118-692: The Cambridge line runs from Cambridge junction north of Hitchin on the East Coast Main Line to Shepreth Branch Junction south of Cambridge on the West Anglia Main Line and forms part of the route between London King's Cross and East Anglia . The line is part of the Network Rail Strategic Route 5 , SRS 05.05 and is classified as a London and South East Commuter line. Plans for a line between Hitchin and Royston were placed before Parliament in 1846 by

236-507: A loading gauge of W8 and a maximum line speed of 90 mph. Just under a mile to the east of Royston station lies the boundary between the Network Rail London North Eastern Route and Anglia Route . All signals between King's Cross and this point are controlled by Kings Cross Power Signal Box, whilst those from here to Cambridge are controlled by Cambridge Signal Box. The signalling system for

354-489: A 'spine' for several diverging branches, serving destinations such as Cambridge , Leeds , Hull , Sunderland and Lincoln , all with direct services to London. In addition, a few ECML services extend beyond Edinburgh to serve other Scottish destinations, such as Stirling , Inverness , Aberdeen or Glasgow Central , although the principal London-Glasgow route is the West Coast Main Line (WCML). The line

472-430: A briefing to contractors was released ahead of an invitation to tender for Midland Mainline Electrification project work to extend electrification to Nottingham and Sheffield. This scheme is expected to cost £1.3 billion. Network Rail has undertaken numerous schemes to develop its own renewable electrical generation footprint, which is used in part to power the operational railway. In January 2014, Network Rail opened

590-654: A central street, accommodating more than 3,000 people. Various divisions, including engineering, logistics, operations (including timetable planning), IT, procurement, planning and finance departments, and Route Services Supply Chain operations have been transferred to the Quadrant. In 2009, allegations appeared in the media from the Transport Salaried Staffs' Association concerning treatment of Network Rail employees. Former chief executive Iain Coucher

708-496: A fibre optic and copper cable network that is located mainly within trackside troughing routes on the former British Rail Telecommunications network. (It is the largest private telecoms network in the UK). Network Rail operates several analogue radio networks that support mobile communication applications for drivers and lineside workers which consist of base stations, antenna systems and control equipment. The National Radio Network (NRN)

826-544: A litany of problems in the areas she was responsible for. Michelle Handforth resigned after infrastructure problems left hundreds of passengers stranded in carriages in London, one of the latest issues with the lines outside Paddington Station . The Office of Rail and Road was already investigating poor reliability and punctuality in the Wales and Western region. During February 2011, it was announced that Network Rail had begun

944-483: A minor overrun against its authorised expenditure of £331.9   million. Of the total cost, 60 per cent was for the electrification process itself, while the remaining 40 per cent covered rolling stock, including the new InterCity 225 trains procured specially for the route. These were introduced in 1989 to operate express services. They were developed by the General Electric Company (GEC), as

1062-582: A net debt of approximately £8 billion by 2003. During May 2001, Railtrack announced that, despite making a pre-tax profit before exceptional expenses of £199m, the £733m of costs and compensation paid out over the Hatfield crash had plunged Railtrack from profit into a loss of £534m, and it approached the government for funding, which it controversially used to pay a £137m dividend to its shareholders in May 2001. Months later, Railtrack sought another bailout from

1180-560: A new public body called Great British Railways . In 2022 it was announced that this process would be delayed. Britain's railway system was built by private companies, but it was nationalised by the Transport Act 1947 and run by British Railways until re-privatisation which was begun in 1994 and completed in 1997. As a part of the privatisation process, the railway infrastructure, passenger and freight services were separated into separate organisations. Between 1994 and 2002,

1298-622: A powerful high-speed locomotive developed and built by English Electric . The prototype was successful and a fleet of 22 locomotives were built and put into BR service for express traffic. Designated Class 55 , they were powered by a pair of Napier Deltic engines that had been developed for fast torpedo boats. The Class 55 'Deltics' were for a time the fastest and most powerful diesel locomotives in service in Britain, capable of reaching 100 mph (160 km/h) and providing up to 3,300  hp (2,500 kW). When introduced into service in 1961,

SECTION 10

#1732791164162

1416-439: A small amount of income from commercial property estate. In February 2019 Network Rail sold its commercial property business consisting of 5,200 properties, mainly railway arches, to a consortium of Telereal Trillium and Blackstone Property Partners for £1.46bn. Network Rail works in five-year funding cycles called "Control Periods" (CP for short). The government specifies what is needed from Network Rail and sets out how much

1534-540: A southbound run from Darlington to York. At least two other trains have subsequently recorded higher speeds, but as of February 2023 the InterCity 125 record remains the highest to have been officially verified. A British speed record for electric locomotives of 161.7 mph (260.2 km/h) was achieved on 17 September 1989, also at Stoke Bank, by Class 91 locomotive number 91010. On 26 September 1991, an InterCity 225 shortened electric locomotive train

1652-554: A successor to the Deltics, the InterCity 125 High Speed Train (HST) between 1978 and 1979. These could reach speeds up to 125 mph (201 km/h) on existing infrastructure, bringing the fastest London–Edinburgh timing down by another hour, to 4 + 1 ⁄ 2 hours. They operated most express passenger services on the line until electrification was completed in 1991, after which they continued in use on services that run off

1770-590: Is London North Eastern Railway , but open-access competition on services to Northern England and Scotland is provided by Hull Trains , Grand Central and Lumo . The ECML is part of Network Rail 's Strategic Route G, which comprises five separate lines: The core route is the main line between King's Cross and Edinburgh, the Hertford Loop is used for local and freight services, and the Northern City Line provides an inner-suburban service to

1888-472: Is a 393-mile long (632 km) electrified railway between its northern terminus at Edinburgh Waverley and southern terminus at London King's Cross station . The key towns and cities of Peterborough , Doncaster , York , Darlington , Durham and Newcastle are on the line. The line is a key transport artery on the eastern side of Great Britain running broadly parallel to the A1 road . The main line acts as

2006-782: Is carried along its route by several bridges and viaducts which are recognised as architecturally significant listed structures ; the longest of which is the 659-metre-long (2,162 ft) Royal Border Bridge at Berwick-upon-Tweed . Others include Digswell Viaduct , near Welwyn Garden City , at 475 m (1,558 ft), the Ouseburn Viaduct in Newcastle at 280 m (920 ft), Durham Viaduct at 240 m (790 ft), and Chester Burn Viaduct in Chester-le-Street at 230 m (750 ft). The 350-metre-long (1,150 ft) King Edward VII Bridge in Newcastle

2124-593: Is carried out mostly by the principal train operating company serving that station; however, in a few cases the train operating company does not serve the station. For example, Hinckley is served by CrossCountry , but it is managed by East Midlands Railway . As of April 2018 , Network Rail manages 20 stations directly, with Clapham Junction and Guildford becoming managed stations on 1 April 2018. The stations Network Rail operate are: National London stations Glasgow Central and Liverpool Lime Street stations are divided into high and low-level stations –

2242-492: Is currently limiting speeds to 125   mph. There are currently no plans to retrofit ERTMS equipment to the InterCity 225 fleet, as they are expected to be withdrawn before the removal of the lineside signals; this means they will never reach their design speed of 140   mph (225   km/h) in service. The line is mainly quadruple track from London to Stoke Tunnel, south of Grantham , with two double track sections: one between Digswell Jn & Woolmer Green Jn, where

2360-399: Is currently undertaking a £38 billion programme of upgrades to the network, including Crossrail , electrification of lines , in-cab signalling , new inter-city trains , upgrading Thameslink , and a new high-speed line . For investment projects, as opposed to routine maintenance, Network Rail has developed an eight-stage process designed to minimise and mitigate risks. This is known as

2478-685: Is not part of the Network Rail network, such as the line between Harrow-on-the-Hill and Amersham being owned by London Underground. Following an initial period in which Network Rail established itself and demonstrated its competence in addressing the principal challenges of improving asset condition, reducing unit costs and tackling delay, the Government's Rail Review in 2004 said that Network Rail should be given responsibility for whole-industry performance reporting, timetable development, specification of small and medium network enhancements, and

SECTION 20

#1732791164162

2596-509: Is on fairly straight track on the flatter, eastern side of England, through Lincolnshire and Cambridgeshire , though there are significant speed restrictions because of the line's curvature particularly north of Darlington and between Doncaster and Leeds. By contrast, the West Coast Main Line crosses the Trent Valley and the mountains of Cumbria , with more curvature and had a lower speed limit of 110 mph (180 km/h). Speeds on

2714-418: Is operated by Colas Rail, primarily using locomotives from Colas' and Network Rail's own fleets, but have also used locomotives hired from other companies such as Direct Rail Services , GB Railfreight and Europhoenix as required. From 1997 to 2014 (inclusive), passenger numbers have more than doubled, following little growth in the previous decades. To cope with the increasing passenger numbers, Network Rail

2832-665: Is operated by Network Rail. A line closure for engineering or renewal works is known as a possession. Network Rail has an internal infrastructure database known as GEOGIS. The system uses codes for four-digit Track IDs to identify which line at any location is referred to. The first number refers to track direction, with values of 1 (Up), 2 (Down), 3 (Reversible/Bi-directional), or 4 (Merry Go Round Loop). The second number refers to track use, which can be 1 (Main or Fast), 2 (Slow, Local or Relief), 3 (Goods), 4 (Single line), 5 (Loop), 6 (Terminal or Bay), 7 (Crossover), 8 (Other or Engine), or 9 (Single Siding). The third and fourth numbers refer to

2950-658: Is the owner (via its subsidiary Network Rail Infrastructure Limited, which was known as Railtrack plc before 2002) and infrastructure manager of most of the railway network in Great Britain . Network Rail is a non-departmental public body of the Department for Transport with no shareholders, which reinvests its income in the railways. Network Rail's main customers are the private train operating companies (TOCs), responsible for passenger transport, and freight operating companies (FOCs), who provide train services on

3068-559: The Leeds - Hull line direct to York . Through journeys were important and lucrative for the companies and in 1860 they built special rolling stock for the line. Services were operated using "East Coast Joint Stock" until 1922. The trains were hauled by GNR locomotives between King's Cross and York, which entailed utilisation of GNR running powers over the NER between Shaftholme Junction and York (which had been agreed in 1849 and exercised from

3186-520: The Northern City Line to Moorgate . In the late 1970s, a working group of British Rail and Department for Transport officials convened and determined that, of all options for further electrification, the ECML represented the best value by far. Its in-house forecasts determined that increases in revenue and considerable reductions in energy and maintenance costs would occur by electrifying

3304-759: The Northern Hub . However as of September 2017 the two Manchester stations remained under the operatorship of Arriva Rail North . There are a small number of stations on the National Rail network that are not owned by Network Rail. As of 2022 these are: Network Rail has several training and development sites around Britain. These include sites in York, Peterborough, Derby, Leeds, Walsall and Larbert which provide refresher courses, and train staff in new equipment. Advanced Apprentice Scheme trainees are trained at Network Rail's Westwood training centre for

3422-733: The Royston and Hitchin Railway . The line was initially planned to be a single track spur from Hitchin, but during debate in the Lords it was recommended that the line be two track in the view of its possible later use as part of a route from Cambridge to Bedford although this was later superseded by the Varsity line via Sandy . The line was opened in 1851 then extended to Cambridge by the Eastern Counties Railway although this

3540-431: The West Anglia Main Line links Liverpool Street to Cambridge now provides mainly stopping services though some peak hour trains stop only at Tottenham Hale and Audley End. The line is double track throughout. Traction current is supplied at 25 kV AC using overhead line equipment overseen by York Electrical Control Room, with Neutral Sections at Cambridge junction, Litlington and Shepreth Branch Junction. It has

3658-534: The West Coast Main Line (WCML) were increased with the introduction of tilting Pendolino trains and now match the 125   mph speeds on the ECML. The line's current principal operator is London North Eastern Railway (LNER), whose services include regular long-distance expresses between King's Cross, the East Midlands, Yorkshire, the North East of England and Scotland. LNER is operated on behalf of

Cambridge line - Misplaced Pages Continue

3776-452: The 14-mile-long (23 km) Selby Diversion . Construction commenced in 1980, and was completed in late 1983 at a cost of £63   million (equivalent to £214   million in 2023). The new section diverged from the original alignment at Temple Hirst Junction, north of Doncaster, bypassed Selby station and the area to be undermined by coal workings, and then joined the Leeds–York line of

3894-673: The Cambridge line, killing seven. As part of the Great Northern Route electrification by British Rail in the mid 1970s, the through service was severed by the need to change from the electrified service at Royston to a diesel train stopping at all stations to Cambridge . The extension of electrification through to Cambridge was completed in 1988 under Network SouthEast and the track improved to increase speed. Occasional services are run by 12-car trains allowing them to stop only at Royston & Letchworth Garden City where

4012-470: The Class 55's ability to rapidly accelerate and maintain high speed with a heavy train over long distances, immediately cut over one hour from the standard London to Edinburgh journey time, from seven hours to under six. Further improvements to the infrastructure meant that by the mid-1970s, another half-hour had been cut from the journey time. In the years following the introduction of the Deltics, sections of

4130-480: The Deltic and High Speed Train, as an interim measure to implement improved services, whilst West Coast electrification proceeded, and was largely complete by 1974. During the period when Richard Beeching was chairman of British Rail, WCML electrification with a spur from Carstairs to Edinburgh was seen as possible justification for the truncation of the ECML at Newcastle. British Rail carried out electrification of

4248-750: The Department for Transport by a consortium of Arup Group , Ernst & Young and SNC-Lavalin Rail & Transit , which took over from Virgin Trains East Coast on 24 June 2018. Other operators of passenger trains on the line are: Eurostar previously held the rights to run five trains a day on the line for services from mainland Europe to cities north of London, as part of the Regional Eurostar plan, which never came to fruition. The overnight Caledonian Sleeper occasionally uses

4366-440: The ECML and onto non-electrified lines. Generally popular with the public, and considered by some to be iconic, they ran on the ECML for 41 years, before being withdrawn in 2019. In 1973, the prototype HST British Rail Class 41 recorded a top speed of 143 mph (230 km/h) in a test run on the line. There had been proposals to electrify all or parts of the ECML as far back as the early 1900s, but no significant scheme

4484-460: The ECML were upgraded for trains running at speeds of up to 100 mph (160 km/h). On 15 June 1965, the first length of high-speed line, a 17 miles (27 km) stretch between Peterborough and Grantham, was completed. The next section was 12 miles (19 km) of line between Grantham and Newark and more sections were upgraded to enable high speeds along much of the line. Continuing demand for reduced journey times led British Rail to introduce

4602-541: The ECML when engineering works prevent it from using its normal train path on the WCML. DB Cargo UK , Direct Rail Services , Freightliner and GB Railfreight operate freight services. The ECML is one of the busiest lines on the British rail network and there is insufficient capacity on parts of the line to satisfy all the requirements of both passenger and freight operators. Network Rail Network Rail Limited

4720-471: The ECML. British Rail 's 1955 modernisation plan placed equal importance on electrification of both the West Coast Main Line (WCML) and ECML; a detailed plan drawn up in 1957 gave a completion date of 1970 for ECML electrification. However, the East Coast authorities decided that they could not wait over a decade for service improvements, and instead decided to invest in high-speed diesel traction,

4838-624: The Governance for Railway Investment Projects (GRIP), previously known as “Guide to Rail Investment Projects”. The stages are as follows: Each stage delivers an agreed set of outputs to defined quality criteria. The process has been criticised as cumbersome by some and it is proposed to replace it with a new process with the acronym PACE- Project Acceleration in a Controlled Environment. For financial and other planning purposes, Network Rail works within 5-year "Control Periods", each one beginning on 1 April and ending on 31 March to coincide with

Cambridge line - Misplaced Pages Continue

4956-570: The LMS countered with its own streamlined Coronation Class  – both of which were capable of reaching speeds in excess of 100 mph (160 km/h). The competition was curtailed soon thereafter by the coming of World War II . In the aftermath of the war, Clement Attlee 's Labour Government nationalised the LNER and the other three major railway companies in Great Britain with

5074-535: The NER at Askern , famously described by the GNR's chairman as in "a ploughed field four miles north of Doncaster". Askern was connected to the Lancashire and Yorkshire Railway , a short section of which was used to reach the NER at Knottingley . In 1871, the line was shortened when the NER opened a direct line from an end-on junction, with the GNR, at Shaftholme, just south of Askern to Selby and over Selby Bridge on

5192-646: The North and Midlands stated that the linespeed would be upgraded to 140 mph (225 km/h). The line links London, South East England , East Anglia and the East Midlands , with Yorkshire , the North East and Scotland, and is important to their local economies. It carries commuter traffic in north London as well as cross-country, commuter and local passenger services, and freight . In 1997, operations were privatised. The primary long-distance operator

5310-592: The Train Operating Companies. During March 2011, the British government announced that the Great Western Main Line would be electrified as far as Bristol Temple Meads. Within four years, this programme, which was headed by Network Rail, was beset by poor planning and cost overruns, leading to the shortcomings being scrutinised by Parliament. Specifically, the projected cost had increased from £1.2 billion to £2.8 billion by

5428-525: The UK, as of March 2014, Network Rail is well underway in the UK implementation of GSM-R to replace its legacy National Radio Network (NRN) and Cab Secure Radio (CSR) systems currently in use. Network Rail operates a large variety of DMUs, locomotives and rolling stock to perform safety checks and maintenance (this fleet is not to be confused with the combined rolling stock assets of Rail Delivery Group members who work in combination as National Rail ). As well as

5546-605: The WCML from the south. In total the electrification programme covered roughly 1,400 single-track miles (2,300 km) and required major infrastructure changes, including resignalling of the line from Temple Hirst Junction (near Selby in Yorkshire) to the Scottish border; the construction of new signalling centres at Niddrie, York, and Newcastle; the commissioning of ten new connections to the national electricity grid; and structure clearance and electrical immunisation works along

5664-711: The Widened Lines route and the GWML, where ERTMS complements traditional lineside signals, the southern ECML will have its signals removed once the transition period to ERTMS is complete. This means that all trains running on the route will be required to be fitted with the appropriate onboard equipment. The Class 800 series (LNER Azuma Classes 800 and 801 , Hull Trains Paragon Class 802 , Lumo Class 803 ), Thameslink Class 700 and Great Northern Class 717 fleets are fitted with ERTMS equipment from manufacture. The Great Northern Class 387 fleet are undergoing retrofit, with

5782-506: The city. The line has engineers line references (ELR) ECM1 to ECM9. The ECML was constructed by three independent railway companies. During the 1830s and 1840s, each company built part of the route to serve its own area, but also intending to link with other railways to form the through route that would become the East Coast Main Line. From north to south, the companies were: The GNR established an end-on connection with

5900-407: The company and EDF was signed to provide more solar energy. In May 2021, the Government announced that Network Rail is to superseded by a new body, Great British Railways , in 2023. Network Rail is a not-for-profit organisation . The majority of funding comes from a mix of direct grants and borrowing from the UK and Scottish Governments, payments from train and freight operators and previously

6018-424: The company experienced financial difficulties; the franchise then passed to National Express East Coast until in 2009, when it too encountered financial problems and the government was forced to run the franchise itself as ' East Coast '. Another attempt at returning the franchise to private-sector operation was made by Virgin Trains East Coast in 2015, but this failed in 2018, and thus since then it has been run by

SECTION 50

#1732791164162

6136-452: The company have any way of assessing the consequence of the speed restrictions it was ordering. These restrictions brought the railway network to an almost total standstill and drew significant public ire. According to railway historian Christian Wolmar , Railtrack's board panicked in the wake of Hatfield. Railtrack's first chief executive, John Edmonds, had pursued a deliberate strategy of outsourcing engineers' work wherever possible with

6254-400: The crossing with a flyover or tunnel, which would increase capacity on both lines, have been proposed on several occasions but are complicated by costs and spatial constraints at the site. With most of the line rated for 125 mph (200 km/h) operation, the ECML was the fastest main line in the UK until the opening of High Speed 1 . The high speeds are possible because much of the line

6372-546: The delivery of route-specific utilisation strategies (RUS). Some of these are functions which Network Rail already had; others – such as the obligation to devise route utilisation strategies – were transferred to Network Rail from the Strategic Rail Authority , a non-departmental public body, part of the UK government. The SRA was abolished in November 2006. Network Rail initially sub-contracted much of

6490-419: The demand for higher speed, British Rail introduced InterCity 125 high-speed trains between 1976 and 1981. In 1973, a Class 41 (an HST prototype) achieved a top speed of 143 mph (230 km/h) in a test run. In the 1980s, the line was electrified and InterCity 225 trains introduced. These have in turn been largely replaced by Class 800 and Class 801 units. The November 2021 Integrated Rail Plan for

6608-585: The electrification of other lines, including Bristol Parkway to Temple Meads and Didcot to Oxford, was also postponed. During 2011, work commenced to extend the electrification of the Midland Main Line , including to both Corby and Nottingham. In July 2017, it was announced the then-Secretary of State for Transport Chris Grayling that the electrification scheme north of Kettering to Derby, Nottingham and Sheffield had been cancelled and that bi-mode trains would be used instead. However, in May 2022,

6726-624: The end of 2015, while the project's timetable was also delayed to the extent that the government had to request Hitachi to retrofit the new high speed trainsets procured under the Intercity Express Programme with diesel engines as well as electric traction. In July 2017, the government announced that, in response to the programme's continued difficulties, the scope of the electrification scheme had been decreased; specifically, it would only be completed as far as Thingley Junction, two miles (3.2 km) west of Chippenham, while

6844-525: The fifth aspect was not removed from signals in the test area , and the relevant track Sectional Appendix continued to list the capability to run special test trains in excess of 125   mph as recently as 2008. As part of the privatisation of British Rail in the mid-1990s, passenger operations on the ECML were offered to bidders as the InterCity East Coast franchise. It was held by Great North Eastern Railway from 1996 until 2007, when

6962-511: The first five months of their apprenticeship and then are trained further at HMS  Sultan in Gosport over seven 2-week periods or five 3-week periods (throughout their second and third year) of their apprenticeship, using a combination of Royal Navy facilities and a specially installed training centre. All courses are taught by VT Flagship (part of Babcock International ) in the first year but apprentices are trained by Network Rail staff in

7080-580: The first train sent to Worksop Depot in October 2022. Following its return to service in July 2023, the remaining trains will be retrofitted in Hornsey Depot. The introduction of in-cab signaling will allow the ECML line speed to be increased to 140   mph in some places. The Class 800 series trains were designed to reach this speed, but minor modifications will be required to remove the equipment that

7198-512: The former York and North Midland Railway at Colton Junction, south-west of York. The old line between Selby and York was dismantled and is now a public cycleway. Mining subsidence discovered in 2001 also necessitated the realignment of 1.8 km (1.1 mi) of line at Dolphingstone in East Lothian , between Prestonpans and Wallyford stations. The new alignment takes the form of a gentle curve of up to 77 m (253 ft) towards

SECTION 60

#1732791164162

7316-497: The full length of the line began on 8 July 1991, eight weeks later than scheduled. Significant traffic increases occurred in the two years after completion; one station recorded a 58 per cent increase in passengers. The programme also electrified the Edinburgh-Carstairs branch of the WCML, to allow InterCity 225 sets to access Glasgow Central , with the added benefit of creating an electrified path to/from Edinburgh on

7434-729: The goal of reducing costs. Various major schemes being undertaken by Railtrack had also gone awry. The modernisation of the West Coast Main Line had suffered from spiralling costs, rising from an estimated £2 billion to roughly £10 billion. This programme suffered failures that were technical as well as managerial, such as the moving block signalling apparatus being immature for such a busy mixed-traffic mainline. In 2000, reports emerged that Railtrack may not be able to go through with its planned commitment to purchase section 2 of High Speed 1 , resulting in disruption and uncertainty for that programme as well. In February 2001, Steve Marshall, Railtrack's chairman, warned that Railtrack could have

7552-450: The government can afford to contribute. The Office of Rail and Road (ORR) then sets the level of fixed income that Network Rail is allowed to charge and assesses the amount of money needed by Network Rail to run efficiently. The last Control Period ran from 2014 to 2019; 1 April 2019 was the start of Control Period 6 . In 2019, government funding for train operating companies amounted to £4.1 billion, paying access charges to use

7670-559: The government. On 7 October 2001, Railtrack plc was placed into railway administration under the Railways Act 1993, following an application to the High Court by the then Transport Secretary , Stephen Byers . Network Rail Ltd. was created with the express purpose of taking over Britain's railway infrastructure control; this was achieved via its purchase of Railtrack plc from Railtrack Group plc for £500 million; Railtrack plc

7788-467: The high-level stations are all termini used primarily by the main inter-city services to those stations. The low-level stations are through routes on local commuter networks that are largely separate from other routes to the main station; these platforms are not managed by Network Rail, but instead by the rail operator that primarily uses them, ScotRail and Merseyrail respectively. Network Rail operated Gatwick Airport station until January 2012 when it

7906-508: The increased maximum speed, BR experimented in 1988 with using a fifth signalling aspect  – flashing green – on the fast lines between Peterborough and Stoke Tunnel. The flashing green aspect appeared at signals preceding one displaying an ordinary steady green aspect, and authorised running at up to 140   mph. Upon encountering a steady green aspect the driver would reduce speed to no greater than 125   mph, and thus be ready to react to subsequent signals in

8024-464: The infrastructure that the company owns and maintains. Since 1 September 2014, Network Rail has been classified as a "public sector body". To cope with rapidly increasing passenger numbers , (as of 2021 ) Network Rail has been undertaking a £38 billion programme of upgrades to the network, including Crossrail , electrification of lines and upgrading Thameslink . In May 2021, the Government announced its intent to replace Network Rail in 2023 with

8142-634: The infrastructure was owned and operated by Railtrack , a privately-owned company. A spate of accidents, including the Southall rail crash in 1997 and the Ladbroke Grove rail crash in 1999 called into question the negative consequences that the fragmentation of the railway network had introduced to both safety and maintenance procedures. Railtrack was severely criticised for both its performance for infrastructure improvement and for its safety record. The Hatfield train crash on 17 October 2000

8260-431: The infrastructure work to private maintenance companies, such as Carillion and First Engineering ; other sub-contractors perform specialist work or additional labour, such as Prima Services Group, Sky Blue, Balfour Beatty, Laboursite, BCL, Atkins (Atkins Rail) and McGinleys. In October 2003, Network Rail announced that it would take over all infrastructure maintenance work from private contractors, following concerns about

8378-543: The irreparably-damaged tunnel; ultimately the line was closed for five months and around 1,100 yards (1 km) of the original alignment had to be abandoned. In the late 1970s in the north of England, the development of the Selby Coalfield  – and the anticipated subsidence that might result from its workings – led the National Coal Board to pay for the construction of

8496-487: The later Class A4 , including 4468 Mallard . During this time Mallard set a new world-record speed for a steam locomotive (see § Speed records ). The East Coast Main Line was engaged in long running rivalry with the West Coast Main Line (WCML), the other main trunk route between London and Scotland. At various points in the late 19th century, highly publicised but unofficial races occurred between express trains on

8614-554: The latter is a brand rather than an organisation, used to inform and promote a nationwide network of passenger railway services. The majority of Network Rail lines also carry freight traffic; some lines are freight only. A few lines that carry passenger traffic are not part of the National Rail network (such as the Tyne and Wear Metro and the London Underground ). Conversely, a few National Rail services operate over track which

8732-567: The latter of which achieved a world record speed for a steam locomotive, 126 mph (203 km/h) on the Grantham-to-Peterborough section. In 1948, the railways were nationalised and operated by British Railways . In the early 1960s, steam was replaced by diesel-electric traction , including the Deltics , and sections of the line were upgraded so that trains could run at speeds of up to 100 mph (160 km/h). With

8850-423: The length of the line. Included in the structure clearance works were the 127 overbridges that crossed the ECML. Where the existing bridge clearance was insufficient, project managers favoured wherever possible the rebuilding of the bridge rather than the lowering of the track, as the latter requires considerable civil works and can create long-term drainage problems. Where listed buildings were to be affected by

8968-612: The line passes over the Digswell Viaduct , Welwyn North station and the two Welwyn tunnels; and one between Fletton Junction (south of Peterborough) and Holme Junction, south of Holme Fen. The route between Holme Junction and Huntingdon is mostly triple track, with the exception of a southbound loop between Conington and Woodwalton. North of Grantham the line is double track except for quadruple-track sections at Retford , around Doncaster, between Colton Junction (south of York), Thirsk and Northallerton , and Newcastle. The line

9086-460: The line. In 1984, the decision was made to commence the electrification of the rest of the ECML to Edinburgh and Leeds. The Secretary of State for Transport Nicholas Ridley and Minister for Railways David Mitchell played a large role in the decision to proceed. Construction began on the second phase in 1985. In 1986 the section to Huntingdon was completed; Leeds was reached in 1988, then York in 1989 and Edinburgh in 1991. Electric services on

9204-550: The lineside signalling system on the southern ECML between London King's Cross and the Stoke Tunnel was commissioned in 1977 and as such was up for renewal between 2020 and 2029. Instead of renewing the current lineside signalling, it was decided to upgrade this section of the ECML to ERTMS in-cab signalling. This will not be the first instance of ERTMS on the UK rail network; it is in use on the Cambrian Line (where it

9322-462: The media concerning the knighthood awarded to John Armitt in the 2012 New Year Honours for services to engineering and construction. Armitt was Chief Executive of Network Rail at the time of the 2007 Grayrigg derailment and the family of a victim of the accident criticised the award, which coincidentally was conferred on the same day that Network Rail were prosecuted for the accident. In 2023, one of Network Rail's managing directors resigned after

9440-447: The multiple units and locomotives, Network Rail own and operate a large stock of rolling stock for particular testing duties and track maintenance. Network Rail also hire freight locomotives from various freight operators including DB Cargo UK , Freightliner , Colas Rail and GB Railfreight amongst others to operate engineers' trains in support of maintenance and renewal work. Network Rail's Infrastructure Monitoring fleet of test trains

9558-492: The ongoing modernisation of the railway network by replacing track and signalling, continues to be carried out by private engineering firms under contract. The biggest renewals projects include the multibillion-pound upgrade of the London – Glasgow West Coast Main Line , which was completed in 2008, the Thameslink Programme to upgrade the north–south railway through London and work on the part of Crossrail which

9676-564: The opening of the GNR in 1850); and by NER locomotives between York and Edinburgh, using NER running powers over the NBR between Berwick and Edinburgh (agreed in 1862 but not exercised until 1869). The entire ECML came under control of the London and North Eastern Railway (LNER) in 1923, under the Railways Act 1921 which 'grouped' many small railway companies into four large ones . The LNER

9794-657: The passage of the Transport Act 1947 , and with effect from 1 January 1948 merged them into British Railways (BR). The ECML came under the control of three of BR's regions ; the Eastern Region , the North Eastern Region , and the Scottish Region (the former two were merged together in 1967). In the early 1960s, steam locomotives were replaced by diesel-electrics , amongst them the Deltic ,

9912-527: The platform is long enough to accommodate them. The platform extension at Letchworth Garden City was completed in December 2011. The Down platforms at Shepreth and Foxton were extended in 2017 to allow 8-car trains to stop without blocking the level crossings. The flat junction at Hitchin has always been an issue with conflicting train movements, but the Hitchin flyover to the north of the existing junction

10030-700: The position for six years. He noted that as Network Rail moved to a "new phase in its development" it was appropriate for a new chairman to lead it there. Network Rail also has a 15-year lease on Square One in Manchester with 800 staff in one of Manchester's largest refurbished office spaces. During June 2012, work was completed on the company's new national centre, known as the Quadrant:MK . Based in Milton Keynes about five minutes' walk from Milton Keynes Central , it comprises four buildings connected to

10148-576: The process of reorganising its operational structure into nine semi-autonomous regional entities, each with their own managing director; the first two units to be created were Scotland and Wessex regions. The reorganisation has been interpreted as a move back towards vertical integration of track and train operations. In December 2016, the Transport Secretary, Chris Grayling announced that Network Rail would lose sole control of track maintenance and repairs, and instead would share this with

10266-597: The programme, BR sought approval for its plans from the Royal Fine Art Commission . Through this process a special design of overhead wiring was developed for use on the visually-sensitive Royal Border Bridge , as well as the Croxdale and Durham City viaducts . Elsewhere the standard Mk.   3B equipment was deployed. The electrification was completed at a cost of £344.4   million (at 1983 prices, equivalent to £1169.3   million in 2023),

10384-693: The public sector through the government's operator of last resort procedure under the London North Eastern Railway brand. The route of the ECML has been altered or diverted several times, beginning with the opening of the King Edward VII Bridge in Newcastle upon Tyne in 1906. Later, the Penmanshiel tunnel collapse in the Scottish Borders in 1979 necessitated urgent works to divert the line around

10502-408: The public through telephones located at level crossings. GAI-Tronics provides many of the telephones sited on trackside and at level crossings. They also provide Public Access Help Points on platforms and stations to provide passengers with easy access to Information and Emergency control centres. GSM-R radio systems are being introduced across Europe under EU legislation for interoperability. In

10620-500: The quality of work carried out by certain private firms and spiralling costs. In 2007, it was announced that the number of track renewal contractors would be reduced from six to four; Amey / SECO , Balfour Beatty , Babcock First Engineering and Jarvis plc . Network Rail has expanded its in-house engineering skills, including funding of apprenticeship and foundation degree schemes, and has reported significant savings from transferring work away from contracting companies. Additional work

10738-491: The rail network, £2.1 billion and freight £58 million. In 2019, it spent £3.1 billion on renewals (restoring existing infrastructure back to how it was when new) and £3.2 billion on enhancements, with the rest spent on maintenance and other costs. Network Rail covers 20,000 miles of track, and 30,000 bridges, tunnels and viaducts. They claim to run the world's largest third rail network. In February 2004, an operations centre at Waterloo station in London

10856-445: The railway tracks, signals, overhead wires, tunnels, bridges, level crossings and most stations, but not the passenger or commercial freight rolling stock, other than its limited departmental stock . While it owns over 2,500 railway stations, it manages only 20 of the biggest and busiest of them as all the other stations are managed by the various train operating companies (TOCs). Network Rail should not be confused with National Rail ,

10974-467: The record for a steam locomotive at 126 mph (203 km/h) whilst descending Stoke Bank on 3 July 1938. The record remains standing today, and a trackside sign was erected in July 1998 at the 90 + 1 ⁄ 4 milepost to commemorate the achievement. The world record for diesel-powered trains was set at 148 mph (238 km/h) on 1 November 1987, by a shortened InterCity 125 train of two Class 43 power cars and three coaches during

11092-398: The same manner as when driving a lower-speed train. The testing found, however, that drivers couldn't be expected to consistently and accurately interpret and respond to lineside signals when driving at the higher speed, and regulations were later changed throughout Britain to require the use of in-cab signalling whenever running service trains at speeds above 125   mph. Nevertheless,

11210-966: The second and third years. Network Rail bought a residential centre from Cable and Wireless in the Westwood Business Centre near Coventry for leadership development. The company and other industry partners such as VolkerRail and Balfour Beatty also operate a Foundation Degree in conjunction with Sheffield Hallam University . In 2008, Network Rail piloted its first qualification in "track engineering". It has been given permission to develop courses equivalent to GCSE and A-levels. Network Rail operates various essential telecommunication circuits for signalling and electrification control systems, train radio systems, lineside communications, level crossing CCTV, station information and security systems as well as more general IT and business telephony needs. The fixed bearer network infrastructure comprises transmission systems and telephone exchanges linked by

11328-410: The south, supported by concrete slabs and other ground stabilisation and reinforcement techniques, and is designed to avoid the need for a permanent speed restriction. It came into use in the last week of April 2003, at a cost of £56   million (equivalent to £92   million in 2023). World speed records for both steam and diesel traction have been set on the ECML. LNER's 4468 Mallard set

11446-695: The southern part of the ECML with 25 kV AC overhead lines from London King's Cross to Hitchin between 1976 and 1977. This was authorised in 1971 for the benefit of London suburban services as part of the Great Northern Suburban Electrification Project , using Mk.   3A equipment. The scheme electrified 70 route miles (110 km), including the Hertford Loop Line , part of the Cambridge Line from Hitchin to Royston , and incorporated

11564-524: The success of this scheme, in 1919 the North Eastern Railway, planned to electrify 80 miles (130 km) of the main line between York and Newcastle; the scheme progressed as far as a prototype locomotive , however it was cancelled on financial grounds after 1923 when the NER was grouped into the LNER, and the new management had no interest in pursuing the scheme. In the early-1930s, studies were conducted into electrifying sections or all of

11682-529: The track number, which can be any number from 00 to 99 inclusive, and are usually numbered sequentially. In 2006, Network Rail made public a high-tech plan to combat the effects of slippery rail . This plan involves the use of satellites for tracking trouble areas, water-jetting trains and crews using railhead scrubbers, sand sticks and a substance called Natrusolve, which dissolves leaf mulch. Network Rail owns more than 2,500 railway stations, divided into six categories . Management and operation of most of them

11800-417: The two routes, most notably in 1888 and 1895. These races were ended over concerns over safety, but later the rivalry resumed in the 1920s and 1930s as both the LNER and its West Coast competitor, the London, Midland and Scottish Railway (LMS), produced ever-more-powerful express locomotives. This reached its crescendo in the late 1930s, when the LNER introduced the famous streamlined Class A4 locomotives and

11918-893: The whole Cambridge line is Track Circuit block , with all main signals being multiple-aspect colour light signals. In order from southwest to north. These are the passenger usage statistics on the National Rail network from the year beginning April 2002 to the year beginning April 2022. Comparing 2002 and 2010, Cambridge increased by nearly 51%, Foxton by 57%, Shepreth by 99%, Meldreth by 41% although it had declined in recent years until this point, Royston increased by 28%, Ashwell and Morden by 30%, Baldock by 50%, Letchworth Garden City by 33% and Hitchin by 44%. 52°03′N 0°02′W  /  52.05°N 0.03°W  / 52.05; -0.03 East Coast Main Line The East Coast Main Line ( ECML )

12036-490: The winners of a competitive tender process. The InterCity 225 sets were used alongside other rolling stock, including Class 90 locomotives and Class 317 electric multiple units. The displaced diesel trains were reallocated predominantly to the Midland Main Line . The infrastructure supported speeds of up to 140   mph, allowing a non-stop run of three hours and 29 minutes between London and Edinburgh on 26 September 1991. As part of testing done to support safe operation

12154-511: The world's largest solar-powered bridge, adjacent to the remains of the old Blackfriars Railway Bridge , across the River Thames . The roof of the new railway bridge is covered with 4,400 photovoltaic panels, providing up to half of the energy requirement for London Blackfriars station . Solar panels are used at various locations across Network Rail's property portfolio, including stations and depots. In August 2022, an agreement between

12272-458: Was a defining moment in the collapse of Railtrack. The immediate major repairs undertaken across the whole British railway network were estimated to have cost in the order of £ 580 million and Railtrack had no idea how many more 'Hatfields' were waiting to happen because it had lost considerable in-house engineering skill following the sale or closure of many of the engineering and maintenance functions of British Rail to external companies; nor did

12390-442: Was also accused of financial impropriety involving unspecified payments to his business partner Victoria Pender during his tenure at Network Rail. An internal investigation held by Network Rail in 2010, vetted by its auditors PricewaterhouseCoopers , uncovered no evidence of wrongdoing. An independent enquiry headed by Anthony White QC in 2011 further examined the claims, but also exonerated Coucher. Critical commentary appeared in

12508-599: Was authorised to reach speeds up to 140mph completing the London to Edinburgh journey in 3 hours 29 minutes. In November 2021, as part of the Integrated Rail Plan , the DfT announced a major upgrade of the line. The upgrade is set to include major track improvements and digital signalling, leading to higher speeds, reduced journey times and increases in seat capacity. The power supply will also be upgraded to allow longer and more frequent trains. The last refresh of

12626-797: Was built during the 1840s by three railway companies, the North British Railway , the North Eastern Railway , and the Great Northern Railway . In 1923, the Railways Act 1921 led to their amalgamation to form the London and North Eastern Railway (LNER) and the line became its primary route. The LNER competed with the London, Midland and Scottish Railway (LMS) for long-distance passenger traffic between London and Scotland. The LNER's chief mechanical engineer Nigel Gresley designed iconic Pacific steam locomotives including Flying Scotsman and Mallard ,

12744-587: Was developed specifically for the operational railway; it provides radio coverage for 98% of the rail network through 500 base stations and 21 radio exchanges. The Radio Electronic Token Block RETB system is based on similar technology as the NRN and ORN but provides data communication for signalling token exchange as well as voice communication. Fixed communication at trackside is provided by telephone. These are primarily provided for signallers to communicate with train crew, via telephones mounted on signal posts, and with

12862-524: Was first piloted), on the Thameslink core Widened Lines route (with an ATO overlay), and on the Heathrow branch of the Great Western Main Line . However, it is the most complex application yet; never before in the UK has ERTMS been used on such a busy, mixed-traffic line, with freight , commuter , regional and InterCity services sharing as little as two tracks in the tightest sections. Unlike

12980-433: Was implemented until the 1970s and 1980s, with the entire line being electrified in two stages between 1976 and 1991. Early proposed schemes included a 1904 proposal by the Great Northern Railway to electrify its suburban services from London. A short stretch of the ECML in the Newcastle area was electrified with a third rail in 1904, as part of the North Eastern Railway 's suburban Tyneside Electrics scheme. Following

13098-686: Was opened in 1906, replacing the older High Level Bridge as the main railway crossing of the River Tyne . Newark flat crossing , where the ECML crosses the Nottingham–Lincoln line on the same level just north of Newark Northgate station, is one of only two remaining flat crossings in Britain, the other being on the Cambrian Line where it intersections with the Welsh Highland Railway . Plans for grade separating

13216-492: Was opened in 2013 to carry north-bound services over the East Coast Main Line . The East West Rail main line is proposed to join the northern section of the line, via a flying junction at Harston or Hauxton . Services on the line are run by both Thameslink and Great Northern as part of their Great Northern Route . A mix of Express, Fast and Stopping services are provided on the line including services through Central London to and from Brighton. An alternative route via

13334-573: Was opened, which was operated jointly by Network Rail and South West Trains . This was the first full collaboration of its kind since privatisation, and it is regarded as a model for other areas of the network, with a further six integrated Network Rail + TOC Control Centres having opened since then, at Blackfriars , Croydon (Leading Control for Thameslink), Swindon , Birmingham New Street , Glasgow and, most recently, Liverpool Street and South Wales based in Cardiff Canton. Track renewal,

13452-412: Was resisted by the company already operating a service from Liverpool Street via the West Anglia Main Line . The line was then leased by the Great Northern Railway in 1850 and subsequently purchased in 1898 and through services run from London King's Cross to Cambridge . In 2002, a train travelling from King's Cross to King's Lynn, via Cambridge, crashed at Potter's Bar , shortly before set to join

13570-527: Was taken back in-house after the serious accident at Potters Bar and other accidents at Rotherham and King's Cross led to Jarvis's collapse into administration in March 2010. The company moved its headquarters to Kings Place, 90 York Way, from 40 Melton Street, Euston, in August 2008. Two months later, Sir Ian McAllister announced that he would not stand for re-election as chairman of Network Rail after holding

13688-482: Was the second largest railway company in Britain, its routes were located to the north and east of London. The LNER appointed Nigel Gresley (who was knighted in 1937) as its Chief Mechanical Engineer, and under his tenure, Pacific steam locomotives were developed as the standard express locomotive to work the line, several of which became famous, these included the Class A3 , including 4472 Flying Scotsman , and

13806-417: Was then renamed and reconstituted as Network Rail Infrastructure Limited . The transaction was completed on 3 October 2002. The former company had thus never ceased to exist but continued under another name: for this reason Network Rail Infrastructure Ltd was the defendant in later prosecutions in respect of events which had occurred in the days of Railtrack. Network Rail owns the infrastructure, including

13924-568: Was transferred to Southern , and Fenchurch Street until November 2014 when it was transferred to c2c . Network Rail took over management of Bristol Temple Meads and Reading in April 2014. A DfT franchise report in 2014 stated Network Rail's intention to subsume more major stations into Network Rail's directly operated portfolio. The report earmarked York for Network Rail management, as well as Manchester Oxford Road and Manchester Victoria which are currently undergoing major rebuilding as part of