Misplaced Pages

London, Tilbury and Southend line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#162837

119-464: The London, Tilbury and Southend line , also known as Essex Thameside , is a commuter railway line on the British railway system . It connects Fenchurch Street station , in central London, with destinations in east London and Essex , including Barking , Upminster , Basildon , Grays , Tilbury , Southend and Shoeburyness . Its main users are commuters travelling to and from London, particularly

238-490: A UK domestic train service was the Hull Trains 07.30 King's Cross to Hull , which covered the 125.4 km (77.9 miles) from Stevenage to Grantham in 42   minutes at an average speed of 179.1 km/h (111.3 mph). This was operated by a Class 180 diesel unit running "under the wires" at the time, and is now operated by Class 802 Paragon bi-mode units, operating on electric power on this section. This

357-718: A V2 exploded at Ripple Lane. Following nationalisation on 1 January 1948 the LTS line was split so that Fenchurch Street to Gas Factory Junction became part of the Eastern Region whilst the rest of the LTS Line became part of the London Midland Region. This arrangement did not last long and on 20 February 1949 the whole of the LTS line was bought under Eastern Region control. November 1949 saw platforms 1 and 2 at Fenchurch Street electrified through to Bow Junction on

476-603: A distance of 39 miles 40 chains (63.6 km). A loop line between Barking and Pitsea provides an alternative route via Rainham (Essex), Grays and Tilbury. Finally, there is a short branch line connecting the main line at Upminster with the loop line at Grays via Ockendon . The line has a maximum speed limit of 75 mph (121 km/h), although the Class 357 and Class 720 electric trains which run on it are capable of speeds of 100 mph (161 km/h). The line forms part of Network Rail's strategic route 6 . It

595-588: A few minor raids between 1942 and early 1944. Incidents elsewhere in London also affected the LTS Line, For example, the Metropolitan line services were suspended 9 December 1940 – March 1941 due to air raid damage at Kings Cross. Some service cuts were made during the blitz including the end of the LNER Fenchurch Street to North Woolwich services (via Bromley and Abbey Mills Junction). 1941 saw

714-438: A link on to the London and Blackwall line, heading towards Blackwall. The GER ran a short-lived Palace Gates to Blackwall service via Stratford but this only lasted a year and there were some Backwall – Southend excursion trains run in 1890. Primary use of the line was to offer another goods route into the docks. Under the management of civil engineer Arthur Lewis Stride, the line was extended from Southend to Shoeburyness . There

833-531: A more direct route from London to Barking was constructed through Bromley , Plaistow and East Ham , connecting with the London and Blackwall Extension Railway a very short distance north east of Gas Factory Junction, and the service from Bishopsgate was withdrawn. Under the management of the LT&;SR lessees from 1856 to 1875 little additional work was done to the LT&S lines. After some degree of independence

952-659: A new high-speed railway in the UK. This study began on the assumption the route would be a new purpose-built high-speed line connected to High-Speed 1 to the Channel tunnel and from London to the West Midlands , via Heathrow Airport , relieving traffic on the West Coast Main Line (WCML). Conventional high-speed rail technology would be used as opposed to Maglev . The rolling stock would be capable of travelling on

1071-665: A number of heritage (mainly steam) standard and narrow gauge railways, and a few industrial railways and tramways. Some lines which appear to be heritage operations sometimes claim to be part of the public transport network; the Romney, Hythe and Dymchurch Railway in Kent regularly transports schoolchildren. Most major cities have some form of commuter rail network . These include Belfast , Birmingham, Bristol, Cardiff , Edinburgh, Exeter , Glasgow , Leeds , Liverpool, London and Manchester . There are four main goods operating companies in

1190-685: A number of other joint railways such as the Midland and Great Northern Joint Railway and the Cheshire Lines Committee as well as special joint railways such as the Forth Bridge Railway, Ryde Pier Railway and at one time the East London Railway ). The "Big Four" were joint-stock public companies and they continued to run the railway system until 31 December 1947. The growth in road transport during

1309-422: A record 22.7 billion net tonne kilometres (14 billion net ton miles) of freight movement were recorded in 2013–4, against 16.6 billion (10.1 billion) in 1986–7, an increase of 38%. Coal made up 36% of the total net tonne kilometre , though its share was declining. Rail freight had increased its market share since privatisation (by net tonne kilometres) from 7.4% in 1998 to 11.1% in 2013. Growth

SECTION 10

#1732782957163

1428-454: A total of 19 LMS trains per hour during the peak. The Fenchurch Street plan saw a comprehensive rebuild and lengthening of the platforms as well as additional approach tracks (which used part of one of the goods depots) as well as the provision of a new signal box and signalling. The platform rebuild and associated infrastructure was completed by the summer of 1935. The new signalling which gave 90 second headways from Stepney to Gasworks Junction

1547-795: Is 70. The UK has the 17th largest railway network in the world ; despite many lines having closed in the 20th century, due to the Beeching cuts , it remains one of the densest networks. It is one of the busiest railways in Europe , with 20% more train services than France , 60% more than Italy , and more than Spain , Switzerland , the Netherlands , Portugal and Norway combined, as well as representing more than 20% of all passenger journeys in Europe. The rail industry employs 115,000 people and supports another 250,000 through its supply chain. After

1666-452: Is a large programme of upgrades to the network, including Thameslink , Crossrail , electrification of lines , in-cab signalling , new inter-city trains and new high-speed lines . According to historians David Brandon and Alan Brooke, the railways brought into being our modern world: The railways started with the local isolated wooden wagonways in 1560s using horses. These wagonways then spread, particularly in mining areas. The system

1785-695: Is according to the Office of Rail and Road and includes open access operators such as Grand Central and Hull Trains . There are 2,579 passenger railway stations on the Network Rail network. This does not include the London Underground , nor other systems which are not part of the national network, such as heritage railways. Most date from the Victorian era and a number are in or on the edge of town and city centres. Major stations lie for

1904-536: Is classified as a London and South East commuter line. Passenger services form the Essex Thameside franchise that is currently operated by train operating company c2c . The first part of the line was built by the London and Blackwall Railway whose line from Blackwall opened in 1840 with a terminus at Minories and intermediate stations on the route at Shadwell and Stepney. The line had two independent tracks which were initially worked by cable haulage and it

2023-525: Is now part of London Overground 's North London Line . Other NLR lines fell into disuse but were later revived as part of the Docklands Light Railway , and London Overground's East London Line . The company was originally called the East & West India Docks & Birmingham Junction Railway (E&WID&BJR) from its start in 1850, until 1853. In 1909, it entered into an agreement with

2142-648: Is now primarily used (in 2014) for empty coaching stock movements between the North London Line and Willesden Depot, freight trains and, during engineering work, diverted passenger services to and from the Watford DC Line . Primrose Hill station has been closed. Since 31 August 1987, Docklands Light Railway has followed the path of the North London Railway from Bow Church to Poplar . The East London Line Extension took over

2261-727: Is partly attributed to a shift away from private motoring due to growing road congestion and increasing petrol prices, but also to the overall increase in travel due to affluence. Passenger journeys in Britain grew by 88% over the period 1997–98 to 2014 as compared to 62% in Germany, 41% in France and 16% in Spain. The United Kingdom is a member of the International Union of Railways (UIC). The UIC country code for United Kingdom

2380-590: The City of London which is served by Fenchurch Street, and areas in east London including the Docklands financial district via London Underground and Docklands Light Railway connections at Limehouse and West Ham . The line is also heavily used by leisure travellers, as it and its branches serve a number of seaside resorts, shopping areas and countryside destinations. Additionally, the Tilbury Loop portion of

2499-606: The Class 252 , reached a world speed record for diesel trains of 143.2 mph, while the main fleet entered service limited to a service speed of 125 mph, and were introduced progressively on main lines across the country, with a rebranding of their services as the InterCity 125 . With electrification of the East Coast Main Line , high-speed rail in Great Britain was augmented with the introduction of

SECTION 20

#1732782957163

2618-525: The Class 91 , intended for passenger service at up to 140 mph (225 km/h), and thus branded as the InterCity 225 . The Class 91 units were designed for a maximum service speed of 140 mph, and running at this speed was trialled with a 'flashing green' signal aspect under the British signalling system . The trains were eventually limited to the same speed as the HST, to 125 mph, with higher speeds deemed to require cab signalling , which as of 2010

2737-614: The Department for Transport (DfT), with the exception of Merseyrail , where the franchise is awarded by the Merseyside Passenger Transport Executive . In Scotland, contracts for ScotRail , is awarded by Transport Scotland , and in Wales , contracts for Transport for Wales Rail , is awarded by Transport for Wales , although the latter is currently publicly owned with no plans for franchising in

2856-409: The Department for Transport 's Transport Ten Year Plan called for an 80% increase in rail freight. Statistics on freight are specified in terms of the weight of freight lifted, and the net tonne kilometre , being freight weight multiplied by distance carried. 116.6 million tonnes of freight was lifted in the 2013–4 period, against 138 million tonnes in 1986–7, a decrease of 16%. However,

2975-485: The Department for Transport . Transport for Wales Rail is owned by Transport for Wales , a Welsh Government owned company, with no current plans to re-privatise the latter. On 1 April 2022, ScotRail was put under public ownership by the Scottish Government , under Transport Scotland as ScotRail operating on the same day. The COVID-19 pandemic caused a huge fall in the number of passengers using

3094-562: The East London line and to terminate at Barking instead. The provision of a flyover to remove goods trains from crossing the layout was not proceeded with but other changes to improve the flexibility at Barking were made. In addition a bay platform and stabling siding were put in at Dagenham and stabling increased at Upminster. The new Metropolitan line service began on 4 May 1936 and an additional eight hourly services worked in with 27 District Line services. The impact of World War II on

3213-650: The Eastern Counties Railway at Bow but there was a dispute and the junction was never completed. A short lived interchange station at Victoria Park & Bow was built at the junction but saw little traffic which led to a temporary closure of the line in September 1850. In January 1853 a new junction was built at Gas Factory Junction enabling the North London Railway to operate a new service into Fenchurch Street. The construction of

3332-768: The Hatfield crash in October 2000. However, in June 2015 the PPM stood at 91.2% after a period of steady increases in the annual moving average since 2003 until around 2012 when the improvements levelled off. Train fares cost 2.7% more than under British Rail in real terms on average. For some years, Britain has been said to have the highest rail fares in Europe, with peak-time and season tickets considerably higher than other countries, partly because rail subsidies in Europe are higher. However, passengers are also able to obtain some of

3451-612: The LMS it was the smallest of 15 workshops. It repaired NLR locomotives and from 1927 those from the former London, Tilbury and Southend Railway (LTSR). In the 1930s, the works developed and manufactured the Hudd automatic control system for the LTSR, which led to a British Rail (BR) team from the national headquarters setting up in Bow to develop BR's standard Automatic Warning System . The workshop

3570-478: The London and Blackwall Railway and the Eastern Counties Railway companies – the railway was authorised in 1852, with the first section opening in 1854. The route was extended in phases and partnerships were formed with the Midland Railway and District Railway to provide through-services. The railway serves three main routes. The main line runs from Fenchurch Street to Shoeburyness via Basildon over

3689-645: The London and North Western Railway which introduced common management, and the NLR was taken over completely by the LNWR in 1922. The LNWR itself became part of the LMS from the start of 1923. The railways were nationalised in 1948 and most LMS lines, including the North London route, then came under the control of the London Midland Region of British Railways. The East & West India Docks & Birmingham Junction Railway

London, Tilbury and Southend line - Misplaced Pages Continue

3808-465: The London, Tilbury and Southend Railway was a joint enterprise between the LBR and ECR and was authorised by Parliament on 17 June 1852. The first section, built by Peto and Grissell , was opened between Forest Gate Junction on the Eastern Counties Railway main line and Tilbury , via Barking and Grays on 13 April 1854. The junction at Bow was finally completed and as part of the deal and this enabled

3927-628: The Tyne and Wear Metro centred on Newcastle upon Tyne . Light rail systems in the form of trams are in Birmingham , Croydon , Manchester , Nottingham , Sheffield and Edinburgh . These systems use a combination of street running tramways and, where available, reserved right of way or former conventional rail lines in some suburbs. Blackpool has the one remaining traditional tram system. Monorails, heritage tramways, miniature railways and funiculars also exist in several places. In addition, there are

4046-421: The 1920s and 1930s greatly reduced revenue for the rail companies. Rail companies accused the government of favouring road haulage through the subsidised construction of roads. The railways entered a slow decline owing to a lack of investment and changes in transport policy and lifestyles. During World War II , the companies' managements joined, effectively forming one company. A maintenance backlog developed during

4165-1002: The 2010s, many upgrades have been under way, such as Thameslink , Crossrail , the Northern Hub and electrification of the Great Western Main Line . Electrification plans for the Midland Main Line and the Transpennine line between Manchester and Leeds have been scaled back. Construction of High Speed 2 is underway, with a projected completion date of 2026 for Phase 1 (London to Birmingham) and 2033 for Phase 2. A poll of 1,500 adults in Britain in June 2018 showed that 64% support renationalising Britain's railways. Currently, six franchises are under public ownership, and thus effectively nationalised. Four, LNER , Northern Trains , Southeastern and TransPennine Express , are operators of last resort owned by

4284-638: The BBC, this represents the largest shake-up in the UK's railways since privatisation. On 18 November 2021, the government announced the biggest ever public investment in Britain's rail network costing £96 billion and promising quicker and more frequent rail connections in the North and Midlands: the Integrated Rail Plan includes substantially improved connections north–south as well as east–west and includes three new high speed lines. In July 2024,

4403-538: The British network the fifth most used in the world (Great Britain ranks 23rd in world population). Unlike a number of other countries, rail travel in the United Kingdom has enjoyed a renaissance in recent years, with passenger numbers approaching their highest ever level (see usage figures below). This has coincided with the privatisation of British Rail , but the cause of this increase is unclear . The growth

4522-495: The District Railway at Whitechapel . The connection allowed through-running of District Railway trains from Central London to provide local services to Upminster from 2 June 1902. A new station was provided at West Ham in 1901 which was built with four platforms in anticipation of quadrupling to East Ham. The track quadrupling progressed in stages between 1902 and 1905 on the south side of the existing lines which became

4641-687: The ECR; they wished to amalgamate formally, but could not obtain government agreement for this until 1862, when the Great Eastern Railway (GER) was formed by amalgamation. In 1866 the LBR was taken over by the GER and all the stations between Fenchurch Street and Stepney became GER stations. On 5 April 1880 the Limehouse Curve opened with a new junction called Salmon Lane Junction, located between Gas Factory Junction and Stepney it provided

4760-543: The East India Docks; a connection at Bow allowed trains to run to Fenchurch Street . This arrangement lasted until 1865, when an extension from Dalston Junction to Broad Street was opened; Broad Street became the main terminus, and the Poplar line became a branch. In the meantime, in 1864, a banker on a train from Fenchurch Street to Chalk Farm became the first victim of a murder on a British train . In 1869,

4879-718: The Eastern Counties Railway to also start operating into Fenchurch Street. At the same time a third track was opened on the Fenchurch Street approaches and the station expanded to four platforms. LT&SR Services initially ran from Fenchurch Street and Bishopsgate stations over existing lines to Stratford where they were coupled together and then via Forest Gate Junction to Tilbury for ferry connections to Gravesend . Further extensions opened in late 1854 to Horndon , to Leigh-on-Sea on 1 July 1855 and finally to Southend on 1 March 1856. In 1858

London, Tilbury and Southend line - Misplaced Pages Continue

4998-429: The GER became part of the London and North Eastern Railway . A new service for workers from Tilbury and East Tilbury to Thames Haven began on 1 January 1923 – the last service had run in 1909. There were four intermediate halts at Mayes Crossing, Curry Marsh, London & Thames Haven Oil Wharves and Thames Haven. A new halt called Gale Street Halt was opened between Barking and Dagenham station on 28 June 1926 to serve

5117-499: The Great Eastern Main Line on the 1500v DC system. No regular electric services worked this line and it was primarily for diversion and emergency usage although regular empty trains ran to ensure the system worked. These were formed of AM6 electric multiple units. During the brief period of London Midland Region control the little used Purfleet Rifle Range Halt was closed on 31 May 1948. During 1949 East Horndon

5236-536: The LTS line was far greater than the first world war as a result of the London Blitz of 1940/1941 and the later deployment of the V1 and V2 flying bombs. The first big event was the evacuation of children from the area and a number of trains were run in late 1939 although many children returned when the extensive aerial bombardment did not materialise. During 1940 a lot of people moved out of towns such as Southend as it

5355-530: The Local Lines whilst the newly laid southern lines (known as the Through Lines) were for longer distance services. The Local Lines were electrified allowing District line services to be extended to East Ham. West of Barking, additional tracks and sidings were provided and the electrified tracks were extended to Barking and that section opened on 1 April 1908. There were three new stations opened in

5474-708: The London and North Western Railway Company as from 1 January 1922." The LNWR, which half-owned Broad Street station, was responsible for electrification of the Broad Street to Richmond and Kew Bridge lines in 1916. The Kew Bridge service was withdrawn as a wartime economy measure in 1940, which proved to be permanent. The line from Dalston Junction to Poplar was heavily damaged during the Blitz of World War II. Passenger services from Broad Street to Poplar via Victoria Park and Bow were suspended on 15 April 1944 and officially closed on 14 May 1944. A substitute bus service

5593-669: The Poplar branch from 14 May 1979, running from Camden Town to Stratford and then over the former Eastern Counties and Thames Junction Railway to North Woolwich. The remaining freight line from Victoria Park Junction to Poplar Docks via Bow Junction closed on 3 October 1983. From 13 May 1985, the Camden to North Woolwich Crosstown Linkline was combined with the Richmond to Broad Street service and ceased to serve Dalston Junction and Broad Street, which finally closed on 30 June 1986. The line between Willesden Junction and Camden via Primrose Hill

5712-579: The Through Lines would also have been electrified (the Local Lines being electrified in 1905) and electric trains to Southend were envisaged. In parallel with this the GER was proposing improvements to Fenchurch Street and a plan was agreed that saw: This agreement was the end of the Merz & Mclellan scheme, although the Midland Railway still wanted to quadruple Bromley to Stepney and this

5831-401: The UK Government permanently got rid of the rail franchising system. On 20 May 2021, the Government announced a white paper that would transform the operation of the railways. The rail network will be partly renationalised, with infrastructure and operations brought together under the state-owned public body Great British Railways . Operations will be managed on a concessions model. According to

5950-401: The UK, the largest of which is DB Cargo UK (formerly DB Schenker, formerly English Welsh & Scottish (EWS)). There are also several smaller independent operators including Mendip Rail . Types of freight carried include intermodal – in essence containerised freight – and coal, metals, oil, and construction materials. The Beeching Cuts, in contrast to passenger services, greatly modernised

6069-403: The abandoned stretch between Dalston Junction and Shoreditch from April 2010, incorporating it into the London Overground network. Among the first locomotives bought by the railway from outside contractors were five 0-4-2 ST engines. After that, all were constructed at Bow, London . Bow railway works was built in 1853 and had a sizeable wagon repair shop. When the railway was merged into

SECTION 50

#1732782957163

6188-484: The answer and in 1913 a report by Merz & Mclellan suggested electrification and four tracking between Campbell Road Junction (west of Bromley station) and Stepney station. West of Stepney a new junction at Ratcliff Square would see six lines as far as Cannon Street Road where the line would then drop underground and either run to Aldgate or via two subterranean additional platforms at Fenchurch Street and onto Bank. The lines would have been electrified and east of Bromley

6307-497: The average Advance ticket in 1995 cost £9.14 (in 2014 prices) compared to £5.17 in 2014. Rail subsidies have increased from £3.4bn in 1992–93 to £4.5bn in 2015–16 (in current prices), although subsidy per journey has fallen from £4.57 per journey to £2.61 per journey. However, this masks great regional variation, as in 2014–15 funding varied from "£1.41 per passenger journey in England to £6.51 per journey in Scotland and £8.34 per journey in Wales." The public image of rail travel

6426-544: The average age to around 15 years by March 2021. Although passengers rarely have cause to refer to either document, all travel is subject to the National Rail Conditions of Travel and all tickets are valid subject to the rules set out in a number of so-called technical manuals , which are centrally produced for the network. Below are the estimated total number of journeys using heavy rail transport in Britain for each financial year. (This table does not include Eurostar, Underground or light rail services) The following table

6545-624: The case of the InterCity West Coast and InterCity East Coast franchises, applicants submit bids to return the most money to the government from operating the service. This has led to franchisees collapsing when passenger growth targets are not met as promised payments to the government cannot be paid and the franchise is exited early. In 2023, Network Rail held over £59.1   billion in debt, and £1.176   billion interest payments. Many of these debts were incurred by Railtrack and transferred to Network Rail when it collapsed. British Rail operations were privatised during 1994–1997. Ownership of

6664-480: The cheapest fares in Europe if they book in advance or travel at off-peak times or purchase 'day-return' tickets which cost little more than a single ticket. UK rail operators point out rail fare increases have been at a substantially lower rate than petrol prices for private motoring. The difference in price has also been blamed on the fact Britain has the most restrictive loading gauge (maximum width and height of trains that can fit through tunnels, bridges etc.) in

6783-412: The closure of Burdett Road (bomb damage), Shadwell and Leman Street. The latter briefly acted as the London terminal of the line when Fenchurch Street had been put out of service due to bomb damage in September 1940. The V weapons bombardment first affected the LTS line on 30 June 1944 when a V1 hit the LMS single line at Romford station. A further ten incidents followed with the last on 17 March 1945 when

6902-483: The company to the North London Railway. At first, it ran trains from Bow Junction on the London and Blackwall Railway (L&BR) to Islington , starting on 26 September 1850. The line was extended to Camden Town railway station from 7 December 1850 and to Hampstead Road station (later renamed Primrose Hill ) from 9 June 1851. Another extension via the L&BR was opened on 1 January 1852, from Bow Junction to Poplar railway station , and from there to Blackwall and

7021-440: The coordination of transport in Great Britain. Rail revenue fell and in 1955 the network again ceased to be profitable. The mid-1950s saw the rapid introduction of diesel and electric rolling stock, but the expected transfer back from road to rail did not occur and losses began to mount. The desire for profitability led to a major reduction in the network during the mid-1960s, with ICI manager Dr. Richard Beeching commissioned by

7140-436: The domestic fleet of InterCity 125 and 225 trains on the existing national network was announced. In 2009 it was announced that the preferred rolling stock option for this project was the Hitachi Super Express family of multiple units, and they entered service in 2017 on the Great Western Main Line and in 2019 on the East Coast Main Line. The trains will be capable of a maximum speed of 140 mph with "minor modifications", with

7259-404: The end of September 2003, the first part of High Speed 1 , a high-speed link to the Channel Tunnel and onward to France and Belgium, was completed, significantly adding to the rail infrastructure of the country. The rest of the link, from north Kent to London St Pancras opened in 2007. A major programme of remedial work on the West Coast Main Line started in 1997 and finished in 2008. Since

SECTION 60

#1732782957163

7378-545: The existing Network Rail infrastructure if required, with the route intersecting with the existing WCML and the East Coast Main Line (ECML). A cancelled second phase of the project was planned to reach further north to Manchester, Sheffield and Leeds, as well as linking into the Midland Main Line . In June 2014, the chancellor of the Exchequer, George Osborne , proposed a high-speed rail link Northern Powerhouse Rail (also known as High Speed 3 or High Speed North) between Liverpool and Newcastle/Sheffield/Hull. The line would use

7497-399: The existing route between Liverpool and Newcastle/Hull and a new route from to Sheffield will follow the same route to Manchester Victoria and then a new line from Victoria to Sheffield, with additional tunnels and other infrastructure. As of August 2023 the following rolling stock on the British network is capable of 125 mph or more: In 2011, the fastest timetabled start-to-stop run by

7616-589: The financial effects of the COVID-19 pandemic . The UK government proposed a new state-owned public body, Great British Railways , which would operate a concession contract system on the network from 2023. As of November 2023 , legislation to establish the new body was said to be "unlikely" within the 2023–2024 parliamentary session. In the 2015–16 operating year, franchised services provided 1,718 million journeys totalling (64.7 billion billion passenger km) of travel, an increase over 1994–5 of 117% in journeys (from 761 million) and just over doubling

7735-414: The first of a new Class 395 train fleet for use partly on High Speed 1 and parts of the rest of the UK rail network, the first domestic high-speed running over 125 mph (to about 140 mph) began in December 2009, including a special Olympic Javelin shuttle for the 2012 Summer Olympics . These services are operated by the South Eastern franchise . The Intercity Express Programme for replacement of

7854-668: The five geographical Regions were replaced by a Sectored organisation, in which passenger services were organised into InterCity , Network SouthEast and Regional Railways sectors. The Railways Act 1993 divided the railways up, with Railtrack taking ownership of British Rail's property portfolio, tracks, signals, bridges and tunnels, Rolling Stock Operating Companies, and train operating companies. Passenger transport services were bundled together into franchises to facilitate cross-subsidy within franchises, with many regulations on ticket prices and types, regulated fare increases and "Parliamentary service" obligations. Companies submit bids to

7973-705: The franchising authority - often the Secretary of State for Transport, Passenger Transport Authority, or devolved government - competing for the lowest subsidy requirement and to invest in the railway over the lifespan of the franchise. There is also provision for subsidy between franchises, with profitable franchises demanding payments made to the government to cover a share of the losses from others. Examples of franchises include ScotRail , Great Western , and Southern Trains . Open Access Operators are entirely free to set their own services and fares unaffected by government regulations. Examples of such operators are Lumo and Grand Central , Hull Trains and Heathrow Express . In

8092-452: The goods sector, replacing inefficient wagons with containerised regional hubs. Freight services had been in steady decline since the 1930s, initially because of the reduction in manufacturing and then road haulage's cost advantage in combination with higher wages. Since 1995, however, the amount of freight carried on the railways has increased sharply due to increased reliability and competition, as well as international services. In 2000,

8211-427: The government resisted calls for the nationalisation of the network (first proposed by 19th century Prime Minister William Gladstone as early as the 1830s). Instead, from 1 January 1923, almost all the remaining companies were grouped into the "big four": the Great Western Railway , the London and North Eastern Railway , the London Midland and Scottish Railway and the Southern Railway companies (there were also

8330-409: The government under Ernest Marples with reorganising the railways. Many branch lines (and a number of main lines) were closed because they were deemed uneconomic ("the Beeching Axe " of 1963), removing much feeder traffic from main line passenger services. In the second Beeching report of 1965, only the "major trunk routes" were selected for large-scale investment, leading many to speculate the rest of

8449-413: The historic London Underground and the Glasgow Subway . There are also many private railways , some of them narrow-gauge , which are primarily short lines for tourists. The main rail network is connected with that of continental Europe by the Channel Tunnel and High Speed 1 , opened in 1994 and 2007 respectively. In 2019, there were 1.738 billion journeys on the National Rail network, making

8568-672: The home of tank engines. Rail transport in Great Britain The railway system in Great Britain is the oldest railway system in the world. The first locomotive-hauled public railway opened in 1825, which was followed by an era of rapid expansion. Most of the track is managed by Network Rail , which in 2017 had a network of 9,824 miles (15,811 km) of standard-gauge lines, of which 3,339 miles (5,374 km) were electrified . In addition, some cities have separate metro, light rail and tram systems, among them

8687-510: The initial period of rapid expansion following the first public railways in the early 19th century, from about 1900 onwards the network suffered from gradual attrition, and more severe rationalisation in the 1950s and 1960s. However, the network has again been growing since the 1980s. The UK was ranked eighth among national European rail systems in the 2017 European Railway Performance Index for intensity of use, quality of service and safety performance. To cope with increasing passenger numbers, there

8806-549: The latter giving the shareholders' approval of amalgamation. The board minutes were signed by A Holland-Hibbert, the chairman, who added "Goodbye!". Beneath this was typed, "This was the last Board Meeting of the North London Railway Company, the Undertaking being absorbed under “The London and North Western Railway (North London Railway and Dearne Valley Railway) Preliminary Absorption Scheme 1922” by

8925-546: The line in 1935. Quadrupling and Electrifying the line was first considered in the Midland Railway Act of 1914 and the LMS presented plans in 1928/1929 to extend the four track section to Upminster. There was no mention of the curve to the Romford line. Upminster station had to be completely rebuilt as a result and additional platforms were added for terminating District Line services. The engine shed at Upminster

9044-543: The line was extended along the North and South Western Junction Railway (a joint enterprise by the LNWR, Midland Railway and the NLR) from Willesden Junction to a London and South Western Railway branch to Richmond . A bypass line from Camden to Willesden Junction via Gospel Oak and West Hampstead opened in 1860. Meanwhile, at the eastern end, a spur line connecting the NLR to Stratford from Victoria Park opened in 1854 but

9163-630: The most part in large cities, with the largest conurbations (e.g. Birmingham, Bristol, Cardiff , Edinburgh, Glasgow , Liverpool , and Manchester ) typically having more than one main station. London is a major hub of the network, with 12 main-line termini forming a "ring" around central London . Birmingham, Leeds, Manchester, Glasgow, Bristol and Reading are major interchanges for many cross-country journeys that do not involve London. However, some important railway junction stations lie in smaller cities and towns, for example York , Crewe and Ely . Some other places expanded into towns and cities because of

9282-482: The national network and the company's spiralling costs set in motion a series of events which resulted in the collapse of the company and its replacement with Network Rail , a state-owned, "not-for-profit" company, with risks underwritten by the taxpayer. According to the European Railway Agency , in 2013 Britain had the safest railways in Europe based on the number of train safety incidents. At

9401-411: The near future and ScotRail was brought into public ownership in 2022. Initially, there were 25 franchises, some franchises have since been combined, others nationalised. There are also a number of local or specialised rail services operated on an open access basis outside the franchise arrangements; examples include Heathrow Express and Hull Trains . Many franchises were effectively abolished due to

9520-469: The nearby Becontree Estate although initially the station was not connected by road. This plan was to see comprehensive investment in new facilities to improve operations as well as additional stations on the LTS Line. Fenchurch Street was not part of the scheme (even though proposals had been made in 1914 and 1924) but a scheme was adopted and agreed with the LNER in 1931/32 as part of the works which would see

9639-734: The necessary signalling modifications required of the Network Rail infrastructure in Britain likely to come from the phased rollout of the Europe-wide European Rail Traffic Management System (ERTMS). Following several studies and consultations on high-speed rail, in 2009 the UK Government formally announced the High Speed 2 project, establishing a company to produce a feasibility study to examine route options and financing for

9758-467: The network would eventually be closed. This was never implemented by BR. Passenger services experienced a renaissance with the introduction of the InterCity 125 trains in the 1970s. Passenger levels fluctuated since then, increasing during periods of economic growth and falling during recessions. The 1980s saw severe cuts in government funding and above-inflation increases in fares, In the early 1990s,

9877-564: The new Labour government confirmed that passenger services would be brought back into public ownership upon the expiration of their contracts as part of the wider renationalisation of the rail network. Passenger services in Great Britain were divided into regional franchises and run by mostly private (that is, non-state owned) train operating companies from 1995 to 2020. These companies bid for seven- to eight-year contracts to run individual franchises. Most contracts in England are awarded by

9996-549: The passenger miles. The passenger-miles figure, after being flat from 1965 to 1995, surpassed the 1947 figure for the first time in 1998 and continues to rise steeply. The key index used to assess passenger train performance is the Public Performance Measure , which combines figures for punctuality and reliability. From a base of 90% of trains arriving on time in 1998, the measure dipped to 75% in mid-2001 due to stringent safety restrictions put in place after

10115-546: The railway network. Swindon , for example, was little more than a village before the Great Western Railway chose to site its locomotive works there. In many instances geography, politics or military considerations originally caused stations to be sited further from the towns they served until, with time, these issues could be overcome (for example, Portsmouth had its original station at Gosport ). High-speed inter-city rail (above 124 mph or 200 km/h)

10234-435: The railways, with journeys in 2020 being about 22% of the previous year, before rising again as travel restrictions eased. During 2020, all train operating companies entered into emergency measures agreements with the UK and Scottish governments. Normal franchise mechanisms were amended, transferring almost all revenue and cost risk to the government, effectively 'renationalising' the network temporarily. In September 2020,

10353-565: The rise in traffic and house building at Southend was paused until the 1920s. The nature of traffic at Fenchurch Street was changing as passenger numbers fell on the GER Blackwall and North Woolwich services. As these services declined and were withdrawn, the LT&SR was allowed to run additional trains in their stead. The 1921 Railways Act saw the Midland Railway become part of the London Midland & Scottish Railway whilst

10472-591: The route provides an artery for freight traffic to and from Dagenham Dock and the Tilbury and London Gateway ports. Freight traffic can also travel further using the connection to the Gospel Oak to Barking line and the Great Eastern Main Line at Forest Gate Junction, allowing access to other main routes. Built by the London, Tilbury and Southend Railway Company – a joint venture between

10591-568: The same day. The works closed in 1960. Richmond to Willesden Junction (joined NLR 1856): Willesden Junction to Camden via Primrose Hill (opened 1851–2, passenger services between South Hampstead and Camden withdrawn 1992): Willesden Junction to Camden via West Hampstead & Gospel Oak (opened 1860): Camden Road to Dalston (opened 1850): Dalston to Broad Street (opened 1865, closed 1986, mostly reopened 2010): Dalston to Poplar (opened 1850, closed to passengers 1944, Dalston- Stratford reopened 1980): Bow to Plaistow (1869 to 1916): At Poplar,

10710-454: The survey started) to 83% in 2013 and the number of passengers not satisfied with their journey dropped from 10% to 6%. Since privatisation, passenger levels have more than doubled, and have surpassed their level in the late 1940s. Train fares cost 2.7% more than under British Rail in real terms on average. However, while the price of anytime and off-peak tickets has increased, the price of Advance tickets has dramatically decreased in real terms:

10829-606: The tilting train Class 390 Pendolino fleet designed for this maximum speed of service were still built and entered service in 2002, and operates limited to 125 mph. Other routes in the UK were upgraded with trains capable of top speeds of up to 125 mph running with the introduction between 2000 and 2005 of Class 180 Adelante DMUs and the Bombardier Voyager DEMUs (Classes 220 , 221 and 222 ). The first implementation of high-speed rail up to 186 mph in regular passenger service in Great Britain

10948-551: The track and infrastructure passed to Railtrack , whilst passenger operations were franchised to individual private sector operators (originally there were 25 franchises) and the goods services sold outright (six companies were set up, but five of these were sold to the same buyer). The government said privatisation would see an improvement in passenger services and satisfaction (according to the National Rail Passenger survey) has indeed gone up from 76% in 1999 (when

11067-482: The war and the private sector only had two years to deal with this after the war ended. After 1945, for both practical and ideological reasons, the government decided to bring the rail service into the public sector . From the start of 1948, the "big four" were nationalised to form British Railways (latterly British Rail ) under the control of the British Transport Commission . Although BR

11186-547: The way for through passenger trains from St Pancras to Southend although most trains terminated at Barking. The approaches to Fenchurch Street were further improved in 1895 with the addition of a fourth track from Stepney to Fenchurch Street. In 1902, the Whitechapel and Bow Railway was constructed as a joint venture with the District Railway , connecting the London, Tilbury and Southend Railway at Bromley with

11305-469: The world which means any trains must be significantly narrower and less tall than those used elsewhere. This means British trains cannot be bought "off-the-shelf" and must be specially built to fit British standards. Average rolling-stock age fell slightly from the third quarter of 2001–02 to 2017–18, from 20.7 years old to 19.6 years old, and recent large orders from Bombardier and its acquirer Alstom , as well as CAF , Hitachi and Stadler , brought down

11424-491: The years before sale to the Midland Railway which were Dagenham Dock (1908) Thorpe Bay (1910) and for military use only Purfleet Rifle Range Halt in 1911. One of, if not the biggest problem, the Midland Railway (MR) faced when it bought the LT&SR was the rising Southend traffic. Additionally traffic was rising on stations between Plaistow and Barking and there were plans to extend more trains out to Upminster. The Midland Railway saw extension of electrification as part of

11543-498: Was a single entity, it was divided into six (later five) regional authorities in accordance with the existing areas of operation. Though there were few initial changes to the service, usage increased and the network became profitable. Regeneration of track and railway stations was completed by 1954. In the same year, changes to the British Transport Commission, including the privatisation of road haulage, ended

11662-477: Was achieved in 1875 the LT&SR started to take steps to becoming an organisation that could stand on its own two feet. One of the first steps was building its own works/engine shed facility at Plaistow followed by ordering its first locomotives. A station at Upton Park was opened in 1877 largely funded by a developer. By the 1860s the railways in East Anglia were in financial trouble, and most were leased to

11781-429: Was also a direct line built between Barking and Pitsea, with new stations at Hornchurch and Upminster opening in 1884, An intermediate station at Dagenham opened in 1885 and the line extended east to East Horndon and later the same year to a re-sited Pitsea in 1886. Two years later a new station between East Horndon and Pitsea was opened at Laindon . A new station was opened in 1886 at Tilbury Town railway station which

11900-402: Was badly damaged during the Blitz and the wagon workshop destroyed. In 1956, the workshop repaired diesel-electric locomotives for the motive power depot at Devons Road (the first to become all-diesel). After a while it was receiving locos in the morning and turning them round by the evening, which initially confused the statistical returns since locos were entering and leaving the works on

12019-430: Was built in conjunction with the building of the rail connected docks next door. A single-track branch was constructed between Grays and Upminster and opened on 1 July 1892 with an intermediate station at Ockendon, The Upminster to Romford section was opened the following year. The Tottenham and Forest Gate Railway was a joint venture between the Midland Railway and LT&SR and opened on 9 July 1894. This opened

12138-415: Was commissioned by April 1935 and consisted of three and four aspect colour light signalling. This part of the work was carried out by the LNER who were responsible for the line with the LMS paying 2/3 of the cost. Other works along with the electrification described below, included: To support this improvement the LMS built 37 new 3-Cylindered Stanier 2-6-4Ts for the line in 1934 and these were working

12257-454: Was demolished and rebuilt at this time. New stations were opened and existing stations had additional platforms added. The stations were staffed by the LMS and from west to east were:- The London Passenger Transport Board (LPTB) was founded in 1932 and bought the management of the different underground lines under one roof. Discussions between the LMS and LPTB resulted in a decision to route Metropolitan Hammersmith & City trains away from

12376-649: Was first introduced in Great Britain in the 1970s by British Rail. BR had pursued two development projects in parallel, the development of a tilting train technology, the Advanced Passenger Train (APT), and development of a conventional high-speed diesel train, the High Speed Train (HST). The APT project was abandoned, but the HST design entered service as the British Rail Classes 253, 254 and 255 trains. The prototype HST,

12495-542: Was incorporated by an act of Parliament, the East and West India Docks and Birmingham Junction Railway Act 1846 ( 9 & 10 Vict. c. cccxcvi), on 26 August 1846. It was empowered to construct a railway from the district of Poplar and the docks to Camden Town in north London. The railway's headquarters and locomotive works were initially in Bow . The North London Railway Act 1853 ( 16 & 17 Vict. c. xcvii) renamed

12614-494: Was later built as a patchwork of local lines operated by small private railway companies. Over the course of the 19th and early 20th centuries, these amalgamated or were bought by competitors until only a handful of larger companies remained (see Railway Mania ). The entire network was brought under government control during the First World War and a number of advantages of amalgamation and planning were revealed. However,

12733-591: Was matched by several Leeds to London Class 91 -operated East Coast trains if their two-minute recovery allowance for this section is excluded from the public timetable. A number of towns and cities have rapid transit networks. Underground technology is used in the Glasgow subway , Merseyrail centred on Liverpool, London Underground centred on London, London Overground and the London Docklands Light Railway centred on London, and

12852-569: Was not in place on the normal British railway network (but was used on the Channel Tunnel Rail Link). A final attempt by the nationalised British Rail at High Speed Rail was the cancelled InterCity 250 project in the 1990s for the West Coast Main Line. Post privatisation, a plan to upgrade the West Coast Main Line to speeds of up to 140 mph with infrastructure improvements were finally abandoned, although

12971-400: Was not until 1848 that steam locomotives were deployed. The line was extended to the current London terminus at Fenchurch Street and operations commenced on 20 July 1841. A short-lived station opened on the route at Cannon Street Road in 1842 but this closed by 1848. The L&BR built an extension, known as the London and Blackwall Extension Railway, from Stepney station to a junction with

13090-430: Was not used by passenger services. The line between Camden Town and Dalston Junction was quadrupled in 1871. The LNWR took over the working of the railway under a common management arrangement on 1 February 1909. The company still existed until 1922, with its own board of directors and shareholders, when it was absorbed by the LNWR. The last board meeting and last shareholders meeting were both held on 23 November 1922,

13209-474: Was one of the areas expected, by the population at least, to be under threat of invasion. The LMS had to deal with a mass evacuation of children and on 2 June 1940 with 12 trains running to destinations in Nottinghamshire and Derbyshire. The timetable was reduced with through District services being cut and other services being cut back but these were minor compared to other areas in the UK. The service

13328-538: Was partly due to more international services including the Channel Tunnel and Port of Felixstowe , which is containerised. Nevertheless, as of 2008, network bottlenecks and insufficient investment in catering for 9' 6" high shipping containers restricted growth. North London Railway The North London Railway ( NLR ) company had lines connecting the northern suburbs of London with the East and West India Docks further east. The main east to west route

13447-515: Was presented in a parliamentary bill passed on 7 August 1914. The bill also covered the quadrupling of Barking to Upminster and a curve at Horndon that would have seen a direct link from Barking to Romford built. Although land between Barking and Upminster was purchased the ongoing strain of World War I saw the collapse of all three schemes. During the war additional day tripper trains to Southend declined (but did not totally disappear). Military supplies ran to Shoeburyness and Dagenham Dock and Tilbury

13566-570: Was provided until 23 April 1945 but the service was finally withdrawn at the end of the war. The northern section of the East Cross Route ( A12 ) built in the late 1960s ran parallel to the rail line between Old Ford and Victoria Park stations, both of which were demolished for the road's construction. The Crosstown Linkline service reinstated passenger service over the Dalston Junction to Victoria Park Junction section of

13685-753: Was renamed West Horndon (where it actually was), Heathway was renamed Dagenham Heathway and Dagenham renamed Dagenham East. The catastrophic North Sea flood of 1953 flooded parts of the LTS line on 1 February 1953. The affected areas on the LTS line were: The last section cut the Southend end of the line off from the London end and a significant number of locomotives and carriages were effectively marooned. Additional services were put in from Southend Victoria to Shenfield where passengers could then change to additional express EMU worked services to Fenchurch Street. This later changed to direct services which saw former GE and LNE tender engines visit Fenchurch Street, normally

13804-441: Was severely damaged by a series of significant accidents after privatisation. These included the Hatfield accident , caused by a rail fragmenting due to the development of microscopic cracks. Following this, the rail infrastructure company Railtrack imposed over 1,200 emergency speed restrictions across its network and instigated an extremely costly nationwide track replacement programme. The consequent severe operational disruption to

13923-521: Was slowed down as the Stanier 3-cylinder 2-6-4Ts were transferred away, and haulage was put back in the hands of the LT&SR and LMS 4-4-2Ts. The first serious incident was recorded on 18 August 1940 when Shoeburyness station and signal box were bombed and a signalman, Charles Walter Speller, was killed on 18 August 1940. The London Blitz lasted until Saturday 10 May/Sunday 11 May 1941 and Kay records 26 serious incidents between those two dates. There were

14042-609: Was the Channel Tunnel Rail Link (now known as High Speed 1 ), when its first phase opened in 2003 linking the British end of the Channel Tunnel at Folkestone with Fawkham Junction in Kent. This is used by international only passenger trains for the Eurostar service, using Class 373 and Class 374 trains. The line was later extended all the way into London St Pancras in 2007. After the building of

14161-502: Was the arrival point for many American servicemen between 1917 and 1918. They were moved to camps all over the country by rail. After the end of the war Purfleet was a major demobilisation centre and rail was again used to disperse the former troops throughout the country. Records show that LT&SR locomotives worked as far as Wood Green (Alexandra Palace) on the Great Northern line from London Kings Cross. The war slowed down

#162837