The RAe TEE II , later known as RABe EC , is a type of high-speed electric multiple unit trainset of the Swiss Federal Railways (SBB-CFF-FFS), which was used from the 1960s until the 1980s on several Trans Europ Express services. After conversion from first-class-only to two-class configuration, the trainsets continued in use on EuroCity or other services until 1999.
116-569: It was designed to be compatible with four different railway electrification systems (different voltages in the overhead lines ), used by various countries in Europe, allowing it to operate on long international routes. Like all TEE trains, the RAe TEE II trainsets were equipped with first-class accommodation only. A total of five trainsets were built, numbered 1051–1055. One, number 1053, has been preserved. These trains were originally used on
232-413: A block and tackle arrangement. Lines are divided into sections to limit the scope of an outage and to allow maintenance. To allow maintenance to the overhead line without having to turn off the entire system, the line is broken into electrically separated portions known as "sections". Sections often correspond with tension lengths. The transition from section to section is known as a "section break" and
348-419: A swing bridge . The catenary wire typically comprises messenger wire (also called catenary wire) and a contact wire where it meets the pantograph. The messenger wire is terminated at the portal, while the contact wire runs into the overhead conductor rail profile at the transition end section before it is terminated at the portal. There is a gap between the overhead conductor rail at the transition end section and
464-476: A "Backdoor" connection between different parts, resulting in, amongst other things, a section of the grid de-energised for maintenance being re-energised from the railway substation creating danger. For these reasons, Neutral sections are placed in the electrification between the sections fed from different points in a national grid, or different phases, or grids that are not synchronized. It is highly undesirable to connect unsynchronized grids. A simple section break
580-411: A fixed centre point, with the two half-tension lengths expanding and contracting with temperature. Most systems include a brake to stop the wires from unravelling completely if a wire breaks or tension is lost. German systems usually use a single large tensioning pulley (basically a ratchet mechanism) with a toothed rim, mounted on an arm hinged to the mast. Normally the downward pull of the weights and
696-485: A high electrical potential by connection to feeder stations at regularly spaced intervals along the track. The feeder stations are usually fed from a high-voltage electrical grid . Electric trains that collect their current from overhead lines use a device such as a pantograph , bow collector or trolley pole . It presses against the underside of the lowest overhead wire, the contact wire. Current collectors are electrically conductive and allow current to flow through to
812-573: A higher total efficiency. Electricity for electric rail systems can also come from renewable energy , nuclear power , or other low-carbon sources, which do not emit pollution or emissions. Electric locomotives may easily be constructed with greater power output than most diesel locomotives. For passenger operation it is possible to provide enough power with diesel engines (see e.g. ' ICE TD ') but, at higher speeds, this proves costly and impractical. Therefore, almost all high speed trains are electric. The high power of electric locomotives also gives them
928-467: A historical concern for double-stack rail transport regarding clearances with overhead lines but it is no longer universally true as of 2022 , with both Indian Railways and China Railway regularly operating electric double-stack cargo trains under overhead lines. Railway electrification has constantly increased in the past decades, and as of 2022, electrified tracks account for nearly one-third of total tracks globally. Railway electrification
1044-484: A level crossing with the 1,200 V DC Uetliberg railway line ; at many places, trolleybus lines cross the tramway. In some cities, trolleybuses and trams shared a positive (feed) wire. In such cases, a normal trolleybus frog can be used. Alternatively, section breaks can be sited at the crossing point, so that the crossing is electrically dead. Many cities had trams and trolleybuses using trolley poles. They used insulated crossovers, which required tram drivers to put
1160-579: A multiple unit passes over them. In the United Kingdom equipment similar to Automatic Warning System (AWS) is used, but with pairs of magnets placed outside the running rails (as opposed to the AWS magnets placed midway between the rails). Lineside signs on the approach to the neutral section warn the driver to shut off traction power and coast through the dead section. A neutral section or phase break consists of two insulated breaks back-to-back with
1276-537: A number of European countries, India, Saudi Arabia, eastern Japan, countries that used to be part of the Soviet Union, on high-speed lines in much of Western Europe (including countries that still run conventional railways under DC but not in countries using 16.7 Hz, see above). Most systems like this operate at 25 kV, although 12.5 kV sections exist in the United States, and 20 kV
SECTION 10
#17327809670491392-404: A pneumatic servo pantograph with only 3 g acceleration. An electrical circuit requires at least two conductors. Trams and railways use the overhead line as one side of the circuit and the steel rails as the other side of the circuit. For a trolleybus or a trolleytruck , no rails are available for the return current, as the vehicles use rubber tyres on the road surface. Trolleybuses use
1508-457: A power grid that is delivered to a locomotive, and within the locomotive, transformed and rectified to a lower DC voltage in preparation for use by traction motors. These motors may either be DC motors which directly use the DC or they may be three-phase AC motors which require further conversion of the DC to variable frequency three-phase AC (using power electronics). Thus both systems are faced with
1624-498: A relative lack of flexibility (since electric trains need third rails or overhead wires), and a vulnerability to power interruptions. Electro-diesel locomotives and electro-diesel multiple units mitigate these problems somewhat as they are capable of running on diesel power during an outage or on non-electrified routes. Different regions may use different supply voltages and frequencies, complicating through service and requiring greater complexity of locomotive power. There used to be
1740-415: A return path for the current through their wheels, and must instead use a pair of overhead wires to provide both the current and its return path. To achieve good high-speed current collection, it is necessary to keep the contact wire geometry within defined limits. This is usually achieved by supporting the contact wire from a second wire known as the messenger wire or catenary . This wire approximates
1856-414: A rigid overhead wire in their tunnels, while using normal overhead wires in their above ground sections. In a movable bridge that uses a rigid overhead rail, there is a need to transition from the catenary wire system into an overhead conductor rail at the bridge portal (the last traction current pylon before the movable bridge). For example, the power supply can be done through a catenary wire system near
1972-468: A second parallel overhead line for the return, and two trolley poles , one contacting each overhead wire. ( Pantographs are generally incompatible with parallel overhead lines.) The circuit is completed by using both wires. Parallel overhead wires are also used on the rare railways with three-phase AC railway electrification . In the Soviet Union the following types of wires/cables were used. For
2088-481: A separate fourth rail for this purpose. In comparison to the principal alternative, the diesel engine , electric railways offer substantially better energy efficiency , lower emissions , and lower operating costs. Electric locomotives are also usually quieter, more powerful, and more responsive and reliable than diesel. They have no local emissions, an important advantage in tunnels and urban areas. Some electric traction systems provide regenerative braking that turns
2204-467: A short section of line that belongs to neither grid. Some systems increase the level of safety by the midpoint of the neutral section being earthed. The presence of the earthed section in the middle is to ensure that should the transducer controlled apparatus fail, and the driver also fail to shut off power, the energy in the arc struck by the pantograph as it passes to the neutral section is conducted to earth, operating substation circuit breakers, rather than
2320-539: A simpler alternative for moveable overhead power rails. Electric trains coast across the gaps. To prevent arcing, power must be switched off before reaching the gap and usually the pantograph would be lowered. Given limited clearance such as in tunnels , the overhead wire may be replaced by a rigid overhead rail. An early example was in the tunnels of the Baltimore Belt Line , where a Π section bar (fabricated from three strips of iron and mounted on wood)
2436-418: A third rail. The key advantage of the four-rail system is that neither running rail carries any current. This scheme was introduced because of the problems of return currents, intended to be carried by the earthed (grounded) running rail, flowing through the iron tunnel linings instead. This can cause electrolytic damage and even arcing if the tunnel segments are not electrically bonded together. The problem
SECTION 20
#17327809670492552-478: A tilted position into the horizontal position, connecting the conductor rails at the transition end section and the bridge together to supply power. Short overhead conductor rails are installed at tram stops as for the Combino Supra . Trams draw their power from a single overhead wire at about 500 to 750 V DC. Trolleybuses draw from two overhead wires at a similar voltage, and at least one of
2668-701: A tramway. The tramway operated on 600–700 V DC and the railway on 15 kV AC . In the Swiss village of Oberentfelden , the Menziken–Aarau–Schöftland line operating at 750 V DC crosses the SBB line at 15 kV AC; there used to be a similar crossing between the two lines at Suhr but this was replaced by an underpass in 2010. Some crossings between tramway/light rail and railways are extant in Germany. In Zürich , Switzerland, VBZ trolleybus line 32 has
2784-730: Is an electrical cable that is used to transmit electrical energy to electric locomotives , electric multiple units , trolleybuses or trams . The generic term used by the International Union of Railways for the technology is overhead line . It is known variously as overhead catenary , overhead contact line ( OCL ), overhead contact system ( OCS ), overhead equipment ( OHE ), overhead line equipment ( OLE or OHLE ), overhead lines ( OHL ), overhead wiring ( OHW ), traction wire , and trolley wire . An overhead line consists of one or more wires (or rails , particularly in tunnels) situated over rail tracks , raised to
2900-422: Is briefly in contact with both wires). In normal service, the two sections are electrically connected; depending on the system this might be an isolator, fixed contact or a Booster Transformer. The isolator allows the current to the section to be interrupted for maintenance. On overhead wires designed for trolley poles, this is done by having a neutral section between the wires, requiring an insulator. The driver of
3016-411: Is derived by using resistors which ensures that stray earth currents are kept to manageable levels. Power-only rails can be mounted on strongly insulating ceramic chairs to minimise current leak, but this is not possible for running rails, which have to be seated on stronger metal chairs to carry the weight of trains. However, elastomeric rubber pads placed between the rails and chairs can now solve part of
3132-451: Is effected by one contact shoe each that slide on top of each one of the running rails . This and all other rubber-tyred metros that have a 1,435 mm ( 4 ft 8 + 1 ⁄ 2 in ) standard gauge track between the roll ways operate in the same manner. Railways and electrical utilities use AC as opposed to DC for the same reason: to use transformers , which require AC, to produce higher voltages. The higher
3248-526: Is electrified, companies often find that they need to continue use of diesel trains even if sections are electrified. The increasing demand for container traffic, which is more efficient when utilizing the double-stack car , also has network effect issues with existing electrifications due to insufficient clearance of overhead electrical lines for these trains, but electrification can be built or modified to have sufficient clearance, at additional cost. A problem specifically related to electrified lines are gaps in
3364-422: Is in use, standard sizes for contact wire are 100 and 150 mm . The catenary wire is made of copper or copper alloys of 70, 120 or 150 mm . The smaller cross sections are made of 19 strands, whereas the bigger has 37 strands. Two standard configurations for main lines consist of two contact wires of 100 mm and one or two catenary wires of 120 mm , totaling 320 or 440 mm . Only one contact wire
3480-415: Is insufficient to guard against this as the pantograph briefly connects both sections. In countries such as France, South Africa, Australia and the United Kingdom, a pair of permanent magnets beside the rails at either side of the neutral section operate a bogie-mounted transducer on the train which causes a large electrical circuit-breaker to open and close when the locomotive or the pantograph vehicle of
3596-486: Is limited and losses are significantly higher. However, the higher voltages used in many AC electrification systems reduce transmission losses over longer distances, allowing for fewer substations or more powerful locomotives to be used. Also, the energy used to blow air to cool transformers, power electronics (including rectifiers), and other conversion hardware must be accounted for. Standard AC electrification systems use much higher voltages than standard DC systems. One of
SBB-CFF-FFS RAe TEE II - Misplaced Pages Continue
3712-778: Is no longer exactly one-third of the grid frequency. This solved overheating problems with the rotary converters used to generate some of this power from the grid supply. In the US , the New York, New Haven, and Hartford Railroad , the Pennsylvania Railroad and the Philadelphia and Reading Railway adopted 11 kV 25 Hz single-phase AC. Parts of the original electrified network still operate at 25 Hz, with voltage boosted to 12 kV, while others were converted to 12.5 or 25 kV 60 Hz. In
3828-450: Is often used for side tracks. In the UK and EU countries , the contact wire is typically made from copper alloyed with other metals. Sizes include cross-sectional areas of 80, 100, 107, 120, and 150 mm . Common materials include normal and high strength copper, copper-silver, copper-cadmium, copper-magnesium, and copper-tin, with each being identifiable by distinct identification grooves along
3944-421: Is set up so that the vehicle's pantograph is in continuous contact with one wire or the other. For bow collectors and pantographs, this is done by having two contact wires run side by side over the length between 2 or 4 wire supports. A new one drops down and the old one rises up, allowing the pantograph to smoothly transfer from one to the other. The two wires do not touch (although the bow collector or pantograph
4060-447: Is sufficient traffic, the reduced track and especially the lower engine maintenance and running costs exceed the costs of this maintenance significantly. Newly electrified lines often show a "sparks effect", whereby electrification in passenger rail systems leads to significant jumps in patronage / revenue. The reasons may include electric trains being seen as more modern and attractive to ride, faster, quieter and smoother service, and
4176-436: Is supplied to moving trains with a (nearly) continuous conductor running along the track that usually takes one of two forms: an overhead line , suspended from poles or towers along the track or from structure or tunnel ceilings, or a third rail mounted at track level and contacted by a sliding " pickup shoe ". Both overhead wire and third-rail systems usually use the running rails as the return conductor, but some systems use
4292-410: Is that the power-wasting resistors used in DC locomotives for speed control were not needed in an AC locomotive: multiple taps on the transformer can supply a range of voltages. Separate low-voltage transformer windings supply lighting and the motors driving auxiliary machinery. More recently, the development of very high power semiconductors has caused the classic DC motor to be largely replaced with
4408-834: Is the countrywide system. 3 kV DC is used in Belgium, Italy, Spain, Poland, Slovakia, Slovenia, South Africa, Chile, the northern portion of the Czech Republic, the former republics of the Soviet Union , and in the Netherlands on a few kilometers between Maastricht and Belgium. It was formerly used by the Milwaukee Road from Harlowton, Montana , to Seattle, across the Continental Divide and including extensive branch and loop lines in Montana, and by
4524-580: Is the development of powering trains and locomotives using electricity instead of diesel or steam power . The history of railway electrification dates back to the late 19th century when the first electric tramways were introduced in cities like Berlin , London , and New York City . In 1881, the first permanent railway electrification in the world was the Gross-Lichterfelde Tramway in Berlin , Germany. Overhead line electrification
4640-649: Is the use of electric power for the propulsion of rail transport . Electric railways use either electric locomotives (hauling passengers or freight in separate cars), electric multiple units ( passenger cars with their own motors) or both. Electricity is typically generated in large and relatively efficient generating stations , transmitted to the railway network and distributed to the trains. Some electric railways have their own dedicated generating stations and transmission lines , but most purchase power from an electric utility . The railway usually provides its own distribution lines, switches, and transformers . Power
4756-838: Is used on some narrow-gauge lines in Japan. On "French system" HSLs, the overhead line and a "sleeper" feeder line each carry 25 kV in relation to the rails, but in opposite phase so they are at 50 kV from each other; autotransformers equalize the tension at regular intervals. Various railway electrification systems in the late nineteenth and twentieth centuries utilised three-phase , rather than single-phase electric power delivery due to ease of design of both power supply and locomotives. These systems could either use standard network frequency and three power cables, or reduced frequency, which allowed for return-phase line to be third rail, rather than an additional overhead wire. The majority of modern electrification systems take AC energy from
SBB-CFF-FFS RAe TEE II - Misplaced Pages Continue
4872-1029: Is used only on the Gornergrat Railway and Jungfrau Railway in Switzerland, the Petit train de la Rhune in France, and the Corcovado Rack Railway in Brazil. Until 1976, it was widely used in Italy. On these railways, the two conductors are used for two different phases of the three-phase AC, while the rail was used for the third phase. The neutral was not used. Some three-phase AC railways used three overhead wires. These were an experimental railway line of Siemens in Berlin-Lichtenberg in 1898 (length 1.8 kilometres (1.1 mi)),
4988-757: The Gottardo , which ran as a Trans Europ Express for the very last time on 24 September 1988, from Milano to Zürich. After their use on TEE services ended, the RAe TEE II sets were converted in 1988–90 to two-class trains, redesignated type RABe EC , repainted from red-and-cream to two-tone grey, and put into use on EuroCity services from Zürich to Milano (the EC Gottardo and EC Manzoni ) and Geneva or Lausanne to Milano (the EC Cisalpin , EC Lemano , and EC Lutetia ), as well as in non-EC service between Bern and Frasne , France. Their new livery earned them
5104-656: The Delaware, Lackawanna and Western Railroad (now New Jersey Transit , converted to 25 kV AC) in the United States, and the Kolkata suburban railway (Bardhaman Main Line) in India, before it was converted to 25 kV 50 Hz. DC voltages between 600 V and 750 V are used by most tramways and trolleybus networks, as well as some metro systems as the traction motors accept this voltage without
5220-647: The HSL-Zuid and Betuwelijn , and 3,000 V south of Maastricht . In Portugal, it is used in the Cascais Line and in Denmark on the suburban S-train system (1650 V DC). In the United Kingdom, 1,500 V DC was used in 1954 for the Woodhead trans-Pennine route (now closed); the system used regenerative braking , allowing for transfer of energy between climbing and descending trains on
5336-648: The Innovia ART system. While part of the SkyTrain network, the Canada Line does not use this system and instead uses more traditional motors attached to the wheels and third-rail electrification. A few lines of the Paris Métro in France operate on a four-rail power system. The trains move on rubber tyres which roll on a pair of narrow roll ways made of steel and, in some places, of concrete . Since
5452-636: The Southern Railway serving Coulsdon North and Sutton railway station . The lines were electrified at 6.7 kV 25 Hz. It was announced in 1926 that all lines were to be converted to DC third rail and the last overhead-powered electric service ran in September 1929. AC power is used at 60 Hz in North America (excluding the aforementioned 25 Hz network), western Japan, South Korea and Taiwan; and at 50 Hz in
5568-461: The United States , the New York, New Haven and Hartford Railroad was one of the first major railways to be electrified. Railway electrification continued to expand throughout the 20th century, with technological improvements and the development of high-speed trains and commuters . Today, many countries have extensive electrified railway networks with 375 000 km of standard lines in
5684-463: The tram or trolleybus must temporarily reduce the power draw before the trolley pole passes through, to prevent arc damage to the insulator. Pantograph-equipped locomotives must not run through a section break when one side is de-energized. The locomotive would become trapped, but as it passes the section break the pantograph briefly shorts the two catenary lines. If the opposite line is de-energized, this voltage transient may trip supply breakers. If
5800-504: The 1500 V DC overhead of the railway and the 650 V DC of the trams, called a Tram Square. Several such crossings have been grade separated in recent years as part of the Level Crossing Removal Project . Athens has two crossings of tram and trolleybus wires, at Vas. Amalias Avenue and Vas. Olgas Avenue, and at Ardittou Street and Athanasiou Diakou Street. They use the above-mentioned solution. In Rome , at
5916-521: The Hell's Gate Bridge boundary between Amtrak and Metro North 's electrifications) that would never be in-phase. Since a dead section is always dead, no special signal aspect was developed to warn drivers of its presence, and a metal sign with "DS" in drilled-hole letters was hung from the catenary supports. Occasionally gaps may be present in the overhead lines, when switching from one voltage to another or to provide clearance for ships at moveable bridges, as
SECTION 50
#17327809670496032-717: The Netherlands, New Zealand ( Wellington ), Singapore (on the North East MRT line ), the United States ( Chicago area on the Metra Electric district and the South Shore Line interurban line and Link light rail in Seattle , Washington). In Slovakia, there are two narrow-gauge lines in the High Tatras (one a cog railway ). In the Netherlands it is used on the main system, alongside 25 kV on
6148-745: The UK, the London, Brighton and South Coast Railway pioneered overhead electrification of its suburban lines in London, London Bridge to Victoria being opened to traffic on 1 December 1909. Victoria to Crystal Palace via Balham and West Norwood opened in May 1911. Peckham Rye to West Norwood opened in June 1912. Further extensions were not made owing to the First World War. Two lines opened in 1925 under
6264-494: The ability to pull freight at higher speed over gradients; in mixed traffic conditions this increases capacity when the time between trains can be decreased. The higher power of electric locomotives and an electrification can also be a cheaper alternative to a new and less steep railway if train weights are to be increased on a system. On the other hand, electrification may not be suitable for lines with low frequency of traffic, because lower running cost of trains may be outweighed by
6380-516: The advantages of raising the voltage is that, to transmit certain level of power, lower current is necessary ( P = V × I ). Lowering the current reduces the ohmic losses and allows for less bulky, lighter overhead line equipment and more spacing between traction substations, while maintaining power capacity of the system. On the other hand, the higher voltage requires larger isolation gaps, requiring some elements of infrastructure to be larger. The standard-frequency AC system may introduce imbalance to
6496-493: The arc either bridging the insulators into a section made dead for maintenance, a section fed from a different phase, or setting up a Backdoor connection between different parts of the country's national grid. On the Pennsylvania Railroad , phase breaks were indicated by a position light signal face with all eight radial positions with lenses and no center light. When the phase break was active (the catenary sections out of phase), all lights were lit. The position light signal aspect
6612-612: The contact wire, cold drawn solid copper was used to ensure good conductivity . The wire is not round but has grooves at the sides to allow the hangers to attach to it. Sizes were (in cross-sectional area) 85, 100, or 150 mm . To make the wire stronger, 0.04% tin might be added. The wire must resist the heat generated by arcing and thus such wires should never be spliced by thermal means. The messenger (or catenary) wire needs to be both strong and have good conductivity. They used multi-strand wires (or cables) with 19 strands in each cable (or wire). Copper, aluminum, and/or steel were used for
6728-476: The controller into neutral and coast through. Trolleybus drivers had to either lift off the accelerator or switch to auxiliary power. In Melbourne , Victoria, tram drivers put the controller into neutral and coast through section insulators, indicated by insulator markings between the rails. Melbourne has several remaining level crossings between electrified suburban railways and tram lines. They have mechanical switching arrangements (changeover switch) to switch
6844-526: The crossing between Viale Regina Margherita and Via Nomentana, tram and trolleybus lines cross: tram on Viale Regina Margherita and trolleybus on Via Nomentana. The crossing is orthogonal, therefore the typical arrangement was not available. In Milan , most tram lines cross its circular trolleybus line once or twice. Trolleybus and tram wires run parallel in streets such as viale Stelvio, viale Umbria and viale Tibaldi. Some railways used two or three overhead lines, usually to carry three-phase current. This
6960-410: The distance they could transmit power. However, in the early 20th century, alternating current (AC) power systems were developed, which allowed for more efficient power transmission over longer distances. In the 1920s and 1930s, many countries worldwide began to electrify their railways. In Europe, Switzerland , Sweden , France , and Italy were among the early adopters of railway electrification. In
7076-448: The electrification. Electric vehicles, especially locomotives, lose power when traversing gaps in the supply, such as phase change gaps in overhead systems, and gaps over points in third rail systems. These become a nuisance if the locomotive stops with its collector on a dead gap, in which case there is no power to restart. This is less of a problem in trains consisting of two or more multiple units coupled together, since in that case if
SECTION 60
#17327809670497192-404: The end of funding. Most electrification systems use overhead wires, but third rail is an option up to 1,500 V. Third rail systems almost exclusively use DC distribution. The use of AC is usually not feasible due to the dimensions of a third rail being physically very large compared with the skin depth that AC penetrates to 0.3 millimetres or 0.012 inches in a steel rail. This effect makes
7308-591: The experiment was curtailed. In 1970 the Ural Electromechanical Institute of Railway Engineers carried out calculations for railway electrification at 12 kV DC , showing that the equivalent loss levels for a 25 kV AC system could be achieved with DC voltage between 11 and 16 kV. In the 1980s and 1990s 12 kV DC was being tested on the October Railway near Leningrad (now Petersburg ). The experiments ended in 1995 due to
7424-500: The fact that electrification often goes hand in hand with a general infrastructure and rolling stock overhaul / replacement, which leads to better service quality (in a way that theoretically could also be achieved by doing similar upgrades yet without electrification). Whatever the causes of the sparks effect, it is well established for numerous routes that have electrified over decades. This also applies when bus routes with diesel buses are replaced by trolleybuses. The overhead wires make
7540-468: The following services: The trains ran in a 4-day circulation: From 30 May 1965, the southbound Gottardo started from Basel, but nevertheless the northbound train still terminated in Zürich. This led to an empty run (every fourth day for any given trainset) from Zürich to Basel. From 30 September 1979, this section was only served on weekdays, and on 23 May 1982 it was withdrawn entirely. During
7656-1012: The general power grid. This is especially useful in mountainous areas where heavily loaded trains must descend long grades. Central station electricity can often be generated with higher efficiency than a mobile engine/generator. While the efficiency of power plant generation and diesel locomotive generation are roughly the same in the nominal regime, diesel motors decrease in efficiency in non-nominal regimes at low power while if an electric power plant needs to generate less power it will shut down its least efficient generators, thereby increasing efficiency. The electric train can save energy (as compared to diesel) by regenerative braking and by not needing to consume energy by idling as diesel locomotives do when stopped or coasting. However, electric rolling stock may run cooling blowers when stopped or coasting, thus consuming energy. Large fossil fuel power stations operate at high efficiency, and can be used for district heating or to produce district cooling , leading to
7772-411: The high cost of the electrification infrastructure. Therefore, most long-distance lines in developing or sparsely populated countries are not electrified due to relatively low frequency of trains. Network effects are a large factor with electrification. When converting lines to electric, the connections with other lines must be considered. Some electrifications have subsequently been removed because of
7888-451: The line is under maintenance, an injury may occur as the catenary is suddenly energized. Even if the catenary is properly grounded to protect the personnel, the arc generated across the pantograph can damage the pantograph, the catenary insulator or both. Sometimes on a larger electrified railway, tramway or trolleybus system, it is necessary to power different areas of track from different power grids, without guaranteeing synchronisation of
8004-497: The losses (saving 2 GWh per year per 100 route-km; equalling about €150,000 p.a.). The line chosen is one of the lines, totalling 6000 km, that are in need of renewal. In the 1960s the Soviets experimented with boosting the overhead voltage from 3 to 6 kV. DC rolling stock was equipped with ignitron -based converters to lower the supply voltage to 3 kV. The converters turned out to be unreliable and
8120-422: The maximum power that can be transmitted, also can be responsible for electrochemical corrosion due to stray DC currents. Electric trains need not carry the weight of prime movers , transmission and fuel. This is partly offset by the weight of electrical equipment. Regenerative braking returns power to the electrification system so that it may be used elsewhere, by other trains on the same system or returned to
8236-482: The military railway between Marienfelde and Zossen between 1901 and 1904 (length 23.4 kilometres (14.5 mi)) and an 800-metre (2,600 ft)-long section of a coal railway near Cologne between 1940 and 1949. On DC systems, bipolar overhead lines were sometimes used to avoid galvanic corrosion of metallic parts near the railway, such as on the Chemin de fer de la Mure . All systems with multiple overhead lines have
8352-409: The natural path of a wire strung between two points, a catenary curve , thus the use of "catenary" to describe this wire or sometimes the whole system. This wire is attached to the contact wire at regular intervals by vertical wires known as "droppers" or "drop wires". It is supported regularly at structures, by a pulley , link or clamp . The whole system is then subjected to mechanical tension . As
8468-402: The need for overhead wires between those stations. Maintenance costs of the lines may be increased by electrification, but many systems claim lower costs due to reduced wear-and-tear on the track from lighter rolling stock. There are some additional maintenance costs associated with the electrical equipment around the track, such as power sub-stations and the catenary wire itself, but, if there
8584-782: The nickname "souris gris" (or "graue Maus" in German ), meaning "grey mouse". In May 1993, the RABe sets were taken off of the Simplon railway line service (Lausanne to Milano) and the freed-up trainsets redeployed on a then-new Zürich to Stuttgart service (the EC Killesberg and EC Uetliberg ). The RABe sets were removed from EuroCity service in August 1994, after the derailment of one set on 22 July 1994 – initially an indefinite suspension of their use any services, which
8700-402: The overhead conductor rail that runs across the entire span of the swing bridge. The gap is required for the swing bridge to be opened and closed. To connect the conductor rails together when the bridge is closed, there is another conductor rail section called "rotary overlap" that is equipped with a motor. When the bridge is fully closed, the motor of the rotary overlap is operated to turn it from
8816-435: The overhead line is limited due to the change in the height of the weights as the overhead line expands and contracts with temperature changes. This movement is proportional to the distance between anchors. Tension length has a maximum. For most 25 kV OHL equipment in the UK, the maximum tension length is 1,970 m (6,460 ft). An additional issue with AT equipment is that, if balance weights are attached to both ends,
8932-455: The pantograph as the train travels around the curve. The movement of the contact wire across the head of the pantograph is called the "sweep". The zigzagging of the overhead line is not required for trolley poles. For tramways , a contact wire without a messenger wire is used. Depot areas tend to have only a single wire and are known as "simple equipment" or "trolley wire". When overhead line systems were first conceived, good current collection
9048-457: The pantograph causes mechanical oscillations in the wire. The waves must travel faster than the train to avoid producing standing waves , which could break the wire. Tensioning the line makes waves travel faster, and also reduces sag from gravity. For medium and high speeds, the wires are generally tensioned by weights or occasionally by hydraulic tensioners. Either method is known as "auto-tensioning" (AT) or "constant tension" and ensures that
9164-411: The pantograph moves along under the contact wire, the carbon insert on top of the pantograph becomes worn with time. On straight track, the contact wire is zigzagged slightly to the left and right of the centre from each support to the next so that the insert wears evenly, thus preventing any notches. On curves, the "straight" wire between the supports causes the contact point to cross over the surface of
9280-505: The phase separation between the electrified sections powered from different phases, whereas high voltage would make the transmission more efficient. UIC conducted a case study for the conversion of the Bordeaux-Hendaye railway line (France), currently electrified at 1.5 kV DC, to 9 kV DC and found that the conversion would allow to use less bulky overhead wires (saving €20 million per 100 route-km) and lower
9396-424: The phases. Long lines may be connected to the country's national grid at various points and different phases. (Sometimes the sections are powered with different voltages or frequencies.) The grids may be synchronised on a normal basis, but events may interrupt synchronisation. This is not a problem for DC systems. AC systems have a particular safety implication in that the railway electrification system would act as
9512-508: The problem by insulating the running rails from the current return should there be a leakage through the running rails. The Expo and Millennium Line of the Vancouver SkyTrain use side-contact fourth-rail systems for their 650 V DC supply. Both are located to the side of the train, as the space between the running rails is occupied by an aluminum plate, as part of stator of the linear induction propulsion system used on
9628-519: The reactive upward pull of the tensioned wires lift the pulley so its teeth are well clear of a stop on the mast. The pulley can turn freely while the weights move up or down as the wires contract or expand. If tension is lost the pulley falls back toward the mast, and one of its teeth jams against the stop. This stops further rotation, limits the damage, and keeps the undamaged part of the wire intact until it can be repaired. Other systems use various braking mechanisms, usually with multiple smaller pulleys in
9744-465: The resistance per unit length unacceptably high compared with the use of DC. Third rail is more compact than overhead wires and can be used in smaller-diameter tunnels, an important factor for subway systems. The London Underground in England is one of few networks that uses a four-rail system. The additional rail carries the electrical return that, on third-rail and overhead networks, is provided by
9860-570: The revenue obtained for freight and passenger traffic. Different systems are used for urban and intercity areas; some electric locomotives can switch to different supply voltages to allow flexibility in operation. Six of the most commonly used voltages have been selected for European and international standardisation. Some of these are independent of the contact system used, so that, for example, 750 V DC may be used with either third rail or overhead lines. There are many other voltage systems used for railway electrification systems around
9976-498: The running rails. On the London Underground, a top-contact third rail is beside the track, energized at +420 V DC , and a top-contact fourth rail is located centrally between the running rails at −210 V DC , which combine to provide a traction voltage of 630 V DC . The same system was used for Milan 's earliest underground line, Milan Metro 's line 1 , whose more recent lines use an overhead catenary or
10092-467: The same task: converting and transporting high-voltage AC from the power grid to low-voltage DC in the locomotive. The difference between AC and DC electrification systems lies in where the AC is converted to DC: at the substation or on the train. Energy efficiency and infrastructure costs determine which of these is used on a network, although this is often fixed due to pre-existing electrification systems. Both
10208-537: The service "visible" even in no bus is running and the existence of the infrastructure gives some long-term expectations of the line being in operation. Due to the height restriction imposed by the overhead wires, double-stacked container trains have been traditionally difficult and rare to operate under electrified lines. However, this limitation is being overcome by railways in India, China and African countries by laying new tracks with increased catenary height. Overhead line An overhead line or overhead wire
10324-569: The steep approaches to the tunnel. The system was also used for suburban electrification in East London and Manchester , now converted to 25 kV AC. It is now only used for the Tyne and Wear Metro . In India, 1,500 V DC was the first electrification system launched in 1925 in Mumbai area. Between 2012 and 2016, the electrification was converted to 25 kV 50 Hz, which
10440-420: The stiffness of the spring for ease of maintenance. For low speeds and in tunnels where temperatures are constant, fixed termination (FT) equipment may be used, with the wires terminated directly on structures at each end of the overhead line. The tension is generally about 10 kN (2,200 lbf). This type of equipment sags in hot conditions and is taut in cold conditions. With AT, the continuous length of
10556-488: The strands. All 19 strands could be made of the same metal or a mix of metals based on the required properties. For example, steel wires were used for strength, while aluminium or copper wires were used for conductivity. Another type looked like it had all copper wires but inside each wire was a steel core for strength. The steel strands were galvanized but for better corrosion protection they could be coated with an anti-corrosion substance. In Slovenia , where 3 kV system
10672-650: The summers of 1974–1979 the Gottardo was extended from Milano to Genova (in both directions). In 1974, the Cisalpin was converted to a locomotive-hauled train and the Ticino was discontinued, freeing up RAe sets for the following two TEE trains: The last TEE Edelweiss ran on 26 May 1979, and the TEE Iris on 30 May 1981. The last international TEE until 1993—and the last TEE anywhere to use RAe TEE II trainsets—was
10788-443: The supply grid, requiring careful planning and design (as at each substation power is drawn from two out of three phases). The low-frequency AC system may be powered by separate generation and distribution network or a network of converter substations, adding the expense, also low-frequency transformers, used both at the substations and on the rolling stock, are particularly bulky and heavy. The DC system, apart from being limited as to
10904-514: The tension is virtually independent of temperature. Tensions are typically between 9 and 20 kN (2,000 and 4,500 lbf ) per wire. Where weights are used, they slide up and down on a rod or tube attached to the mast, to prevent them from swaying. Recently, spring tensioners have started to be used. These devices contain a torsional spring with a cam arrangement to ensure a constant applied tension (instead of varying proportionally with extension). Some devices also include mechanisms for adjusting
11020-694: The three-phase induction motor fed by a variable frequency drive , a special inverter that varies both frequency and voltage to control motor speed. These drives can run equally well on DC or AC of any frequency, and many modern electric locomotives are designed to handle different supply voltages and frequencies to simplify cross-border operation. Five European countries – Germany, Austria, Switzerland, Norway and Sweden – have standardized on 15 kV 16 + 2 ⁄ 3 Hz (the 50 Hz mains frequency divided by three) single-phase AC. On 16 October 1995, Germany, Austria and Switzerland changed from 16 + 2 ⁄ 3 Hz to 16.7 Hz which
11136-575: The through traffic to non-electrified lines. If through traffic is to have any benefit, time-consuming engine switches must occur to make such connections or expensive dual mode engines must be used. This is mostly an issue for long-distance trips, but many lines come to be dominated by through traffic from long-haul freight trains (usually running coal, ore, or containers to or from ports). In theory, these trains could enjoy dramatic savings through electrification, but it can be too costly to extend electrification to isolated areas, and unless an entire network
11252-494: The train or tram and back to the feeder station through the steel wheels on one or both running rails. Non-electric locomotives (such as diesels ) may pass along these tracks without affecting the overhead line, although there may be difficulties with overhead clearance . Alternative electrical power transmission schemes for trains include third rail , ground-level power supply , batteries and electromagnetic induction . Vehicles like buses that have rubber tyres cannot provide
11368-466: The train stops with one collector in a dead gap, another multiple unit can push or pull the disconnected unit until it can again draw power. The same applies to the kind of push-pull trains which have a locomotive at each end. Power gaps can be overcome in single-collector trains by on-board batteries or motor-flywheel-generator systems. In 2014, progress is being made in the use of large capacitors to power electric vehicles between stations, and so avoid
11484-713: The train's kinetic energy back into electricity and returns it to the supply system to be used by other trains or the general utility grid. While diesel locomotives burn petroleum products, electricity can be generated from diverse sources, including renewable energy . Historically, concerns of resource independence have played a role in the decision to electrify railway lines. The landlocked Swiss confederation which almost completely lacks oil or coal deposits but has plentiful hydropower electrified its network in part in reaction to supply issues during both World Wars. Disadvantages of electric traction include: high capital costs that may be uneconomic on lightly trafficked routes,
11600-470: The tram wire. The tram's pantograph bridges the gap between the different conductors, providing it with a continuous pickup. Where the tram wire crosses, the trolleybus wires are protected by an inverted trough of insulating material extending 20 or 30 mm (0.79 or 1.18 in) below. Until 1946, a level crossing in Stockholm , Sweden connected the railway south of Stockholm Central Station and
11716-413: The transmission and conversion of electric energy involve losses: ohmic losses in wires and power electronics, magnetic field losses in transformers and smoothing reactors (inductors). Power conversion for a DC system takes place mainly in a railway substation where large, heavy, and more efficient hardware can be used as compared to an AC system where conversion takes place aboard the locomotive where space
11832-444: The trolleybus wires must be insulated from tram wires. This is usually done by the trolleybus wires running continuously through the crossing, with the tram conductors a few centimetres lower. Close to the junction on each side, the tram wire turns into a solid bar running parallel to the trolleybus wires for about half a metre. Another bar similarly angled at its ends is hung between the trolleybus wires, electrically connected above to
11948-470: The tyres do not conduct the return current, the two guide bars provided outside the running ' roll ways ' become, in a sense, a third and fourth rail which each provide 750 V DC , so at least electrically it is a four-rail system. Each wheel set of a powered bogie carries one traction motor . A side sliding (side running) contact shoe picks up the current from the vertical face of each guide bar. The return of each traction motor, as well as each wagon ,
12064-406: The upper lobe of the contact wire. These grooves vary in number and location on the arc of the upper section. Copper is chosen for its excellent conductivity, with other metals added to increase tensile strength. The choice of material is chosen based on the needs of the particular system, balancing the need for conductivity and tensile strength. Catenary wires are kept in mechanical tension because
12180-432: The voltage, the lower the current for the same power (because power is current multiplied by voltage), and power loss is proportional to the current squared. The lower current reduces line loss, thus allowing higher power to be delivered. As alternating current is used with high voltages. Inside the locomotive, a transformer steps the voltage down for use by the traction motors and auxiliary loads. An early advantage of AC
12296-405: The weight of an on-board transformer. Increasing availability of high-voltage semiconductors may allow the use of higher and more efficient DC voltages that heretofore have only been practical with AC. The use of medium-voltage DC electrification (MVDC) would solve some of the issues associated with standard-frequency AC electrification systems, especially possible supply grid load imbalance and
12412-499: The whole tension length is free to move along the track. To avoid this a midpoint anchor (MPA), close to the centre of the tension length, restricts movement of the messenger/catenary wire by anchoring it; the contact wire and its suspension hangers can move only within the constraints of the MPA. MPAs are sometimes fixed to low bridges, or otherwise anchored to vertical catenary poles or portal catenary supports. A tension length can be seen as
12528-532: The world, and the list of railway electrification systems covers both standard voltage and non-standard voltage systems. The permissible range of voltages allowed for the standardised voltages is as stated in standards BS EN 50163 and IEC 60850. These take into account the number of trains drawing current and their distance from the substation. 1,500 V DC is used in Japan, Indonesia, Hong Kong (parts), Ireland, Australia (parts), France (also using 25 kV 50 Hz AC ) ,
12644-534: The world, including China , India , Japan , France , Germany , and the United Kingdom . Electrification is seen as a more sustainable and environmentally friendly alternative to diesel or steam power and is an important part of many countries' transportation infrastructure. Electrification systems are classified by three main parameters: Selection of an electrification system is based on economics of energy supply, maintenance, and capital cost compared to
12760-437: Was exacerbated because the return current also had a tendency to flow through nearby iron pipes forming the water and gas mains. Some of these, particularly Victorian mains that predated London's underground railways, were not constructed to carry currents and had no adequate electrical bonding between pipe segments. The four-rail system solves the problem. Although the supply has an artificially created earth point, this connection
12876-553: Was first applied successfully by Frank Sprague in Richmond, Virginia in 1887-1888, and led to the electrification of hundreds of additional street railway systems by the early 1890s. The first electrification of a mainline railway was the Baltimore and Ohio Railroad's Baltimore Belt Line in the United States in 1895–96. The early electrification of railways used direct current (DC) power systems, which were limited in terms of
12992-854: Was later made a permanent withdrawal from use on EC services. Thereafter, they were employed only on two pairs of daily IC trains operating between Bern and Frasne, which was continuing in early 1996. The last three active sets were retired from regular service altogether in November 1999. One of the five RAe TEE II trainsets, No. 1053, has been preserved, and in 2003 it was restored by the SBB Historic foundation to red-and-cream TEE livery. In 2012–13, it received updates to allow it to continue to be operated. Its interior configuration remained unchanged from its circa 1989 conversion to RABe class. This article uses material from German Misplaced Pages. Railway electrification system Railway electrification
13108-729: Was originally devised by the Pennsylvania Railroad and was continued by Amtrak and adopted by Metro North . Metal signs were hung from the catenary supports with the letters "PB" created by a pattern of drilled holes. A special category of phase break was developed in America, primarily by the Pennsylvania Railroad. Since its traction power network was centrally supplied and only segmented by abnormal conditions, normal phase breaks were generally not active. Phase breaks that were always activated were known as "Dead Sections": they were often used to separate power systems (for example,
13224-429: Was possible only at low speeds, using a single wire. To enable higher speeds, two additional types of equipment were developed: Earlier dropper wires provided physical support of the contact wire without joining the catenary and contact wires electrically. Modern systems use current-carrying droppers, eliminating the need for separate wires. The present transmission system originated about 100 years ago. A simpler system
13340-488: Was proposed in the 1970s by the Pirelli Construction Company, consisting of a single wire embedded at each support for 2.5 metres (8 ft 2 in) of its length in a clipped, extruded aluminum beam with the wire contact face exposed. A somewhat higher tension than used before clipping the beam yielded a deflected profile for the wire that could be easily handled at 400 km/h (250 mph) by
13456-468: Was used, with the brass contact running inside the groove. When the overhead line was raised in the Simplon Tunnel to accommodate taller rolling stock, a rail was used. A rigid overhead rail may also be used in places where tensioning the wires is impractical, for example on moveable bridges . In modern uses, it is very common for underground sections of trams, metros, and mainline railways to use
#48951