A trade name , trading name , or business name is a pseudonym used by companies that do not operate under their registered company name. The term for this type of alternative name is fictitious business name . Registering the fictitious name with a relevant government body is often required.
58-660: Drax Group plc , trading as Drax , is a power generation business. The principal downstream enterprises are based in the UK and include Drax Power Limited, which runs the biomass fuelled Drax power station , near Selby in North Yorkshire . The Group also runs an international biomass supply chain business. The company is listed on the London Stock Exchange and is a constituent of the FTSE 250 Index . In 2021,
116-533: A SCADA solution developed in partnership by RWE npower (a descendant company of CEGB) and Thales UK . APMS itself has since become obsolete. However, Eggborough was the last station, particularly unit 2; fully operated using APMS until its decommissioning in 2017. In contrast, PowerGen , later taken over by E.ON (which further split to form Uniper ), undertook a programme to port the entire system to current hardware. The most current version of Cutlass, 'PT-Cutlass Kit 9', runs on Motorola PPC-based hardware, with
174-420: A DBA must be registered with a local or state government, or both, depending on the jurisdiction. For example, California, Texas and Virginia require a DBA to be registered with each county (or independent city in the case of Virginia) where the owner does business. Maryland and Colorado have DBAs registered with a state agency. Virginia also requires corporations and LLCs to file a copy of their registration with
232-467: A DBA statement, though names including the first and last name of the owner may be accepted. This also reduces the possibility of two local businesses operating under the same name, although some jurisdictions do not provide exclusivity for a name, or may allow more than one party to register the same name. Note, though, that this is not a substitute for filing a trademark application. A DBA filing carries no legal weight in establishing trademark rights. In
290-516: A businessperson writes a trade name on a contract, invoice, or cheque, they must also add the legal name of the business. Numbered companies will very often operate as something other than their legal name, which is unrecognizable to the public. In Chile , a trade name is known as a nombre de fantasía ('fantasy' or 'fiction' name), and the legal name of business is called a razón social (social name). In Ireland , businesses are legally required to register business names where these differ from
348-737: A day it already receives for burning biomass." After ministers overruled objections from the planning authority and approved the plant, a legal challenge was brought against the decision but failed in the courts in January 2021. However, the company announced in February 2021 that the plans for the new plant had been abandoned. On 3 October 2022, BBC Panorama aired an episode showing how pellets burned in Drax powerplants came from natural growth forest in British Columbia . Trading as In
406-501: A director-general, a director of generation, a director of operational planning, a director of transmission, a financial controller, a controller of scientific services and a personnel manager. Regional headquarters: Haslucks Green Road, Shirley, Solihull , West Midlands. The Midlands Region was responsible for the operation of 38 power stations, over 170 sub-stations and nearly 2,000 miles of grid transmission line in an area that covered 11,000 square miles. The region produced more than
464-622: A new 3.6 GW gas-fired power plant at Selby which was expected to produce 75% of the UK's power sector emissions once the plant was underway. A protest took place outside the company's offices in London in July 2019 and further protests took place in Yorkshire in August 2020. Protesters claimed that the company was asking for substantial subsidies to operate the new plant "in addition to the £2.36 million
522-480: A number of countries, the phrase " trading as " (abbreviated to t/a ) is used to designate a trade name. In the United States , the phrase " doing business as " (abbreviated to DBA , dba , d.b.a. , or d/b/a ) is used, among others, such as assumed business name or fictitious business name . In Canada , " operating as " (abbreviated to o/a ) and " trading as " are used, although " doing business as "
580-562: A quarter of the electricity used in England and Wales and had a major share of the industrial construction programme mounted by the CEGB during the 1960s. In 1948 the total generating capacity of all the power stations in the region was 2,016 MW only a little more than a modern 2,000 MW station. By 1957 the region's capacity was up to 4,000 MW, doubling to 8,000 MW by 1966 and rising to 14,000 MW in 1969 and 16,000 MW by 1971. Previous chairmen of
638-1372: A re-financing and shares in Drax Group plc were listed on the London Stock Exchange for the first time. In 2009, Drax Group acquired Haven Power – enabling it to sell electricity directly. In 2015, the Group acquired Billington Bioenergy, specialists in providing sustainable biomass pellets for domestic energy systems. In 2016, Drax Group acquired Opus Energy for £340 million funded by a new acquisition debt facility of up to £375 million. In October 2017, Drax sold Billington Bioenergy for £2 million to an AIM-listed energy company called Aggregated Micro Power Holdings. On 16 October 2018, Drax Group announced that it had agreed to acquire Scottish Power 's portfolio of pumped storage, hydro and gas-fired generation for £702 million in cash from Iberdrola , subject to shareholder approval. Drax confirmed that approval had been granted on 1 January 2019. The acquisition brings with it Cruachan pumped storage power station, Rye House power station, Damhead Creek power station, Galloway hydro-electric power scheme, Lanark Hydro Electric Scheme , Shoreham Power Station and Blackburn Mill power station. On 15 December 2020, Drax Group announced
SECTION 10
#1732775930937696-458: A registered legal name and a fictitious business name, or trade name, is important because fictitious business names do not always identify the entity that is legally responsible . Legal agreements (such as contracts ) are normally made using the registered legal name of the business. If a corporation fails to consistently adhere to such important legal formalities like using its registered legal name in contracts, it may be subject to piercing of
754-562: A series of standstill agreements with its creditors, the AES Corporation and Drax parted company in August 2003. During the restructuring, a number of bids were received from companies wishing to take a stake in the ownership of Drax, but creditors voted overwhelmingly to retain their interest in Drax. In December 2003, the restructuring was completed and Drax came under the ownership of a number of financial institutions. Almost exactly two years later, on 15 December 2005, Drax underwent
812-659: A significant increase in unit size and had many teething problems, most of which were solved to result in reliable service and gave good experience towards the design of the 660 MW units. In the 1970s and 1980s, for the real-time control of power stations the R&D team developed the Cutlass programming language and application system. After privatisation, CUTLASS systems in National Power were phased out and replaced largely with Advanced Plant Management System (APMS) –
870-407: A total of 131,178 employees in the electricity supply industry 1989, composed as follows: The CEGB spent more on industrial construction than any other organisation in the UK. In 1958 about 40 power stations were being planned or constructed at a capital cost of £800 million. Those public supply power stations that were in operation at any time between 1958 and 1990 were owned and operated by
928-454: Is also sometimes used. A company typically uses a trade name to conduct business using a simpler name rather than using their formal and often lengthier name. Trade names are also used when a preferred name cannot be registered, often because it may already be registered or is too similar to a name that is already registered. Using one or more fictitious business names does not create additional separate legal entities. The distinction between
986-579: Is called a razón social . Central Electricity Generating Board The Central Electricity Generating Board ( CEGB ) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 January 1958 to assume the functions of the Central Electricity Authority (1955–1957), which had in turn replaced
1044-949: Is demonstrated in the following table. In 1981–2 there was a total of 203 substations operating at 275/400 kV, these sub-stations included 570 transformers operating at 275/400 kV. At the centre of operations was the National Control Centre of the National Grid in London, which was part of the control hierarchy for the system. The National Control Centre was based in Bankside House from 1962. There were also both area and district Grid Control Areas, which were originally at Newcastle upon Tyne , Leeds , Manchester, Nottingham , Birmingham, St Albans , East Grinstead and Bristol . The shift control engineers who worked in these control centres would cost, schedule and load-dispatch an economic commitment of generation to
1102-565: Is responsible for storing and loading the biomass at the Port of Baton Rouge ), Haven Power (an electricity supplier) and Opus Energy (a supplier of gas and electricity to businesses across the United Kingdom). The company has attracted a series of protests in the past: (i) a climate camp on 31 August 2006, attended over 600 people protesting against the high carbon emissions: 39 people were arrested after trying illegally to gain access to
1160-659: The British Electricity Authority (1948–1955). The Electricity Council was also established in January 1958, as the coordinating and policy-making body for the British electricity supply industry. The CEGB was responsible for electricity generation, transmission and bulk sales in England and Wales , whilst in Scotland electricity generation was carried out by the South of Scotland Electricity Board and
1218-458: The North of Scotland Hydro-Electric Board . The CEGB's duty was to develop and maintain an efficient, coordinated and economical system of supply of electricity in bulk for England and Wales, and for that purpose to generate or acquire supplies of electricity and to provide bulk supplies of electricity for the area electricity boards for distribution. It also had power to supply bulk electricity to
SECTION 20
#17327759309371276-466: The United Kingdom , there is no filing requirement for a "business name", defined as "any name under which someone carries on business" that, for a company or limited liability partnership, "is not its registered name", but there are requirements for disclosure of the owner's true name and some restrictions on the use of certain names. A minority of U.S. states, including Washington , still use
1334-622: The British Electricity Authority's dual roles of electricity generation and supervision had led to central concentration of responsibility and to duplication between headquarters and divisional staff which led to delays in the commissioning of new stations. The Committee's recommendations were enacted by the Electricity Act 1957 which established the Electricity Council to oversee the industry and
1392-491: The CEGB with responsibility for generation and transmission. The CEGB was established by section 2 of the Electricity Act 1957 . It consisted of a Generating Board comprising a chairman and seven to nine full-time or part-time members, appointed by the Minister of Power , who had experience or capacity in "the generation or supply of electricity, industrial, commercial or financial matters, applied science, administration, or
1450-402: The CEGB. In 1971–1972 there were 183 power stations on 156 sites, with an installed capacity of 58,880.051 MW, and supplied 190,525 GWh. By 1981–1982 there were 108 power stations with a capacity of 55,185 MW and supplied 210,289 GWh. At its inception the CEGB operated 2,763 circuit km of high-tension 275 kV supergrid. The growth of the high voltage National Grid over the lifetime of the CEGB
1508-692: The Midlands Region were Arthur Hawkins , Gilbert Blackman, and R. L. Batley. Prior to 1968 the Midlands Region was divided into the West Midlands Division and the East Midlands Division. The number of power stations, installed capacity and electricity supplied in the Midlands Region was: Regional Headquarters: Merrion Centre, Leeds (1971). Beckwith Knowle, Otley Road, Harrogate . Extending through Northumberland , Durham , Yorkshire and North Lincolnshire
1566-609: The Minister of Power in May 1962), Marchwood Engineering Laboratory (MEL), and Berkeley Nuclear Laboratories (BNL). There were also five regional facilities and four project groups, North, South, Midlands and the Transmission Project Group. These scientific service departments (SSD) had a base in each region. A major SSD role was solving engineering problems with the several designs of 500 MW units. These were
1624-771: The North Eastern Region was divided into the Northern Division and the Yorkshire Division.The number of power stations, installed capacity and electricity supplied in the North Eastern Region was: Regional Headquarters: 825 Wilmslow Road, Manchester, M20 (1971). Europa House, Bird Hall Lane, Cheadle Heath, Stockport . Previous chairman of the North Western Region were J.L. Ashworth and G.B. Jackson. The number of power stations, installed capacity and electricity supplied in
1682-574: The North Eastern Region was responsible for the operation of 32 power stations capable of producing 8,000 MW of electricity. 108 substations and over 1,200 route miles of overhead lines transmitted the electricity to the Yorkshire Electricity Board and the North Eastern Electricity Board for passing onto the customer. A previous chairman of the North Eastern Region was P.J. Squire. Prior to 1968
1740-768: The North Western Region was: Regional Headquarters: Bankside House, Summer Street, London. Past chairman of the South Eastern Region were G.N. Stone, H.J. Bennett and F.W. Skelcher. Prior to 1968 the South Eastern Region was divided into the North Thames Division and the South Thames Division. The number of power stations, installed capacity and electricity supplied in the South Eastern Region was: Regional Headquarters: 15–23 Oakfield Grove, Clifton, Bristol (1971). Bedminster Down, Bridgwater Road, Bristol. Previous chairman of
1798-585: The Scottish boards or electricity undertakings outside Great Britain. The organisation was unusual in that most of its senior staff were professional engineers, supported in financial and risk-management areas. In 1954, six years after nationalisation, the Government appointed the Herbert Committee to examine the efficiency and organisation of the electricity industry. The committee found that
Drax Group - Misplaced Pages Continue
1856-818: The South Western Region were Douglas Pask , Roy Beatt, A.C. Thirtle and R.H. Coates. Prior to 1968 the South Western Region was divided into the Southern Division, the Western Division and the South Wales Division. The number of power stations, installed capacity and electricity supplied in the South Western Region was: The supplies of electricity from the CEGB Regions to the area electricity boards in 1971–2 and 1981–2 were as follows. The average charge in 1971–2
1914-764: The Transmission Division had been restructured as the Transmission and Technical Services Division based in Guildford, and a Technology Planning and Research Division based in London, the latter was formed from the Research Division System Technical and Generation Studies Branches. A Corporate Strategy Department was formed in 1981 from some of the Planning Department. A Nuclear Operations Support Group
1972-418: The U.S., trademark rights are acquired by use in commerce, but there can be substantial benefits to filing a trademark application. Sole proprietors are the most common users of DBAs. Sole proprietors are individual business owners who run their businesses themselves. Since most people in these circumstances use a business name other than their own name, it is often necessary for them to get DBAs. Generally,
2030-624: The board plus the chairmen of the area boards were members of the Electricity Council. The design, construction and development functions associated with power stations and transmission was undertaken by two divisions: the Generation Development and Construction Division based in Cheltenham and then Barnwood Gloucester, and the Transmission Development and Construction Division based in Guildford. In 1979
2088-601: The company was taken out of the S&P Global Clean Energy Index, as it is no longer considered to be a "clean" energy company by the S&P. In 1990, the electricity industry of England and Wales was privatised under the Electricity Act 1989. Three generating companies and 12 regional electricity companies were created. As a result of privatisation , Drax Power Station came under the ownership of National Power , one of
2146-484: The corporate veil . In English , trade names are generally treated as proper nouns . In Argentina , a trade name is known as a nombre de fantasía ('fantasy' or 'fiction' name), and the legal name of business is called a razón social (social name). In Brazil , a trade name is known as a nome fantasia ('fantasy' or 'fiction' name), and the legal name of business is called razão social (social name). In some Canadian jurisdictions , such as Ontario , when
2204-534: The county or city to be registered with the State Corporation Commission. DBA statements are often used in conjunction with a franchise . The franchisee will have a legal name under which it may sue and be sued, but will conduct business under the franchiser's brand name (which the public would recognize). A typical real-world example can be found in a well-known pricing mistake case, Donovan v. RRL Corp. , 26 Cal. 4th 261 (2001), where
2262-477: The engineering workstation and administrative functions provided by a standard Microsoft Windows PC. It is fully compatible (with a few minor exceptions) with the DEC PDP-11 version (kit 1) released by PowerGen and has a high level of compatibility with the final version of kit 1 formerly used at National Power. It is used at three UK power stations: Ratcliffe-on-Soar , Cottam , and Fiddlers Ferry . The CEGB
2320-545: The grid. Drax had previously stated that the facilities would start in Autumn 2024. Drax Group's key asset is Drax Power Station. Originally built, owned and operated by the Central Electricity Generating Board (CEGB), Drax Power Station was constructed and commissioned in two stages. Stage one (units 1, 2 and 3) was completed in 1974. Some 12 years later in 1986, stage two (units 4, 5 and 6)
2378-402: The law is to protect the public from fraud, by compelling the business owner to first file or register his fictitious business name with the county clerk, and then making a further public record of it by publishing it in a newspaper. Several other states, such as Illinois , require print notices as well. In Uruguay , a trade name is known as a nombre fantasía , and the legal name of business
Drax Group - Misplaced Pages Continue
2436-487: The main interconnected system (the 400/275/132kV network) at an adequate level of security. They also had information about the running costs and availability of every power producing plant in England and Wales. They constantly anticipated demand, monitored and instructed power stations to increase, reduce or stop electricity production. They used the " merit order ", a ranking of each generator in power stations based upon how much they cost to produce electricity. The objective
2494-461: The named defendant, RRL Corporation, was a Lexus car dealership doing business as " Lexus of Westminster ", but remaining a separate legal entity from Lexus, a division of Toyota Motor Sales, USA, Inc. . In California , filing a DBA statement also requires that a notice of the fictitious name be published in local newspapers for some set period of time to inform the public of the owner's intent to operate under an assumed name . The intention of
2552-561: The newly formed generating companies. Over the years that followed privatisation, the map of the industry changed dramatically. One significant change was the emergence of vertically integrated companies, combining generation, distribution and supply interests. In certain cases, it became necessary for generation assets to be divested, and so in 1999 Drax Power Station was acquired by the US-based AES Corporation for £1.87 billion (US$ 3 billion). A partial re-financing of Drax
2610-544: The organisation of workers". The power of appointment later devolved to the Minister of Technology , then to the Secretary of State for Trade and Industry . There were six chairmen of the CEGB: The executive comprised the chairman and the full-time board members. The Headquarters Operations Department provided a service to the board and executive and could supply specialist staff. The chairman and two other members of
2668-472: The plant, (ii) a train protest on 13 June 2008, attended by 30 climate change campaigners who halted an EWS coal train en route to the station, and (iii) a worker strike on 18 June 2009, when up to 200 contractors walked out of or failed to show up in a wildcat strike . Also in October 2011 a fire started by spontaneous combustion in a stockpile at the Port of Tyne biomass facility. Another fire occurred at
2726-463: The sale of Rye House, Damhead Creek, Shoreham and Blackburn Mill to VPI Holdings for £193.3m. On 13 April 2021, Drax announced that it had completed the acquisition of Pinnacle Renewable Energy Inc. In November 2024, Drax Group Plc pushed back the start of three new gas-fired power stations in South Wales, Suffolk, and Bedfordshire to next year because of delays in getting the units connected to
2784-495: The same facility in a conveyor transfer tower in October 2013. A "virtual protest" was held in April 2020 by Biofuelwatch, which claims that Drax is the UK's largest emitter of carbon dioxide and that the wood pellets Drax burns are leading to the destruction of forests in the southern United States. Protesters also claim that the company is burning more wood than any other power station in the world. The company had proposed to build
2842-459: The surname(s) of the sole trader or partners, or the legal name of a company. The Companies Registration Office publishes a searchable register of such business names. In Japan , the word yagō ( 屋号 ) is used. In Colonial Nigeria , certain tribes had members that used a variety of trading names to conduct business with the Europeans. Two examples were King Perekule VII of Bonny , who
2900-469: The term trade name to refer to "doing business as" (DBA) names. In most U.S. states now, however, DBAs are officially referred to using other terms. Almost half of the states, including New York and Oregon , use the terms assumed business name or assumed name ; nearly as many, including Pennsylvania , use the term fictitious name . For consumer protection purposes, many U.S. jurisdictions require businesses operating with fictitious names to file
2958-417: Was 0.6519 pence/kWh, in 1981–2 the charge was 3.0615 pence/kWh. During the lifetime of the CEGB peak demand had more than doubled from 19,311 MW in 1958 to 47,925 MW in 1987. Sales of electricity had increased from 79.7 TWh in 1958 to 240 TWh in 1988. The CEGB had an extensive R&D section with its three principal laboratories at Leatherhead (Central Electricity Research Laboratories, CERL) (opened by
SECTION 50
#17327759309373016-678: Was also formed in 1981 to provide expert support. The sculpture "Power in Trust" from the CEGB logo was made by Norman Sillman to represent a hand made from boiler pipes and a turbine, it was commissioned in the 1961 for the opening of Staythorpe B Power Station . When first constituted the CEGB's London headquarters was at the former Central Electricity Authority's building in Winsley Street W1, there were also offices in Buchanan House, 24/30 Holborn, London, EC1. There were
3074-504: Was as follows: Note: imports are bulk supplies from the South of Scotland and France and from private sources, exports are bulk supplies to the South of Scotland and France. A summary of the income and expenditure of the CEGB (in £ million) is as follows: Detailed control of operational matters such planning, electricity generation, transmission and maintenance were delegated to five geographical regions. From January 1971 each region had
3132-493: Was completed in 2000, with £400 million of senior bonds being issued by AES Drax Holdings, and £267 million of subordinated debt issued by AES Drax Energy. Increased competition, over-capacity and new trading arrangements contributed to a significant drop in wholesale electricity prices, which hit an all-time low in 2002. Many companies experienced financial problems, and Drax Power Station's major customer went into administration, triggering financial difficulties for Drax. Following
3190-529: Was completed. Drax was the last coal-fired power station to be built in the UK, and was initially designed to use low-sulphur coal from the nearby Selby coalfield in six generating units. Each unit has a capacity of 660 MW when burning coal, giving a total capacity of just under 4 GW. This made Drax the largest power station in the UK. Related enterprises include Drax Biomass (which specialises in producing biomass pellets to be used to generate electricity and fuel domestic heating systems), Baton Rouge Transit (which
3248-553: Was known as Captain Pepple in trade matters, and King Jubo Jubogha of Opobo , who bore the pseudonym Captain Jaja . Both Pepple and Jaja would bequeath their trade names to their royal descendants as official surnames upon their deaths. In Singapore , there is no filing requirement for a "trading as" name, but there are requirements for disclosure of the underlying business or company's registered name and unique entity number. In
3306-587: Was subject to examination from external bodies and formed policies and strategies to meet its responsibilities. A 1978 government white paper Re-organisation of the Electricity Supply in England and Wales proposed the creation of an Electricity Corporation to unify the fragmented structure of the industry. Parliamentary constraints prevented its enactment. A report by the Monopolies and Mergers Commission , Central Electricity Generating Board:
3364-449: Was to ensure that electricity production and transmission was achieved at the lowest possible cost. In 1981 the three-tier corporate transmission structure: National Control, area control rooms in the regions, and district control rooms (areas) was changed to a two-tier structure by merging the area and district control rooms. The electricity generated, supplied and sold by the CEGB, in GWh,
#936063