27-474: Interchange stations The KTM Batu Caves–Pulau Sebang Line ( Malay : KTM Laluan Batu Caves–Pulau Sebang ), formerly known as the Seremban Line ( Malay : Laluan Seremban ) is one of the three KTM Komuter Central Sector lines provided by Keretapi Tanah Melayu . Its electric trains run between Batu Caves and Pulau Sebang/Tampin . Prior to 15 December 2015, the northern terminus of this line
54-491: A transfer station is a train station for more than one railway route in a public transport system that allows passengers to change from one route to another, often without having to leave a station or pay an additional fare. Transfer may occur within the same mode, or between rail modes, or to buses (for stations with bus termini attached). Such stations usually have more platforms than single route stations. These stations can exist in either commercial centers or on
81-477: A 30-minute frequency. Travel time from Seremban to Pulau Sebang was about 38 minutes while a trip from Seremban to Gemas took approximately 65 minutes. The service had been operationally effective 10 October 2015 until 11 July 2016, when Seremban Line services to Pulau Sebang/Tampin replaced this shuttle. The shuttle was cut short to Pulau Sebang/Tampin on 20 June 2016; Batang Melaka and Gemas are no longer served by KTM Komuter. A new route for KTM Komuter services
108-610: A normal Port Klang Line train to Tanjung Malim, stopping at every station before terminating at Tanjung Malim at 7:44 am. From 22 December 2017, services on the line's three city-centre stations - the old Kuala Lumpur station , Bank Negara and Putra were temporarily suspended due to track upgrading works, though the Port Klang Line continued to serve those stations. Trains only travelled between Tampin and KL Sentral , Batu Caves and Sentul . Free shuttle buses, provided by Rapid KL , connected Sentul Komuter station to
135-569: Is a 12 km (7.5 mi) monorail route with 17 stations and Line 2 , which is a 6 km (3.7 mi) monorail route with 6 stations. In 2019, the government proposed a new light rapid transit (LRT) system may be built to revive the incomplete monorail project. The monorail will include the Monorail Suspension Bridge , currently incomplete, and the Putra Bridge . The monorail line would allow transfers to
162-514: Is an incomplete monorail system in Putrajaya , Malaysia . Construction has been stalled since 2004, and while revivals have been proposed periodically, as of 2023 there are no plans to revive the project. Putrajaya was originally planned to include a light rail system, but plans were changed, and a monorail plan was selected instead, after the construction of tunnels for aforementioned system began. It called for two sublines; Line 1 , which
189-414: Is expected to be integrated with the existing and future rail lines between Putrajaya and Bangi and will also cover the distance between Cyberjaya and Kajang. The MRT Kajang Line only reaches Kajang but MRT Putrajaya Line will reach KT3 PY41 Putrajaya Sentral station which is currently in operation. The future HSR station located at Kampung Abu Bakar Baginda will be one of
216-526: Is located at Pulau Sebang on the Melaka side of the border. Buses cost around RM5.00 between Melaka Sentral in the City of Malacca and Tampin and take around one hour, depending on traffic. Taxis cost RM35.00 upwards one way. A station serving the police headquarters at Bukit Aman is being planned, to be built between the old Kuala Lumpur station and Bank Negara station. On 1 October 2015, KTMB announced
243-697: Is offered between mainline railways and city metro systems, such as Barking and Stratford stations in London . In some cases, no dedicated underground passage or footbridge is provided, and therefore passengers have to transfer between two parts of a station through city streets. Examples include Kuramae Station of Toei in Tokyo , Japan and Lexington Avenue-59th Street / Lexington Avenue–63rd Street stations in New York City . In many cases, electronic ticketing allows transferring passengers re-admission to
270-590: Is provided at a nominal charge. The system is one of the components of the Klang Valley Integrated Transit System . The line is numbered 1 and coloured blue on official transit maps. It was initially named after its former terminus, Seremban station . The line began as part of the Selangor Government Railway which opened in 1886. The modern-day Seremban Line began as a spur line, opened in 1895, from
297-730: The Kuala Lumpur-Klang railway line beginning from Resident station , through the Sultan Street station , Pudu station and Sungai Besi , before reaching Kajang in 1897. The line was later re-routed through Seputeh , with the Sultan Street-Pudu stretch being demolished and incorporated into the LRT Ampang Line . The Rawang –Seremban stretch and the Sentul – Port Klang stretch were electrified in
SECTION 10
#1732782379251324-566: The MMC Corporation Berhad (MMC) submitted a proposal to the Economic Council (EC) to revive the stalled monorail project. The Land Public Transport Commission (SPAD) was due to conduct a feasibility study for monorail and tram services for both Putrajaya and Cyberjaya. In October 2020, the government announced it had opened a request for proposals process to complete the project, within three months. As of 2021,
351-735: The New Territories , Hong Kong, and in the downtown of Lafayette , Indiana . In London and Paris , a number of stations on the Underground in London and the Métro in Paris are interchanges between two or more rapid transit lines. Examples include King's Cross St. Pancras in London, an interchange between six lines and Chatelet in Paris, an interchange between five lines. Putrajaya Monorail The Putrajaya Monorail
378-892: The Sentul LRT station on the LRT Ampang and Sri Petaling Lines , and KL Sentral. Passengers from the Tampin–KL Sentral stretch could still reach downtown Kuala Lumpur via the LRT Kelana Jaya Line at KL Sentral, the LRT Sri Petaling Line at Bandar Tasik Selatan or the MRT Kajang Line at Kajang and Muzium Negara . Services have since resumed to their original arrangements. The line uses KTM Class 92 trains in 6 car formations. Interchange station An interchange station or
405-633: The Gardens Mall and Mid Valley Megamall . Feeder bus T410 to KG26 Taman Connaught on the MRT Kajang Line . ⇄ KTM ETS Feeder bus T565 to PY33 Serdang Jaya on the MRT Putrajaya Line from Flat Taman Muhibbah. ⇄ KTM ETS Proposed interchange station to the 14 Putrajaya Monorail . ⇄ KTM ETS The station is 1 km (0.62 mi) from Tampin Bus Terminal as it
432-531: The RFP has not yet opened. In June 2023, the Ministry of Transport confirmed that the government is not planning to revive the project. Federal Territories Minister , Datuk Seri Tengku Adnan Tengku Mansor , had hoped to get tram infrastructure construction going within three years. Now under the jurisdiction of the Economic Council, the minister saw the development of the tram system as an alternative solution to
459-466: The abandoned monorail projects and recommended it be built due to cost considerations. SPAD had hoped to open up tenders for the tram system between Putrajaya and Bangi in 2018 after getting the green light from EC. This move was announced by SPAD during their annual review of public transportation for 2017. The tram system was selected due to its relatively cheaper price of construction and operation compared to conventional rail systems. The tram system
486-682: The city outskirts in residential areas. Cities typically plan for land use around interchange stations for development . Passengers may be required to pay extra fare for the interchange if they leave a paid area . With the opening of the Woodside and Birkenhead Dock Street Tramway in 1873, Birkenhead Dock railway station in Birkenhead , England probably became the world's first tram to train interchange station. Verney Junction interchange station in Buckinghamshire , England
513-471: The early 1990s. Another branch line from Seremban-Port Dickson opened in 1891. The line is also known as a "Zig Zag Line" until in the 1970s. when the few stations has closed. In 2008, the line closed with the branch line undergoing dismantling in 2022. An infill station , the Kajang 2 station, was constructed between Kajang station and UKM station . It commenced operations on Monday, 13 March 2023, with
540-409: The existing KLIA Transit , connecting to Kuala Lumpur and Kuala Lumpur International Airport , and the now opened MRT Putrajaya line at KT3 PY41 Putrajaya Sentral station . The project originally cost RM400 million. Construction was halted in 2004 ; 20 years ago ( 2004 ) , and will probably resume as the city becomes more populated. In 2016,
567-600: The introduction of the Seremban–Gemas shuttle service for Seremban – Gemas stretch. It was operated by KTM Class 83 trains running the electrified double tracks at speeds up to 140 km/h (87 mph). Spanning over 100 km (62 mi), it served at Seremban, Senawang , Sungai Gadut , Rembau , Pulau Sebang/Tampin , Batang Melaka and ends at Gemas . The service offered 59 services daily - 55 services between Seremban and Pulau Sebang and 4 services from Seremban to Gemas. Trains start at 5 am and ends at 11 pm, with
SECTION 20
#1732782379251594-601: The official launch of the station done a month later on 14 April 2023 by the Minister of Transport, Anthony Loke . ⇄ = cross-platform interchange ⇄ KTM Tanjung Malim-Port Klang Line ⇄ KTM Tanjung Malim-Port Klang Line ⇄ KTM Tanjung Malim-Port Klang Line & KTM ETS Feeder bus T819 to KG13 Pavlilion Damansara Heights-Pusat Bandar Damansara on the MRT Kajang Line . ⇄ KTM Tanjung Malim-Port Klang Line , KS01 KTM KL Sentral-Terminal Skypark Line & KTM ETS Exit to
621-433: The transit system without paying fare a second time, as if they had never left the fare control area in the station (this process is called a "free out-of-system transfer"). There are also bus interchanges , where people can change between different bus routes with no extra fare or only the differences of the fares of the two routes. Examples include Tai Lam Tunnel Bus Interchange and Shing Mun Tunnel Bus Interchange in
648-501: Was Rawang . KTM Komuter is an electrified commuter train service first introduced in 1995, catering especially to commuters in Kuala Lumpur and the surrounding suburban areas. It is a popular mode of transportation for commuters working in Kuala Lumpur, as they can travel to the city without the hassle of traffic congestion. Coaches are modern and air-conditioned. For those who drive to the stations/halts, 'Park & Ride' facility
675-470: Was built at the point of two railway lines intersecting each other in open countryside. The station was built in an open remote field being used from 1868 to 1968. The Manhattan Transfer (PRR station) on the Pennsylvania Railroad was located outside Newark, New Jersey in a relatively isolated area, and was used primarily for passenger interchange. Sometimes cross-platform interchange
702-472: Was effectively named the Batu Caves–Pulau Sebang Line. On 4 August 2016, an additional morning train (Mondays to Fridays except on public holidays) was introduced between Bandar Tasik Selatan , KL Sentral and Tanjung Malim . The train starts at Bandar Tasik Selatan at 5:35 am, running non-stop express to KL Sentral, arriving at 5:49 am. The train then leaves KL Sentral at 6:15 am and runs as
729-655: Was introduced for the preparation of the infrastructure upgrading works in the Klang Valley Double Tracking project which began in April 2016. It aimed to increase the frequency and the smooth running of the KTM ETS , KTM Komuter , KTM Intercity & Freight at the Central Sector. The initial route for from Rawang-Seremban was changed to Batu Caves-Seremban effective 15 December 2015. The line
#250749