The Versatile Test Reactor ( VTR ) was a project by the U.S. Department of Energy to build a fast-neutron test reactor by 2026. Funding for the project was scrapped in 2022
71-729: After the Fast Flux Test Facility and the Experimental Breeder Reactor-II (EBR-II) were decommissioned in 1992 and 1994, respectively, the United States was left with no fast-neutron reactor in its fleet. Fast-neutron research was limited to a few restricted reactors located in Russia, including the Bor-60 . To address this problem Nuclear Energy Innovation Capabilities Act of 2017 included
142-433: A chain reaction , as well as the ratio of breeding to fission. On the other hand, a fast reactor needs no moderator to slow down the neutrons at all, taking advantage of the fast neutrons producing a greater number of neutrons per fission than slow neutrons. For this reason ordinary liquid water , being a moderator and neutron absorber , is an undesirable primary coolant for fast reactors. Because large amounts of water in
213-489: A sodium-cooled 300 megawatt reactor based on GE-Hitachi ’s PRISM reactor. The proposed first fuel will utilize a uranium-plutonium-zirconium alloy fuel. Such an alloy fuel was tested previously in the EBR-II reactor. Later reactor fuel could consist of other mixtures and varying enrichments of uranium and plutonium and could use other alloying metals in place of zirconium. There are no power generating facilities planned for
284-460: A blend of uranium, plutonium, and zirconium (used because it is "transparent" to neutrons). Enriched uranium can be used on its own. Many designs surround the reactor core in a blanket of tubes that contain non-fissile uranium-238, which, by capturing fast neutrons from the reaction in the core, converts to fissile plutonium-239 (as is some of the uranium in the core), which is then reprocessed and used as nuclear fuel. Other FBR designs rely on
355-455: A breeder reactor then needs to be reprocessed to remove those neutron poisons . This step is required to fully utilize the ability to breed as much or more fuel than is consumed. All reprocessing can present a proliferation concern, since it can extract weapons-usable material from spent fuel. The most common reprocessing technique, PUREX , presents a particular concern since it was expressly designed to separate plutonium. Early proposals for
426-535: A chain reaction), fission products are viewed as nuclear 'ashes' left over from consuming fissile materials. Furthermore, only seven long-lived fission product isotopes have half-lives longer than a hundred years, which makes their geological storage or disposal less problematic than for transuranic materials. With increased concerns about nuclear waste, breeding fuel cycles came under renewed interest as they can reduce actinide wastes, particularly plutonium and minor actinides. Breeder reactors are designed to fission
497-538: A fission reactor. Breeder reactors by design have high burnup compared to a conventional reactor, as breeder reactors produce more of their waste in the form of fission products, while most or all of the actinides are meant to be fissioned and destroyed. In the past, breeder-reactor development focused on reactors with low breeding ratios, from 1.01 for the Shippingport Reactor running on thorium fuel and cooled by conventional light water to over 1.2 for
568-416: A half-life between 91 and 200,000 years. As a result of this physical oddity, after several hundred years in storage, the activity of the radioactive waste from an FBR would quickly drop to the low level of the long-lived fission products . However, to obtain this benefit requires the highly efficient separation of transuranics from spent fuel. If the fuel reprocessing methods used leave a large fraction of
639-1190: A heavily moderated thermal design, evolved into the fast reactor concept, using light water in a low-density supercritical form to increase the neutron economy enough to allow breeding. Aside from water-cooled, there are many other types of breeder reactor currently envisioned as possible. These include molten-salt cooled , gas cooled , and liquid-metal cooled designs in many variations. Almost any of these basic design types may be fueled by uranium , plutonium , many minor actinides , or thorium , and they may be designed for many different goals, such as creating more fissile fuel, long-term steady-state operation, or active burning of nuclear wastes . Extant reactor designs are sometimes divided into two broad categories based upon their neutron spectrum, which generally separates those designed to use primarily uranium and transuranics from those designed to use thorium and avoid transuranics. These designs are: All current large-scale FBR power stations were liquid metal fast breeder reactors (LMFBR) cooled by liquid sodium . These have been of one of two designs: There are only two commercially operating breeder reactors as of 2017 :
710-457: A light-water reactor for longer than 100,000 years, the transuranics would be the main source of radioactivity. Eliminating them would eliminate much of the long-term radioactivity from the spent fuel. In principle, breeder fuel cycles can recycle and consume all actinides, leaving only fission products. As the graphic in this section indicates, fission products have a peculiar "gap" in their aggregate half-lives, such that no fission products have
781-465: A provision directing the Department of Energy to begin planning for a fast-neutron source. Congress included $ 35 million in 2018 and $ 65 million in 2019 in the budget in support of this. In February 2019, VTR cleared Critical Decision 0, demonstrating a mission need requiring investment, the first in a series of project approvals. At that time, Secretary of Energy Rick Perry announced the start of
SECTION 10
#1732787450979852-419: A reactor's performance is the "conversion ratio", defined as the ratio of new fissile atoms produced to fissile atoms consumed. All proposed nuclear reactors except specially designed and operated actinide burners experience some degree of conversion. As long as there is any amount of a fertile material within the neutron flux of the reactor, some new fissile material is always created. When the conversion ratio
923-781: A similar facility would cost an estimated $ 2–5 billion. In April, 2006, the FFTF was honored by the American Nuclear Society as a "National Nuclear Historic Landmark". Achievements cited include: The probable successor to the FFTF will be the Versatile Test Reactor , which will roughly have the same size and capabilities as future test reactor and which will be built at Idaho National Laboratory in Idaho or Oak Ridge National Laboratory in Tennessee in
994-592: A third of the world's thorium reserves are in India, which lacks significant uranium reserves. The third and final core of the Shippingport Atomic Power Station 60 MWe reactor was a light water thorium breeder, which began operating in 1977. It used pellets made of thorium dioxide and uranium-233 oxide; initially, the U-233 content of the pellets was 5–6% in the seed region, 1.5–3% in
1065-566: A thorium thermal breeder. Liquid-fluoride reactors may have attractive features, such as inherent safety, no need to manufacture fuel rods, and possibly simpler reprocessing of the liquid fuel. This concept was first investigated at the Oak Ridge National Laboratory Molten-Salt Reactor Experiment in the 1960s. From 2012 it became the subject of renewed interest worldwide. Breeder reactors could, in principle, extract almost all of
1136-493: Is being pursued with regard to repairing the reactor. As the coolant was drained, the system was filled with high purity argon gas to prevent corrosion. The support basket is an unpressurized area, and the reactor core has not yet been breached (as of June 2006). The reason for renewed interest in the FFTF is that the global atmosphere with regard to nuclear energy has changed , and the US is pursuing nuclear power once again. To build
1207-564: Is due to the nation's large reserves, though known worldwide reserves of thorium are four times those of uranium. India's Department of Atomic Energy said in 2007 that it would simultaneously construct four more breeder reactors of 500 MWe each including two at Kalpakkam . BHAVINI , an Indian nuclear power company, was established in 2003 to construct, commission, and operate all stage II fast breeder reactors outlined in India's three-stage nuclear power programme . To advance these plans,
1278-403: Is enough fuel for breeder reactors to satisfy the world's energy needs for 5 billion years at 1983's total energy consumption rate, thus making nuclear energy effectively a renewable energy . In addition to seawater, the average crustal granite rocks contain significant quantities of uranium and thorium that with breeder reactors can supply abundant energy for the remaining lifespan of the sun on
1349-457: Is greater than 1, it is often called the "breeding ratio". For example, commonly used light water reactors have a conversion ratio of approximately 0.6. Pressurized heavy-water reactors running on natural uranium have a conversion ratio of 0.8. In a breeder reactor, the conversion ratio is higher than 1. "Break-even" is achieved when the conversion ratio reaches 1.0 and the reactor produces as much fissile material as it uses. The doubling time
1420-408: Is not a breeder reactor itself, but rather a sodium-cooled fast neutron reactor , as the name suggests. It is stated on the site dedicated to the FFTF, that it tested "advanced nuclear fuels , materials, components , nuclear power plant operations and maintenance protocols, and reactor safety designs." By 1993, the number of uses to which the reactor could be put was diminishing, so the decision
1491-416: Is nothing good about these reactors", he said. "I think there is a love of plutonium in the [Energy] Department that is irrational." The breeder design of the reactor produces more fissile material in the form of plutonium, resulting in proliferation fears. Fast Flux Test Facility The Fast Flux Test Facility ( FFTF ) is a 400 MW thermal, liquid sodium cooled , nuclear test reactor owned by
SECTION 20
#17327874509791562-440: Is the amount of time it would take for a breeder reactor to produce enough new fissile material to replace the original fuel and additionally produce an equivalent amount of fuel for another nuclear reactor. This was considered an important measure of breeder performance in early years, when uranium was thought to be scarce. However, since uranium is more abundant than thought in the early days of nuclear reactor development, and given
1633-445: Is transuranics (atoms heavier than uranium), which are generated from uranium or heavier atoms in the fuel when they absorb neutrons but do not undergo fission. All transuranic isotopes fall within the actinide series on the periodic table , and so they are frequently referred to as the actinides. The largest component is the remaining uranium which is around 98.25% uranium-238, 1.1% uranium-235, and 0.65% uranium-236. The U-236 comes from
1704-400: The activity of the waste is about the same as that produced by a light-water reactor. Waste from a breeder reactor has a different decay behavior because it is made up of different materials. Breeder reactor waste is mostly fission products, while light-water reactor waste is mostly unused uranium isotopes and a large quantity of transuranics. After spent nuclear fuel has been removed from
1775-531: The BN-600 reactor , at 560 MWe, and the BN-800 reactor , at 880 MWe. Both are Russian sodium-cooled reactors. The designs use liquid metal as the primary coolant, to transfer heat from the core to steam used to power the electricity generating turbines. FBRs have been built cooled by liquid metals other than sodium—some early FBRs used mercury ; other experimental reactors have used a sodium-potassium alloy . Both have
1846-476: The Chinese Academy of Sciences annual conference in 2011. Its ultimate target was to investigate and develop a thorium-based molten salt nuclear system over about 20 years. South Korea is developing a design for a standardized modular FBR for export, to complement the standardized pressurized water reactor and CANDU designs they have already developed and built, but has not yet committed to building
1917-453: The FBR-600 is a pool-type sodium-cooled reactor with a rating of 600 MWe. The China Experimental Fast Reactor is a 25 MW(e) prototype for the planned China Prototype Fast Reactor. It started generating power in 2011. China initiated a research and development project in thorium molten-salt thermal breeder-reactor technology (liquid fluoride thorium reactor), formally announced at
1988-607: The Hanford Site in the state of Washington , which was decommissioned in 1992. The preliminary requirements that meet these considerations include: Edwin Lyman , senior scientist and acting director of the Nuclear Safety Project at the non-profit Union of Concerned Scientists , questioned the need for a fast-neutron reactor, stating that existing facilities could be utilized to produce fast neutrons. "There
2059-630: The International Panel on Fissile Materials said "After six decades and the expenditure of the equivalent of tens of billions of dollars, the promise of breeder reactors remains largely unfulfilled and efforts to commercialize them have been steadily cut back in most countries". In Germany, the United Kingdom, and the United States, breeder reactor development programs have been abandoned. The rationale for pursuing breeder reactors—sometimes explicit and sometimes implicit—was based on
2130-464: The U.S. Department of Energy . It does not generate electricity. It is situated in the 400 Area of the Hanford Site , which is located in the state of Washington . The construction of the FFTF was completed in 1978, and the first reaction took place in 1980. From April 1982 to April 1992 it operated as a national research facility to test various aspects of commercial reactor design and operation, especially relating to breeder reactors . The FFTF
2201-479: The supercritical water reactor (SCWR) has sufficient heat capacity to allow adequate cooling with less water, making a fast-spectrum water-cooled reactor a practical possibility. The type of coolants, temperatures, and fast neutron spectrum puts the fuel cladding material (normally austenitic stainless or ferritic-martensitic steels) under extreme conditions. The understanding of the radiation damage, coolant interactions, stresses, and temperatures are necessary for
Versatile Test Reactor - Misplaced Pages Continue
2272-407: The 1960s as more uranium reserves were found and new methods of uranium enrichment reduced fuel costs. Many types of breeder reactor are possible: A "breeder" is simply a nuclear reactor designed for very high neutron economy with an associated conversion rate higher than 1.0. In principle, almost any reactor design could be tweaked to become a breeder. For example, the light-water reactor ,
2343-414: The 2020s. 46°26′07″N 119°21′36″W / 46.435284°N 119.360061°W / 46.435284; -119.360061 Breeder reactor A breeder reactor is a nuclear reactor that generates more fissile material than it consumes. These reactors can be fueled with more-commonly available isotopes of uranium and thorium , such as uranium-238 and thorium-232 , as opposed to
2414-548: The Soviet BN-350 liquid-metal-cooled reactor. Theoretical models of breeders with liquid sodium coolant flowing through tubes inside fuel elements ("tube-in-shell" construction) suggest breeding ratios of at least 1.8 are possible on an industrial scale. The Soviet BR-1 test reactor achieved a breeding ratio of 2.5 under non-commercial conditions. Fission of the nuclear fuel in any reactor unavoidably produces neutron-absorbing fission products . The fertile material from
2485-490: The VTR being considered were Oak Ridge National Laboratory and Idaho National Laboratory. Funding for the project was scrapped in 2022 Four national laboratories, Idaho National Laboratory , Argonne National Lab , Los Alamos National Lab , and Oak Ridge National Laboratory worked with universities and commercial industry to come up with conceptual designs, costs and schedule estimates, and support. The likely design will be
2556-468: The VTR. The Department of Energy Office of Nuclear Energy (NE), Nuclear Energy Advisory Committee (NEAC) report, "Assessment of Missions and Requirements for a New U.S. Test Reactor" recommended the need for a US domestic fast-neutron test capability. The considerations for such a capability include These planned capabilities are roughly similar to the capabilities of the sodium-cooled fast neutron 400MWth test reactor Fast Flux Test Facility , located at
2627-503: The Versatile Test Reactor Project. In November 2019, Battelle Energy Alliance , the organization that manages Idaho National Laboratory , announced an Expression of Interest (EOI) seeking an industry partner to design and construct the VTR. In January 2020, a collaboration between GE Hitachi Nuclear Energy (GEH) and TerraPower supported by Energy Northwest was announced. The potential building sites of
2698-458: The actinide wastes as fuel and thus convert them to more fission products. After spent nuclear fuel is removed from a light water reactor, it undergoes a complex decay profile as each nuclide decays at a different rate. There is a large gap in the decay half-lives of fission products compared to transuranic isotopes. If the transuranics are left in the spent fuel, after 1,000 to 100,000 years the slow decay of these transuranics would generate most of
2769-406: The advantage that they are liquids at room temperature, which is convenient for experimental rigs but less important for pilot or full-scale power stations. Three of the proposed generation IV reactor types are FBRs: FBRs usually use a mixed oxide fuel core of up to 20% plutonium dioxide (PuO 2 ) and at least 80% uranium dioxide (UO 2 ). Another fuel option is metal alloys , typically
2840-428: The amount of plutonium available in spent reactor fuel, doubling time has become a less important metric in modern breeder-reactor design. " Burnup " is a measure of how much energy has been extracted from a given mass of heavy metal in fuel, often expressed (for power reactors) in terms of gigawatt-days per ton of heavy metal. Burnup is an important factor in determining the types and abundances of isotopes produced by
2911-414: The blanket region, and none in the reflector region. It operated at 236 MWt, generating 60 MWe, and ultimately produced over 2.1 billion kilowatt hours of electricity. After five years, the core was removed and found to contain nearly 1.4% more fissile material than when it was installed, demonstrating that breeding from thorium had occurred. A liquid fluoride thorium reactor is also planned as
Versatile Test Reactor - Misplaced Pages Continue
2982-497: The breeder-reactor fuel cycle posed an even greater proliferation concern because they would use PUREX to separate plutonium in a highly attractive isotopic form for use in nuclear weapons. Several countries are developing reprocessing methods that do not separate the plutonium from the other actinides. For instance, the non-water-based pyrometallurgical electrowinning process, when used to reprocess fuel from an integral fast reactor , leaves large amounts of radioactive actinides in
3053-424: The core are required to cool the reactor, the yield of neutrons and therefore breeding of Pu are strongly affected. Theoretical work has been done on reduced moderation water reactors , which may have a sufficiently fast spectrum to provide a breeding ratio slightly over 1. This would likely result in an unacceptable power derating and high costs in a liquid-water-cooled reactor, but the supercritical water coolant of
3124-455: The deactivation was continued, after the DOE found that it was not needed for tritium production. Work was halted in 2002 when court action was begun. As of May 2003, deactivation has continued, and it is currently in a state of cold standby . In May 2005 the core support basket was drilled to drain the remaining sodium coolant, which effectively made the reactor unusable. However, a technical study
3195-493: The energy contained in uranium or thorium, decreasing fuel requirements by a factor of 100 compared to widely used once-through light water reactors, which extract less than 1% of the energy in the actinide metal (uranium or thorium) mined from the earth. The high fuel-efficiency of breeder reactors could greatly reduce concerns about fuel supply, energy used in mining, and storage of radioactive waste. With seawater uranium extraction (currently too expensive to be economical), there
3266-426: The fertile material in the uranium fuel cycle has an atomic weight of 238. That mass difference means that thorium-232 requires six more neutron capture events per nucleus before the transuranic elements can be produced. In addition to this simple mass difference, the reactor gets two chances to fission the nuclei as the mass increases: First as the effective fuel nuclei U233, and as it absorbs two more neutrons, again as
3337-428: The following key assumptions: Some past anti-nuclear advocates have become pro-nuclear power as a clean source of electricity since breeder reactors effectively recycle most of their waste. This solves one of the most-important negative issues of nuclear power. In the documentary Pandora's Promise , a case is made for breeder reactors because they provide a real high-kW alternative to fossil fuel energy. According to
3408-474: The fuel nuclei U235. A reactor whose main purpose is to destroy actinides rather than increasing fissile fuel-stocks is sometimes known as a burner reactor . Both breeding and burning depend on good neutron economy, and many designs can do either. Breeding designs surround the core by a breeding blanket of fertile material. Waste burners surround the core with non-fertile wastes to be destroyed. Some designs add neutron reflectors or absorbers. One measure of
3479-573: The fuel such a 1 gigawatt reactor would need. Such self-contained breeders are currently envisioned as the final self-contained and self-supporting ultimate goal of nuclear reactor designers. The project was canceled in 1994 by United States Secretary of Energy Hazel O'Leary . The first fast reactor built and operated was the Los Alamos Plutonium Fast Reactor (" Clementine ") in Los Alamos, NM. Clementine
3550-447: The geometry of the fuel (which also contains uranium-238), arranged to attain sufficient fast neutron capture. The plutonium-239 (or the fissile uranium-235) fissile cross-section is much smaller in a fast spectrum than in a thermal spectrum, as is the ratio between the Pu/ U fission cross-section and the U absorption cross-section. This increases the concentration of Pu/ U needed to sustain
3621-426: The long term. Germany, in contrast, abandoned the technology due to safety concerns. The SNR-300 fast breeder reactor was finished after 19 years despite cost overruns summing up to a total of € 3.6 billion, only to then be abandoned. The advanced heavy-water reactor is one of the few proposed large-scale uses of thorium. India is developing this technology, motivated by substantial thorium reserves; almost
SECTION 50
#17327874509793692-490: The main sequence of stellar evolution. No fission products have a half-life in the range of 100 a–210 ka ... ... nor beyond 15.7 Ma In broad terms, spent nuclear fuel has three main components. The first consists of fission products , the leftover fragments of fuel atoms after they have been split to release energy. Fission products come in dozens of elements and hundreds of isotopes, all of them lighter than uranium. The second main component of spent fuel
3763-416: The minor actinides (neptunium, americium, curium, etc.). Since breeder reactors on a closed fuel cycle would use nearly all of the isotopes of these actinides fed into them as fuel, their fuel requirements would be reduced by a factor of about 100. The volume of waste they generate would be reduced by a factor of about 100 as well. While there is a huge reduction in the volume of waste from a breeder reactor,
3834-403: The movie, one pound of uranium provides as much energy as 5,000 barrels of oil . The Soviet Union constructed a series of fast reactors, the first being mercury-cooled and fueled with plutonium metal, and the later plants sodium-cooled and fueled with plutonium oxide. BR-1 (1955) was 100W (thermal) was followed by BR-2 at 100 kW and then the 5 MW BR-5. BOR-60 (first criticality 1969)
3905-448: The non-fission capture reaction where U-235 absorbs a neutron but releases only a high energy gamma ray instead of undergoing fission. The physical behavior of the fission products is markedly different from that of the actinides. In particular, fission products do not undergo fission and therefore cannot be used as nuclear fuel. Indeed, because fission products are often neutron poisons (absorbing neutrons that could be used to sustain
3976-507: The power produced by commercial nuclear reactors comes from fission of plutonium generated within the fuel. Even with this level of plutonium consumption, light water reactors consume only part of the plutonium and minor actinides they produce, and nonfissile isotopes of plutonium build up, along with significant quantities of other minor actinides. Breeding fuel cycles attracted renewed interest because of their potential to reduce actinide wastes, particularly various isotopes of plutonium and
4047-529: The protactinium remains in the reactor, small amounts of uranium-232 are also produced, which has the strong gamma emitter thallium-208 in its decay chain. Similar to uranium-fueled designs, the longer the fuel and fertile material remain in the reactor, the more of these undesirable elements build up. In the envisioned commercial thorium reactors , high levels of uranium-232 would be allowed to accumulate, leading to extremely high gamma-radiation doses from any uranium derived from thorium. These gamma rays complicate
4118-453: The radioactivity in that spent fuel. Thus, removing the transuranics from the waste eliminates much of the long-term radioactivity of spent nuclear fuel. Today's commercial light-water reactors do breed some new fissile material, mostly in the form of plutonium. Because commercial reactors were never designed as breeders, they do not convert enough uranium-238 into plutonium to replace the uranium-235 consumed. Nonetheless, at least one-third of
4189-672: The rare uranium-235 which is used in conventional reactors. These materials are called fertile materials since they can be bred into fuel by these breeder reactors. Breeder reactors achieve this because their neutron economy is high enough to create more fissile fuel than they use. These extra neutrons are absorbed by the fertile material that is loaded into the reactor along with fissile fuel. This irradiated fertile material in turn transmutes into fissile material which can undergo fission reactions . Breeders were at first found attractive because they made more complete use of uranium fuel than light-water reactors , but interest declined after
4260-418: The reactor fuel. More conventional water-based reprocessing systems include SANEX, UNEX, DIAMEX, COEX, and TRUEX, and proposals to combine PUREX with those and other co-processes. All these systems have moderately better proliferation resistance than PUREX, though their adoption rate is low. In the thorium cycle, thorium-232 breeds by converting first to protactinium-233, which then decays to uranium-233. If
4331-501: The reactor. This process is an obvious chemical operation which is not required for normal operation of these reactor designs, but it could feasibly happen beyond the oversight of organizations such as the International Atomic Energy Agency (IAEA), and thus must be safeguarded against. Like many aspects of nuclear power, fast breeder reactors have been subject to much controversy over the years. In 2010
SECTION 60
#17327874509794402-508: The safe handling of a weapon and the design of its electronics; this explains why uranium-233 has never been pursued for weapons beyond proof-of-concept demonstrations. While the thorium cycle may be proliferation-resistant with regard to uranium-233 extraction from fuel (because of the presence of uranium-232), it poses a proliferation risk from an alternate route of uranium-233 extraction, which involves chemically extracting protactinium-233 and allowing it to decay to pure uranium-233 outside of
4473-408: The safe operation of any reactor core. All materials used to date in sodium-cooled fast reactors have known limits. Oxide dispersion-strengthened alloy steel is viewed as the long-term radiation resistant fuel-cladding material that can overcome the shortcomings of today's material choices. One design of fast neutron reactor, specifically conceived to address the waste disposal and plutonium issues,
4544-519: The salt carrier with heavier metal chlorides (e.g., KCl, RbCl, ZrCl 4 ). Several prototype FBRs have been built, ranging in electrical output from a few light bulbs' equivalent ( EBR-I , 1951) to over 1,000 MWe . As of 2006, the technology is not economically competitive to thermal reactor technology, but India , Japan, China, South Korea, and Russia are all committing substantial research funds to further development of fast breeder reactors, anticipating that rising uranium prices will change this in
4615-431: The site of the breeder reactor. Breeder reactors incorporating such technology would most likely be designed with breeding ratios very close to 1.00, so that after an initial loading of enriched uranium and/or plutonium fuel, the reactor would then be refueled only with small deliveries of natural uranium . A quantity of natural uranium equivalent to a block about the size of a milk crate delivered once per month would be all
4686-498: The transuranics in the final waste stream, this advantage would be greatly reduced. The FBR's fast neutrons can fission actinide nuclei with even numbers of both protons and neutrons. Such nuclei usually lack the low-speed "thermal neutron" resonances of fissile fuels used in LWRs. The thorium fuel cycle inherently produces lower levels of heavy actinides. The fertile material in the thorium fuel cycle has an atomic weight of 232, while
4757-479: The waste. Some of these fission products could later be separated for industrial or medical uses and the rest sent to a waste repository. The IFR pyroprocessing system uses molten cadmium cathodes and electrorefiners to reprocess metallic fuel directly on-site at the reactor. Such systems co-mingle all the minor actinides with both uranium and plutonium. The systems are compact and self-contained, so that no plutonium-containing material needs to be transported away from
4828-506: Was 60 MW, with construction started in 1965. India has been trying to develop fast breeder reactors for decades but suffered repeated delays. By December 2024 the Prototype Fast Breeder Reactor is due to be completed and commissioned. The program is intended to use fertile thorium-232 to breed fissile uranium-233. India is also pursuing thorium thermal breeder reactor technology. India's focus on thorium
4899-424: Was fueled by Ga-stabilized delta-phase Pu and cooled with mercury. It contained a 'window' of Th-232 in anticipation of breeding experiments, but no reports were made available regarding this feature. Another proposed fast reactor is a fast molten salt reactor , in which the molten salt's moderating properties are insignificant. This is typically achieved by replacing the light metal fluorides (e.g. LiF, BeF 2 ) in
4970-741: Was taken in December of that year to deactivate it. Over the next three years, the active parts of the facility were gradually halted, fuel rods removed and stored in above-ground dry storage vessels . However, in January 1997, the DOE ordered that the reactor be maintained in a standby condition, pending a decision as to whether to incorporate it into the US Government's tritium production program, for both medical and fusion research. Since then, due to legal wrangling, decommissioning has been stopped and restarted at intervals. In December 2001,
5041-477: Was the integral fast reactor (IFR, also known as an integral fast breeder reactor, although the original reactor was designed to not breed a net surplus of fissile material). To solve the waste disposal problem, the IFR had an on-site electrowinning fuel-reprocessing unit that recycled the uranium and all the transuranics (not just plutonium) via electroplating , leaving just short- half-life fission products in