Misplaced Pages

IFI

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#585414

42-481: IFI may refer to: Ifield railway station , West Sussex, England (code: IFI) Iglesia Filipina Independente ( Philippine Independent Church ) Illinois Family Institute , United States, a conservative Christian organisation Industrial Fasteners Institute , the Independence, Ohio based trade and standards organization and publisher Inland Fisheries Ireland ,

84-525: A 2+2 seating arrangement, with fold-up seats and designed for high levels of standing passengers. Ride quality and noise levels were expected to equal or be better than those of current vehicles and climate control (air-conditioning) was to be fitted. The vehicles were to be fitted for driver-only operation , and to include GSM-R communications radio, as well as AWS , TPWS , and ERTMS level 2 safety systems. The ability to be used in ' Automatic train operation ' (ATO) mode, where an on-board computer controls

126-666: A 243 m (797 ft) train. In July 2008, the Department for Transport shortlisted consortia including Alstom , Bombardier , Hitachi , and Siemens as train builders. The invitations to tender were issued to the four bidders in November 2008. Hitachi exited the bidding process in April 2009. In July 2009, Siemens unveiled the Desiro City , a development of design and technology used in its Desiro UK range and

168-455: A date for this has not yet been confirmed. Because the trains were to be built outside the UK, the decision to award the contract to Siemens proved controversial: there was widespread criticism of the UK government's bidding process and perceived lack of support for British manufacturing, which in turn led to a review of governmental procurement mechanisms. Additionally, the decision to procure

210-777: A slightly wider design; the smaller number of bogies was to have resulted in a train approximately 40 tonnes lighter than a conventional design. However, the design would have resulted in a higher axle load. The bid was rejected in October 2009. Bombardier Transportation offered the Aventra , a design incorporating a development of the FLEXX Eco inside frame bogie with bogie-mounted traction motors. Both Bombardier's and Siemens' rolling-stock designs were conventional EMUs incorporating inside frame bogies and modern passenger and rolling stock information systems. The contract for

252-571: A special NHS appreciation livery to show support for the NHS and the 200,000 essential commuters travelling on Govia Thameslink Railway's network each week during the nationwide lockdown caused by the COVID-19 pandemic . Unit 700124 is named Driver Phill Marchant Keeping us moving for more than 12 years In 2008, the Department for Transport commissioned a study into the location of depots for

294-718: A state agency in Ireland InnerChange Freedom Initiative , a Christian prisoner program International Federation of Interior Architects/Designers , a global interior architecture/design umbrella organization International financial institutions , as in the IMF, the World Bank, etc. International Fund for Ireland , inter-governmental agency promoting reconciliation in Ireland Institut de la Francophonie pour l'Informatique ,

336-476: A top speed of 100 mph (160 km/h), and high acceleration and deceleration performance in line with a high-frequency timetable. The trains were to be designed for low weight, low track forces, and high energy efficiency. A standard 12-car train was to be about 240 metres (790 ft) long and shorter 8-car trains were limited to 162 metres (531 ft). The passenger accommodation was to include versions for both "metro" and "commuter" trains, based around

378-519: A train with a new bogie design untested in the UK was challenged by several observers at a parliamentary investigation into the train procurement; rival bidder Bombardier already had a proven low-weight bogie. In 2014, the NAO reported on the Department for Transport 's handling of Intercity Express and Thameslink rolling-stock procurement projects. The report questioned the DfT's attempt to take leadership in

420-409: A twelve-car formation of a Thameslink Class 377/5 and 807 on a twelve car formation of a Great Northern Class 365 . The reduction in the number of seats is intended to provide more standing room on busy trains into Central London, but has been criticised by those who use the trains for longer journeys. There will, however, be more seats overall, as the services will run more frequently. Additionally,

462-423: Is a fixed length continuously gangwayed vehicle. The initial livery is "light grey with pastel blue doors and a white diagonal flash at the carriage ends". In July 2019, unit 700155 was wrapped with vinyl trainbow stickers to celebrate LGBT Pride and to mark Brighton's annual pride event . As of April 2020, unit 700111, alongside Southern unit 377111 and Great Northern unit 717011 , has been wrapped with

SECTION 10

#1732781183586

504-455: Is also served by a limited number of Southern services to London Victoria , Bognor Regis , Portsmouth & Southsea and Southampton Central . On Sundays, the service is reduced to hourly in each direction and northbound services run to and from Bedford instead of Peterborough. 51°06′58″N 0°12′54″W  /  51.116°N 0.215°W  / 51.116; -0.215 British Rail Class 700 The British Rail Class 700

546-701: Is an electric multiple unit passenger train from the Desiro City family built by Siemens Mobility . It is capable of operating on 25 kV 50 Hz AC from overhead wires or 750 V DC from third rail . 115 trainsets were built between 2014 and 2018, for use on the Thameslink network, as part of the Thameslink Programme in the United Kingdom . As of 2021 , they are operated by Govia Thameslink Railway . In 2011,

588-627: Is different from Wikidata All article disambiguation pages All disambiguation pages Ifield railway station Ifield railway station (pronounced 'Eye-field') serves the neighbourhoods of Ifield and Gossops Green in the West Sussex town of Crawley , England. It is on the Arun Valley Line , 31 miles 66 chains (51.2 km) down the line from London Bridge , measured via Redhill. Train services are provided by Thameslink and Southern . The station

630-479: The Desiro Mainline range. Development of the design had begun in 2007, with an investment of about £45 million. In September 2009, Alstom unveiled the X'trapolis UK , unusually an articulated vehicle , using 15.6 metre (51 ft) cars, with individual carriages proposed to be supported at one end by a bogie and at the opposite end by a linkage to the next carriage. The shorter vehicle allowed

672-850: The Wegberg-Wildenrath Test and Validation Centre ; a completed unit was presented by Siemens in Krefeld, Germany in April 2015. The first train arrived in the UK by the end of July 2015, and was delivered to the Three Bridges depot . The first test run on the Brighton Main Line took place in December 2015. The first train in service was unit 700108 forming the 1002 Brighton to London Bridge service on 20 June 2016. By 18 September 2017, Class 700s replaced all Class 319 , 377 , and 387 units previously in use on

714-641: The Francophone Institute for Computer Science. Institut Français d'Indonésie , a French cultural institution located in Indonesia. Institut de Formation Internationale , a business school located in Rouen, France. Irish Film Institute , a cinema and national body based in Dublin, Ireland. Islamic Foundation of Ireland , a religious organization in Dublin, Ireland Topics referred to by

756-465: The Hornsey application was blocked by Secretary of State for Communities and Local Government John Denham on grounds of its scale. Potential sites for the northern depot were reassessed and possible options reduced to three: a main depot at Coronation Sidings Hornsey; a main depot adjacent to the existing depot at Hornsey; and a site at Chesterton, Cambridge – a depot reduced in size on the site of

798-510: The SF5000 design. The primary suspension system uses layered rubber, with pneumatic secondary suspension. Motor bogies have a wheelbase of 2,200 mm (87 in), while trailer bogies are 100 mm (3.9 in) shorter. Both variants use wheels of 820 mm (32 in) nominal diameter. Braking is by tread brakes and regenerative braking on motor bogies, and two axle-mounted disc brakes per axle on trailer bogies. Prototypes of

840-459: The Thameslink network. Each train is able to reach 100 mph (160 km/h) and carry 1,146 passengers in an 8-car train, and 1,754 passengers in a 12-car train. Maintenance depots have been built at Hornsey and Three Bridges . The Department for Transport began its procurement process ( Thameslink Rolling Stock Project , or Thameslink Rolling stock Programme ) on 9 April 2008, with

882-463: The UK-market replacement for the preceding Siemens SGP SF5000 model. To reduce energy consumption and track access charges, a key feature of the design was reduced weight: weight-saving design elements included short wheelbase, inboard frames, a bolsterless bogie design, and hollow axles. Total bogie weight is 6.3 tonnes (powered) and 4.4 tonnes (trailer), a reduction of around one third from

SECTION 20

#1732781183586

924-560: The aim of introducing more passenger capacity on Thameslink lines to match expected demand. In addition, the bidders were to provide depots for vehicle maintenance and storage and finance for the rolling-stock project whereby revenues would be generated from the long-term leasing of rolling stock to the train operating company and associated maintenance payments. The general specifications included: high reliability, short station dwell times, integrated information technology including passenger information and information for vehicle maintenance,

966-535: The consortium Cross London Trains (XLT) consisting of Siemens Project Ventures , 3i Infrastructure , and Innisfree was announced as preferred bidder with Siemens Mobility to manufacture the trains. The decision was politically controversial as the trains were to be built in Germany, while the competing consortium led by Bombardier Transportation had a UK train factory . Both the procurement process and final close of contract were significantly delayed, resulting in

1008-465: The expected first delivery date moving from 2012 to 2016. The £1.6 billion contract to manufacture and provide service depots for the trains was finalised in June 2013. The first train was delivered in late July 2015. A fleet of 60 eight-car and 55 twelve-car trains entered service between Spring 2016 and 2019. Having replaced Class 319s , 377s , and 387s , Class 700s are the only trains operated on

1050-614: The first, 700128, operating the 0656 Peterborough to London Kings Cross service. The Great Northern route has since been partially incorporated in the Thameslink network after through services through the Canal Tunnels began on 26 February 2018. On this route, Class 700s replaced parts of the Class 365 fleet. On 11 December 2017, Class 700s took over peak-time services from London Bridge to Littlehampton and weekday-only services from London Bridge to Horsham from Southern with

1092-481: The fleet. The new fleet were allocated TOPS classification '700' in 2013. This was divided into subclasses 700/0 for eight-car units and 700/1 for twelve-car units. The first class compartment at the rear of each unit is declassified at all times. In July 2013 Eversholt Rail entered into an agreement with Cross London Trains to provide long-term (22-year) asset management for the fleet of trains. There are 60 eight-car units and 55 twelve-car units. Each

1134-500: The former starting from Bedford instead of London Bridge. From 21 May 2018, Class 700s also entered service on the new Rainham to Luton service, having replaced the Southeastern Class 465s from Gillingham to London Charing Cross . The Class 465s are now being used to enhance capacity on other routes. Class 700s are still due to enter service on a planned new service between Cambridge and Maidstone East but

1176-475: The future Thameslink rolling stock: Network Rail preferred two depots based on an expectation that at times the central area of the Thameslink route would be closed for maintenance outside commercial operational hours, with no workable alternative electrified routes available; as a result, depots on either side of the central Thameslink area were required, enabling trains to reach a depot on a nightly basis without passing through central London. A single-depot solution

1218-591: The lack of padding was required to meet fire regulations; however, the Rail Safety and Standards Board have claimed that this is untrue, and that it was simply a measure by the DfT to reduce costs. Upon delivery, the trains were also missing various amenities which were considered standard, including seatback tables and Wi-Fi , which are now being retrofitted to some units. As of April 2023 , 58% of Class 700/1 (12 coach) and 23% of Class 700/0 (8 coach) are fitted with Wi-Fi with no plans to extend this further across

1260-399: The motors and brakes, was also specified. Vehicles were to operate on 750 V DC and 25 kV AC electrification systems, with regenerative brakes . Maintenance time was to be reduced by the use of modular components, remote diagnostics, and the avoidance of over-complicated systems. The Department for Transport gave a target of 384 tonnes (378 long tons; 423 short tons) when empty for

1302-480: The network. All units were accepted by Thameslink by summer 2018, and by the end of 2019 all were in passenger service. The Class 700 fleet, at 60 eight-car and 55 twelve-car units, is over double the size of the old Thameslink fleet. This increase has been used not only to enhance capacity, but also to expand the Thameslink network. On 6 November 2017, Class 700s started on the Great Northern route with

IFI - Misplaced Pages Continue

1344-618: The new bogie were completed at Siemens' bogie plant in Graz , Austria in late 2011. Manufacture of pre-series production trainsets began before formal financial close of the project in mid-2013. A mock-up of the train was unveiled at the ExCel centre in January 2014, and then displayed at various stations in London and the surrounding area. In March 2014, testing of a twelve-car unit began at

1386-651: The order contract was finalised in July 2013. In mid-2013 the National Audit Office (NAO) reported that the contract delay could negatively impact the delivery of the entire Thameslink Programme. The £1.6 billion contract to finance, supply, and maintain a 1,140-carriage fleet of passenger rolling stock was eventually finalised between the DfT, the supplier Siemens, and the Cross London Trains consortium on 14 June 2013. To finance

1428-526: The order was originally planned to be signed in Summer 2009, with the first vehicles in service by February 2012, and squadron service by 2015. The award of the contract was delayed by the 2010 general election and the subsequent spending review , following which the procurement was announced to be proceeding in late 2010. On 16 June 2011, Cross London Trains Ltd, a consortium formed by Siemens Project Ventures GmbH, Innisfree Ltd., and 3i Infrastructure Ltd.,

1470-530: The project, contrary to general policy, without any prior experience of large-scale rolling stock procurement; the NAO also said the DfT had handled communications with bidders poorly, increasing the likelihood of a legal challenge to its decisions. The Class 700 units have been criticised for having fewer seats than those they replaced. There are 666 seats on the twelve-car versions of the Class 700, compared to 714 on

1512-403: The same term [REDACTED] This disambiguation page lists articles associated with the title IFI . If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=IFI&oldid=1177467360 " Category : Disambiguation pages Hidden categories: Short description

1554-438: The seats themselves have been criticised for being an uncomfortable shape and having insufficient padding. They are also narrow and positioned close together – another design intended to increase standing space. These poor levels of comfort, along with their tall, thin, tapered appearance, have led them to sometimes be nicknamed " ironing boards "; they have also been likened to sitting on concrete . Thameslink have claimed that

1596-486: The work, loans were arranged with nineteen banks, with Lloyds , Sumitomo Mitsui Banking Corporation , KfW and BTMU acting as mandated lead arrangers ; the European Investment Bank also provided a debt facility. Loans for the construction of the rolling-stock depots were through Siemens Financial Services . Development of the new SF7000 bogie began in 2007, with the intention that it would be

1638-507: Was also investigated, but no suitably large sites were identified for such a facility. Sites were considered at: Wellingborough ; Hornsey ; Cricklewood ; Selhurst ; Three Bridges ; and Tonbridge . By late 2008, the sites had been narrowed to Hornsey, Three Bridges and Tonbridge; finally Hornsey and Three Bridges were selected as a two-depot solution. In August 2009, planning applications for both sites were submitted by Arup acting on behalf of Network Rail . However, in December,

1680-403: Was hoped for by the end of the year, and financial close in early 2013. Key aspects of the commercial contract were reported to have been finalised by December 2012. As a result of the delays to the procurement, in late 2012, train operating company Southern began procurement of 116 dual-voltage Class 387 EMUs from Bombardier that would be used temporarily on the Thameslink route until 2015;

1722-532: Was named preferred bidder for the PFI contract , and the targeted entry of trains into service was rescheduled to 2015–2018. The vehicles would be manufactured at Siemens' plant in Krefeld , Germany, and maintenance depots were to be built at Hornsey (London) and Three Bridges (Sussex). The contract was significantly delayed: initially Siemens had hoped to reach agreement in early 2012; by late 2012 commercial close

IFI - Misplaced Pages Continue

1764-531: Was opened on 1 June 1907 as Lyons Crossing Halt, although it became known as Ifield Halt later that year. It was one of a series of unstaffed intermediate halts set up by the London Brighton and South Coast Railway , to be worked by rail motor trains . It became known simply as Ifield station from 1930. Off-peak, all services at Ifield are operated by Thameslink using Class 700 EMUs . The typical off-peak service in trains per hour is: The station

#585414