South East CDC
63-932: (Redirected from Tōzai Line ) East–West line may refer to several rapid transit lines: East–West MRT line , Singapore East-West Line, former name of the Blue Line (MARTA) in Georgia, United States Tōzai Line ( 東西線 , Tōzai-sen , "East West Line") can refer to one of several Japanese railway lines: JR Tōzai Line , operated by JR West mainly in Osaka Prefecture Tōzai Line (Kobe) , operated by Kobe Rapid Railway in Kobe, Hyogo Prefecture Tōzai Line (Kyoto) , operated by Kyoto Municipal Transportation Bureau in Kyoto Tōzai Line (Sapporo) , operated by
126-458: A C151 train approaching Pasir Ris station, resulting in a temporarily service delay between Tanah Merah and Pasir Ris for over two hours that affected at least 10,000 commuters. The two trainee staff had joined SMRT in January 2016 and worked as technicians under a technical team of 15 staff led by a supervisor and were tasked to go down to the tracks to investigate an alarm triggered by
189-546: A Relay interlocking system that prevents incorrect signal and track points to be set. The stretch of track between Pioneer and Tuas Link stations was equipped with the new signalling system which came into use in June 2017. As the section of track between Pioneer and Joo Koon support 'mixed-mode' of both signalling systems, trains terminating at either Joo Koon or Tuas Link would have to change signalling modes at Pioneer MRT station as trains terminating at Joo Koon would proceed to
252-644: A S$ 90 million technology park along Tampines Industrial Avenue, to manufacture its System Z mainframes and high-end POWER systems for its clients across Asia. Changi is also a major aviation and commercial zone in the region with airlines such as, Singapore Airlines , Singapore Airlines Cargo , Jetstar Asia Airways , Scoot , Valuair and Tigerair having their head offices in the area. Changi Business Park , located in Changi South, also houses several commercial offices of business such as, DBS Bank , Standard Chartered and IBM . Residents living within
315-583: A computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set. The old signalling system has undergone decommissioning work from August 2018 and was completed on 23 November 2018. It consists of Westinghouse fixed block signalling system with Automatic train control (ATC) under Automatic train operation (ATO) GoA 2. The subsystems consist of Automatic train protection (ATP) to govern train speed, Automatic Train Supervision (ATS) to track and schedule trains and
378-688: A more common feature worldwide. They were first installed at Jurong East , Pasir Ris , and Yishun stations in 2009 as trial runs . On 31 August 2011, the LTA announced completion of the installation of PSDs along the East–West Line, with Expo being the last station on the line to receive the PSDs. Installation of PSDs across both the North–South and East–West lines (NSEWL) were completed on 14 March 2012, 3 months ahead of schedule. The timber sleepers on
441-530: A new infill station located between Buona Vista station and Clementi station , namely Dover station , began in June 1998. It is the first station in the MRT network to be built as an infill station. The building of the station was met with reservations by some members of the public over the small area it serviced and there were criticisms over the spending of " taxpayers' money " chiefly for use only by students of one educational institution. Despite some opposition,
504-581: A new platform will be constructed at Tanah Merah, enabling faster travel and shorter waiting times for commuters heading towards Expo and Changi Airport on the Changi Airport branch line of the East–West Line. On 26 October 2016, the Land Transport Authority awarded the civil contract to Lum Chang Building Contractors Pte. Ltd. to build a new platform at Tanah Merah and viaducts for a contract sum of S$ 325 million. In addition to
567-432: A possible signalling equipment fault close by the station. An operator cited that they were granted access to the tracks, but did not coordinate with a Signal Unit in the station to ensure trains could not travel in the area where the team was. Patrick Nathan, SMRT vice-president, promised that "SMRT will review all safety protocols particularly those involving track access". SMRT chief executive Desmond Kuek apologised for
630-399: A section between Jurong East and Clementi station and five tracks nearby Changi Depot and Tanah Merah station. Some stations are commonly placed at the middle of the roads such as Tanah Merah , Bedok , Queenstown , Commonwealth , Dover , Clementi , Pioneer , Joo Koon , Gul Circle , Tuas Crescent and Tuas West Road . The line runs mostly on overhead viaducts but goes underground in
693-467: A single track before turning eastwards to Expo station. After Expo station , it goes underground and curves south before terminating at Changi Airport station. The East–West Line was constructed along the North–South Line . As such, both lines used identical signalling equipment and rolling stock . The line serves 35 stations across 57.2 kilometres (35.5 mi) of track, and station codes for
SECTION 10
#1732765401820756-642: A stretch near Clementi MRT station . A defective train axle box on one of the first generation C151 trains , which had been deadheading to Ulu Pandan Depot after it was withdrawn at Clementi station, dropped onto the tracks near Dover station and caused the wheels of a bogie - an undercarriage - to come off the running rail and hit track equipment, including stretches of the third rail , 3 point machines as well as power cables and rail clips. In an update at about 9:30pm on 25 September 2024, LTA and SMRT announced that train services between Buona Vista and Jurong East would remain suspended on 26 September 2024,
819-612: A total land area of 93.1 km (35.9 sq mi), the region is situated on the eastern corner of Singapore Island , bordering the North-East Region to the north-west, Central Region to the south-west and shares riverine borders with the North-Eastern Islands to the north. The East Region is governed locally by two different Community Development Councils , namely the North East CDC and
882-448: A turn back siding which was built as part of the TWE which only supports the new signalling system. Eastbound trains towards Pasir Ris would have to change back to the old signalling system at Pioneer MRT station. This procedure was removed after the train collision at Joo Koon as trains terminated at Joo Koon. The new signalling system became fully operational on 28 May 2018. When the line
945-441: Is 2 to 3 minutes while during non-peak hours the frequency is reduced to 5 minutes throughout the entire route. The first train departs from these places: Train services on the East–West Line are also subjected to maintenance and renewal works, usually on selected Fridays, Saturdays or Sundays. Shuttle bus services may be provided throughout the duration of the early closures and late openings for affected commuters. Operations of
1008-486: Is different from Wikidata All article disambiguation pages All disambiguation pages East%E2%80%93West MRT line The East–West Line ( EWL ) is a high-capacity Mass Rapid Transit (MRT) line operated by SMRT in Singapore , running from Pasir Ris station in the east to Tuas Link station in the west , with an additional branch between Changi Airport and Tanah Merah stations. It
1071-555: Is set to be completed by mid-2024. On 5 August 1993, before opening, a maintenance vehicle spilt oil on the tracks between Clementi and Jurong East . The first ten eastbound trains reported braking problems, then the eleventh train from Jurong stopped at the Clementi station for two minutes longer than scheduled due to it using its emergency brakes to stop at the station at 7.50 am, before being hit by another eastbound train when it failed to stop in time. 156 passengers were injured by
1134-401: Is the second Mass Rapid Transit line to be built in Singapore . Coloured green on the rail map, the line serves 35 stations, 8 of which (from Lavender to Tiong Bahru and Changi Airport stations) are underground. At 57.2 kilometres (35.5 mi), the line is the longest on the MRT network. Constructed and opened as part of the North–South Line (NSL) in the early stages of development,
1197-499: The Land Transport Authority proceeded with the construction to serve commuters along Singapore Polytechnic with Dover housing estate. The station opened on 18 October 2001. Prior to opening, test runs were conducted from 13 to 17 October 2001 when the trains stopped at the station but did not open their doors. The idea of extending the Mass Rapid Transit system to Changi Airport was reconsidered when Terminal 3 of
1260-514: The South East CDC , both divided into six different planning areas. Manufacturing makes up majority of the economical activity in the region, with industrial estates located in the planning areas of Bedok , Changi , Pasir Ris , Tampines and Paya Lebar . Pasir Ris and Tampines Wafer Fabrication Parks houses several major semiconductor fabrication companies such as GlobalFoundries , UMC , SSMC and Siltronic . IBM had also set up
1323-638: The Workplace Safety and Health Act for lapses which led to the accident, and were fined $ 400,000 respectively. and $ 55,000. On 20 July 2018, the Land Transport Authority fined the operator S$ 1.9 million (US$ 1.41 million) for this incident and the Bishan tunnel flooding . A second train collision occurred on 15 November 2017 at approximately 8.18am, where two C151A trains collided at Joo Koon MRT station. A train fault caused
SECTION 20
#17327654018201386-473: The 1st day of the PSLE exams, while service between Boon Lay and Jurong East, and Queenstown and Buona Vista, would each run their own separate shuttle services every 10 minutes. On Thursday night, SMRT announced that no trains will run between Jurong East and Buona Vista for a third straight day, with full service expected to resume the following Monday. However, in an update at about 4:30pm on 29 September 2024,
1449-599: The East–West Line are affected by the COVID-19 pandemic , leading to the drop of ridership. As its name implies, the East–West Line connects central Singapore to both eastern and western parts of the island, with an additional branch between Changi Airport and Tanah Merah , which operates as a separate shuttle service. It is 57.2 kilometers (35.5 miles) long and it is predominantly double-tracked, but certain short sections at Tanah Merah, Outram Park and Joo Koon widens to three tracks, four tracks nearby Jurong East station and
1512-561: The East–West Line was required to be replaced as they were near the end of their 25-year lifespan. The replacement sleepers, made of concrete, have a significantly longer lifespan. To speed up works, train services on the East–West Line was adjusted to end earlier. The work was divided into three phases: Phase 1 (Bugis – Tanah Merah), Phase 2 (Joo Koon – Jurong East, Tanah Merah – Pasir Ris) and Phase 3 (Jurong East – Outram Park). The sleepers were fully replaced on 18 February 2017. A new moving-block signalling system, supplied by Thales, replaced
1575-644: The East–West Line was the second rail line formed in Singapore after NSL, with the opening of the eastern extension to Tanah Merah on the EWL in 1989. Nevertheless, both lines use identical signalling equipment and rolling stock . The East–West Line signalling systems have been upgraded along with the North–South Line, with both MRT lines having its signalling fully upgraded, converting it from semi-automatic to fully automatic. The first segment of what would become
1638-408: The East–West Line, between City Hall and Outram Park stations, was opened on 12 December 1987 as part of the North–South Line and Phase 1 of the initial system. Subsequently, it was extended westwards to Clementi station on 12 March 1988 and to Lakeside on 5 November 1988. The 15-kilometre (9.3 mi) eastern extension to Tanah Merah station opened on 4 November 1989, which also marked
1701-402: The East–West Line. Stations along the TWE had half-height platform screen doors manufactured by Fangda installed during the station's construction. East Region, Singapore The East Region ( Malay : Wilayah Timur , Chinese : 東區 , Tamil : கிழக்குப் பிராந்தியம் ) of Singapore is one of the five regions in the city-state . The region is the 2nd most densely populated among
1764-708: The MTR line in Hong Kong East and West Junction Railway , a disused line in central England East-West Passenger Rail (Massachusetts) , a proposed passenger rail corridor between Boston and Western Massachusetts, United States East West Rail , a rail line under construction in England between Oxford and Cambridge East-West Railway , a proposed line in Nepal North–South Line (disambiguation) Northeast Line (disambiguation) Topics referred to by
1827-535: The North–South Line between City Hall and Raffles Place stations, which are cross-platform interchanges to the North–South Line . After Tanjong Pagar, the line curves northwestwards towards Outram Park. After Tiong Bahru , the line continues above ground starting with Redhill station and follows the direction of Commonwealth Avenue, Commonwealth Avenue West and Boon Lay Way. Between Clementi and Jurong East station, three branches (one going east and two going west) to Ulu Pandan Depot are deployed. At Jurong East station ,
1890-963: The Sapporo City Transportation Bureau in Sapporo, Hokkaido Tokyo Metro Tōzai Line , operated by Tokyo Metro in Tokyo Sendai Subway Tōzai Line , operated by the Sendai City Transportation Bureau in Sendai See also [ edit ] Busan Metro Line 2 or the Dongseo Line, an east-west rail line in Busan, South Korea Central line (disambiguation) Crossrail (disambiguation) "East West Corridor" or Tuen Ma line (includes former Ma On Shan line ),
1953-459: The Tuas West extension, an extension of the East–West Line from Joo Koon to Tuas Link was announced. The extension has a span of 7.5 kilometres (4.7 mi), which spans a twin-tracked MRT viaduct, four above-ground stations and a 26-hectare depot to provide stabling and maintenance facilities for the additional trains that will be bought for the extension and to cater for future expansion of
East–West line - Misplaced Pages Continue
2016-483: The airport was being built. Earlier plans had long been made for a new line branching off from the existing East–West Line at Tanah Merah , with some conceptual plans showing a tentative route alignment up to the airport along Airport Boulevard, continuing beyond the airport to Changi Point, before turning southwest back towards the city along the eastern coasts. The plans were finally announced by then Deputy Prime Minister Lee Hsien Loong on 15 November 1996. However,
2079-724: The area have access to different educational facilities ranging from preschools to primary and secondary schools as these are located around the different towns in the East region. The area is also home to various tertiary institutions such as, ITE College East , Singapore University of Technology and Design , Tampines Meridian Junior College , Temasek Junior College , Temasek Polytechnic and Victoria Junior College , 6 international schools namely, Global Indian International School (GIIS), East Coast Campus, NPS International School , Sekolah Indonesia Singapura, Overseas Family School and United World College of South East Asia (Tampines Campus) and
2142-678: The capacity on both the North–South and the East–West lines in order to cope with increasing ridership. Both the North–South and the East–West lines utilized identical rolling stock up until the 2010s, when the C151A trains were temporary suspended from operating on the North–South Line from January 2012 until November 2013 following the 2011 train disruptions. The C151B trains, which were introduced in April 2017, did not begin revenue service on
2205-587: The city area between Kallang and Redhill , Bedok and Kembangan , and between Expo and Changi Airport . Travelling from one end of the line to the other takes about 85 minutes. The line begins above ground at Pasir Ris station from where it continues to head south towards Simei station. The line curves between Simei to Tanah Merah stations and continues westwards, joining the Changi Airport branch, paralleling New Upper Changi Road. Two branch lines to Changi Depot and to Changi Airport station exists between Simei and Tanah Merah stations. At Tanah Merah station ,
2268-547: The collision. During the evening peak hours on 7 July 2015, train services on the East–West and North–South Lines were temporarily disrupted due to massive power trips detected along both lines. The cause of the disruption was due to damaged insulators which had resulted in the failure of the power supply. For this disruption that brought inconvenience to 413,000 commuters, LTA imposed a 'record' fine of S$ 5.4 million on SMRT. At about 11:08 a.m. on 22 March 2016, two SMRT track-maintenance trainee staff were run over and killed by
2331-436: The eastern terminus of the line, was announced by the Land Transport Authority on 29 Jun 2018. It would extend the railway viaduct past the station by 148 metres. The turnback will allow for an increase in service frequency during peak times from 30 to 36 trains per hour as trains will be able to change directions faster to head westwards on the line, to meet future increases in ridership demand. Construction started in 2019 and
2394-504: The entire day on 16 November 2017, and westbound trains temporarily terminated at Joo Koon . An update by the Land Transport Authority (LTA) & SMRT on 16 November 2017 stated that LTA and SMRT had decided to isolate for up to one month the operations of the Tuas West extension, which runs on the new signalling system, from the rest of the East–West Line, which runs on the old signalling system, enabling LTA engineers to carry out further assurance checks together with Thales. The train
2457-705: The first rolling stock on the East–West Line to be manufactured by Bombardier (Bought by Alstom in 2021), which has also supplied trains for the Downtown Line . The first train entered service on the East–West Line on 4 June 2023. The East–West Line is equipped with Thales SelTrac communications-based train control (CBTC) moving block signalling system with automatic train control (ATC) under automatic train operation (ATO) Grades of Automation (GoA) 3. The subsystems consist of automatic train protection (ATP) to govern train speed, NetTrac MT Automatic Train Supervision (ATS) to track and schedule trains and
2520-412: The first train heading in the direction of Tuas Link to stall at the station. A minute later, a second train stopped behind the first and then "moved forward unexpectedly," hitting the other train. Thirty-eight people, including two SMRT staff, were hospitalized. Train services between Tuas Link and Joo Koon stations were temporally suspended in both directions for two hours on the day itself and
2583-570: The five, and has the smallest land area. Bedok is the region's most populous town and Tampines is the regional centre of the area. Comprising 11,000 hectares, it includes six planning areas and is also home to Singapore's Changi Airport and Paya Lebar Air Base . The region also houses the Changi Naval Base and Changi Prison , which was first constructed in 1936 by the British and is Singapore's oldest internment facility. With
East–West line - Misplaced Pages Continue
2646-489: The former ageing fixed-block signalling system on the East–West Line. The new signalling system, costing $ 195 million, reduces waiting times for trains during peak periods from 120 seconds then to 100 seconds now. The new system became operational between Pioneer and Tuas Link stations on 18 June 2017. Newer rolling stocks, such as the C151B and C151C , are equipped for use solely on the new signalling system. Since 27 May 2018,
2709-736: The full stretch of the East–West Line until the line's trial of the CBTC signalling system in May 2018. The C151C trains, despite their introduction on 30 September 2018 on the North–South Line, only made their full day debut on the East–West Line on 4 November 2023. Another generation of rolling stock, the R151 trains, will be delivered from 2022 to 2026, to replace all 66 first-generation C151 trains which will be retired by 2026, as well as all 19 second-generation C651 and 21 third-generation C751B trains which have been fully phased out. The R151 trains are
2772-496: The high installation costs. Nevertheless, the LTA reversed its decision and made plans to install half-height platform screen doors on elevated stations on 25 January 2008. The first platform screen doors by ST Electronics were installed at Pasir Ris, Jurong East and Yishun stations in 2009 as trial runs. Subsequently, installation began in May 2011 at Ang Mo Kio station on the North–South Line. On 14 March 2012, platform screen doors became operational at all elevated stations on
2835-513: The incident and said SMRT will investigate how "the [two men] got hit by the train". SMRT fired both an engineer responsible for leading with the team and the train driver who was involved at the scene of the incident. The engineer who led the inspection team was charged with negligence causing death under the Penal Code and was subsequently sentenced to 4 weeks in jail. SMRT Trains and one member of SMRT management were charged for violating
2898-479: The line are green, corresponding to the line's colour on the system map. 8 stations, including Changi Airport , and 7 other stations on the stretch from Lavender to Tiong Bahru are underground, with the rest being elevated. With the exception of Dover, all stations have island platforms. Legend List SMRT used to operate the branch sector of Tanah Merah to Changi Airport as a through service from Boon Lay from 18 November 2001 until 22 July 2003, when it
2961-470: The line extends again to four tracks due to its interchange with the North-South line but then, separates into two before heading west to Chinese Garden station. After Pioneer station , the line heads south-west before curving westwards towards Joo Koon station. The line terminates at Tuas Link with a branch heading towards Tuas Depot . The Changi Airport extension starts at Tanah Merah station as
3024-584: The line extends to four tracks due to its interchange with the Changi branch before turning back into two tracks in a western direction. From Bedok station to Kembangan station, the line goes underground but then goes above-ground, and follows the route of Sims Avenue and Sims Avenue East in an opposite direction. After Kallang station, the line goes underground through the Central Area and runs heads south-west towards City Hall station. It then runs parallel to
3087-424: The line. The viaduct is integrated with part of a 4.8-kilometre-long (3.0 mi) road viaduct along Pioneer Road, which will increase the road capacity to cope with anticipated increase in traffic. The stations are Gul Circle , Tuas Crescent , Tuas West Road , and Tuas Link . On 4 May 2012, the Land Transport Authority marked the start of construction of the Tuas West extension with a groundbreaking ceremony at
3150-471: The new platforms, the existing East–West Line tracks will be extended to connect the line to the new four-in-one East Coast Integrated Depot at Changi. When completed in 2024, it will be the second station to have triple island platforms after Jurong East . There were calls for platform screen doors (PSDs) to be installed at above-ground stations after several incidents in which passengers were killed or seriously injured by oncoming trains when they fell onto
3213-431: The new route alignment showed a deviation from previous plans, where the final plan involved in building only the first two stations of Expo , and Changi Airport, the latter being the underground station built between Terminal 2 and Terminal 3 . The alignment of the station at the airport also switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of
SECTION 50
#17327654018203276-419: The new signalling system has been operating full-day on the entire East–West Line. Replacement works on the third rail, which provides electricity to the trains, were carried out between September 2015 and August 2017. The new third rail replaced its 30-year-old predecessor and is expected to increase reliability of the East–West line's electrical system. A new railway turnback located at Pasir Ris station ,
3339-434: The railway tracks at above-ground stations. Underground stations already featured the doors since 1987. The authorities initially rejected the proposal by casting doubts over functionality and concerns about the high installation costs, but made an about-turn later with the government announcing plans to install half-height platform screen doors on the elevated stations on 25 January 2008, citing lower costs due to it becoming
3402-482: The same term [REDACTED] This disambiguation page lists articles associated with the title East–West line . If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=East–West_line&oldid=1193238966#Japanese " Category : Disambiguation pages Hidden categories: Articles containing Japanese-language text Short description
3465-405: The site of the future Tuas Link station. The extension began service on 18 June 2017. During initial stages after opening, the westbound trains will alternate their terminus between Joo Koon and Tuas Link , where for every two trains, one train will terminate at the former, while the other train will terminate at the latter. On 25 August 2014, the Land Transport Authority announced that
3528-414: The start of independent operations as the East–West Line. The opening ceremony was attended by then First Deputy Prime Minister Goh Chok Tong . The 6-kilometre (3.7 mi) line extension to Pasir Ris station was opened ahead of schedule on 16 December 1989 with a sneak preview beforehand. Boon Lay station opened on 6 July 1990, marking the completion of the initial MRT system. Construction on
3591-411: The station. The station's designs were unveiled on 10 February 1998 with construction starting on 29 January 1999. Expo and Changi Airport were opened on 10 January 2001 and 8 February 2002 respectively and operates under a shuttle service. Prior to 22 July 2003, train services from Boon Lay commences after the opening, but were later reverted to shuttle services due to low patronage. On 25 May 2019, it
3654-528: The suspension a free bridging bus service is available between the two stations. Continuous service between Pasir Ris and Gul Circle resumed on 28 May 2018, with the permanent activation of the new CBTC system; since the incident, selected portions of either the North–South Line or East–West Line were closed to conduct track renewal works with early weekend closures and later station openings. Train services between Boon Lay and Queenstown had been suspended since 9am on 25 September 2024 after trains lost power on
3717-527: The target date for restoration of full service was pushed back to Tuesday. On September 30, SMRT and LTA announced that full service would fully resume on October 1, with westbound train speeds being reduced from the usual 60-80 kilometres per hour (37.5-50mph) to 40 kilometres per hour (25mph) until October 3, as part of a standard process after rail replacements. Train services on the East–West Line operates from approximately 5:30 am to around midnight daily. In general, during peak hours, train frequency
3780-684: Was announced that the Changi Airport Extension will be converted to become part of Thomson-East Coast line Extension (TELe) by 2040. The 3.8-kilometre (2.4 mi) Boon Lay extension was first announced by the LTA on 29 December 2004, set to serve residents from the Jurong West Town area and those working in the Jurong Industrial Estate. The two stations, Pioneer and Joo Koon stations, officially opened on 28 February 2009. On 11 January 2011,
3843-484: Was first opened, full-height platform screen doors supplied by Westinghouse were installed at underground stations. These doors serve to prevent suicides, enable climate control within the station, better security control by restricting access to the tunnels and tracks and for overall passenger safety considerations. The authorities initially rejected calls for platform screen doors to be installed at elevated stations by casting doubts over functionality and concerns about
SECTION 60
#17327654018203906-629: Was replaced with a shuttle service. By 2040, the Changi Airport line (CAL) will be converted to the Thomson-East Coast line. Five batches of rolling stock operate on the East–West Line, namely the C151 , C151A , C151B , C151C and R151 from oldest to newest, shared with the North–South Line . Trains are maintained at Changi Depot , Ulu Pandan Depot and Tuas Depot , which provide train maintenance, inspection and overhaul facilities. These models of rolling stock were introduced to boost
3969-529: Was switching systems when the collision took place. Train service on the line resumed on 20 November, with the Tuas West extension between Gul Circle and Tuas Link using the new signalling system and the section between Pasir Ris and Joo Koon, together with the Changi Airport Branch continuing to run on the old signalling system. Train services between Joo Koon and Gul Circle were temporarily suspended until its resumption on 28 May 2018; between
#819180