The Extremely Large Telescope ( ELT ) is an astronomical observatory under construction. When completed, it will be the world's largest optical and near-infrared extremely large telescope . Part of the European Southern Observatory (ESO) agency, it is located on top of Cerro Armazones in the Atacama Desert of northern Chile .
61-428: The design consists of a reflecting telescope with a 39.3-metre-diameter (130-foot) segmented primary mirror and a 4.2 m (14 ft) diameter secondary mirror. The telescope is equipped with adaptive optics , six laser guide star units, and various large-scale scientific instruments. The observatory's design will gather 100 million times more light than the human eye, equivalent to about 10 times more light than
122-563: A construction proposal for approval in December 2011. Funding was subsequently included in the 2012 budget for initial work to begin in early 2012. The project received preliminary approval in June 2012. ESO approved the start of construction in December 2014, with over 90% funding of the nominal budget secured. The design phase of the 5-mirror anastigmat was fully funded within the ESO budget. With
183-460: A diameter of 5.9 m (19 ft). However, in 2011 a proposal was put forward to reduce overall size by 13% to 978 m, with a 39.3 m (130 ft) diameter primary mirror and a 4.2 m (14 ft) diameter secondary mirror. This reduced projected costs from 1.275 billion to 1.055 billion euros and should allow the telescope to be finished sooner. The smaller secondary is a particularly important change; 4.2 m (14 ft) places it within
244-422: A diameter of 8.4 meters. The use of segmented mirrors is therefore a key component for large-aperture telescopes . Using a monolithic mirror much larger than 5 meters is prohibitively expensive due to the cost of both the mirror, and the massive structure needed to support it. A mirror beyond that size would also sag slightly under its own weight as the telescope was rotated to different positions, changing
305-474: A factor of 500 in the resolution compared to the best seeing conditions achieved so far without adaptive optics. The AdOptica consortium, partnered with INAF (Istituto Nazionale di Astrofisica) as subcontractors, are responsible for the design and manufacture of the quaternary mirror. The 6 petals were cast by Schott in Germany and polished by Safran Reosc. As of July 2023, all six petals are completed and in
366-559: A feasibility study concluded the proposed 100 m (328 ft) diameter, Overwhelmingly Large Telescope , would cost €1.5 billion (£1 billion), and be too complex. Both current fabrication technology and road transportation constraints limit single mirrors to being roughly 8 m (26 ft) per piece. The next-largest telescopes currently in use are the Keck Telescopes , the Gran Telescopio Canarias and
427-486: A novel design with a total of five mirrors. The first three mirrors are curved (non-spherical) and form a three-mirror anastigmat design for excellent image quality over the 10-arcminute field of view (one-third of the width of the full Moon). The fourth and fifth mirrors are (almost) flat, and respectively provide adaptive optics correction for atmospheric distortions (mirror 4) and tip-tilt correction for image stabilization (mirror 5). The fourth and fifth mirrors also send
488-503: A segmented mirror is somewhat more complicated than that of a monolithic one, requiring careful alignment of the segments (a technique called cophasing ). Experience gained in existing segmented mirrors (for example, the Keck telescope ) suggests that the mirror proposed for the OWL is feasible. However, the projected cost (of around €1.5 billion) was considered too high, so the ESO is now building
549-436: A subsidiary of Safran Electronics & Defense . They receive the mirror blanks from Schott, and polish one mirror segment per day to meet the 7-year deadline. During this process, each segment is polished until it has no surface irregularity greater than 7.5 nm root mean square . Afterward, Safran Reosc mounts, tests, and completes all optical testing before delivery. This is the second-largest contract for ELT construction and
610-440: Is an array of smaller mirrors designed to act as segments of a single large curved mirror . The segments can be either spherical or asymmetric (if they are part of a larger parabolic reflector ). They are used as objectives for large reflecting telescopes . To function, all the mirror segments have to be polished to a precise shape and actively aligned by a computer-controlled active optics system using actuators built into
671-485: Is constructed from 91 hexagonal segments. The telescope's main mirror is fixed at a 55 degree angle and can rotate around its base. A target is tracked by moving the instruments at the focus of the telescope; this allows access to about 70–81% of the sky at its location and a single target can be tracked for up to two hours. The Southern African Large Telescope (SALT) is a 10-meter telescope dedicated on spectroscopy for most of its observing time. It shares similarities with
SECTION 10
#1732787364828732-452: Is designed to allow complete freedom to the telescope so that it can position itself whether it is opened or closed. It will also permit observations from the zenith down to 20 degrees from the horizon. With such a large opening, the ELT dome requires the presence of a windscreen to protect the telescope's mirrors (apart from the secondary), from direct exposure to the wind. The baseline design of
793-671: Is the highest priority in the European planning activities for research infrastructures, such as the Astronet Science Vision and Infrastructure Roadmap and the ESFRI Roadmap. The telescope underwent a Phase B study in 2014 that included "contracts with industry to design and manufacture prototypes of key elements like the primary mirror segments, the adaptive fourth mirror or the mechanical structure (...) [and] concept studies for eight instruments". The ELT will use
854-548: The Hebei Province of China. It consists of two rectangular mirrors, made up of 24 and 37 segments, respectively. Each hexagonal segment is 1.1 metre in size. The 18 mirror segments of the James Webb Space Telescope were mostly fabricated in 2011. The space telescope was launched by an Ariane 5 from Guiana Space Centre on December 25, 2021. Three extremely large telescopes will be
915-512: The James Webb Space Telescope . Overwhelmingly Large Telescope The Overwhelmingly Large Telescope ( OWL ) was a conceptual design by the European Southern Observatory (ESO) organization for an extremely large telescope , which was intended to have a single aperture of 100 meters in diameter. Because of the complexity and cost of building a telescope of this unprecedented size, ESO has decided to focus on
976-490: The Southern African Large Telescope , which each use small hexagonal mirrors fitted together to make a composite mirror slightly over 10 m (33 ft) across. The ELT uses a similar design, as well as techniques to work around atmospheric distortion of incoming light, known as adaptive optics . A 40-metre-class mirror will allow the study of the atmospheres of extrasolar planets . The ELT
1037-424: The augmented reality sector to minimize the size of the optical components. A partial reflective segmented mirror array is used by tooz to out-couple the light from their light guides, which is used as an optical smartglass element. Some of the largest optical telescopes in the world use segmented primary mirrors. These include, but are not limited to the following telescopes: The twin Keck Telescopes are
1098-534: The mirror support cell . The concept was pioneered by Guido Horn D'Arturo , who built the first working segmented mirror in 1952, after twenty years of research; It was later independently rediscovered and further developed under the leadership of Dr. Jerry Nelson at the Lawrence Berkeley National Laboratory and University of California during the 1980s , and since then all the necessary technologies have spread worldwide to
1159-422: The 2011 changes in the baseline design (such as a reduction in the size of the primary mirror from 42 m to 39.3 m), in 2017 the construction cost was estimated to be €1.15 billion (including first generation instruments). In 2014, the start of operations was planned for 2024. Actual construction officially began in early 2017, and a technical first light is planned for 2028. ESO focused on the current design after
1220-418: The 39-meter diameter Extremely Large Telescope instead. OWL was first proposed in 1998, and at that time was estimated to be technologically feasible by 2010–2015. While the original 100 m design would not exceed the angular resolving power of interferometric telescopes , it would have exceptional light-gathering and imaging capacity that would greatly increase the depth to which mankind could explore
1281-460: The 40-metre-class ELT dome is a nearly hemispherical dome, rotating atop a concrete pier, with curved laterally-opening doors. This is a re-optimisation from the previous design, aimed at reducing the costs, and it is being revalidated to be ready for construction. One year after signing the contract, and after the laying of the first stone ceremony in May 2017, the site was handed over to ACe, signifying
SECTION 20
#17327873648281342-488: The ESO Council approved the ELT programme's plans to begin civil works at the telescope site, with the construction of the telescope itself pending final agreement with governments of some member states. Construction work on the ELT site started in June 2014. By December 2014, ESO had secured over 90% of the total funding and authorized construction of the telescope to start, estimated to cost around one billion euros for
1403-706: The GranTeCan, the Canaries Great Telescope uses a total of 36 segmented mirrors. With a primary mirror of 10.4 m (34 ft), it is currently the world's largest optical telescope, located at the Roque de los Muchachos Observatory on the island of La Palma , in the Canary Islands in Spain. The Large Sky Area Multi-Object Fibre Spectroscopic Telescope is a survey telescope located in
1464-624: The Hobby-Eberly Telescope and also consists of 91 hexagonal mirror segments, each 1 meter across, resulting in a total hexagonal mirror of 11.1 m by 9.8 m. It is located close to the town of Sutherland in the semi-desert region of the Karoo , South Africa. It is a facility of the South African Astronomical Observatory , the national optical observatory of South Africa. Also known as
1525-560: The VLT and the NASA/ESA Hubble Space Telescope, use two curved mirrors to form an image. In these cases, a small, flat tertiary mirror is sometimes introduced to divert the light to a convenient focus. However, in the ELT the tertiary mirror also has a curved surface, as the use of three mirrors delivers a better final image quality over a larger field of view than would be possible with a two-mirror design. Much like
1586-411: The airflow in and around the dome, as well as the effectiveness of the dome and windscreen in protecting the telescope. Besides being designed for water-tightness, air-tightness is also one of the requirements as it is critical to minimise the air-conditioning load. The air-conditioning of the dome is necessary not only to thermally prepare the telescope for the forthcoming night but also in order to keep
1647-596: The baseline site for the planned ELT. Other sites that were under discussion included Cerro Macon, Salta, in Argentina; Roque de los Muchachos Observatory , on the Canary Islands; and sites in North Africa, Morocco, and Antarctica. Early designs included a segmented primary mirror with a diameter of 42 metres (140 feet) and an area of about 1,300 m (14,000 sq ft), with a secondary mirror with
1708-408: The beginning of the construction of the dome's main structure. In terms of astronomical performance the dome is required to be able to track about the 1-degree zenithal avoidance locus as well as preset to a new target within 5 minutes. This requires the dome to be able to accelerate and move at angular speeds of 2 degrees/s (the linear speed is approximately 5 km/h or 4.6 ft/s). The dome
1769-516: The blanks of the 798 segments, as well as a maintenance set of 133 additional segments. This maintenance set allows segments to be removed, replaced, and recoated on a rotating basis once the ELT is in operation. The mirror is being cast from the same low-expansion ceramic Zerodur as the existing Very Large Telescope mirrors in Chile. The other contract was awarded to the French company, Safran Reosc,
1830-446: The capabilities of multiple manufacturers, and the lighter mirror unit avoids the need for high-strength materials in the secondary mirror support spider. ESO's Director General commented in a 2011 press release that "With the new E-ELT design we can still satisfy the bold science goals and also ensure that the construction can be completed in only 10–11 years." The ESO Council endorsed the revised baseline design in June 2011 and expected
1891-509: The contract for the fabrication of the 4608 edge sensors to the FAMES consortium, which is composed of French company Fogale and German company Micro-Epsilon. These sensors can measure relative positions to an accuracy of a few nanometres, the most accurate ever used in a telescope. In May 2017, ESO awarded two additional contracts. One was awarded to the German company Schott AG who manufactures
Extremely Large Telescope - Misplaced Pages Continue
1952-483: The first construction phase. The first stone of the telescope was ceremonially laid on 26 May 2017, initiating the construction of the dome's main structure and telescope. The telescope passed the halfway point in its development and construction in July 2023, with the expected completion and first light set for 2028. On 26 April 2010, the European Southern Observatory (ESO) Council selected Cerro Armazones , Chile , as
2013-529: The general laws of physics. The telescope will have several science instruments and will be able to switch from one instrument to another within minutes. The telescope and dome will also be able to change positions on the sky and start a new observation in a short time. Four of its instruments, the first generation, will be available at or shortly after first light, while two others will begin operations later. Throughout its operation other instruments can be installed. Segmented mirror A segmented mirror
2074-462: The goals of the ELT is the possibility of making a direct measurement of the acceleration of the Universe's expansion. Such a measurement would have a major impact on our understanding of the Universe. The ELT will also search for possible variations in the fundamental physical constants with time. An unambiguous detection of such variations would have far-reaching consequences for our comprehension of
2135-564: The largest optical telescopes in existence as of 2023, with the ability to correct for atmospheric distortion. It has around 250 times the light-gathering area of the Hubble Space Telescope and, according to the ELT's specifications, will provide images 16 times sharper than those from Hubble. The project was originally called the European Extremely Large Telescope ( E-ELT ), but the name
2196-432: The largest of all three, using a total of 798 segments for its primary mirror. Its first light is expected for 2027. Images from telescopes with segmented mirrors also exhibit diffraction spikes due to diffraction from the mirrors' edges. As before, two spikes are perpendicular to each edge orientation, resulting in six spikes (plus two fainter ones due to the spider supporting the secondary mirror) in photographs taken by
2257-534: The largest secondary mirror ever employed on an optical telescope and the largest convex mirror ever produced. In January 2017, ESO awarded a contract for the mirror blank to Schott AG , who cast it later the same year from Zerodur . In May 2017, Schott AG was also awarded the contract for the much larger primary segment of the mirror. Complex support cells are also necessary to ensure the flexible secondary and tertiary mirrors retain their correct shape and position; these support cells will be provided by SENER . Like
2318-425: The light sideways to one of two Nasmyth focal stations at either side of the telescope structure, allowing multiple large instruments to be mounted simultaneously. The 39-metre (128 ft) primary mirror will be composed of 798 hexagonal segments, each approximately 1.4 metres (4.6 ft) across and with a thickness of 50 mm (2.0 in). Two segments will be re-coated and replaced each working day, to keep
2379-570: The main structure of the telescopes, with the Italian ACe Consortium, consisting of Astaldi and Cimolai and the nominated subcontractor, Italy's EIE Group. The signature ceremony took place on 25 May 2016 at ESO's Headquarters in Garching bei München, Germany. The dome is to provide needed protection to the telescope in inclement weather and during the day. A number of concepts for the dome were evaluated. The baseline concept for
2440-456: The making. Thus, the ELT will answer fundamental questions regarding planet formation and evolution. By probing the most distant objects the ELT will provide clues to understanding the formation of the first objects that formed: primordial stars, primordial galaxies and black holes and their relationships. Studies of extreme objects like black holes will benefit from the power of the ELT to gain more insight into time-dependent phenomena linked with
2501-437: The mirror always clean and highly reflective. Edge sensors constantly measure the positions of the primary mirror segments relative to their immediate neighbours. 2394 position actuators (3 for each segment) use this information to adjust the system, keeping the overall surface shape unchanged against deformations caused by external factors such as wind, gravity, temperature changes and vibrations. In January 2017, ESO awarded
Extremely Large Telescope - Misplaced Pages Continue
2562-602: The most prominent of the Mauna Kea Observatories at an elevation of 4,145 meters (13,600 ft) near the summit of Mauna Kea in Hawaii , United States. Both telescopes feature 10 m (33 ft) primary mirrors. The Hobby-Eberly Telescope (HET) is a 9.2-meter (30-foot) telescope located at the McDonald Observatory , West Texas at an altitude of 2,026 m (6,647 ft). Its primary mirror
2623-567: The next generation of segmented-mirror telescopes and are planned to be commissioned in the 2020s. The Giant Magellan Telescope uses seven large segments and is either grouped with segmented mirrors telescopes or its own category. The Thirty Meter Telescope is to be built at the Mauna Kea Observatories in Hawaii, though construction is on hold. This will use 492 hexagonal segments. The European Extremely Large Telescope will be
2684-496: The point that essentially all future large optical telescopes plan to use segmented mirrors. There is a technological limit for primary mirrors made of a single rigid piece of glass. Such non-segmented, or monolithic mirrors can not be constructed larger than about eight meters in diameter. The largest monolithic mirrors in use are currently the two primary mirrors of the Large Binocular Telescope , each with
2745-443: The precision shape of the surface. Segments are also easier to fabricate, transport, install, and maintain over very large monolithic mirrors. Segmented mirrors do have the drawback that each segment may require some precise asymmetrical shape, and rely on a complicated computer-controlled mounting system. All of the segments also cause diffraction effects in the final image. Another application for segmented mirrors can be found in
2806-497: The process of being integrated into their support structure. The six laser sources for the adaptive optics system, which will work hand-in-hand with the quaternary mirror, have also been completed and are in testing. The 2.7-by-2.2-metre (8.9 by 7.2 ft) quinary mirror is a tip-tilt mirror used to refine the image using adaptive optics . The mirror will include a fast tip-tilt system for image stabilization that will compensate perturbations caused by wind, atmospheric turbulence, and
2867-471: The secondary mirror (with which it shares many design characteristics), the tertiary mirror will be slightly deformable to regularly allow deviations to be corrected. Both mirrors will be mounted on 32 points, with 18 on their backside and 14 along their edges. As of July 2023, the tertiary mirror has been cast and is in polishing. The 2.4-metre (7.9 ft) quaternary mirror is a flat, 2 mm (0.08 in) thick adaptive mirror. With up to 8,000 actuators,
2928-431: The secondary mirror is being polished and tested by Safran Reosc. The mirror will be shaped and polished to a precision of 15 nanometres (15 millionths of a millimetre) over the optical surface. By early 2024 this mirror was reported to be close to final accuracy. The 3.8-metre (12 ft) concave tertiary mirror, also cast from Zerodur, will be an unusual feature of the telescope. Most current large telescopes, including
2989-404: The smaller Extremely Large Telescope around 39 m in diameter. Also, there appears to be some inconsistency as to the actual construction costs of the OWL, with some estimating its cost an order of magnitude higher (ELT currently at €1.3 billion, equivalent to around $ 1.3 billion, scaled using D^2.77 proportionality assuming a 100 meter diameter yields $ 21 billion). It has been estimated that
3050-492: The supports with the ELT glass segments; to handle and transport the segment assemblies; and to operate and maintain them. As of July 2023, over 70% of the mirror segment blanks and their supporting structures had been manufactured, and by early 2024 tens of segments had been polished. Making the secondary mirror is a major challenge as it is highly convex, and aspheric. It is also very large; at 4.2 metres (14 ft) in diameter and weighing 3.5 tonnes (7,700 lb), it will be
3111-503: The surface can be readjusted one thousand times per second. The deformable mirror will be the largest adaptive mirror ever made, and consists of six component petals, control systems, and voice-coil actuators. The image distortion caused by the turbulence of the Earth's atmosphere can be corrected in real-time, as well as deformations caused by the wind upon the main telescope. The ELT's adaptive optics system will provide an improvement of about
SECTION 50
#17327873648283172-425: The telescope itself before reaching the ELT instruments. As of early 2024 the six component petals had been fabricated and are being brazed into a single unit. The ELT dome will have a height of nearly 74 metres (243 ft) from the ground and a diameter of 86 metres (282 ft), making it the largest dome ever built for a telescope. The dome will have a total mass of around 6,100 tonnes (13,400,000 lb), and
3233-414: The telescope mounting and tube structure will have a total moving mass of around 2,800 tonnes (6,200,000 lb). For the observing slit, two main designs were under study: one with two sets of nested doors, and the current baseline design, i.e. a single pair of large sliding doors. This pair of doors has a total width of 45.3 metres (149 ft). ESO signed a contract for its construction, together with
3294-411: The telescope optics clean. The air-conditioning of the telescope during the day is critical and the current specifications permit the dome to cool the telescope and internal volume by 10 °C (18 °F) over 12 hours. The ELT will search for extrasolar planets—planets orbiting other stars. This will include not only the discovery of planets down to Earth-like masses through indirect measurements of
3355-439: The tertiary mirror, the secondary mirror will be mounted on 32 points, with 14 along its edges and 18 on the back. The entire assembly will be mounted on a hexapod, allowing its position to be aligned every few minutes to sub-micrometer precision. Deformations on the secondary mirror have a much smaller effect on the final image compared to errors on the tertiary, quaternary, or quinary mirrors. The pre-formed glass-ceramic blank of
3416-465: The third-largest contract ESO has ever signed. The segment support system units for the primary mirror were designed and are produced by CESA (Spain) and VDL (the Netherlands). The contracts signed with ESO also include the delivery of detailed and complete instructions and engineering drawings for their production. Additionally, they include the development of the procedures required to integrate
3477-410: The universe. The OWL could be expected to regularly see astronomical objects with an apparent magnitude of 38, or 1,500 times fainter than the faintest object that has been detected by the Hubble Space Telescope . All proposed designs for the OWL are variations on a segmented mirror , since there is no technology available to build and transport a monolithic 60- or 100-meter mirror. The operation of
3538-455: The various processes at play around compact objects. The ELT is designed to make detailed studies of the first galaxies. Observations of these early galaxies with the ELT will give clues that will help understand how these objects form and evolve. In addition, the ELT will be a unique tool for making an inventory of the changing content of the various elements in the Universe with time, and to understand star formation history in galaxies. One of
3599-528: The windscreen minimises the volume required to house it. Two spherical blades, either side of the observing slit doors, slide in front of the telescope aperture to restrict the wind. The dome design ensures that the dome provides sufficient ventilation for the telescope not to be limited by dome seeing . For this the dome is also equipped with louvers, whereby the windscreen is designed to allow them to fulfill their function. Computational fluid dynamic simulations and wind tunnel work are being carried out to study
3660-455: The wobbling motion of stars perturbed by the planets that orbit them, but also the direct imaging of larger planets and possibly even the characterisation of their atmospheres. The telescope will attempt to image Earthlike exoplanets . Furthermore, the ELT's suite of instruments will allow astronomers to probe the earliest stages of the formation of planetary systems and to detect water and organic molecules in protoplanetary discs around stars in
3721-444: Was shortened in 2017. The ELT is intended to advance astrophysical knowledge by enabling detailed studies of planets around other stars, the first galaxies in the Universe, supermassive black holes, the nature of the Universe's dark sector, and to detect water and organic molecules in protoplanetary disks around other stars. As planned in 2011, the facility was expected to take 11 years to construct, from 2014 to 2025. On 11 June 2012,