Misplaced Pages

CrossCountry

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#473526

128-618: CrossCountry (legal name XC Trains Limited ) is a British train operating company owned by Arriva UK Trains , operating the current CrossCountry franchise. The CrossCountry franchise was restructured by the Department for Transport (DfT) in 2006, incorporating elements of both the Central Trains and the Virgin CrossCountry franchises, ahead of its invitation to tender on October of that year. On 10 July 2007,

256-712: A 100% FirstGroup subsidiary when the 24.5% shareholder bought out its partners. The TOCs were renamed First Great Western and First North Western . Go-Ahead Group bought the remaining 35% share in Thames Trains . Virgin Group sold a 49% share in Virgin Rail Group that operated the CrossCountry and West Coast franchises to Stagecoach . The completion of the rail link to Heathrow Airport led to Heathrow Express , an open-access operator outside

384-418: A London–Glasgow time of 4   hours 8   minutes. Some projects that were removed from the modernisation as a result of the de-scoping, such as a flyover at Norton Bridge station, were later restarted. A £250   million project to grade-separate the tracks at Norton Bridge that allowed for increased service frequency as well as improved line-speeds was completed in spring 2016. Other projects such as

512-515: A Weymouth to Bournemouth return journey, calling at Wareham and Poole . During December 2016, CrossCountry published a consultation document for changes to the timetable proposed to be implemented in December 2017. These included: To allow these changes to take place, all CrossCountry services on some routes (which had a limited service) would be withdrawn and replaced with extra services run by other operators. These included: In April 2017, it

640-571: A company wholly owned by the Strategic Rail Authority , which would operate the franchise until it could be tendered again. New franchise holders Arriva Trains Wales and Merseyrail began operating. FirstGroup purchased GB Railways which owned the Anglia Railways and Hull Trains businesses. A policy where the majority of services (both long-distance and commuter) from each London terminal would all be operated by

768-474: A daily Nottingham to Bournemouth service introduced during December 2008, were also implemented. CrossCountry has designated four stations as alternative changeover stations: Cheltenham Spa , Derby , Leamington Spa and Wolverhampton . Special services have occasionally been run, such as between Bournemouth and Weymouth in support of the Sailing at the 2012 Olympics & Paralympics . In August 2024,

896-510: A few years. After driver training the ex-Midland Mainline sets returned to service in May 2008 on Glasgow and Edinburgh to Plymouth diagrams while the other Class 43 power cars were overhauled at Brush Traction including repowering with MTU engines and the Mark 3 carriages overhauled at Doncaster Works to a similar specification as GNER 's Mallard refurbishments. Once these were completed,

1024-560: A four-car unit; however, it did retain the quiet coaches on its five HST sets. During November 2017, as a part of CrossCountry's franchise extension, two former Virgin Trains Class 221 Super Voyager driving cars of unit 221144 were reactivated, having been stored at Central Rivers TMD for several years. Two of the existing five-car sets released a centre carriage that, when combined with the reactivated pair of driving cars, formed an additional four-car set to be formed. In 2021, six of

1152-459: A government-owned operator of last resort , due either to failing expectations or to events on the rail system as a whole. The term is also sometimes used to describe companies operating passenger or freight rail services over tracks owned by another company or a national network owner. Franchises were initially let by the Office of Passenger Rail Franchising (OPRAF). This was in turn replaced by

1280-614: A number of services were extended from Edinburgh to Glasgow to replace East Coast services. By mid-2020, CrossCountry had considerably curtailed its services in response to the significant decline of passenger travel amid the COVID-19 pandemic . From 15 June 2020, both passengers and staff on public transport in England, including CrossCountry services, were required to wear face coverings while travelling, and that anyone failing to do so would be liable to be refused travel or fined. While

1408-410: A reappraisal of the plans, while the cost of the upgrade soared. Following fears that cost overruns on the project would push the final price tag to £13 billion, the plans were scaled down, bringing the cost down to between £8 billion and £10 billion, to be ready by 2008, with a maximum speed for tilting trains of a more modest 125 mph (201 km/h) – equalling the speeds available on

SECTION 10

#1732765803474

1536-550: A result of an agreement with CrossCountry to match their demands for an equal pay rise, the planned industrial action by the TSSA was cancelled. CrossCountry is one of several train operators affected by the 2022–2024 United Kingdom railway strikes , the first national rail strike in the UK for three decades. Its workers were amongst those who voted in favour of industrial action due to a dispute over pay and working conditions. CrossCountry

1664-425: A specified duration, while a small number of open-access operators hold licences to provide supplementary services on chosen routes. These operators can run services for the duration of the licence validity. The franchised operators have changed considerably since privatisation: previous franchises have been divided, merged, re-let to new operators, or renamed. Some privately-operated franchises have been taken over by

1792-522: A track realignment scheme to raise speeds on the WCML; a proposed project called InterCity 250 , which entailed realigning parts of the line in order to increase curve radii and smooth gradients in order to facilitate higher-speed running. The scheme, which would have seen the introduction of new rolling stock derived from that developed for the East Coast electrification, was scrapped in 1992. As part of

1920-527: A useful alternative route to Manchester, however poor relations between the LNWR and the NSR meant that through trains did not run until 1867. The route to Scotland was marketed by the LNWR as 'The Premier Line'. Because the cross-border trains ran over the LNWR and Caledonian Railway, through trains consisted of jointly owned "West Coast Joint Stock" to simplify operations. The first direct London to Glasgow trains in

2048-499: Is 399 miles (642 km) long, with principal InterCity stations at Watford Junction , Milton Keynes Central , Rugby , Stafford , Crewe , Warrington Bank Quay , Wigan North Western , Preston , Lancaster , Oxenholme Lake District , Penrith and Carlisle . The spine has bypasses serving the major towns and cities of Northampton , Coventry , Birmingham and Wolverhampton . Spurs serve Stoke-on-Trent , Macclesfield , Stockport , Manchester, Runcorn and Liverpool . There

2176-442: Is a short double track stretch through the 777-yard (710 m) Shugborough Tunnel. The line is then quadruple track most of the way to Acton Bridge railway station, except for a double track section between Winsford and Hartford. The line is double track from Acton Bridge railway station to Weaver Junction (where a double track spur to Liverpool branches off). The line is double track from Weaver Junction to Warrington Bank Quay, but

2304-618: Is also a branch to Edinburgh , at Carstairs in Scotland which is not the most direct route between London and Edinburgh. It provides a direct connection between the WCML and the East Coast Main Line . Originally, the lines between Rugby , Birmingham and Stafford were part of the main spine, until the Trent Valley Line was built in 1847. This line formed a direct connection between Rugby and Stafford becoming

2432-404: Is due to run from 10 August to 9 November 2024. The company cited a driver training backlog as the reason for the reduced service. In a letter to the company's joint interim managing directors, Haigh said Over the past year, the level of train cancellations across your company has increased significantly and by your own forecasts, you expected to breach your contractual targets for cancellations in

2560-564: Is entirely electrified – this situation is, however, changing since the expansion of the Pendolino fleet; from 2013 onward Class 390 sets have been routinely deployed on Edinburgh/Glasgow–Birmingham services. By 2012, the WCML Pendolino fleet was strengthened by the addition of two coaches to 31 of the 52 existing sets, thus turning them into 11-car trains. Four brand new 11-car sets are also part of this order, one of which replaced

2688-546: Is the loss of through services between Liverpool and Scotland; however these were restored by TransPennine Express in 2019. British Rail introduced the Advanced Passenger Train APT project, which proved that London–Glasgow WCML journey times of less than 4   hours were achievable and paved the way for the later tilting Virgin Pendolino trains. In the late 1980s, British Rail put forward

SECTION 20

#1732765803474

2816-487: The Birmingham branch , and the routes to Manchester via Stoke-on-Trent was completed on 6 March 1967, allowing electric services to commence to those destinations. In March 1970 the government approved electrification of the northern half of the WCML, between Weaver Junction (where the branch to Liverpool diverges) and Glasgow, and this was completed on 6 May 1974. The announcement, after five years of uncertainty,

2944-519: The Class 170 Turbostar fleet was refurbished, during which the three-carriage units repainted at Marcroft Engineering, Stoke-on-Trent , the two-carriage units at EWS 's Toton depot and the interiors renewed by Transys Projects, Clacton-on-Sea , including the fitting of first-class seating to the Class 170/5s and 170/6s. The tilt function on the Class 221 Super Voyagers was removed in 2008; tilting

3072-824: The Greater Anglia franchise on 5 February 2012. In September 2012, FirstGroup was awarded the right to operate the West Coast franchise which provoked a backlash from incumbent Virgin Trains West Coast. As a result of the Department for Transport having provided incorrect information during the bid process, the offer was withdrawn in October 2012 and £40 million of bid costs refunded. In September 2014, Govia Thameslink Railway took over services formerly operated by First Capital Connect as part of

3200-760: The InterCity East Coast franchise. West Coast Main Line The West Coast Main Line ( WCML ) is one of the most important railway corridors in the United Kingdom, connecting the major cities of London and Glasgow with branches to Birmingham , Manchester , Liverpool and Edinburgh . It is one of the busiest mixed-traffic railway routes in Europe, carrying a mixture of intercity rail , regional rail , commuter rail and rail freight traffic. The core route of

3328-629: The London and Birmingham Railway was completed, connecting to the capital via Coventry , Rugby and the Watford Gap . The Grand Junction and London and Birmingham railways shared a Birmingham terminus at Curzon Street station , so that it was now possible to travel by train between London, Birmingham, Manchester and Liverpool. These lines, together with the Trent Valley Railway (between Rugby and Stafford, avoiding Birmingham) and

3456-557: The London and North Western Railway (LNWR), which then gradually absorbed most of the others; the exceptions were the Caledonian Railway in Scotland, and the North Staffordshire Railway (NSR) which both remained independent until 1923. The core route was mostly built between the 1830s and 1850s, but several cut-off routes and branches were built in later decades. In 1923, the entire route came under

3584-584: The Manchester and Birmingham Railway (Crewe–Manchester), amalgamated operations in 1846 to form the London and North Western Railway (LNWR). Three other companies, the North Union Railway ( Parkside –Wigan–Preston), the Lancaster and Preston Junction Railway and the Lancaster and Carlisle Railway , completed a through route to Carlisle by the end of 1846, these were later absorbed by

3712-488: The Mark 2 and from 1974 the fully integral , air-conditioned Mark 3 design. These remained the mainstay of express services until the early 2000s. Line speeds were raised to a maximum 110 mph (180 km/h), and these trains, hauled by Class 86 and Class 87 electric locomotives, came to be seen as BR's flagship passenger service. Passenger traffic on the WCML doubled between 1962 and 1975. The modernisation also saw

3840-733: The Merseyside Passenger Transport Executive lets the Merseyrail franchise, while in London, Transport for London (TfL) oversees the new London Overground and Elizabeth line concessions. ( London Underground , a wholly owned subsidiary of Transport for London , operates trains nearly all on its own network serving mostly its own stations: It is not a Train Operating Company by the definition here.) The Rail Delivery Group (RDG) (formerly

3968-955: The Metro buses in Belfast and Ulsterbus coaches around the country. NIR is not a TOC under the terms of the Railways Act 1993 , which only applies to Great Britain. The cross-border service Enterprise (Belfast–Dublin) is jointly operated with Iarnród Éireann , the publicly owned national railway company of the Republic of Ireland. Upon privatisation in 1994, the three passenger-operating sectors of British Rail ( InterCity , Network SouthEast and Regional Railways ) were divided, and their existing operations were let as 25 franchises: The privatisation process began when BR's passenger sectors were divided into 25 train operating units which were gradually incorporated as publicly owned subsidiaries of

CrossCountry - Misplaced Pages Continue

4096-736: The North East Regional franchise and the North West Regional franchise . In 2004, these were altered into the TransPennine franchise, for intercity services, and the Northern franchise, for local services that were awarded to First TransPennine Express and Northern Rail respectively. Some North West services were transferred to the Arriva Trains Wales franchise. In the same year, Thames Trains

4224-589: The Quintinshill rail disaster , occurred on the WCML during World War I , on 22 May 1915, between Glasgow Central and Carlisle, in which 227 were killed and 246 injured. The entire route came under the control of the London, Midland and Scottish Railway (LMS) on 1 January 1923 when the railway companies were grouped , under the Railways Act 1921 . The LMS competed fiercely with the rival LNER 's East Coast Main Line for London to Scotland traffic (see Race to

4352-478: The Secretary of State for Transport , Louise Haigh , criticised the company's performance and threatened to take action if it did not improve, following its request to reduce its service levels in the new timetable. During June 2006, the Department for Transport (DfT) announced its intention to restructure a number of the existing railway franchises. As a result of these changes, a 'New Cross Country' franchise

4480-584: The Strategic Rail Authority , which has since been abolished. For England, franchising is now the responsibility of the Department for Transport in the majority of cases. In Scotland, it is the responsibility of Transport Scotland . In Wales, since 2017, the responsibility for the specification and procurement of the Wales & Borders franchise belongs to Transport for Wales . In two parts of England, local government agencies are responsible: in Merseyside ,

4608-572: The Thameslink, Southern & Great Northern franchise and branded them as Thameslink and Great Northern. Services operated by Southern , another Govia subsidiary, were merged into the new franchise in the following year. Hull Trains became a 100% subsidiary of FirstGroup when the 80% shareholder bought out its partners. In March 2015, a Stagecoach and Virgin joint venture trading as Virgin Trains East Coast commenced operating

4736-454: The death of Queen Elizabeth II , locomotive hauled services returned briefly to the WCML once more when incumbent operator Avanti West Coast employed a rake of Mark 3 coaches (hauled by a Class 90 locomotive) to provide additional services to Euston for those wishing to travel to London for the Queen's lying-in-state and subsequent funeral. The following table lists the rolling stock which forms

4864-570: The early railway era was for companies to promote individual lines between two destinations, rather than to plan grand networks of lines, as it was considered easier to obtain backing from investors. The first stretch of what is now the WCML was the Grand Junction Railway connecting the Liverpool and Manchester Railway to Birmingham , via Warrington , Crewe , Stafford and Wolverhampton , opening in 1837. The following year

4992-791: The passenger transport executive or other civic body responsible for administering public transport. One of these bodies, the Merseyside Passenger Transport Executive (Merseytravel) is responsible for one of three National Rail franchises not awarded by central government, namely the Merseyrail franchise, while certain National Rail services in North London came under the control of TfL in November 2007 as London Overground. Two other franchises,

5120-598: The privatisation of British Rail in the 1990s, the infrastructure was taken over in 1994 by the private company Railtrack , which later collapsed in 2002, and was replaced by the not-for-profit company Network Rail . WCML's InterCity services became part of the InterCity West Coast franchise , which was won by Virgin Trains who took over in 1997. In 2019, Avanti West Coast won the new West Coast Partnership franchise, taking over from Virgin Trains. By

5248-431: The railway system of Great Britain , a train operating company ( TOC ) is a railway undertaking operating passenger trains under the collective National Rail brand. TOCs have existed since the privatisation of the network under the Railways Act 1993 . There are two types of TOC: most hold franchises let by the Department for Transport (DfT) through a tendering system, to operate services on certain routes for

CrossCountry - Misplaced Pages Continue

5376-536: The 1850s took 12.5   hours to complete the 400-mile (640 km) journey. The final sections of what is now the WCML were put in place over the following decades. A direct branch to Liverpool , bypassing the earlier Liverpool and Manchester line, was opened in 1869, from Weaver Junction north of Crewe to Ditton Junction via the Runcorn Railway Bridge over the River Mersey . At

5504-598: The 2010-2017 timeframe. The Wigan North Western to Lostock Parkway branch is also in the process of being electrified. The majority of stock used on the West Coast Main Line is new-build, part of Virgin's initial franchise agreement having been a commitment to introduce a brand-new fleet of tilting Class 390 "Pendolino" trains for long-distance high-speed WCML services. The 53-strong Pendolino fleet, plus three tilting SuperVoyager diesel sets, were bought for use on these InterCity services. One Pendolino

5632-630: The Association of Train Operating Companies) provides a commonality for the TOCs and provides some centralised co-ordination. Its activities include the provision of a national timetable and online journey planner facility, and the operation of the various Railcard discount schemes. Eurostar is also a member of the RDG, though it is not itself a TOC. For historical and geographical reasons

5760-565: The British Railways Board. They acted as shadow franchises prior to being put to tender: The opening of the Channel Tunnel saw operations by Eurostar begin from London Waterloo to Paris and Brussels . The franchising process was implemented, with various private companies taking over the shadow franchises. Three were awarded to management buyouts . The Great Western Holdings ' management also were awarded

5888-545: The Class 220 Voyagers and 20% extra luggage space and sixteen extra standard-class seats to the Class 221 Super Voyagers . Three years later, a refresh of the interiors was conducted, during which the standard-class seats were re-covered in the existing red and blue moquette and while the first class seats were finished with a maroon moquette. In summer 2014, CrossCountry began removing the quiet coach designation from such vehicles across its Voyager fleet, believing them to be outdated and to take up an excessive amount of space on

6016-615: The Crewe–Manchester line via Wilmslow was completed in summer 2006. In September 2006, a new speed record was set on the WCML ;– a Pendolino train completed the 401-mile (645 km) Glasgow Central – London Euston run in a record 3   hours 55   minutes, beating the APT's record of 4   hours 15   minutes, although the APT still holds the overall record on the northbound run. The decade-long modernisation project

6144-502: The DfT Rail Group. Until 2005 this role was performed by the Strategic Rail Authority . The infrastructure of the railways in England, Scotland, and Wales – including tracks and signalling  – is owned and operated not by the train companies but by Network Rail , which took over responsibility from Railtrack in 2002. Most passenger trains are owned by a small number of rolling stock companies (ROSCO) and are leased to

6272-683: The DfT announced that Arriva had been awarded the New Cross Country franchise. CrossCountry is one of only two franchised train operating companies that does not manage any stations, the other being Caledonian Sleeper . CrossCountry's services have been periodically disrupted by industrial action amongst its staff, often due to disputes over rostering and pay. While the franchise had been originally due to conclude on 31 March 2016, multiple subsequent agreements have been enacted; in September 2023,

6400-765: The DfT confirmed that the franchise has been extended for a further four years for a finish date of 15 October 2027. At the commencement of operations, CrossCountry's rolling stock consisted of 34 four-car Class 220 Voyagers and 40 five-car and 4 four-car Class 221 Super Voyagers from Virgin CrossCountry as well as 11 two-car and 18 three-car Class 170 Turbostars from Central Trains . As per its franchise agreement, it obtained ten Class 43 power cars and forty Mark 3 carriages to operate on services that required greater seating capacity, while some Super Voyagers were transferred to Virgin West Coast. Overhauls of

6528-600: The DfT issued the invitation to tender (ITT) to the four shortlisted bidders: Arriva , FirstGroup , National Express and Virgin Rail Group . On 10 July 2007, the DfT announced that Arriva had been awarded the New Cross Country franchise, and that the services operated by Virgin CrossCountry would be transferred to CrossCountry on 11 November 2007, along with the Cardiff to Nottingham and Birmingham to Stansted Airport services from Central Trains. After taking over

SECTION 50

#1732765803474

6656-418: The Direct Award was further extended by one year, moving the expiry date back to October 2020. During September 2020, it was announced that the emergency agreements with train operating companies introduced due to the COVID-19 pandemic in the United Kingdom were to be extended for 18   months, and that all passenger rail franchising in Great Britain was abandoned. In October 2020, the DfT confirmed that

6784-422: The East Coast franchise. In April 2008, Wrexham & Shropshire began operating open access services between Wrexham and London Marylebone . In June 2008, the Gatwick Express franchise was integrated with the South Central franchise operated by Southern . The government announced that National Express East Coast would have its franchise to operate intercity services along the ECML terminated, and that

6912-488: The East Coast route, but some way short of the original target, and even further behind BR's original vision of 155 mph (250 km/h) speeds planned and achieved with the APT. The first phase of the upgrade, south of Manchester, opened on 27 September 2004 with journey times of 1   hour 21   minutes for London to Birmingham and 2   hours 6   minutes for London to Manchester. The final phase, introducing 125 mph (201 km/h) running along most of

7040-498: The LNWR. North of Carlisle, the Caledonian Railway remained independent, and opened its main line from Carlisle to Beattock on 10 September 1847, connecting to Edinburgh in February 1848, and to Glasgow in November 1849. Another important section, the North Staffordshire Railway (NSR), which opened its route in 1848 from Macclesfield (connecting with the LNWR from Manchester) to Stafford and Colwich Junction via Stoke-on-Trent , also remained independent. The NSR provided

7168-582: The Midlands and this area has been called the " Golden Triangle of Logistics ". Nearly all of the WCML is electrified with overhead line equipment at 25 kV AC . Several of the formerly unelectrified branches of the WCML in the North West have recently been electrified such as the Preston to Blackpool North Line on which electric service commenced in May 2018 along with the Preston – Manchester Piccadilly line which saw electric service commence in February 2019. Wigan to Liverpool via St Helens Shaw Street and St Helens Junction were also electrified in

7296-506: The Monday-Friday daytime services, with frequencies in trains per hour (tph), include: These services combine to provide higher frequencies between Birmingham and the following major destinations: The Sunday service pattern is mostly similar to the weekday one, except that services typically do not start until late morning or early afternoon, and often have a slightly different stopping pattern. Several Bristol–Manchester trains start from Birmingham New Street on Sundays. The above table shows

7424-410: The North ). Attempts were made to minimise end-to-end journey times for a small number of powerful lightweight trains that could be marketed as glamorous premium crack expresses, especially between London and Glasgow, such as the 1937–39 Coronation Scot , hauled by streamlined Princess Coronation Class locomotives, which made the journey in 6   hours 30   minutes, making it competitive with

7552-446: The North West Regional Railways franchise. The remainder were divided between a handful of major transport operators: In Northern Ireland, NIR stopped using its own branding on the Enterprise service between Belfast and Dublin when it purchased new rolling stock in conjunction with IÉ, instead launching Enterprise as a separate brand name. Great Western Holdings , which operated Great Western Trains and North West Trains, became

7680-401: The RMT came to an agreement over staff working conditions on 11 January. Separate strike action was later threatened by the Transport Salaried Staffs' Association (TSSA) union later that month, with strikes planned for 26 January. These were in relation to CrossCountry staff being offered a 1% pay rise, compared to a 3.3% pay rise for staff at other Arriva -owned train operating companies. As

7808-484: The Remedial Plan, I will not hesitate to take further action. The company operates medium- and long-distance services that run outside of the London area. The network is centred at Birmingham New Street . Services can be categorised into two types: CrossCountry's official website does show a distinction between the two types of services (for example, each has a separate timetable booklet), but does not explicitly call them Inter-City and Regional. As of December 2023,

SECTION 60

#1732765803474

7936-411: The Scottish national franchise, currently operated by ScotRail , and the Welsh domestic franchise, operated by Transport for Wales , are awarded by the devolved governments of the two constituent nations. The Rail Delivery Group is the coordinating body of the train operating companies in Great Britain and owns the National Rail brand, which uses the former British Rail double-arrow logo and organises

8064-441: The UK's longest direct rail passenger service, from Aberdeen in the north-east of Scotland to Penzance in western Cornwall, which has a journey time of 13 hours and 15 minutes. While some services on the West Coast Main Line were promptly discontinued with the introduction of a new timetable on 9 December 2007, with some transferring over to both Virgin Trains West Coast and to First TransPennine Express , new services, such as

8192-537: The Voyager & Super Voyager fleets were performed, the removal of the shop to fit more seating and storage being a prominent change; the Mark 3 carriages were also refurbished to provide suitable amenities for modern travellers. Both the Super Voyagers and Turbostar fleets have been extended where possible to provide more capacity. CrossCountry's network is centred around Birmingham New Street . It operates intercity and other long-distance passenger trains across Great Britain, but does not serve Greater London. It operates

8320-458: The WCML form part of the suburban railway systems in London, Coventry , Birmingham, Manchester, Liverpool and Glasgow, with many more smaller commuter stations, as well as providing links to more rural towns. It is one of the busiest freight routes in Europe, carrying 40% of all UK rail freight traffic. The line is the principal rail freight corridor linking the European mainland (via the Channel Tunnel ) through London and South East England to

8448-424: The WCML runs from London to Glasgow for 400 miles (644 km) and was opened from 1837 to 1881. With additional lines deviating to Northampton , Birmingham, Manchester, Liverpool and Edinburgh, this totals a route mileage of 700 miles (1,127 km). The Glasgow–Edinburgh via Carstairs line connects the WCML to Edinburgh. However, the main London–Edinburgh route is the East Coast Main Line . Several sections of

8576-586: The WCML) were given 30 new "Desiro" Class 350s , originally ordered for services in the south-east. Following Govia 's successful bid for the West Midlands franchise in 2007, another 37 Class 350 units were ordered to replace its older fleet of Class 321s . The older BR-vintage locomotive-hauled passenger rolling stock still has a limited role on the WCML, with the overnight Caledonian Sleeper services between London Euston and Scotland using Mark 3 and Mark 2 coaches until their replacement with Mark 5 stock in October 2019. Virgin also retained and refurbished one of

8704-446: The West Midlands, North West England and Scotland. The line has been declared a strategic European route and designated a priority Trans-European Networks (TENS) route. A number of railway writers refer to it as "The Premier line". The WCML was not originally conceived as a single route, but was built as a patchwork of local lines which were linked together, built by various companies, the largest of which amalgamated in 1846 to create

8832-486: The a part of the spine. South of Rugby, there is a bypass loop that serves Northampton . There is a spur at Weaver Junction north of Crewe to Liverpool . Weaver Junction on this branch is the oldest flyover-type junction in Britain. A spur branches off from Crewe to serve Manchester . There is also a spur between Colwich Junction in the Trent Valley, south of Stafford to Stoke-on-Trent, with another spur north of Stafford, also to Stoke-on-Trent. The geography of

8960-416: The basic service pattern; however, a small number of these services are extended beyond their usual destination: CrossCountry extended some of its Bournemouth services to Weymouth for the Sailing at the 2012 Olympics & Paralympics . There were two services Monday to Saturday in each direction with one in each direction on Sundays. These ran express to Weymouth from Bournemouth. One train also operated

9088-447: The coming months. I do not find this level of service provision acceptable, nor do I find a three-month reduced timetable to be a satisfactory response. Given your inability to run a full timetable, and the need to provide clear information for passengers I had little choice but to approve this request. Put simply, the only reason I accepted your proposal was to give passengers more certainty on which services will run. If you fail to deliver

9216-471: The common ticketing structure. Many of the train operating companies are in fact parts of larger companies which operate multiple franchises. The railway network in Northern Ireland is managed differently from the rest of the UK. The sole company in Northern Ireland that operates trains is NI Railways , who are a subsidiary of Translink , the publicly owned transport corporation, which also runs

9344-786: The dawn of the 1990s, it was clear that further modernisation was required. Initially this took the form of the InterCity 250 project. The modernisation plan unveiled by Virgin and the new infrastructure owner Railtrack involved the upgrade and renewal of the line to allow the use of tilting Pendolino trains with a maximum line speed of 140 mph (225 km/h), in place of the previous maximum of 110 mph (177 km/h). Railtrack estimated that this upgrade would cost £2 billion, be ready by 2005, and cut journey times to 1 hour for London to Birmingham and 1 hr 45 mins for London to Manchester. However, these plans proved too ambitious and were subsequently scaled back. The upgrade

9472-463: The demolition and redevelopment of several of the key stations on the line: BR was keen to symbolise the coming of the "electric age" by replacing the Victorian-era buildings with new structures built from glass and concrete. Notable examples were Birmingham New Street , Manchester Piccadilly , Stafford , Coventry and London Euston . To enable the latter, the famous Doric Arch portal into

9600-732: The early-1990s. Further modernisation of the route finally occurred during the 2000s in the period of privatisation , which saw speeds raised further to 125 mph (201 km/h) and the introduction of tilting Class 390 Pendolino trains. As much of the line has a maximum speed of 125 mph (201 km/h), it meets the European Union 's definition of an upgraded high-speed line , although only Class 390 Pendolinos and Class 221 Super Voyagers with tilting mechanisms operated by Avanti West Coast travel at that speed. Non-tilting trains are limited to 110 mph (177 km/h). The spine between London Euston and Glasgow Central

9728-453: The economic climate of the time. The early history of the WCML is complex, as it was not originally conceived as a single trunk route, but was built as a patchwork of separate lines by different companies, mostly during the 1830s and 1840s, but some parts were opened as late as the 1880s. After the completion of the pioneering Liverpool and Manchester Railway in 1830, schemes were mooted to build more inter-city lines. The business practice of

9856-410: The ex-Midland Mainline examples were also overhauled. To operate services to Paignton and Newquay on summer Saturdays, two High Speed Trains were hired from National Express East Coast in 2008. High Speed Trains were hired from East Coast and East Midlands Trains on a number of occasions to operate services from Edinburgh Waverley to Plymouth when HSTs or Voyagers were unavailable. During 2008,

9984-535: The existing two-carriage Class 170s were lengthened. This happened as a result of East Midlands Railway only leasing the two-carriage driving vehicles of the West Midlands Railway 170/6 sets, hence six centre cars became available when they were replaced by West Midlands Trains for transfer to CrossCountry. In September 2023, it was announced that seven Class 221 "Super Voyagers" would be transferred from Avanti West Coast to CrossCountry, following

10112-475: The franchise had been extended for three years, putting the finishing date back to 15 October 2023. In September 2023, the DfT announced a franchise extension for a further four years to 15 October 2027 with a chance of extension of an additional four years. The franchise deal includes the refurbishment of the existing fleet, the potential introduction of extra rolling stock, the return of regular services linking Cambridge and Stansted Airport , and by December 2024

10240-438: The franchise had been originally due to conclude on 31 March 2016, during August 2013, it was announced that it had been extended until December 2019. At one point, it had been expected that an ITT would be issued in October 2018 for the next franchise, but in September 2018 it was announced that the competition had been cancelled so that the recommendations from a report into the franchise system could be incorporated. In July 2019,

10368-514: The franchise would pass into the hands of public-sector company, Directly Operated Railways , which acted as the parent for East Coast . Grand Central open-access services from London to Bradford began on 23 May 2010. DB Regio's operations in the UK were integrated into those of Arriva following the acquisition of the latter by Deutsche Bahn in the previous year. Owing to continuing losses, Wrexham & Shropshire ceased operating on 28 January 2011. Abellio Greater Anglia began operating

10496-696: The franchise, CrossCountry continued to operate the existing timetable including the West Coast Main Line services for four weeks. When the new timetable commenced on 9 December 2007 on 11 November 2007, the Birmingham New Street to Edinburgh Waverley and Glasgow Central services were transferred to Virgin Trains West Coast while the Manchester Airport to Edinburgh and Glasgow services transferred to First TransPennine Express . The ITT did not require retention of

10624-401: The franchising system, beginning its services from London Paddington to Heathrow with operating rights until 2023. The shareholdings of M40 Trains were restructured with John Laing owning 84% of the company with the remaining 16% held by former BR managers. MTL which operated Merseyrail Electrics and Northern Spirit and Prism Rail that operated c2c (renamed from LTS Rail earlier in

10752-509: The high-level platforms are served only by CrossCountry, but the entire station is managed by West Midlands Trains, which serves the low-level platforms alongside Avanti West Coast . Similarly, at Worcestershire Parkway , the low-level platforms are served only by CrossCountry, but the station is managed by Great Western Railway , which serves only the high-level platforms. Manea was served only by CrossCountry until 2013, when Abellio Greater Anglia started running one train every two hours at

10880-630: The individual TOCs. However, a handful of TOCs own and maintain some of their own rolling stock. Train operating companies also operate most of the network's stations , in their role as station facility owners (SFO), in which they lease the buildings and associated land from Network Rail. Network Rail manages some major railway stations and several stations are operated by London Underground or other companies. Most passenger TOCs in Great Britain are privately owned. The majority of these hold franchises to operate rail services on specific parts of

11008-473: The line is quadruple track between Warrington Bank Quay to Wigan North Western. At Newton-le-Willows, the slow tracks join the Liverpool to Manchester line to pass through the centre of the town, while the fast tracks take the direct route via the Golborne cut-off. There are two more stretches of quadruple track, otherwise the line is double track to Scotland. The first is from Euxton Balshaw Lane to Preston, and

11136-548: The line, was announced as opening on 12 December 2005, bringing the fastest journey between London and Glasgow to 4   hours 25   mins (down from 5   hours 10   minutes). However, considerable work remained, such as the quadrupling of the track in the Trent Valley, upgrading the slow lines, the second phase of remodelling Nuneaton, and the remodelling of Stafford, Rugby, Milton Keynes and Coventry stations, and these were completed in late 2008. The upgrading of

11264-614: The name Wales & Borders . The remainder of Wales & West's services in the west of England were renamed Wessex Trains . John Laing bought out its partners in M40 Trains. Connex , having already lost the South Central franchise in 2001, was removed as franchisee of the South Eastern franchise in 2003 on the grounds of poor financial management. It was replaced as the franchise holder by South Eastern Trains ,

11392-631: The northern end, the Caledonian replaced its original Southside terminus in Glasgow, with the much larger and better located Glasgow Central in 1879. To expand capacity, the line between London and Rugby was widened to four tracks in the 1870s. As part of this work, a new line, the Northampton Loop , was built, opening in 1881, connecting Northampton before rejoining the main line at Rugby. The worst-ever rail accident in UK history,

11520-853: The original Philip Hardwick -designed terminus was demolished in 1962 amid much public outcry. Electrification of the Edinburgh branch was carried out in the late 1980s as part of the East Coast Main Line electrification project in order to allow InterCity 225 sets to access Glasgow via Carstairs Junction. Modernisation brought great improvements in speed and frequency. However some locations and lines were no longer served by through trains or through coaches from London, such as: Windermere ; Barrow-in-Furness , Whitehaven and Workington ; Huddersfield , Bradford Interchange , Leeds and Halifax (via Stockport); Blackpool South ; Colne (via Stockport); Morecambe and Heysham ; Southport (via Edge Hill ); Blackburn and Stranraer Harbour. Notable also

11648-444: The original Mark 3 rakes with a Driving Van Trailer and a Class 90 locomotive as a standby set to cover for Pendolino breakdowns. This set was retired from service on 25 October with a rail tour the following day. In November 2014, the "Pretendolino" was transferred to Norwich Crown Point depot to enter service with Abellio Greater Anglia having come to the end of its agreed lease to Virgin Trains. In September 2022, following

11776-552: The other main line between London and Scotland. The principal solution has been the adoption of tilting trains , initially with British Rail 's APT and latterly the Class 390 Pendolino trains constructed by Alstom and introduced by Virgin Trains in 2003. A 'conventional' attempt to raise line speeds as part of the InterCity 250 upgrade in the 1990s would have relaxed maximum cant levels on curves and seen some track realignments; this scheme faltered for lack of funding in

11904-452: The ownership of the London, Midland and Scottish Railway (LMS) when the railway companies were grouped under the Railways Act 1921 . The LMS itself was nationalised in 1947 to form part of British Railways (BR). As the WCML is the most important long-distance railway trunk route in the UK, BR carried out an extensive programme of modernisation of it between the late 1950s and early 1970s, which included full overhead electrification of

12032-404: The purview of National Rail, which operate specific services which are recent additions to Britain's railways. The main examples are Eurostar, which operates to continental Europe via the Channel Tunnel , and Heathrow Express , which runs fast services from London to Heathrow Airport . A number of metropolitan railways on the network are operated by the local franchise holder in conjunction with

12160-716: The railway and come under the auspices of the National Rail brand. In addition, companies are able to bid for "paths" (specific parts of the overall National Rail timetable) to operate their own services, which the franchises do not operate – these operators are classed as open-access operators and are not franchise holders. Currently in Great Britain, there are three open-access operators: Hull Trains , which runs services between London King's Cross and Hull , Grand Central , which operates between King's Cross and Sunderland and between King's Cross and Bradford , and Lumo , which operates between King's Cross and Edinburgh Waverley . In addition, there are operators that fall outside

12288-614: The railway network of the United Kingdom is split into two independent systems: one in Great Britain (including the Isle of Wight ), and one in Northern Ireland, which is closely linked to the railway system of the Republic of Ireland. In Great Britain, passenger train services are operated by a number of companies, referred to as Train Operating Companies or TOCs, normally on the basis of regional franchises awarded by

12416-574: The reintroduction of daily services between Cardiff Central and Edinburgh Waverley . During November and December 2017, CrossCountry on-board train managers and senior conductors affiliated with the National Union of Rail, Maritime and Transport Workers (RMT) staged five 24-hour and two 48-hour strikes in an industrial dispute regarding staff rostering, in particular in relation to working on Sundays. Further strikes had been planned for January 2018, but these were cancelled after CrossCountry and

12544-799: The replacement of a weak bridge in Watford allowed line-speeds to be increased from 90 mph (145 km/h) to 125 mph (201 km/h), decreasing journey times. The main spine of the WCML is quadruple track almost all of the route from London to south of Winsford . At Hanslope Junction (near Milton Keynes ), the line divides with one pair going direct to Rugby and the other pair diverting via Northampton to rejoin at Rugby. The spine continues north in quadruple track until Brinklow, where it reduces to triple track. The line between Brinklow and Nuneaton has three tracks, with one northbound track and fast and slow southbound tracks. The line then reverts to quadruple track at Nuneaton. North of Rugeley, there

12672-433: The rival East Coast Flying Scotsman (British Railways in the 1950s could not match this, but did achieve a London-Glasgow timing of 7   hours 15   minutes in the 1959–60 timetable by strictly limiting the number of coaches to eight and not stopping between London and Carlisle. ) In 1948, following nationalisation , the line came under the control of British Railways ' London Midland and Scottish Regions , when

12800-550: The route was determined by avoiding large estates and hilly areas, such as the Chilterns ( Tring Cutting ); the Watford Gap and Northampton uplands, followed by the Trent Valley; the mountains of Cumbria , with a summit at Shap ; and Beattock Summit in South Lanarkshire . This legacy means the WCML has limitations as a long-distance main line, with lower maximum speeds than the East Coast Main Line (ECML) route,

12928-435: The route with overhead line equipment. The first stretch to be upgraded and electrified was Crewe to Manchester, completed on 12 September 1960. This was followed by Crewe to Liverpool, completed on 1 January 1962. Electrification was then extended south to London. The first electric trains from London ran on 12 November 1965, with a full public service to Manchester and Liverpool launched on 18 April 1966. Electrification of both

13056-502: The route, and the introduction of modern intercity passenger services at speeds of up to 110 mph (177 km/h). Further abortive modernisation schemes were proposed, including the introduction of the Advanced Passenger Train (APT) in the 1980s; an ill-fated high speed train which used tilting technology , which was required to allow faster speeds on the curving route, and the abortive InterCity 250 project in

13184-501: The routes operated by Silverlink in London, which were combined with the extended East London line in 2011. Services are controlled directly by TfL, with running of the trains themselves contracted to a private company as an operating concession. This is different from an ordinary franchise, as the train operator is not given control of the strategic aspects of the operation, such as pricing, timetabling and rolling stock procurement. In December 2007, National Express East Coast took over

13312-628: The running of the InterCity East Coast franchise from GNER . Grand Central also began operating its services between London and Sunderland as an open access operator. In January 2008, Laing Rail which owned M40 Trains and a 50% shareholding in London Overground Rail Operations was sold to Deutsche Bahn , becoming part of the DB Regio Group. In February 2008, One was re-branded by National Express as National Express East Anglia to bring it into line with

13440-532: The same franchise was partially enacted. In April 2004, One commenced operating the Greater Anglia franchise that combined the Anglia Railways and First Great Eastern franchises with the West Anglia Great Northern services radiating out from Liverpool Street . The remainder continuing to be operated as WAGN . In the North of England, prior to 2004 there were two regional franchises,

13568-638: The same platform – instead of Birmingham New Street, a larger, more complex station. CrossCountry services are operated using diesel trains only, since none of the routes it operates are fully electrified. CrossCountry inherited 34 four-car Class 220 Voyagers and 40 five-car and 4 four-car Class 221 Super Voyagers from Virgin CrossCountry as well as 11 two-car and 18 three-car Class 170 Turbostars from Central Trains . In December 2007 Class 221 Super Voyagers 221101 - 113 and 221142 - 144 were transferred to Virgin Trains West Coast with 221114 - 118 following in December 2008. A franchise commitment

13696-529: The second is a busy section around Glasgow. The WCML is noted for the diversity of branches served from the spine, notably those to/from the West Midlands and North Wales , Greater Manchester , and Liverpool. These are detailed in the route diagram . The complete route has been cleared for W10 loading gauge freight traffic, allowing use of higher 9 ft 6 in (2,896 mm) hi-cube shipping containers . The route passes through Nuneaton and

13824-436: The services beyond Guildford after December 2008, so the services to both Gatwick Airport and Brighton soon ceased. As a result of these changes, all CrossCountry services now completely avoid Greater London . Starting in December 2008, a daily Nottingham to Bournemouth service was introduced. From December 2010, a number of services from Newcastle were extended from Reading to Southampton Central . From May 2011,

13952-681: The set lost in the Grayrigg derailment. Although the new stock was supplied in Virgin livery, it was not expected to enter traffic before 31 March 2012, when the InterCity West Coast franchise was due to be re-let, though the date for the new franchise was later put back to December 2012, and any effect of this on the timetable for introducing the new coaches remains unclear. Previous franchisees Central Trains and Silverlink (operating local and regional services partly over sections of

14080-588: The south-east of England, were replaced as the operator of the Network SouthCentral franchise by Govia , who began operating it under the name South Central . Also in 2001, a new franchise, the Wales & Borders franchise was created by the amalgamation of Valley Lines and the majority of services in Wales and the Borders held by Wales & West . The new franchise was initially operated under

14208-421: The station in addition to the CrossCountry services there. To improve the travelling experience, CrossCountry has designated four stations as alternative changeover stations: these are Cheltenham Spa, Derby, Leamington Spa and Wolverhampton. Connection times can be shorter at these smaller stations. For example, passengers travelling from Cardiff to Edinburgh could change at Cheltenham – where both their trains use

14336-460: The technical viability and cost of implementing moving block prior to promising the speed increase to Virgin and the government. By 1999, with little headway on the modernisation project made, it became apparent to engineers that the technology was not mature enough to be used on the line. The bankruptcy of Railtrack in 2001 and its replacement by Network Rail following the Hatfield crash brought

14464-409: The term "West Coast Main Line" came into use officially, although it had been used informally since at least 1912. As part of the 1955 modernisation plan , British Rail carried out a large programme of modernisation of the WCML in stages between 1959 and 1974; the modernisation involved upgrading the track and signaling to allow higher speeds, rebuilding a number of stations, and electrification of

14592-433: The withdrawal of its HSTs. In March 2024, it was announced that a further five Class 221 Super Voyagers would be transferred from Avanti West Coast. In addition, all of CrossCountry's Voyager trains will be refurbished, as well as its regional Turbostar fleet. The last InterCity 125s were withdrawn on 18 September 2023. The last service operated was the 16:27 from Plymouth to Leeds . Train operating company In

14720-505: The year), Valley Lines Trains , Wales & West , and West Anglia Great Northern were purchased by Arriva and National Express respectively, resulting in the latter owning nine franchises. The two companies transferred to Arriva were renamed Arriva Trains Merseyside and Arriva Trains Northern. The first open access operator using the National Rail brand, Hull Trains , commenced running its services between King's Cross and Hull . In 2001, Connex , which had operated two franchises in

14848-525: Was announced the proposed changes would not be proceeding. CrossCountry does not manage any stations, although there are stations managed by other train operating companies at which it is the only operator: five stations ( Burton-on-Trent , Hinckley , Narborough , South Wigston and Willington ) are managed by East Midlands Railway , while three stations ( Coleshill Parkway , Water Orton and Wilnecote ) are managed by West Midlands Trains . At Tamworth station, which has tracks and platforms at two levels,

14976-423: Was capable of operating only a very minimal timetable on any of the planned dates for the strikes due to the number of staff involved. In August 2024, the Secretary of State for Transport , Louise Haigh , criticised the company's performance saying she had "serious concerns" and threatened to take action if it did not improve, following its request to reduce its service levels in the new three-month timetable which

15104-419: Was described as "a classic example of disastrous project management". Central to the implementation of the plan was the adoption of moving block signalling , which had never been proven on anything more than simple metro lines and light rail systems – not on a complex high-speed heavy-rail network such as the WCML. Despite this, Railtrack made what would prove to be the fatal mistake of not properly assessing

15232-426: Was finally completed in December 2008. This allowed Virgin's VHF (very high frequency) timetable to be progressively introduced through early 2009, the highlights of which are a three-trains-per-hour service to both Birmingham and Manchester during off-peak periods, and nearly all London-Scottish timings brought under the 4   hours 30   minutes barrier – with one service (calling only at Preston) achieving

15360-399: Was later dropped) and offering journey times as London to Birmingham in 1 hour 35 minutes, and London to Manchester or Liverpool in 2   hours 40   minutes (and even 2   hours 30   minutes for the twice-daily Manchester Pullman ). This represented a big improvement on the 3   hours 30   minutes to Manchester and Liverpool of the fastest steam service. A new feature

15488-479: Was made 48   hours before the writ was issued for a by-election in South Ayrshire . The Observer commented that, if the £25 million decision was politically rather than financially motivated, it would have the makings of a major political scandal. A new set of high-speed long-distance services was introduced in 1966, launching British Rail's highly successful " Inter-City " brand (the hyphen

15616-468: Was not required on the parts of the West Coast Main Line that CrossCountry serves. CrossCountry stated this change would improve reliability and reduce maintenance costs. Between 2008 and 2009, both the Class 220 Voyagers and Class 221 Super Voyagers underwent refurbishment at Bombardier Transportation 's Derby Litchurch Lane Works . This work involved the removal of the shop, adding 25% extra luggage space and fourteen extra standard-class seats to

15744-564: Was produced, which incorporated the existing InterCity Cross Country franchise run by Virgin CrossCountry , while excluding those services ran on the West Coast Main Line (while the Birmingham to Scotland services were transferred to Virgin Trains West Coast and the Manchester to Scotland services transferring to First TransPennine Express ). Several services from the Central Trains franchise were also to be added. In October 2006,

15872-548: Was superseded by First Great Western Link and ScotRail (National Express) by First ScotRail . A new operator, Heathrow Connect , jointly run by BAA and First Great Western , began operating stopping services between London Paddington and Heathrow Airport complementing the Heathrow Express. Three new integrated franchises began operating in April 2006: Further integrations occurred in 2007. The first of these

16000-479: Was that these fast trains were offered on a regular-interval service throughout the day: initially hourly to Birmingham, two-hourly to Manchester, and so on. The service proved to be so popular that in 1972 these InterCity service frequencies were doubled to deal with increased demand. With the completion of the northern electrification in 1974, London to Glasgow journey times were reduced from 6   hours to 5. Along with electrification came modern coaches such as

16128-632: Was the South Western franchise ; this merged the original South West Trains franchise with the Island Line Trains franchise on the Isle of Wight and began operating in February 2007 under the name South West Trains, with Island Line retained as a separate brand. In November 2007, three new integrated franchises began operating: In addition to these three, a further new operator, London Overground Rail Operations , took control of

16256-574: Was the acquisition of ten Class 43 power cars and forty Mark 3 carriages . Midland Mainline had six Class 43 power cars and fourteen Mark 3 carriages that were off lease from November 2007 that were leased. The remaining four Class 43 power cars were ex Virgin CrossCountry examples in varying states of decay, while the carriages were five ex-Virgin CrossCountry Mark 3 carriages and twenty-one ex-Virgin Trains West Coast loco-hauled Mark 3B carriages. Most had been in store at Long Marston for

16384-690: Was written off in 2007 following the Grayrigg derailment . After the 2007 franchise "shake-up" in the Midlands, more SuperVoyagers were transferred to Virgin West Coast, instead of going to the new CrossCountry franchise. The SuperVoyagers are used on London–Chester and Holyhead services because the Chester/North Wales line is not electrified, so they run "under the wires" between London and Crewe. SuperVoyagers were also used on Virgin's London-Scotland via Birmingham services, even though this route

#473526