyclists and pedestrians across the Yarra between a jetty at Fishermans Bend near Westgate Park – Bay Trail and
1539-436: The bridge found at least 62 cases between 1991 and 1998. Seven people survived the 58-metre (190 ft) fall. Around 74 per cent of those who jumped from the bridge were male, with an average age of 33. More than 70 per cent were suffering from mental illness . Of those who jumped off the West Gate Bridge, 31 per cent fell onto land. Some of those who landed in water drowned afterwards. In June 2008, Gabriela Garcia jumped off
1596-432: The bridge itself) carries a very high volume and occupancy of traffic; a total of between 180,000 and 200,000 cars, trucks, and motorcycles use it per day, according to VicRoads . This makes the West Gate Bridge and West Gate Freeway one of the busiest road corridors in Australia. As it is the only main direct link between Melbourne's CBD and the west, it is frequently congested during the morning and afternoon peaks and
1653-467: The bridge to deter people from attempting to end their lives. Those who argued for a suicide barrier claimed that most of those who jump from the West Gate Bridge do so through impulse, and that police officers who tried to save jumpers were putting their own lives in danger. There were reported incidents of police officers dangling off the side of the bridge while holding onto would-be jumpers. A 2000 Royal Melbourne Hospital study on people who jumped from
1710-496: The bridge. The flag design is a reference to 1803 maritime communications by Rear Admiral Home Riggs Popham , the symbol on the flag meaning "I can spare what you asked for". The flag was flown until the end of the "Melbourne Now" show on 25 March 2014. Since July 2022, the Aboriginal flag will formally fly over the bridge alongside the Australian flag permanently as announced. The cost was not disclosed, as with $ 25 million for
1767-453: The bridges still under construction at this time were delayed for investigation of the basic design principle. Some were abandoned and rebuilt as a different form of bridge altogether. Most of those that remained as box girder bridges, such as Erskine Bridge ( illus. ), were either redesigned, or had additional stiffening added later. Some bridges were strengthened a few years after opening and then further strengthened years later, although this
West Gate Bridge - Misplaced Pages Continue
1824-765: The collapse. A West Gate Bridge Memorial Park is located near the bridge. It opened on 15 October 2004, the 34th anniversary of the collapse. It includes the West Gate Bridge Memorial and Sculpture, and the memorial for six who died in the Spotswood sewer tunnel collapse of 12 April 1895. Three other steel box girder bridges collapsed during their construction between 1969 and 1971: the Fourth Danube Bridge in Vienna on 6 November 1969; Cleddau Bridge (Milford Haven), Wales on 2 June 1970; and
1881-582: The concerns regarding a tunnel was the limitation on particular goods or cargoes - notably, flammable material - that could legally, or safely, be carried through a tunnel. In the state government's analysis, the cost of building a bridge or a tunnel would be equal, however, notwithstanding the Harbour Trust 's strong advocacy for a tunnel, it was felt by those in power that a bridge would more readily allow use by petrol tankers. In 1965, Yvonne A. Van Den Nouwelant writes, ‘the Lower Yarra Crossing Authority
1938-411: The failure of the bridge to two causes: the structural design by designers Freeman Fox & Partners , and an unusual method of construction by World Services and Construction , the original contractors for the project. On the day of the collapse, there was a difference in camber of 11.4 centimetres (4.5 in) between two half- girders at the west end of the span which needed to be joined. It
1995-423: The girders are normally fabricated off site and lifted into place by crane, with sections connected by bolting or welding. If a composite concrete bridge deck is used, it is often cast in-place using temporary falsework supported by the steel girder. Either form of bridge may also be installed using the technique of incremental launching . Under this method, gantry cranes are often used to place new segments onto
2052-561: The ground and water below. Thirty-five construction workers died and eighteen were injured, and it remains Australia's worst industrial accident. Many of those who died were on lunch break beneath the structure in workers' huts, which were crushed by the falling span. Others were working on and inside the span when it fell. The whole 2,000-tonne (4,400,000 lb) mass plummeted into the Yarra River mud with an explosion of gas, dust and mangled metal that shook buildings hundreds of metres away. Nearby houses were spattered with flying mud. The roar of
2109-607: The impact, the explosion, and the fire that followed, could be clearly heard over 20 kilometres (12 mi) away. On the following morning, 16 October, Sir Henry Bolte (Premier of Victoria) announced that a Royal Commission would be set up immediately to look into the cause of the disaster. Prime Minister John Gorton , said: "I am sure the whole of Australia is shocked and saddened by the serious accident at West Gate Bridge. Please extend my deepest sympathy to all those families to whom this tragic event has brought such grief." The Royal Commission concluded on 14 July 1971. It attributed
2166-732: The incident was his recent separation and apparent fear of loss of access to the children (similar to the 2005 Robert Farquarson case). A week after that incident, on 5 February 2009, 17-year-old Allem Halkic jumped from the inbound lanes near the Todd Road exit on the Port Melbourne side of the bridge. On walking up the bridge he was reported to have said to the VicRoads operator via the emergency phone, "You better get someone here before I jump". Police responded within minutes of this, but were too late to save Halkic and found his body in
2223-410: The original steel and concrete deck by a lighter and stronger orthotropic steel deck as technically and economically the most appropriate solution. This orthotropic deck is a steel plate stiffened longitudinally by closely spaced cellular troughs and laterally, at intervals, by cross beams. The proof engineer was Karlheinz Roik , a professor of steel construction at TU Berlin . He independently checked
2280-485: The peak direction, opposing traffic having three lanes. This was to be done using overhead signals and barriers; the State Government allocated funds to this project in its 2006–2007 state budget, but the works were never carried out. In 2008 the expansion plans were revised as part of the Victorian Transport Plan , when it was announced that the bridge would be widened to five lanes in each direction,
2337-409: The plan would allow the bridge to carry 50 per cent more vehicles, while reducing crashes by 20 per cent. Structural analysis work on the bridge concluded in early 2009, and was completed over a 14-month period. Works to strengthen the bridge commenced in the first half of 2009, with the entire strengthening project scheduled for completion in 2011. On 22 June 2011, all five lanes were finally opened to
West Gate Bridge - Misplaced Pages Continue
2394-482: The possibilities of using tanks for battlefield engineering purposes such as bridge-laying and mine -clearing. Here he continued trials on modified Mark V tanks. The bridging component involved an assault bridge, designed by Major Charles Inglis RE, the Canal Lock Bridge, which had sufficient length to span a canal lock . Major Martel mated the bridge with the tank and used hydraulic power generated by
2451-452: The public in both directions, with the completion of the required strengthening works. The full cost was $ 347 million, $ 107 million more than VicRoads had originally planned, but included considerable additional scope of works. This cost increase was after the deletion of $ 20 million architectural lighting originally included in the scope of the works. The engineers for the strengthening project, Flint & Neill and Sinclair Knight Merz , won
2508-628: The re-design of the West Gate Bridge in accordance with the recommendations of the Royal Commission. The re-design was also checked against the German code DIN 4114 and the Appraisal Rules of the Merrison Committee's reports. The re-design was endorsed by four other university professors of civil engineering: F.B. Bull ( Adelaide ), N.W. Murray ( Monash ), J.W. Roderick ( Sydney ) and L.K. Stevens ( Melbourne ). Construction resumed in 1972 with World Services and Construction continuing to fabricate
2565-479: The south-west. It is part of one of the busiest road corridors in Australia. The high span bridge was built to allow large cargo ships to access the docks in the Yarra River. The main river span is 336 metres (1,102 ft) long, and 58 metres (190 ft) above the water. The total length of the bridge is 2,582.6 metres (8,473 ft). It is the fifth-longest in Australia, the longest being Melbourne's Bolte Bridge at 5 kilometres (3.1 mi). The West Gate Bridge
2622-474: The space being gained by narrowing the existing traffic lanes and closing the emergency lanes , in a move criticised by Victorian fire, police and ambulance unions. Overhead gantries would be used to direct traffic out of lanes when breakdowns and accidents occur. Costed at $ 240 million, each lane would be 3.1 metres (10 ft) wide; by comparison, lanes on the Sydney Harbour Bridge have a width of 2.8 metres (9.2 ft). Roads Minister Tim Pallas claimed that
2679-473: The span collapsed. Six twisted fragments of the collapsed bridge can be found in the West Gate garden at the engineering faculty of Monash University, Clayton campus . The university acquired them after being asked to participate in the investigation of the collapse. It is said that they are to remind engineers of the consequences of their errors. Commemorations have been held on 15 October every year since
2736-738: The tank's engine to manoeuvre the bridge into place. For mine clearance the tanks were equipped with 2-ton rollers . Martel also developed his new bridging concept at the EBE, the Martel bridge, a modular box girder bridge suitable for military applications. The Martel bridge was adopted by the British Army in 1925 as the Large Box Girder Bridge. A scaled down version of this design, the Small Box Girder Bridge,
2793-715: Was Oscar G. Meyer. The Deputy Chairman was Bernard J. Callinan , who was also Chairman of the Technical Committee. In 1971, the Authority was renamed as the West Gate Bridge Authority. Intensive reviews of the structure focused attention on the inadequate strength of the original design of the bridge's deck. This consisted of a 100 mm reinforced concrete slab acting compositely with a steel deck plate stiffened by bulb flats. Numerous proposals were examined and Wolfram recommended replacing
2850-571: Was also formally adopted by the Army in 1932. This latter design was copied by many countries, including Germany, who called their version the Kastenträger-Gerät (K-Gerät for short). The United States was another country whose army created their own copy, designating it the H-20. In addition, the modular construction of the basic Martel bridge would later during WWII become part of the basis of
2907-409: Was built to carry 40,000 vehicles a day but volumes had grown to more than four times the original number, approximately 160,000 vehicles on an average day. On 17 May 2006, the State Government as part of its Meeting Our Transport Challenges plan announced plans to change traffic flow in peak periods on the West Gate Bridge and approaches to it, using a reversible lane to provide five traffic lanes in
SECTION 50
#17327723160482964-465: Was formed in August 1957 and claimed to be ‘representative of all industries in Altona , Footscray , Sunshine , Werribee and Williamstown districts’. Having formed a sub-committee to investigate a Yarra crossing, in 1958 it asked Victorian Premier Henry Bolte ‘to give urgent consideration to construction of a traffic tunnel under the Yarra.’ The Association had been told by 'shipping interests' that
3021-496: Was granted a franchise by Act of Parliament and in 1968 construction started on the West Gate Bridge.’ It was noted by the press at the time that the location of the bridge's eastern approaches would require the removal of the Fishermen's Bend airstrip . Two years into construction of the bridge, at 11:50 am on 15 October 1970, the 112-metre (367-foot) span between piers 10 and 11 collapsed and fell 50 metres (164 feet) to
3078-444: Was often due to increased traffic load as much as better design standards. The Irwell Valley bridge of 1970 was strengthened in 1970 and again in 2000. If made of concrete, box girder bridges may be cast in place using falsework supports, removed after completion, or in sections if a segmental bridge . Box girders may also be prefabricated in a fabrication yard, then transported and emplaced using cranes . For steel box girders,
3135-632: Was planning a $ 240 million project to identify and eliminate structural weaknesses in the bridge, with specific concerns including crash barriers, cracking, corrosion and potential buckling. News of the work was prompted by the collapse of the I-35W Mississippi River bridge in Minneapolis . Experts were reported as saying the West Gate was initially designed to carry loads of 25 tonnes (55,000 lb) but now carried B-double trucks weighing up to 68 tonnes (150,000 lb). The bridge
3192-537: Was proof-checked by the Directorate of Engineering. Charles, Prince of Wales visited the West Gate Bridge project in October 1974 and met with members of the West Gate Bridge Authority and workers. After 10 years of construction, the bridge was completed in 1978 at a cost of $ 202 million. Speed cameras were erected on the bridge in 2004, but were not activated until September 2005, because of issues with
3249-409: Was proposed that the higher one be weighted down with 10 concrete blocks, each weighing 8 t (8.8 short tons), which were located on-site. The weight of those blocks caused the span to buckle, which was a sign of structural failure . The longitudinal joining of the half-girders was partially complete when orders came through to remove the buckle. As the bolts were removed, the bridge snapped back and