Astravyets ( Belarusian : Астравец , romanized : Astraviec , IPA: [astraˈvʲet͡s] ; Russian : Островец , romanized : Ostrovets , IPA: [ɐstrɐˈvʲets] ; Polish : Ostrowiec ; Lithuanian : Astravas ) is a town in Grodno Region , Belarus . It serves as the administrative center of Astravyets District . As of 2024, it has a population of 15,116.
79-741: The Astravets Nuclear Power Plant (also called the Belarusian Nuclear Power Plant or Ostrovets Nuclear Power Plant ) is a nuclear power plant located in the Astravyets District , Grodno Region in north-western Belarus . The power plant is built close to the Belarus- Lithuania border, being 40 kilometres (25 mi) east of the Lithuanian capital of Vilnius . The plant is powered by two 1194-MW VVER-1200 units supplied by Atomstroyexport ,
158-810: A Directorate for the Construction of a Nuclear Power Plant, established under the Ministry of Energy. The Nuclear and Radiation Safety Department, part of the Emergencies Ministry, is acting as the state nuclear regulator and licensing authority. Scientific support for the project is provided by the United Power & Nuclear Research Institute Sosny of the National Academy of Sciences of Belarus . The state-owned power engineering industry research and design institute Belnipienergoprom
237-433: A US$ 2 billion credit line for the purchasing of equipment from Russia's Power Machines Company . On 12 November 2007, a decree defining the organizations responsible for preparing the construction of the nuclear power plant was signed. The Belarusian Security Council made the decision to construct a nuclear power plant on 15 January 2008. The Nuclear Power Act, covering the design and construction of nuclear facilities,
316-466: A combined capacity of 1,000 MW by 2005 and 2010. However, no decision concerning site or reactor type was made. In 1999, the Government of Belarus adopted a nuclear moratorium, but preparations for the construction of a nuclear power plant were carried on. On 2 May 2002, Belarusian President Alexander Lukashenko stated that Belarus would not construct a nuclear power plant on its territory, but
395-759: A complaint to the Compliance Committee of the Aarhus Convention challenging the legality of NPP construction due to violation of public participation rights provided by the Aarhus Convention. In 2014, the Espoo Convention parties found that Minsk had not fulfilled some of its obligations in the construction of the NPP. In 2016, the European Parliamentary Research Service noted the construction of
474-465: A condenser. The condenser is a heat exchanger which is connected to a secondary side such as a river or a cooling tower . The water is then pumped back into the steam generator and the cycle begins again. The water-steam cycle corresponds to the Rankine cycle . The nuclear reactor is the heart of the station. In its central part, the reactor's core produces heat due to nuclear fission. With this heat,
553-442: A coolant is heated as it is pumped through the reactor and thereby removes the energy from the reactor. The heat from nuclear fission is used to raise steam, which runs through turbines , which in turn power the electrical generators. Nuclear reactors usually rely on uranium to fuel the chain reaction. Uranium is a very heavy metal that is abundant on Earth and is found in sea water as well as most rocks. Naturally occurring uranium
632-402: A facility has been completely decommissioned it is released from regulatory control, and the licensee of the station no longer has responsibility for its nuclear safety. Generally speaking, nuclear stations were originally designed for a life of about 30 years. Newer stations are designed for a 40 to 60-year operating life. The Centurion Reactor is a future class of nuclear reactor that
711-404: A nuclear reactor heats the reactor coolant. The coolant may be water or gas, or even liquid metal, depending on the type of reactor. The reactor coolant then goes to a steam generator and heats water to produce steam. The pressurized steam is then usually fed to a multi-stage steam turbine . After the steam turbine has expanded and partially condensed the steam, the remaining vapor is condensed in
790-683: A nuclear reactor was used to generate electricity was on December 21, 1951, at the Experimental Breeder Reactor I , powering four light bulbs. On June 27, 1954, the world's first nuclear power station to generate electricity for a power grid , the Obninsk Nuclear Power Plant , commenced operations in Obninsk , in the Soviet Union . The world's first full scale power station, Calder Hall in
869-483: A nuclear station is smaller than the fuel cost for operation of coal or gas plants. Since most of the cost of nuclear power plant is capital cost, there is almost no cost saving by running it at less than full capacity. Nuclear power plants are routinely used in load following mode on a large scale in France, although "it is generally accepted that this is not an ideal economic situation for nuclear stations". Unit A at
SECTION 10
#1732783989343948-516: A number of long-established projects are struggling to find financing, notably Belene in Bulgaria and the additional reactors at Cernavodă in Romania , and some potential backers have pulled out. Where cheap gas is available and its future supply relatively secure, this also poses a major problem for nuclear projects. Analysis of the economics of nuclear power must take into account who bears
1027-444: A previous goal aimed to reduce nuclear electricity generation share to lower than fifty percent by 2025, this target was postponed to 2035 in 2019 and ultimately discarded in 2023. Russia continues to export the most nuclear power plants in the world, with projects across various countries: as of July 2023, Russia was constructing 19 out of 22 reactors constructed by foreign vendors; however, some exporting projects were canceled due to
1106-591: A significantly different evaluation of the economics of new nuclear power stations. Following the 2011 Fukushima nuclear accident in Japan , costs are likely to go up for currently operating and new nuclear power stations, due to increased requirements for on-site spent fuel management and elevated design basis threats. However many designs, such as the currently under construction AP1000, use passive nuclear safety cooling systems, unlike those of Fukushima I which required active cooling systems, which largely eliminates
1185-413: A slight decrease from the 2653 TWh produced in 2021. Thirteen countries generated at least one-quarter of their electricity from nuclear sources. Notably, France relies on nuclear energy for about 70% of its electricity needs, while Ukraine , Slovakia , Belgium , and Hungary source around half their power from nuclear. Japan , which previously depended on nuclear for over a quarter of its electricity,
1264-427: A small enough volume to become supercritical. Most reactors require continuous temperature control to prevent a core meltdown , which has occurred on a few occasions through accident or natural disaster, releasing radiation and making the surrounding area uninhabitable. Plants must be defended against theft of nuclear material and attack by enemy military planes or missiles. The most serious accidents to date have been
1343-482: A three-year research study of offshore floating nuclear power generation. In October 2022, NuScale Power and Canadian company Prodigy announced a joint project to bring a North American small modular reactor based floating plant to market. The economics of nuclear power plants is a controversial subject, and multibillion-dollar investments ride on the choice of an energy source. Nuclear power stations typically have high capital costs, but low direct fuel costs, with
1422-580: A worldwide perspective, long-term waste storage costs are uncertain. Construction, or capital cost aside, measures to mitigate global warming such as a carbon tax or carbon emissions trading , increasingly favor the economics of nuclear power. Further efficiencies are hoped to be achieved through more advanced reactor designs, Generation III reactors promise to be at least 17% more fuel efficient, and have lower capital costs, while Generation IV reactors promise further gains in fuel efficiency and significant reductions in nuclear waste. In Eastern Europe,
1501-496: Is a thermal power station in which the heat source is a nuclear reactor . As is typical of thermal power stations, heat is used to generate steam that drives a steam turbine connected to a generator that produces electricity . As of September 2023 , the International Atomic Energy Agency reported that there were 410 nuclear power reactors in operation in 32 countries around
1580-526: Is about 1/3 of solar and 1/45 of natural gas and 1/75 of coal . Newer models, like HPR1000 , produce even less carbon dioxide during the whole operating life, as little as 1/8 of power plants using gen II reactors for 1.31g/kWh. Astravyets Within the Grand Duchy of Lithuania , Astravyets was part of Vilnius Voivodeship . In 1795, Astravyets was acquired by the Russian Empire in
1659-527: Is anticipated to resume similar levels of nuclear energy utilization. Over the last 15 years, the United States has seen a significant improvement in the operational performance of its nuclear power plants, enhancing their utilization and efficiency, adding the output equivalent to 19 new 1000 MWe reactors without actual construction. In France, nuclear power plants still produce over sixty percent of this country's total power generation in 2022. While
SECTION 20
#17327839893431738-503: Is being designed to last 100 years. One of the major limiting wear factors is the deterioration of the reactor's pressure vessel under the action of neutron bombardment, however in 2018 Rosatom announced it had developed a thermal annealing technique for reactor pressure vessels which ameliorates radiation damage and extends service life by between 15 and 30 years. Nuclear stations are used primarily for base load because of economic considerations. The fuel cost of operations for
1817-431: Is found in two different isotopes : uranium-238 (U-238), accounting for 99.3% and uranium-235 (U-235) accounting for about 0.7%. U-238 has 146 neutrons and U-235 has 143 neutrons. Different isotopes have different behaviors. For instance, U-235 is fissile which means that it is easily split and gives off a lot of energy making it ideal for nuclear energy. On the other hand, U-238 does not have that property despite it being
1896-429: Is the only nuclear facility that does not use a natural body of water for cooling, instead it uses treated sewage from the greater Phoenix metropolitan area. The water coming from the cooling body of water is either pumped back to the water source at a warmer temperature or returns to a cooling tower where it either cools for more uses or evaporates into water vapor that rises out the top of the tower. The water level in
1975-489: The BWR , the steam is directed into the suppression chamber and condenses there. The chambers on a heat exchanger are connected to the intermediate cooling circuit. The main condenser is a large cross-flow shell and tube heat exchanger that takes wet vapor, a mixture of liquid water and steam at saturation conditions, from the turbine-generator exhaust and condenses it back into sub-cooled liquid water so it can be pumped back to
2054-484: The International Atomic Energy Agency to guarantee adherence to international safety standards. On 10 November 2020, the facility's output was suspended after several voltage transformers exploded. Repairs were completed within nine days and the plant was consequently reconnected to the grid. Nuclear power plant A nuclear power plant ( NPP ), also known as a nuclear power station ( NPS ), nuclear generating station ( NGS ) or atomic power station ( APS )
2133-491: The Russia-Belarus energy dispute in 2007. The power plant was controversial due to its location being in close proximity with Lithuania and the Lithuanian government has boycotted the power plant and established anti-radiation safety measures with its citizens. Construction of the first unit started on 8 November 2013 and the second on 27 April 2014. The plant entered commercial operation with Atomstroyexport transferring
2212-496: The Russian invasion of Ukraine . Meanwhile, China continues to advance in nuclear energy: having 25 reactors under construction by late 2023, China is the country with the most reactors being built at one time in the world. Nuclear decommissioning is the dismantling of a nuclear power station and decontamination of the site to a state no longer requiring protection from radiation for the general public. The main difference from
2291-678: The UAE launched the Arab region's first-ever nuclear energy plant. Unit 1 of the Barakah plant in the Al Dhafrah region of Abu Dhabi commenced generating heat on the first day of its launch, while the remaining 3 Units are being built. However, Nuclear Consulting Group head, Paul Dorfman, warned the Gulf nation's investment into the plant as a risk "further destabilizing the volatile Gulf region, damaging
2370-657: The United Kingdom , opened on October 17, 1956 and was also meant to produce plutonium . The world's first full scale power station solely devoted to electricity production was the Shippingport Atomic Power Station in Pennsylvania , United States, which was connected to the grid on December 18, 1957. The conversion to electrical energy takes place indirectly, as in conventional thermal power stations. The fission in
2449-424: The 1970s and 1980s, when it "reached an intensity unprecedented in the history of technology controversies," in some countries. Proponents argue that nuclear power is a sustainable energy source which reduces carbon emissions and can increase energy security if its use supplants a dependence on imported fuels. Proponents advance the notion that nuclear power produces virtually no air pollution, in contrast to
Astravets Nuclear Power Plant - Misplaced Pages Continue
2528-485: The 1979 Three Mile Island accident , the 1986 Chernobyl disaster , and the 2011 Fukushima Daiichi nuclear disaster , corresponding to the beginning of the operation of generation II reactors . Professor of sociology Charles Perrow states that multiple and unexpected failures are built into society's complex and tightly coupled nuclear reactor systems. Such accidents are unavoidable and cannot be designed around. An interdisciplinary team from MIT has estimated that given
2607-572: The Brussels supplementary convention, and the Vienna Convention on Civil Liability for Nuclear Damage . However states with a majority of the world's nuclear power stations, including the U.S., Russia, China and Japan, are not party to international nuclear liability conventions. The nuclear power debate about the deployment and use of nuclear fission reactors to generate electricity from nuclear fuel for civilian purposes peaked during
2686-523: The NPP has sparked international concern, particularly from Lithuania, which has accused Belarus of violating the United Nations' Espoo and Aarhus Conventions . The European Union has also called on Belarus to ensure the highest international safety standards and conduct stress tests for the NPP, in line with its commitments made after the Fukushima nuclear accident. Lithuania is a critic of
2765-557: The chief viable alternative of fossil fuel. Proponents also believe that nuclear power is the only viable course to achieve energy independence for most Western countries. They emphasize that the risks of storing waste are small and can be further reduced by using the latest technology in newer reactors, and the operational safety record in the Western world is excellent when compared to the other major kinds of power plants. Opponents say that nuclear power poses many threats to people and
2844-525: The city of Minsk . The reactors would each have had a power rating of 900 MW net and 940 MW gross capacity. The nuclear initiative was revitalized after Belarus gained independence from the Soviet Union. On 22 December 1992, Belarus announced its intention to build nuclear power plants and started a program to examine 15 possible sites. It was foreseen that the first unit of 500-600 MW would be commissioned by 2005, and additional units with
2923-543: The combined capacity of around 2400 MW. It is possible that two additional reactors will be built by 2025. The nuclear power plant plans have raised several concerns. Civil society groups have in 2008 campaigned and collected signatures against the construction of a nuclear power plant in Belarus. In 2008 young members of the Belarusian People's Front have campaigned against possible Russian involvement in
3002-533: The construction of the foundation pit for the nuclear power plant started near the small village of Shulniki in Astravets District, Hrodna Region, some 16 km (10 mi) from the Lithuanian border. Both in March and April 2013 journalists were not permitted to visit the construction site. In March 2013 Radio Svaboda's correspondent Mikhail Karnevich received official permission to make a report about
3081-470: The construction of the plant and urged the Belarusian government to award the contract to build the nuclear power plant to a company based in a country other than Russia. Also in 2008 a group of Belarusian scientists founded a movement for a nuclear-free Belarus, claiming that the Belarusian government started preparations for the construction of the nuclear power plant before a moratorium adopted in 1999
3160-479: The construction of the power plant. But when he came to Astravets, he found out that he would not be able to visit the construction site. In April 2013 journalists Ales Barazenka and Nastaśsia Jaūmien were detained in Astravets where they were filming the nuclear power plant construction and were asked an "intelligible explanation to the fact of filming the construction works". The first nuclear concrete for Unit 1
3239-493: The costs of fuel extraction, processing, use and spent fuel storage internalized costs. Therefore, comparison with other power generation methods is strongly dependent on assumptions about construction timescales and capital financing for nuclear stations. Cost estimates take into account station decommissioning and nuclear waste storage or recycling costs in the United States due to the Price Anderson Act . With
Astravets Nuclear Power Plant - Misplaced Pages Continue
3318-791: The course of the Third Partition of Poland . From 1921 until 1939, Astravyets was part of the Second Polish Republic . In September 1939, the town was occupied by the Red Army and, on 14 November 1939, incorporated into the Byelorussian SSR . From 27 June 1941 until 3 July 1944, Astravyets was occupied by Nazi Germany and administered as a part of the Generalbezirk Litauen of Reichskommissariat Ostland . On 11 October 2011, an agreement
3397-424: The destruction of a turbine in operation from flying towards the reactor. In the case of a pressurized water reactor, the steam turbine is separated from the nuclear system. To detect a leak in the steam generator and thus the passage of radioactive water at an early stage, an activity meter is mounted to track the outlet steam of the steam generator. In contrast, boiling water reactors pass radioactive water through
3476-458: The dismantling of other power stations is the presence of radioactive material that requires special precautions to remove and safely relocate to a waste repository. Decommissioning involves many administrative and technical actions. It includes all clean-up of radioactivity and progressive demolition of the station. Once a facility is decommissioned, there should no longer be any danger of a radioactive accident or to any persons visiting it. After
3555-534: The energy-intensive stages of the nuclear fuel chain are considered, from uranium mining to nuclear decommissioning , nuclear power is not a low-carbon electricity source despite the possibility of refinement and long-term storage being powered by a nuclear facility. Those countries that do not contain uranium mines cannot achieve energy independence through existing nuclear power technologies. Actual construction costs often exceed estimates, and spent fuel management costs are difficult to define. On 1 August 2020,
3634-402: The environment and raising the possibility of nuclear proliferation." Nuclear power plants do not produce greenhouse gases during operation. Older nuclear power plants, like ones using second-generation reactors , produce approximately the same amount of carbon dioxide during the whole life cycle of nuclear power plants for an average of about 11g/kWh, as much power generated by wind , which
3713-775: The environment, and that costs do not justify benefits. Threats include health risks and environmental damage from uranium mining , processing and transport, the risk of nuclear weapons proliferation or sabotage, and the problem of radioactive nuclear waste . Another environmental issue is discharge of hot water into the sea. The hot water modifies the environmental conditions for marine flora and fauna. They also contend that reactors themselves are enormously complex machines where many things can and do go wrong, and there have been many serious nuclear accidents . Critics do not believe that these risks can be reduced through new technology , despite rapid advancements in containment procedures and storage methods. Opponents argue that when all
3792-411: The environment. In addition, many reactors are equipped with a dome of concrete to protect the reactor against both internal casualties and external impacts. The purpose of the steam turbine is to convert the heat contained in steam into mechanical energy. The engine house with the steam turbine is usually structurally separated from the main reactor building. It is aligned so as to prevent debris from
3871-525: The expected growth of nuclear power from 2005 to 2055, at least four serious nuclear accidents would be expected in that period. The MIT study does not take into account improvements in safety since 1970. Nuclear power works under an insurance framework that limits or structures accident liabilities in accordance with the Paris Convention on Third Party Liability in the Field of Nuclear Energy ,
3950-606: The first unit to Belenergo on 10 June 2021, becoming the first VVER-1200 unit to operate outside Russia. The construction and commissioning has been marred in controversies. In the 1980s there were plans to build a nuclear heating and power plant in Rudensk , about 50 kilometres (31 mi) south of Minsk . Following the Chernobyl nuclear disaster , these plans were halted. The plant was to comprise two VVER-1000 nuclear reactors, designed to provide both electricity and heat for
4029-477: The grid. Astravets NPP was issued an operating license on 2 June and entered commercial operation 8 days later. Criticality of unit 2 was first announced on 26 April 2022. It started supplying electricity in May 2023 and entered commercial operation on 1 November 2023. The nuclear power plant costs up to US$ 11 billion. In addition, there are investments to upgrade the national power grid for power transmission from
SECTION 50
#17327839893434108-406: The hot coolant is used as a heat source for a boiler, and the pressurized steam from that drives one or more steam turbine driven electrical generators . In the event of an emergency, safety valves can be used to prevent pipes from bursting or the reactor from exploding. The valves are designed so that they can derive all of the supplied flow rates with little increase in pressure. In the case of
4187-426: The hours over which the fixed cost of construction can be amortized. Nuclear power plants have a carbon footprint comparable to that of renewable energy such as solar farms and wind farms , and much lower than fossil fuels such as natural gas and coal . Nuclear power plants are among the safest modes of electricity generation, comparable to solar and wind power plants. The first time that heat from
4266-607: The need to spend more on redundant back up safety equipment. According to the World Nuclear Association , as of March 2020: The Russian state nuclear company Rosatom is the largest player in international nuclear power market, building nuclear plants around the world. Whereas Russian oil and gas were subject to international sanctions after the Russian full-scale invasion of Ukraine in February 2022, Rosatom
4345-483: The now decommissioned German Biblis Nuclear Power Plant was designed to modulate its output 15% per minute between 40% and 100% of its nominal power. Russia has led in the practical development of floating nuclear power stations , which can be transported to the desired location and occasionally relocated or moved for easier decommissioning. In 2022, the United States Department of Energy funded
4424-420: The nuclear equipment exporter branch of the Russian nuclear corporation Rosatom . The plant is owned by State Enterprise Belarusian NPP, which in turn is owned by the state-owned operator Belenergo. Initial plans of the plant were announced in the 1980s, but were suspended after the 1986 Chernobyl disaster . The project was revived by the Belarusian government to have the country become energy-independent due to
4503-437: The nuclear power plant, and the construction of an urban settlement for the power plant's workers. Repayment of the $ 10 billion loan would start no later than April 2021. Half the loan was at a fixed 5.23% interest rate and the other half at the six-month Libor dollar rate plus 1.83%. In 2020 Belarus requested an extension of the repayment period from 25 to 35 years. The preparation, design and exploration works were overseen by
4582-440: The pouring of an excessive amount of concrete for the foundations of a nuclear service building. This resulted in the structural frame breaking down and its components collapsing. Belarusian Deputy Energy Minister Vadim Zakreskov has confirmed that the incident has taken place. According to the unnamed source, it was not the first incident to occur at the site. In the aftermath, Lithuania reiterated its calls for stress tests , urging
4661-651: The power plant and in 2018 announced its plan to boycott it. On 7 February 2019, the Meeting of the Parties to the Espoo Convention decided that Belarus had violated the convention in choosing a construction site for its nuclear power plant. On 11 February 2021, the European Parliament has adopted a resolution expressing serious concerns over the safety of the Ostrovets nuclear plant and has called for
4740-474: The prospect that all spent nuclear fuel could potentially be recycled by using future reactors, generation IV reactors are being designed to completely close the nuclear fuel cycle . However, up to now, there has not been any actual bulk recycling of waste from a NPP, and on-site temporary storage is still being used at almost all plant sites due to construction problems for deep geological repositories . Only Finland has stable repository plans, therefore from
4819-427: The reactor by the condensate and feedwater pumps. In the main condenser, the wet vapor turbine exhaust come into contact with thousands of tubes that have much colder water flowing through them on the other side. The cooling water typically come from a natural body of water such as a river or lake. Palo Verde Nuclear Generating Station , located in the desert about 97 kilometres (60 mi) west of Phoenix, Arizona,
SECTION 60
#17327839893434898-581: The reactor unit under hot conditions, but with dummy fuel rods placed in the reactor. These tests were completed in April 2020. In February 2020, the plant was inspected by IAEA . Fuel loading for the first unit started on 7 August 2020. On 11 October 2020, Unit 1 achieved first criticality . The reactor started supplying electricity on 3 November 2020 and was officially connected to the grid on 7 November 2020. Testing in January 2021 resulted in disconnection from
4977-565: The reactor was then shipped by a special rail car to the Astravyets railway station near the plant. On 10 July 2016, the reactor vessel for Unit 1 was accidentally dropped from a height of 4 meters while being moved around the construction site. Rosatom eventually agreed to swap the vessel with one intended for the Kaliningrad Nuclear Power Plant . In December 2019, the first unit started hot trials, checking
5056-540: The risks of future uncertainties. To date all operating nuclear power stations were developed by state-owned or regulated utilities where many of the risks associated with construction costs, operating performance, fuel price, and other factors were borne by consumers rather than suppliers. Many countries have now liberalized the electricity market where these risks and the risk of cheaper competitors emerging before capital costs are recovered, are borne by station suppliers and operators rather than consumers, which leads to
5135-407: The same element. Different isotopes also have different half-lives . U-238 has a longer half-life than U-235, so it takes longer to decay over time. This also means that U-238 is less radioactive than U-235. Since nuclear fission creates radioactivity, the reactor core is surrounded by a protective shield. This containment absorbs radiation and prevents radioactive material from being released into
5214-628: The security, safety, and physical protection of such facilities, and their regulation (and also prohibiting the production of nuclear weapons and other nuclear explosives ), was adopted by the House of Representatives of the National Assembly of Belarus on 25 June 2008. The location of the construction site some 18 kilometres (11 mi) away from Astravyets in Hrodna Voblast , 45 kilometres (28 mi) from Vilnius , Lithuania,
5293-693: The steam generator and the nuclear reactor is controlled using the feedwater system. The feedwater pump has the task of taking the water from the condensate system, increasing the pressure and forcing it into either the steam generators—in the case of a pressurized water reactor — or directly into the reactor, for boiling water reactors . Continuous power supply to the plant is critical to ensure safe operation. Most nuclear stations require at least two distinct sources of offsite power for redundancy. These are usually provided by multiple transformers that are sufficiently separated and can receive power from multiple transmission lines. In addition, in some nuclear stations,
5372-487: The steam turbine, so the turbine is kept as part of the radiologically controlled area of the nuclear power station. The electric generator converts mechanical power supplied by the turbine into electrical power. Low-pole AC synchronous generators of high rated power are used. A cooling system removes heat from the reactor core and transports it to another area of the station, where the thermal energy can be harnessed to produce electricity or to do other useful work. Typically
5451-491: The suspension of its commercial launch. The Parliament criticized the hasty commissioning of the plant and the lack of transparency regarding the frequent emergency shutdowns of the reactor and equipment failures. In December 2021, investigative journalists, citing Cyber Partisans , announced that they had received documents where 18 thousand shortcomings of the first power unit were identified. On 8 April 2016, workers were under time pressure from their supervisors, resulting in
5530-477: The turbine generator can power the station's loads while the station is online, without requiring external power. This is achieved via station service transformers which tap power from the generator output before they reach the step-up transformer. Nuclear power plants generate approximately 10% of global electricity, sourced from around 440 reactors worldwide. They are recognized as a significant provider of low-carbon electricity , accounting for about one-quarter of
5609-459: The world's supply in this category. As of 2020, nuclear power stood as the second-largest source of low-carbon energy, making up 26% of the total. Nuclear power facilities are active in 32 countries or regions, and their influence extends beyond these nations through regional transmission grids, especially in Europe. In 2022, nuclear power plants generated 2545 terawatt-hours (TWh) of electricity,
5688-402: The world, and 57 nuclear power reactors under construction. Building a nuclear power plant often spans five to ten years, which can accrue significant financial costs, depending on how the initial investments are financed. Because of this high construction cost and lower operations, maintenance, and fuel costs, nuclear plants are usually used for base load generation, because this maximizes
5767-484: Was chosen on 20 December 2008. Alternative sites were Chyrvo, Bykhaw , and Kukshynava between Horki and Shkloŭ in Mahilyow Voblast. In January 2009, it was decided that the nuclear power plant would be built by Atomstroyexport, the nuclear equipment exporter branch of the Russian nuclear corporation Rosatom and the Russian loan was agreed in February 2009. The contract was signed in 2011. In June 2012
5846-697: Was expired. The moratorium expired on 14 January 2009. On 1 July 2009, a Ukrainian NGO sent a complaint to the Implementation Committee of the Espoo Convention alleging numerous violations of the Espoo Convention . In particular, the complaint argues that Belarus is in violation of the requirements of the convention by pre-defining two key alternatives of the nuclear power plant construction – location and no-action alternative, as well as by not establishing an environmental impact assessment procedure that permits public participation. In December 2009 European ECO Forum Legal Focal Points submitted
5925-749: Was interested in purchasing nuclear power from Russia, and in the possibility of constructing a Belarus-owned reactor at the Smolensk nuclear power plant in Russia. However, in mid 2006, the Government of Belarus approved a plan for the construction of an initial 2000 MWe nuclear power plant in the Mahilyow Voblast using pressurized water reactors technology. After the Russia-Belarus energy dispute in 2007, Lukashenko re-declared that to ensure national energy security, Belarus needed to build its own nuclear power plant. In June 2007, Russia offered
6004-477: Was not targeted by sanctions. However, some countries, especially in Europe, scaled back or cancelled planned nuclear power plants that were to be built by Rosatom. Modern nuclear reactor designs have had numerous safety improvements since the first-generation nuclear reactors. A nuclear power plant cannot explode like a nuclear weapon because the fuel for uranium reactors is not enriched enough, and nuclear weapons require precision explosives to force fuel into
6083-524: Was poured on 6 November 2013. The construction of the second unit began 8 months later. Construction of each unit was expected to take about five years. In November 2015, Lithuania informed that there is no possibility to reserve power of the Kruonis Pumped Storage Plant , aside from emergency case, for the Belarusian nuclear power plant. In February 2016, the 330-tonne, 13-meter high, 4.5 meters diameter, reactor vessel (which
6162-661: Was the first reactor produced by Atommash after a 29-year hiatus) was delivered to the site. According to press reports, it took Atommash 840 days (2 years and 4 months) to build the reactor; it was shipped from the plant on 14 October 2015. After being transported by barge over the Tsimlyansk Reservoir , the Volga–Don Canal , the Volga–Baltic Waterway , and the Volkhov River to Novgorod ,
6241-507: Was the general designer of the plant and operates as the project management company, negotiating and signing contracts with suppliers, carrying out feasibility studies and preparing tender documents. Yelena Mironova is the Head of the project management service. Atomstroyexport was the contractor and supplier of the III generation VVER-1200 type reactors (AES-2006 model). The first two reactors have
#342657