139-686: The Araneta City Cyberpark is a 8-hectare (20-acre) office development located in the Araneta City in Cubao , Quezon City . Located along the southern part of the mixed-use commercial development, the office complex is currently undergoing a ₱20 billion redevelopment under a new master plan, consisting of five green office towers, retail spaces, and an outdoor park. The ongoing development currently includes 2 towers completed, and one tower topped off, with 191,000 m (2,055,906.89 sq ft) of office space completed as of January 2021. The complex

278-543: A circular economy . Draft versions of LEED v5 were released for public comment in 2024, and the final version of LEED v5 is expected to appear in 2025. It may address some of the previous criticisms. Despite concerns, LEED has been described as a "transformative force in the design and construction industry". LEED is credited with providing a framework for green building, expanding the use of green practices and products in buildings, encouraging sustainable forestry, and helping professionals to consider buildings in terms of

417-762: A 20-year redevelopment project, known as the Araneta Center Master Plan, was formulated in 1999 and was unveiled in 2000, with an estimated budget of over ₱80 billion ($ 1.62 billion), and began its implementation in 1999 with the renovation of the Araneta Coliseum and the Farmers Plaza , which was completed in 2001. The redevelopment master plan is envisioned to turn the complex into an inter-connected, transit oriented " Garden City " concept, promoting connectivity, green architecture and open spaces within its buildings. Araneta also hired

556-469: A 9-storey building in 1982, designed by Rogelio Garcia Villarosa. The bookstore branch also serves as one of the primary warehouses of books within Metro Manila, and for the company's online shopping operations. The SM Araneta City, formerly named SM Cubao, is a mall located along P. Tuazon Boulevard and serves as one of the first shopping centers by SM Retail . Groundbreaking for the construction of

695-539: A Canadian provider organization and a green rater. The provider organization helps the project through the process while overseeing the green raters, individuals who conduct two mandatory site inspections: the thermal bypass inspection and the final inspection. The provider and rater assist in the certification process but do not themselves certify the project. In addition to certifying projects pursuing LEED, USGBC's Green Business Certification Inc. (GBCI) offers various accreditations to people who demonstrate knowledge of

834-507: A LEED-certified building 20 miles (32 km) away in the suburb of Lenexa, Kansas . Kaid Benfield of the Natural Resources Defense Council estimated that the carbon emissions associated with the additional miles driven were almost three times higher than before, a change from 0.39 metric tons per person per month to 1.08 metric tons of carbon dioxide per person per month. Speck writes that "The carbon saved by

973-471: A building. Critics such as David Owen and Jeff Speck also point out that LEED certification focuses on the building itself, and does not take into account factors such as the location in which the building stands, or how employee commutes may be affected by a relocation. In Green Metropolis (2009), Owen discusses an environmentally-friendly building in San Bruno, California , built by Gap Inc. , which

1112-716: A bus terminal, the Araneta City Busport , servicing local and long-distance passengers going to provinces in both Central Luzon and Southern Luzon . The area around the complex also serves as a transport terminal for other jeepneys and provincial buses serving nearby cities and provincial areas around the country. Buses also connect the area to selected rationalized bus routes under bus route numbers 51 (bound for Valenzuela Gateway Complex ), and 55 (bound for San Pedro Pacita Complex ). Buses bound to Antipolo , Bulakan, Bulacan and under bus route 61 bound for Dasmariñas -Robinsons Dasmariñas are also located along

1251-428: A comparison with emphasis on factors that heavily influence energy consumption. The number of points achieved in this credit is proportional to the predicted energy savings. This method has been criticized for inaccurately predicting actual energy usage. The USGBC admits that "current information indicates that most buildings do not perform as well as design metrics indicate. As a result, building owners might not obtain

1390-585: A curved building design with floor-to-ceiling double-glazed energy-efficient windows, smart elevators, side balconies with planters, solar panels, and a rainwater recovery system. The demolition of the Alorica Building began in June 2019, while the groundbreaking for the construction of the tower started afterwards, in September 2019. The tower is originally slated to be completed in 2022, however, due to

1529-484: A finalist at the 2008 Urban Land Institute Awards for Excellence. In September 2023, the Gateway Mall unveiled its expansion project known as the Gateway Mall 2, and has 200,000 m (2,200,000 sq ft) of total floor area. The expansion also features roughly 400 retail shops, 100 restaurants, a modernized Shopwise Supermarket, an activity area atrium, a "Tropical themed" Lagoon Restaurant Collection,

SECTION 10

#1732801165360

1668-679: A free E-shuttle services from Ali Mall , up to the LRT 2-Gateway Mall Concourse, as well as to Gateway Mall 2 and vice versa. The free E-shuttle services began operations on June 20, 2009, and were temporarily suspended in March 2020 in the aftermath of the COVID-19 pandemic in the Philippines . The E-shuttle service were returned to service in November 2022. In the afternoon of February 9, 2023,

1807-606: A jeepney terminal servicing areas around Quezon City and the Province of Rizal , and the private Araneta White House (Bahay na Puti) complex. The development also sits on the former lot occupied by Fiesta Carnival, a 2 hectares (4.9 acres) amusement park formerly occupying the Shopwise Hypermarket complex. As the carnival declined in the 1990s due to rising competition from other amusement parks, mall-based entertainment, political unrest, and other technological shifts,

1946-477: A minimum of $ 2,900 to over $ 1 million for a large project. "Soft" costs – i.e., added costs to the building project to qualify for LEED certification – may range from 1% to 6% of the total project cost. The average cost increase was about 2%, or an extra $ 3–$ 5 per square foot. The application review and certification process is conducted through LEED Online, USGBC's web-based service. The GBCI also utilizes LEED Online to conduct their reviews. Applicants have

2085-400: A rainwater collection system, and Solar panels located at the tower's roof deck. The tower currently houses a variety of business process outsourcing companies such as Intouch (formerly 24-7 Intouch), ProbeCX (formerly Stellar), The Vibal Group , and Accenture , which serves as the tower's main tenant, and the company's third office within the area, aside from its current operations within

2224-723: A spire from the tower's side balconies, which was scrapped during the tower's construction phase. Groundbreaking for the construction of the tower started in February 2016, while construction works began on the 3rd quarter of 2016, and was topped off in March 2018, before being fully completed in December 2018, as tenants and stores began occupying the tower. The tower, like its predecessor, the Cyberpark Tower 1, has 3 basement parking levels with 2 levels of retail spaces and currently houses companies like Alorica , serving as one of

2363-414: A variety of green initiatives and an ultra-high-speed fiber optic network infrastructure, enhancing the city's network connectivity, capable of reaching 5G networks, in collaboration with Smart Communications and PLDT . The targeted completion of the entire green office complex is set within 2030. The Araneta City Cyberpark consists of five LEED-approved towers, interconnected with direct connections with

2502-443: A weighted average for each rating scheme based upon actual impacts and the relative importance of those impacts to human health and environmental quality. The LEED council also appears to have assigned credit and measured weighting based upon the market implications of point allocation. From 2010, buildings can use carbon offsets to achieve green power credits for LEED-NC (new construction certification). For LEED BD+C v4 credit,

2641-585: A wider range of temperatures. On April 2, 2019, the USGBC released LEED v4.1, a new version of the LEED green building program, designed for use with cities, communities and homes. However, LEED v4.1 was never officially balloted. An update to v4, proposed as of November 22, 2022, took effect on March 1, 2024. Any projects that register under LEED v4 after March 1, 2024 must meet these updated guidelines. As of January 2023, USGBC began to develop LEED v5. LEED v5

2780-523: Is a green building certification program used worldwide. Developed by the non-profit U.S. Green Building Council (USGBC), it includes a set of rating systems for the design, construction, operation, and maintenance of green buildings , homes, and neighborhoods, which aims to help building owners and operators be environmentally responsible and use resources efficiently. As of 2023 there were over 105,000 LEED-certified buildings and over 205,000 LEED-accredited professionals in 185 countries worldwide. In

2919-464: Is a 22-storey, mixed-use tower comprising retail, office, penthouse spaces and a rooftop helipad, with Isetann Department Store and Supermarket occupying its first seven floors. The tower has 19,800 m (213,000 sq ft) of total space and was completed in 1984. The tower also serves as the former headquarters of the Araneta Group and currently houses local companies, which includes

SECTION 20

#1732801165360

3058-569: Is a 31-storey mixed-use tower directly connected to the Gateway Mall . Completed in 2014, the tower serves as the headquarters of the Araneta Group and other Business Process Outsourcing (BPO) companies. The tower also comprises retail spaces, more commonly known as the Gateway Tower Mall, corporate office spaces, which are currently occupied by the Araneta Group , 3 penthouse levels, and a helipad. The Araneta City Cyberpark

3197-452: Is a 8-hectare (20-acre) office development complex located within the city's southern cluster and serves as the office and information technology (IT) Hub components of the area, and houses both international and local companies, primarily Business Process Outsourcing (BPO) companies. The complex currently comprises two towers, namely Cyberpark Tower 1 and Tower 2, which are completed in 2016 and 2019, respectively. One tower, Cyberpark Tower 3,

3336-409: Is a budget hotel located adjacent to the Gateway Mall 2 , along General Roxas Avenue. The new hotel opened its doors in a soft opening in March 2024, and features 286 rooms and features six function rooms, a lobby lounge, an all-day dining restaurant and patisserie, and a rooftop pool bar with a cantilevered pool, and is expected to be fully completed within the second half of 2024. The Aurora Tower

3475-471: Is a design tool rather than a performance-measurement tool and has tended to focus on energy modeling rather than actual energy consumption. It has been criticized for a point system that can lead to inappropriate design choices and the prioritization of LEED certification points over actual energy conservation; for lacking climate specificity; for not sufficiently addressing issues of climate change and extreme weather; and for not incorporating principles of

3614-582: Is a model supported by CAGBC and the Canada Infrastructure Bank (CIB) for the verification of proposed retrofit projects. LEED certification is granted by the Green Building Certification Institute (GBCI), which arranges third-party verification of a project's compliance with the LEED requirements. The certification process for design teams consists of the design application, under the purview of

3753-579: Is also occupied by banks, convenience stores, food stalls, and restaurants within the tower's commercial levels. The Cyberpark Tower 3 is third tower of the project, and is the latest tower being built in the complex, which is currently under construction, soon to rise on the former Alorica (EGS) Building site. The tower will be similarly designed to the Cyberpark Tower 2, standing 31 storeys high, and having 97,000 m (1,044,099.31 sq ft) of office spaces, while having 91,000 m (979,515.85 sq ft) of gross floor area. The tower also features

3892-405: Is also occupied by gyms, beauty services stalls, banks, a 7-Eleven convenience store; restaurants, food stalls and coffee stores such as Taco Bell , CoCo Fresh Tea & Juice and Starbucks ; and The Medical City Clinic Cubao Branch. The tower is also connected to nearby SM Cubao via Elevated Bridge. In November 2022, PartnerHero opened their first private office in the country, and occupies

4031-562: Is also set to open its second hotel in the area in 2023, with the opening of the Ibis Styles Araneta City . Meanwhile, three hotels in the area are owned by different companies, such as Cheers Hotel, located along EDSA , Hotel Dreamworld, which is formerly occupied by Eurotel, and Eurotel, which occupies the first seven floors of the Vivaldi Residences Cubao , serve as the budget hotel component within

4170-480: Is currently being constructed, and will be similarly designed to its predecessor, the Cyberpark Tower 2. The upcoming tower is aimed to be completed in the 1st quarter of 2025. The Araneta City is also home to other commercial buildings within the area, wherein some of the buildings served as movie theaters repurposed into various purposes, or newly built buildings within the 2000s. These buildings are presently occupied by Puregold , Rex Bookstore , Savemore Market ,

4309-557: Is currently in the planning stages. Araneta City Araneta City (stylized in all lowercase ), formerly and still commonly known as Araneta Center , is a 35-hectare (86-acre) transit oriented , commercial mixed-use urban development in Quezon City , Philippines. Situated in Barangay Socorro in Cubao , and at the intersection of two major roads, Epifanio de los Santos Avenue (EDSA) and Aurora Boulevard ,

Araneta City Cyberpark - Misplaced Pages Continue

4448-589: Is currently in the planning stages. The Cyberpark Tower 5 is a planned 40-storey office building planned to be built on the Araneta City Jeepney Terminal and the private Araneta White House complex, which includes the Colombian Honorary Consulate. The tower will be located alongside the Cyberpark Tower 2, the Cyberpark Tower 3, and P. Tuazon Boulevard. The planned tower will feature an oval-shaped building design, and

4587-641: Is designed by ASYA Design and ACI Inc. serves as the owner and developer of the project. The redevelopment project is part of the Araneta City Master Plan . The Araneta City Cyberpark is part of the Araneta City master plan unveiled in 2000, and was rolled out in 2002, situated in an 8 hectares (20 acres) property along Gen. Aguinaldo, Gen. Araneta, and Gen. McArthur Avenues, primarily for Business Process Outsourcing/Information Technology (BPO-IT) office development. The development sits on

4726-591: Is directly connected to the Cyberpark Tower One , located along General Aguinaldo Avenue. On 3 October 2022, the building was renamed as SM Araneta City, after an agreement was made between the Araneta Group and SM Retail to rename the building. The Fiesta Carnival is an indoor amusement park located along General Aguinaldo and General McArthur Avenues. Following the closure of the original Fiesta Carnival, an indoor amusement park which occupied

4865-482: Is owned by ACI, Inc., a subsidiary of the Araneta Group , who also serves as the developer and manager of the commercial area. ACI, Inc. is also currently in charge of spearheading a redevelopment master plan after years of delays and issues, which aims to transform the area into a "garden city" and consists of additional buildings, shopping malls, and other high-rise facilities within the complex, set to be completed within 2030. The 35 hectares (86 acres) property where

5004-525: Is the "Manhattan Tower" project, a mixed-use, high-rise development with retail and residential facilities. The problem also caused the Araneta Group to strengthen its key subsidiaries to finance the company's future projects. During the construction of the MRT Line 3 along Epifanio de los Santos Avenue (EDSA) in 1996, the Araneta Group saw the potential opportunity to revamp the complex and proposed plans to once again begin its redevelopment plans and push

5143-666: Is the first tower of the project, and standing 30 storeys high on the former EGS parking lot. Formerly known as the "Gateway Tower 2" project, which is named after the Gateway Tower , the construction of the tower started in February 2014, and was completed in May 2016. The Cyberpark Tower 1 has a total floor area of 94,000 m (1,011,807.58 sq ft) of office space, with 3 basement parking levels and 3 retail levels. The tower also features an asymmetrical window facade with floor-to-ceiling double glazed windows for energy efficiency,

5282-440: Is the first version of the LEED rating system to be based on the June 2022 Future of LEED principles. The LEED v5 rating system will cover both new construction and existing buildings. An initial draft version was discussed at Greenbuild 2023. The beta draft of LEED v5 was released for an initial period of public comment on April 3, 2024. Changes were made in response to nearly 6,000 comments. A second public comment period

5421-529: Is the fourth tower of the project, which will rise as a 30-storey office building, and is planned to be built on the current site of the Telus House and across Cyberpark Tower 2, with a direct connection to the Gateway Mall 3. The tower will also have the same features with its predecessors, and is currently on the planning stages. The fifth and final office building planned in the Cyberpark complex, which

5560-722: Is the renovations of Ali Mall and SM Cubao in 2010, Shopwise in 2012, and the Farmers Plaza in 2014, as well as the construction of the first 12 towers of the Manhattan Gardens complex, the Gateway Tower , the Novotel Manila Araneta City , and the Araneta City Cyberpark Towers 1 and 2. The completion of the first phase is set within 2024, with the completion of the Manhattan Plaza Tower 2 and opening of

5699-413: The Araneta Group decided to move the carnival into an open lot located in the south west corner lot of the complex, across SM Cubao . Unfortunately, the outdoor complex did not click the public and was completely closed down years later. From the beginning of the late 1990s to 2001, the steady rise of the demand of business process outsourcing firms being founded in the country continues to contribute to

Araneta City Cyberpark - Misplaced Pages Continue

5838-538: The Arroyo administration as part of their economic programs. Due to the huge market potential of the industry and the successful launches of various BPO companies, the rising BPO industry also attracted the Araneta Group and prompted the company to launch the Cyberpark Master Plan in 2000, which also began to develop similar properties to cater the rapid rise of the industry, starting with the completion of

5977-667: The Canada Green Building Council (CAGBC) received permission to create LEED Canada-NC v1.0, which was based upon LEED-NC 2.0. As of 2021, Canada ranked second in the world (not including the USA) in its number of LEED-certified projects and square feet of space. Buildings in Canada such as Winnipeg's Canadian Museum for Human Rights are LEED certified due to practices including the use of rainwater harvesting , green roofs, and natural lighting. As of March 18, 2022,

6116-480: The Gateway Tower . In 2019, Accenture began relocating their business activities from the Gateway Office Building to the Cyberpark Tower 1 in order to cater the company's expansion, which was completed in 2022. Cibo, an Italian restaurant owned by Margarita Forés , occupies office spaces along the tower's seventh floor, which serves as the company's headquarters. The tower's commercial level area

6255-1006: The International Building Code , only members of the USGBC and specific "in-house" committees may add to, subtract from, or edit the standard, subject to an internal review process. Proposals to modify the LEED standards are offered and publicly reviewed by USGBC's member organizations, of which there were 4551 as of October 2023. LEED has evolved since 1998 to more accurately represent and incorporate emerging green building technologies. LEED has developed building programs specific to new construction (NC), core and shell (CS), commercial interiors (CI), existing buildings (EB), neighborhood development (ND), homes (LEED for Homes), retail, schools, and healthcare. The pilot version, LEED New Construction (NC) v1.0, led to LEED NCv2.0, LEED NCv2.2 in 2005, LEED 2009 ( a.k.a. LEED v3) in 2009, and LEED v4 in November ;2013. LEED 2009

6394-411: The Manhattan Gardens currently has eleven towers in completion, and is now set to construct several additional condominium towers on the pipeline within the former Rustan's Superstore and the present Araneta City Bus Station. Another residential project located within the complex is the Vivaldi Residences Cubao , a 40-storey mixed-use tower, located along the northwestern side of the complex, and along

6533-482: The Novotel Manila Araneta City and the upcoming Ibis Styles Araneta City . The early planning stages of the complex began in 2012, wherein among the plans laid out consists of an open-air outdoor park with an intersecting road in between the towers, while having a total of 5 levels for retail, directly connected via footbridges. In 2014, the master plan was finalized, wherein the development will consist of 5 towers with varied architectural designs. The implementation of

6672-549: The Philippine American Life and General Insurance Company , and other local firms. The Manhattan Gardens is a four-phase (Parkway, Parkview, Heights, Plaza) condominium complex, serving as the first transit-oriented residential development in the country, and occupies 5.7-hectare (14-acre) hectares of the Araneta City. The development project will have a total condominium units of 9,000 units spread out through 18 residential towers upon completion. At present,

6811-414: The Province of Rizal , the Cyberpark Tower 2 has 97,000 m (1,044,099.31 sq ft) of office space, featuring a curved building design, floor-to-ceiling double-glazed energy-efficient windows, smart elevators, side balconies with planters, solar panels on the tower's rooftop, and a rainwater recovery system. The final design of the tower was initially planned to include vertical trellises and erect

6950-464: The U.S. Environmental Protection Agency 's (EPA) Labs21 and LEED Canada. The Australian Green Star is based on both LEED and the UK's Building Research Establishment Environmental Assessment Methodology ( BREEAM ). LEED 2009 encompasses ten rating systems for the design, construction and operation of buildings, homes and neighborhoods. Five overarching categories correspond to the specialties available under

7089-706: The civic center , located in the middle of the complex. The upcoming complex will also be influenced from the Rockefeller Center in New York City . The Araneta Mansion, which is commonly known as the White House, and is often translated as the Bahay Na Puti, is also located within the Araneta City, occupying the southwest corner of the complex located along the corner of P. Tuazon Boulevard and Epifanio de los Santos Avenue , and serves as

SECTION 50

#1732801165360

7228-427: The "Palenque" food alley, a 18-cinema cineplex , the "Asian Village" food hall, a K-Pop and P-Pop themed Cafe, a bowling center, a sensory and culinary garden, and a " Mitre " inspired 1,000-seater Sagrada Familia Church. The new expansion of the mall was completed in September 2023. The Ali Mall is a four-storey mall located within the corner lot of P. Tuazon Boulevard, and General Romulo Avenue, Ali Mall served as

7367-422: The 7th floor in the tower. On 31 August 2023, Everise became the tower's latest tenant, and serves as the company's first branch in Quezon City . One of the planned original tenants of the tower was Expert Global Solutions (EGS), after the company announced its plans to relocate their operation to the tower in early 2016. However, after lengthy negotiations with the Araneta Group and Alorica's acquisition of EGS,

7506-592: The Araneta Center was renamed as Araneta City after a brand relaunch. The Araneta City hosts over 2,100 shopping, dining and leisure establishments throughout the complex, notably included in its tenants are located in malls such as Ali Mall , Farmers Plaza , and the Gateway Mall , as well as in SM Araneta City and Farmer's Market, which has a combined retail space of 438,900 m (4,724,000 sq ft). Other tenants are apparently located on

7645-583: The Araneta City Bus Terminal was razed down by fire. The following day, at 12:00 noon, the fire has once again reignited and was placed on first alarm, before being fully watered down a few hours later. Two days later, on February 11, 2023, jeepney operations within the terminal were revived and once again have resumed operations. Leadership in Energy and Environmental Design Leadership in Energy and Environmental Design ( LEED )

7784-652: The Araneta City Parking Garage South, a green parking building completed in August 2012, which is equipped with systems that decreases carbon emissions in the atmosphere, located at the southern part of the Smart Araneta Coliseum . The parking building is capable of storing over 1,500 vehicles. Often known as the "Big Dome", the Smart Araneta Coliseum is an indoor arena located along General Aguinaldo Avenue. Construction for

7923-676: The Araneta City, formerly named Araneta Center, is located in Quezon City , and was purchased by J. Amado Araneta in 1952, after the family's mansion in Taft Avenue , Manila was destroyed during the Battle of Manila in 1945. The land stood on bedrock, and has an elevation level of 43 meters, which is the highest point of the Metro Manila , located between Highway 54 (now Epifanio de los Santos Avenue ), Aurora Boulevard , and P. Tuazon Boulevard; and along Gen. Romulo Avenue. As of 1959,

8062-481: The Araneta Enterprise Building along Aurora Avenue. PDC would be later tasked to develop the Araneta Coliseum . In the following years after the opening of the Araneta Coliseum in 1960, rapid development took place in the area. From the 1960s until the 1980s, there was a construction boom around the complex, and the area became a bustling entertainment and leisure hub, with the creation of

8201-971: The Aurora Tower. The developments around the complex caused the area to prosper over the years and competed with other business districts in the Metro, such as Manila , the Makati Central Business District , the Greenhills Center , and the Ortigas Center . The Araneta City and the surrounding areas also served as the home of many movie theaters such as the Nation Cinerama, Quezon Theater, Cinema 21, Sampaguita Theater, ACT Theater, Ocean Theater, Diamond Theater, Remar Theater, Alta Cinema, and Coronet Theater, all of which were constructed and completed between

8340-497: The Canada Green Building Council took over direct oversight for LEED™ green building certification of projects in Canada, formerly done by GBCI Canada. CAGBC will continue to work with Green Business Certification Inc. (GBCI) and USGBC while consolidating certification and credentialing for CAGBC's Zero Carbon Building Standards, LEED, TRUE, and Investor Ready Energy Efficiency (IREE). IREE

8479-572: The City Plaza is a 2 hectares (4.9 acres) mixed-use development consisting of five towers with approximately 60 storeys skyward or higher for each tower. The City Plaza will also feature a four-star hotel, premium grade offices, luxury residential towers, leisure and retail spaces, and green amenities such as the "Spanish Steps", which were inspired from the Spanish Steps in Rome , Italy , and

SECTION 60

#1732801165360

8618-439: The Cyberpark was laid out in 2007, and began construction in the same year, before being completed in 2008. The complex is composed of 2 4-storey low-rise buildings, with 5 additional low rise buildings planned during the early planning phases. The two buildings were occupied by companies, such as Telus , APAC Customer Services Inc., Advanced Contact Solutions , Agentworx Contact Solutions, and Expert Global Solutions . Following

8757-681: The EPA's Tools for the Reduction and Assessment of Chemical and Other Environmental Impacts (TRACI) and the environmental-impact weighting scheme developed by the National Institute of Standards and Technology (NIST). Prior to LEED 2009 evaluation and certification, a building must comply with minimum requirements including environmental laws and regulations, occupancy scenarios, building permanence and pre-rating completion, site boundaries and area-to-site ratios. Its owner must share data on

8896-473: The Farmer's Garden area; and a planned expansion of Ali Mall, which includes a 4-tower mixed-use development located along the northern area of the mall. The overall redevelopment master-plan covers 3,000,000 m (32,000,000 sq ft) square meters of gross floor area and are set within the target completion date of 2030, as part of the company's Vision 2030 plan within the area. On September 24, 2019,

9035-755: The Farmers Plaza Bus Stop, located along EDSA while plans are also being laid out to construct a bus stop to cater buses from the EDSA Busway . Aside from provincial destinations, the Araneta City Busport also offers local routes within Metro Manila and Bulacan , as well as the UBE Express Premium Point-to-Point Airport Bus Service, which connects Araneta City to Manila International Airport . The complex also offers

9174-414: The Gateway Office Building in 2005, which is primarily occupied by Accenture . The Cyberpark also became part of the finalized Araneta Center Redevelopment Plan in 2006, following the opening of the Gateway Mall in 2004, which also featured the Manhattan Gardens , the Gateway Tower , and a proposed 400-room business hotel, which became known today as Novotel Manila Araneta City . The first master plan of

9313-464: The IEQ category addresses thermal , visual, and acoustic comfort as well as indoor air quality . Laboratory and field research have directly linked occupants' satisfaction and performance to the building's thermal conditions. Energy reduction goals can be supported while improving thermal satisfaction. For example, providing occupants control over the thermostat or operable windows allows for comfort across

9452-550: The Icon Tower, a planned 40+ storey tower, connected from the Manhattan Plaza. The master plan will also include a multi-billion dollar 8 hectares (20 acres) Integrated resort consisting hotels, dining, entertainment, gaming, conventions and conferences, luxurious retail shops, a modernised Farmer's Market, and a heritage area located along EDSA, spanning from the Farmer's Market and its surrounding buildings, up to

9591-569: The LEED Pilot Committee from 1996–2001. Scot Horst chaired the LEED Steering Committee beginning in 2005 and was deeply involved in the development of LEED 2009. Joel Ann Todd took over as chair of the steering committee from 2009 to 2013, working to develop LEED v4, and introducing social equity credits. Other steering committee chairs include Chris Schaffner (2019) and Jennifer Sanguinetti (2020). Chairs of

9730-823: The LEED professional program. That suite consists of: LEED v3 aligned credits across all LEED rating systems, weighted by environmental priority. It reflects a continuous development process, with a revised third-party certification program and online resources. Under LEED 2009, an evaluated project scores points to a possible maximum of 100 across six categories: sustainable sites (SS), water efficiency (WE), energy and atmosphere (EA), materials and resources (MR), indoor environment quality (IEQ) and design innovation (INNO). Each of these categories also includes mandatory requirements, which receive no points. Up to 10 additional points may be earned: 4 for regional priority credits and 6 for innovation in design. Additional performance categories for residences (LEED for Homes) recognize

9869-449: The LEED rating system, including LEED Accredited Professional (LEED AP), LEED Green Associate, and LEED Fellow. The Green Building Certification Institute (GBCI) describes its LEED professional accreditation as "demonstrat[ing] current knowledge of green building technologies, best practices" and the LEED rating system, to assure the holder's competency as one of "the most qualified, educated, and influential green building professionals in

10008-836: The Leadership in Energy and Environmental Design (LEED) green certification program was Natural Resources Defense Council (NRDC) senior scientist Robert K. Watson . It was Watson, sometimes referred to as the "Founding Father of LEED", who created the acronym. Over two decades, Watson led a broad-based consensus process, bringing together non-profit organizations, government agencies, architects, engineers, developers, builders, product manufacturers and other industry leaders. The original planning group consisted of Watson, Mike Italiano, architect Bill Reed (founding LEED Technical Committee co-chair 1994–2003), architect Sandy Mendler, builder Gerard Heiber and engineer Richard Bourne. Tom Paladino and Lynne Barker (formerly King) co-chaired

10147-864: The US, the District of Columbia consistently leads in LEED-certified square footage per capita, followed in 2022 by the top-ranking states of Massachusetts, Illinois, New York, California, and Maryland. Outside the United States, the top-ranking countries for 2022 were Mainland China, India, Canada, Brazil, and Sweden. LEED Canada has developed a separate rating system adapted to the Canadian climate and regulations. Many U.S. federal agencies, state and local governments require or reward LEED certification. As of 2022 , based on certified square feet per capita,

10286-576: The USGBC's Energy and Atmosphere Technical Advisory Group for LEED technology have included Gregory Kats . The LEED initiative has been strongly supported by the USGBC Board of Directors, including Chair of the Board of Directors Steven Winter (1999–2003). The current chair of the Board of Directors is Anyeley Hallová (2023). LEED has grown from one standard for new construction to a comprehensive system of interrelated standards covering aspects from

10425-406: The amusement park was set within November 2023, yet was eventually moved to December 2023. On December 9, 2023, the Araneta Group and REKS Amusement launched the soft opening of the revived Fiesta Carnival, which offers a variety of indoor activities, arcade video games, food kiosks, and a carnival themed activity area. Full operations of the amusement park began on December 16, 2023, a week after

10564-466: The application of LEED guidelines in several southern states. In 2013, the states of Alabama, Georgia and Mississippi effectively banned the use of LEED in new public buildings, in favor of other industry standards that the USGBC considers too lax. LEED is considered a target of a type of disinformation attack known as astroturfing , involving "fake grassroots organizations usually sponsored by large corporations". Unlike model building codes, such as

10703-401: The architect and the engineer and documented in the official construction drawings, and the construction application, under the purview of the building contractor and documented during the construction and commissioning of the building. A fee is required to register the building, and to submit the design and construction applications. Total fees are assessed based on building area, ranging from

10842-609: The area offers retail, dining, entertainment, residential, office, lodging and parking facilities throughout the complex and hosts over 1 million people daily, due to its close proximity to transport terminals, including the railway stations of the MRT Line 3 and the LRT Line 2 . Located within the complex are key structures such as the Gateway Mall , the Araneta Coliseum , the New Frontier Theater , Ali Mall , Farmers Market , and Farmers Plaza . The entire complex

10981-483: The area was remote and located in an area designated for suburban mass housing and frequented by Hukbalahap rebels. The original owner of the property was the Radio Corporation of America (RCA). In 1953, Araneta initially only purchased 4 hectares (9.9 acres) of land from RCA, where he built his residence, which would become known as the "Bahay na Puti" (White House). It was in 1955 that Araneta purchased

11120-412: The area's revival and redevelopment, which is expected to be worth ₱140 billion ($ 5.32 billion). After a series of negotiations, and along the uncertainties caused by the 1997 Asian financial crisis , the Araneta Group decided to drop the proposal in order to push their own redevelopment plan using the company's own finances assisted by various bank loans. With the ambition of regaining its former glory,

11259-476: The area, a capital slump within the Araneta Group 's finances, and neglect on their buildings, causing rising crime rates and low business opportunities, prompting the Araneta group to temporarily use their capital to maintain the properties within the area, and halt their future plans and proposals to upgrade the area's potential and other big-scale redevelopment plans within the area. One noted planned development

11398-648: The basement area of the Farmers Plaza, the market has 12,000 m (130,000 sq ft) of market space and offers fresh produces in the country. The National Book Store Superbranch in Cubao, which is also known as the National Book Store Outlet Store, serves as one of the largest branches of the office-supplies store chain in the Philippines. The bookstore first became a single-floor building in 1972, before being upgraded into

11537-484: The benefits promised." The LEED for Homes rating system was first piloted in 2005. It has been available in countries including the U.S., Canada, Sweden, and India. LEED for Homes projects are low-rise residential . The process of the LEED for Homes rating system differs significantly from the LEED rating system for new construction. Unlike LEED, LEED for Homes requires an on-site inspection. LEED for Homes projects are required to work with either an American or

11676-410: The building from its opening in 1971 to the late 1990s, Shopwise opened its doors in 2004 and serves as one of the biggest branches of the supermarket brand, which has a 18,000 m (190,000 sq ft) of retail space. On July 28, 2023, Shopwise moved to the lower ground section of the new Gateway Mall 2 , while efforts were made to revive the complex. The original target date of the opening of

11815-502: The building industry to support green building and develop a green building rating system. Also influential early on was architect Bob Berkebile. Fedrizzi served as the volunteer founding chair of USGBC from 1993 to 2004, and became its CEO as of 2004. As of November 4, 2016, he was succeeded as president and CEO of USGBC by Mahesh Ramanujam. Ramanujam served as CEO until 2021. Peter Templeton became interim president and CEO of USGBC as of November 1, 2021. A key player in developing

11954-571: The building's energy and water use for five years after occupancy (for new construction) or date of certification (for existing buildings). The credit weighting process has the following steps: First, a collection of reference buildings are assessed to estimate the environmental impacts of similar buildings. NIST weightings are then applied to judge the relative importance of these impacts in each category. Data regarding actual impacts on environmental and human health are then used to assign points to individual categories and measures. This system results in

12093-430: The certification points), quality of life (25%) and conservation and ecological restoration (25%) in terms of five principles: decarbonization, ecosystems, equity, health and resilience. One of the reponses to public comments was to emphasize a data-driven approach to Operations and Maintenance by more clearly identifying performance-based credits (80% of points) and decoupling them from strategic credits (20%). In 2003,

12232-417: The coliseum began in 1957, before being completed in 1960, and hosted numerous events since its opening, ranging from various concerts, sports matches, gatherings, and entertainment purposes. In the aftermath of the Araneta Center redevelopment plan, plans were also laid out to demolish the Araneta Coliseum in 1999, due to high maintenance costs and amusement taxes. These problems gained little to no revenue in

12371-573: The combined parking space within the complex has a total capacity of housing over 3,100 vehicles. The complex is also connected to other buildings and developments within the Araneta City via sky bridges and walk paths. The development was completed on 2024, with the completion of the Gateway Mall 2 and the Ibis Styles Hotel. Set to be built within the Shopwise Supermarket, which is currently being revived as Fiesta Carnival,

12510-423: The company's plans for long-term development. The redevelopment dream was further titillated in the aftermath of the construction of the LRT Line 2 a year later, and prompted J. Amado's son, Jorge L. Araneta to launch a multi-phase master plan to reinvigorate their long-waited vision. In January 1997, plans were also laid out to create a joint venture partnership with Ayala Land and Atok-Big Wedge Co. to push for

12649-487: The complex, including the "Millenium Mall" project, a planned 7-storey mall which is interconnected to the Araneta Coliseum , the "Manila Tower", a 300 m (984.3 ft) planned mixed-use tower with communications facilities, and a modernization of the complex's entertainment venues, the Araneta Coliseum and the New Frontier Theater . The redevelopment is also envisioned to have a 972,000 m (10,460,000 sq ft) of total retail floor area. The first phase of

12788-434: The complex. The Novotel Manila Araneta City is a 24-storey, mid-scale hotel located at the southeast corner to the Araneta Coliseum , and serves as the first Novotel hotel in the country. The hotel has a total of 401 rooms and features five restaurants, seven meeting and function rooms, a spa room, a play area, an open-air events space, a Premium Lounge and a penthouse at the topmost floor. The Ibis Styles Araneta City

12927-447: The corners of EDSA and Aurora Boulevard . Owned and managed by Euro Towers International Inc., the tower began construction in 2011, before being completed in 2016, and houses Eurotel on its first seven floors. The Gateway Square is a 5-hectare (12-acre) mixed-use superblock development located in the central part of the Araneta City. The development has a total floor area of 400,000 m (4,300,000 sq ft) and consists of

13066-463: The country's GDP through foreign and local investments, which also contributed to the creation of jobs in various sectors, and enabling the country to take a spot in the global outsourcing market in 2005 by attributing a total average of 3% of the total global output, making the BPO industry one of the fastest growing industries in the country. Developments for BPO related industries flourished further during

13205-402: The country, a newer and updated master plan was finalized, consisting of 5 PEZA certified and LEED -approved towers, with 3 levels of retail podium spaces, surrounding the future Gateway Mall 3 set to rise in the complex, and are also connected to malls and nearby buildings such as SM Cubao , Ali Mall , the Manhattan Gardens condominiums, the Araneta Coliseum , the New Frontier Theater ,

13344-563: The design and construction to the maintenance and operation of buildings. LEED has also grown from six committee volunteers to an organization of 122,626 volunteers, professionals and staff. As of 2023 , more than 185,000 LEED projects representing over 28 billion square feet (2.6 × 10 ^  m ) have been proposed worldwide, and more than 105,000 projects representing over 12 billion square feet (1.1 × 10 ^  m ) have been certified in 185 countries. However, lumber, chemical and plastics trade groups have lobbied to weaken

13483-400: The effects of the COVID-19 pandemic in the Philippines , as well as market driven factors, financial problems and a case settlement with Megawide Construction Corporation regarding the construction issues of the Cyberpark Tower 2, the Gateway Mall 2 and the Ibis Styles Araneta City , the construction of the tower was temporarily delayed. In August 2022, the general contractor for the project

13622-549: The eight properties, namely the Gateway Mall , the Gateway Mall 2 , the Gateway Tower , the Gateway Office, the Smart Araneta Coliseum , the Novotel Manila Araneta City , the Ibis Styles Araneta City and the Parking Garage South. The mixed-use area is the first of its kind in the country as the complex offers a direct connection of malls, offices, hotels, a sports arena, cinemas, and parking spaces, as

13761-465: The example of debating whether to add a reflective roof, used to can counter "heat island" effects in urban areas, to a building high in the Rocky Mountains. A 2012 USA Today review of 7,100 LEED-certified commercial buildings found that designers tended to choose easier points such as using recycled materials, rather than more challenging ones that could increase the energy efficiency of

13900-536: The fire from the adjacent Araneta City Terminal on February 9, 2023, and was initially restored as the Times Square Food Park on November 10, 2023, following the lighting of the 100-foot giant Christmas Tree situated in the area. The Araneta City is also host of some of Metro Manila's major event venues, such as the Smart Araneta Coliseum and the New Frontier Theater . The city also offers around 10,000 parking spaces, including parking spaces from

14039-547: The first integrated mall in the country, following its opening in 1976. Named after Muhammad Ali in the aftermath of his fight against Joe Frazier in the Thrilla in Manila , held at the Araneta Coliseum . The mall has 64,500 square meters (694,000 sq ft) of floor area and is occupied by local shops, restaurants, and government facilities. The Farmers Plaza is a 5-storey mall located along EDSA . Completed in 1969,

14178-421: The first strip mall in the country composed of 147 stores, located along Aurora Boulevard , and the creation of Ali Mall , SM Cubao , Fiesta Carnival (later the site of a Shopwise hypermarket), Plaza Fair, New Frontier Theater , Rustan's Superstore, National Book Store Superbranch, COD Department Store, Matsuzakaya Department Store and Matsuzakaya House, Uniwide Cubao, Farmers Plaza , Farmer's Market, and

14317-434: The ground floor. The building will soon be demolished in order to give way for the construction of the Gateway Mall 3 , a 5-storey 100,000 m (1,100,000 sq ft) expansion project of the Gateway Mall , and the Cyberpark Tower 4. The future development will feature eco-friendly initiatives, additional retail spaces and an elevated, green, outdoor park, and is currently on the planning stage. The Cyberpark Tower 1

14456-401: The importance of transportation access, open space, and outdoor physical activity, and the need for buildings and settlements to educate occupants. Buildings can qualify for four levels of certification: The aim of LEED 2009 is to allocate points "based on the potential environmental impacts and human benefits of each credit". These are weighed using the environmental impact categories of

14595-475: The international architectural firm RTKL Associates , along with local architectural firms Palafox Associates, owned by Felino Palafox , ASYA Design, and Aidea, for the redevelopment master plan. Araneta also tapped Deshazo Starek and Tang (now Deshazo Group), Jones Lang LaSalle Incorporated and Colliers International to serve as the main consultants of the master plan. The plans for the master plan include additional malls, towers and renovated facilities within

14734-586: The leading five states (after the District of Columbia ) were Massachusetts, Illinois, New York, California, and Maryland. Incentives can include tax credits, zoning allowances, reduced fees, and expedited permitting. Offices, healthcare-, and education-related buildings are the most frequent LEED-certified buildings in the US (over 60%), followed by warehouses, distribution centers, retail projects and multifamily dwellings (another 20%). Studies have found that for-rent LEED office spaces generally have higher rents and occupancy rates and lower capitalization rates. LEED

14873-525: The main tenants of the tower, occupying 7 floors aboveground and a recruitment hub located at the ground floor of the tower. The tower is also housed by the ACI Inc. and companies under by the Philippine Pizza Inc. (PPI), wherein both are subsidiaries of the Araneta Group , after relocating their operations from the Aurora Tower, the company's former headquarters, in 2019. Aside from Alorica,

15012-592: The mall began in October 1978, and was completed in 1980. The mall has 102,000 m (1,100,000 sq ft) of space and it is the largest department store building of SM Store in the country, occupying the mall's first 3 floors and has a floor area of 85,000 m (910,000 sq ft), which also presents the SM Supermarket and the Cyberzone. The building also entered renovation in June 2009 and

15151-577: The mall served as the first mall in the country and formerly house the Farmers Market until 1976. The mall has a total floor area of 60,400 m (650,000 sq ft) and is occupied by various merchandise, electronics, clothing and lifestyle stores, and a Bazaar , known as the Farmers Plaza Bazaar at the topmost floor. The Farmers Market is a wet market located adjacent to the Farmers Plaza. Opened in 1976 after occupying

15290-440: The marketplace." Critics of LEED certification such as Auden Schendler and Randy Udall have pointed out that the process is slow, complicated, and expensive. In 2005, they published an article titled "LEED is Broken; Let's Fix It", in which they argued that the certification process "makes green building more difficult than it needs to be" and called for changes "to make LEED easier to use and more popular" to better accelerate

15429-515: The nearby areas within Metro Manila and the province of Rizal , such as the former Araneta City Bus Station, which is currently occupied by BEEP Jeepneys, Modern Jeeps and UV Express operators. UV Express vehicles bound for selected destinations in Laguna , such as San Pedro , Balibago,Santa Rosa , and Santa Rosa are also available located at the Center Avenue row. The city also caters

15568-523: The new master plan is set to cost ₱20 billion and commenced with the construction of Cyberpark Tower 1 in April 2014, the Cyberpark Tower 2 in February 2016, and the Cyberpark Tower 3 in 2023. The development is also outlined to interconnect all office towers within the Cyberpark through the complex's basement parking and retail levels, and will also include a planned road extension of the Gen. Araneta Avenue, linking

15707-532: The offices of the Honorary Consulate of Colombia as tenants occupy the upper levels of the building. The Gateway Office is a PEZA-certified 11-storey office building situated along Aurora Boulevard and General Aguinaldo Avenue. The building has a total floor area of 6,700 m (72,000 sq ft) of office space, and is directly connected to the Gateway Mall and the LRT 2 Gateway Mall Concourse on its first three floors. The Gateway Tower

15846-474: The official residence of the Araneta family . The private property also features approximately 300 chicken dens on the mansion's western side for cockfighting and fowl breeding purposes. There are two elevated rail stations serving the area; the MRT Line 3 and the LRT Line 2 Araneta Center-Cubao stations. The area also serves as a terminal for jeepneys , BEEP Jeepneys , and UV Express vehicles serving

15985-425: The option of achieving credit points by building energy models. One model represents the building as designed, and a second model represents a baseline building in the same location, with the same geometry and occupancy. Depending on location (climate) and building size, the standard provides requirements for heating, ventilation and air-conditioning (HVAC) system type, and wall and window definitions. This allows for

16124-502: The part of the Araneta Group, despite being subsidized by the company. After further discussions and planning, Jorge Araneta decided to retain and preserve the Coliseum, due to its historical significance and its potential to cater more events in the near future. The coliseum serves as the primary events venue for local media firms and for sports-related events. The New Frontier Theater is a 2,385-seater multi-purpose events hall, which

16263-520: The plan was cancelled and the company decided to temporarily maintain their operations to the Alorica Building until March 2019, as the company moved its operations to the nearby Cyberpark Tower 2. The tower is also planned be directly connected to the upcoming Gateway Mall 3, and the Cyberpark Tower 4. The Cyberpark Tower 2 is the second tower of the project, standing 31 storeys high on the former Jeepney Terminal servicing areas within Quezon City and

16402-438: The proposed Gateway Mall 3 and other properties within the Araneta City. The following table lies the current updates of the towers as of August 2023: The Telus House is one of the first low-rise, 4-storey buildings in the original Cyberpark plan completed in 2008, and currently houses Telus as its main tenant. The building has 15,000 m (160,000 sq ft) of total office space, and features retail stores located at

16541-415: The redevelopment plan, totaling over ₱30 billion ($ 608 million) began in 2002 with the construction of the Gateway Mall , completed in 2004, which was followed by the construction of the Gateway Office in 2005, a major renovation of the Araneta Coliseum , as well as the rehabilitation of the New Frontier Theater , which were completed in 2014 and 2015, respectively. Also included in the redevelopment project

16680-695: The remaining 31 hectares (77 acres) from the RCA. After purchasing the land, Araneta envisioned the area as a potential mixed-use area. In 1956, Araneta sold a portion of the property to the Philippine National Bank which proceeded to set up a branch in the area. On the same year, the first Aguinaldo Department Store, a well-known retailer established its first branch beyond Manila . Araneta's Progressive Development Corporation (PDC) relocated its offices from Plaza Cervantes in Binondo , Manila to

16819-743: The retail levels of the Aurora Tower, the Manhattan Gardens condominium complex, the Cyberpark Towers, and on other commercial buildings. The Gateway Mall is a 6-storey mall located within General Aguinaldo Avenue and serves as the complex's flagship mall. The mall has 300,000 m (3,200,000 sq ft) of floor area and houses local and international brands such as Rustan's , H&M , Uniqlo , Automatic Centre Digital Plaza, and various lifestyle shops, tech shops, food kiosks, and restaurants. The mall

16958-491: The road to the P. Tuazon Boulevard. The development is also connected to major transport hubs such as the MRT 3 Cubao Station , the LRT 2 Cubao Station and transport terminals, with future connections to the Gateway Mall 3 , and the Gateway Mall 2 , primarily attracting business process outsourcing and corporate services companies, with plans laid out to also cater Philippine Offshore Gaming Operators . The complex also features

17097-663: The shopping malls in the Metro that led to lesser patronage to these movie theaters. It was during the late 1980s where the complex began losing steam and encountered numerous problems within its properties, from the Farmers Plaza fire to the coups against the Presidency of Corazon Aquino , the Araneta Group also faced numerous uncertainties and rising competition from newer mixed-use developments with more advantageous locations within Manila and Ninoy Aquino International Airport . The following problems created an urban decay within

17236-747: The soft opening of the complex. The complex also contains numerous al fresco dining areas, vintage shops, and plant and gardening shops catering its clientele, such as the Araneta City Expo, the Cubao Expo, the Farmers Garden, and the Manhattan Row, wherein the area also serves as an alternative outdoor concert venue. On 3 June 2022, the Araneta City Foodpark, which is also known as the Times Square Food Park,

17375-451: The success of the Cyberpark, the development led in an increase of demand for more office spaces within the area. Guided with the continuous success of the BPO industry and related companies within the area, as well as an increase of deals, partnerships, and potential investment opportunities between the Araneta Group and various BPO firms, and a rising trend of green office developments throughout

17514-433: The tower is also housed by various BPO companies such as Ibex, which also occupies multiple floors of the tower, Acquire BPO , Offshore Business Processing, and HasTech IT Limited. In February 2023, R1 RCM , an American healthcare BPO company became the latest tenant to occupy the building. On the third quarter of 2024, Genesys has relocated its operations to the Cyberpark Tower 2 from the nearby Cyberpark Tower 1. The tower

17653-431: The transition to green building. Schendler and Udall also identified a pattern which they call "LEED brain", in which participants may become focused on "point mongering" and pick and choose design elements that don't actually go well together or don't fit local conditions, to gain points. The public relations value of LEED certification begins to drive the development of buildings rather than focusing on design. They give

17792-417: The upcoming Gateway Mall 2 and Ibis Styles Araneta City . The second phase, totaling over ₱50 billion ($ 1.01 billion) is set to begin in the next few years, and will include the development of 3 additional Cyberpark Towers, 6 additional Manhattan Gardens Towers, and the Gateway Mall 3 . The phase will also include the construction of the City Plaza, a 2 hectares (4.9 acres) Mixed-use development , and

17931-476: The well-being of their occupants and as part of larger systems. In April 1993, the U.S. Green Building Council (USGBC) was founded by Rick Fedrizzi , the head of environmental marketing at Carrier, real estate developer David Gottfried , and environmental lawyer Michael Italiano. Representatives from 60 firms and nonprofits met at the American Institute of Architects to discuss organizing within

18070-399: The years 1969-1974. Many of these establishments however have been closed by the end of the 1990s, with the buildings either repurposed for commercial purposes or demolished to give way to future developments due to the introduction of the home entertainment systems, supported with the rising usage of compact discs from the 1990s to the 2000s, and the creation of in-house movie theaters inside

18209-404: Was attended by officials of the Araneta Group; JLL Philippines , which serves as the Araneta City's real estate advisor, and Telus , wherein the company serves as the tower's main tenant upon completion, as the company will move its overall operations to the tower from the Telus House located along the complex. The tower is set to be completed in the second quarter of 2025. The Cyberpark Tower 4

18348-406: Was awarded to Datem Incorporated, while the tower's groundbreaking phase continued in December 2022. On 6 February 2023, the first concrete pouring of the tower began in a ceremony attended by various Araneta Group officials, along with Binibining Pilipinas contestants. The tower is expected to be completed within the first quarter of 2025. On June 27, 2024, the tower was officially topped off and

18487-467: Was completed in January 2010, which featured a modernized facade design pattered with stripes within the grey and white colored exteriors, upgraded interiors such as the upgraded atriums with a "shower-like" LED lights display and a striped interior design, expanded floor space, and a skybridge along Times Square Avenue, linking the building to Ali Mall. Another skybridge was unveiled in February 2019, which

18626-434: Was depreciated for new projects registered from October 31, 2016. LEED v4.1 was released on April 2, 2019. Draft versions of LEED v5 have been released and revised in response to public comment during 2024. The official final version of LEED v5 is expected to be released in 2025. Future updates to the standard are planned to occur every five years. LEED forms the basis for other sustainability rating systems such as

18765-709: Was designed by RTKL Associates in partnership with Felino Palafox of Palafox Associates and received various acclaims of different organizations, as the mall was named the shopping mall as the Shopping Center of the Year for two consecutive years in 2006 and 2007 by the Philippine Retailers Association, a Merit Awardee at the International Council of Shopping Centers (ICSC) 30th Innovative Design and Development Awards, and

18904-669: Was located 16 miles (26 km) from the company's corporate headquarters in downtown San Francisco , and 15 miles (24 km) from Gap's corporate campus in Mission Bay . Although the company added shuttle buses between buildings, "no bus is as green as an elevator". Similarly, in Walkable City (2013), Jeff Speck describes the relocation of the Environmental Protection Agency ' s Region 7 Headquarters from downtown Kansas City, Missouri , to

19043-433: Was opened for the revised version, from September 27 to October 28, 2024. The official release of the final version of LEED v5 is expected to occur in 2025. Future updates of the certification system are planned to occur every five years. LEED v5 reorganizes the credits system and prerequisites, and has a greater focus on decarbonization of buildings. The scorecard expresses three global goals of climate action (worth 50% of

19182-549: Was repurposed in partnership with S&T Leisure Worldwide and became the Araneta Fiesta Park, offering outdoor rides, attractions and outdoor dining spaces. On November 11 of the same year, Araneta City revives the iconic Christmas On Display (COD), mounted inside the Carnival, while on November 18, the Araneta Fiesta Park rebrands as Mini Fiesta Carnival. The Fiesta Carnival Park halted their operations due to

19321-517: Was the largest theater in the Philippines when it opened in 1967. The theater is currently used as an alternative to the Smart Araneta Coliseum for small scale concerts and meet up gatherings. The complex currently houses five hotels, wherein two of the hotels are owned by Araneta Hotels Inc., in partnership with Accor Hotels. One of these hotels is the Novotel Manila Araneta City , which opened its doors in 2015. The Araneta Group