67-500: Brisbane Metro is a high-frequency bus rapid transit system that services the city of Brisbane in Queensland , Australia. It consists of two routes that run through the Brisbane CBD every five minutes during peak times (12bph), transporting up to 1,800 passengers per hour in each direction. The Metro temporarily operated a trial service on the 169 between UQ and Eight Miles plains between 21 October and 17 November. Metro Routes M1 and M2 are expected to temporarily commence at
134-621: A "BHLS" (stands for Bus with a High Level of Service ). The term transitway was originated in 1981 with the opening of the OC Transpo transitway in Ottawa , Ontario , Canada. Critics have charged that the term "bus rapid transit" has sometimes been misapplied to systems that lack most or all the essential features which differentiate it from conventional bus services. The term " bus rapid transit creep " has been used to describe severely degraded levels of bus service which fall far short of
201-494: A BRT system to 35,000 passengers per hour. The single-lane roads of Istanbul Metrobus had been frequently blocked by Phileas buses breaking down, causing delays for all the buses in a single direction. After focusing on Mercedes-Benz buses, capacity increased to 45,000 pph. Light rail, by comparison, has reported passenger capacities between 3,500 pph (mainly street running) to 19,000 pph (fully grade-separated ). Adelaide Street, Brisbane Adelaide Street
268-532: A Temporary Terminus at Queen Street in early 2025 with full integration with the Inner Northern Busway via a new tunnel under Adelaide Street to begin in mid to late 2025. It is serviced by 60 electric , bi-articulated buses that can carry 150 passengers, or 170 passengers during events. The system largely uses Brisbane's existing busway network infrastructure and stations, with a number of smaller infrastructure upgrades being built as part of
335-425: A conventional bus system. Typically, a BRT system includes roadways that are dedicated to buses , and gives priority to buses at intersections where buses may interact with other traffic; alongside design features to reduce delays caused by passengers boarding or leaving buses, or paying fares . BRT aims to combine the capacity and speed of a light rail transit (LRT) or mass rapid transit (MRT) system with
402-595: A hub for Brisbane's buses, with services operated under Translink . Entrances to King George Square busway station and Central station are also accessed from Adelaide Street side of King George Square and Anzac Square . [REDACTED] Australian Roads portal [REDACTED] This Misplaced Pages article incorporates text from "The Queensland heritage register" published by the State of Queensland under CC-BY 3.0 AU licence (accessed on 7 July 2014, archived on 8 October 2014). The geo-coordinates were computed from
469-772: A key education, knowledge health corridor by connecting the University of Queensland with the Royal Brisbane & Women's Hospital , Boggo Road transport hub and Princess Alexandra Hospital and the Queensland University of Technology, Kelvin Grove Campus via the Eastern and Northern busways. Below is a list of stations that Metro 2 will service and its available transport connections. The project introduced 60 bi-articulated buses based on
536-428: A low-noise, low-emissions "hush mode" (in which the diesel engine operates but does not exceed idle speed ) when underground. The need to provide electric power in underground environments brings the capital and maintenance costs of such routes closer to those of light rail, and raises the question of building or eventually converting to light rail. In Seattle, the downtown transit tunnel was retrofitted for conversion to
603-570: A new busway tunnel as part of a new Gympie Road bypass tunnel would be built north of chermside and the existing Northern busway between RBWH and Kedron Brook bus stations would be used for a Metro extension on the Northside of Brisbane. Bus rapid transit Bus rapid transit ( BRT ), also referred to as a busway or transitway , is a trolleybus , electric bus and public transport bus service system designed to have much more capacity , reliability , and other quality features than
670-545: A programme of city beautification and street improvements, including the cutting down and widening of several of the principal thoroughfares. From 1923 to 1928 the Brisbane City Council implemented its most ambitious town improvement scheme to that date: the widening of Adelaide Street by 14 feet (4.3 m) along its entire length. Resumptions in Adelaide Street had commenced in the 1910s, but work on
737-449: A result, less forced ventilation will be required in tunnels to achieve the same air quality. Another alternative is to use electric propulsion, which Seattle 's Metro Bus Tunnel and Boston 's Silver Line Phase II implemented. In Seattle, dual-mode (electric/diesel electric) buses manufactured by Breda were used until 2004, with the center axle driven by electric motors obtaining power from trolley wires through trolley poles in
SECTION 10
#1732801775769804-455: A shared hybrid-bus and light-rail facility in preparation for Seattle's Central Link Light Rail line, which opened in July 2009. In March 2019, expansion of the light rail in the tunnel moved busses back to surface streets. Bi-articulated battery electric buses cause no problems in tunnels anymore but provide BRT capacity. A BRT system can be measured by a number of factors. The BRT Standard
871-419: A static map, featuring services like trip planning, live arrival and departure times, up-to-date line schedules, local station maps, service alerts, and advisories that may affect one's current trip. Transit and Moovit are examples of apps that are available in many cities around the world. Some operators of bus rapid transit systems have developed their own apps, like Transmilenio. These apps even include all
938-480: A total daily ridership), in the developing world this capacity constraint (or rumor of a capacity constraint) was a significant argument in favor of heavy rail metro investments in some venues. When TransMilenio opened in 2000, it changed the paradigm by giving buses a passing lane at each station stop and introducing express services within the BRT infrastructure. These innovations increased the maximum achieved capacity of
1005-597: Is a major street in Brisbane , Queensland, Australia. It runs between and parallel to Queen Street and Ann Street . By May 1873 there was a Primitive Methodist Church in Adelaide Street. Under the provisions of the City of Brisbane Improvement Act 1916 and the Local Authorities Act Amendment Act 1923 the Brisbane City Council contributed significantly to the 1920s building boom, with
1072-586: Is a risk of a dangerous gap between bus and platform , and is even greater due to the nature of bus operations. Kassel curbs or other methods may be used to ease quick and safe alignment of the BRT vehicle with a platform. A popular compromise is low-floor buses with a low step at the door, which can allow easy boarding at low-platform stops compatible with other buses. This intermediate design may be used with some low- or medium-capacity BRT systems. The MIO system in Santiago de Cali, Colombia, pioneered in 2009
1139-585: Is less complex than rail maintenance. Moreover, buses are more flexible than rail vehicles, because a bus route can be altered, either temporarily or permanently, to meet changing demand or contend with adverse road conditions with comparatively little investment of resources. The first use of a protected busway was the East Side Trolley Tunnel in Providence , Rhode Island . It was converted from trolley to bus use in 1948. However,
1206-459: Is today over 18.5 miles long. The OC Transpo BRT system in Ottawa , Canada, was introduced in 1983. The first element of its BRT system was dedicated bus lanes through the city centre, with platformed stops. The introduction of exclusive separate busways (termed 'Transitway') occurred in 1983. By 1996, all of the originally envisioned 31 km Transitway system was in operation; further expansions were opened in 2009, 2011, and 2014. As of 2019,
1273-570: The BRT Standard promoted by the Institute for Transportation and Development Policy (ITDP) and other organizations. Compared to other common transit modes such as light rail transit (LRT), bus rapid transit (BRT) service is attractive to transit authorities because it does not cost as much to establish and operate: no track needs to be laid, bus drivers typically require less training and less pay than rail operators, and bus maintenance
1340-583: The Brisbane Airport in time for the 2032 Summer Olympics . As part of that announcement, it was confirmed that a conversion of the Doomben line to Busway for a Metro to Brisbane Airport was one of the two shortlisted routes, the other being a more direct alignment via the Airportlink tunnel with a depot on the site of the former Toombul Shopping Centre . The Northern Transitway as well as
1407-564: The Brisbane City Council (BCC) announced the Brisbane Metro to address the current constraints and challenges facing the city's current busway network , which had reached capacity at many inner city sections. This proposal incorporated the conversion of the busway from Woolloongabba to Herston into a rubber-tyred Metro with a single track to provide power and enable driverless operations. In March 2017, while keeping
SECTION 20
#17328017757691474-540: The HESS lighTram 25 with the capacity to carry up to 150 passengers in comfort mode and capable of using the existing busway infrastructure alongside regular bus services. In "event mode" the buses were announced as carrying up to 180 passengers, however this was subsequently revised to 170. The Metro buses will be 24.4 metres long and visually resemble a tram or light rail buses. Buses can travel 90 km/h. The buses have lithium-titanium-oxide batteries . On 24 November 2019,
1541-624: The Indonesian capital city . Bus rapid transit is a mode of mass rapid transit (MRT) and describes a high-capacity urban public-transit system with its own right of way , vehicles at short headways , platform-level boarding, and preticketing. The expression "BRT" is mainly used in the Americas and China; in India, it is called "BRTS" (BRT System); in Europe it is often called a "busway" or
1608-595: The King George Square busway station . The tunnel would connect the South East Busway with the Inner Northern Busway and reduce the number of buses running on city streets. Construction was expected to take at least twelve months with services expected to commence in late 2024. Services by the Brisbane Metro began on the morning of 21 October 2024. Brisbane Metro consists of two routes covering 21 kilometres, linking Brisbane's outer suburbs with
1675-937: The MIO in Cali since November 2008, Metrolinea in Bucaramanga since December 2009, Megabús in Pereira since May 2009. This design is also used in Johannesburg 's Rea Vaya . The term "station" is more flexibly applied in North America and ranges from enclosed waiting areas ( Ottawa and Cleveland ) to large open-sided shelters ( Los Angeles and San Bernardino ). A unique and distinctive identity can contribute to BRT's attractiveness as an alternative to driving cars, (such as Viva, Max, TransMilenio, Metropolitano, Metronit, Select) marking stops and stations as well as
1742-723: The Shrine of Remembrance within ANZAC Square at Adelaide Street. Adelaide Street is featured on television every year on ANZAC Day, 25 April, with the ANZAC Day Dawn Service and the ANZAC Day Parade (when the full parade is telecast live, including the saluting of the veterans by the Queensland Governor near King George Square, next to Brisbane City Hall). Adelaide Street bus mall is
1809-435: The 15,000 to 25,000 range. Research of the Institute for Transportation and Development Policy (ITDP) shows a capacity ranking of MRT modes, based on reported performance of 14 light rail systems, 14 heavy rail systems (just 1-track + 3 2-track-systems "highest capacity") and 56 BRT systems. The study concludes, that BRT-"capacity on TransMilenio exceeds all but the highest capacity heavy rail systems, and it far exceeds
1876-503: The BCC announced a consortium of Hess , Volgren and ABB had been awarded a contract for 60 buses. The buses will be fully electric via pantographic overhead wireless charging that will charge at the end of each route for less than six minutes. The buses will be fully low-floor and have next stop displays and audible announcement of the next stop. In addition, they have onboard WiFi, USB charging points and four large double doors. A pilot bus
1943-545: The CBD. The network uses the existing busway infrastructure and was planned to provide high-frequency services with three minutes headways during peak times however this was later scaled back to every 5 minutes when the services begin operation. Once all 60 buses are delivered and sufficient drivers trained, 3-minute services can be introduced if passenger demand is appropriate. The metro route M1 and M2 other bus services may be implemented that will curtail previous direct bus routes to
2010-578: The LNP announced their intentions to build a Metro Bus depot and charging facility on the Bill Brown Sports Reserve at a cost of $ 125 million. There are proposed future extensions of the network to Carindale , Chermside , Springwood and the Brisbane Airport (subject to approvals). In August 2024, Premier Steven Miles and Lord Mayor Adrian Schrinner announced plans to extend the network to Springwood , Capalaba , Carseldine , and
2077-467: The South East Busway at Rochedale . The 10 hectare site hosts stabling and maintenance facilities for the fleet. The design of the depot is based on sustainability . There are 2,300 solar panels in use. Rainwater harvesting and recycled water systems for vehicle washing are both used. Sixty 50 kW slow chargers are used during off-peak times. During the 2024 Brisbane City Council Elections
Brisbane Metro - Misplaced Pages Continue
2144-661: The United States, BRT began in 1977, with Pittsburgh's South Busway , operating on 4.3 miles (6.9 km) of exclusive lanes. Its success led to the Martin Luther King Jr. East Busway in 1983, a fuller BRT deployment including a dedicated busway of 9.1 miles (14.6 km), traffic signal preemption , and peak service headway as low as two minutes. After the opening of the West Busway , 5.1 miles (8.2 km) in length in 2000, Pittsburgh's Busway system
2211-419: The buses. Large cities usually have big bus networks. A map showing all bus lines might be incomprehensible, and cause people to wait for low-frequency buses that may not even be running at the time they are needed. By identifying the main bus lines having high-frequency service, with a special brand and separate maps, it is easier to understand the entire network. Public transit apps are more convenient than
2278-601: The center of major arterial roads, in 1980 the Curitiba system added a feeder bus network and inter-zone connections, and in 1992 introduced off-board fare collection, enclosed stations, and platform-level boarding. Other systems made further innovations, including platooning (three buses entering and leaving bus stops and traffic signals at once) in Porto Alegre , and passing lanes and express service in São Paulo . In
2345-605: The central part of the Transitway has been converted to light rail transit , due to the downtown section being operated beyond its designed capacity. In 1995, Quito , Ecuador, opened MetrobusQ its first BRT trolleybuses in Quito , using articulated trolleybuses. The TransMilenio in Bogotá , Colombia, opening in 2000, was the first BRT system to combine the best elements of Curitiba's BRT with other BRT advances, and achieved
2412-547: The city. Instead, the new routes will terminate stations outside the city that allow for transfers with the Metro lines M1 and M2. This will reduce direct routes but will also reduce bus traffic through the choke points through queen street and cultural centre bus stations, allowing a simpler and faster service. Not all routes will be cut back, and most routes from the Queen Street bus station will remain. Metro 1 will replace
2479-584: The concept while sketching on the back of an envelope. The town was designed around the transport system, with most residents no more than five minutes walking distance, or 500 yards (460 m), from the Busway. The second BRT system in the world was the Rede Integrada de Transporte (RIT, integrated transportation network ), implemented in Curitiba , Brazil, in 1974. The Rede Integrada de Transporte
2546-653: The construction of a tunnel under Adelaide Street. The tunnel provides a link between the South East Busway and the Inner-Northern Busway for Brisbane Metro vehicles and buses. A number of locations on Adelaide Street are listed on the Queensland Heritage Register , including: The Atlas Café, located at Atlas Chambers, 27 Adelaide Street in Brisbane’s CBD, was operated by Greek migrant George Sklavos, starting some time during
2613-483: The cost had increased to an expected $ 1.7 billion. A contributing factor was the inclusion of a new $ 450 million bus station to be built at Woolloongabba, in line with the existing busway. This plan has since been cancelled and the budget reduced to $ 1.4 billion. Also in February 2023, construction began on the 213-metre tunnel beneath Adelaide Street in the CBD, which will provide a connection between North Quay and
2680-485: The cutting down of the hill below St John's Cathedral in 1928 facilitated greater access to Petrie Bight, which, close to new city wharves at the end of Boundary Street, boomed in the 1920s as a warehousing district. In 1975, Adelaide Street was extended from George Street to North Quay as construction on the Brisbane Administration Centre was underway. In November 2021 work began on
2747-711: The first BRT system in the world was the Runcorn Busway in Runcorn , England. First conceived in the Runcorn New Town Masterplan in 1966, it opened for services in October 1971 and all 22 kilometres (14 mi) were operational by 1980. The central station is at Runcorn Shopping City where buses arrive on dedicated raised busways to two enclosed stations. Arthur Ling , Runcorn Development Corporation's Master Planner, said that he had invented
Brisbane Metro - Misplaced Pages Continue
2814-626: The flexibility, lower cost and simplicity of a bus system. The world's first BRT system was the Runcorn Busway in Runcorn New Town, England, which entered service in 1971. As of March 2018 , a total of 166 cities in six continents have implemented BRT systems, accounting for 4,906 km (3,048 mi) of BRT lanes and about 32.2 million passengers every day. The majority of these are in Latin America , where about 19.6 million passengers ride daily, and which has
2881-442: The following features: Bus-only lanes make for faster travel and ensure that buses are not delayed by mixed traffic congestion . A median alignment bus-only keeps buses away from busy curb-side side conflicts, where cars and trucks are parking, standing and turning. Separate rights of way may be used such as the completely elevated Xiamen BRT . Transit malls or 'bus streets' may also be created in city centers. Fare prepayment at
2948-662: The green phase or reducing the red phase in the required direction compared to the normal sequence. Prohibiting turns may be the most important measure for moving buses through intersections. The station platforms for BRT systems should be level with the bus floor for quick and easy boarding, making it fully accessible for wheelchairs, disabled passengers and baby strollers, with minimal delays. High-level platforms for high-floored buses makes it difficult to have stops outside dedicated platforms, or to have conventional buses stop at high-level platforms, so these BRT stops are distinct from street-level bus stops. Similar to rail vehicles, there
3015-648: The highest capacity and highest speed BRT system in the world. In January 2004 the first BRT in Southeast Asia, TransJakarta , opened in Jakarta , Indonesia. As of 2015 , at 210 kilometres (130 mi), it is the longest BRT system in the world. Africa's first BRT system was opened in Lagos , Nigeria, in March 2008 but is considered a light BRT system by many people. Johannesburg , South Africa, BRT Rea Vaya ,
3082-450: The highest light rail system." Performance data of 84 systems show More topical are these BRT data After the first BRT system opened in 1971, cities were slow to adopt BRT because they believed that the capacity of BRT was limited to about 12,000 passengers per hour traveling in a given direction during peak demand. While this is a capacity rarely needed in the US (12,000 is more typical as
3149-740: The mid-1920s. Sklavos is first listed as the proprietor of the Atlas Cafe in the 1927–1928 edition of the Queensland Post Office Directory . Notable buildings and parks along Adelaide Street include Brisbane City Hall , King George Square , ANZAC Square with the Shrine of Remembrance (both of which honour Australia's war dead), ANZAC Square Arcade , Brisbane Square and Post Office Square . ANZAC Day parades, in which Australian war veterans (and war veterans of allied nations) march, take place in Adelaide Street, on 25 April every year, and Dawn services are held at
3216-479: The most cities with BRT systems, with 54, led by Brazil with 21 cities. The Latin American countries with the most daily ridership are Brazil (10.7 million), Colombia (3.0 million), and Mexico (2.5 million). In the other regions, China (4.3 million) and Iran (2.1 million) stand out. Currently, TransJakarta is the largest BRT network in the world, with about 251.2 kilometres (156.1 mi) of corridors connecting
3283-594: The project reduced the Cultural Centre upgrade from an underground station to an upgrade of the existing above ground station with an additional platform for local services heading towards West End. This was due to a disagreement between the State Government, who owns the Busway, and the Council over what the optimal configuration of the underground station would look like. This disagreement resulted in
3350-492: The project was shifted to BRT the project's name was criticised by a rail lobby group for having a misleading name that implied it was a rail system, but Brisbane City Council rejected the idea of changing its name. In late 2023 further complaints about the name were raised. A poll by the Brisbane Times revealed 71% of respondents thought that Brisbane Electric Rapid Transit (BERT) was a better name. By February 2023,
3417-553: The project. These include a new short tunnel underneath Adelaide Street in the CBD, an upgrade to the Cultural Centre bus station , the removal of vehicle traffic from Victoria Bridge , and various streetscape upgrades. The expected total cost of the project is $ 1.7 billion. Together with Cross River Rail , the project is intended to boost public transport reliability in Brisbane and alleviate congestion. In January 2016,
SECTION 50
#17328017757693484-877: The right side of the street. Groups of criteria form the BRT Standard 2016, which is updated by the Technical Committee of the BRT Standard. High-capacity vehicles such as articulated or even bi-articulated buses may be used, typically with multiple doors for fast entry and exit. Double-decker buses or guided buses may also be used. Advanced powertrain control may be used for a smoother ride. Bottleneck BRT stations typically provide loading areas for simultaneous boarding and alighting of buses through multiple doors coordinated via displays and loudspeakers. An example of high-quality stations include those used on TransMilenio in Bogotá since December 2000,
3551-437: The route 111 and 160, connecting Eight Mile Plains with Roma Street , with 11 stations via the South East Busway . The route is designed to provide a new trunk route from the southern suburbs to the inner-city, servicing key destinations and providing interchanges to other Translink services. Below is a list of stations that Metro 1 will service and its available transport connections. Metro 2 replaces route 66, providing
3618-408: The same name, the project was redefined with the project shifting to operating high capacity bi-articulated buses on the existing busway, reducing the cost by one-third. The new buses would operate two routes which replace the 66 and 111/160 services. In November 2017 the BCC released its business case , detailing the benefits, costs and impacts of delivering the project. In November 2017, the project
3685-775: The schedules and live arrival times and stations for buses that feed the BRT, like the SITP (Sistema Integrado de Transporte Público or Public Transit Integrated System) in Bogotá . A special issue arises in the use of buses in metro transit structures. Since the areas where the demand for an exclusive bus right-of-way are apt to be in dense downtown areas where an above-ground structure may be unacceptable on historic, logistic, or environmental grounds, use of BRT in tunnels may not be avoidable. Since buses are usually powered by internal combustion engines , bus metros raise ventilation issues similar to those of motor vehicle tunnels. Powerful fans typically exchange air through ventilation shafts to
3752-448: The state government delaying approval to modify their property. Subjects to approvals, the BCC expects the detailed design and construction of the project to commence in 2019 with services commencing by 2023. This was later revised to 2024. In October 2018 five consortia were shortlisted to bid for the building of stage 1. ADCO Constructions began work on a 10-hectare (25-acre) depot at Rochedale in October 2021. In 2022, 5 years after
3819-492: The station, instead of on board the bus, eliminates the delay caused by passengers paying on board. Fare machines at stations also allow riders to purchase multi-ride stored-value cards and have multiple payment options. Prepayment also allows riders to board at all doors, further speeding up stops. Prohibiting turns for traffic across the bus lane significantly reduces delays to the buses. Bus priority will often be provided at signalized intersections to reduce delays by extending
3886-429: The street widening did not take place until the 1920s. The work was undertaken in stages, commencing in 1923 at the southern end where the new Brisbane City Hall was under construction. Some buildings had the front section removed and a contemporary facade installed on the new road alignment. Elsewhere, earlier buildings were demolished and substantial new structures took their place. At the northern end of Adelaide Street
3953-404: The subway, and with the rear axle driven by a conventional diesel powertrain on freeways and streets. Boston is using a similar approach, after initially using trolleybuses pending delivery of the dual-mode vehicles that was completed in 2005. In 2004, Seattle replaced its "Transit Tunnel" fleet with diesel-electric hybrid buses, which operate similarly to hybrid cars outside the tunnel and in
4020-417: The surface; these are usually as remote as possible from occupied areas, to minimize the effects of noise and concentrated pollution. A straightforward way to reduce air quality problems is to use internal combustion engines with lower emissions. The 2008 Euro V European emission standards set a limit on carbon monoxide from heavy-duty diesel engines of 1.5 g/kWh, one third of the 1992 Euro I standard. As
4087-428: The theoretical maximum throughput measured in passengers per hour per direction (PPHPD) for a single traffic lane is some 150,000 passengers per hour (250 passengers per vehicle, one vehicle every 6 seconds). In real world conditions BRT Rio (de Janeiro, BRS Presidente Vargas) with 65.000 PPHPD holds the record, TransMilenio Bogotá and Metrobus Istanbul perform 49,000 – 45,000 PPHPD, most other busy systems operating in
SECTION 60
#17328017757694154-499: The use of dual buses, with doors on the left side of the bus that are located at the height of high-level platforms, and doors on the right side that are located at curb height. These buses can use the main line with its exclusive lanes and high level platforms, located on the center of the street and thus, boarding and leaving passengers on the left side. These buses can exit the main line and use normal lanes that share with other vehicles and stop at regular stations located on sidewalks on
4221-522: Was budgeted to cost $ 944 million. The BCC released a draft design report for the project in April 2018 with a project concept displayed publicly for community feedback, following the announcement that Brisbane Metro has been confirmed as a high priority project on Infrastructure Australia 's priority list. In April 2018, the Federal Government agreed to contribute $ 300 million. In June 2020,
4288-414: Was built and tested in Europe in 2021. Originally planned by 2020, the pilot bus arrived in Brisbane for testing in early 2022. Following successful testing an order for the further 59 was placed with delivers scheduled to start in late 2023 for operations in 2024. The 60 vehicles will cost $ 190 million an increase of $ 100 million compared to more traditionally powered vehicles. A depot was built adjacent to
4355-438: Was developed by the Institute for Transportation and Development Policy (ITDP) to score BRT corridors, producing a list of rated BRT corridors meeting the minimum definition of BRT. The highest rated systems received a "gold" ranking. The latest edition of the standard was published in 2016. Other metrics used to evaluate BRT performance include: Based on this data, the minimum headway and maximum current vehicle capacities,
4422-503: Was inspired by the previous transport system of the National Urban Transport Company of Peru (In Spanish: ENATRU ), which only had quick access on Lima downtown , but it would not be considered BRT itself. Many of the elements that have become associated with BRT were innovations first suggested by Carlos Ceneviva, within the team of Curitiba Mayor Jaime Lerner . Initially just dedicated bus lanes in
4489-669: Was the first true BRT in Africa, in August 2009, carrying 16,000 daily passengers. Rea Vaya and MIO (BRT in Cali , Colombia, opened 2009) were the first two systems to combine full BRT with some services that also operated in mixed traffic, then joined the BRT trunk infrastructure. In 2017 Marrakesh , Morocco, opened its first BRT Marrakesh trolleybus system (BHNS De Marrakesh) trolleybuses Corridors of 8 km (5.0 mi), of which 3 km (1.9 mi) of overhead wiring for operation as trolleybus. BRT systems normally include most of