73-677: Rail Projects Victoria ( RPV ) was a project team of the Government of Victoria , Australia, responsible for the management of certain major infrastructure projects on the Victorian rail network , such as Metro Tunnel , Regional Rail Revival and Melbourne Airport Rail . Originally established as the Melbourne Metro Rail Authority ( MMRA ), to deliver the Melbourne Metro Rail Project ,
146-631: A competition in January 2012 to name the TBMs, in which over 2,500 entries were received and 10 pairs of names short-listed. After a public vote in February 2012, the first three pairs of names were announced on 13 March and the last pair on 16 August 2013: In September 2012, a gantry supporting a spoil hopper, used to load rail wagons with excavated waste at a construction site near Westbourne Park Underground station , collapsed. It tipped sideways, causing
219-630: A government investigation into blacklisting at Crossrail. Further allegations of blacklisting against Crossrail were made in Parliament in September 2017. In March 2023, a former Crossrail worker made a High Court statement regarding a damages claim against Crossrail, Skanska, Costain, T Clarke and NG Bailey for blacklisting. The case had been settled out of court in December 2021. Electrician Daniel Collins had raised health and safety concerns at
292-534: A member selected by each of the government recognised traditional owner groups. Additional Reserved Member seats may be granted by the assembly on application by an Aboriginal group. The main task of the Assembly is to work out the rules by which individual treaties will be negotiated between the Victoria Government and the various Aboriginal peoples. It will also establish an independent umpire,
365-441: A new wetland nature reserve ( Wallasea Wetlands ). The project eventually moved seven million tons of earth. Restoration of Connaught Tunnel by filling with concrete foam and reboring, as originally intended, was deemed too great a risk to the structural integrity of the tunnel, and so the docks above were drained to give access to the tunnel roof in order to enlarge its profile. This work took place during 2013. Boring of
438-478: A number of other schemes including a "Thameslink Metro" route enhancement, and the Chelsea–Hackney line. The cost of the east–west scheme including rolling stock was estimated at £885 million. In 1991, a private bill was submitted to Parliament for a scheme including a new underground line from Paddington to Liverpool Street. The bill was promoted by London Underground and British Rail, and supported by
511-739: A project team. On 2 April 2024, the Major Transport Infrastructure Authority merged with Victorian Health Building Authority to form Victorian Infrastructure Delivery Authority (VIDA). The Regional Rail Revival and Melbourne Airport Rail projects were also transferred to the Level Crossing Removal Project, and the RPV project team was replaced by the Metro Tunnel Project to focus on testing and commissioning. The Metro Tunnel
584-477: A specialist investigation by the Railway (London Plan) Committee, appointed in 1944 and reporting in 1946 and 1948. The term "Crossrail" emerged in the 1974 London Rail Study Report. Although the idea was seen as imaginative, only a brief estimate of cost was given: £300 million. A feasibility study was recommended as a high priority so that the practicability and costs of the scheme could be determined. It
657-407: A timetable through the core section, to check the reliability of the railway. In November 2021, Crossrail entered trial operation which is the final stage before opening. With an initial budget of £14.8 billion, the total cost rose to £18.25 billion by November 2019, and increased further to £18.8 billion by December 2020. Delays to the project of several months were caused by
730-798: A tunnel under the Thames , was awarded to Hochtief and J. Murphy & Sons in 2011. By September 2009, preparatory work for the £1 billion developments at Tottenham Court Road station had begun, with buildings (including the Astoria Theatre ) being compulsorily purchased and demolished. In March 2010, contracts were awarded to civil engineering companies for the second round of 'enabling work' including 'Royal Oak Portal Taxi Facility Demolition', 'Demolition works for Crossrail Bond Street Station ', 'Demolition works for Crossrail Tottenham Court Road Station' and 'Pudding Mill Lane Portal'. In December 2010, contracts were awarded for most of
803-434: Is a body of 31 elected and appointed members representing Aboriginal Victorians . 22 "General Members" are elected via optional preferential voting in 5 multi-member electorates (known as "Regions"). General Members receiving a sufficient quota in each Region are elected, with the lowest ranking male candidates excluded until at least 40% of the members elected to a region are non-male. 10 "Reserved Members" are appointed, with
SECTION 10
#1732773307458876-657: Is a pair of 9 km (5.6 mi) rail tunnels between South Kensington in Melbourne's inner north-west and South Yarra in the city's inner south-east. Currently under construction, the tunnels will connect the Sunbury line to the Cranbourne and Pakenham lines through the Melbourne CBD . The project includes five new stations – Arden , Parkville , State Library , Town Hall and Anzac – and will increase
949-598: Is exercised by the premier, appointed by the governor, provided they can command the support of a majority of members of the Legislative Assembly . The Cabinet is the de facto chief policy making organ and consists of the premier and all ministers. Legislative power rests with the Parliament of Victoria , which consists of King Charles III , represented by the Governor of Victoria , and the two Houses,
1022-517: Is responsible for planning, procurement and delivery of a rail line to Melbourne Airport . Construction is expected to begin in 2022 along a preferred route via Sunshine in the city's west, with funding from state and federal governments as well as the private sector. An expression of interest process closed in late 2018 and a detailed business case will be completed by RPV in 2019. From April 2018, RPV became responsible for planning and managing electrification of lines to Melton and Wyndham Vale , at
1095-746: The Australian state of Victoria . As a parliamentary constitutional monarchy , the State Government was first formed in 1851 when Victoria first gained the right to responsible government . The Constitution of Australia regulates the relationship between the Victorian Government and the Commonwealth level of government, and cedes legislative and judicial supremacy to the federal government on conflicting matters. The Victoria State Government enforces acts passed by
1168-613: The COVID-19 pandemic in England , and in late 2020 this reduced the number of workers that could be safely on-site. By August 2021, seven of the nine new stations had been handed over to TfL. The Abbey Wood to Paddington section opened to passengers on 24 May 2022, although initially trains did not run on Sundays to allow for further testing, nor did they call at Bond Street, which opened on 24 October 2022. From Sunday 6 November trains began running directly from Reading and Heathrow in
1241-680: The Eddington Transport Study 's recommendation of a new north–south rail connection. It was realigned and rebranded as the Melbourne Rail Link under premier Denis Napthine in 2014, but reverted to closely match its original form when the Liberal government lost the 2014 Victorian election . The establishment of the MMRA was announced in February 2015 with a commitment of $ 40 million. Premier Daniel Andrews , making
1314-715: The Great Western Main Line and the Great Eastern Main Line . The project was approved in 2007, and construction began in 2009 on the central section and connections to existing lines that became part of the route, which has been named the Elizabeth line in honour of Queen Elizabeth II who opened the line on 17 May 2022 during her Platinum Jubilee . The central section of the line between Paddington and Abbey Wood opened on 24 May 2022, with 12 trains per hour running in each direction through
1387-639: The Regional Network Development Plan in 2016, a series of major upgrade works for the Ballarat line were announced. In November of that year, Minister for Public Transport Jacinta Allan announced that the Ballarat Line Upgrade would be managed by a dedicated project team established within the MMRA, noting the potential for the projects to together result in electrification of the line to Melton . Planning for
1460-610: The Thames Tideway Scheme and the High Speed 2 projects, which were under development in London at the same time as Crossrail, the excavation works that took place during the project gave archaeologists a valuable opportunity to explore the earth underneath London's streets that was previously seen as inaccessible. Crossrail undertook what was described as one of the most extensive archaeological programmes ever seen in
1533-777: The Victorian Legislative Council (the upper house) and the Victorian Legislative Assembly (the lower house). Judicial power is exercised by the Supreme Court of Victoria and a system of subordinate courts, but the High Court of Australia and other federal courts have overriding jurisdiction on matters which fall under the ambit of the Australian Constitution. The First Peoples' Assembly of Victoria
SECTION 20
#17327733074581606-538: The Victorian Parliament , the Victorian Legislative Council . It met for the first time on 10 December 2019, and again met over two days in February 2020. The assembly hopes to agree upon a framework, umpire and process before November 2022, the date of the next state election. The Labor government under Daniel Andrews was supportive, but the Coalition had not made a clear commitment to supporting
1679-575: The Bond Street station site in February 2015, was fired three days later, and faced repeated difficulties in gaining new employment on the project. He alleged there was a "secretive system of misuse of private information" about union activists. Crossrail and the contractors denied all Collins' allegations, saying they settled the court case "for purely commercial reasons" and "without admission of liability or wrongdoing". Collins received an undisclosed sum for damages and to cover court costs. Much like
1752-505: The Crossrail scheme, and also a Wimbledon–Hackney scheme. While CLRL was promoting the Crossrail project, alternative schemes were being proposed. In 2002, GB Railways put forward a scheme called SuperCrossRail which would link regional stations such as Cambridge , Guildford , Oxford , Milton Keynes Central , Southend Victoria and Ipswich via a west–east rail tunnel through central London. The tunnel would follow an alignment along
1825-662: The MURLA employed only a small staff and most work was outsourced to a private consortium by contract. The administrative costs of MURLA were jointly met by the VR, the Melbourne City Council and the Melbourne and Metropolitan Board of Works from their annual budgets, separately to the costs of the project itself. The Metro Tunnel project was first proposed in 2008 by the state government led by John Brumby , following
1898-619: The Regional Rail Revival and Melbourne Airport Rail projects were transferred to the Level Crossing Removal Project team, and RPV was replaced by Metro Tunnel Project. The Metro Tunnel Project continued to be a project team within the new Victorian Infrastructure Delivery Authority, which had replaced MITA on the same day. For much of the history of the Victorian railway network, construction work
1971-588: The Regional Rail Revival. Then, in April, the government announced that the MMRA would be renamed Rail Projects Victoria, and begin work on a Melbourne Airport rail link and a high-speed rail line to Geelong. The reorganisation was welcomed by the Public Transport Users Association , who observed that a single rail construction authority would be able to coordinate projects and efficiently manage specialised resources. In mid-2018, it
2044-541: The River Thames, with stations at Charing Cross , Blackfriars and London Bridge . In 2004 another proposal named Superlink was promoted by a group of senior railway managers. Like SuperCrossRail, Superlink envisaged linking a number of regional stations via a tunnel through London, but advocated the route already safeguarded for Crossrail. CLRL evaluated both proposals and rejected them due to concerns about network capacity and cost issues. The Crossrail Act 2008
2117-458: The Thames tunnel, which involves tunnelling through chalk ; and 'Earth Pressure Balance Machines' (EPBM) for tunnelling through clay, sand and gravel (at lower levels through Lambeth Group and Thanet Sands ground formation). The TBMs weigh nearly 1,000 tonnes and are over 100 metres (330 feet) long. The main tunnelling contracts were valued at around £1.5 billion. Crossrail ran
2190-474: The Treaty Authority, to oversee negotiations between Aboriginal groups and the Victoria Government and ensure fairness. It will also establish a fund to help negotiations are take place on an even financial footing among the various groups, and debate and decide which ideas, laws, policies and rights will be the subject of treaty negotiations. The assembly meets in the chamber of the upper house of
2263-538: The UK. Over 100 archaeologists have found tens of thousands of items from 40 sites, spanning 55 million years of London's history and prehistory. Many of the items were placed on show at the Museum of London Docklands from February to September 2017. Some of the most notable finds include: In the first half of 2021, Crossrail entered trial running stage of construction. Crossrail, in partnership with TfL, ran trains to
Rail Projects Victoria - Misplaced Pages Continue
2336-662: The adjacent Network Rail line to be closed. On 7 March 2014, Rene Tkacik, a Slovakian construction worker, was killed by a piece of falling concrete while working in a tunnel. In April 2014, The Observer reported details of a leaked internal report, compiled for the Crossrail contractors by an independent safety consultancy. The report was alleged to have pointed to poor industrial relations arising from safety concerns, and that workers were "too scared to report injuries for fear of being sacked". Three construction workers died from suspected heart attacks over six months in 2019, but Crossrail announced that, following extensive testing,
2409-490: The air quality at Bond Street station was within acceptable limits. In 2012, Crossrail faced accusations of blacklisting . It was revealed that an industrial relations manager, Ron Barron, employed by Bechtel , had routinely cross-checked job applicants against the Consulting Association database. An employment tribunal in 2010 heard that Barron introduced the use of the blacklist at his former employer,
2482-463: The announcement, described the authority's initial task as managing the planning and site investigation works required to formally commence the Metro Tunnel project. The funding was brought forward from a promise made at the 2014 election for $ 300 million towards the project in the first budget of the new Labor government. From a machinery of government perspective, the creation of the MMRA
2555-586: The area. On 24 June 2009 it was reported that no traces of anthrax or bubonic plague had been found on human bone fragments discovered during tunnelling. Invitations to tender for the two principal tunnelling contracts were published in the Official Journal of the European Union in August 2009. 'Tunnels West' (C300) was for twin 6.2-kilometre-long (3.9-mile) tunnels from Royal Oak through to
2628-434: The capacity of the inner Melbourne network by releasing train paths in the existing City Loop underground railway. The tunnel is expected to be structurally complete by 2024 and to open in 2025. RPV is responsible for the delivery of the Metro Tunnel project, including property acquisitions, planning approvals and ensuring positive social outcomes. It appointed a consortium led by Lendlease and John Holland to construct
2701-440: The construction firm Chicago Bridge & Iron Company (CB&I), and referred to it more than 900 times in 2007 alone. He was found to have unlawfully refused employment to a Philip Willis. Aggravated damages were awarded because Barron had added information about Willis to the blacklist. In May 2012, a BFK manager challenged their subcontractor, Electrical Installations Services Ltd. (EIS), saying that one of their electricians
2774-512: The core section in Central London . The main feature of the project was the construction of a new railway line that runs underground from Paddington Station to a junction near Whitechapel. There it splits into a branch to Stratford , where it joins the Great Eastern Main Line ; and a branch to Abbey Wood in southeast London. When the Elizabeth line became fully operational in May 2023,
2847-865: The existing Great Eastern Main Line at Stratford . The south-eastern branch runs underground to Abbey Wood via Canary Wharf , Custom House and Woolwich . This branch takes over a stretch of the former North London line built by the Eastern Counties and Thames Junction Railway , and connects it with the North Kent Line via a tunnel under the Thames at North Woolwich . The tunnelled sections are altogether approximately 42 km (26 miles) in length. There are new stations at Paddington , Bond Street , Tottenham Court Road , Farringdon , Liverpool Street and Whitechapel , with interchanges with London Underground and National Rail services. Due to
2920-535: The government; it was rejected by the Private Bill Committee in 1994 on the grounds that a case had not been made, though the government issued "Safeguarding Directions", protecting the route from any development that would jeopardise future schemes. In 2001, Cross London Rail Links (CLRL), a joint-venture between TfL and the Department for Transport (DfT), was formed to develop and promote
2993-637: The governor. The Government of Victoria operates under the principles of the Westminster system as adapted in the Australian Constitution and of responsible government . Both systems and principles of governance have developed out of the United Kingdom, to which Victoria was previously a colony. Executive power rests formally with the Executive Council, which consists of the governor and senior ministers. In practice, executive power
Rail Projects Victoria - Misplaced Pages Continue
3066-629: The length and positioning of the new platforms, Farringdon station is also connected to Barbican station, and Liverpool Street to Moorgate station. From the western end of the tunnel Elizabeth line services continue to Hayes and Harlington where they either remain on the Great Western Main Line and run to Reading or Maidenhead via Slough or split off to the Heathrow branch terminating at Heathrow Terminals 4 or 5 . Existing stations were refurbished and upgraded, including
3139-563: The line would not open in 2021, with TfL not expecting the full line from Heathrow to Shenfield to open until the early part of the 2023/24 financial year. In August 2020, Crossrail announced that the central section would be ready to open "in the first half of 2022". In May 2021, trial running commenced, with the core section opened by Queen Elizabeth II for passenger service on 24 May 2022. The project used eight 7.1-metre (23-foot) diameter tunnel-boring machines (TBM) from Herrenknecht AG (Germany). Two types are used; 'slurry' type for
3212-499: The new Crossrail Farringdon Station , with a portal west of Paddington . The 'Tunnels East' (C305) request was for three tunnel sections and 'launch chambers' in east London . Contracts were awarded in late 2010: the 'Tunnels West' contract was awarded to BAM Nuttall , Ferrovial Agroman and Kier Construction (BFK); the 'Tunnels East' contract was awarded to Dragados and John Sisk & Son . The remaining tunnelling contract (C310, Plumstead to North Woolwich ), which included
3285-703: The new nine-carriage Class 345 trains started to run at frequencies in the central section of up to 24 trains per hour in each direction through the central core, after which services divide into two branches: in the west to Reading and to Heathrow Central ; in the east to Abbey Wood and to Shenfield . Local services on the section of the Great Eastern Main Line between Liverpool Street and Shenfield had been transferred to TfL Rail in May 2015; TfL Rail also took over Heathrow Connect services in May 2018 and replaced some local services between Paddington and Reading in December 2019. The TfL Rail brand
3358-434: The office was later expanded in its responsibilities to include the management and planning of a number of major infrastructure programs on V/Line 's regional rail services. In January 2019, it was renamed to RPV to reflect its expanded scope. It also ceased to be an independent office and became a project team within the Department of Transport and Planning 's Major Transport Infrastructure Authority (MITA). On 2 April 2024,
3431-404: The overhead lines were powered up between Westbourne Park and Stepney , the installation of platform doors was completed, and video was released of the first trains travelling through the tunnels. TfL Rail took over Heathrow Connect services from Paddington to Heathrow in May 2018. At the end of August 2018, four months before the scheduled opening of the core section of the line, it
3504-498: The parliament through government departments, statutory authorities, and other public agencies. The government is formally presided over by the governor , who exercises executive authority granted by the state's constitution through the Executive Council, a body consisting of senior cabinet ministers . In reality, both the governor and the Executive Council are largely ceremonial, with the premier and ministers having control over policy, appointments, and other executive orders made by
3577-696: The peak of construction up to 14,000 people were expected to be needed in the project's supply chain. Work began on 15 May 2009 when piling works started at the future Canary Wharf station . The threat of diseases being released by work on the project was raised by Lord James of Blackheath at the passing of the Crossrail Bill. He told the House of Lords select committee that 682 victims of anthrax had been brought into Smithfield in Farringdon with some contaminated meat in 1520 and then buried in
3650-570: The project was repeatedly delayed, including several months caused by the COVID-19 pandemic . The concept of large-diameter tunnels crossing central London to connect Paddington in the west and Liverpool Street in the east was first proposed by railwayman George Dow in The Star newspaper in June 1941. The project that became Crossrail has origins in the 1943 County of London Plan and 1944 Greater London Plan by Patrick Abercrombie . These led to
3723-405: The prospect of delays to the project in updates to Mayor of London Sadiq Khan, and called for TfL commissioner Mike Brown to consider his position. Crossrail said major challenges before completion included writing and testing the software that would integrate the train with three different track signalling systems, and installing equipment inside the tunnels. In July 2019, it was announced that
SECTION 50
#17327733074583796-488: The provision of step-free access at all stations, and platform lengthening at most to accommodate the new 200-metre-long (660 ft) trains. Earlier plans suggested terminating at Maidenhead, with an extension to Reading safeguarded. Various commentators advocated an extension further west as far as Reading because it was seen as complementary to the Great Western Electrification project which
3869-590: The railway tunnels was officially completed at Farringdon on 4 June 2015 in the presence of the Prime Minister and the Mayor of London . Installation of the track was completed in September 2017. The ETCS signalling was scheduled to be tested in the Heathrow tunnels over the winter of 2017–2018. The south east section of the infrastructure was energised in February 2018, with the first test train run between Plumstead and Abbey Wood that month. In May 2018
3942-488: The route. The Bendigo line upgrade works include improved signalling north of Bendigo , and works to increase permissible track speed between Bendigo and Echuca . The Gippsland line includes duplication and stabling facilities, as well as the eventual replacement of the rail bridge over the Avon River . The Geelong and Warrnambool lines will also receive lengths of duplication and signalling improvements. RPV
4015-527: The same time as investigating a dedicated high-speed alignment to Geelong. This work was later announced as part of the state government's Western Rail Plan , in additional to the possible high-speed electrification of the Geelong and Ballarat lines. Government of Victoria The Victoria State Government , also referred to as the Victorian Government , is the executive government of
4088-607: The treaty process. On 11 July 2020, the Victorian Government announced that it would establish a truth and reconciliation commission for Aboriginal Australians in Victoria, the first ever in Australia, with the terms of reference to be worked out collaboratively. The 21 elected members of the assembly would consult with their communities and work with the Victoria Government to design the process. The announcement
4161-527: The tunnel to the Great Western Main Line and the Metropolitan line on the Underground. The City route was shown as a new connection across the City of London linking the Great Northern Route with London Bridge. The north–south line proposed routing West Coast Main Line , Thameslink, and Great Northern trains through Euston and King's Cross / St Pancras , then under the West End via Tottenham Court Road , Piccadilly Circus and Victoria towards Crystal Palace and Hounslow . The report also recommended
4234-453: The tunnelling work. To assist with the skills required for the Crossrail project, Crossrail opened in 2011 the Tunnelling and Underground Construction Academy in Ilford . The academy was handed over to TfL in 2017, who have sub-contracted its management to PROCAT . In February 2010, Crossrail was accused of bullying residents whose property lay on the route into selling for less than the market value. A subsequent London Assembly report
4307-434: The tunnels in late 2017. Regional Rail Revival is the collective branding for a series of major maintenance and development works overseen by RPV on the regional Victorian rail network. The first works to be announced were the Ballarat Line Upgrade, a $ 518 million package of works including several new crossing loops on the Ballarat corridor, new stabling facilities for trains at Ararat , and several station upgrades along
4380-428: The upgrade project was carried out on this basis, with Evan Tattersall describing extension of suburban services as a "long-term aspiration" that could be completed following the opening of the Metro Tunnel. Prior to the 2017 Victorian Budget, the Andrews government announced that the Ballarat Line Upgrade would be augmented by improvements to each of Victoria's regional passenger rail lines, to be collectively branded as
4453-442: The west to Abbey Wood, and from Shenfield in the east through to Paddington as the surface railways connect with the central tunnels. TfL expects that the full line, with final timetable, will be operational by May 2023. In the west, the new tunnel connects with the Great Western Main Line at Royal Oak , west of Paddington . East of Whitechapel the line splits at an underground junction. The north-eastern branch emerges to join
SECTION 60
#17327733074584526-405: Was a trade union activist. Some days later, Pat Swift, the HR manager for BFK and a regular user of the Consulting Association , again challenged EIS. EIS refused to dismiss their worker and lost the contract. Flash pickets were held at the Crossrail site and also at the sites of the BFK partners. The Scottish Affairs Select Committee called on the UK Business Secretary , Vince Cable , to set up
4599-417: Was also suggested that the alignment of the tunnels should be safeguarded while a final decision was taken. The Central London Rail Study of 1989 proposed tunnels linking the existing rail network as the "East–West Crossrail", "City Crossrail", and "North–South Crossrail" schemes. The east–west scheme was for a line from Liverpool Street to Paddington/Marylebone with two connections at its western end linking
4672-403: Was announced in July 2009. A Reading terminus was also recommended by Network Rail's 2011 Route Utilisation Strategy . On 27 March 2014 it was announced that the line would indeed extend to Reading. A flyover at Airport Junction near Hayes & Harlington station allows Heathrow Express trains to pass over the track used by Crossrail, avoiding delays caused by crossings. The line between
4745-409: Was announced that completion was delayed and that the line would not open before autumn 2019. In April 2019, it was announced that Crossrail would be completed between October 2020 and March 2021, two years behind schedule, and that it would not include the opening of the Bond Street station, one of ten new stations on the line. The London Assembly's transport committee concluded that TfL played down
4818-412: Was appointed as the chief executive officer of the MMRA. Previously, Tattersall had been involved in the delivery of the Regional Rail Link and the redevelopment of Melbourne's Southern Cross station . Many of the original staff of the MMRA transferred from other rail infrastructure projects in Melbourne, or from international projects such as London's Crossrail . At the same time as the publication of
4891-441: Was carried out by the Construction Branch of the vertically integrated Victorian Railways (VR). The first major rail infrastructure project in Melbourne to be delivered by an independent entity was the City Loop railway line, which began construction in 1971. The Melbourne Underground Rail Loop Authority (MURLA), established by the Melbourne Underground Rail Loop Act 1970 , pioneered a new approach to construction management, where
4964-564: Was discontinued when the core section of the Elizabeth line opened in May 2022. The Elizabeth line is operated by MTR Corporation (Crossrail) Ltd as a London Rail concession of Transport for London (TfL), in a similar manner to London Overground . TfL's annual revenues from the line were forecast in 2018 to be nearly £500 million in 2022–23 and over £1 billion from 2024 to 2025. The total estimated cost rose from an initial budget of £14.8 billion to £18.8 billion by December 2020. Originally planned to open in 2018,
5037-552: Was given royal assent in July 2008, giving CLRL the powers necessary to build the line. In September 2009, TfL was loaned £1 billion towards the project by the European Investment Bank . Both Conservatives and Labour made commitments in their 2010 election manifestos to deliver Crossrail, and the coalition government following the election was committed to the project. In April 2009, Crossrail announced that 17 firms had secured 'Enabling Works Framework Agreements' and would now be able to compete for packages of works. At
5110-526: Was highly critical of the insensitive way in which Crossrail had dealt with compulsory purchases and the lack of assistance given to the people and businesses affected. There were also complaints from music fans , as the London Astoria was forced to close. In December 2011, a contract to ship the excavated material from the tunnel to Wallasea Island was awarded to a joint venture comprising BAM Nuttall Limited and Van Oord UK Limited. Between 4.5 and 5 million tonnes of soil would be used to construct
5183-501: Was part of the reorganisation of the Department of Transport, Planning and Local Infrastructure (DTPLI) into the Department of Economic Development, Jobs, Transport and Resources (DEDJTR). Responsibility for the Rail Office of the "Moving Victoria" program was transferred to DEDJTR from DTPLI and during this process, the Office was renamed and reconstituted as MMRA, reporting to the newly created Coordinator General, Major Transport Infrastructure Program. On 10 March 2015, Evan Tattersall
5256-552: Was reported that RPV would take over the Murray Basin Rail Project from V/Line , following problems with the latter's management of the program. On 1 January 2019, with the division of DEDJTR into the Department of Jobs, Precincts and Regions and the Department of Transport, RPV was abolished as an independent administrative office and incorporated into the new Major Transport Infrastructure Authority as
5329-615: Was welcomed by the community. The 2017 Uluru Statement from the Heart called for a similar commission to be established at a national level. Crossrail Crossrail is a completed railway project centred on London. It provides a high-frequency hybrid commuter rail and rapid transit system, known as the Elizabeth line , that crosses the capital from suburbs on the west to east and connects two major railway lines terminating in London: