The University Nanosat Program is a satellite design and fabrication competition for universities. It is jointly administered by the Air Force Office of Scientific Research (AFOSR), the Air Force Research Laboratory (AFRL), the American Institute of Aeronautics and Astronautics (AIAA), the Space Development and Test Wing and the AFRL Space Vehicles Directorate's Spacecraft Technology division. NASA's Goddard Space Flight Center was involved from the program inception through Nanosat-3.

#521478

60-453: The UNP is a recurring competition that involves two phases. The first phase (Phase A) occurs as university teams initially respond to a solicitation posted by the UNP program or one of its partner organizations. The solicitation results in a competition for selection for that program cycle. Typically 10-11 awards are made during this initial phase. Grants are offered to the awardees to participate in

120-592: A Space Structures Complex in Middle River, Maryland , deliver a comprehensive suite of advanced composite products for the space industry and to further vertically integrate supply for the company's internal needs across launch and space systems. The site will also play a role in the development and long-term supply of carbon composite structures for Neutron. Through the acquisition of SolAero, Rocket Lab also has facilities in Albuquerque, New Mexico . Through

180-466: A US patent on the system. In 2011, Rocket Lab had a program called "Instant Eyes". The Instant Eyes unmanned aerial vehicle (UAV) was designed for military applications requiring a bird's-eye view, much like drones. Upon launching, the rocket with its 5 megapixel -camera would reach an altitude of 2,500 feet (760 m) within 20 seconds. In October 2024, Rocket Lab was awarded a NASA contract from Matthew McCormick to explore new concepts for

240-406: A cubic shape measuring 10 × 10 × 10 cm (1 unit or 1U), and can be fabricated of multiple cubic units such as 2U, 3U and 6U, and weighing 1.33 kg per unit. Because of the high cost incurred by launching them to orbit, ELaNa's satellites are launched as secondary payload on other missions that have mass and space to spare. Since the launch waiting list has grown considerably, another initiative

300-510: A flight named "Still Testing", launched, reached orbit and deployed three CubeSats for customers Planet Labs and Spire Global . The rocket also carried a satellite payload called Humanity Star , a 1 m-wide (3.3 ft) carbon fiber geodesic sphere made of 65 panels that reflect the Sun's light. Humanity Star re-entered Earth's atmosphere and burned up in March 2018. On 11 November 2018,

360-459: A high vacuum by an electron beam. By March 2016, the 5,000 pounds-force (22 kN) second-stage Rutherford engine had completed firing tests. The first test flight took place on 25 May 2017 from Māhia Peninsula on New Zealand's North Island . After reaching an altitude of about 224 kilometres (139 mi), the rocket was performing nominally, but telemetry was lost and flight control destroyed it. On 21 January 2018, their second rocket, on

420-431: A launch mission named "Return to Sender" successfully deployed its payload of 30 small satellites . First stage recovery was also successfully implemented. On 15 May 2021, the company launched "Running Out Of Toes" which successfully used the first stage recovery method like the one used on "Return to Sender". However, the rocket failed to place its payload of two BlackSky satellites into orbit after an issue occurred with

480-519: A pathfinder. It has since flown three times. It flew the CAPSTONE mission. Photon communicates on the S-band . Depending on the orbital inclination (37° to Sun-synchronous orbit ), it is expected to have a payload capacity of 170 kg (370 lb). The interplanetary version was to have a 40 kg (88 lb) payload capacity. In February 2020, Rocket Lab was selected by NASA to launch

540-421: A payload capacity of 700 kg (1,500 lb), double that of Electron. It can deploy payloads from 80 km (50 mi) altitude and higher. In 2024, two HASTE launches were planned. As of November 2023 Rocket Lab had contracted for at least six HASTE missions. The company announced in March 2021 that it was developing a new medium-lift two-stage human-rated launch vehicle called Neutron . Neutron

600-571: A question and answer session with space and rocket communicator Scott Manley , Beck indicated a preference to avoid fixed assets such as landing barges. This indicated that design work had proceeded on the basis that the Neutron would return for landing rather than landing downrange. Neutron launches are intended to take place from the Mid-Atlantic Regional Spaceport (MARS) on the eastern coast of Virginia. Rocket Lab

660-600: A rigorous two-year process to design and develop their satellite concept. At the end of the two years, a Flight Competition Review is held where judges evaluate each program's progress and readiness to move to the next phase. Winners from each cycle are offered launch by AFRL when the systems are ready for flight. Other U.S. Government agencies, such as NASA through the Educational Launch of Nanosatellites (ELaNa) initiative, also step in to offer launch opportunities when available. Since 1999, there have been 11 cycles of

SECTION 10

#1732772434522

720-575: A sample return from the surface of Mars. In October 2018, the company revealed their new manufacturing facility in Auckland , New Zealand. It is intended for the production of propellant tanks and stage builds , and is in charge of the overall integration of launch vehicles at Launch Complex 1 . The company's headquarters in Long Beach, California, produces their Rutherford engines and avionics . The company's primary manufacturing facility

780-589: A tie-breaker decision. The Nanosat-9 Flight Selection Review process resulted in selection of the University of Georgia MOCI payload as winner with the University of Colorado at Boulder's MAXWELL coming in second. In November 2021, three universities were notified of selection for flight when each program's satellite is ready for launch. The Nanosat-11 competition was announced in August 2021. Participants were notified by AFRL of onward inclusion in

840-416: Is capable of delivering payloads of 150 kg to a 500 km Sun-synchronous orbit . The projected cost is less than US$ 5 million per launch. The Rutherford engine uses pumps driven by battery-powered electric motors rather than a gas generator , expander , or preburner . The engine is fabricated largely by 3D printing , using electron beam melting , whereby layers of metal powder are melted in

900-554: Is customizable for uses including LEO payload hosting, lunar flybys, and interplanetary missions. Photon uses chemical propulsion for orbit adjustments. It can use a variety of engines, such as the Curie and HyperCurie engines, as well as engines from third-party sources, such as the one powering the EscaPADE mission . Photon first launched in August 2020 on Rocket Lab's I Can't Believe It's Not Optical mission, where it served as

960-475: Is expected to be 40 m (130 ft) tall with a 4.5 m-diameter (15 ft) fairing . It will have 13-and-15-short-ton (12 and 14 t) capacities. Rocket Lab said they aim to make the first stage of the vehicle reusable , with landings planned on a floating landing platform downrange in the ocean. This method is similar to how SpaceX recovers the Falcon 9 and Falcon Heavy rockets. During

1020-402: Is expected to modify the existing launch pad infrastructure at Launch Pad 0A (LP-0A) . In March 2022, Rocket Lab announced that Neutron will be manufactured at a facility adjacent to MARS Launch Complex 2. Launch Complex 2 is currently being used for Electron launches. Rocket Lab began to break ground for this facility on 11 April 2022. As of March 2021, the company is planning for

1080-606: Is located in Huntington Beach, where rocket components are manufactured and assembled before traveling to the New Zealand launch site . The manufacturing process begins with the production of the Electron rocket's first stage, which is built using carbon composite . The material is designed to be strong and lightweight. Once the first stage is complete, it is transported to the New Zealand launch site, where

1140-597: The CAPSTONE (Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment) on Electron and deploy it to lunar orbit from a Photon spacecraft bus . CAPSTONE is a microwave oven–sized CubeSat weighing 55 pounds and is the first spacecraft to test a unique, elliptical lunar orbit. As a pathfinder for the Lunar Gateway , a Moon-orbiting outpost that is part of NASA’s Artemis program , CAPSTONE will help reduce risk for future spacecraft by validating innovative navigation technologies and verifying

1200-528: The Nasdaq stock exchange on 25 August 2021 after merging with SPAC Vector Acquisition, at a $ 4.8 billion valuation. The transaction added $ 777 million in gross cash. At the time Rocket Lab had over 500 employees and it had successfully launched 105 satellites into orbit. Rocket Lab's launch business booked revenues of $ 13.5 million in 2018, $ 48 million in 2019 and an estimated $ 33 million in 2020. Rocket Lab spent somewhere between $ 250 million to $ 300 million of

1260-694: The Operationally Responsive Space Office (ORS) to study a low cost space launcher to place CubeSats into orbit. The agreement with NASA enabled the company to contract for limited NASA resources such as personnel, facilities, and equipment for commercial launch efforts. Around 2013, the company moved to the United States, and established its headquarters in Huntington Beach , California. The move coincided with funding from American sources, and

SECTION 20

#1732772434522

1320-653: The Nanosat-11 effort on November 23, 2021 Educational Launch of Nanosatellites Educational Launch of Nanosatellites ( ELaNa ) is an initiative created by NASA to attract and retain students in the science, technology, engineering and mathematics disciplines. The program is managed by the Launch Services Program (LSP) at NASA's Kennedy Space Center in Florida. The ELaNa initiative has made partnerships with universities in

1380-703: The Nanosat-7 opportunity: The Nanosat-8 cycle started in late 2012 with the selection of 10 competing schools. AFRL announced the winners of the Nanosat-8 cycle in February 2015. The first four winners included Missouri University of Science and Technology, the University of Colorado at Boulder, Georgia Institute of Technology, and Taylor University respectively. With a tie for fifth spot, Boston University and State University of New York at Buffalo teams will support deep-dive visits from judges to each program for

1440-453: The US to design and launch small research satellites called CubeSats (because of their cube shape). These low-cost CubeSat missions provide NASA with valuable opportunities to test emerging technologies that may be useful in future space missions, while university students get to be involved in all phases of the mission, from instrument and satellite design, to launch and monitoring. A CubeSat has

1500-748: The University of Texas at Austin’s Formation Autonomous Spacecraft with Thruster, Relative-Navigation, Attitude and Crosslink or FASTRAC satellite(s) as the winner. Events and Milestones: In March 2005, eleven universities were chosen from the submitted proposals to compete in the Nanosat-4 Phase B effort. CUSat was selected the winner of the cycle in March 2007. Events and Milestones: The Nanosat-5 competition began in January 2007 with 11 universities being selected from 26 proposal submissions. The University of Colorado at Boulder’s Drag and Atmospheric Neutral Density Experiment or DANDE

1560-531: The cash gained from going public to develop Neutron. Rocket Lab aimed to launch Neutron by 2025. As of August 2021, the company intended to build a new factory in the United States to build the rockets as well as launch infrastructure for Neutron at the Mid-Atlantic Regional Spaceport in Wallops Island , Virginia. In October 2021, the company acquired Advanced Solutions, Inc (ASI), a Colorado -based spacecraft flight software company. In November 2021,

1620-404: The company acquired Planetary Systems Corporation (PSC), a manufacturer of satellite separation systems for $ 81.4 million. In January 2022, the company acquired SolAero, a supplier of space solar power products. On 3 May 2022, in the "There And Back Again" mission, the company launched its Electron rocket from New Zealand and attempted to recover it for the first time. It was able to capture

1680-456: The company entered the engine test phase in Neutron’s development process. In November 2024, news reports said the company threatened an academic in New Zealand with a defamation lawsuit for comments that Rocket Lab was involved with US military control over nuclear weapons. Electron is a two-stage launch vehicle that uses Rocket Lab's Rutherford liquid engines on both stages. The vehicle

1740-573: The company had approximately 2,000 full-time permanent employees globally. Approximately 700 of these employees were based in New Zealand with the remainder in the United States. In August 2021, the company went public on the Nasdaq stock exchange through a SPAC merger. The company was founded in June 2006 by Peter Beck in New Zealand , after a trip to the United States . During

1800-579: The company launched its first Photon satellite. The company built and operates satellites for the Space Development Agency , part of the United States Space Force . In May 2022, the company attempted to recover a returning Electron booster with a helicopter. In 2024, the company announced that a booster recovered on an earlier launch would be reused. Rocket Lab was founded in New Zealand in 2006. By 2009,

1860-405: The company with $ 790 million in working capital to support the development of a medium-lift two-stage-to-orbit launch vehicle called Neutron , aiming for the mega-constellation satellite deployment market. Neutron was planned to be partially reusable with the booster stage performing a Return To Launch Site (RTLS) landing, to be refurbished and relaunched. The company began trading on

University Nanosatellite Program - Misplaced Pages Continue

1920-490: The dynamics of this halo-shaped orbit. Originally scheduled to launch from Virginia, the launch location was adjusted to Launch Complex 1 in New Zealand in August 2021 due to delays in certifying the NASA autonomous flight termination system planned to fly on Electron missions from Launch Complex 2 . The CAPSTONE mission was successfully launched on Electron in June 2022 and on July 4th Photon's HyperCurie engine completed

1980-438: The effort to study the potential recovery of an Electron first stage in August 2019, aiming to use a parachute and mid-air retrieval . In December 2019, they flight tested the reentry technology, a Rocket Lab proprietary aerothermal decelerator , on Electron flight number 10, and were able to decelerate the rocket and successfully bring it through the space to lower atmosphere transition. In November 2022, Rocket Lab cut

2040-599: The falling rocket booster in mid-air, a historic first. Beck later said that the booster was hanging improperly, so it was allowed to parachute into the water where it was extracted by a ship. In August 2022, the company revealed plans to become the first private company to reach Venus . The company is building a small probe, called the Venus Life Finder (VLF), which is designed to plunge through Venus's upper atmosphere for roughly five minutes between 29 mi (47 km) and 37 mi (60 km) above

2100-495: The final Translunar Injection Burn, successfully releasing the CAPSTONE spacecraft on a trajectory to lunar orbit. CAPSTONE completed its primary six-month mission and as of July 2023 was continuing an enhanced mission to deliver ongoing data in support of Artemis. In 2012, the company demonstrated a rocket propelled by a viscous liquid monopropellant (VLM) developed via DARPA and Office of Naval Research (NRL) work. The VLM

2160-400: The first commercial launch (third launch overall) took off from Māhia Peninsula carrying satellites for Spire Global , GeoOptics, a CubeSat built by high school students, and a prototype of a dragsail. On 4 July 2020, an issue during the second-stage burn of flight 13, named "Pics or It Didn't Happen", caused Electron to fail to get into orbit and its payloads were lost. On 19 November 2020,

2220-419: The first launch no earlier than mid-2025. In mid-2024, the company completed assembly on the first Archimedes engine, to undergo testing at Stennis Space Center , as well as some assembly on Neutron’s fairings. The first and only launch of the Ātea ( Māori for "space") sub-orbital sounding rocket occurred in late 2009. The 6 m-long (20 ft) rocket, weighing approximately 60 kg (130 lb),

2280-602: The launch of a Japanese radar imaging satellite, which marked a record 10th flight for the rocket in 2023. Two attempts have been made to recover an Electron booster by helicopter. In addition, six attempts have been made at soft water recovery . Hypersonic Accelerator Suborbital Test Electron (HASTE) is a suborbital testbed launch vehicle derived from the Electron orbital rocket. HASTE provides flight test opportunities for hypersonic and suborbital system technology development. It successfully launched its first mission "Scout's Arrow" on 18 June 2023, for Leidos . HASTE has

2340-826: The order they are manifested; due to the nature of launching, the actual launch order differs from the mission numbers. List of future missions: Rocket Lab Rocket Lab USA, Inc. is a publicly traded aerospace manufacturer and launch service provider . Its Electron orbital rockets launches small satellites , and has launched 53 times as of 2024. A sub-orbital Electron variant called HASTE (Hypersonic Accelerator Suborbital Test Electron) serves other needs. The company also supplies satellite components including star trackers , reaction wheels , solar cells and arrays , satellite radios , separation systems, as well as flight and ground software. The expendable Electron rocket first launched in May 2017. In August 2020,

2400-488: The payload being made by Sinclair Interplanetary. In March 2021, the company announced that it was planning to go public through an initial public offering (IPO) of stock in the second quarter of 2021. The company planned to accomplish the IPO through a merger with a special-purpose acquisition company (SPAC) called Vector Acquisition Corporation (VACQ). The merger planned to value the company at US$ 4.1 billion and provide

2460-649: The planets' surface, searching for organic compounds. As of March 2023, the target launch date aboard the Electron rocket was January 2025. In October 2023, Rocket Lab officially opened its engine development facility in Long Beach to support the development of the Archimedes engine. The facility, including production assets such as machinery and equipment, had been acquired in May 2023 out of Virgin Orbit 's bankruptcy proceedings. In January 2024, Rocket Lab became

University Nanosatellite Program - Misplaced Pages Continue

2520-422: The prime contractor for a $ 515M USSF military satellite project, the company's largest contract to date. In April 2024, the company announced it would begin selling carbon composite products to customers. As of 2024, the company was developing the bigger Neutron reusable unibody rocket ; multiple spacecraft buses, and rocket engines : Rutherford , Curie , HyperCurie , and Archimedes . In mid 2024,

2580-575: The program. The program's objective is to train tomorrow's space professionals by providing a rigorous two year concept to flight-ready spacecraft competition for U. S. higher education institutions and to enable small satellite research and development (R&D), integration and flight test. Approximately 5,000 college students and 40 institutions of higher learning have been involved in this unique experience since its inception in 1999. Events and Milestones: The Nanosat-3 cycle started in 2003 when 13 universities were chosen to compete. The panel selected

2640-577: The ribbon on an engine test facility for the Archimedes engine at NASA's Stennis Space Center . In March 2020, the company announced that it had acquired Sinclair Interplanetary, a Canadian manufacturer of components for small satellites. Rocket Lab said that it would use Sinclair technology on its Photon line of small satellite buses , and that it would help Sinclair increase production of small satellite components for sale to other firms. Thereafter, Rocket Lab launched missions with some or all of

2700-457: The second stage and other components are added. The second stage is powered by a single Rutherford engine. The engine uses an electric pump-fed propulsion system . Manufacturing the carbon composite components of the main flight structure has traditionally required 400 hours, involving extensive hand labor. In late 2019, Rocket Lab brought a new robotic manufacturing capability online to produce Electron's composite parts in 12 hours. The robot

2760-420: The second stage. On 15 September 2022, Rocket Lab launched "The Owl Spreads Its Wings" mission, sending a synthetic-aperture radar (SAR) satellite into Earth orbit. On September 19, 2023, the Electron failed its mission to deliver a Capella Space synthetic-aperture radar imaging satellite when the rocket's second stage failed shortly after separation. Electron successfully returned to flight on December 14 with

2820-652: The successful launch of Ātea-1 made the organization the first private company in the Southern Hemisphere to reach space . The company established its headquarters in California in 2013. Rocket Lab acquired four companies, including Sinclair Interplanetary in April 2020, Advanced Solutions in December 2021, SolAero Holdings in January 2022, and Planetary Systems in December 2021. As of June 2024,

2880-695: The trip, Beck realized the possibility and potential for a low-cost, small rocket. While contacting potential investors, he met Mark Rocket, who later became a seed investor and was co-director from 2007 to 2011. Other investors to the company included Stephen Tindall , Vinod Khosla , and the New Zealand Government . The company became the first private company in the Southern Hemisphere to reach space after launching its Ātea-1 sounding rocket in November 2009. The payload

2940-426: Was " potentially hazardous " and contained delicate instruments . Performance characteristics were determined by the boost stage using downlink telemetry , and was recovered. This allowed Rocket Lab to move the entire team to the Electron rocket. Photon is a satellite bus based on Rocket Lab's Electron kick stage. It moves satellites into their appropriate orbits once boosted by rockets such as Electron. It

3000-551: Was already a supplier to Rocket Lab, so when SailGP announced plans to move operations to the UK, Rocket Lab took over the facilities and employees to support a growing production rate for the Electron rocket and the rapid development of Neutron . In October 2023, Rocket Lab officially opened its Engine Development Center in Long Beach in the former Virgin Orbit factory, where the company now builds Rutherford and Archimedes engines. In November 2023, Rocket Lab announced plans to establish

3060-412: Was designed to carry a 2 kg (4.4 lb) payload to an altitude of around 120 km (75 mi). It was intended to carry scientific payloads or possibly personal items. Ātea-1 , named Manu Karere or Bird Messenger by the local Māori iwi , was successfully launched from Great Mercury Island near Coromandel Peninsula on 30 November 2009 at 01:23 UTC (14:23 local time). The rocket

SECTION 50

#1732772434522

3120-566: Was in part due to increased U.S. government involvement. The New Zealand company became a subsidiary of the American company. In 2020, Rocket Lab moved to Long Beach . The move was motivated by the need to accommodate the company's growing workforce and to be closer to suppliers and customers. The new facility includes a state-of-the-art production facility for manufacturing the company's Electron launch vehicle , as well as administrative offices and other support facilities. In 2013, funding

3180-801: Was launched in 2015 in partnership with the private industry to develop launch vehicles dedicated to CubeSats exclusively. A new company is called Rocket Lab and their launch vehicle is the Electron rocket . This agreement with NASA, enables the company to use NASA resources such as personnel, facilities and equipment for commercial launch efforts. In 2015, NASA contracted two other companies for this purpose: Firefly Space Systems and Virgin Galactic . Nevertheless, NASA CubeSats will continue to hitch rides as secondary payloads in larger rockets whenever possible. As of August 2017, NASA's ELaNa initiative has selected 151 CubeSat missions, 49 of which have been launched into space. ELaNa mission numbers are based on

3240-706: Was named " Rosie the Robot ", after The Jetsons character. The process can make all the carbon fiber structures as well as handle cutting, drilling, and sanding such that the parts are ready for final assembly. The company objective as of November 2019 was to reduce the overall Electron manufacturing cycle to seven days. Rutherford engine production uses additive manufacturing . In October 2023, Rocket Lab announced it had acquired carbon composite manufacturing facilities, equipment and more than 50 team members from SailGP Technologies in Warkworth, New Zealand . SailGP

3300-406: Was not recovered, and the launch was deemed unsuccessful. The payload was a ballistic instrumentation dart and its trajectory depended only on the boost phase . The launch took place off the coast of New Zealand, from the private island ( Great Mercury Island ) of Michael Fay , a New Zealand banker and Rocket Lab investor. In December 2010, the company was awarded a U.S. government contract from

3360-428: Was obtained from Khosla Ventures , and Callaghan Innovation (a Crown entity of New Zealand). Bessemer Venture Partners invested in 2014 and Lockheed Martin invested in 2015. Rocket Lab announced in March 2017 that it had raised an additional US$ 75 million in a Series D equity round led by Data Collective with participation by Promus Ventures and earlier investors. In May 2017, Callaghan Innovation funding

3420-407: Was reported to be thixotropic , so that it behaves as a pseudo-solid until a shear force is applied, after which it flows like a liquid. The VLM density was reported to be comparable to solid-rocket propellant . The VLM reportedly required no special handling, was non-toxic, water-soluble, had low sensitivity to shock, a high ignition point, and was barely flammable in atmosphere. The company earned

3480-481: Was reported to total NZ$ 15 million. In November 2018, the company reported raising a $ 150 million Series E round led by Future Fund . The first NASA mission, launched in 2018, was valued by the space agency at $ 6.9 million (with launch services, etc., included). In 2018, Rocket Lab began to develop reusable first stage technology, after previously stating publicly that they had no intention of attempting to recover and reuse their launch vehicles. They disclosed

3540-702: Was selected to continue on toward launch. Events and Milestones: The Nanosat-6 Program Flight Competition Review was sponsored by the American Institute of Aeronautics and Astronautics was held in Albuquerque, New Mexico. A panel of judges from the Air Force Research Laboratory, Space Test Program, Air Force Institute of Technology and industry selected the winners identified in the table below. Events and Milestones: Eleven schools were selected to pursue

3600-479: Was tracked by a GPS uplink to the Inmarsat-B satellite constellation. After the flight, Ātea-1 splashed down approximately 50 kilometres (31 mi) downrange . The payload had no telemetry downlink , but carried instrumentation . The payload was not recovered as it was a dart of no value. The company advised that should it be encountered by vessels at sea, the payload should not be handled as it