The Wipp Valley ( German : Wipptal ) is an Alpine valley in Tyrol , Austria and in South Tyrol , Italy, running between Innsbruck and Franzensfeste . The Brenner Pass (1,374 m) at the Austro-Italian border divides it into the northern, Austrian Lower Wipp Valley ( Unteres Wipptal ) and the southern, Italian Upper Wipp Valley ( Oberes Wipptal ). The Lower Wipp Valley extends along the Sill River southward from Innsbruck , where the Sill meets the larger Inn River , up to the Brenner Pass. South of the border, the Upper Wipp Valley stretches along the Eisack River by way of Sterzing to Franzensfeste . It forms the Wipptal District of the province of South Tyrol.
78-762: The Brenner Autobahn (motorway) (A13 in Austria, A22 in Italy) passes through the valley, beginning with the Europa Bridge near Innsbruck. It is an important road connection across the Alps, forming part of the connection between Munich and Verona . The inhabitants of the Wipp Valley have been complaining for years about the volume of traffic. The Brenner railway also runs through the valley. The proposed Brenner Base Tunnel would remove all long-distance trains from
156-405: A filling station , charging station , lavatories, toilets, and baby changes. Most rest areas also have restaurants, shops, public telephones, Internet access, and a playground. Some have hotels. Mandated every 50 kilometres (31 mi) or so, rest areas are usually open all night. Both kinds of rest areas are directly on the autobahn, with their own exits, and any service roads connecting them to
234-476: A 20% plunge in sales, which they attributed in part to the lowered speed limits. The 100 km/h limit championed by Transportation Minister Lauritz Lauritzen lasted 111 days. Adjacent nations with unlimited speed autobahns, Austria and Switzerland, imposed permanent 130 km/h (81 mph) limits after the crisis. However, after the crisis eased in 1974, the upper house of the German parliament , which
312-601: A centre median like modern motorways, but instead was termed a Kraftfahrstraße ("motor vehicle road") with two lanes each direction without intersections, pedestrians, bicycles, or animal-powered transportation. Just days after the 1933 Nazi takeover, Adolf Hitler enthusiastically embraced an ambitious autobahn construction project, appointing Fritz Todt , the Inspector General of German Road Construction, to lead it. By 1936, 130,000 workers were directly employed in construction, as well as an additional 270,000 in
390-466: A garrison. In 1763, Pirmasens was granted city rights by Ludwig IX, who stayed in his small residence even after taking office in Hesse-Darmstadt after his father's death in 1768. The garrison was continuously expanded, a town hall, two churches and a large exercise hall were erected. Residence and garrison abruptly ended with the landgrave's death in 1790. In 1793, Pirmasens was the location of
468-470: A general speed limit. In the mid-1980s, acid rain and sudden forest destruction renewed debate on whether or not a general speed limit should be imposed on autobahns. A car's fuel consumption increases with high speed, and fuel conservation is a key factor in reducing air pollution. Environmentalists argued that enforcing limits of 100 km/h (62 mph) limit on autobahns and 80 km/h (50 mph) on other rural roads would save lives as well as
546-637: A historical association with war-time restrictions and deprivations, the Nazi era, and the Soviet era in East Germany. After the Nazi dictatorship, German society was happy to overcome the traumas of war by freeing itself from most government restrictions, prohibitions and regulations. "Free driving for free citizens" ("freie Fahrt für freie Bürger"), a slogan promoted by the German Auto Club since
624-475: A lot of rules that corresponded with the international standards of the time. The reasons for this speed limit are unknown. Oftentimes it is argued that the roads were in a poor state, however, there is no proof that the road conditions were a relevant factor in introducing the speed limit, especially since the roads were not much used in the first 20 years after the Second World War and the majority of
702-562: A mandatory limit, deciding the modest measured emission reduction would have no meaningful effect on forest loss. By 1987, all restrictions on test sections had been removed, even in Hesse where the state government was controlled by a "red-green" coalition . Prior to German reunification in 1990, eastern German states focused on restrictive traffic regulation such as a 100 km/h (62 mph) autobahn speed limit and of 80 km/h (50 mph) on other rural roads. Within two years after
780-435: A maximum design speed of 62 km/h (39 mph) (usually denoted by a round black-on-white sign with "62" on it), along with flashing orange beacons to warn approaching cars that they are travelling slowly. There is no general minimum speed but drivers are not allowed to drive at an unnecessarily low speed as this would lead to significant traffic disturbance and an increased collision risk. German national speed limits have
858-495: A part of the German highway system; the plots of land are federal property. Autobahn exits leading to such parking areas are marked at least 200 metres (660 ft) (mostly 500 metres (1,600 ft)) in advance with a blue sign with the white letter "P". They are usually found every few kilometres. Some of them bear local or historic names. A managed rest area (German: Autobahnraststätte or Raststätte ( German: [ˈʁastˌʃtɛtə] ) for short) usually also includes
SECTION 10
#1732772153350936-467: A planned 20,000 km (12,000 mi) of autobahn had been completed. Meanwhile, the median strips of some autobahns were paved over to allow their conversion into auxiliary airstrips . Aircraft were either stashed in numerous tunnels or camouflaged in nearby woods. However, for the most part during the war, the autobahns were not militarily significant. Motor vehicles, such as trucks, could not carry goods or troops as quickly or in as much bulk and in
1014-420: A speed limit of 120 km/h (75 mph) in order to reduce noise pollution during overnight hours (usually 10 pm – 6 am) or because of increased traffic during daytime (6 am – 8 pm). Some limits were imposed to reduce pollution and noise. Limits can also be temporarily put into place through dynamic traffic guidance systems that display the corresponding message. More than half of
1092-635: A total length of about 13,192 kilometres (8,197 mi) in 2021 ), and a density of 36 motorway kilometres per thousand square kilometers (Eurostat) which ranks it among the densest and longest controlled-access systems in the world, and fifth in density within the EU in 2016 (Netherlands 66, Finland 3). Longer similar systems can be found in the United States (77,960 kilometres (48,440 mi)) and in China (149,600 kilometres (93,000 mi)). However both
1170-695: A treaty signed in 1606, it was agreed that Bitsch would revert to Lorraine and Hanau-Lichtenberg would retain Lemberg. This corresponded approximately to the religious realities of the territories. Since then, Pirmasens was part of the Amt Lemberg in the County of Hanau-Lichtenberg . Before the Thirty Years War , Pirmasens had 59 families and about 235 inhabitants resident, whereas in Lemberg were counted 54 families (about 215 people). When counting it
1248-630: Is Strecke 46 [ de ] between Bad Brückenau and Gemünden am Main on the Fulda-Würzburg route, which was replaced by A7 . The autobahns of East Germany (GDR) were neglected in comparison to those in West Germany after 1945. In 1956, the speed limit was set to 100 kilometres per hour (62 mph) in the new version of the Rules of the Road (Straßenverkehrsordnung), which adopted
1326-551: Is 36 kilometers per thousand square kilometer in 2016, close to that of the smaller countries nearby (Netherlands, Belgium, Luxembourg, Switzerland, Slovenia). About 17,000 emergency telephones are distributed at regular intervals all along the autobahn network, with triangular stickers on the armco barriers pointing the way to the nearest one. Despite the increasing use of mobile phones, there are still about 150 calls made each day on average (after some 700 in 2013). This still equals four calls per kilometre each year. The location of
1404-477: Is an independent town in Rhineland-Palatinate , Germany , near the border with France . It was famous for the manufacture of shoes . The surrounding rural district was called Landkreis Pirmasens from 1818 until 1997, when it was renamed to Südwestpfalz . The first mention of "Pirminiseusna", a colony of Hornbach Abbey , dates from 860. The name derives from St. Pirminius , the founder of
1482-489: Is not illegal in the absence of a speed limit, it can cause an increased liability in the case of a collision (which mandatory auto insurance has to cover); courts have ruled that an "ideal driver" who is exempt from absolute liability for "inevitable" tort under the law would not exceed the advisory speed limit. A 2017 report by the Federal Road Research Institute reported that in 2015, 70.4% of
1560-472: Is strongly preferred when the intent is to make specific reference to Germany's Autobahn network. Similar to high-speed motorways in other countries, autobahns have multiple lanes of traffic in each direction, separated by a central barrier with grade-separated junctions and access restricted to motor vehicles with a top speed greater than 60 km/h (37 mph). Nearly all exits are to the right; rare left-hand exits result from incomplete interchanges where
1638-661: Is the federal controlled-access highway system in Germany . The official term is Bundesautobahn (abbreviated BAB ), which translates as 'federal motorway'. The literal meaning of the word Bundesautobahn is 'Federal Auto(mobile) Track'. Much of the system has no speed limit for some classes of vehicles. However, limits are posted and enforced in areas that are urbanised, substandard, accident-prone, or under construction. On speed-unrestricted stretches, an advisory speed limit ( Richtgeschwindigkeit ) of 130 kilometres per hour (81 mph) applies. While driving faster
SECTION 20
#17327721533501716-493: Is the isolated and abandoned twin-carriageway Borovsko Bridge southeast of Prague, on which construction started in July 1939 and halted after the assassination of Reinhard Heydrich by former Czechoslovak army soldiers at the end of May 1942. As of 2021 , Germany's autobahn network has a total length of about 13,192 kilometres (8,197 mi). From 2009 Germany has embarked on a massive widening and rehabilitation project, expanding
1794-537: The A ;555 from Cologne to Bonn) that usually have three digits for numbering. The first digit used is similar to the system above, depending on the region. East–west routes are even-numbered, north–south routes are odd-numbered. The north–south autobahns are generally numbered from west to east; that is to say, the more easterly roads are given higher numbers. Similarly, the east–west routes are numbered from north (lower numbers) to south (higher numbers). The idea for
1872-759: The Battle of Pirmasens between Prussia and the French Corps of the Vosges . The French lost the battle, but their opponents' internal divisions nevertheless enabled them to return and occupy Pirmasens by the end of the year: between 1798 and 1814, the town was included in the French département of Mont-Tonnerre ( "Donnersberg-Département" in German). After the French defeat, it was made part of Bavaria together with
1950-545: The County of Bitsch , the Lordship of Ochsenstein and half the Lordship of Lichtenberg (Philip's father had already held the other half). James's older brother, Simon V Wecker, had already died in 1540, also without a male heir. A dispute about the inheritance erupted between the husbands of Ludowika Margaretha and of her cousin Amalie, Philip V of Hanau-Lichtenberg and Philip I of Leiningen-Westerburg, respectively. Formally,
2028-702: The Franco-Dutch War in 1677, the town was burned down again, this time by French troops. During the Nine Years' War , it was sacked by French troops under General de Ezéchiel Mélac , who devastated the Palatinate in 1689. In 1691, only 16 people lived in Pirmasens. At the same time, the part of Lemberg Castle that was still habitable after the Thirty Years' War, was completely destroyed. Thus,
2106-537: The HaFraBa were completed in the late 1930s and early 1940s, but construction eventually was halted by World War II . The first public road of this kind was completed in 1932 between Cologne and Bonn and opened by Konrad Adenauer ( Lord Mayor of Cologne and future Chancellor of West Germany) on 6 August 1932. Today, that road is the Bundesautobahn 555 . This road was not yet called Autobahn and lacked
2184-465: The Raststätten fuel prices are significantly higher. Rest areas and truck stops are marked several times as motorists approach, starting several kilometres in advance, and include large signs that often include icons announcing what kinds of facilities travellers can expect, such as hotels, filling stations, rest areas, etc. Germany's autobahns are famous for being among the few public roads in
2262-527: The Rhenish Palatinate . On 15 March 1945 Pirmasens was captured by US troops, and the following year it became part of the newly established German state Rhineland-Palatinate. During the occupation on Sept. 19, 1945, the Museum of Pirmasens announced that about 50 paintings, which had been stored in the air-raid shelter at Husterhoh School during the war, had been plundered during the arrival of
2340-570: The sixteen States and reported the following, comparing the years 2006 and 2008: Except at construction sites, the general speed limits, where they apply, are usually between 100 km/h (62 mph) and 130 km/h (81 mph); construction sites usually have a speed limit of 80 km/h (50 mph) but the limit may be as low as 60 km/h (37 mph). In rare cases, sections may have limits of 40 km/h (25 mph), or on one ramp 30 km/h (19 mph). Certain stretches have lower speed limits during wet weather. Some areas have
2418-500: The "straight-on" leads into the exit. The earliest motorways were flanked by shoulders about 60 centimetres (24 in) in width, constructed of varying materials; right-hand shoulders on many autobahns were later retrofitted to 120 centimetres (47 in) in width when it was realized cars needed the additional space to pull off the autobahn safely. In the postwar years, a thicker asphaltic concrete cross-section with fully paved hard shoulders came into general use. The top design speed
Wipptal - Misplaced Pages Continue
2496-759: The 1930s, when construction began on the system, the official name was Reichsautobahn . Various other controlled-access highways exist on the federal ( Bundesstraße ), state ( Landesstraße ), district, and municipal level but are not part of the Autobahn network and are officially referred to as Kraftfahrstraße (with rare exceptions, like A 995 Munich-Giesing–Brunntal until 2018). These highways are considered autobahnähnlich (autobahn-like) and are sometimes colloquially called Gelbe Autobahn (yellow autobahn) because most of them are Bundesstraßen (federal highways) with yellow signs. Some controlled-access highways are classified as "Bundesautobahn" in spite of not meeting
2574-672: The 1970s, is a popular slogan among those opposing autobahn speed restrictions. Tarek Al-Wazir , head of the Green Party in Hesse, and currently the Hessian Transport Minister has stated that "the speed limit in Germany has a similar status as the right to bear arms in the American debate . At some point, a speed limit will become reality here, and soon we will not be able to remember the time before. It's like
2652-617: The Autobahn network had only the advisory speed limit, 6.2% had temporary speed limits due to weather or traffic conditions, and 23.4% had permanent speed limits. Measurements from the German state of Brandenburg in 2006 showed average speeds of 142 km/h (88 mph) on a 6-lane section of Autobahn in free-flowing conditions. Only federally built controlled-access highways with certain construction standards including at least two lanes per direction are called Bundesautobahn . They have their own white-on-blue signs and numbering system. In
2730-595: The County of Bitsch and the district of Lemberg were fiefs of the Duchy of Lorraine and such fiefs could only be inherited in the male line. Philip V was initially successful in the dispute with Philip I about Zweibrücken-Bitsch. However, he introduced the Lutheran confession in his newly gained territories in 1572. This upset his powerful Catholic neighbour and liege lord, Duke Charles III of Lorraine . The Duke terminated
2808-719: The Polish S22 expressway from Elbląg (Elbing) to the border with the Russian Kaliningrad Oblast , where it is continued by the R516 regional road. Also on 27 September 1936, a section from Breslau ( Wrocław ) to Liegnitz ( Legnica ) in Silesia was inaugurated, which today is part of the Polish A4 autostrada , followed by the (single vehicle) Reichsautobahn 9 from Bunzlau ( Bolesławiec ) to Sagan ( Żagań )
2886-622: The U.S. and China have an area nearly 30 times bigger than Germany, which demonstrates the high density of Germany's highway system. The first autobahn in Austria was the West Autobahn from Wals near Salzburg to Vienna . Building started by command of Adolf Hitler shortly after the Anschluss in 1938. It extended the Reichsautobahn 26 from Munich (the present-day A 8 ), however only 16.8 km (10.4 mi) including
2964-616: The accident remains one of the highest speeds ever achieved on a public motorway. In the 1930s, a ten-kilometre stretch of what is today Bundesautobahn 9 just south of Dessau —called the Dessauer Rennstrecke —had bridges with no piers and was designed for cars like the Mercedes-Benz T80 to attempt to make land speed records . The T80 was to make a record attempt in January 1940 , but plans were abandoned after
3042-585: The administrative centre of Amt Lemberg was moved to Pirmasens in 1697. This made Pirmasens the most important locality of the region. In 1736, Johann Reinhard III , the last count of Hanau-Lichtenberg, died without male heir and the duchy passed to his grandson, Landgrave Ludwig IX of Hesse-Darmstadt , the son of Countess Charlotte of Hanau-Lichtenberg , sole heir of the county of Hanau Lichtenberg, and Ludwig VIII , Landgrave of Hesse-Darmstadt. Landgrave Ludwig IX took residence in his grandfather's hunting lodge in Pirmasens, Schloss Pirmasens , and established
3120-552: The advisory speed limit is 130 km/h (81 mph), referred to in German as the Richtgeschwindigkeit . The advisory speed is not enforceable; however, being involved in an accident driving at higher speeds can lead to the driver being deemed at least partially responsible due to "increased operating danger" ( Erhöhte Betriebsgefahr ). The Federal Road Research Institute ( Bundesanstalt für Straßenwesen ) solicited information about speed regulations on autobahns from
3198-579: The autobahn are located outside densely populated areas. Vehicles with a top speed less than 60 km/h (37 mph) (such as quads , low-end microcars, and agricultural/construction equipment) are not allowed to use the autobahn, nor are motorcycles and scooters with low engine capacity regardless of top speed (mainly applicable to mopeds which are typically limited to 25 kilometres per hour (16 mph) or 45 kilometres per hour (28 mph) anyway). To comply with this limit, heavy-duty trucks in Germany (e.g. mobile cranes, tank transporters etc.) often have
Wipptal - Misplaced Pages Continue
3276-461: The autobahn construction standard (for example, the A 62 near Pirmasens ). Similar to some other German words, the term autobahn when used in English is usually understood to refer specifically to the national highway system of Germany, whereas in German the word autobahn is applied to any controlled highway in any country. For this reason in German, the more specific term Bundesautobahn
3354-475: The branch-off of the planned Tauern Autobahn was opened to the public on 13 September 1941. Construction works discontinued the next year and were not resumed until 1955. There are sections of the former German Reichsautobahn system in the former eastern territories of Germany , i.e. East Prussia , Farther Pomerania , and Silesia ; these territories became parts of Poland and the Soviet Union with
3432-490: The caller is automatically sent to the operator. For breaks during longer journeys, parking sites, rest areas , and truck stops are distributed over the complete Autobahn network. Parking on the autobahn is prohibited in the strictest terms outside these designated areas. There is a distinction between "managed" and "unmanaged" rest areas. (German: bewirtschaftet / unbewirtschaftet ). Unmanaged rest areas are basically only parking spaces, sometimes with toilets. They form
3510-551: The capital letter A, which simply stands for "Autobahn" followed by a blank and a number (for example A 8 ). The main autobahns going all across Germany have a single-digit number. Shorter autobahns that are of regional importance (e.g. connecting two major cities or regions within Germany) have a double-digit number (e.g. A 24 , connecting Berlin and Hamburg). The system is as follows: There are also some very short autobahns built just for local traffic (e.g. ring roads or
3588-596: The construction of the autobahn was first conceived in the mid-1920s during the days of the Weimar Republic , but the construction was slow, and most projected sections did not progress much beyond the planning stage due to economic problems and a lack of political support. One project was the private initiative HaFraBa which planned a "car-only road" crossing Germany from Hamburg in the north via central Frankfurt am Main to Basel in Switzerland. Parts of
3666-674: The exception of some top of the range models or engines—to 250 km/h (155 mph). These limiters can be deactivated, so speeds up to 300 km/h (190 mph) might arise on the German autobahn, but due to other traffic, such speeds are generally not attainable except during certain times like between 10 p.m. and 6 a.m. or on Sundays (when truck drivers have to rest by law). Furthermore, there are certain autobahn sections which are known for having light traffic, making such speeds attainable during most days (especially some of those located in Eastern Germany). Most unlimited sections of
3744-682: The fief and in July 1572 Lorraine troops occupied the county. Since Philip V's army was no match for Lorraine, he took his case to the Imperial Chamber Court in Speyer. During the trial, Lorraine argued that, firstly, a significant part of the territory of Zweibrücken-Bitsch had been obtained in an exchange with Lorraine in 1302 and, secondly, the Counts of Leiningen had sold their hereditary claims to Lorraine in 1573. In 1604, Hanau-Lichtenberg and Lorraine decided to settle out of court. In
3822-461: The final report issued in 1977, the Institute stated the mandatory speed limit could reduce the autobahn death toll but there would be economic impacts, so a political decision had to be made due to the trade-offs involved. At that time, the federal government declined to impose a mandatory limit. The fatality rate trend on the German autobahn mirrored those of other nations' motorways that imposed
3900-539: The first limited-access, high-speed road network in the world, with the first section from Frankfurt am Main to Darmstadt opening in 1935. This straight section was used for high-speed record attempts by the Grand Prix racing teams of Mercedes-Benz and Auto Union until a fatal accident involving popular German race driver Bernd Rosemeyer in early 1938. The world record of 432 kilometres per hour (268 mph) set by Rudolf Caracciola on this stretch just prior to
3978-424: The forest, reducing the annual death toll by 30% (250 lives) on autobahns and 15% (1,000 lives) on rural roads; the German motor vehicle death toll was about 10,000 at the time. The federal government sponsored a large-scale experiment with a 100 km/h (62 mph) speed limit in order to measure the impact of reduced speeds on emissions and compliance. Afterward, again, the federal government declined to impose
SECTION 50
#17327721533504056-768: The implementation of the Oder–Neisse line after World War II. Parts of the planned autobahn from Berlin to Königsberg (the Berlinka ) were completed as far as Stettin ( Szczecin ) on 27 September 1936. After the war, they were incorporated as the A6 autostrada of the Polish motorway network . A single-carriageway section of the Berlinka east of the former " Polish Corridor " and the Free City of Danzig opened in 1938; today it forms
4134-407: The lane count of many of its major arterial routes, such as the A 5 in the southwest and A 8 going east–west. Most sections of Germany's autobahns have two or three, sometimes four lanes in each direction in addition to an emergency lane ( hard shoulder ). A few sections have only two lanes in each direction without emergency lanes, and short slip-roads and ramps. The motorway density in Germany
4212-543: The monastery. During the period it was under rule of the Bishopric of Metz . It was passed to Diocese of Speyer in last the quarter of the 11th century, then was captured by County of Saarbrücken in 1100. In 1182, the County of Saarbrücken was divided by Simon II and Henry I, who were sons of Simon I. Pirmasens was given to Henry I and his dominion was named as County of Zweibrücken . He built Lemberg Castle to protect his dominion in 1198. During this period Pirmasens
4290-641: The next year, today part of the Polish A18 autostrada . After the German occupation of Czechoslovakia , plans for a motorway connecting Breslau with Vienna via Brno (Brünn) in the " Protectorate of Bohemia and Moravia " were carried out from 1939 until construction works discontinued in 1942. A section of the former Strecke 88 near Brno is today part of the D52 motorway of the Czech Republic. Also, there
4368-841: The number of traffic deaths back to pre-unification levels after a decade of effort while traffic regulations were conformed to western standards (e.g., 130 km/h (81 mph) freeway advisory limit, 100 km/h (62 mph) on other rural roads, and 0.05 percent BAC ). In 1993, the Social Democratic-Green Party coalition controlling the State of Hesse experimented with a 90 km/h (56 mph) limit on autobahns and 80 km/h (50 mph) on other rural roads. These limits were attempts to reduce ozone pollution . Pirmasens Pirmasens ( German pronunciation: [ˈpɪʁmazɛns] ; Palatine German : Bärmesens (also Bermesens or Bärmasens ))
4446-423: The opening, availability of high-powered vehicles and a 54% increase in motorized traffic led to a doubling of annual traffic deaths, despite "interim arrangements [which] involved the continuation of the speed limit of 100 km/h (62 mph) on autobahns and of 80 km/h (50 mph) outside cities". An extensive program of the four E s (enforcement, education, engineering, and emergency response ) brought
4524-589: The outbreak of World War II in Europe in September 1939. During World War II, many of Germany's workers were required for various war production tasks. Therefore, construction work on the autobahn system increasingly relied on forced workers and concentration camp inmates, and working conditions were very poor. As of 1942, when the war turned against the Third Reich , only 3,800 km (2,400 mi) out of
4602-445: The remaining original Reichsautobahn , a section of A 11 northeast of Berlin near Gartz built in 1936—the westernmost remainder of the never-finished Berlinka — was scheduled for replacement around 2015. Roadway condition is described as "deplorable"; the 25 metres (82 ft)-long concrete slabs, too long for proper expansion, are cracking under the weight of the traffic as well as the weather. Germany's autobahn network has
4680-541: The rest of the road network are usually closed to general traffic. Apart from rare exceptions, the autobahn must not be left nor entered at rest areas. Truck stops (German Autohof ( German: [ˈaʊ̯toˌhoːf] ), plural Autohöfe ( German: [ˈaʊ̯toˌhøːfə] )) are large filling stations located at general exits, usually at a small distance from the autobahn, combined with fast food facilities and/or restaurants, but have no ramps of their own. They mostly sell fuel at normal price level while
4758-604: The road network was based on the Reichsautobahn of Nazi-Germany just like in West Germany, and thus were in a good state. Speed limit violations on the autobahns of the GDR were rare because most cars had not the engine power to go much faster than the set limit. For example, the most common car of the GDR, the Trabant , could reach a maximum of only 110 kilometres per hour (68 mph). The last 4 kilometres (2.5 mi) of
SECTION 60
#17327721533504836-413: The same numbers as trains could, and the autobahns could not be used by tanks as their weight and caterpillar tracks damaged the road surface. The general shortage of petrol in Germany during much of the war, as well as the low number of trucks and motor vehicles needed for direct support of military operations, further decreased the autobahn's significance. As a result, most military and economic freight
4914-544: The same year. In 1525, during the German Peasants' War , Pirmasens was looted by peasants from Bitsch. In 1560, Ludowika Margaretha of Zweibrücken-Bitsch , daughter of Count James of Zweibrücken-Bitsch (1510–1570), the last male member of the House of Zweibrücken, was married to Philip V, Count of Hanau-Lichtenberg . In 1570, Count James of Zweibrücken-Bitsch died without male heir and Ludowika Margaretha inherited
4992-422: The smoking ban in restaurants." The Weimar Republic had no federally required speed limits. The first crossroads-free road for motorized vehicles only, now A 555 between Bonn and Cologne, had a 120 km/h (75 mph) limit when it opened in 1932. In October 1939, the Nazis instituted the first national maximum speed limit, throttling speeds to 80 km/h (50 mph) in order to conserve gasoline for
5070-442: The supply chain for construction equipment, steel, concrete, signage, maintenance equipment, etc. In rural areas, new camps to house the workers were built near construction sites. The job creation program aspect was not especially important because full employment was almost reached by 1936. However, according to one source autobahn workers were often conscripted through the compulsory Reich Labor Service (and thereby removed from
5148-414: The total length of the German autobahn network has no speed limit, about one third has a permanent limit, and the remaining parts have a temporary or conditional limit. Some cars with very powerful engines can reach speeds of well over 300 km/h (190 mph). Major German car manufacturers, except Porsche , follow a gentlemen's agreement by electronically limiting the top speeds of their cars—with
5226-438: The unemployment registry). The autobahns were not primarily intended as major infrastructure improvement of special value to the military as sometimes stated. Their military value was limited as all large-scale military transportation in Germany was done by train to save fuel. The propaganda ministry turned the construction of the autobahns into a major media event that attracted international attention. The autobahns formed
5304-518: The valley. Wipptal was politically and culturally united in the County of Tyrol and the Roman Catholic Diocese of Bolzano-Brixen up to the Treaty of St Germain in 1920. [REDACTED] Media related to Wipptal (Tyrol) at Wikimedia Commons 47°00′N 11°30′E / 47°N 11.5°E / 47; 11.5 Autobahn The Autobahn ( IPA: [ˈaʊtoˌbaːn] ; German pl. Autobahnen , pronounced [ˈaʊ̯toˌbaːnən] )
5382-489: The war effort. After the war, the four Allied occupation zones established their own speed limits until the divided East German and West German republics were constituted in 1949; initially, the Nazi speed limits were restored in both East and West Germany. In December 1952 the West German legislature voted to abolish all national speed limits , reverting to State-level decisions. National limits were reestablished incrementally. The 50 km/h (31 mph) urban limit
5460-437: The war. During the 1950s, the West German government restarted the construction program. It invested in new sections and in improvements to older ones. Finishing the incomplete sections took longer, with some stretches opened to traffic by the 1980s. Some sections cut by the Iron Curtain in 1945 were only completed after German reunification in 1990. Others were never completed, as more advantageous routes were found. An example
5538-565: The world without blanket speed limits for cars and motorcycles. As such, they are important German cultural identifiers, "often mentioned in hushed, reverential tones by motoring enthusiasts and looked at with a mix of awe and terror by outsiders." Some speed limits are implemented on different autobahns. Certain limits are imposed on some classes of vehicles: Additionally, speed limits are posted at most on- and off-ramps and interchanges and other danger points like sections under construction or in need of repair. Where no general limit exists,
5616-450: Was approximately 160 km/h (99 mph) in flat country but lower design speeds were used in hilly or mountainous terrain. A flat-country autobahn that was constructed to meet standards during the Nazi period could support speeds of up to 150 km/h (93 mph) on curves. The current autobahn numbering system in use in Germany was introduced in 1974. All autobahns are named by using
5694-505: Was assumed at that time that a family consisted of four to five people. In 1622, Pirmasens and Lemberg were ravaged by Spaniards and Croatian horsemen of the Imperial troops. The imperial army set fire to the village. Even the church was destroyed in a fire. After the withdrawal of the troops, the Pirmasens inhabitants began to rebuild it. It was again ravaged by imperial troops under Matthias Gallas . They also looted Lemberg Castle, which
5772-427: Was burned in 1636. Then the headquarters of the Lutheran parish of Lemberg was moved to Pirmasens. But Pirmasens was heavily damaged in the war. In 1657, only 9 families (about 40 people) lived there. The population then slowly increased through immigration of Reformed Swiss, Catholic Tyrolean as well as Franconian and Württembergian families, so that in 1661 21 families (about 87 people) were counted in Pirmasens. During
5850-402: Was carried by rail. After the war, numerous sections of the autobahns were in bad shape, severely damaged by heavy Allied bombing and military demolition. Furthermore, thousands of kilometres of autobahns remained unfinished, their construction brought to a halt by 1943 due to the increasing demands of the war effort. In West Germany (FRG), most existing autobahns were repaired soon after
5928-570: Was controlled by conservative parties , successfully resisted the imposition of a permanent mandatory limit supported by Chancellor Brandt . The upper house insisted on a 130 km/h (81 mph) recommended limit until a thorough study of the effects of a mandatory limit could be conducted. Accordingly, the Federal Highway Research Institute conducted a multiple-year experiment, switching between mandatory and recommended limits on two test stretches of autobahn. In
6006-452: Was enacted in 1956, effective in 1957. The 100 km/h (62 mph) limit on rural roads—except autobahns—became effective in 1972. Just prior to the 1973 oil crisis , Germany, Switzerland, and Austria all had no general speed restriction on autobahns. During the crisis, like other nations, Germany imposed temporary speed restrictions; for example, 100 km/h (62 mph) on autobahns effective 13 November 1973. Automakers projected
6084-421: Was under the formal jurisdiction of the bishop of Metz, but the parish administration of Pirmasens was passed to the monastery of Hornbach after confirmation by John, Bishop of Metz, in 1225. In 1297, the County of Zweibrücken was divided and Pirmasens was passed to County of Zweibrücken-Bitsch, Eberhard I's dominion. He traded some localities with Duke Frederick III of Lorraine and took lordship of Bitsch in
#349650