Rohini is a series of sounding rockets developed by the Indian Space Research Organisation (ISRO) for meteorological and atmospheric study. These sounding rockets are capable of carrying payloads of 2 to 200 kilograms (4.4 to 440.9 lb) between altitudes of 100 to 500 kilometres (62 to 311 mi). The ISRO currently uses RH-200, RH-300,Mk-II, RH-560 Mk-II and RH-560 Mk-III rockets, which are launched from the Thumba Equatorial Rocket Launching Station (TERLS) in Thumba and the Satish Dhawan Space Centre in Sriharikota .
60-790: Satish Dhawan Space Centre – SDSC (formerly Sriharikota Range – SHAR ), is the primary spaceport of the Indian Space Research Organisation (ISRO), located in Sriharikota , Andhra Pradesh . The Centre currently has two functioning launch pads used for launching sounding rockets , polar satellites and geosynchronous satellites . India's Lunar exploration probes Chandrayaan-1 , Chandrayaan-2 , Chandrayaan-3 , Mars Orbiter Mission , solar research mission Aditya-L1 and space observatory XPoSat were also launched in SDSC. Originally called Sriharikota Range (SHAR),
120-614: A S band Doppler weather radar that contributes to India Meteorological Department radar network and serves as a stand-in for Doppler weather radar in Chennai. ISRO opened a viewing gallery at the Satish Dhawan Space Centre in March 2019. The gallery faces the two launchpads and can accommodate 5,000 people giving the general public the opportunity to witness rocket launches. The launch of PSLV-C45 on 1 April 2019
180-474: A Satellite Launch Vehicle , took place on 10 August 1979, but due to a failure in thrust vectoring of the rocket's second stage, the satellite's orbit decayed on 19 August 1979. SHAR was named as 'Satish Dhawan Space Centre SHAR' (SDSC), on 5 September 2002, in memory of Satish Dhawan, former chairman of the ISRO. The SHAR facility now consists of two launch pads, with the second built in 2005. The second launch pad
240-648: A 3,450 tonne, 76.5 m high Mobile Service Tower (MST) which provides the SP-3 payload clean room. The Solid Propellant Space Booster Plant (SPROB) processes large size propellant grains for the satellite launch vehicles. The Vehicle Assembly & Launching Facility (VALF), Solid Motor Preparation & Environmental Testing Facility (SMP&ETF) tests and qualifies different types of solid motor for launch vehicles. The control centre at SHAR houses computers and data processing, closed circuit television, real-time tracking systems and meteorological observation equipment. It
300-1010: A Node 3 spaceport on the Martian moon Phobos to enable refueling and resupply prior to Mars surface landings, missions beyond Mars, and return trips to Earth. In addition to propellant mining and refueling, the network of spaceports could provide services such as power storage and distribution, in-space assembly and repair of spacecraft, communications relay, shelter, construction and leasing of infrastructure, maintaining spacecraft positioned for future use, and logistics. Space launch facilities have been colonial developments and have also been impacting its surroundings by destroying or polluting their environment, creating precarious cleanup situations. Rohini sounding rocket series Various programs such as Equatorial ElectroJet (EEJ), Leonid Meteor Shower (LMS), Indian Middle Atmosphere Programme (IMAP), Monsoon Experiment (MONEX), Middle Atmosphere Dynamics (MIDAS), and Sooryagrahan-2010 have been conducted using
360-493: A driving factor in spaceport placement because most of the delta-v for a launch is spent on achieving the required horizontal orbital speed . The small gain from a few kilometers of extra altitude does not usually off-set the logistical costs of ground transport in mountainous terrain. Many spaceports have been placed at existing military installations, such as intercontinental ballistic missile ranges, which are not always physically ideal sites for launch. A rocket launch site
420-471: A table of spaceports and launch complexes for vertical launchers with documented achieved launches of humans to space (more than 100 km (62 mi) altitude). The sorting order is spaceport by spaceport according to the time of the first human launch. † Three of the Soyuz missions were uncrewed and are not counted ( Soyuz 2 , Soyuz 20 , Soyuz 34 ). ‡ STS-51-L ( Challenger ) failed to reach orbit and
480-566: Is a site for launching or receiving spacecraft , by analogy to a seaport for ships or an airport for aircraft. The word spaceport , and even more so cosmodrome , has traditionally been used for sites capable of launching spacecraft into orbit around Earth or on interplanetary trajectories. However, rocket launch sites for purely sub-orbital flights are sometimes called spaceports, as in recent years new and proposed sites for suborbital human flights have been frequently referred to or named "spaceports". Space stations and proposed future bases on
540-566: Is built as far as possible away from major population centers in order to mitigate risk to bystanders should a rocket experience a catastrophic failure. In many cases a launch site is built close to major bodies of water to ensure that no components are shed over populated areas. Typically a spaceport site is large enough that, should a vehicle explode, it will not endanger human lives or adjacent launch pads. Planned sites of spaceports for sub-orbital tourist spaceflight often make use of existing ground infrastructure, including runways. The nature of
600-739: Is currently used to launch the Polar Satellite Launch Vehicle , and formerly used by the Geosynchronous Satellite Launch Vehicle . It is one of two operational orbital launch pads at the site, the other being the Second Launch Pad , which opened in 2005. The first launch from this pad occurred on 20 September 1993, and was the maiden flight of the Polar Satellite Launch Vehicle carrying the IRS-1E satellite. The maiden flight of
660-429: Is linked to eight radars located at Sriharikota and the five stations of ISRO's Telemetry, Tracking & Command Network ( ISTRAC ). The propellant production plant produces composite solid propellant for rocket motors of ISRO using ammonium perchlorate (oxidiser), fine aluminium powder (fuel) and hydroxyl terminated polybutadiene (binder). The solid motors processed here include those for the first-stage booster motor of
SECTION 10
#1732786727107720-452: Is not counted. STS-107 ( Columbia ) reached orbit and is therefore included in the count (disaster struck on re-entry). Crewed Missions failed to reach Kármán line: Soyuz T-10a (1983) STS-51-L (1986) Soyuz MS-10 (2018) The following is a table of spaceports with a documented achieved launch to orbit. The table is sorted according to the time of the first launch that achieved satellite orbit insertion. The first column gives
780-527: Is on a National Highway 16 (India) that connects it to Chennai and Kolkata . Originally known as the Sriharikota Range (SHAR) and later named after Satish Dhawan . It is India's primary orbital launch site to this day. First flight-test of 'Rohini-125', a small sounding rocket which took place on 9 October 1971 was the first rocket launch from SHAR. Since then technical, logistic and administrative infrastructure have been enhanced. Together with
840-557: Is the major European spaceport, with satellite launches that benefit from the location 5 degrees north of the equator. In October 2003 the Jiuquan Satellite Launch Center achieved the first Chinese human spaceflight. Breaking with tradition, in June 2004 on a runway at Mojave Air and Space Port , California, a human was for the first time launched to space in a privately funded, suborbital spaceflight, that
900-749: The Augmented Satellite Launch Vehicle (ASLV). Initially it was built for launching SLV-3s but was later also used as an ASLV launch complex. The first launch from this pad occurred on 10 August 1979, and was that of the first experimental flight of SLV-3 carrying the Rohini Technology Payload satellite. The last flight was of ASLV on 4 May 1994 carrying SROSS-C2 . The First Launch Pad, located at 13°44′00″N 80°14′05″E / 13.7333°N 80.2347°E / 13.7333; 80.2347 ( First Launch Pad ) , began operation in 1993. It
960-454: The Earth's rotational speed (465 m/s at the equator). Such launches also provide a desirable orientation for arriving at a geostationary orbit . For polar orbits and Molniya orbits this does not apply. In principle, advantages of high altitude launch are reduced vertical distance to travel and a thinner atmosphere for the rocket to penetrate. However, altitude of the launch site is not
1020-840: The Moon , Mars , orbiting the Earth, at Sun-Earth and Earth-Moon Lagrange points , and at other locations in the Solar System . Human-tended outposts on the Moon or Mars, for example, will be spaceports by definition. The 2012 Space Studies Program of the International Space University studied the economic benefit of a network of spaceports throughout the solar system beginning from Earth and expanding outwardly in phases, within its team project Operations And Service Infrastructure for Space (OASIS). Its analysis claimed that
1080-493: The RH-300 Mk-II , has a maximum launch altitude of 116 kilometres (72 mi). It has ability to lift a payload up to 80 kilograms (20 kg of scientific payload) having volume measuring 380*500 mm in diameter. It is capable of reaching very high acceleration (20 G to M6). Numerous payloads can be tested in a single flight. This two stage vehicle is derived from French Stromboli engine technology. Another variant,
1140-527: The RH-560 Mk-II , can reach a maximum launch altitude of 548 kilometres (341 mi). The RH-560 Mk-III variant's maiden flight (the flight was successful) was 12 March 2021. It achieved an apogee of 511.73 kms against the pre-flight prediction of 476 kms. The payloads were Electron and Neutral Wind Probe (ENWi), Langmuir Probe (LP) and Tri Methyl Aluminium (TMA). On 23rd July 2024, ISRO successfully launched world's first air breathing rocket which
1200-580: The Small Satellite Launch Vehicle also occurred from this pad on 7 August 2022. The First Launch Pad is undergoing major expansion with PIF (PSLV Integration Facilities) project worth ₹ 475 crore (US$ 57 million). Once complete, the first launch pad is expected to cater to around 15 launches per year. The Second Launch Pad, located at 13°43′12″N 80°13′50″E / 13.7199°N 80.2305°E / 13.7199; 80.2305 ( Second Launch Pad ) ,
1260-614: The Astronauts during the Spaceflight. AgniKul Cosmos inaugurated first private launchpad and mission control centre in India at the Satish Dhawan Space Centre (SDSC) in Sriharikota , Andhra Pradesh on 28 November 2022. The launchpad and the mission control centre are 4 km apart from one another. At present, the launchpad can handle liquid stage launch vehicle. The pad has received the name Dhanush and referred as ALP-01. All
SECTION 20
#17327867271071320-406: The Moon are sometimes called spaceports, in particular if intended as a base for further journeys. The term rocket launch site is used for any facility from which rockets are launched. It may contain one or more launch pads or suitable sites to mount a transportable launch pad. It is typically surrounded by a large safety area, often called a rocket range or missile range . The range includes
1380-1222: The Polar Satellite Launch Vehicle (PSLV) — a five segmented motor of 2.8 m (9 ft 2 in) diameter and 22 m (72 ft) length, weighing 160 tonnes (160 long tons; 180 short tons) with a thrust level of 450 tonnes (440 long tons; 500 short tons). Rocket motors and their subsystems have to be rigorously tested and evaluated on ground before they are declared flight worthy. The facilities at SDSC are used for testing solid rocket motors, both at ambient conditions and simulated high altitude conditions. Besides these, there are facilities for conducting vibration, shock, constant acceleration and thermal/humidity tests. SDSC has infrastructure for launching satellites into low Earth orbit, polar orbit and geo-stationary transfer orbit. The launch complexes provide support for vehicle assembly, fueling, checkout and launch operations. The centre also has facilities for launching sounding rockets for atmospheric studies. The mobile service tower, launch pad, preparation facilities for different launch stages & spacecraft, storage, transfer and servicing facilities for liquid propellants, etc., are
1440-522: The RH-200. A polyvinyl chloride ( PVC )-based propellant had previously been employed with the RH-200 rocket. In September 2020, a new propellant based on hydroxyl-terminated polybutadiene ( HTPB ) was successfully used to launch it from the TERLS. The RH-300 is a single stage sounding rocket, derived from French Belier rocket engine technology. It has a launch altitude of 100 km (62 mi). A variant,
1500-508: The Rohini sounding rocket series. It has been the forerunners for ISRO's heavier and more complex launch vehicles, with continued usage even today for atmospheric and meteorological experiment and research. Currently, three versions are offered as operational sounding rockets , which cover a payload range of 8-100 Kg and an apogee range of 80-475 km. Several scientific missions with national and international participation have been conducted using
1560-547: The Rohini sounding rockets. On November 21, 1963, the American Nike-Apache was the first sounding rocket to launch from Thumba. Following that, two-stage rockets from France (Centaure) and Russia (M-100) were launched. In 1967, the Rohini RH-75, an ISRO variant, was launched. The Rohini Sounding Rocket (RSR) Programme was established in 1975 to encompass all sounding rocket operations. The rockets in
1620-509: The SLP for the Gaganyaan project. Systems such as a crew ingress and egress system, access platform, recovery setup for emergencies during the flight's ascent phase, module preparation facility for assembly and testing along with an helipad are built at a cost of about ₹2000 crore. All the facilities will be connected an upcoming Gaganyaan control facility, which will monitor and communicate with
1680-468: The SP-3 payload clean room. The solid propellant motors for the PSLV are processed by SHAR, which also carries out launch operations. The first launch of the PSLV took place on 20 September 1993. The first launch of India's Geosynchronous Satellite Launch Vehicle (GSLV) was successfully completed on 18 April 2001. GSLV, with its own cryogenic upper stage, has enabled the launch of communications satellites of
1740-569: The Solid Propellant Space Booster Plant (SPROB) are located at SHAR for casting and testing solid motors. The site also has a Telemetry, Tracking, Range Instrumentation, & Control centre for Range Operation (RO), Liquid Propellant Storage and Servicing Facilities (LSSF), the Management Service Group and Sriharikota Common Facilities. The PSLV launch complex was commissioned in 1990. It has
1800-530: The Vehicle Integration Building (VIB) and completed on the pad within the 40 m tall Mobile Service Structure. The first ASLV launch from SHAR took place in 1987 and resulted in a failure. Eventually, out the four ASLV launches from 1987 to 1994, only one was successful. The Polar Satellite Launch Vehicle launch complex was commissioned during 1990. It has a 3,450 tonne, 76.5 m high Mobile Service Tower (MST) which provides
1860-958: The area over which launched rockets are expected to fly, and within which some components of the rockets may land. Tracking stations are sometimes located in the range to assess the progress of the launches. Major spaceports often include more than one launch complex , which can be rocket launch sites adapted for different types of launch vehicles . (These sites can be well-separated for safety reasons.) For launch vehicles with liquid propellant, suitable storage facilities and, in some cases, production facilities are necessary. On-site processing facilities for solid propellants are also common. A spaceport may also include runways for takeoff and landing of aircraft to support spaceport operations, or to enable support of HTHL or horizontal takeoff and vertical landing (HTVL) winged launch vehicles. The first rockets to reach space were V-2 rockets launched from Peenemünde , Germany in 1944 during World War II . After
Satish Dhawan Space Centre - Misplaced Pages Continue
1920-470: The centre was renamed on 5 September 2002 as a tribute to ISRO's former chairman Satish Dhawan with retaining its original acronym and is referred as SDSC-SHAR . Sriharikota island was chosen in 1969 for a satellite launching station. It is located 80 km (50 mi) north of Chennai . The centre became operational on 9 October 1971 when an RH-125 sounding rocket was launched. The first attempted launch of an orbital satellite , Rohini 1A aboard
1980-454: The class up to 2 tonnes. The next variant of GSLV is GSLV Mk III with its own cryogenic high-thrust engine and stage capable of launching communications satellites of the 4-ton class. The SDSC has two operational orbital launch pads. SHAR is ISRO's satellite launching base and additionally provides launch facilities for the full range of Rohini sounding rockets . The Vehicle Assembly, Static Test and Evaluation Complex (VAST, previously STEX) and
2040-577: The complete SLV-3 rocket occurred in August 1979 but it was only partially successful following a malfunction in the second-stage guidance system. SHAR facilities worked satisfactorily during the SLV-3 preparation and launch. On 18 July 1980 the SLV-3 successfully launched India's third satellite. Out of the four SLV launches from SHAR, two were successful. The ASLV orbital launcher was integrated vertically, beginning with motor and subassembly preparations in
2100-519: The cosmodrome was initially held secret. Guesses to its location were misdirected by a name in common with a mining town 320 km away. The position became known in 1957 outside the Soviet Union only after U-2 planes had identified the site by following railway lines in the Kazakh SSR , although Soviet authorities did not confirm the location for decades. The Baikonur Cosmodrome achieved
2160-585: The critical systems performing functions at Agnikul launchpad (ALP) and the Agnikul mission control center (AMCC) have high degree of redundancy to ensure 100% operationality although none of these systems were tested so far. ISRO's range operations team will monitor key flight safety parameters during launches from ALP while AMCC can share critical data with ISRO's Mission Control Center. Both the facilities have support of ISRO and Indian National Space Promotion and Authorisation Centre (IN-SPACe). A Third Launch Pad
2220-675: The early human flights, were carried out at Cape Canaveral Space Force Station . For the Apollo programme, an adjacent spaceport, Kennedy Space Center , was constructed, and achieved the first crewed mission to the lunar surface ( Apollo 11 ) in July 1969. It was the base for all Space Shuttle launches and most of their runway landings. For details on the launch complexes of the two spaceports, see List of Cape Canaveral and Merritt Island launch sites . The Guiana Space Centre in Kourou, French Guiana,
2280-475: The east coast of Andhra Pradesh. Features like a good launch azimuth corridor for various missions, nearness to the equator (benefiting eastward launches), and large uninhabited area for a safety zone make it an ideal spaceport. SHAR covers a total area of about 145 km (56 sq mi) with a coastal length of 27 km (17 mi). Prior to its acquisition for ISRO by the Government of India , it
2340-602: The first launch of a human into space ( Yuri Gagarin ) in 1961. The launch complex used, Site 1, has reached a special symbolic significance and is commonly called Gagarin's Start . Baikonur was the primary Soviet cosmodrome, and is still frequently used by Russia under a lease arrangement with Kazakhstan. In response to the early Soviet successes, the United States built up a major spaceport complex at Cape Canaveral in Florida. A large number of uncrewed flights, as well as
2400-561: The first phase, placing the "Node 1" spaceport with space tug services in low Earth orbit (LEO), would be commercially profitable and reduce transportation costs to geosynchronous orbit by as much as 44% (depending on the launch vehicle). The second phase would add a Node 2 spaceport on the lunar surface to provide services including lunar ice mining and delivery of rocket propellants back to Node 1. This would enable lunar surface activities and further reduce transportation costs within and out from cislunar space . The third phase would add
2460-470: The frequency of orbital launches from SDSC-SHAR with a new larger assembly facility called Second Vehicle Assembly Building (SVAB) serving it. But due to lack of budgetary resources and delays in LVM3 being operational and subsequent conceptualization of next generation launch vehicles that Third Launch Pad was supposed to serve, the project has not been approved. Second Vehicle Assembly Building (SVAB) facility
Satish Dhawan Space Centre - Misplaced Pages Continue
2520-442: The geographical location. Operations from a different country are indicated in the fourth column. A launch is counted as one also in cases where the payload consists of multiple satellites. 4 Qaem 100 The following table shows spaceports with documented achieved launches of humans to at least 100 km altitude, starting from a horizontal runway. All the flights were sub-orbital . Spaceports have been proposed for locations on
2580-468: The launching of PSLV-C6 . MECON's sub-contractors for this project including Inox India, HEC, Tata Growth, Goderej Boyce, Simplex, Nagarjuna Construction, Steelage, etc. The other Launch Pad being the First Launch Pad . It is used by Polar Satellite Launch Vehicle , Geosynchronous Satellite Launch Vehicle , LVM3 and is intended for India's first crewed space mission . The first launch from
2640-399: The local view from 100 km (62 mi) altitude is also a factor to consider. The space tourism industry (see List of private spaceflight companies ) is being targeted by spaceports in numerous locations worldwide. e.g. Spaceport America , New Mexico. The establishment of spaceports for tourist trips raises legal issues, which are only beginning to be addressed. The following is
2700-508: The northerly Balasore Rocket Launching Station, the facilities are operated under the ISRO Range Complex (IREX) headquartered at SHAR. The range became operational when three Rohini 125 sounding rockets were launched on 9 and 10 October 1971. Previously, India used Thumba Equatorial Rocket Launching Station (TERLS), at Thiruvananthapuram , on the south-western coast of India, to launch sounding rockets. The first test launch of
2760-507: The pad occurred on 5 May 2005, and was of a Polar Satellite Launch Vehicle carrying the CARTOSAT-1 and HAMSAT satellites. India's 1st Moon Mission, Chandrayaan-1 was launched from this launch pad on 22 October 2008. Its follow-up missions were also launched from this launch pad, where Chandrayaan-2 was launched on 22 July 2019 and Chandrayaan-3 was launched on 14 July 2023. In November 2019, ISRO released tenders for augmentation of
2820-842: The principal parts of the PSLV/GSLV launch complex. For supporting the GSLV Mark III , additional facilities were set up at SDSC. A new plant (SPP) is set up to process heavier class boosters with 200 tonnes of Solid propellant. The static test complex is being augmented for qualifying the S-200 booster. Other new facilities include a Solid Stage Assembly Building, Satellite Preparation and Filling Facility and Hardware Storage buildings. The existing liquid propellant and cryogenic propellant storage and filling systems, Propellant Servicing Facilities will also be augmented. The range instrumentation system will be enhanced further. SDSC also has
2880-499: The proposal has been present in front of the space cabinet for final budget approval. It is proposed to have NGLV horizontally integrated, requiring a different set of changes as compared to the other launch pads.The new facility will also accommodate more liquid engine boosters , necessitating a redesigned jet deflector system.It is planned for the third launch pad to be used for entire-stage testing, streamlining test operations for ISRO. Spaceport A spaceport or cosmodrome
2940-407: The series are designated with the letters RH (for "Rohini"), followed by a number corresponding to the diameter (in millimetres) of the rocket. The RH-75, the first sounding rocket developed by India, It weighed 32 kilograms (71 lb), had a diameter of 75 millimetres (3.0 in) and flew 15 times between November 1967 and September 1968. The RH-100 was a single-stage solid-fuel rocket that
3000-535: The war, 70 complete V-2 rockets were brought to White Sands for test launches, with 47 of them reaching altitudes between 100 km and 213 km. The world's first spaceport for orbital and human launches, the Baikonur Cosmodrome in southern Kazakhstan , started as a Soviet military rocket range in 1955. It achieved the first orbital flight ( Sputnik 1 ) in October 1957. The exact location of
3060-411: Was a firewood plantation of Eucalyptus and Casuarina trees. This island is affected by both south-westerly and north-easterly monsoons, but heavy rains come only in October and November. Thus many clear days are available for out-door static tests and launchings. SHAR is linked to Sullurupeta by a road across Pulicat Lake . Sullurupeta has connectivity with other parts of India by Indian Railways and
SECTION 50
#17327867271073120-480: Was capable of carrying its payload up to an altitude of 55 km or more. When paired with a 650mm long by 40mm wide copper shaft dart used for meteorological research, it was referred to as a Menaka-I rocket. This rocket was launched on October 9, 1971, from Sriharikota. It was a single-stage rocket using a solid propellant , carrying a 7 kilograms (15 lb) payload to 19 kilometres (12 mi) in altitude. It flew twice between January 1970 and October 1971. It
3180-414: Was designed, supplied, erected and commissioned by MECON Limited , a Government of Indian Enterprise, located at Ranchi (Jharkhand, India) during the period March 1999 to December 2003. It cost about ₹ 400 crore (equivalent to ₹ 14 billion or US$ 160 million in 2023) at that time. The second launch pad with associated facilities was built in 2005 and became operational on 5 May with
3240-582: Was established in 2019 and currently serves Second Launch Pad. In 2018, after the announcement of the Gaganyaan project under the Indian Human Spaceflight Programme , it was thought a new launch pad might be needed. However, it was decided to augment the Second Launch Pad for crewed flights instead. Instead it would be developed for use by the upcoming NGLV rocket. On 8 October 2024, India Today reported that
3300-427: Was intended to pave the way for future commercial spaceflights. The spacecraft, SpaceShipOne , was launched by a carrier airplane taking off horizontally. At Cape Canaveral, SpaceX in 2015 made the first successful landing and recovery of a first stage used in a vertical satellite launch. Rockets can most easily reach satellite orbits if launched near the equator in an easterly direction, as this maximizes use of
3360-455: Was proposed in 2012 with estimated cost to be ₹ 500 crore (US$ 60 million). This launch pad is intended to be used for future Indian rockets as well as the older ones like PSLV, GSLV and LVM3. The launch pad will be used for the India's future human space missions . Main reasons behind establishing this launch pad were that it will provide redundancy to existing launch pads as well as increase
3420-434: Was successfully placed into Mars orbit on 24 September 2014. Initially under Indian Human Spaceflight Programme existing launch facilities will be augmented to meet the target of launching a crewed spacecraft called Gaganyaan . SDSC's current director is Arumugam Rajarajan. He took over from S. Pandian in July 2019. Satish Dhawan Space Centre (SDSC-SHAR) is located in Sriharikota , a spindle-shaped barrier island on
3480-543: Was the first launch that allowed spectators into the gallery. Download coordinates as: The SLV3 Launch Pad , located at 13°39′59″N 80°13′38″E / 13.6664°N 80.2272°E / 13.6664; 80.2272 ( SLV3 Launch Pad ) , began operation in 1979 and was decommissioned in 1994. It was used by two launch vehicles of the ISRO : the Satellite Launch Vehicle (SLV) and
3540-428: Was used for launches beginning in 2005 and is a universal launch pad, accommodating all of the launch vehicles used by ISRO . The two launch pads will allow multiple launches in a single year, which was not possible earlier. India's lunar orbiter Chandrayaan-1 launched from the centre at 6:22 AM IST on 22 October 2008. India's first Mars orbiter Mangalyaan was launched from the centre on 5 November 2013, which
3600-414: Was used in testing and perfecting various techniques like staging, destruct system, separation devices and clustering. It was also used as a booster to the weather forecasting rockets. As such it was named as Menaka II which worked along with Menaka I. The RH-200 is a two-stage rocket that can reach up to a maximum altitude of 80 kilometres (50 mi). Solid motors power the first and second stages of
#106893