Misplaced Pages

Northern City Line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Commuter rail or suburban rail is a passenger rail transport service that primarily operates within a metropolitan area , connecting commuters to a central city from adjacent suburbs or commuter towns . Commuter rail systems can use locomotive-hauled trains or multiple units, using electric or diesel propulsion. Distance charges or zone pricing may be used.

#351648

91-711: The Northern City Line is a commuter railway line in England, which runs from Moorgate station to Finsbury Park in London with services running beyond. It is part of the Great Northern Route services, and operates as the south-eastern branch of the East Coast Main Line (ECML). It is underground from Moorgate to Drayton Park in Highbury, from which point it runs in a cutting until joining

182-631: A conductor rail outside each running rail. The GN&CR was bought in 1913 by the Metropolitan Railway (MR), which operated what are today the Metropolitan and Hammersmith & City lines and the former East London line . The MR had plans to link it to the Circle and Waterloo & City lines, but these were never fulfilled. During this period, the line remained an isolated branch, without through services to any other part of

273-482: A Highbury Branch train ran through the terminus at speed and crashed into the dead end of the tunnel beyond. The cause of the crash, which killed 43 people, was never determined. A report found that there was insufficient evidence to say if it was a deliberate act of the driver or due to a medical condition. On 8 March 2013, pile boring operations from a building site in East Road, Hackney, 13 m (43 ft) above

364-510: A chairman and six other members. The members were chosen jointly by five appointing trustees listed in the Act: The Act required that the board members should be ' persons who have had wide experience, and have shown capacity, in transport, industrial, commercial or financial matters or in the conduct of public affairs and, in the case of two members, shall be persons who have had not less than six years' experience in local government within

455-651: A city's central business district, and often share right-of-way with intercity or freight trains. Some services operate only during peak hours and others use fewer departures during off peak hours and weekends. Average speeds are high, often 50 km/h (30 mph) or higher. These higher speeds better serve the longer distances involved. Some services include express services which skip some stations in order to run faster and separate longer distance riders from short-distance ones. The general range of commuter trains' travel distance varies between 15 and 200 km (10 and 125 miles), but longer distances can be covered when

546-413: A headway rather than a published timetable and use dedicated tracks (underground or elevated), whereas commuter rail often shares tracks, technology and the legal framework within mainline railway systems, and uses rolling stocks with more seating and higher speed for comfort on longer city-suburban journeys. However, the classification as a metro or rapid rail can be difficult as both may typically cover

637-581: A metropolitan area exclusively, run on separate tracks in the centre, and often feature purpose-built rolling stock. The fact that the terminology is not standardised across countries (even across English-speaking countries) further complicates matters. This distinction is most easily made when there are two (or more) systems such as New York's subway and the LIRR and Metro-North Railroad , Paris' Métro and RER along with Transilien , Washington D.C.'s Metro along with its MARC and VRE , London's tube lines of

728-436: A motor car, bringing the fleet to 32 motors and 44 trailers. (The remaining sets of traction control equipment were used as maintenance spares.) Normal operation was six-car formations at peak times, reduced to two-car sets at other times. Cars were 56 ft 6 in (17.22 m) long over buffers, 9 ft 4 in (2.84 m) wide, and 12 ft 2 in (3.71 m) in height. Seats were provided for 58 passengers in

819-522: A train is standing at a signal at danger inside a tunnel and it is not possible for the driver to contact the signaller, the driver is permitted to pass that signal under their own authority . As soon as the train starts to move, the tripcock on the train will automatically operate and bring the train to a stop, so the driver must reset it before continuing. They must then proceed with caution, be prepared to stop short of any obstruction, and not travel any faster than 3 mph (4.8 km/h). When they reach

910-935: Is especially the case for lines operated by Korail , such as the Gyeongui-Jungang Line , the Gyeongchun Line , the Suin-Bundang Line , or the Gyeonggang Line . Even some lines not operated by Korail, such as the AREX Line, the Seohae Line or the Shinbundang Line mostly function as commuter rail. Lastly, even for the "numbered lines" (1–9) of the Seoul Metropolitan Subway which mostly travel in

1001-603: Is heavily used by commuters in the Greater Tokyo Area , who commute between 100 and 200 km (62 and 124 mi) by Shinkansen . To meet the demand of commuters, JR sells commuter discount passes. Before 2021, they operated 16-car bilevel E4 Series Shinkansen trains at rush hour, providing a capacity of 1,600 seats. Several lines in China, such as the Beijing–Tianjin Intercity Railway and

SECTION 10

#1732771842352

1092-417: Is often a case of asset sweating , by using a single large combined fleet for intercity and regional services. Loco hauled services are usually run in push-pull formation, that is, the train can run with the locomotive at the "front" or "rear" of the train (pushing or pulling). Trains are often equipped with a control cab at the other end of the train from the locomotive, allowing the train operator to operate

1183-1963: Is one suburban rail called the Chittagong Circular Railway . Another suburban railway called the Dhaka Circular Railway is currently proposed. Karachi in Pakistan has a circular railway since 1969. Tehran Metro currently operates the Line 5 commuter line between Tehran and Karaj . Turkey has lines connecting Başkentray , İZBAN , Marmaray and Gaziray . Major metropolitan areas in most European countries are usually served by extensive commuter/suburban rail systems. Well-known examples include BG Voz in Belgrade (Serbia), S-Bahn in Germany, Austria and German-speaking areas of Switzerland, Proastiakos in Greece, RER in France and Belgium, Servizio ferroviario suburbano in Italy, Cercanías and Rodalies ( Catalonia ) in Spain, CP Urban Services in Portugal, Esko in Prague and Ostrava (Czech Republic), HÉV in Budapest (Hungary) and DART in Dublin (Ireland). London has multiple commuter rail routes: The Merseyrail network in Liverpool consists of two commuter rail routes powered by third rail, both of which branch out at one end. At

1274-470: Is operationally more like a typical metro system (frequent trains, an emphasis on standing passengers , short station spacings) than it is like commuter rail in other countries. Japanese commuter rail commonly interline with city center subway lines, with commuter rail trains continuing into the subway network, and then out onto different commuter rail systems on the other side of the city. Many Japanese commuter systems operate various stopping patterns to reduce

1365-526: Is still possible to tell them apart. Some operators, for example Thameslink , focus solely on commuter services. Others, such as Avanti West Coast and LNER , run solely intercity services. Others still, such as GWR and EMR , run a mixture of commuter, regional and intercity services. Some of these operators use different branding for different types of service (for example EMR brands its trains as either "InterCity", "Connect" for London commuter services, and "Regional") but even for those operators that do not,

1456-600: Is the Moorgate Line , but it is rarely referred to as this due to confusion with the Widened Lines route from Kentish Town to Farringdon , which, until March 2009, also served Moorgate surface-level station on the London Midland Region . The Northern City Line's name is derived from the fact that it was originally a London Underground line, where it was described or managed as part of both

1547-589: Is the number of passengers using stations on the line from the year beginning April 2002 to the year beginning April 2019. These numbers include all passengers using the station, not just Northern City Line users. [REDACTED] London transport portal Commuter rail The term can refer to systems with a wide variety of different features and service frequencies, but is often used in contrast to rapid transit or light rail . Some services share similarities with both commuter rail and high-frequency rapid transit ; examples include New Jersey Transit in

1638-579: Is used in Australia (Sydney for example) to describe the regional trains operating beyond the boundaries of the suburban services, even though some of these "inter-city" services stop all stations similar to German regional services. In this regard, the German service delineations and naming conventions are clearer and better used for academic purposes. Sometimes high-speed rail can serve daily use of commuters. The Japanese Shinkansen high speed rail system

1729-426: Is widely used in many commuter rail trains to increase capacity in rush hours. Carriages are usually not organized to increase seating capacity (although in some trains at least one carriage would feature more doors to facilitate easier boarding and alighting and bench seats so that they can be folded up during rush hour to provide more standing room) even in the case of commuting longer than 50 km and commuters in

1820-919: The Brisbane ( Queensland Rail 's City network ) and Perth ( Transperth ) systems in Australia, in some systems in Sweden, and on the Genoa-Casella line in Italy. Some countries and regions, including Finland , India, Pakistan, Russia , Brazil and Sri Lanka, as well as San Francisco ( BART ) in the US and Melbourne and Adelaide in Australia, use broad gauge track. Metro rail and rapid transit usually cover smaller inner-urban areas within 12 to 20 km (7 to 12 mi) of city centers, with shorter stop spacing, use rolling stocks with larger standing spaces, lower top speed and higher acceleration, designed for short-distance travel. They also run more frequently, to

1911-544: The Central London Railway with a diameter less than 12 feet (3.7 m). For this reason the line was popularly known as the "Big Tube" in its early days. However, the GNR eventually opposed the scheme and cancelled its electrification plans, and the line opened in 1904 with the northern terminus in tunnels underneath Finsbury Park GNR station. It was originally electrified using an unusual fourth-rail system with

SECTION 20

#1732771842352

2002-769: The Chennai MRTS , also covers over 300 stations and carries more than 2.5 million people daily to different areas in Chennai and its surroundings. Other commuter railways in India include the Hyderabad MMTS , Delhi Suburban Railway , Pune Suburban Railway and Lucknow-Kanpur Suburban Railway . In 2020, Government of India approved Bengaluru Suburban Railway to connect Bengaluru and its suburbs. It will be unique and first of its kind in India as it will have metro like facilities and rolling stock. In Bangladesh, there

2093-528: The Greater Tokyo Area , Seoul metropolitan area , and Jabodetabek area have to stand in the train for more than an hour. Currently there are not many examples of commuter rail in Africa . Metrorail operates in the major cities of South Africa , and there are some commuter rail services in Algeria , Botswana , Kenya , Morocco , Egypt and Tunisia . In Algeria, SNTF operates commuter rail lines between

2184-845: The Guangshen Railway have more frequent metro-like service. The two MTR lines which are owned and formerly operated by the Kowloon-Canton Railway Corporation ( East Rail line and Tuen Ma line which is integrated from the former West Rail line and Ma On Shan line in 2021), then the "KCR" ), and MTR's own Tung Chung line connect the new towns in New Territories and the city centre Kowloon together with frequent intervals, and some New Territories-bound trains terminate at intermediate stations, providing more frequent services in Kowloon and

2275-585: The Jakarta city center with surrounding cities and sub-urbans in Banten and West Java provinces, including Depok , Bogor , Tangerang , Serpong , Rangkasbitung , Bekasi and Cikarang . In July 2015, KRL Commuterline served more than 850,000 passengers per day, which is almost triple of the 2011 figures, but still less than 3.5% of all Jabodetabek commutes. Other commuter rail systems in Indonesia include

2366-631: The London Transport Executive was established on 1 January 1948. When the LPTB was formed in 1933, the companies taken over, notably the Underground Group and Thomas Tilling 's London operations, were 'bought' partially with cash and partially by the issue of interest-bearing stock – C stock – authorised by the enabling Act, which meant that those former businesses continued to earn yields from their holdings. The LPTB had

2457-1023: The Metro Surabaya Commuter Line , Commuter Line Bandung , KAI Commuter Yogyakarta–Solo Line , Kedung Sepur , and the Sri Lelawangsa . In the Philippines, the Philippine National Railways has two commuter rail systems currently operational; the PNR Metro Commuter Line in the Greater Manila Area and the PNR Bicol Commuter in the Bicol Region . A new commuter rail line in Metro Manila,

2548-695: The Metropolitan and Northern lines (sometimes as the "Highbury Branch"), although never connected to either. Built as an isolated route with a northern terminus at Finsbury Park, reconstruction connected it to the British Rail network in 1976 and began its modern service pattern. One of London's deep-level railways, the Northern City is unlike the others in being owned by Network Rail and served by commuter trains operated by Great Northern from Moorgate to Finsbury Park and onwards to Hertfordshire . The Great Northern & City Railway (GN&CR)

2639-676: The Northern Heights plan was to connect the Northern City Line at Finsbury Park to existing main-line suburban branches running to Alexandra Palace , High Barnet and Edgware , which would be taken over by London Transport and electrified. The Highgate branch of the Edgware–Morden line would connect to this network north of Highgate. Only parts of this plan were completed: when the Second World War started,

2730-614: The North–South Commuter Railway , is currently under construction. Its North section is set to be partially opened by 2021. In Malaysia, there are two commuter services operated by Keretapi Tanah Melayu . They are the KTM Komuter that serves Kuala Lumpur and the surrounding Klang Valley area , and the KTM Komuter Northern Sector that serves Greater Penang , Perak , Kedah and Perlis in

2821-769: The RT-type bus . Although curtailed and delayed by the outbreak of World War Two, the programme nevertheless delivered some key elements of the present overground sections of the Underground system. However, the most profound change enacted by the board, through the new works, was the transition from tram to trolleybus operation alluded to earlier. In 1933, the LPTB had operated 327 route miles of tramways and 18 route miles of trolleybuses. By 1948, these totals were 102 and 255 miles respectively, mainly by eliminating trams in North London. The final disappearance of trams, in 1952,

Northern City Line - Misplaced Pages Continue

2912-767: The Shanghai–Nanjing High-Speed Railway , serve a similar role with many more under construction or planned. In South Korea, some sections of the high-speed rail network are also heavily used by commuters, such as the section between Gwangmyeong Station and Seoul Station on the KTX network ( Gyeongbu HSR Line ), or the section between Dongtan Station and Suseo station on the SRT Line. The high-speed services linking Zürich , Bern and Basel in Switzerland (200 km/h (120 mph)) have brought

3003-676: The Southern Railway . Consequently, it was empowered to enter into co-ordination agreements with the mainline railway companies concerning their suburban services. It was, to a limited extent, accountable to users via The London and Home Counties Traffic Advisory Committee. Ninety-two transport and ancillary undertakings, with a capital of approximately £120 million, came under the LPTB. Central buses, trolleybuses, underground trains and trams were painted in "Underground" and "London General" red, coaches and country buses in green, with coaches branded Green Line . Already in use on most of

3094-588: The Underground and the Overground , Elizabeth line , Thameslink along with other commuter rail operators , Madrid's Metro and Cercanías , Barcelona's Metro and Rodalies , and Tokyo's subway and the JR lines along with various privately owned and operated commuter rail systems. Regional rail usually provides rail services between towns and cities, rather than purely linking major population hubs in

3185-605: The Yamanote Line , Keihin Tohoku Line , Chūō–Sōbu Line services arguably are more akin to rapid transit with frequent stops, simple stopping patterns (relative to other JR East lines) no branching services and largely serving the inner suburbs; other services along the Chūō Rapid Line , Sōbu Rapid Line / Yokosuka Line , Ueno–Tokyo Line , Shōnan–Shinjuku Line etc. are mid-distance services from suburban lines in

3276-550: The city branch of the North London Line . These British Rail services used the name " Great Northern Electrics ". The track and tunnels are now owned by Network Rail. Services are provided by Great Northern to Welwyn Garden City and, via the Hertford Loop Line , to Hertford North (with some extending to Stevenage , Hitchin or Letchworth ). The name "Northern City Line" has been revived to refer to

3367-502: The 300 km/h (186 mph) Nuremberg–Ingolstadt high-speed railway . The regional trains Stockholm – Uppsala , Stockholm– Västerås , Stockholm– Eskilstuna and Gothenburg – Trollhättan in Sweden reach 200 km/h (120 mph) and have many daily commuters. In Great Britain , the HS1 domestic services between London and Ashford runs at a top speed of 225 km/h, and in peak hours

3458-448: The Central Business Districts (CBDs) of these three cities within 1 hour of each other. This has resulted in unexpectedly high demand for new commuter trips between the three cities and a corresponding increase in suburban rail passengers accessing the high-speed services at the main city-centre stations ( Hauptbahnhof ). The Regional-Express commuter service between Munich and Nuremberg in Germany runs at 200 km/h (120 mph) on

3549-411: The Class 313 units when operating on the NCL had their Driving Motor B vehicle at the London end, and whilst on 750 V DC were electronically limited to 30 mph (48 km/h), which is the maximum line speed. All stations are long enough to accept six-car trains. The Moorgate tube crash , the most serious peacetime accident on the London Underground, occurred at Moorgate on 28 February 1975, when

3640-439: The ECML south of Finsbury Park. Its stations span northern inner districts of Greater London southwards to the City of London , the UK's main financial centre. Since December 2015, its service timetable has been extended to run into the late evenings and at weekends, meeting a new franchise commitment for a minimum of six trains per hour until 23:59 on weekdays and four trains per hour at weekends. The official name for this line

3731-402: The East Rail Line share tracks with intercity trains to mainland China . The three KCR lines are integrated into the MTR network since 2008 and most passengers do not need to exit and re-enter the system through separate fare gates and purchase separate tickets to transfer between such lines and the rest of the network (the exceptions are between the Tuen Ma line's East Tsim Sha Tsui station and

Northern City Line - Misplaced Pages Continue

3822-420: The Edgware, Alexandra Palace and Crystal Palace (High Level) branches were all closed to passengers in 1954. As a result, the Northern City Line remained isolated from the rest of the network. In 1964, the Northern City Line (low level) platforms at Finsbury Park were given over to become the southbound platforms of both the Piccadilly line and the new Victoria Line, the former Piccadilly line platforms becoming

3913-486: The Highgate link and electrification of the Barnet branch were well under way and ultimately completed, but the Northern City connection to Highgate was first postponed and finally cancelled after the war. After the war there were proposals to extend the Northern City Line north and south. The London Plan Working Party Report of 1949 proposed several new lines and suburban electrification schemes for London, lettered from A to M. The lower-priority routes J and K would have seen

4004-404: The LPTB had a monopoly of local road public transport. Under the Act the LPTB acquired the following concerns: The LPTB was a quasi-public organisation akin to a modern quango with considerable autonomy granted to its senior executives. It enjoyed a more or less full monopoly of transport services within its area, with the exception of those provided by the Big Four railway companies such as

4095-467: The LPTB were often of exemplary quality and are still much sought after. The LPTB was replaced in 1948 by the London Transport Executive , under the Transport Act 1947 . It was effectively nationalised, being taken under the wing of the British Transport Commission , which also ran much of the nation's other bus companies, an amount of road haulage, as well as the nation's railways, but it still retained considerable autonomy. The LPTB continued to exist as

4186-532: The London Passenger Transport Area." The first chairman and vice-chairman were Lord Ashfield and Frank Pick , who had held similar positions with the Underground Group. Members of the board had a term of office of between three and seven years, and were eligible for reappointment. Latham and Cliff became Chairman and Vice-Chairman of the successor London Transport Executive in 1947. The London Passenger Transport Area (LPTA) had an approximate radius of 30 miles (48 km) from Charing Cross , extending beyond

4277-433: The Netherlands carry many commuters, while their equipment, range, and speeds are similar to those of commuter trains in some larger countries. The United Kingdom has a privatised rail system, with different routes and services covered by different private operators. The distinction between commuter and intercity rail is not as clear as it was before privatisation (when InterCity existed as a brand of its own), but usually it

4368-474: The Northern City Line extended to Woolwich (Route J) and Crystal Palace (Route K), retaining the "Northern Heights" extensions to Edgware and Alexandra Palace. The lines would have run in small-diameter tube tunnels south from Moorgate to Bank and London Bridge . The "K" branch would have run under Peckham to Peckham Rye , joining the old Crystal Palace (High Level) branch (which was still open in 1949) near Lordship Lane. Nothing came of these proposals, and

4459-680: The Northern City line to Highbury & Islington and then changed onto the Victoria Line. In 1970 the line was connected (as intended by its original promoters) to the mainline via the high level platforms at Finsbury Park as part of a wider plan to electrify ECML suburban services. The line was renamed Northern line (Highbury Branch) and the following year an agreement was made to transfer it to British Rail . Commuter trains were run to/from Moorgate instead of King's Cross , relieving congestion at King's Cross. The last London Underground services ran in October 1975 and British Rail services commenced in August 1976, replacing services to Broad Street via

4550-411: The Tsuen Wan line's Tsim Sha Tsui station . In Taiwan, the Western line in the Taipei - Taoyuan Metropolitan Area, Taichung Metropolitan Area and Tainan - Kaohsiung Metropolitan Area as well as the Neiwan - Liujia line in the Hsinchu Area are considered commuter rail. In South Korea, the Seoul Metropolitan Subway includes a total of 22 lines, and some of its lines are suburban lines. This

4641-473: The U.S., German S-Bahn in some cities, the Réseau Express Régional (RER) in Paris, the S Lines in Milan, many Japanese commuter systems, the East Rail line in Hong Kong, and some Australasian suburban networks, such as Sydney Trains . Many commuter rail systems share tracks with other passenger services and freight . In North America, commuter rail sometimes refers only to systems that primarily operate during rush hour and offer little to no service for

SECTION 50

#1732771842352

4732-445: The Underground, being phased out during the last weeks of October 1966 through 3 November. 1938 tube stock serviced the line, in variously three-, four- and six-car formations, until its temporary closure on 4 October 1975. Services are currently operated by dual-voltage Class 717 electric multiple units (EMUs), which replaced Class 313 units as part of a franchise commitment when Govia Thameslink Railway took over management of

4823-400: The Up platform at Drayton Park is held at danger (red) as the train approaches. This ensures that all trains stop to lower the pantograph before going into the tunnel. In the 1970s the original London Underground fourth-rail traction current supply was converted to a third-rail 750V DC system. The redundant centre fourth-rail was disconnected and left in situ since it was difficult to remove in

4914-404: The assisting train. The driver remains with the train and the signaller will authorise the driver of the assisting train to proceed to the rear of the failed train at a maximum speed of 3 mph (4.8 km/h). To ensure that the rear of the failed train is always visible, all trains working over the NCL are required to display three red lights at their rear: two tail lamps plus the red portion of

5005-428: The boundaries of what later officially became Greater London , to Baldock in the North, Brentwood in the East, Horsham in the South and High Wycombe in the West. The LPTA had an area of 1,986 square miles (5,140 km ). The LPTA overlapped with the London Traffic Area (LTA) defined by the London Traffic Act 1924 and the part of the LPTA that was within the LTA was defined as the "special area" within which

5096-467: The capital Algiers and its southern and eastern suburbs. They also serve to connect Algiers ' main universities to each other. The Dar es Salaam commuter rail offers intracity services in Dar es Salaam , Tanzania. In Botswana, the ( Botswana Railways ) "BR Express" has a commuter train between Lobatse and Gaborone . In Japan, commuter rail systems have extensive network and frequent service and are heavily used. In many cases, Japanese commuter rail

5187-464: The capital was spent before World War Two broke out, it allowed extensions to the Central, Bakerloo, Northern and Metropolitan lines; built new trains and maintenance depots, with extensive rebuilding of many central area stations (such as Aldgate East); and replacement of much of the tram network by what was to become one of the world's largest trolleybus systems. During this period, two icons of London Transport were first seen: 1938 tube stock trains and

5278-640: The construction of the line, in 1901 British Thomson-Houston provided 35 sets of traction control equipment to Brush Electrical Engineering Company and Dick, Kerr & Company . The original plan was for 11 seven-car trains (33 motors and 44 trailers) and one shunting locomotive . Initially 26 motorcars and 32 trailer cars were built. They were known as the 'wooden' cars because they were fabricated of teak and mahogany on steel underframes. In 1906 Brush delivered another five motors and 13 trailers. There were of all-steel construction and naturally-enough referred to as 'steel cars'. The GN&CR converted one trailer to

5369-417: The dense parts of Seoul, some track sections extend far outside of the city, and operate large sections at ground level, such as on the Line 1 , Line 3 and Line 4 . In Busan, the Donghae Line , while part of the Busan Metro system, mostly functions as a commuter rail line. In Indonesia , the KRL Commuterline is the largest commuter rail system in the country, serving the Greater Jakarta . It connects

5460-485: The destination roller blind. On reaching the failed train, the assisting driver will stop short then clip their tunnel telephone onto the tunnel wires so that they can discuss with the driver of the failed train how to carry out the assistance in order to get the trains moving again. Then the two trains are coupled together and the drivers can talk to each other over the usual cab-to-cab handsets before proceeding. As part of its contract to supply electrical equipment during

5551-412: The formation of the London Passenger Transport Board in 1933, the MR was amalgamated with the other Underground railways and the line was renamed the Northern City Line. In 1934 it was re-branded as part of the Edgware–Morden line (which was renamed the Northern line in 1937), and in 1939 operations were transferred from the Metropolitan to the Northern. As part of London Transport's New Works Programme ,

SECTION 60

#1732771842352

5642-416: The former BR 's Regional Railways , France's TER ( Transport express régional ), Germany's Regionalexpress and Regionalbahn , and South Korea's Tonggeun and Mugunghwa-ho services. In some European countries, the distinction between commuter trains and long-distance/intercity trains is subtle, due to the relatively short distances involved. For example, so-called " intercity " trains in Belgium and

5733-485: The line and its services. The Class 717s began to enter service in March 2019. To comply with regulations for trains operating in single-bore tunnels where there is not enough clearance space for side evacuation, they have emergency doors at both ends of a unit. When operating on 750 V DC , the two motor coaches of a Class 313 collected traction current from their own shoe gear only; there was no traction bus linking them together as found on most electric multiple units. All of

5824-510: The line, along with the first test train under the new system, took place during the Early May Bank Holiday in 2022. The new signalling system was approved by the Office of Rail and Road in March 2023, and used on passenger services from 27 November 2023. Because mainline trains operate over the infrastructure inherited from London Underground, there are some practices on the NCL which differ from Railway Rulebook instructions, and these are contained in an additional publication. These include: If

5915-400: The narrow tunnels. Signalling is controlled from Kings Cross power box. Between Drayton Park and Moorgate, there is no Automatic Warning System or Train Protection & Warning System equipment provided, due to the position of the auxiliary return rail. All signals are multiple aspect colour light signals fitted with train stop arms. Works to commission new ETCS digital signalling on

6006-463: The new parliament under the incoming National Government . The new government, although dominated by Conservatives , decided to continue with the bill, with no serious changes, despite its extensive transfer of private undertakings into the public sector. On 1 July 1933, the LPTB came into being, covering the "London Passenger Transport Area". The LPTB's financial structure was not the same as that of outright nationalisation, which did not occur until

6097-430: The next signal they must stop and attempt to contact the signaller, to inform the signaller of what has taken place regardless of the aspect that it is showing. Platform starting signals, which let the train into a tunnel, can only be passed at danger with the signaller's authority. Unlike surface lines, the driver of a train which fails on the NCL is not required to leave the train to lay detonators and then wait for

6188-458: The northbound Piccadilly and Victoria lines' platforms. From this time the NCL used Drayton Park as its terminus. At the same time a change was made at Highbury & Islington , with the northbound Northern City line diverted to a new platform alongside the northbound Victoria line, and the southbound Victoria using the former northbound Northern City platform, both providing cross-platform interchange . Passengers from Moorgate to Finsbury Park took

6279-502: The northern region of Peninsular Malaysia. In Thailand, the Greater Bangkok Commuter rail and the Airport Rail Link serve the Bangkok Metropolitan Region . The SRT Red Lines , a new commuter line in Bangkok, started construction in 2009. It opened in 2021. Another commuter rail system in Southeast Asia is the Yangon Circular Railway in Myanmar . In India, commuter rail systems are present in major cities and form an important part of people's daily lives. Mumbai Suburban Railway ,

6370-889: The number expected to rise even higher upon full completion of the Acharnes Railway Center . Eskişehir-Ankara and Konya-Ankara high speed train routes serve as high speed commuter trains in Turkey. Commuter/suburban trains are usually optimized for maximum passenger volume, in most cases without sacrificing too much comfort and luggage space, though they seldom have all the amenities of long-distance trains. Cars may be single- or double-level , and aim to provide seating for all. Compared to intercity trains, they have less space, fewer amenities and limited baggage areas. Commuter rail trains are usually composed of multiple units , which are self-propelled, bidirectional, articulated passenger rail cars with driving motors on each (or every other) bogie . Depending on local circumstances and tradition they may be powered either by diesel engines located below

6461-417: The oldest suburban rail system in Asia, carries more than 7.24 million commuters on a daily basis which constitutes more than half of the total daily passenger capacity of the Indian Railways itself. Kolkata Suburban Railway , one of the largest suburban railway networks in the world, consists of more than 450 stations and carries more than 3.5 million commuters per day. The Chennai Suburban Railway along with

6552-513: The other, the Northern line continues out of the city centre to a mainline rail interchange, while the Wirral line has a city-centre loop. London Passenger Transport Board The London Passenger Transport Board was the organisation responsible for local public transport in London and its environs from 1933 to 1948. In common with all London transport authorities from 1933 to 2000,

6643-700: The outer reaches of Greater Tokyo through operating into these lines to form a high frequency corridor though central Tokyo. Other commuter rail routes in Japan include: Commuter rail systems have been inaugurated in several cities in China such as Beijing , Shanghai , Zhengzhou , Wuhan , Changsha and the Pearl River Delta . With plans for large systems in northeastern Zhejiang , Jingjinji , and Yangtze River Delta areas. The level of service varies considerably from line to line ranging high to near high speeds. More developed and established lines such as

6734-423: The passenger compartment ( diesel multiple units ) or by electricity picked up from third rails or overhead lines ( electric multiple units ). Multiple units are almost invariably equipped with control cabs at both ends, which is why such units are so frequently used to provide commuter services, due to the associated short turn-around time. Locomotive hauled services are used in some countries or locations. This

6825-559: The public name and brand was London Transport . The London Passenger Transport Board (LPTB) was established pursuant to the London Passenger Transport Act 1933 enacted on 13 April 1933. The bill had been introduced by Herbert Morrison , who was Transport Minister in the Labour Government until 1931. Because the legislation was a hybrid bill it had been possible to allow it to 'roll over' into

6916-541: The rail network. Carriages were brought to it through a connection into a freight yard near Drayton Park station, where a small depot was built to service trains. The GN&CR generating station closed when the MR took over, and became the studio of Gainsborough Pictures . After lying derelict for many years, it became a temporary venue for the Almeida Theatre . The site has since been redeveloped as apartments. After

7007-552: The rest of the day, with regional rail being used to refer to systems that offer all-day service. Most commuter (or suburban) trains are built to main line rail standards, differing from light rail or rapid transit (metro rail) systems by: Compared to rapid transit (or metro rail), commuter/suburban rail often has lower frequency , following a schedule rather than fixed intervals, and fewer stations spaced further apart. They primarily serve lower density suburban areas (non inner-city), generally only having one or two stops in

7098-488: The same right-of-way can drastically reduce system construction costs. However, frequently they are built with dedicated tracks within that right-of-way to prevent delays, especially where service densities have converged in the inner parts of the network. Most such trains run on the local standard gauge track. Some systems may run on a narrower or broader gauge. Examples of narrow gauge systems are found in Japan, Indonesia , Malaysia , Thailand , Taiwan, Switzerland, in

7189-461: The towns closer to Kowloon. They use rolling stocks with a faster maximum speed and have longer stop spacing compared to other lines which only run in the inner urban area, but in order to maximise capacity and throughput, these rolling stocks have longitudinal seatings, 5 pairs of doors in each carriage with large standing spaces like the urban lines, and run as frequent as well. Most of the sections of these four lines are overground and some sections of

7280-515: The train from either end. The motive power for locomotive-hauled commuter trains may be either electric or diesel–electric , although some countries, such as Germany and some of the former Soviet-bloc countries, also use diesel–hydraulic locomotives. In the US and some other countries, a three-and-two seat plan is used. Middle seats on these trains are often less popular because passengers feel crowded and uncomfortable. In Japan, South Korea and Indonesia, longitudinal (sideways window-lining) seating

7371-553: The trains can be full with commuters standing. The Athens Suburban Railway in Greece consists of five lines, 4 of which are electrified. The Kiato – Piraeus line and the Aigio – Airport lines reach speeds of up to 180 km/h (112 mph). The Athens – Chalcis line is also expected to attain speeds of up to 200 km/h (124 mph) upon upgrading of the SKA–Oinoi railway sector. These lines also have many daily commuters, with

7462-521: The trains run between two or several cities (e.g. S-Bahn in the Ruhr area of Germany). Distances between stations may vary, but are usually much longer than those of urban rail systems. In city centres the train either has a terminal station or passes through the city centre with notably fewer station stops than those of urban rail systems. Toilets are often available on-board trains and in stations. Their ability to coexist with freight or intercity services in

7553-469: The travel time to distant locations, often using station passing loops instead of dedicated express tracks. It is notable that the larger Japanese commuter rail systems are owned and operated by for-profit private railway companies, without public subsidy. East Japan Railway Company operates a large suburban train network in Tokyo with various lines connecting the suburban areas to the city center. While

7644-456: The tube system, "U NDERGROUN D" branding was extended to all lines and stations. The name was said to have been coined by Albert Stanley, 1st Baron Ashfield in 1908, when he was general manager of the Underground Group . The LPTB embarked on a £35 million capital investment programme that extended services and reconstructed many existing assets, mostly under the umbrella of the 1935–1940 New Works Programme . Although only about £21 million of

7735-502: The tunnel, penetrated and obstructed the line between Old Street and Essex Road stations. A serious accident was averted by the actions of an observant train driver, and the line was restricted for several days for repairs. A subsequent investigation by the Rail Accident Investigation Branch was highly critical of carelessness on the construction companies involved and the planning approval process. This

7826-574: The type of train, amenities offered, and stopping pattern, usually tell the services apart. Russian commuter trains , on the other hand, frequently cover areas larger than Belgium itself, although these are still short distances by Russian standards. They have a different ticketing system from long-distance trains, and in major cities they often operate from a separate section of the train station. Some consider "inter-city" service to be that which operates as an express service between two main city stations, bypassing intermediate stations. However, this term

7917-480: The underground part of the route. From Finsbury Park to Drayton Park traction current is supplied at 25 kV AC via overhead line , controlled by York Electrical Control Room. From Drayton Park to Moorgate traction current is supplied at 750 V DC via third rail . There are two electrical sections, separated by a gap at Poole Street: Trains change from AC to DC traction supply, or vice versa, whilst standing at Drayton Park station. The platform starting signal on

8008-470: The way inter-city rail does. Regional rail operates outside major cities. Unlike Inter-city, it stops at most or all stations between cities. It provides a service between smaller communities along the line that are often byproducts of ribbon developments , and also connects with long-distance services at interchange stations located at junctions, terminals, or larger towns along the line. Alternative names are "local train" or "stopping train". Examples include

8099-422: The wooden trailers and 64 in the steel ones. Motor cars seated 54 because of a 2 ft 10 in (86 cm) equipment compartment behind the driver's cab. Uniquely in England, coupling between cars was by means of link and pin on the centre-line. The original fleet of 76 carriages was withdrawn and replaced by London Underground Standard Stock on 15 May 1939. These became the last pre-1938 trains running on

8190-524: Was planned to allow electrified trains to run from the Great Northern Railway (GNR, now the East Coast Main Line ) at Finsbury Park to the City of London at Moorgate . Despite being built using similar methods to the tube network then under construction, the tunnels were built large enough to take a main-line train, with an internal diameter of 16 feet (4.9 m), compared with those of

8281-669: Was regretted by some sections of the staff and the public, but in terms of impact on users, this was probably the most visible and dramatic change in the period. The last of the 653 trolleybuses which ran were replaced by buses by 1961. The LPTB continued to develop its corporate identity, design and commercial advertising that had been put in place by the Underground Group. This included stations designed by Charles Holden ; bus garages by architects such as Wallis, Gilbert & Partners; and even more humble structures such as bus stops and shelters. The posters and advertising issued by

#351648