(Period of data: 1984-2018)310 km /a (9,800 m /s)
113-556: The Sans Sault Rapids are a navigational impediment on Canada's Mackenzie River , in the Northwest Territories . The river narrows, and takes a tight turn north, near the river's confluence with the Mountain River , near mile 630. Barry Gough, in his account of explorer Alexander Mackenzie 's transit of the river, recounted how Mackenzie's guides described the rapids as "the most difficult, dangerous stretch of
226-745: A greenhouse gas . According to the World Commission on Dams report, where the reservoir is large compared to the generating capacity (less than 100 watts per square metre of surface area) and no clearing of the forests in the area was undertaken prior to impoundment of the reservoir, greenhouse gas emissions from the reservoir may be higher than those of a conventional oil-fired thermal generation plant. In boreal reservoirs of Canada and Northern Europe, however, greenhouse gas emissions are typically only 2% to 8% of any kind of conventional fossil-fuel thermal generation. A new class of underwater logging operation that targets drowned forests can mitigate
339-463: A low-head hydro power plant with hydrostatic head of few meters to few tens of meters can be classified either as an SHP or an LHP. The other distinction between SHP and LHP is the degree of the water flow regulation: a typical SHP primarily uses the natural water discharge with very little regulation in comparison to an LHP. Therefore, the term SHP is frequently used as a synonym for the run-of-the-river power plant . The largest power producers in
452-421: A flood and fail. Changes in the amount of river flow will correlate with the amount of energy produced by a dam. Lower river flows will reduce the amount of live storage in a reservoir therefore reducing the amount of water that can be used for hydroelectricity. The result of diminished river flow can be power shortages in areas that depend heavily on hydroelectric power. The risk of flow shortage may increase as
565-538: A key element for creating secure and clean electricity supply systems. A hydroelectric power station that has a dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once a hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel -powered energy plants. However, when constructed in lowland rainforest areas, where part of
678-809: A large natural height difference between two waterways, such as a waterfall or mountain lake. A tunnel is constructed to take water from the high reservoir to the generating hall built in a cavern near the lowest point of the water tunnel and a horizontal tailrace taking water away to the lower outlet waterway. A simple formula for approximating electric power production at a hydroelectric station is: P = − η ( m ˙ g Δ h ) = − η ( ( ρ V ˙ ) g Δ h ) {\displaystyle P=-\eta \ ({\dot {m}}g\ \Delta h)=-\eta \ ((\rho {\dot {V}})\ g\ \Delta h)} where Efficiency
791-451: A larger amount of methane than those in temperate areas. Like other non-fossil fuel sources, hydropower also has no emissions of sulfur dioxide, nitrogen oxides, or other particulates. Reservoirs created by hydroelectric schemes often provide facilities for water sports , and become tourist attractions themselves. In some countries, aquaculture in reservoirs is common. Multi-use dams installed for irrigation support agriculture with
904-592: A positive risk adjusted return, unless appropriate risk management measures are put in place. While many hydroelectric projects supply public electricity networks, some are created to serve specific industrial enterprises. Dedicated hydroelectric projects are often built to provide the substantial amounts of electricity needed for aluminium electrolytic plants, for example. The Grand Coulee Dam switched to support Alcoa aluminium in Bellingham, Washington , United States for American World War II airplanes before it
1017-548: A relatively constant water supply. Large hydro dams can control floods, which would otherwise affect people living downstream of the project. Managing dams which are also used for other purposes, such as irrigation , is complicated. In 2021 the IEA called for "robust sustainability standards for all hydropower development with streamlined rules and regulations". Large reservoirs associated with traditional hydroelectric power stations result in submersion of extensive areas upstream of
1130-540: A result of climate change . One study from the Colorado River in the United States suggest that modest climate changes, such as an increase in temperature in 2 degree Celsius resulting in a 10% decline in precipitation, might reduce river run-off by up to 40%. Brazil in particular is vulnerable due to its heavy reliance on hydroelectricity, as increasing temperatures, lower water flow and alterations in
1243-448: A small TV/radio). Even smaller turbines of 200–300 W may power a few homes in a developing country with a drop of only 1 m (3 ft). A Pico-hydro setup is typically run-of-the-river , meaning that dams are not used, but rather pipes divert some of the flow, drop this down a gradient, and through the turbine before returning it to the stream. An underground power station is generally used at large facilities and makes use of
SECTION 10
#17327660662081356-455: A source of low-cost renewable energy. Alternatively, small hydro projects may be built in isolated areas that would be uneconomic to serve from a grid, or in areas where there is no national electrical distribution network. Since small hydro projects usually have minimal reservoirs and civil construction work, they are seen as having a relatively low environmental impact compared to large hydro. This decreased environmental impact depends strongly on
1469-414: A start-up time of the order of a few minutes. Although battery power is quicker its capacity is tiny compared to hydro. It takes less than 10 minutes to bring most hydro units from cold start-up to full load; this is quicker than nuclear and almost all fossil fuel power. Power generation can also be decreased quickly when there is a surplus power generation. Hence the limited capacity of hydropower units
1582-528: A steady decline since the 1960s. Water mammals such as beavers and muskrats are extremely common in the Mackenzie Delta and surrounding areas of muskeg. The Mackenzie estuary is also a calving area for beluga whales . The Mackenzie valley is believed to have been the path taken by prehistoric peoples during the initial human migration from Asia to North America more than 10,000 years ago. However, archaeological evidence of human habitation along
1695-581: A total of 1,500 terawatt-hours (TWh) of electrical energy in one full cycle" which was "about 170 times more energy than the global fleet of pumped storage hydropower plants". Battery storage capacity is not expected to overtake pumped storage during the 2020s. When used as peak power to meet demand, hydroelectricity has a higher value than baseload power and a much higher value compared to intermittent energy sources such as wind and solar. Hydroelectric stations have long economic lives, with some plants still in service after 50–100 years. Operating labor cost
1808-588: A tourist described transiting the river, in Motorboating magazine . He wrote authorities had marked hidden navigational hazards, within the rapids, with navigational buoys —and that many of the buoys were missing, or submerged. Mackenzie River (Period of data: 1973-2011)10,300 m /s (360,000 cu ft/s) The Mackenzie River (French: Fleuve (de) Mackenzie ; Slavey : Deh-Cho [tèh tʃʰò], literally big river ; Inuvialuktun : Kuukpak [kuːkpɑk], literally great river )
1921-452: Is hydroelectric power on a scale serving a small community or industrial plant. The definition of a small hydro project varies but a generating capacity of up to 10 megawatts (MW) is generally accepted as the upper limit. This may be stretched to 25 MW and 30 MW in Canada and the United States. Small hydro stations may be connected to conventional electrical distribution networks as
2034-543: Is 1,738 kilometres (1,080 mi) long, flowing north-northwest from Great Slave Lake into the Arctic Ocean , where it forms a large delta at its mouth. Its extensive watershed drains about 20 percent of Canada. It is the largest river flowing into the Arctic from North America , and including its tributaries has a total length of 4,241 kilometres (2,635 mi), making it the thirteenth longest river system in
2147-714: Is a river in the Canadian boreal forest . It forms, along with the Slave, Peace, and Finlay, the longest river system in Canada , and includes the second largest drainage basin of any North American river after the Mississippi . The Mackenzie River flows through a vast, thinly populated region of forest and tundra entirely within the Northwest Territories in Canada, although its many tributaries reach into five other Canadian provinces and territories . The river's main stem
2260-635: Is also usually low, as plants are automated and have few personnel on site during normal operation. Where a dam serves multiple purposes, a hydroelectric station may be added with relatively low construction cost, providing a useful revenue stream to offset the costs of dam operation. It has been calculated that the sale of electricity from the Three Gorges Dam will cover the construction costs after 5 to 8 years of full generation. However, some data shows that in most countries large hydropower dams will be too costly and take too long to build to deliver
2373-649: Is considered to be some of the best northern farmland in Canada, due to the high concentration of minerals found in the soil. These conditions are expected to be improved even more by trends in climate change, such as warmer temperatures and a longer growing season. According to the British Columbia Environmental Network, "there is enough agricultural capability in the Peace River Valley to provide vegetables to all of northern Canada". The only functioning oil pipeline in
SECTION 20
#17327660662082486-526: Is forested (mostly boreal forest ). Wetlands comprise about 18%, or about 324,900 km (125,400 sq mi), of the basin. More than 93% of forested areas are virgin old-growth forest . However, human activities such as oil extraction have threatened water quality in the headwaters of the Mackenzie River. In addition, a warming climate in northern parts of the watershed is melting permafrost and destabilizing soil through erosion. Most of
2599-426: Is formed by the confluence of the two rivers and flows 415 kilometres (258 mi) due north into Great Slave Lake, at Fort Resolution , Northwest Territories. The Slave is by far the largest river flowing into the lake, with an annual flow of 108 km (87 million acre-feet). It contributes about 77% of the overall inflow, and forms a large delta where it enters the lake. Other rivers entering Great Slave Lake are
2712-470: Is highest in the winter when solar energy is at a minimum. Pico hydro is hydroelectric power generation of under 5 kW . It is useful in small, remote communities that require only a small amount of electricity. For example, the 1.1 kW Intermediate Technology Development Group Pico Hydro Project in Kenya supplies 57 homes with very small electric loads (e.g., a couple of lights and a phone charger, or
2825-445: Is initially produced during construction of the project, and some methane is given off annually by reservoirs, hydro has one of the lowest lifecycle greenhouse gas emissions for electricity generation. The low greenhouse gas impact of hydroelectricity is found especially in temperate climates . Greater greenhouse gas emission impacts are found in the tropical regions because the reservoirs of power stations in tropical regions produce
2938-539: Is known as Mills Lake. After heading west for about 100 km (62 mi) the Mackenzie narrows and turns northwest through a long stretch of fast water and rapids, past the village of Jean Marie River . At Fort Simpson it is joined by the Liard River , its biggest direct tributary, from the west. The Liard drains a large area in the southern Yukon and northern BC and carries a large amount of sediment during
3051-562: Is nearly 210 km (130 mi) from north to south, and ranges in width from 50 to 80 km (31 to 50 mi). It is the second biggest Arctic delta in the world, after the Lena River delta in Russia. Most land in the Mackenzie delta consists of permafrost , with great depths to bedrock. A characteristic feature of the delta is its numerous pingos , or hills of earth-covered-ice – some 1,400 of them. The Peel River , carrying much of
3164-462: Is not an energy source, and appears as a negative number in listings. Run-of-the-river hydroelectric stations are those with small or no reservoir capacity, so that only the water coming from upstream is available for generation at that moment, and any oversupply must pass unused. A constant supply of water from a lake or existing reservoir upstream is a significant advantage in choosing sites for run-of-the-river. A tidal power station makes use of
3277-452: Is not generally used to produce base power except for vacating the flood pool or meeting downstream needs. Instead, it can serve as backup for non-hydro generators. The major advantage of conventional hydroelectric dams with reservoirs is their ability to store water at low cost for dispatch later as high value clean electricity. In 2021, the IEA estimated that the "reservoirs of all existing conventional hydropower plants combined can store
3390-410: Is often higher (that is, closer to 1) with larger and more modern turbines. Annual electric energy production depends on the available water supply. In some installations, the water flow rate can vary by a factor of 10:1 over the course of a year. Hydropower is a flexible source of electricity since stations can be ramped up and down very quickly to adapt to changing energy demands. Hydro turbines have
3503-678: Is significantly deeper than Great Bear. The third major lake, Athabasca, is less than a third that size with an area of 7,800 km (3,000 sq mi). Six other lakes in the watershed cover more than 1,000 km (390 sq mi), including the Williston Lake reservoir , the second-largest artificial lake in North America, on the Peace River. The river discharges more than 325 cubic kilometres (78 cu mi) of water each year, accounting for roughly 11% of
Sans Sault Rapids - Misplaced Pages Continue
3616-592: Is very young in geologic terms – its channel formed over a period of no more than several thousand years as the ice sheet retreated. Prior to the ice ages, only the Peel River tributary flowed through what is now the Mackenzie Delta into the Arctic Ocean. The other tributaries of the Mackenzie combined into the "Bell River" which flowed east into Hudson Bay. During glaciation the weight of the ice sheet depressed northern Canada's terrain to such an extent that when
3729-618: The 1825–1827 Mackenzie River expedition . The following year he traced the coast west until blocked by ice while John Richardson followed the coast east to the Coppermine River . In 1849 William Pullen reached the Mackenzie from the Bering Strait. In the following decades the North West Company established forts on the river, the precursors of present-day settlements such as Fort Simpson (formerly Fort of
3842-538: The Arctic Red River from the southwest at Tsiigehtchic , where traffic on the Dempster Highway crosses via ferry/ice bridge. About 30 kilometres (19 mi) northwest of Tsiigehtchic is Point Separation, the head of the vast Mackenzie River Delta, whose branching channels, ponds and wetlands spread across more than 12,000 square kilometres (4,600 sq mi) of the coastal plain. The delta
3955-888: The Athabasca River all the way to the delta, though with several areas such as the huge rapids on the Slave River requiring portages . The route taken by gold seekers started in Edmonton and followed the Athabasca, Slave and Mackenzie Rivers as far as the Peel River , then up the Peel and its tributary the Rat River to the headwaters of the Porcupine River , which flows to the Yukon River . Many who attempted
4068-762: The Bering Strait ; and the Fraser River and Columbia River systems, both of which empty into the Pacific Ocean . Lowland divides in the north separate the Mackenzie basin from the Arctic Ocean watersheds of the Anderson , Horton , Coppermine and Back Rivers. In the east, the Mackenzie borders on the Hudson Bay watersheds of the Thelon and Churchill Rivers, and to the south it is bordered by
4181-679: The Bonneville Dam in 1937 and being recognized by the Flood Control Act of 1936 as the premier federal flood control agency. Hydroelectric power stations continued to become larger throughout the 20th century. Hydropower was referred to as "white coal". Hoover Dam 's initial 1,345 MW power station was the world's largest hydroelectric power station in 1936; it was eclipsed by the 6,809 MW Grand Coulee Dam in 1942. The Itaipu Dam opened in 1984 in South America as
4294-588: The Gwichya Gwich'in . In 2008, Canadian and Japanese researchers extracted a constant stream of natural gas from a test project at the Mallik methane hydrate field in the Mackenzie Delta. This was the second such drilling at Mallik: the first took place in 2002 and used heat to release methane. In the 2008 experiment, researchers were able to extract gas by lowering the pressure, without heating, requiring significantly less energy. The Mallik gas hydrate field
4407-549: The Industrial Revolution would drive development as well. In 1878, the world's first hydroelectric power scheme was developed at Cragside in Northumberland , England, by William Armstrong . It was used to power a single arc lamp in his art gallery. The old Schoelkopf Power Station No. 1 , US, near Niagara Falls , began to produce electricity in 1881. The first Edison hydroelectric power station,
4520-806: The International Exhibition of Hydropower and Tourism , with over one million visitors 1925. By 1920, when 40% of the power produced in the United States was hydroelectric, the Federal Power Act was enacted into law. The Act created the Federal Power Commission to regulate hydroelectric power stations on federal land and water. As the power stations became larger, their associated dams developed additional purposes, including flood control , irrigation and navigation . Federal funding became necessary for large-scale development, and federally owned corporations, such as
4633-649: The Northern Interior of BC, is the ultimate source of the Mackenzie River via the Finlay – Peace River system, which stretches 1,923 kilometres (1,195 mi) through BC and Alberta. The 1,231-kilometre (765 mi) Athabasca River originates further south, in Jasper National Park in southwest Alberta. Together, the Peace and Athabasca rivers drain a significant portion of the eastern slope of
Sans Sault Rapids - Misplaced Pages Continue
4746-568: The Rocky Mountains and the central Alberta prairie. The Peace contributes the majority of the water, about 66 km (54 million acre-feet ) per year, and the Athabasca contributes 25 km (20 million acre-feet). The Peace and Athabasca meet at the Peace-Athabasca Delta , a vast inland delta at the western end of Lake Athabasca , which also takes runoff from the northern third of Saskatchewan. The Slave River
4859-758: The Saskatchewan – Nelson River system, which also empties into Hudson Bay. The Mackenzie system is hydrologically connected to the Hudson Bay watershed via Wollaston Lake , which is not only the source of the Fond du Lac tributary of Lake Athabasca, but also of the Cochrane River , which flows east into the Churchill River. The eastern portion of the Mackenzie basin is dominated by vast reaches of lake-studded boreal forest and includes many of
4972-455: The Taltson , Lockhart and Hay Rivers , the latter of which also extends into Alberta and BC. The Mackenzie River issues from the western end of Great Slave Lake about 150 km (93 mi) south-west of Yellowknife . The channel is initially several kilometres wide but narrows to about 800 m (2,600 ft) at Fort Providence , which was historically an important ferry crossing in
5085-633: The Tennessee Valley Authority (1933) and the Bonneville Power Administration (1937) were created. Additionally, the Bureau of Reclamation which had begun a series of western US irrigation projects in the early 20th century, was now constructing large hydroelectric projects such as the 1928 Hoover Dam . The United States Army Corps of Engineers was also involved in hydroelectric development, completing
5198-583: The Vulcan Street Plant , began operating September 30, 1882, in Appleton, Wisconsin , with an output of about 12.5 kilowatts. By 1886 there were 45 hydroelectric power stations in the United States and Canada; and by 1889 there were 200 in the United States alone. At the beginning of the 20th century, many small hydroelectric power stations were being constructed by commercial companies in mountains near metropolitan areas. Grenoble , France held
5311-506: The potential energy of dammed water driving a water turbine and generator . The power extracted from the water depends on the volume and on the difference in height between the source and the water's outflow. This height difference is called the head . A large pipe (the " penstock ") delivers water from the reservoir to the turbine. This method produces electricity to supply high peak demands by moving water between reservoirs at different elevations. At times of low electrical demand,
5424-400: The water frame , and continuous production played a significant part in the development of the factory system, with modern employment practices. In the 1840s, hydraulic power networks were developed to generate and transmit hydro power to end users. By the late 19th century, the electrical generator was developed and could now be coupled with hydraulics. The growing demand arising from
5537-505: The 3,200-kilometre (2,000 mi) journey died along the way or turned back before reaching the Yukon. Oil was discovered at Norman Wells in the 1920s, beginning a period of industrialization in the Mackenzie valley. Oil was initially shipped out by steamboats, supplying mines and towns across the NWT. This demand grew when gold was discovered on the northern shore of Great Slave Lake, leading to
5650-503: The Forks). A lucrative fur trade was carried out, as the Mackenzie basin teemed with beaver and muskrat. However, the short summer and harsh winter conditions limited trappers' activities. During the late 19th century Fort Simpson was regional headquarters for the Hudson's Bay Company . The first fur trappers were native, but starting in the 1920s increasing numbers of European trappers entered
5763-579: The Great Slave Lake region. By acting as a massive stabilizer on the water flow of the Peace River, Williston Lake reduces flood crests on the Peace, Slave and Mackenzie rivers as far downstream as Fort Good Hope . This has made the Peace Valley more suitable for farming, but has had significant impacts on downstream wildlife and riparian communities. The more stable annual flow slows down the spread of essential nutrients which builds up in
SECTION 50
#17327660662085876-463: The IEA released a main-case forecast of 141 GW generated by hydropower over 2022–2027, which is slightly lower than deployment achieved from 2017–2022. Because environmental permitting and construction times are long, they estimate hydropower potential will remain limited, with only an additional 40 GW deemed possible in the accelerated case. In 2021 the IEA said that major modernisation refurbishments are required. Most hydroelectric power comes from
5989-526: The Liard River, it is 6,769 m /s (239,000 cu ft/s). At Norman Wells it is 8,446 m /s (298,300 cu ft/s), and at the Arctic Red confluence it is 8,926 m /s (315,200 cu ft/s). Mackenzie monthly mean discharge at Arctic Red River (m /s) As recently as the last glacial maximum about 30,000 years ago, the majority of northern Canada was buried under
6102-445: The Mackenzie River drainage basin encompasses nearly 20 percent of Canada. About 980,000 km (380,000 sq mi), or 54 percent of the basin, lies above Great Slave Lake. Permafrost underlies about three-quarters of the watershed, reaching up to 100 m (330 ft) deep in the Mackenzie Delta. As a whole, the Mackenzie basin receives only meager to moderate rainfall, averaging 410 millimetres (16 in) over
6215-581: The Mackenzie River. Fort Providence lost 20 percent of its population, and some smaller villages and camps were completely wiped out. Steamboat service on the Mackenzie River began in the 1880s, and the number of vessels surged in the early 1900s as the Klondike Gold Rush brought a wave of prospectors to the Yukon. The Mackenzie River was one of the main routes into the northern interior, with sternwheelers transporting passengers, domestic supplies and industrial goods from as far upstream as
6328-498: The Mackenzie basin connects Norman Wells with Zama City , Alberta. Norman Wells was the main oil-producing area on the Mackenzie River until the 1970s, when new oil fields were discovered further north in the Mackenzie delta and the surrounding coastline. As of 2016, there were an estimated 166 billion barrels of oil reserves in this region. There is a proposal for a Mackenzie Valley Pipeline , which has not been built due to environmental concerns and falling oil and gas prices. During
6441-492: The Mackenzie is scant, despite the efforts of many researchers. Many archaeological sites have probably been destroyed by flooding, freeze-thaw and erosion. The Inuvialuit , Gwich'in and other Indigenous peoples have lived along the river for thousands of years; however, the oldest known evidence of continuous occupation stretches back only about 1300–1400 years, at the Gwich'in community of Tsiigehtchic . The Mackenzie provided
6554-556: The Mackenzie watershed is unbroken wilderness and human activities have little influence on the overall water quality, although there are some localized impacts. Some parts of the Mackenzie basin are rich in natural resources – oil and gas in the Northwest Territories and in central Alberta , lumber in the Peace River headwaters, uranium in Saskatchewan, gold and zinc in the Great Slave Lake area and tungsten in
6667-620: The Mountain River the Mackenzie flows due north until reaching The Ramparts , a limestone gorge barely 500 metres (1,600 ft) wide and up to 45 metres (148 ft) deep. Below The Ramparts is the village of Fort Good Hope , where the Mackenzie turns northwest again, soon crossing the Arctic Circle . The Mackenzie here flows slightly lower in elevation than the surrounding tundra , as a braided river between low bluffs about 3 to 5 km (1.9 to 3.1 mi) apart. It receives
6780-459: The Yukon. As of 2003 there were two operational gold mines in Yellowknife, and many more abandoned mines dot the region. Communities along the Mackenzie River depend on subsistence fishing, although there is also some commercial fishing on the river. Agriculture in the Mackenzie River basin is mainly concentrated in the Peace and Athabasca valleys to the south. The valley of the former river
6893-464: The ability to transport particles heavier than itself downstream. This has a negative effect on dams and subsequently their power stations, particularly those on rivers or within catchment areas with high siltation. Siltation can fill a reservoir and reduce its capacity to control floods along with causing additional horizontal pressure on the upstream portion of the dam. Eventually, some reservoirs can become full of sediment and useless or over-top during
SECTION 60
#17327660662087006-595: The balance between stream flow and power production. Micro hydro means hydroelectric power installations that typically produce up to 100 kW of power. These installations can provide power to an isolated home or small community, or are sometimes connected to electric power networks. There are many of these installations around the world, particularly in developing nations as they can provide an economical source of energy without purchase of fuel. Micro hydro systems complement photovoltaic solar energy systems because in many areas water flow, and thus available hydro power,
7119-526: The basin, none of them endemic . The Mackenzie River has a similar range of fish fauna to the Mississippi River system. It is believed that the two river systems were connected during the Ice Ages by meltwater lakes and channels, allowing fish in the two rivers to interbreed. Fish in the Mackenzie River proper include the northern pike , several minnow species, and lake whitefish . Fish in
7232-404: The daily rise and fall of ocean water due to tides; such sources are highly predictable, and if conditions permit construction of reservoirs, can also be dispatchable to generate power during high demand periods. Less common types of hydro schemes use water's kinetic energy or undammed sources such as undershot water wheels . Tidal power is viable in a relatively small number of locations around
7345-505: The dams, sometimes destroying biologically rich and productive lowland and riverine valley forests, marshland and grasslands. Damming interrupts the flow of rivers and can harm local ecosystems, and building large dams and reservoirs often involves displacing people and wildlife. The loss of land is often exacerbated by habitat fragmentation of surrounding areas caused by the reservoir. Hydroelectric projects can be disruptive to surrounding aquatic ecosystems both upstream and downstream of
7458-608: The eastern and southern edges of the basin; these include uranium , gold , lead , and zinc . Agriculture remains prevalent along the south, particularly in the Peace River area. Various tributaries and headwaters of the river have been developed for hydroelectricity production, flood control and irrigation. Through its many tributaries, the Mackenzie River basin covers portions of five Canadian provinces and territories – British Columbia (BC), Alberta , Saskatchewan , Yukon , and Northwest Territories. Thutade Lake , in
7571-705: The effect of forest decay. Another disadvantage of hydroelectric dams is the need to relocate the people living where the reservoirs are planned. In 2000, the World Commission on Dams estimated that dams had physically displaced 40–80 million people worldwide. Because large conventional dammed-hydro facilities hold back large volumes of water, a failure due to poor construction, natural disasters or sabotage can be catastrophic to downriver settlements and infrastructure. During Typhoon Nina in 1975 Banqiao Dam in Southern China failed when more than
7684-557: The enormous continental Laurentide Ice Sheet . The tremendous erosive powers of the Laurentide and its predecessors, at maximum extent, completely buried what is now the Mackenzie watershed under thousands of metres of ice and flattened the eastern portions of the watershed. When the ice sheet receded for the last time, it left a 1,100 km (680 mi) long proglacial lake , Lake McConnell , of which Great Bear, Great Slave and Athabasca Lakes are remnants. Today's Mackenzie River
7797-554: The entire basin, though mountain areas experience much higher precipitation, and areas near and north of the Arctic Circle receive much lower precipitation. The Mackenzie drainage basin is bordered by multiple major North American watersheds. Much of the western edge of the Mackenzie basin runs along the Continental Divide . The divide separates the Mackenzie watershed from that of the Yukon River , which flows to
7910-399: The excess generation capacity is used to pump water into the higher reservoir, thus providing demand side response . When the demand becomes greater, water is released back into the lower reservoir through a turbine. In 2021 pumped-storage schemes provided almost 85% of the world's 190 GW of grid energy storage and improve the daily capacity factor of the generation system. Pumped storage
8023-534: The forest is inundated, substantial amounts of greenhouse gases may be emitted. Construction of a hydroelectric complex can have significant environmental impact, principally in loss of arable land and population displacement. They also disrupt the natural ecology of the river involved, affecting habitats and ecosystems, and siltation and erosion patterns. While dams can ameliorate the risks of flooding, dam failure can be catastrophic. In 2021, global installed hydropower electrical capacity reached almost 1,400 GW,
8136-474: The form of sediments, thus causing the river to become more polluted. Hydroelectricity Hydroelectricity , or hydroelectric power , is electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity , almost 4,210 TWh in 2023, which is more than all other renewable sources combined and also more than nuclear power . Hydropower can provide large amounts of low-carbon electricity on demand, making it
8249-527: The government-owned Marine Transportation Services . In 2016, Northern Transportation Company went bankrupt, and its assets were bought by the government of Northwest Territories. Barge traffic travels the entire length of the Mackenzie in long "trains" of up to fifteen shallow-draft vessels pulled by tugboats . Goods are shipped as far as the port of Tuktoyaktuk on the eastern end of the Mackenzie Delta, where they are transferred to oceangoing vessels and delivered to communities along Canada's Arctic coast and
8362-506: The highest among all renewable energy technologies. Hydroelectricity plays a leading role in countries like Brazil, Norway and China. but there are geographical limits and environmental issues. Tidal power can be used in coastal regions. China added 24 GW in 2022, accounting for nearly three-quarters of global hydropower capacity additions. Europe added 2 GW, the largest amount for the region since 1990. Meanwhile, globally, hydropower generation increased by 70 TWh (up 2%) in 2022 and remains
8475-479: The ice retreated, the Mackenzie system was captured to lower elevations in the northwest, establishing the present flow direction to the Arctic. Fluvial deposits and other erosional evidence indicate that around the end of the Pleistocene , about 13,000 years ago, the Mackenzie channel was scoured by one or more massive glacial lake outburst floods unleashed from Lake Agassiz , formed by melting ice west of
8588-449: The ice-free season, the Mackenzie is a major transportation link through the vast wilderness of northern Canada, linking the many isolated communities along its course. Wide, calm sections of the river are frequently used to land seaplanes in the ice-free season. Canada's northernmost major railhead is located at the town of Hay River , on the south shore of Great Slave Lake. Goods shipped there by train and truck are loaded onto barges of
8701-419: The lake to rise, and the excess water can only flow out after the rivers have receded. The same phenomenon occurs at Great Slave Lake, which naturally regulates the flow from the Slave River into the Mackenzie. There are river gauges at several upstream points along the Mackenzie River. The average flow rate at the outlet of Great Slave Lake is 4,269 m /s (150,800 cu ft/s). At Fort Simpson, below
8814-442: The largest lakes in North America. By both volume and surface area, Great Bear Lake is the biggest in the watershed and third largest on the continent, with a surface area of 31,153 km (12,028 sq mi) and a volume of 2,236 km (536 cu mi). Great Slave Lake is slightly smaller, with an area of 28,568 km (11,030 sq mi) and containing 2,088 km (501 cu mi) of water, although it
8927-519: The largest renewable energy source, surpassing all other technologies combined. Hydropower has been used since ancient times to grind flour and perform other tasks. In the late 18th century hydraulic power provided the energy source needed for the start of the Industrial Revolution . In the mid-1700s, French engineer Bernard Forest de Bélidor published Architecture Hydraulique , which described vertical- and horizontal-axis hydraulic machines, and in 1771 Richard Arkwright 's combination of water power ,
9040-750: The largest, producing 14 GW , but was surpassed in 2008 by the Three Gorges Dam in China at 22.5 GW . Hydroelectricity would eventually supply some countries, including Norway , Democratic Republic of the Congo , Paraguay and Brazil , with over 85% of their electricity. In 2021 the International Energy Agency (IEA) said that more efforts are needed to help limit climate change . Some countries have highly developed their hydropower potential and have very little room for growth: Switzerland produces 88% of its potential and Mexico 80%. In 2022,
9153-487: The major route into Canada's northern interior for European explorers as early as the late 18th century. Scottish explorer Alexander Mackenzie travelled the river in the hope it would lead to the Pacific Ocean , but instead reached its mouth on the Arctic Ocean on 14 July 1789. There is a story, likely apocryphal, that he named it "Disappointment River", but eventually it was named after him. No European reached its mouth again until Sir John Franklin on 16 August 1825 during
9266-404: The major route into Canada's northern interior for early European explorers. Economic development remains limited along the river. During the 19th century, fur trading became a lucrative business, but this was affected by harsh weather conditions. The discovery of oil at Norman Wells in the 1920s began a period of industrialization in the Mackenzie valley. Metallic minerals have been found along
9379-494: The massive cost and environmental impact. The Royal Canadian Mint honoured the 200th anniversary of the naming of the Mackenzie River with the issue of a silver commemorative dollar in 1989. In 1997, a cultural landscape along the section of the Mackenzie River at Tsiigehtchic was designated the Nagwichoonjik (Mackenzie River) National Historic Site of Canada due to its cultural, social and spiritual significance to
9492-455: The mid-twentieth century, more than 400,000 birds passed through during the spring and up to a million in autumn. Some 215 bird species in total have been catalogued in the delta, including species such as the whooping crane , peregrine falcon and bald eagle . The construction of the W.A.C. Bennett Dam on the Peace River has reduced the seasonal variations of water levels in the delta, causing damage to its ecosystem. Bird populations have seen
9605-482: The mine shut down in 1988, the railroad remains an important transportation link between the Mackenzie River waterway and the rest of Canada. In the 1950s the U.S. Army Corps of Engineers proposed the North American Water and Power Alliance (NAWAPA), a vast series of dams, tunnels and reservoirs designed to move 150 km (120,000,000 acre⋅ft) of water from northern Canada to southern Canada,
9718-459: The north. Year round, the Mackenzie's outflow has a major stabilizing effect in the local climate above the Arctic Ocean with large amounts of warmer fresh water mixing with the cold seawater. The average flow rate at the mouth is 9,910 m /s (350,000 cu ft/s), the second largest in Canada after the St Lawrence , and the fourteenth largest in the world. About 60 percent of
9831-457: The numerous islands to the north. In winter, the frozen channel of the Mackenzie River, especially in the delta region, is used as an ice road , firm enough to support large trucks, although travel between northern communities is mostly by dog sleds and snowmobiles. Although the Mackenzie River is wide and deep, navigation is "notoriously difficult" due to the locations of sandbars and shallows changing from year to year. In some narrower parts of
9944-551: The oil due to poor construction. It only operated for thirteen months, shutting down in 1945. Much abandoned equipment remains along the corridor today; part of the pipeline route has been designated the Canol Heritage Trail . In 1964 the Mackenzie Northern Railway (now a subsidiary of CN ) reached the shore of Great Slave Lake, to serve the new Pine Point zinc mine near Hay River. Although
10057-633: The plant site. Generation of hydroelectric power changes the downstream river environment. Water exiting a turbine usually contains very little suspended sediment, which can lead to scouring of river beds and loss of riverbanks. The turbines also will kill large portions of the fauna passing through, for instance 70% of the eel passing a turbine will perish immediately. Since turbine gates are often opened intermittently, rapid or even daily fluctuations in river flow are observed. Drought and seasonal changes in rainfall can severely limit hydropower. Water may also be lost by evaporation. When water flows it has
10170-505: The present-day Great Lakes . At its peak, Agassiz had a greater volume than all present-day freshwater lakes combined. This is believed to have disrupted currents in the Arctic Ocean and led to an abrupt 1,300-year-long cold temperature shift called the Younger Dryas . The Mackenzie carries a very large sediment load, transporting about 128 million tonnes each year to its delta. The Liard River alone accounts for 32 percent of
10283-450: The rainfall regime, could reduce total energy production by 7% annually by the end of the century. Lower positive impacts are found in the tropical regions. In lowland rainforest areas, where inundation of a part of the forest is necessary, it has been noted that the reservoirs of power plants produce substantial amounts of methane . This is due to plant material in flooded areas decaying in an anaerobic environment and forming methane,
10396-539: The region. Beaver and muskrat populations were heavily depleted, especially in areas around and south of Great Slave Lake. Catholic missionary Henri Grollier founded missions at Fort Simpson, Fort Norman and Fort Good Hope between 1858 and 1859. During the late 19th century and early 20th century epidemics of introduced European diseases swept through Indigenous communities along the river, and thousands of native people lost their lives. One particularly severe influenza in 1928 killed as many as one in ten native people along
10509-508: The river to canoe." However, he found that his party was able to transit the rapids, and avoid a tedious portage, after all. Above the rapids the river is several kilometres wide. At the rapids it narrows to less than one kilometre. A rock ridge extends into the river channel, from the east bank. Boaters can avoid the rocks by sticking to the west bank. The river's only other rapids, the Ramparts , are found 56 kilometres north. In 1979
10622-404: The river, barges must be uncoupled and towed one by one through hazardous stretches, despite attempts to widen and deepening the channel by blasting. Although there are no dams along the main stem of the Mackenzie, many of its tributaries and headwaters have been developed for hydroelectricity production, flood control and irrigation. The W.A.C. Bennett and Peace Canyon hydroelectric dams on
10735-541: The runoff from the northern Yukon, joins in the delta at a point northeast of Fort McPherson . Below there, the Mackenzie diverges into several large channels with the largest heading north-northeast, emptying into the Beaufort Sea west of Tuktoyaktuk . The Mackenzie Delta contains a logjam with 400,000 caches of wood, which stores 3.4 million tons of carbon , equivalent to a year's emissions from 2.5 million cars. At 1,805,000 km (697,000 sq mi),
10848-514: The settlement of Yellowknife and the opening of several mines in the area. By the 1940s steamboats had been replaced by modern gas and diesel-powered craft, which continue to serve the river today. During World War II oil pumped in Norman Wells was shipped to Fairbanks , Alaska via the 1,000-kilometre (620 mi) Canol pipeline . The pipeline was considered a "fiasco", going five times over budget and losing as much as 20 percent of
10961-464: The southern half of the watershed are genetically isolated from those of the northern half due to large rapids on the Slave River preventing fish from swimming upstream. Migratory birds use the three major deltas in the Mackenzie River basin – the Mackenzie Delta and the inland Slave and Peace-Athabasca Deltas – as resting and breeding areas. The latter is located at the convergence of four major North American migratory routes, or flyways. As recently as
11074-478: The spring, the difference in discharge between the two halves of the watershed becomes even more marked. While large amounts of snow and glacial melt dramatically drive up water levels in the Mackenzie's western tributaries, large lakes to the east retard springtime discharges. Spring floods from the Peace-Athabasca system are significantly slowed by the delta area at the western end of Lake Athabasca causing
11187-494: The summer melt – which does not fully mix with the clear water in the Mackenzie for almost 500 km (310 mi) downstream, with the resulting phenomenon of a clear current on the east bank and muddy water on the west bank. The river continues west-northwest until its confluence with the North Nahanni River , where it turns north towards the Arctic. It flows through open taiga with its wide valley bounded, on
11300-562: The summer, and used as an ice bridge in the winter for traffic along the Yellowknife Highway . In 2012 the Deh Cho Bridge was completed at a point about 10 km (6.2 mi) upstream, providing a safer permanent crossing. It is the only bridge across the main stem of the Mackenzie. West of Fort Providence the Mackenzie widens considerably, resembling a shallow, swampy lake more than a river; one large widening here
11413-402: The taiga consists of black spruce , aspen and poplar forest. In the north, the river's shores are lined with sparse vegetation like dwarf birch and willows , as well as extensive areas of muskeg and peat bogs . South of Great Slave Lake, there are much larger reaches of temperate and alpine forest, prairie, and fertile floodplain and riparian habitat. There are 53 fish species in
11526-472: The total river flow into the Arctic Ocean. The river is frozen for most of the year, with the ice typically breaking up by early to mid-May in the south, and late May-early June in the north. Ice breaks up earlier on the tributaries, sometimes causing ice jams and flooding where they meet the Mackenzie. In the middle of the larger lakes, such as Great Slave, ice can persist as late as mid-June. The river typically freezes by late October or November, starting in
11639-487: The total, and the Peel River about 20 percent. Essentially all of the sediment is contributed by areas downstream of Fort Providence, since upstream sediment is trapped in Great Slave Lake. The Mackenzie River's watershed is considered one of the largest and most intact ecosystems in North America, especially the northern half. Approximately 63% of the drainage basin, or 1,137,000 km (439,000 sq mi),
11752-560: The upper Peace River were completed in 1968 and 1980 by BC Hydro . They have a combined capacity of more than 3,600 megawatts (MW). The reservoir of W.A.C. Bennett, Williston Lake , is the largest body of fresh water in BC and the ninth largest man-made lake in the world, with a volume of 70.3 km (57,000,000 acre⋅ft). Other smaller hydroelectric plants are located along the Snare and Taltson River tributaries, providing power to mines in
11865-491: The water comes from the western half of the basin, which includes the Rocky, Selwyn , and Mackenzie mountain ranges out of which spring major tributaries such as the Peace and Liard Rivers, which contribute 23 and 27 percent of the total flow, respectively. In contrast the eastern half, despite being dominated by marshland and large lakes, provides only about 25 percent of the Mackenzie's discharge. During peak flow in
11978-755: The west, by the Mackenzie Mountains and to the east by low hills of the Canadian Shield . This mostly uninhabited area is called the Mackenzie Lowlands; although partly forested, it is mostly covered by large areas of muskeg , swamps and many small lakes. A number of major tributaries join from the west, including the Root River, Redstone River and Keele River . Below the Keele River, the Mackenzie River flows north along
12091-590: The western United States and Mexico. The system would involve building massive dams on the Liard, Mackenzie, Peace, Columbia , and Fraser river systems and pumping water into a 650 km (400 mi) long reservoir in the Rocky Mountain Trench . The water would then flow by gravity to irrigate more than 220,000 km (85,000 sq mi) in the three countries and generate more than 50,000 MW of surplus energy. The projects were never built due to
12204-635: The western base of the Franklin Mountains before turning northwest, and receives the Great Bear River , the outflow of Great Bear Lake at Tulita . The Mackenzie widens considerably to about 6 to 7 km (3.7 to 4.3 mi) at Norman Wells , a major center of oil production. There is a narrows at the Mountain River confluence called the Sans Sault Rapids , where the Mackenzie falls about 6 metres (20 ft). Below
12317-446: The world . The ultimate source of the Mackenzie River is Thutade Lake , in the Northern Interior of British Columbia . The Mackenzie valley is believed to have been the path taken by prehistoric peoples during the initial human migration from Asia to North America over 10,000 years ago, despite sparse evidence. The Inuvialuit , Gwich'in and other Indigenous peoples lived along the river for thousands of years. The river provided
12430-524: The world are hydroelectric power stations, with some hydroelectric facilities capable of generating more than double the installed capacities of the current largest nuclear power stations . Although no official definition exists for the capacity range of large hydroelectric power stations, facilities from over a few hundred megawatts are generally considered large hydroelectric facilities. Currently, only seven facilities over 10 GW ( 10,000 MW ) are in operation worldwide, see table below. Small hydro
12543-539: The world. The classification of hydropower plants starts with two top-level categories: The classification of a plant as an SHP or LHP is primarily based on its nameplate capacity , the threshold varies by the country, but in any case a plant with the capacity of 50 MW or more is considered an LHP. As an example, for China, SHP power is below 25 MW, for India - below 15 MW, most of Europe - below 10 MW. The SHP and LHP categories are further subdivided into many subcategories that are not mutually exclusive. For example,
12656-586: Was allowed to provide irrigation and power to citizens (in addition to aluminium power) after the war. In Suriname , the Brokopondo Reservoir was constructed to provide electricity for the Alcoa aluminium industry. New Zealand 's Manapouri Power Station was constructed to supply electricity to the aluminium smelter at Tiwai Point . Since hydroelectric dams do not use fuel, power generation does not produce carbon dioxide . While carbon dioxide
12769-485: Was first discovered by Imperial Oil in 1971–1972. As of 2001, approximately 400,000 people lived in the Mackenzie River basin – representing only one percent of Canada's population. Ninety percent of the population lived in the Peace and Athabasca River basins, mostly in Alberta. The cold northern permafrost regions beyond the Arctic Circle are very sparsely populated, mainly by Indigenous peoples . Most of
#207792