51-625: Derby High School could refer to several high schools: England [ edit ] Derby High School, Bury in Greater Manchester Derby High School, Derbyshire in Derby United States [ edit ] Derby High School (Connecticut) in Derby, Connecticut Derby High School (Kansas) in Derby, Kansas [REDACTED] Topics referred to by
102-462: A 12-minute frequency (24-minute after 00:00): Thus the combined frequency for some routes is every 6 minutes or less. Other part-day services The Altrincham – Piccadilly service operates an extended service to Etihad Campus from 20:00–00:00 on Monday–Thursdays, 20:00–01:00 Friday–Saturdays, and 07:00–00:00 (all day) Sundays and bank holidays . One service which replaces the normal service and runs to Etihad Campus via Piccadilly and runs to
153-465: A 12-minute frequency (24-minute after 00:00, and 15-minute on Sundays): Early morning service The early morning service used to operate from 03:00–06:00 Monday–Saturdays and 03:00–07:00 on Sundays and bank holidays. One service which ran to a 20-minute frequency: This was mostly to support airport shift workers and people with early flights, however, these services were removed in March 2020 due to
204-544: A 12-minute frequency (24-minute after 00:00, and 15-minute on Sundays): This is the minimum service that the Metrolink can provide whilst bringing trams to all available stops, hence why it is called the 'core' service. Daytime services (enhanced) The following services run alongside the core service during peak times: from 07:00–20:00 on Monday–Friday and 09:00–18:30 on Saturdays, and not operational on Sundays or bank holidays . Three extra services which each run to
255-530: A Grammar School on nearby Parliament Street, which closed when the Derby opened. They had gone there having passed the Eleven Plus examination. Other pupils came from Bury Junior Technical School having attended that school from the age of 13 years. In September 1979 it became a comprehensive school and its sixth form was closed. The school's patron was the Earl of Derby , with the school's badge being based on
306-488: A baseline Service Specification to grade bidders seeking to operate the concession from July 2017, once the Second City Crossing was in operation. In the baseline service pattern, there are no designated 'peak' periods of service operation; instead, there was an 'enhanced' service operating from start of service to 08:00 Monday to Friday, and to 18:00 Saturday; and a 'core' service running at all other times. In
357-460: A fleet of 147 trams. Because low-floor tram technology was in its infancy when Metrolink was in its planning stages, and in order to be compatible with the former British Rail stations that Metrolink inherited, the network uses high-floor trams with a platform height of 900 mm (35 in), the same height as main line trains. Trams on Metrolink operate either single units, or coupled together to form double units, which regularly run on
408-414: A stop at Wharfside to serve Old Trafford Stadium closer and faster than Old Trafford tram stop , a stop at Imperial War Museum , also providing a closer and faster connection to IWM North from the city centre, the alternate tram option being walking from MediaCityUK , and a stop adjacent to Barton Dock Road , serving Trafford Palazzo . All six stops also opened with new dot matrix displays unique to
459-547: Is different from Wikidata All article disambiguation pages All disambiguation pages Derby High School, Bury The Derby High School is a secondary school, located on Radcliffe Road, Bury, Greater Manchester , England. It opened in September 1959 as the Derby Grammar School, a new school that offered both a grammar and a technical education. Some of the pupils moved from Bury High School,
510-585: The COVID-19 pandemic . There are currently no plans to reintroduce this service. Services during COVID-19 pandemic Due to changing travel patterns as a result of the COVID-19 pandemic, advice was against all but essential travel, and thus, the Metrolink temporarily introduced a reduced timetable, and trams ran to a 20-minute frequency on the following routes only. Gradually, in the following months, with more people returning to work and social activities,
561-732: The G-Mex , with a 0.4-mile (0.64 km) branch from Piccadilly Gardens to Manchester Piccadilly station . This route is now known as the First City Crossing (1CC), and it was built with network expansion in mind. A fleet of 26 AnsaldoBreda T-68 light rail vehicles was procured to operate the 19.2-mile (30.9 km) network. Construction was carried out by the GMA Group (a consortium of AMEC , GM Buses , John Mowlem & Company and GEC ), costing £145 million (equivalent to £379 million in 2023). Metrolink
SECTION 10
#1732779559725612-577: The Oldham and Rochdale Line , East Manchester Line , South Manchester Line , and Airport Line . Phase 3 was put in doubt when central government funding was withdrawn due to increasing costs, but after negotiations with the Department for Transport, Phase 3 was split into two parts, 3a and 3b, to secure investment. The new 0.25-mile (0.40 km) spur off the Eccles Line to MediaCityUK
663-658: The Trafford Centre . It runs on a mixture of on-street track shared with other traffic; reserved track sections segregated from other traffic, and converted former railway lines. Metrolink is operated by a fleet of 147 high-floor Bombardier M5000 light rail vehicles. Each of the nine Metrolink routes run five trams per hour in each direction; stops with more than one route running through it will have trams arriving more frequently. Services on busier lines operate as "doubles": two tram vehicles coupled together. A light rail system for Greater Manchester emerged from
714-511: The Trafford Park Line from Pomona to The Trafford Centre , opened on 22 March 2020. The Greater Manchester Combined Authority has proposed numerous further expansions of the network , including the addition of tram-train technology to extend Metrolink services onto local heavy-rail lines. Manchester's first tram age began in 1877 with the first horse-drawn trams of Manchester Suburban Tramways Company . Electric traction
765-402: The enhanced service pattern operates the core service plus extra services up to Bury, Altrincham, Etihad Campus, Shaw and Crompton, East Didsbury, and MediaCityUK. All-day services (core) The following services run during all operating times, from 06:00–00:00 on Monday–Thursday, 06:00–01:00 on Friday–Saturday, and 07:00–00:00 on Sundays and bank holidays . Six services which each run to
816-541: The ' Picc-Vic tunnel ' project. The project was a proposal to link Piccadilly and Victoria stations via a tunnel under the city centre and enable train services to run across the Manchester conurbation. Greater Manchester County Council (GMC) inherited the project and presented it to the United Kingdom Government in 1974, but the council failed to secure the necessary funding, and the project
867-452: The 'enhanced' service pattern, trams ran with a six-minute frequency to Shaw and Crompton, Bury, Ashton-under-Lyne, Altrincham, Manchester Airport and East Didsbury; and with a 12-minute frequency to Rochdale, Eccles and MediaCityUK. As of 2024, the core service pattern operates exactly one route to every terminus on the Metrolink network, during all operating times , at a 12-minute frequency on all routes (15 minute frequency on Sundays), and
918-510: The 1960s, transport design studies were undertaken to address the problems of increasing traffic congestion . Many urban public transport schemes were evaluated for Manchester, including several types of monorail systems and metro-style systems. While the monorail schemes were all abandoned, a scheme to create a tunnel link gained momentum. The SELNEC Passenger Transport Executive — the body formed in 1969 to improve public transport for Manchester and its surrounding municipalities – promoted
969-598: The Altrincham – Bury line and on other lines during peak hours. In December 2009, Metrolink took delivery of the first Bombardier M5000 tram. Built by Bombardier Transportation and Vossloh Kiepe , the initial eight M5000s were ordered to allow services to be increased. They are part of the Bombardier Flexity Swift range of light rail vehicles and have a design similar to the K5000 vehicle used on
1020-554: The Sixth Form, behind the boys' gym. It was later used as a music room until it was recently converted to a dance and drama studio with its current name 'Inspire'. There is a caretaker's house at the side of the girls' gym. Extensive grounds lie at the front on the School; abutting the fields of Bury Church of England High School, Bury Rugby Union Football Club, Radcliffe Road and the grounds of Radcliffe Road Baptist Church, Bury , and
1071-586: The United Kingdom . Over the 2023/24 financial year 42 million passenger journeys were made on the system. Metrolink is owned by the public body Transport for Greater Manchester (TfGM) and is part of the region's Bee Network . It is operated and maintained under contract by a Keolis / Amey consortium. The network consists of eight lines which radiate from Manchester city centre to termini at Altrincham , Ashton-under-Lyne , Bury , East Didsbury , Eccles , Manchester Airport , Rochdale and
SECTION 20
#17327795597251122-551: The United Kingdom's first modern street-running rail system; the 1885-built Blackpool tramway being the only first-generation tram system in the UK that had survived up to Metrolink's creation. Expansion of Metrolink has been a critical strategy of transport planners in Greater Manchester, who have overseen its development in successive projects, known as Phases 1, 2, 3a, 3b, 2CC, and Trafford Park. The latest extension,
1173-595: The construction of a new 9-mile (14 km) Airport Line to Manchester Airport , and extending three of the Phase 3a lines: the East Manchester Line to Ashton-under-Lyne ; the South Manchester Line to East Didsbury ; and adding street-running routes through Oldham and Rochdale town centres to the Oldham and Rochdale Line . Construction work began in March 2011, and Phase 3b
1224-598: The conversion of two suburban heavy rail lines to light rail operation — the Bury Line in the north (conversion started in July 1991) and the MSJ&AR line in the south (conversion started December 1991) — and the construction of a street-level tramway through the city centre to connect the two. Tracks were laid down along a 1.9-mile (3.1 km) route from Victoria station, via Market Street and St Peter's Square to
1275-587: The earl's coat of arms. Mr. G.A.C. Sawtell was the Headmaster from the opening until his retirement in 1977 when he was succeeded by Mr. Geoff Wolsternholme. The current Headmistress is Ms Helen Hubert who began leading Derby High School in 2016 after previous headteacher Ms Alison Byrne stepped down from teaching in the summer of 2015. The school is essentially a three storey building with a smaller single storey block at one end where Domestic Science and Practical Crafts such as woodwork and metalwork are taught. At
1326-467: The expansion of the Metrolink network, it became necessary to build a new route across Manchester City Centre to alleviate congestion and improve capacity. Known as the Second City Crossing (or 2CC), the project involved laying 0.8 miles (1.3 km) of tram tracks from St Peter's Square tram stop via Princess Street, Albert Square , Cross Street and Corporation Street to rejoin the original Metrolink line just before Victoria station. One new tram stop
1377-428: The failure of the 1970s Picc-Vic tunnel scheme to obtain central government funding. A light-rail scheme was proposed in 1982 as the least expensive rail-based transport solution for Manchester city centre and the surrounding Greater Manchester metropolitan area . Government approval was granted in 1988, and the network began operating services between Bury Interchange and Victoria on 6 April 1992. Metrolink became
1428-513: The gardens of houses on Inglewhite Close. A recently constructed (2014) sports hall is situated at the "town end" of the main school building. To the rear of the school is a rough track and the embankment of the Manchester Metrolink Tram line. Access by car is via Radcliffe Road or by foot and bike via a path, off Manchester Old Road which passes Bury C of E High School, to the rear of the school. The original boys sports hall
1479-469: The inauguration, GMPTE's original concept was for Metrolink's operator to provide a service every ten minutes from Bury to Piccadilly and Altrincham to Piccadilly from 06:00 to midnight, Monday to Saturday. Greater Manchester Metro Limited, the system's original operator, argued for adjustments, citing the need to provide an efficient and commercially viable operation in line with vehicle running times and passenger demand. Due to power limitations, this pattern
1530-590: The need for costly tunnelling works . A Rail Study Group, composed of officials from British Rail, GMC and GMPTE formally endorsed the Project Light Rail scheme in 1984. Initial abstract proposals, based on light rail systems in North America and continental Europe , illustrated a draft 62-mile (100 km) network consisting of three lines: Altrincham – Hadfield / Glossop , Bury – Marple / Rose Hill and Rochdale – East Didsbury . To promote
1581-406: The other end is the main entrance serving a large reception area, kitchen, offices and staff rooms. Above the reception area is the library and the school's distinctive tower. Behind the reception area is the school hall with a stage at the far end. Two gymnasiums run from the rear of the stage with one for boys at one side and opposite one for the girls. There is also a small hut, originally used by
Derby High School - Misplaced Pages Continue
1632-548: The rest of the network as the system has grown. Heavy snowfall during the winter of 2009/10 impaired Metrolink services and the operator was criticised for failing to have cold weather procedures. This prompted a programme to improve the reliability and performance of the system in freezing conditions. Metrolink operated icebreaker -style vehicles at night during snowfall in January 2013 to provide standard services. In January 2016, Transport for Greater Manchester agreed on
1683-459: The rest of the network. Enabling works began in January 2017, and the first test tram ran in November 2019 between Pomona and Village . The line finally opened on 22 March 2020. The COVID-19 pandemic lockdown in the UK on the second day of operation overshadowed news of the new line's opening, leading to it not getting much ridership after the lockdown ended. via Exchange Square Before
1734-520: The route and adding several new stops as well, re-opening a disused 1.7-mile (2.7 km) section of the Cheshire Lines Committee railway to use as the first part of the South Manchester Line (up to St Werburgh's Road ), and building a new 4-mile (6.4 km) East Manchester Line as far as Droylsden . When completed in 2013, Phase 3a increased Metrolink's total network length to 43 miles (69 km). Phase 3b involved
1785-486: The same term This disambiguation page lists articles about schools, colleges, or other educational institutions which are associated with the same title. If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=Derby_High_School&oldid=1005389771 " Category : Educational institution disambiguation pages Hidden categories: Short description
1836-520: The scheme, GMPTE held a public proof of concept demonstration in March 1987 using a Docklands Light Railway P86 train on a freight-only line adjacent to Debdale Park . The Project Light Rail proposals were presented to the UK Government for taxpayer funding; following route revisions in 1984 and 1987, Project Light Rail was approved. Because of the central government's constraints on financial support for innovative transport projects, funding
1887-496: The service frequency on all routes was increased to 10 minutes during peak times and 20 minutes off-peak Monday–Saturday, and every 15 minutes on Sundays. Normal service was reintroduced on 5 July 2021, although temporarily removed in late August 2021 due the number of staff having to self isolate. The two enhanced service routes at the time: Altrincham–Bury direct and Shaw and Crompton–East Didsbury resumed on 31 August and 6 September 2021 respectively. As of 2022 , Metrolink operated
1938-531: The street running section to Eccles Interchange was completed. The Broadway–Eccles section was opened on 21 July 2000, and the complete line was officially opened by Princess Anne on 9 January 2001. The Phase 3 extension project, nicknamed the "Big Bang", was promoted by GMPTE and the Association of Greater Manchester Authorities (AGMA) in the early 2000s. The project, costing £489 million (£1040 million in 2023), would create four new lines:
1989-422: Was abandoned in 1977. The Centreline shuttle bus service provided inter-station links for many years. The Greater Manchester Passenger Transport Executive (GMPTE), the successor to SELNEC, continued to examine possible rail link solutions. Light rail emerged in the early 1980s as a cost-effective option that could make use of existing railway lines and run through the city centre at street level, eliminating
2040-609: Was built at Exchange Square . The project also involved re-ordering St Peter's Square and re-siting the Cenotaph to accommodate an enlarged tram interchange and junction. Construction began in 2014, and the 2CC route opened fully in February 2017. The Transport & Works Act Order for the 3.4 mile (5.4 km) Trafford Park Line was granted in October 2016. This new line includes six tram stops, including, but not limited to,
2091-472: Was closed. Trolleybuses were withdrawn from service in 1966. Greater Manchester's railway network historically suffered from poor north–south connections because Manchester's main railway stations, Piccadilly and Victoria , were built in the 1840s on peripheral locations outside Manchester city centre . The central commercial district had no rail links, and over the years, several unsuccessful schemes were proposed to connect Manchester's rail termini. In
Derby High School - Misplaced Pages Continue
2142-710: Was completed in November 2014 with the Airport Line 's opening. Phase 3b was delayed after a failed bid to raise funding through the Greater Manchester Transport Innovation Fund and a proposed traffic congestion charge in 2008. GMPTE and AGMA instead funded Phase 3b through a combination of council tax , government grants, Metrolink fares and contributions from the Manchester Airports Group and other bodies. With increased tram traffic brought about by
2193-509: Was funded by the GMPTA , the ERDF and private developers. It was constructed 1997–99 by Altram (a consortium of Serco , Ansaldo and John Laing ) and six new AnsaldoBreda T-68A trams were bought to operate services on the line, but were also used in other locations across the network. The line was inaugurated by Prime Minister Tony Blair on 6 December 1999 as far as Broadway tram stop as
2244-599: Was funded separately by the Northwest Regional Development Agency . As part of Phase 3, the original blue T-68 trams were also phased out and replaced with a new fleet of Bombardier M5000 trams, which entered service in December 2009. Beginning in October 2009 with the closure of the 14-mile (23 km) Oldham Loop heavy rail line , Phase 3a involved converting this line to light rail operation , including rebuilding all stations on
2295-563: Was granted by HM Treasury with the strict condition that the system be constructed in phases. Additional taxpayer funding came from the European Regional Development Fund and bank lending. Parliamentary authority to proceed with Phase 1 construction was obtained with two Acts of Parliament – the Greater Manchester (Light Rapid Transit System) Act 1988 and Greater Manchester (Light Rapid Transit System) (No. 2) Act 1988. The first phase of Metrolink involved
2346-520: Was initially scheduled to open in September 1991, but services did not begin until 1992, when the Bury Line of the Metrolink opened from Victoria station to Bury Interchange on 6 April. The first street-level trams began running on 27 April between Victoria and G-Mex (renamed Deansgate-Castlefield in 2010), and the Altrincham Line opened on 15 June from G-Mex to Altrincham . The branch to Piccadilly station opened on 20 July. Metrolink
2397-427: Was introduced in 1901, and the municipal Manchester Corporation Tramways expanded across the city. By 1930, Manchester's tram network had grown to 163 route miles (262 km), making it the third-largest tram system in the United Kingdom. After World War II , electric trolleybuses and motor buses began to be favoured by local authorities as a cheaper transport alternative, and by 1949 the last Manchester tram line
2448-413: Was modified to a twelve-minute service throughout the day, doubling to a six-minute service in peak periods, resulting in a "ten trams per hour" service pattern on routes running from Altrincham and Bury to Manchester every six minutes. Operators were required to provide this level of service at least 98% of the time or incur a financial penalty charge. This twelve-minute service pattern has been adopted on
2499-409: Was officially opened by Queen Elizabeth II on 17 July 1992. In Phase 2, the Metrolink network was extended westwards to Eccles along the new 4-mile (6.4 km) Eccles Line , as part of the 1990s urban regeneration of Salford Quays , increasing the total Metrolink route length to 24 miles (39 km). The extension cost £160 million (equivalent to £340 million in 2023) and
2550-484: Was renamed to ExITe with a brand new ICT room and a PE classroom with a special needs area for people who need extra support. It was named "Include" Manchester Metrolink Manchester Metrolink is a tram / light rail system in Greater Manchester , England. The network has 99 stops along 64 miles (103 km) of standard-gauge route, making it the most extensive light rail system in
2601-413: Was transformed into a new building with 2 floors. It was named "Create" with subjects hosted being Food Tech, Technology & Engineering as a course for Y10 & Y11. The top floor has 2 giant cooking rooms with 24 desks in each. With the lower floor having 2 tech rooms, an ICT suite and an engineering room. The old building where those subjects used to be was on the other side of school called T-block but
SECTION 50
#1732779559725#724275