In geotechnical engineering , a caisson ( / ˈ k eɪ s ən , - s ɒ n / ; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa ) is a watertight retaining structure used, for example, to work on the foundations of a bridge pier , for the construction of a concrete dam , or for the repair of ships .
23-729: The Zandkreekdam is a compartmentalisation dam located approximately 3 kilometres north of the city of Goes in The Netherlands , which connects Zuid-Beveland with Noord-Beveland , and separates the Oosterschelde from the Veerse Meer . A navigation lock in the dam permits shipping connections to Middelburg and Vlissingen , via the Veerse Meer and the Walcheren navigation channel. The Zandkreekdam
46-528: A box caisson with pinpoint accuracy. An open caisson is similar to a box caisson, except that it does not have a bottom face. It is suitable for use in soft clays (e.g. in some river-beds), but not for where there may be large obstructions in the ground. An open caisson that is used in soft grounds or high water tables, where open trench excavations are impractical, can also be used to install deep manholes, pump stations and reception/launch pits for microtunnelling , pipe jacking and other operations. A caisson
69-433: A lock to permit navigation. Construction began in the spring of 1957, with dredging undertaken to form a foundation trench 6.5 metres below Amsterdam Ordnance Datum ( Normaal Amsterdams Peil , N.A.P.). Weak soils including soft clay and peat were removed and replaced with approximately 160,000 cubic metres of sand, and excavation depths up to 14 metres below N.A.P. were realised. Unit caissons were used to construct
92-424: A suitable foundation material is encountered. While bedrock is preferred, a stable, hard mud is sometimes used when bedrock is too deep. The four main types of caisson are box caisson , open caisson , pneumatic caisson and monolithic caisson . A box caisson is a prefabricated concrete box (with sides and a bottom); it is set down on prepared bases. Once in place, it is filled with concrete to become part of
115-618: A suitable sub-foundation. These piles are connected by a foundation pad upon which the column pier is erected. Caisson engineering has been used since at least the 19th century, with three prominent examples being the Royal Albert Bridge (completed in 1859), the Eads Bridge (completed in 1874), and the Brooklyn Bridge (completed in 1883). To install a caisson in place, it is brought down through soft mud until
138-703: Is 830 metres in length, and was the first compartmentalisation dam to be constructed as part of the Delta Works , having been proposed by Johan van Veen as part of the Drie-Eilanden Plan ( English : Three Islands Plan) which originated in the 1930s . It was the second project constructed under the Delta Works Plan, after the Stormvloedkering Hollandse IJssel which was completed in 1958. The construction of
161-559: Is excavated by clamshell excavator bucket on crane. The formation level subsoil may still not be suitable for excavation or bearing capacity . The water in the caisson (due to a high water table) balances the upthrust forces of the soft soils underneath. If dewatered, the base may "pipe" or "boil", causing the caisson to sink. To combat this problem, piles may be driven from the surface to act as: H-beam sections (typical column sections, due to resistance to bending in all axis) may be driven at angles "raked" to rock or other firmer soils;
184-466: Is required. Shallow caissons may be open to the air, whereas pneumatic caissons (sometimes called pressurized caissons ), which penetrate soft mud , are bottomless boxes sealed at the top and filled with compressed air to keep water and mud out at depth. An airlock allows access to the chamber. Workers, called sandhogs in American English, move mud and rock debris (called muck ) from
207-520: Is sunk by self-weight, concrete or water ballast placed on top, or by hydraulic jacks. The leading edge (or cutting shoe ) of the caisson is sloped out at a sharp angle to aid sinking in a vertical manner; it is usually made of steel. The shoe is generally wider than the caisson to reduce friction, and the leading edge may be supplied with pressurised bentonite slurry, which swells in water, stabilizing settlement by filling depressions and voids. An open caisson may fill with water during sinking. The material
230-581: The Brouwersdam and Oosterscheldekering . Johan van Veen had been developing his Three Islands Plan since the 1930s, in which he considered land reclamation around the islands of Walcheren, Nord-Beveland and Zuid-Beveland and proposed the closure of two bodies of water : the Veerse Gat and the Zandkreek. In combination with the effects of the previously-constructed Sloedam , this would shorten
253-555: The pressurized environment of the caisson must decompress at a rate that allows symptom-free release of inert gases dissolved in the body tissues if they are to avoid decompression sickness , a condition first identified in caisson workers, and originally named "caisson disease" in recognition of the occupational hazard. Construction of the Brooklyn Bridge , which was built with the help of pressurised caissons, resulted in numerous workers being either killed or permanently injured by caisson disease during its construction. Barotrauma of
SECTION 10
#1732782473308276-518: The H-beams are left extended above the base. A reinforced concrete plug may be placed under the water, a process known as tremie concrete placement . When the caisson is dewatered, this plug acts as a pile cap, resisting the upward forces of the subsoil. A monolithic caisson (or simply a monolith ) is larger than the other types of caisson, but similar to open caissons. Such caissons are often found in quay walls, where resistance to impact from ships
299-618: The Zandkreek. The Delta Plan was of such unprecedented size and complexity that the plan was to start with the easiest parts and gain experience along the way. There were a total of four sea arms to be closed in the Delta region, of which the Veerse Gat - extending east into the Zandkreek - was the smallest. By commencing with the smaller works, the engineers of the Delta Service could thus gain knowledge of construction methods, materials, and equipment - essential exercises for closing
322-643: The Zandkreekdam locks to permit vehicular traffic to pass over it at any time. Johan van Veen's Three-Island Plan required that construction of the Zankreekdam and the Veerse Gatdam should be undertaken as early as possible in the Delta Works programme, to permit Dutch civil engineers and contractors to gain experience that would be necessary for more complicated Delta Works projects such as
345-599: The Zandkreekdam, together with the Veerse Gatdam in 1961, created the freshwater Veerse Meer (Veerse Lake). Poor water quality in the lake led to the decision to build a control lock , known as the Katse Heule , which was completed in 2004 and re-established saltwater intrusion from the Oosterschelde into the Veerse Meer, and led to a significant improvement in water quality. There are two bridges at
368-435: The base of the caisson. When the caisson hits bedrock, the sandhogs exit through the airlock and fill the box with concrete, forming a solid foundation pier. A pneumatic (compressed-air) caisson has the advantage of providing dry working conditions, which is better for placing concrete. It is also well suited for foundations for which other methods might cause settlement of adjacent structures. Construction workers who leave
391-514: The coastline from 52 kilometers to 2.5 kilometres and open up large areas of land which could then be reclaimed from the sea. Van Veen recognised the need to close both bodies of water, with the Zandkreekdam acting as a secondary dam to make the works on the Veerse Gatdam easier and therefore being constructed first. Having made extensive studies, van Veen realised that the closure of the Veerse Gat alone would cause unacceptable tidal streams in
414-533: The dam, with the maximum depth of the closing hole being 5m below N.A.P. On 3 May 1960, a pair of caissons were sunk into the final gap and the dam was then completed to a height of 8.25m above N.A.P. The navigation lock, 140 metres long and 20 metres wide, was ready for shipping in the spring of 1960. Compartmentalisation dam Too Many Requests If you report this error to the Wikimedia System Administrators, please include
437-466: The details below. Request from 172.68.168.226 via cp1108 cp1108, Varnish XID 223195708 Upstream caches: cp1108 int Error: 429, Too Many Requests at Thu, 28 Nov 2024 08:27:53 GMT Caisson (engineering) Caissons are constructed in such a way that the water can be pumped out, keeping the work environment dry. When piers are being built using an open caisson, and it is not practical to reach suitable soil, friction pilings may be driven to form
460-415: The edge of the workspace to a water-filled pit, connected by a tube (called the muck tube ) to the surface. A crane at the surface removes the soil with a clamshell bucket . The water pressure in the tube balances the air pressure, with excess air escaping up the muck tube. The pressurized air flow must be constant to ensure regular air changes for the workers and prevent excessive inflow of mud or water at
483-539: The effects of storm surges in both the Veerse Gat and the Zandkreek. The body set up to implement the Delta Works scheme, known as the Deltacommissie (English: Delta Commission), adopted the Three Islands Plan and the Zandkreekdam was taken forward. The design was based on the use of caissons 6 metres high, 7.5 metres wide and 11 metres long to form a closure dam, along with the construction of
SECTION 20
#1732782473308506-488: The larger Brouwershavense Gat and the Eastern Scheldt . The location pinpointed by van Veen for the Zandkreekdam is at a wantij , a Dutch term for the point at which the tidal currents from both sea arms meet at high tide, and the current is minimal. It was also important that construction of the Veerse Gatdam did not lag too far behind the Zandkreekdam, as closing only the Zandkreek would dangerously increase
529-401: The permanent works, such as the foundation for a bridge pier. Hollow concrete structures are usually less dense than water so a box caisson must be ballasted or anchored to keep it from floating until it can be filled with concrete. Sometimes elaborate anchoring systems may be required, such as in tidal zones . Adjustable anchoring systems combined with a GPS survey enable engineers to position
#307692