96-818: Mountain Station is a New Jersey Transit station in South Orange , Essex County , New Jersey , United States, along the Morris and Essex (formerly Erie Lackawanna Morristown Line). The station, built in 1915, was designed by Frank J. Nies . It has been listed in the New Jersey Register of Historic Places and National Register of Historic Places since 1984 and is part of the Operating Passenger Railroad Stations Thematic Resource . The station
192-650: A 51 percent share in the Indiana Harbor Belt Railroad . In the years leading to 1973, the freight railroad system of the Northeastern United States was collapsing. Although government-funded Amtrak took over intercity passenger services on May 1, 1971, railroad companies continued to lose money due to extensive government regulations, expensive labor costs, competition from other transportation modes, declining industrial business and other factors. The largest railroad in
288-558: A bill to nationalize the bankrupt railroads. The Association of American Railroads , which opposed nationalization, submitted an alternate proposal for a government-funded private company. Judge Fullam forced the Penn Central to operate into 1974, when, on January 2, after threatening a veto , President Richard Nixon signed the Regional Rail Reorganization Act of 1973 into law. The "3R Act," as it
384-577: A bridge. At the westbound end of the station, the Mountain House Road crossing was eliminated entirely and a pedestrian walkway was built. The walkway was removed during the late 1970s as part of the re-electrification project for the line, however, access to Montrose Avenue is still available due to stairs on the platform. At present, as in the past, most trains that stop here proceed onto, or have originated in, Hoboken. Most Midtown Direct trains into New York City bypass Mountain Station, but
480-597: A contract with Metro-North Railroad . The New Jersey Transit Police Department (NJTPD) is the transit police agency of NJ Transit. New Jersey Transit Police operates under the authority of Chapter 27 of the NJ Revised Statutes. Title 27:25-15.1 states in part "The Transit Police Officers so appointed shall have general authority, without limitation, to exercise police powers and duties, as provided by law for police officers and law enforcement officers, in all criminal and traffic matters at all times throughout
576-565: A distance of 7.3 miles (11.7 km), began. The project was delayed by a lack of environmental permits to clear the roadbed between Lake Lackawanna and Andover. Based on projections from NJ Transit, the restart of construction, including extensive work on Roseville Tunnel , was to occur in mid- to late-2016, with the re-opening of service to Andover projected to occur in 2020. The proposed rehabilitation west of Andover, which has not yet been funded, would provide commuter rail service between Hoboken Terminal and New York's Penn Station, and would serve
672-493: A former Pittsburgh, Cincinnati, Chicago and St. Louis Railroad (PRR Panhandle Route line), while Norfolk Southern got the former Pennsylvania Railroad main line and Cleveland and Pittsburgh Railroad from Jersey City, New Jersey , to Cleveland, and the rest of the former NYC main line west to Chicago, Illinois . Thus the Conrail "X" was neatly split in two, CSX getting one diagonal from Boston to St. Louis and Norfolk Southern
768-508: A large number do stop at the main station in South Orange , which is less than a mile to the south (timetable west). Midtown Direct trains can be accessed from Mountain Station by transferring at an intermediate station. In addition, the 92 NJT Bus is available on Scotland Road, which goes to either South Orange Station or towards Branch Brook Park Light Rail Station . New Jersey Transit New Jersey Transit Corporation , branded as NJ Transit or NJTransit and often shortened to NJT ,
864-827: A new rail junction at Secaucus, allowing for a one-train ride between the Port Jervis , Main , Bergen County , Pascack Valley, and Raritan Valley lines and New York Penn Station. The Lehigh and the West Trenton extension plans would require added capacity and the ARC project would provide that capacity. The project broke ground in June 2009. Both the Federal Transit Administration and the Port Authority made public commitments of $ 3 billion to
960-677: A new station at Newark Liberty International Airport . On December 15, 2003, it opened the Secaucus Junction transfer station, connecting its two commuter networks in northern New Jersey for the first time. The new station allowed passengers on trains to Hoboken Terminal to transfer to trains to New York Penn Station in Midtown Manhattan , saving an estimated 15 minutes over connecting with PATH trains at Hoboken. On October 31, 2005, NJT took over Clocker (NY–Philadelphia) service from Amtrak. Four new trains were added to
1056-475: A new, higher lift bridge . The West Trenton Line is a proposed service connecting West Trenton Station with Newark Penn Station , connecting with the Raritan Valley Line at Bridgewater . As of 2004, NJT's estimate of the cost was $ 197 million. To date, no funding has been secured. Service ran on the line prior to 1983. The West Shore Route is a proposal to reactivate passenger service on
SECTION 10
#17327939677181152-406: A standardized rulebook called Northeast Operating Rules Advisory Committee (NORAC). This significantly increased operational flexibly, allowing crews to operate on any territory they were qualified on, instead of additionally needing multiple operating rules qualifications. Additionally, standardized signal rules allowed Conrail to standardize signaling hardware and operation across its system. In
1248-415: A tenant. Western Hills Express (5703) With Conrail's increasing success, it decided to merge the company with another railroad, so it approached CSX Transportation about buying Conrail. CSX's bid for Conrail, however, drew the attention of Norfolk Southern Railway which, fearing that CSX would come to dominate rail traffic in the eastern US, made a bid of its own leading to a takeover battle between
1344-507: A terminal operating company owned by both CSX and NS. The Conrail Shared Assets Operations arrangement was a concession made to federal regulators who were concerned about the lack of competition in certain rail markets and logistical problems associated with the breaking-up of Conrail operations as they existed in densely-populated areas with many local customers. The smaller Conrail operation that exists today serves rail freight customers in these markets on behalf of its two owners. A fourth area,
1440-626: Is a 501(c)(3) non-profit organization based in Shippensburg, Pennsylvania . The society aims to preserve and restore equipment, items pertaining to, and photographs of Conrail specifically and of American railroading in general. As of 2022, the group publishes a quarterly magazine and a calendar, as well as other occasional mailings. Previous conventions have been held in Altoona, Pennsylvania , Philadelphia , Cleveland , and Warren, Ohio . More recent preservation activities include completion of
1536-508: Is a portmanteau based on the company's legal name. It continues to do business as an asset management and network services provider in three Shared Assets Areas that were excluded from the division of its operations during its acquisition by CSX Corporation and the Norfolk Southern Railway . The federal government created Conrail to take over the potentially profitable lines of multiple bankrupt carriers, including
1632-400: Is a state-owned public transportation system that serves the U.S. state of New Jersey and portions of the states of New York and Pennsylvania . It operates buses , light rail , and commuter rail services throughout the state, connecting to major commercial and employment centers both within the state and in its two adjacent major cities, New York City and Philadelphia . In 2023,
1728-651: Is no longer pursuing the Newark–Elizabeth Rail Link. The airport has a monorail link to NJT's Northeast Corridor Line and Amtrak's Northeast Corridor , both of which run to both Newark and Elizabeth. Conrail Conrail ( reporting mark CR ), formally the Consolidated Rail Corporation , was the primary Class I railroad in the Northeastern United States between 1976 and 1999. The trade name Conrail
1824-832: Is owned by the Port Authority of New York and New Jersey ; the PATCO Speedline , which is owned by the Delaware River Port Authority ; two SEPTA Regional Rail lines, the West Trenton Line and the Trenton Line ; and a handful of tourist trains in the southern and northwestern parts of New Jersey. Since inception, rail ridership has quadrupled. In the 1990s the rail system expanded, with new Midtown Direct service to New York City and new equipment. On October 21, 2001, it opened
1920-578: Is ownership of the three Shared Assets Areas in New Jersey , Philadelphia , and Detroit . Both CSX and NS have the right to serve all shippers in these areas, paying Conrail for the cost of maintaining and improving trackage . They also make use of Conrail to perform switching and terminal services within the areas, but not as a common carrier , since contracts are signed between shippers and CSX or NS. Conrail also retains various support facilities including maintenance-of-way and training, as well as
2016-546: Is somewhat unusual in that when the Lackawanna Railroad rebuilt the Morristown Line during the 1910s and 1920s, to eliminate grade crossings between Newark and Millburn, Mountain Station was the only location at which the elevation of the railroad's roadbed was not changed. As a result, the grade crossing of Montrose Avenue at the eastbound end of the station was eliminated and the roadway was raised onto
SECTION 20
#17327939677182112-624: The COVID-19 pandemic . An environmental assessment was published in February 2021, and it is now in the design and engineering phase. The project is projected to be operational by 2028. Bus rapid transit in New Jersey includes limited stop bus lines, exclusive bus lanes (XBL) and bus bypass shoulders (BBS). Next Generation Bus is the term used by NJT to refer to the development of numerous bus rapid transit (BRT) systems across
2208-699: The Chessie System , which would help spur competition in Conrail's territory. Chessie, however, could not reach an agreement with EL labor unions , and in February 1976 announced that it would not be buying the EL section. The USRA hurriedly assigned large amounts of trackage rights to the Delaware and Hudson Railway , allowing it to compete in the Philadelphia, Pennsylvania , and Washington, D.C. , markets. The State of Michigan decided to keep operational
2304-669: The Erie Lackawanna last provided with the Lake Cities in 1970. At the time of the Cut-Off's construction, the DL&W had extensive experience with concrete construction, but not on the scale that would be employed on the Cut-Off. All structures, including stations, bridges, interlocking towers and two large viaducts and thousands of fence posts, were made of concrete. Despite the lack of maintenance on these structures over
2400-532: The Federal Transit Administration has issued a Finding of No Significance Impact ( FONSI ). Preliminary engineering began in 2018. The new station will be a contributing factor to the $ 180 million urban renewal project of Bayfront . There is also a project to improve Route 440 itself near the rail extension. As of 2020, the project is still ongoing after upgrades were made to West Side Avenue Station In May 2001, New Jersey acquired
2496-627: The Henry Hudson Rail Trail ). NJT is still planning to study all the routes as to not delay action further on the EIS, and says all three routes are still up for evaluation, although it will take the Governor's comments into consideration. In late May 2009 representatives of the three counties agreed to back one potential route from Ocean County to Red Bank, instead of to Monmouth Junction, ending years of stalemate. Under that compromise,
2592-605: The Hudson–Bergen Light Rail in North Bergen . The project is currently in its initial study phase. The Monmouth-Ocean-Middlesex (MOM) line is a proposed south and central New Jersey commuter rail route to New Brunswick , Newark and New York's Penn Station. This would restore service previously provided by the Central Railroad of New Jersey with similar station sequences. Prior to 1941 cancellation
2688-610: The Lehigh Valley Railroad and the Central Railroad of New Jersey . These cities were last served in 1967. NJT intended to construct a new two-track Hudson River tunnel adjacent to the two single-track Northeast Corridor tunnels built in the early 20th century by the Pennsylvania Railroad . NJT referred to the project as Access to the Region's Core , which would have used dual-power locomotives and
2784-812: The Massachusetts Bay Transportation Authority service district (transferred to the Boston and Maine Railroad , under contract to the MBTA, in March 1977 ). Pursuant to the Northeast Rail Service Act of 1981, Conrail operated the remainder until 1983 when these services were transferred to state or metropolitan transit authorities. The transit authorities purchased the track and right-of-way on which their commuter operations ran, leaving Conrail freight operations as
2880-553: The Northeast Corridor through a series of phases. It will create new capacity that will allow the doubling of passenger trains running under the Hudson River . The program will increase track, tunnel, bridge, and station capacity, eventually creating four mainline tracks between Newark, NJ, and Penn Station , New York, including a new, two-track Hudson River tunnel. It is being undertaken in partnership with Amtrak,
2976-422: The Northeast Corridor , further improving its finances. In 1984, the government put its 85% share up for sale. Bids were received from Alleghany Corporation , Citibank , an employee buyout , Guilford Transportation Industries , Norfolk Southern Railway and a consortium headed by J. Willard Marriott . On February 8, 1985, Secretary of Transportation Elizabeth Dole announced Norfolk Southern Railway as
Mountain Station - Misplaced Pages Continue
3072-777: The Penn Central Transportation Company and Erie Lackawanna Railway . After railroad regulations were lifted by the 4R Act and the Staggers Act , Conrail began to turn a profit in the 1980s and was privatized in 1987. The two remaining Class I railroads in the East , CSX Transportation and the Norfolk Southern Railway (NS), agreed in 1997 to acquire the system and split it into two roughly-equal parts (alongside three residual shared-assets areas), returning rail freight competition to
3168-671: The Raritan River Railroad (1980) were also included (See list of railroads transferred to Conrail for a full list). It was approved by Congress on November 9, and on February 5, 1976, President Gerald Ford signed the Railroad Revitalization and Regulatory Reform Act of 1976, which included this Final System Plan, into law. The EL had been formed in 1960 as a merger of the Erie Railroad and Delaware, Lackawanna and Western Railroad . It too
3264-544: The 2010s, as railroads upgraded their signals for Positive Train Control compliance. Today, most Northeastern railroads associated with former Conrail lines have maintained standardization of all systems as vertical color light signals using NORAC rules. Conrail Shared Assets Operations continues to use the tri-light as its standard signal type. Amtrak uses a colorized version of PRR position light signals called "Position Color Lights". The Conrail Historical Society, Inc.,
3360-624: The CNJ operated Blue Comet trains (Jersey City-Atlantic City) and some local trains on this route. The line was originally proposed by the Ocean County Board of Chosen Freeholders in March 1980. It would run on a 40.1-mile rail corridor and would provide diesel commuter rail service from Monmouth Junction ( South Brunswick ), where the Jamesburg Branch partially joins the Northeast Corridor (NEC), south to Lakehurst in
3456-482: The Conrail breakup was agreed upon, and neither NS or CSX wanted 'their' locomotives to be equipped with markers. Similarly, the standard-cab SD70, Conrail's final order of locomotives, were ordered to NS specifications, and were in Norfolk Southern's preferred numbering series (the 2500's), which they retained after the breakup. When Conrail was formed, it acquired many different railways, and as typical in
3552-589: The NEC between Monmouth Junction and Newark. Passengers for New York would transfer at Newark. Eight new stations and a train storage yard would be constructed. In mid-February 2008, New Jersey Governor Jon Corzine withdrew the Monmouth Junction alignment from the MOM Plan. Corzine opted to endorse the two remaining alternate alignments (via Red Bank or Matawan-Freehold, the latter which is currently part of
3648-747: The New Jersey-New York section of the West Shore Railroad from Hoboken, NJ to West Nyack, NY. The project has been included in the NJ Transit's portion of the federally-designated Metropolitan Planning Organization, the North Jersey Transportation Planning Authority's Transportation Improvement Program (TIP) for the fiscal years of 2016–2019. The route holds perhaps the greatest promise in all of New Jersey since it travels through
3744-644: The North American rail industry, signaling was not standardized between these railways. This caused problems for Conrail, which had to "qualify" train crews on as many as seven different signaling systems and operating rules. The varying systems included the PRR position light signals , the NYC searchlight signals and tri-light signals, and the EL tri-light and semaphore signals. Conrail, and other eastern railroads which required multiple operating rules, came up with
3840-763: The North River Tunnels in service, which would cause a massive reduction in rail service. As of 2018, the final design was completed and it is being advanced through the U.S. Department of Transportation TIGER grant. The project is partnered with the FRA , PANYNJ , NJ Transit and Amtrak, all of which have provided a total funding of $ 86.5 million. This project will extend the Hudson–Bergen Light Rail from North Bergen in Hudson County to Englewood in Bergen County . The extension will better meet
3936-655: The Northeast Rail Service Act of 1981 (NERSA), which amended portions of the 3R Act by exempting Conrail from liability for any state taxes and requiring the Secretary of Transportation to make arrangements for the sale of the government's interest in Conrail. After NERSA was implemented, Conrail, under the aggressive leadership of L. Stanley Crane began to improve and reported taxable income between $ 2 million and $ 314 million each year from 1983 through 1986. Conrail's government-funded rebuilding of
Mountain Station - Misplaced Pages Continue
4032-780: The Northeast by essentially undoing the 1968 merger of the Pennsylvania Railroad and New York Central Railroad that created Penn Central . Following approval by the Surface Transportation Board , CSX and NS took control in August 1998, and on June 1, 1999, began operating their respective portions of Conrail. The old company remains a jointly-owned subsidiary, with CSX and NS owning respectively 42% and 58% of its stock , corresponding to how much of Conrail's assets they acquired. Each parent, however, has an equal voting interest . The primary asset retained by Conrail
4128-520: The Port Authority of New York and New Jersey, the State of New Jersey , and the State of New York . This project will replace the existing century-old swing-span bridge with a new, fixed-span bridge over the Hackensack River . The current bridge causes train traffic and delays due to maritime traffic, as well as malfunctions occurring from opening and closing; the new bridge will eliminate
4224-616: The Staggers Act, railroads, including Conrail, were freed from the requirement to continue money-losing services. Conrail began turning a profit by 1981, the result of the Staggers Act freedoms and its own managerial improvements under the leadership of L. Stanley Crane, who had been chief executive officer of the Southern Railway . While the Staggers Act helped immensely in allowing all railroads to more-easily abandon unprofitable rail lines and set their own freight rates, it
4320-531: The State and, in addition, to enforce such rules and regulations as the corporation shall adopt and deem appropriate." One of the primary responsibilities of NJ Transit Police is to provide police services and security to the hundreds of bus terminals, rail stations, light-rail stations and all other property owned, operated and leased by NJ Transit throughout the state. The Department employs approximately 250 sworn police officers. This project will expand and restore
4416-836: The United States. At its northern end in Camden, it will connect with the River Line, with which its infrastructure and vehicles will be compatible. At the northern terminus, the Walter Rand Transportation Center , paid transfers will be possible to the PATCO Speedline . The project's goal is to improve mobility and connect towns in Gloucester and Camden counties. The project was originally expected to be completed by 2019, but faced construction delays due to local pushback, lack of funding, and later
4512-412: The auxiliary power cables, traction power, and signal and communication devices along the HBLR that were affected by Hurricane Sandy was in the works. Repairs to Hoboken Terminal are said to be complete by 2020. Numerous power line, power system, and flood protection systems were in progress or completed at numerous terminals and stations. The 110-year old Raritan Bay Drawbridge is said to be replaced by
4608-516: The cosmetic restoration of N7E caboose 21165 and a partnership with the B&O Railroad Museum to restore its ex-Conrail SW7 8905. The CRHS owns four pieces of on-track equipment: 86-foot boxcar 243880 (currently under development into a stand-alone Conrail museum), cabooses 21165 and 22130, and former Triple Crown RoadRailer TCSZ 463491. A preserved Conrail ex-PRR GP30 is on display at the Railroad Museum of Pennsylvania . To mark its 30th anniversary, Norfolk Southern painted 20 new locomotives with
4704-412: The dilapidated infrastructure and rolling stock it inherited from its six predecessors succeeded by the end of the 1970s in improving the physical condition of tracks, locomotives and freight cars . However, fundamental economic regulatory issues remained, and Conrail continued to post losses of as much as $ 1 million a day. Conrail management, recognizing the need for more regulatory freedoms to address
4800-465: The early years of Conrail, the NYC "small-back" searchlight was adopted as the systemwide standard for new signal installations and replacements. The standard signal was quickly changed to the NYC tri-light. This move was done to decrease maintenance requirements, as searchlight signals need moving parts to switch between colors, unlike tri-lights, which have individual lamps. Many signals from previous railroads were re-used though, as new signaling hardware
4896-473: The economic issues, were among the parties lobbying for what became the Staggers Act of 1980, which significantly loosened the Interstate Commerce Commission 's rigid economic control of the rail industry. This allowed Conrail and other carriers the opportunity to become profitable and strengthen their finances. The Staggers Act allowed the setting of rates that would recover capital and operating cost (fully allocated cost recovery) by each and every route mile
SECTION 50
#17327939677184992-478: The end of 2019. As of December 2022, the project is still in its design phase, and NJT was given a $ 600K federal grant to study transit-oriented development along the proposed extension. This project will extend Hudson-Bergen Light Rail access in Jersey City . It will extend service from West Side Avenue Station by 0.7 miles (1.1 km) of new rail to a new terminus on the west side of Route 440 . An environmental assessment has been prepared by NJ Transit, and
5088-432: The former Monongahela Railway in southwest Pennsylvania , was originally owned jointly by the Baltimore and Ohio Railroad , Pennsylvania Railroad and Pittsburgh and Lake Erie Railroad . Conrail absorbed the company in 1993, and assigned trackage rights to CSX, the successor to the B&O and P&LE. With the Conrail breakup, those lines are owned by NS, but the CSX trackage rights are still in place. Since Conrail
5184-408: The full Ann Arbor Railroad , of which Conrail would run only the southernmost portion. Michigan bought it and the whole line was operated by Conrail for several years until it was sold to a short line . Conrail was incorporated in Pennsylvania on October 25, 1974, and operations began on April 1, 1976. The federal government owned 85%, with employees owning the remaining 15%. The theory was that if
5280-576: The future. The leadership of the municipalities along the route have been organizing for decades to get service running again and have been rezoning the areas around the former train stations ever since being told by NJ Transit that the number of projected riders is too low to justify investment. The Passaic–Bergen–Hudson Transit Project would reintroduce passenger service on the New York, Susquehanna and Western Railway right-of-way in Passaic , Bergen and Hudson counties between Hawthorne and Hackensack , as well as extending service to connect to
5376-959: The general public and three State officials. The two non-voting members are "recommended by labor organizations representing the plurality of employees". The Governor has veto power on decisions made by the board. NJT splits its operations into three classes: bus, light rail, and commuter rail, operated by four legal businesses: NJ Transit Bus Operations, Inc. , subsidiaries NJ Transit Mercer, Inc. and NJ Transit Morris, Inc. , and NJ Transit Rail Operations, Inc. . NJT Bus Operations operates 253 bus routes using 2,221 buses. Its subsidiaries NJ Transit Mercer and NJ Transit Morris operate those routes concentrated in Trenton and Monmouth and Morris counties. Additional buses are also leased out to several private New Jersey operators, including Coach USA , Lakeland , Transbridge Lines , and Academy . NJT operates three light rail systems: NJT operates thirteen commuter rail lines, two of which are operated under
5472-404: The growing exurban communities in Monroe County, Pennsylvania , the Pocono Mountains , northern Warren County , and southern Sussex County in New Jersey. In October 2015, the Federal Transit Administration (FTA) requested that a preliminary engineering study be performed in order to update the cost figures on the previous study. Funding for this study is currently being sought. As of 2023,
5568-420: The heart of NJ Transit Bus Operations' Midtown "commuter shed", with four bus routes (165, 167, 168 & 177) running well beyond capacity. Issues regarding the restart of commuter rail service include: With these considerable technical issues, as well as no available space in New York Penn Station for West Shore Line trains, this proposal was put on hold until capacity into New York Penn Station will increase in
5664-535: The interior of northern Ocean County . As of 2006, the line was opposed by Jamesburg and Monroe Township. From Monmouth Junction the line would continue southeast to Jamesburg , Monroe , Englishtown , Manalapan , Freehold Borough , Freehold Township , Howell and Farmingdale . A new rail connection would be required in Farmingdale. It would proceed southward from Farmingdale to Lakehurst, passing through Howell, Lakewood , Jackson , Toms River , Townships, and Lakehurst/ Manchester . Trains would also operate on
5760-521: The largest being those operated by the state's largest electric company, Public Service Electric and Gas Company . It gradually acquired most of the state's bus services. In northern New Jersey, many of the bus routes are arranged in a web. In southern New Jersey, most routes are arranged in a "spoke-and-hub" fashion, with routes emanating from Trenton , Camden , and Atlantic City . In 1983, NJT assumed operation of all commuter rail service in New Jersey from Conrail , which had been formed in 1976 through
5856-400: The lights above the deck. Red marker lights (not class lights, which are multi-color) were also a preference of Conrail. Most locomotives that went to CSX retained their marker lights, while Norfolk Southern quickly removed them. All Conrail locomotives that went to CSX and NS have been either retired or repainted. The last unit to wear "Conrail Blue", NS 8312, was retired in 2014. Conrail was
SECTION 60
#17327939677185952-405: The line's southern terminus would be in Lakehurst, and it would run through Lakewood along existing freight tracks to join the North Jersey Coast Line in Red Bank. It also includes the possibility of a spur between Freehold and Farmingdale. In August 2010, NJT received $ 534,375 in Federal Funds to investigate the possibilities of a MOM line. Since that time there has been no further advancement of
6048-409: The merging of a number of financially troubled railroads. Conrail had operated two extensive commuter railroad networks in northern New Jersey under contract to NJDOT; in turn, these lines were the successors of numerous commuter routes dating from the mid-19th century. NJT now operates every passenger and commuter rail line in the state except for Amtrak ; the Port Authority Trans-Hudson (PATH), which
6144-437: The movable span, thus improving reliability and increasing train speeds. The project is partnered with the Port Authority of New York and New Jersey, NJ Transit, Amtrak, and United States Department of Transportation , with funding provided by NJ Transit, Amtrak , and the Federal Railroad Administration . This project will entail the design and construction of a new Hudson River rail tunnel serving Penn Station, New York, and
6240-401: The needs of travelers in the area, advance cost-effective transit solutions, improve regional mobility and access, reduce roadway congestion, and attract growth and development. There have been several public hearings so far, and the project has received the Supplemental Draft Environmental Impact Statement from the Environmental Protection Agency . The final EIS was expected to be completed by
6336-417: The new Consolidated Rail Corporation. Unlike most railroad consolidations, only the designated lines were to be taken over. Other lines would be sold to Amtrak, various state governments, transportation agencies, and solvent railroads. The few remaining lines were to remain with the old companies along with all previously-abandoned lines, many stations, and all non-rail related properties, thus converting most of
6432-490: The new companies, and NS also acquired the CR reporting mark. Operations under CSX and NS began on June 1, 1999, bringing Conrail's 23-year existence to an end. As the names indicated, CSX acquired the former New York Central Railroad main line from New York City and Boston, Massachusetts , to Cleveland, Ohio , and the former Cleveland, Cincinnati, Chicago and St. Louis Railway (NYC Big Four) line to Indianapolis, Indiana (continuing west to East St. Louis, Illinois ) on
6528-480: The old companies into solvent property-holding companies. The plan was unveiled on July 26, 1975, consisting of lines from Penn Central and six other companies—the Ann Arbor Railroad (bankrupt 1973), Erie Lackawanna Railway (1972), Lehigh Valley Railroad (1970), Reading Company (1971), Central Railroad of New Jersey (1967) and Lehigh and Hudson River Railway (1972). Controlled railroads and jointly-owned railroads such as Pennsylvania-Reading Seashore Lines and
6624-447: The only railroad to receive EMD SD80MACs (an order from the Chicago & North Western was cancelled when that company merged with Union Pacific ) and were separated evenly between CSX and NS. Conrail had a different paint scheme for these locomotives and also the SD70MAC , with a large white, cone-shaped line on the front, bearing "Conrail Quality" lettering. The SD70MACs were not fitted with marker lights, as they were ordered after
6720-504: The other from New York to Chicago. The two lines cross at a bridge southeast of downtown Cleveland ( 41°26′49″N 81°37′37″W / 41.447°N 81.627°W / 41.447; -81.627 ), where the former Cleveland and Pittsburgh Railroad crosses over the NYC's former Cleveland Short Line Railway around the south side of Cleveland. In three major metropolitan areas – North Jersey, South Jersey/Philadelphia, and Detroit – Conrail Shared Assets Operations continues to serve as
6816-431: The paint schemes of predecessor railroads. The first, on March 15, 2012, was GE ES44AC #8098 in Conrail blue with the "can opener" logo. In July 2023, CSX unveiled GE ES44AH unit #1976, which was repaired and repainted at the CSX shops in Waycross , GA with a CSX dark blue and yellow color scheme on the front (nose) and cab of the locomotive, and the light blue Conrail scheme with the Conrail Quality logo throughout
6912-525: The past four decades (and in some cases much longer), most are still in operational or near-operational condition. A 2009 study by NJT estimated that bringing the line back into operation to Scranton, Pennsylvania , would cost approximately $ 551 million, although service may be extended in several interim phases before reaching Scranton. In 2011, the Lackawanna Cut-Off Restoration Project from Port Morris to Andover ,
7008-795: The project. The inertia is partially attributed to the cancellation of the Access to the Region's Core project. In November 2008, the Lehigh Valley Economic Development Corporation (LVEDC), along with both Lehigh and Northampton counties, commissioned a study to explore extending the Raritan Valley Line to the Lehigh Valley region of eastern Pennsylvania, which would potentially include stops in Allentown , Bethlehem and Easton . This would resume passenger service previously provided jointly by
7104-543: The project. However, the project was suspended on October 7, 2010, due to concerns that the State of New Jersey would be solely responsible for projected $ 5 billion in overruns. On October 27, 2010, Governor Chris Christie made a final decision to cancel the project. Amtrak later unveiled the Gateway Project , which addresses some of the issues ARC was meant to resolve. Planned to connect Downtown Newark and Elizabeth via Newark Liberty International Airport , NJT
7200-440: The projected completion date for Andover service is 2027, with work at Roseville Tunnel and Andover, NJ ongoing. There is a possibility of Amtrak extending service from New York City to Scranton, PA via the Cut-Off, but no official commitment for that service has been made to date. The Glassboro–Camden Line is an 18-mile (28.97 km) diesel multiple unit (DMU) light rail system planned for southwestern part of New Jersey in
7296-497: The railroad operated. There would be no more cross-subsidization of costs between route-miles (that is, revenue on profitable route segments were not used to subsidize routes where rates were set at intermodal parity, yet still did recover fully-allocated costs). Finally, where current and/or future traffic projections showed that profitable volumes of traffic would not return, the railroads were allowed to abandon those routes, shippers and passengers to other modes of transportation. Under
7392-621: The region, Penn Central (PC), declared bankruptcy in 1970, after less than three years of existence. Formed in 1968 by the merger of the New York Central Railroad and Pennsylvania Railroad (and supplemented in 1969 by the New York, New Haven and Hartford Railroad ), the PC was created with almost no plans to merge the varied corporate cultures, and the resulting company was a hopelessly-entangled mess. At its lowest point, PC
7488-415: The rehabilitation and modernization of the existing North River Tunnels , which incurred serious and ongoing damage during Hurricane Sandy. The tunnel was flooded with millions of gallons of saltwater during Hurricane Sandy, causing corrosion that continues to damage the century-old tunnel. It plans to build a new tunnel, rather than close and renovate the existing tunnel, as doing so would leave only one of
7584-455: The rest of the locomotive. It was numbered #1976 in homage to the year of Conrail's creation. In August 2023, MTA Metro–North Railroad unveiled locomotive #201, a GE P32AC-DM , wrapped in a yellow and blue scheme worn by Conrail's EMD FL9 units between 1976 and 1982. In October 2024, New Jersey Transit unveiled EMD GP40PH-2B #4208 in Conrail blue with the "can opener" logo, similar to Norfolk Southern #8098. NJT stated that Conrail
7680-591: The right-of-way of the Lackawanna Cut-Off . Constructed by the Delaware, Lackawanna and Western Railroad between 1908 and 1911, this provided a direct route with minimal curves and grades between Slateford Junction , two miles (3.25 km) below the Delaware Water Gap , and the crest of the watershed at Lake Hopatcong ( Port Morris Junction ), the connection with NJT's Montclair-Boonton Line . This would restore long-distance service that
7776-505: The schedule, but cut back to Trenton. During Hurricane Sandy in October 2012, the rail operations center of NJ Transit was flooded by 8 feet (2.4 m) of water and an emergency generator submerged. Floodwater damaged at least 65 locomotive engines and 257 rail cars. The Governor of New Jersey appoints a thirteen-member Board of Directors, consisting of eleven voting and two non-voting members. The voting members consist of eight from
7872-491: The service was improved through increased capital investment , the economic basis of the railroad would be improved. During its first seven years, Conrail proved to be highly unprofitable, despite receiving billions of dollars of assistance from Congress. The corporation declared enormous losses on its federal income tax returns from 1976 through 1982, resulting in an accumulated net operating loss of $ 2.2 billion during that period. Congress once again reacted with support by passing
7968-459: The state which are being studied by the agency, NJDOT , the metropolitan planning organizations of New Jersey (MPO), and contract bus carriers. In 2011, NJT announced that it would equip its entire bus fleet with real-time location , creating the basis for "next bus" scheduling information at bus shelters and web-enabled devices and considered an important feature of BRT. As of 2018, there are several projects in progress. A project to replace
8064-608: The successful bidder. After considerable debate in Congress, the Conrail Privatization Act of 1986 was signed into law by President Reagan on October 21, 1986. However, in August 1986, Norfolk Southern had withdrawn its bid citing Congressional delays and taxation changes. The government decided that its interest in Conrail would then be sold by the then-largest initial public offering in US history. The sale
8160-422: The system had a ridership of 209,259,800. Covering a service area of 5,325 square miles (13,790 km ), NJT is the largest statewide public transit system and the third-largest provider of bus, rail, and light rail transit by ridership in the United States. NJT also acts as a purchasing agency for many private operators in the state; in particular, buses to serve routes not served by the transit agency. NJT
8256-530: The two railroads. In 1997, however, the two railroads struck a compromise agreement to jointly acquire Conrail and split most of its assets between them, with Norfolk Southern acquiring a larger portion of the Conrail network via a larger stock buyout. Under the final agreement approved by the Surface Transportation Board , Norfolk Southern acquired 58 percent of Conrail's assets, including roughly 6,000 Conrail route miles, and CSX received 42 percent of Conrail's assets, including about 3,600 route miles. The buyout
8352-691: Was approved by the Surface Transportation Board (STB) (successor agency to the Interstate Commerce Commission(ICC) and took place on August 22, 1998. Under the control of lawyer-turned-CEO Tim O'Toole , the lines were transferred to two newly formed limited liability companies , to be subsidiaries of Conrail but leased to CSX and Norfolk Southern, respectively New York Central Lines (NYC) and Pennsylvania Lines (PRR). The NYC and PRR reporting marks , which had passed to Conrail, were also transferred to
8448-408: Was bankrupt, but was somewhat stronger financially than the others. It was ruled reorganizable under Chapter 77 on April 30, 1974 (as had the Boston and Maine Railroad ), but on January 9, 1975, with no end to its losses in sight, its trustees reconsidered and asked for inclusion. The Final System Plan assigned a major section of the EL, from northern New Jersey west to northeast Ohio , to be sold to
8544-656: Was called, provided interim funding to the bankrupt railroads and defined a new Consolidated Rail Corporation under the Association of American Railroads ' plan. The 3R Act also formed the United States Railway Association (USRA), another government corporation , taking over the powers of the Interstate Commerce Commission with respect to allowing the bankrupt railroads to abandon unprofitable lines. The USRA
8640-459: Was divided between Norfolk Southern Railway and CSX Transportation in 1999, all remaining locomotives have been successively repainted, and many remain in service. CR units had unique features such as "Bright Future" blue paint, flashing ditch lights, and Leslie RS-3L horns. Another key spotting feature is ditch lights mounted under the locomotive's front deck. This is a preference different from Norfolk Southern and CSX, which order locomotives with
8736-568: Was effective from March 26, 1987, when Conrail's stock, worth $ 1.65 billion, was sold to private investors. Conrail inherited the commuter rail operations of its predecessor lines. It relinquished several during the 1970s, including the Erie Cleveland–Youngstown service (discontinued in 1977), the Pennsylvania Railroad Chicago–Valparaiso service (transferred to Amtrak in 1979), and the services within
8832-577: Was expensive, and Conrail faced financial difficulty. As mentioned above, significant projects took place to reduce trackage, oftentimes removing double-track with automatic block signals in favor of single track with centralized traffic control (CTC). Conrail also installed CTC across much of the former PRR multi-track mainline, which had relied on local towers to operate signals and control track. Conrail spent its entire existence installing tri-light signals (using NORAC rules) across much of its system. Many Conrail-installed signaling locations were removed in
8928-581: Was founded on July 17, 1979, an offspring of the New Jersey Department of Transportation (NJDOT), mandated by the state government to address many then-pressing transportation problems. It came into being with the passage of the Public Transportation Act of 1979 to "acquire, operate, and contract for transportation service in the public interest." NJT originally acquired and managed a number of private bus services, one of
9024-459: Was incorporated on February 1, 1974, and Edward G. Jordan, an insurance executive from California , was named president on March 18 by Nixon. Arthur D. Lewis of Eastern Air Lines was appointed chairman on April 30, and the remainder of the board was named on May 30 and sworn in on July 11. Under the 3R Act, the USRA was to create a "Final System Plan" to decide which lines should be included in
9120-524: Was losing over $ 1 million a day and trains were becoming lost all over the railroad. In 1972, Hurricane Agnes damaged the rundown Northeast railway network and threatened the solvency of other railroads, including the somewhat more solvent Erie Lackawanna (EL). In mid-1973, officials with the bankrupt Penn Central threatened to liquidate and cease operations by year's end if they did not receive government aid by October 1. This threat to US freight and passenger traffic galvanized Congress to quickly create
9216-413: Was under Crane's leadership that Conrail truly became a profitable operation. Soon after Crane took office in 1981 he shed another 4,400 miles from the Conrail system in the following two years, which accounted for only 1% of the railroad's overall traffic and 2% of its profits while saving it millions of dollars in maintenance costs. NERSA relieved Conrail of its requirement to provide commuter service on