Wien Westbf – Kn. Wagram – (GZU) – Linz Hbf – Salzburg Hbf New Western Railway ( Neue Westbahn):

#807192

53-569: Westbahn may refer to: Westbahn (Austria) , a railway line linking Vienna and Salzburg in Austria Westbahn (Hanover) , a railway line in the German states of Lower Saxony and North Rhine-Westphalia Westbahn (Württemberg) , a railway line in the German state of Württemberg WESTbahn , an Austrian railway train operating company Western Railway (disambiguation) , various railways with

106-672: A few months later, in 2001, this was followed by the opening of the Prinzersdorf–Groß Sierning and St. Peter-Seitenstetten–St. Valentin (including the St. Peter green tunnel and the Sieberg Tunnel) sections. Since the opening of the Amstetten–St. Peter-Seitenstetten section in 2003, trains can run continuously from Amstetten to St. Valentine at 200 km/h. In 2004, two junctions were built at Wagram and Rohr and finally in 2007

159-659: Is a main line railway in Austria . It runs through the states of Salzburg and Tyrol ( North Tyrol ) from the city of Salzburg to Wörgl and belongs to the core network ( Kernnetz ) of the Austrian Federal Railways (ÖBB). The section between Salzburg and Schwarzach - Sankt Veit is part of the Salzburg S-Bahn urban railway network. The standard gauge line runs along the Salzach valley,

212-454: Is an important section of the TEN line between Paris and Bratislava and Budapest . In the long term there are expected to be direct services on these routes with modern high-speed train sets. Since 1990 the capacity of the line has been increased by the creation of a high-speed line. The existing two-track line is being upgraded to provide high capacity and in addition a new double track line

265-501: Is being built between St. Pölten and Linz, together creating a four-track line. The new sections are designed with many new tunnels and straight sections of track to allow speeds of up to 250 km/h. This upgraded condition of the line has allowed ICE T services to run from Vienna to Frankfurt, Munich and Bregenz since the timetable change in 2006 in Austria and Railjet services to run between Budapest, Vienna, Munich and Zurich since

318-407: Is different from Wikidata All article disambiguation pages All disambiguation pages Westbahn (Austria) The Western Railway ( German : Westbahn ) is a two-track, partly four-track, electrified railway line in Austria that runs from Vienna to Salzburg via St. Pölten and Linz Hauptbahnhof and is one of the major lines of Austria. It was originally opened as

371-617: Is electrified and is powered by 15,000  Volt alternating current and a frequency of 16.7  Hertz . In particular the S-train section from Salzburg Hauptbahnhof to the southern branch-off of the Tauern Railway line at Schwarzach-St. Veit was given a major upgrade and, in places, entirely rebuilt and re-routed. It is (and was ) also known as the Gisela Railway ( Giselabahn ), after Archduchess Gisela of Austria ,

424-407: Is expected that the whole Western Railway from Vienna to Wels will have four continuous tracks in 2021, but it will not consist of a four-track line, but it will rather be two double track lines that are operationally linked at several points. A further four track upgrade is planned for the 20 km section between Neumarkt and Salzburg Kasern. Various possible routes have been examined. The upgrade

477-466: Is expected to be rebuilt as four tracks by 2016. From Amstetten station, the Western Railway runs as four tracks again and with the recommencement of LZB long-distance traffic can accelerate to 200 km/h after the sharp left turn at the western exit to the station, which restricts speeds to 160 km/h. The Old and New Western Railways run parallel as far as St. Peter-Seitenstetten, before

530-662: Is expected to return to service in July 2013. Speeds on other already upgraded sections, such as St. Valentin–Linz Kleinmünchen, were increased from 200 to 230 km/h in December 2012. As Vienna West station is a terminus, trains to Vienna and continuing to the east (for example, to Budapest) must currently change direction in the West station. After the start of operations through the Lainz Tunnel on 9 December 2012, which connects

583-854: Is necessary because this section is used by additional services of line S2 of the Salzburg S-Bahn . On 10 January 2013 the fixed route selected for the Neumarkt–Salzburg Kasern section was presented with a start expected in less than 20 years. The upgrade to four tracks is also currently being planned for the Linz–Wels section and planning is continuing on the second stage of the New Lower Inn Valley railway (Schaftenau–Kundl). 48°11′49″N 16°20′14″E  /  48.19694°N 16.33722°E  / 48.19694; 16.33722 Salzburg-Tyrol Railway The Salzburg-Tyrol Railway ( German : Salzburg-Tiroler-Bahn )

SECTION 10

#1732781042808

636-652: Is west of Hadersdorf junction. From this point, the line can be run at up to 250 km/h (160 mph). The line resurfaces after 13 km at Chorherrn near to the Tulln Basin . The regional station of Tullnerfeld is situated in the Tulln Basin . The high-speed line has been connected to the Franz Josef Railway by the reactivation of disused Tulln western curve, promoting regional traffic. After passing through three cut-and-cover tunnels that were built for noise abatement reasons in an open cutting,

689-512: The Empress Elisabeth Railway in 1858 (Vienna–Linz). The line is owned and operated by Austrian Federal Railways (ÖBB). The Western Railway consists of the double-track Old Western Railway ( Alten Westbahn , line 1) and the double-track New Western Railway ( Neuen Westbahn , line 30). For operational reasons the Western Railway is supplemented by the suburban track (line 23) from Vienna Hütteldorf to Unter Purkersdorf and

742-1028: The Bischofshofen hub being of particular importance as the junction with the Enns Valley Railway to Selzthal in Styria . At the Wörgl terminus, the Salzburg-Tyrol Railway meets the Lower Inn Valley Railway running from the Tyrolean capital Innsbruck to the German border at Kufstein and the Deutsches Eck transport link. The line has been upgraded to double track throughout and both tracks may be worked in bi-directional running. The entire route

795-621: The Danube Bank Railway ). Near Asten, the Old and New Western Railways come together again. From Asten-Fisching 1 junction the speed limit is reduced to 200 km/h (120 mph) on the two parallel lines to Linz Kleinmünchen, the current end of the four-track section on the Western Railway. The New Western Railway has been equipped with the European Train Control System (ETCS) on the newly built section of

848-824: The Enns valley via Steyr and Selzthal to Bischofshofen ) and Enns to Linz, where the line through the Mühlviertel to České Budějovice ( Summerau Railway ) and the Pyhrn Railway branch off. There is also a connection in Linz to the Linz Local Railway to Eferding . After Linz the Western Railway moves away from the Danube . While the Danube flows from the northwest to Linz, the Western Railway now heads off to

901-598: The Southern Railway , are the main arteries of the Austrian railways. With EU enlargement , their importance continues to grow. Not only is a large part of the Austrian National rail traffic on the western railway line, but long-distance services between Vienna and cities such as Hamburg , Dortmund , Cologne , Frankfurt , Munich and Zurich also run on the Western Railway. The Western Railway

954-621: The EU in 1995. However, its significance is increasingly on the wane, partly because it has the characteristics of an Alpine railway with steep hills and tight curves, hence high-speed rail transport is not possible. Austrian east-west trains therefore usually use the route from Salzburg via Rosenheim station in Germany to Innsbruck, transiting the Deutsches Eck link. The line is important, though, especially for regional services, as part of

1007-693: The Enns bypass (St. Valentin–Asten) was opened to traffic. As part of the rebuilding of St. Pölten Hauptbahnhof the double-bore Eisbergbogen tunnels (a single track tunnel for a passing track and a double track tunnel for the two main tracks) was built west of St. Pölten and opened to traffic in 2010. The line begins in Vienna West station ( Westbahnhof ) and first runs through the Vienna Woods ( Wienerwald ). The Old Western Railway to St. Pölten has now been replaced from Wagram junction to Rohr junction by

1060-818: The Kalvarienberg Tunnel, was opened in 1995. The realignment of the Breitenschützing–Schwanenstadt section, including the Römerberg Tunnel, followed in 1997. Three years later, two sections, St. Pölten–Prinzersdorf and Groß Sierning–Pöchlarn, including the Rohr “green” tunnel (that is built in order to protect the environment), the Wachberg II Tunnel and the Melk Tunnel, were released for operations at 200 km/h. Only

1113-518: The New Western Railway route through Tullnerfeld directly to the mainline tracks of the new Vienna Hauptbahnhof (to open in 2014), long-distance trains will mostly run there. WESTbahn has however announced that its trains from Salzburg to Vienna will continue to run to the West station. The four-track Ybbs an der Donau–Amstetten section, which is designed for a maximum of 250 km/h came into operation in 2015. The reconstruction of

SECTION 20

#1732781042808

1166-584: The New Western Railway. After the completion of the freight railway bypass closing the "St. Pölten–Loosdorf gap" from Wagram junction to Rohr junction the newly constructed freight bypass will form part of the Old West Railway. After Rohr junction the Western Railway runs through the foothills via Pöchlarn (a junction with the Erlauf Valley Railway to Kienberg-Gaming ), Amstetten , St. Valentin (a junction with Rudolf's Railway up

1219-677: The Tauern Railway, from Schwarzach - Sankt Veit station on the Salzburg-Tyrol Railway up to Bad Gastein , opened on 20 September 1905. The southern continuation across the main chain of the Alps to Spittal in the Drava Valley, including the Tauern Railway Tunnel , was inaugurated by Emperor Franz Joseph on 5 July 1909. By 1915 the Salzburg-Tyrol Railway was upgraded to double track and, in 1925, electrification of

1272-533: The Vienna–Salzburg line, it also built the Wels–Passau Railway (1861) and the St. Valentin–Summerau– České Budějovice line (1872). The line was authorised under a treaty contracted by Bavaria and Austria in 1851. The Vienna–Linz section was completed in 1858 and the rest of the line to Salzburg was opened for traffic in 1860. The trip from Vienna to Salzburg initially took nine hours. A few weeks before

1325-613: The congestion track between St. Pölten Hbf and Prinzersdorf south of the two-track main line, with its own tube through the Eisbergbogen Tunnel) to Prinzersdorf, then two tracks through the Markersdorf an der Pielach station to Rohr junction, where it fans from two to four tracks. Here the Old Western Railway branches to the northwest to Loosdorf station, while the New Western Railway runs to the south of

1378-540: The connexion from Innsbruck to the state capitals Klagenfurt and Graz as well as part of the line from Salzburg to Graz (via the Enns Valley Railway). In addition, the only Austrian coach transport service from North Tyrol to Lienz in East Tyrol leaves from Kitzbühel station on the Salzburg-Tyrol Railway. The line is also fairly important as an alternative route for international rail traffic on

1431-416: The development of the Western Railway. Construction was expected to start in 1987, with completion in 1992. New sections would be built between Attnang-Puchheim and Salzburg; upgraded sections would be built between St. Pölten and Linz and between Linz and Attnang-Puchheim. The planned top speed was 250 km/h. The Sittenberg Tunnel was opened as the first new section in 1994. The Lambach bypass, including

1484-408: The east end of Amstetten station to increase top speed from Ybbs to 230 km/h continued until 2016. In 2017, the St. Pölten freight bypass railway (Wagram junction–Rohr junction), which is designed for a maximum speed of 120 km/h, will be opened to traffic. The four-track upgrade from Linz Kleinmünchen to the eastern approach to Linz station is expected to be completed no earlier than 2018. It

1537-530: The east–west axis, but it is more significant as a feeder for the Tauern Railway crossing the Hohe Tauern range of the Central Eastern Alps from north to south. The Salzburg-Tyrol Railway is also used by sleeping car trains. The night train from Bregenz to Vienna used to run on this line until December 2008, in order to achieve journey times that enabled passengers to spend enough time in

1590-523: The end of the war. This was intended to give Wels marshalling yards serving traffic running both west–east (today's yard) and east–west (the abandoned yard). The Linz East marshalling yard was given a large expansion as a result of the establishment of the "Hermann Göring Works" (now Voestalpine ) by the Reichswerke Hermann Göring . At a press conference in 1983 Austrian Transport Minister Karl Lausecker outlined details of plans for

1643-510: The equivalent English language name Topics referred to by the same term [REDACTED] This disambiguation page lists articles associated with the title Westbahn . If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=Westbahn&oldid=1194714283 " Categories : Disambiguation pages Railway disambiguation pages Hidden categories: Short description

Westbahn - Misplaced Pages Continue

1696-425: The line began, finished in 1930. Towards the end of World War II , the railway became a target for Allied bombing due to its strategic importance. Up to today, the Salzburg-Tyrol Railway is the only east–west railway link to Tyrol that runs entirely on Austrian territory. The fact that there is no parallel motorway link on national territory gave the line great importance, especially before Austria's accession to

1749-424: The line continues to Salzburg station , where the Western Railway ends. The new Vienna–St. Pölten section of the New Western Railway is a high-speed railway. It runs from Vienna via Tullnerfeld to St. Pölten and is part of the TEN project No. 17 " Magistrale for Europe ". The section was put into scheduled operation on 9 December 2012. The travel time without stopping between Vienna West station and St. Pölten

1802-511: The line from Vienna to Wagram junction. The so-called “registration” ( Anmelde ) line starts at the entrance to Lainz Tunnel, which is equipped with both ETCS and with the old Punktförmige Zugbeeinflussung (PZB) system. From Hadersdorf junction it was originally intended that the line be exclusively signalled with ETCS level 2, but it was decided to have PZB as a fallback. It is possible to run from St. Pölten to Attnang-Puchheim at 230 km/h using LZB signalling. The Western Railway, along with

1855-532: The line runs through three more tunnels, known as the Perschling tunnel chain ( Tunnelkette Perschling ). The line then runs to Wagram junction in St. Pölten, which now forms the end of the new Western line. Simultaneously with the construction of the new high-speed line, the railway stations in Vienna and St. Pölten are being rebuilt. Vienna Hauptbahnhof was opened on 9 December 2012 for partial operations and

1908-420: The new Vienna–St. Pölten section (journey time reduction ≈ 15 min) and the New Lower Inn Valley railway from Radfeld to Baumkirchen (journey time reduction ≈ 5 min). These sections are operated at 230 or 220 km/h. Here, the winding and mountainous section of track through the Vienna Woods was supplemented with a new route through Tullnerfeld (Vienna Woods Tunnel and the Perschling tunnel chain) that rejoins

1961-399: The new line makes a tighter curve than the existing route through the St. Peter “green” tunnel. At St. Johann-Weistrach the two lines run for a few hundred meters next to each other again. After the station, the Old Western Railway runs towards Haag , while the New Western Railway takes a right turn to a straight section and then runs to the north through the 6.5 km long Sieberg Tunnel. At

2014-463: The northern portal, the two lines meet and again run parallel to each other to St. Valentin station . After the station, the new line enters the “Enns bypass”, which can be operated at 230 km/h (140 mph), running around the area of the port and the settled areas of Enns. (In 2005, in the course of the upgrade to four tracks between Ennsdorf and Enns, a junction was built towards Mauthausen , allowing direct operations of trains from Linz towards

2067-591: The official opening Empress Elizabeth used the line to travel to her home in Bavaria. Emperor Franz Joseph and Maximilian II of Bavaria were present at the official opening on the line on 12 August 1860. In 1884 the railway was nationalised. The extension of the railway line on Austrian territory, the Salzburg-Tyrol Railway ("Gisela Railway") via Zell am See to Wörgl (owned by the KEB since 1875)

2120-463: The old line, which has been rebuilt on the new alignment. Now, the two parallel lines run through Pöchlarn station until the new line takes a slight curve to the left to enter the almost 5 km long Sittenberg Tunnel. Shortly after the western portal the new and old lines come together again and, about 2 km later, reach Ybbs an der Donau station, where the maximum speed is cut to 160 km/h. The two-track line section between Ybbs and Amstetten

2173-516: The period of management of operation by Deutsche Reichsbahn (during the annexation by Germany from 1938 to 1945). Thus, the passing loops at Hutten and Ederbauer were built and a new marshalling yard was built in Wels (to the north of the Western Railway). Also, the construction of a second marshalling yard in Wels was started (to the south of the Western Railway), but it was left unfinished at

Westbahn - Misplaced Pages Continue

2226-516: The relief track (line 3) from Pottenbrunn via St. Pölten to Prinzersdorf . The line was opened from Vienna Westbahnhof to Linz on 15 December 1858 and was extended to Salzburg on 1 August 1860. The continuation to Munich was opened on 12 August 1860. The line was built by the k.k. privilegierte Kaiserin Elisabeth-Bahn (" Imperial and Royal privileged Empress Elisabeth Railway", KEB) company under Hermann Dietrich Lindheim. In addition to

2279-466: The route of the Old Western Railway at St. Pölten. Following the upgrade of the last section of the double-track Old Western Railway between Wels and Attnang-Puchheim, namely the Lambach–Breitenschützing section, it now has a high level of performance and since October 2012, trains are able to run on it at 230 km/h. The old line on the Lambach–Breitenschützing section is being rebuilt and

2332-561: The second daughter of Emperor Franz Joseph I and his wife Elisabeth . Today it is frequently considered to be a continuation of the Western Railway from Vienna to Salzburg; the whole railway line from Wien Westbahnhof to Salzburg and Wörgl is also referred to as Empress Elisabeth Railway ( Kaiserin-Elisabeth-Bahn ). The westernmost Zell am See –Wörgl section in Tyrol is also called Brixental Railway. The Salzburg-Tyrol Railway

2385-632: The sleepers and to save the rail tolls charged by German Deutsche Bahn railway company for using the Deutsches Eck transport link. The railway is also important for local services in the central region of Salzburg and in North Tyrol. Between Salzburg Hauptbahnhof and Golling - Abtenau the line is served every half-an-hour and from Golling to Schwarzach every hour by the S3 line of the Salzburg S-Bahn network. The section from Wörgl to Saalfelden

2438-593: The southwest towards Wels. The Western Railway to Salzburg and the line to Passau separate in Wels station . The Alm Valley Railway to Grünau im Almtal also branches off here. The next junction is at Attnang-Puchheim , where it crosses the Salzkammergut Railway running from Stainach –Irdning to Ried . After Straßwalchen where the Mattig Valley Railway branches off to Braunau ,

2491-516: The timetable change in December 2008. The travel time from Vienna to Innsbruck was four and half hours before the timetable change on 9 December 2012; at the timetable change the duration was reduced to four hours and 15 minutes. The upgrading of the line is aimed at achieving the so-called "1-2-3-scheme", that is the journey from Vienna to Linz will be only an hour, Salzburg would be two hours away and Munich and Innsbruck would be three hours from Vienna. On 9 December 2012, two new sections were opened:

2544-478: The town through a “green” tunnel. To the northwest of Loosdorf the two lines come within a few metres of each other before the new line takes a slight curve to the left to the entrance of the Wachberg 2 Tunnel. Shortly after its western portal it runs through the Melk Tunnel, which takes its name from the nearby town . Immediately afterwards it runs over a bridge over a small river before turning to run parallel with

2597-552: Was also nationalised. Duplication of the line was completed on 14 August 1902; it had been gradual: Linz – Wels on 7 August 1870, St. Valentin –Linz on 22 August 1874, Wels– Lambach on 1 November 1898, Lambach– Attnang-Puchheim on 14 August 1899 and Attnang-Puchheim–Salzburg on 14 August 1902. As a result of Austria's loss of coal reserves at the end of the First World War under the Treaty of Saint-Germain-en-Laye , it

2650-753: Was built from 1873 to 1875 on the basis of the "Concession Authority dated 10 November 1872 for the Limited Company of the Privileged Empress Elisabeth Railway for the Construction and Operation of a Locomotive Railway Running from Upper Styria to Salzburg and North Tyrol". It runs from Salzburg via Hallein , Bischofshofen , St. Johann im Pongau , Schwarzach - St. Veit , Zell am See, Hochfilzen , St. Johann in Tirol and Kitzbühel to Wörgl. The north ramp of

2703-402: Was decided to electrify the line, starting from the west. Electification was completed to Steindorf on 3 October 1938, to Attnang-Puchheim on 6 October 1941, to Linz on 15 May 1949 and to Amstetten on 28 June 1951. Electification of the line was completed with the inauguration of the Amstetten– Vienna West station section on 19 December 1952. Numerous enhancements and additions were made during

SECTION 50

#1732781042808

2756-526: Was fully completed in 2015. St. Pölten station was rebuilt at the end of 2011. Immediately following St. Pölten station runs through a right-hand bend, which can be run at up to 80 km/h, a short straight section and a left-hand curve through the 460 metres-long Eisbergbogen Tunnel, which was newly built in 2010/11 and which can be run through at 160 km/h. At the end of the curve, Linienzugbeeinflussung (LZB) signalling starts, allowing operations at 200 km/h. The line here has three tracks (including

2809-419: Was reduced as a result from 41 to 25 minutes. The new section of the New Western Railway begins at the exit of Wien Meidling station and runs through the Lainz Tunnel , which leads directly to Hadersdorf junction. Up to that point the traditional link to and from the Old Western Railway can be operated at 160 km/h (99 mph). The start of the high-speed line at the entrance of the Vienna Woods Tunnel