102-652: Swindon Works was opened by the Great Western Railway in 1843 in Swindon , Wiltshire, England. It served as the principal west England maintenance centre until closed in 1986. In 1835, Parliament approved the construction of the Great Western Main Line between London and Bristol by the Great Western Railway (GWR). Its Chief Engineer was Isambard Kingdom Brunel . From 1836, Brunel had been buying locomotives from various makers for
204-475: A guard riding in the coach to uncouple it from the main train and bring it to a stop at the correct position. The first such " slip coach " was detached from the Flying Dutchman at Bridgwater in 1869. The company's first sleeping cars were operated between Paddington and Plymouth in 1877. Then on 1 October 1892 its first corridor train ran from Paddington to Birkenhead, and the following year saw
306-401: A bustling railway town . Built to the north of the main town centre, the works had need for locally accessible housing and services for the workers. The development of the railway village was on the lines of similar Victorian era socially-encompassing lifestyle concepts, such as that at Bournville , but architect/builder Rigby's were given license to create a commercially viable development by
408-407: A legal entity for nearly two more years, being formally wound up on 23 December 1949. GWR designs of locomotives and rolling stock continued to be built for a while and the region maintained its own distinctive character, even painting for a while its stations and express trains in a form of chocolate and cream. About 40 years after nationalisation British Rail was privatised and the old name
510-705: A legal requirement that the GWR, along with all other British railways, had to serve each station with trains which included third-class accommodation at a fare of not more than one penny per mile and a speed of at least 12 mph (19 km/h). By 1882, third-class carriages were attached to all trains except for the fastest expresses . Another parliamentary order meant that trains began to include smoking carriages from 1868. Special " excursion " cheap-day tickets were first issued in May 1849 and season tickets in 1851. Until 1869 most revenue came from second-class passengers but
612-604: A lodging house but became a Wesleyan chapel in 1867, the GWR Museum in 1962 and then The Platform (Swindon Music Service) in 2000. The Armoury, built in 1862, became the GWR Hospital in 1871 and the Central Community Centre in 1960. The GWR Park, adjacent to St Mark's Church, was acquired in 1844. The Octagonal Market started in 1892 and was demolished in 1977. A house and shop built in the 1840s became
714-528: A public house in the 1850s and is now the Glue Pot public house. The terraced two-storey cottages were built on two blocks of four parallel streets, not dissimilar in appearance to passing trains. Each road was named after the destinations of trains that passed nearby: Bristol, Bath, Taunton, London, Oxford and Reading among them. Built in the nearby open area, named Emlyn Square after GWR director Viscount Emlyn (later known as John Campbell, 1st Earl Cawdor ),
816-485: A result, from 1957 the works produced 38 "Warship" class D800s and 30 Western class D1000s . However, early diesel production followed previous steam locomotive construction strategy, resulting in numerous classes with short production runs and a resultant high maintenance cost in traffic. With the Beeching Axe strategy of reshaping BR towards inter-city traffic, the need for many of these diesel-powered classes
918-545: A role which later expanded to all scrap railwayana in light of the Beeching axe . However, it also brought about an end to steam locomotive production, with the works producing BR's last steam locomotive 92220 Evening Star , by which time the works only employed 5,000. Much of the original design and specification for the first Mark 2 carriages and bogies was carried out by the Engineering drawing office at Swindon in
1020-471: A series of amalgamations saw it also operate 4 ft 8 + 1 ⁄ 2 in ( 1,435 mm ) standard-gauge trains; the last broad-gauge services were operated in 1892. The GWR was the only company to keep its identity through the Railways Act 1921 , which amalgamated it with the remaining independent railways within its territory, and it was finally merged at the end of 1947 when it
1122-652: A task completed through to Exeter on 1 March 1876 by the GWR. The station here had been shared with the LSWR since 1862. This rival company had continued to push westwards over its Exeter and Crediton line and arrived in Plymouth later in 1876, which spurred the South Devon Railway to also amalgamate with the Great Western. The Cornwall Railway remained a nominally independent line until 1889, although
SECTION 10
#17327810178501224-558: Is Box Tunnel , the longest railway tunnel driven by that time. Several years later, the railway opened the even longer Severn Tunnel to carry a new line between England and Wales beneath the River Severn . Some other notable structures were added when smaller companies were amalgamated into the GWR. These include the South Devon Railway sea wall , the Cornwall Railway 's Royal Albert Bridge , and Barmouth Bridge on
1326-566: The 3 + 1 ⁄ 2 -mile (5.6 km) Clevedon branch line ; others were much longer such as the 23-mile (37 km) Minehead Branch . A few were promoted and built by the GWR to counter competition from other companies, such as the Reading to Basingstoke Line to keep the London and South Western Railway away from Newbury . However, many were built by local companies that then sold their railway to their larger neighbour; examples include
1428-619: The Cambrian Railways . In the early years the GWR was managed by two committees, one in Bristol and one in London. They soon combined as a single board of directors which met in offices at Paddington. The board was led by a chairman and supported by a secretary and other "officers". The first Locomotive Superintendent was Daniel Gooch , although from 1915 the title was changed to Chief Mechanical Engineer. The first Goods Manager
1530-596: The Channel Islands and France. The railway's headquarters were established at Paddington station. Its locomotives and rolling stock were built and maintained at Swindon Works but other workshops were acquired as it amalgamated with other railways, including the Shrewsbury companies' Stafford Road works at Wolverhampton, and the South Devon's workshops at Newton Abbot . Worcester Carriage Works
1632-493: The Class 14 diesel-hydraulic locomotives. Locomotive repairs and carriage and wagon work continued, though the original carriage and wagon workshop was sold. After the works became part of BR's integrated British Rail Engineering Ltd (BREL) , it won less and less maintenance business against the internal competition of Crewe and Derby Works . With the town of Swindon expanding and needing land close to its centre for development,
1734-581: The English Heritage Archive and the National Trust 's central office building, known as Heelis . A great many different activities were carried out within the works and most of the components used to make locomotives, carriages and wagons were made on site. The works were organised into a number of shops:- Great Western Railway The Great Western Railway ( GWR ) was a British railway company that linked London with
1836-481: The Flying Dutchman express train, which was the fastest express train in the world for several decades. In 1852, the daily service from London Paddington to Exeter (194 miles or 312 km) was achieved with an average speed of 53 mph (85 km/h), with the flatter section between London and Swindon covered at an average speed of 59 mph (95 km/h). From about 1865, the Iron Duke Class
1938-792: The Launceston and Brixham branches. Further variety came from the traffic carried: holidaymakers ( St Ives );. royalty ( Windsor ); or just goods traffic ( Carbis Wharf ). Brunel envisaged the GWR continuing across the Atlantic Ocean and built the SS ; Great Western to carry the railway's passengers from Bristol to New York . Most traffic for North America soon switched to the larger port of Liverpool (in other railways' territories) but some transatlantic passengers were landed at Plymouth and conveyed to London by special train. Great Western ships linked Great Britain with Ireland,
2040-513: The Marquess of Ailesbury , who owned the land, objected. The Marquess had previously objected to part of the Kennet and Avon Canal running through his estate (see Bruce Tunnel ). With the railway needing to run near to a canal at this point, and as it was cheaper to transport coal for trains along canals at this time, Swindon was the next logical choice for the works, 20 miles (32 km) north of
2142-602: The Midland Railway and it was converted to standard gauge in 1854, which brought mixed-gauge track to Temple Meads station – this had three rails to allow trains to run on either broad or standard gauge. The GWR extended into the West Midlands in competition with the Midland and the London and North Western Railway . Birmingham was reached through Oxford in 1852 and Wolverhampton in 1854. This
SECTION 20
#17327810178502244-614: The Midland and South Western Junction Railway , a line previously working closely with the Midland Railway but which now gave the GWR a second station at Swindon, along with a line that carried through-traffic from the North via Cheltenham and Andover to Southampton . The 1930s brought hard times but the company remained in fair financial health despite the Depression . The Development (Loans, Guarantees and Grants) Act 1929 allowed
2346-609: The Museum of the Great Western Railway , dedicated to the works and the GWR. The engineers' office is now the headquarters of English Heritage , with most of the remaining buildings redeveloped as part of the Designer Outlet Village . The rest of the site's extensive railway yard was redeveloped on a mixed-use basis, some for housing and some for commercial buildings including purpose-built storage for
2448-577: The River Avon , then climbing back up through Chippenham to the Box Tunnel before descending once more to regain the River Avon's valley which it followed to Bath and Bristol. Swindon was also the junction for a line that ran north-westwards to Gloucester then south-westwards on the far side of the River Severn to reach Cardiff , Swansea and west Wales. This route was later shortened by
2550-623: The " grouping ", under which smaller companies were amalgamated into four main companies in 1922 and 1923. The GWR built a war memorial at Paddington station, unveiled in 1922, in memory of its employees who were killed in the war. The new Great Western Railway had more routes in Wales, including 295 miles (475 km) of former Cambrian Railways lines and 124 miles (200 km) from the Taff Vale Railway . A few independent lines in its English area of operations were also added, notably
2652-459: The "gauge war" and led to the appointment by Parliament of a Gauge Commission , which reported in 1846 in favour of standard gauge so the 7-foot gauge was proscribed by law ( Railway Regulation (Gauge) Act 1846 ) except for the southwest of England and Wales where connected to the GWR network. Other railways in Britain were to use standard gauge. In 1846, the Bristol and Gloucester was bought by
2754-557: The 1-mile-1,452-yard (2.94 km) Box Tunnel , which was ready for trains on 30 June 1841, after which trains ran the 152 miles (245 km) from Paddington through to Bridgwater. In 1851, the GWR purchased the Kennet and Avon Canal , which was a competing carrier between London, Reading, Bath and Bristol. The GWR was closely involved with the C&GWUR and the B&ER and with several other broad-gauge railways. The South Devon Railway
2856-512: The GWR by Brunel's Chepstow Bridge in 1852. It was completed to Neyland in 1856, where a transatlantic port was established. There was initially no direct line from London to Wales as the tidal River Severn was too wide to cross. Trains instead had to follow a lengthy route via Gloucester, where the river was narrow enough to be crossed by a bridge. Work on the Severn Tunnel had begun in 1873, but unexpected underwater springs delayed
2958-459: The GWR held a large number of shares in the company. One final new broad-gauge route was opened on 1 June 1877, the St Ives branch in west Cornwall , although there was also a small extension at Sutton Harbour in Plymouth in 1879. Part of a mixed gauge point remains at Sutton Harbour, one of the few examples of broad gauge trackwork remaining in situ anywhere. Once the GWR was in control of
3060-559: The GWR needed a central repair works, so in 1840 Gooch identified a site at Swindon because it was at the junction with the Golden Valley line and also a "convenient division of the Great Western line for engine working". With Brunel's support, Gooch made his proposal to the GWR directors, who, on 25 February 1841, authorised the establishment of the works at Swindon. Construction started immediately and they became operational on 2 January 1843. There are several stories relating to how
3162-451: The GWR route being via Chippenham and a route initially started by the Wilts, Somerset and Weymouth Railway . Further west, the LSWR took over the broad-gauge Exeter and Crediton Railway and North Devon Railway , also the standard-gauge Bodmin and Wadebridge Railway . It was several years before these remote lines were connected with the parent LSWR system and any through traffic to them
Swindon Works - Misplaced Pages Continue
3264-417: The GWR to obtain money in return for stimulating employment and this was used to improve stations including London Paddington , Bristol Temple Meads and Cardiff General ; to improve facilities at depots and to lay additional tracks to reduce congestion. The road motor services were transferred to local bus companies in which the GWR took a share but instead, it participated in air services . A legacy of
3366-401: The GWR to reach Crewe . Operating agreements with other companies also allowed GWR trains to run to Manchester . South of the London to Bristol main line were routes from Didcot to Southampton via Newbury , and from Chippenham to Weymouth via Westbury . A network of cross-country routes linked these main lines, and there were also many and varied branch lines . Some were short, such as
3468-602: The GWR's most powerful and largest locomotive, the King class , was introduced to become the "flagship" of the GWR fleet. The Kings had been developed from the Castle Class which, along with the Halls , were the foundation of the GWR's reputation and image. This was the heyday of Swindon Works, when 14,000 people were employed and the main locomotive fabrication workshop, the A Shop was, at 11.25 acres (45,500 m), one of
3570-609: The GWR. The completed village provided to the town medical and educational facilities that had been sorely lacking, together with the large St Mark's Church and the Bakers Arms public house , all completed before 1850. The GWR Medical Fund Baths and Dispensary were built in 1891-92, becoming the NHS Health Centre & Milton Road Baths in 1947 and the Health Hydro in 1986. The Barracks were built in 1853-55 as
3672-653: The Isles (the last to be withdrawn) was initially preserved by the GWR at Swindon Works , but was scrapped in January 1906 owing to the pressure of space. The three conversions were withdrawn between September 1880 and October 1887, while the other locomotives to the later design were all withdrawn with the end of the GWR 7 ft 1 ⁄ 4 in ( 2,140 mm ) broad gauge in May 1892 (except Hirondelle , which had been withdrawn in December 1890). Many of
3774-493: The Midlands but which had been built as standard gauge after several battles, both political and physical. On 1 April 1869, the broad gauge was taken out of use between Oxford and Wolverhampton and from Reading to Basingstoke. In August, the line from Grange Court to Hereford was converted from broad to standard and the whole of the line from Swindon through Gloucester to South Wales was similarly treated in May 1872. In 1874,
3876-481: The broad gauge was that trains for some routes could be built slightly wider than was normal in Britain and these included the 1929-built " Super Saloons " used on the boat train services that conveyed transatlantic passengers to London in luxury. When the company celebrated its centenary during 1935, new "Centenary" carriages were built for the Cornish Riviera Express, which again made full use of
3978-461: The broad-gauge Bristol and Gloucester Railway had opened, but Gloucester was already served by the 4 ft 8 + 1 ⁄ 2 in ( 1,435 mm ) standard gauge lines of the Birmingham and Gloucester Railway . This resulted in a break-of-gauge that forced all passengers and goods to change trains if travelling between the south-west and the North. This was the beginning of
4080-445: The chief one for American trade. The increase in the size of ships and the gradual silting of the River Avon had made Liverpool an increasingly attractive port, and with a Liverpool to London rail line under construction in the 1830s Bristol's status was threatened. The answer for Bristol was, with the co-operation of London interests, to build a line of their own; a railway built to unprecedented standards of excellence to out-perform
4182-551: The company's previously circuitous routes. The principal new lines opened were: The generally conservative GWR made other improvements in the years before World War I such as restaurant cars, better conditions for third class passengers, steam heating of trains, and faster express services. These were largely at the initiative of T. I. Allen, the Superintendent of the Line and one of a group of talented senior managers who led
Swindon Works - Misplaced Pages Continue
4284-760: The company's workshops at Swindon , were painted a middle chrome green colour while, for most of its existence, it used a two-tone "chocolate and cream" livery for its passenger coaches. Goods wagons were painted red but this was later changed to mid-grey. Great Western trains included long-distance express services such as the Flying Dutchman , the Cornish Riviera Express and the Cheltenham Spa Express . It also operated many suburban and rural services, some operated by steam rail motors or autotrains . The company pioneered
4386-412: The country". In the 1960s, Swindon Borough Council applied to demolish much of the village, but poet and railway enthusiast John Betjeman led a successful campaign to preserve it. Today much of the village is a conservation area, and many structures within it are listed buildings. One of the last houses to be built, 34 Faringdon Road, originally 1 Faringdon Street, has been restored to the condition it
4488-419: The decision was made to close the works. The final day of operation was 26 March 1986. Between 2000 and 2006, the rolling chassis of GWR No. 7200 was restored in the former iron foundry (J Shop), making it the final Great Western steam locomotive to receive attention at the works. The redevelopment of the works took account of the listed building status of the original core infrastructure. One building houses
4590-568: The early 1960s. The B4 bogie used on this carriage provided more reliable high speed running than that under the previous generation Mark 1 carriage and heralded the higher running speeds brought in with the start of InterCity services and the West Coast Main Line electrification. The future of the works had been defined by the GWR's post-WW2 choice to develop its new diesel-powered experimental locomotives using diesel-hydraulic transmission systems rather than diesel-electric. As
4692-419: The first 4-6-2 "Pacific" entered service, the only tender engine of that type in Britain until 1922 . It was later rebuilt as a 4-6-0 . From 1914 the works turned to aiding the war effort, producing twelve howitzers by the end of the year. Charles Collett , Chief Mechanical Engineer from 1921 to 1941, greatly improved the works' boiler making and its facilities for working heavy gauge sheet metal. In 1927
4794-555: The first trains heated by steam that was passed through the train in a pipe from the locomotive. May 1896 saw the introduction of first-class restaurant cars and the service was extended to all classes in 1903. Sleeping cars for third-class passengers were available from 1928. GWR Iron Duke Class The Great Western Railway Iron Duke Class 4-2-2 was a class of 7 ft 1 ⁄ 4 in ( 2,140 mm ) broad gauge steam locomotives for express passenger train work. The prototype locomotive, Great Western ,
4896-411: The gradients from Swindon to Bristol were much more arduous than the relatively easy route between London and Swindon. Drawing water for the engines from the canals was also considered, and an agreement to this effect was completed in 1843. Gooch recorded at the time: I was called to report upon the best situation to build these works and, on full consideration, I reported in favour of Swindon, it being
4998-543: The junction with the Cheltenham branch and also a convenient division of the Great Western Line for the engine working. Mr. Brunel and I went to look at the ground, then only green fields, and he agreed with me as to its being the best place. Once the plan was set for the railway to come to Swindon, it was at first intended to bring it closely along the foot of Swindon Hill, so as to be as close as possible to
5100-429: The largest covered areas in the world. During World War II , Swindon was again involved with military hardware, producing various types of gun mountings. Loco wheel-turning lathes were also ideally suited for making turret rings for tanks . The works also built landing craft and parts for midget submarines. At the nationalisation of British Railways (BR) in 1948, the works were still producing 60 new locomotives in
5202-416: The line to Faringdon Road on 20 July 1840. Meanwhile, work had started at the Bristol end of the line, where the 11 + 1 ⁄ 2 -mile (19 km) section to Bath opened on 31 August 1840. On 17 December 1840, the line from London reached a temporary terminus at Wootton Bassett Road west of Swindon and 80.25 miles (129 km) from Paddington. The section from Wootton Bassett Road to Chippenham
SECTION 50
#17327810178505304-411: The line was not direct from London to Bristol. From Reading heading west, the line would curve in a northerly sweep back to Bath. Brunel surveyed the entire length of the route between London and Bristol himself, with the help of many, including his solicitor, Jeremiah Osborne of the Bristol law firm Osborne Clarke , who on one occasion rowed Brunel down the River Avon to survey the bank of the river for
5406-546: The lines being constructed to the North West of England . The company was founded at a meeting in Bristol on 21 January 1833. Isambard Kingdom Brunel , then aged 27, was appointed engineer on 7 March 1833. The name Great Western Railway was adopted on 19 August 1833, and the company and was incorporated by the Great Western Railway Act 1835 ( 5 & 6 Will. 4 . c. cvii) on 31 August 1835. This
5508-654: The masterpieces of railway design". Working westwards from Paddington, the line crosses the valley of the River Brent on Wharncliffe Viaduct and the River Thames on Maidenhead Railway Bridge , which at the time of construction was the largest span achieved by a brick arch bridge. The line then continues through Sonning Cutting before reaching Reading after which it crosses the Thames twice more, on Gatehampton and Moulsford bridges. Between Chippenham and Bath
5610-419: The mixed gauge was extended along the main line to Chippenham and the line from there to Weymouth was narrowed. The following year saw mixed gauge laid through the Box Tunnel, with the broad gauge now retained only for through services beyond Bristol and on a few branch lines. The Bristol and Exeter Railway amalgamated with the GWR on 1 January 1876. It had already made a start on mixing the gauge on its line,
5712-603: The nameplates can be seen at the National Railway Museum and at the Museum of the Great Western Railway , while the driving wheels from Lord of the Isles can also be seen at Swindon. The prototype for this class was named the Great Western and built in 1846. Named after the railway, it was designed to show how the 2-2-2 express engines could be improved; its 8-foot-diameter (2.438 m) driving wheels were one foot (305 mm) larger than those of
5814-402: The names of withdrawn locomotives of the original design, they were not rebuilt from them like the first three, but entirely new locomotives (though it is believed that Rover , Swallow and Balaklava may have included some parts from the earlier locomotives of those names). Apart from the three conversions, the original locomotives were withdrawn between December 1870 and June 1884. Lord of
5916-466: The network. The original Great Western Main Line linked London Paddington station with Temple Meads station in Bristol by way of Reading , Didcot , Swindon , Chippenham and Bath . This line was extended westwards through Exeter and Plymouth to reach Truro and Penzance , the most westerly railway station in England. Brunel and Gooch placed the GWR's main locomotive workshops close to
6018-408: The new railway. Brunel's general specifications gave the locomotive makers a free hand in design, although subject to certain constraints such as piston speed and axle load, resulting in a diverse range of locomotives of mixed quality. In 1837, Brunel recruited Daniel Gooch and gave him the job of rectifying the heavy repair burden of the GWR's mixed bag of purchased locomotives. It became clear that
6120-451: The north of England to the south coast (via the London and South Western Railway – LSWR) without transshipment . The line to Basingstoke had originally been built by the Berks and Hants Railway as a broad-gauge route in an attempt to keep the standard gauge of the LSWR out of Great Western territory but, in 1857, the GWR and LSWR opened a shared line to Weymouth on the south coast,
6222-492: The opening of a more direct east–west route through the Severn Tunnel . Another route ran northwards from Didcot to Oxford from where two different routes continued to Wolverhampton , one through Birmingham and the other through Worcester . Beyond Wolverhampton the line continued via Shrewsbury to Chester and (via a joint line with the LNWR ) onwards to Birkenhead and Warrington ; another route via Market Drayton enabled
SECTION 60
#17327810178506324-532: The original route. The line was laid in 1840, but the location of the works was still undecided. Tracks were laid at Didcot in 1839 (chosen as Lord Wantage did not want the railway passing close to Abingdon ) and for some time this seemed a more likely site. Gooch noted that the nearby Wilts & Berks Canal gave Swindon a direct connection with the Somerset Coalfield . He also realised that engines needed to be changed at Swindon or close by, as
6426-439: The outbreak of World War I in 1914, the GWR was taken into government control, as were most major railways in Britain. Many of its staff joined the armed forces and it was more difficult to build and maintain equipment than in peacetime. After the war, the government considered permanent nationalisation but decided instead on a compulsory amalgamation of the railways into four large groups. The GWR alone preserved its name through
6528-413: The passenger stock, resulting in 1878 of a separate carriage and wagon works being built on land north of the station. The first Royal Saloon was built in 1874 and converted to standard gauge in 1899. 1875 saw the opening of the boiler and tender making shops, eventually used to also produce parts for locomotives, and marine engines for the GWR's fleet of ships and barges. The first GWR through corridor train
6630-468: The railway came to pass through Swindon. A well-circulated myth states that Brunel and Gooch were surveying a vale north of Swindon Hill and Brunel either threw a stone or dropped a sandwich and declared that spot to be the centre of the works. However, Swindon's midway point between GWR terminals and the topography of land near the town were more likely factors. The GWR mainline was originally planned to cut through Savernake Forest near Marlborough , but
6732-640: The railway into the Edwardian era : Viscount Emlyn ( Earl Cawdor , Chairman from 1895 to 1905); Sir Joseph Wilkinson (general manager from 1896 to 1903), his successor, the former chief engineer Sir James Inglis; and George Jackson Churchward (the Chief Mechanical Engineer ). It was during this period that the GWR introduced road motor services as an alternative to building new lines in rural areas, and started using steam rail motors to bring cheaper operation to existing branch lines. At
6834-468: The railway: one illustrated with lithographs by John Cooke Bourne ; the other, a critique of Brunel's methods and the broad gauge. The first 22 + 1 ⁄ 2 miles (36 km) of line, from Paddington station in London to Maidenhead Bridge station , opened on 4 June 1838. When Maidenhead Railway Bridge was ready the line was extended to Twyford on 1 July 1839 and then through the deep Sonning Cutting to Reading on 30 March 1840. The cutting
6936-414: The route. George Thomas Clark played an important role as an engineer on the project, reputedly taking the management of two divisions of the route including bridges over the River Thames at Lower Basildon and Moulsford and of Paddington Station . Involvement in major earth-moving works seems to have fed Clark's interest in geology and archaeology and he, anonymously, authored two guidebooks on
7038-498: The same route in June 1879 and became known as The Zulu . A third West Country express was introduced in 1890, running to and from Penzance as The Cornishman . A new service, the Cornish Riviera Express ran between London and Penzance – non-stop to Plymouth – from 1 July 1904, although it ran only in the summer during 1904 and 1905 before becoming a permanent feature of the timetable in 1906. The Cheltenham Spa Express
7140-468: The southwest, west and West Midlands of England and most of Wales . It was founded in 1833, received its enabling act of Parliament on 31 August 1835 and ran its first trains in 1838 with the initial route completed between London and Bristol in 1841. It was engineered by Isambard Kingdom Brunel , who chose a broad gauge of 7 ft ( 2,134 mm )—later slightly widened to 7 ft 1 ⁄ 4 in ( 2,140 mm )—but, from 1854,
7242-492: The successful Fire Fly class . It broke its leading axle after a short while in service and was subsequently rebuilt as a 4-2-2, becoming part of the Iron Duke class. After withdrawal in 1884, the locomotive was stored at Swindon Works until 1906; during this time it was exhibited at Edinburgh in 1890, Chicago in 1893, and Earl's Court , (London) in 1897. When exhibited, it was claimed that between 1851 and July 1881 it
7344-454: The town without entailing the excessive engineering works of building on the hill. However, the Goddard family ( lords of the manor of Swindon) objected to having it near their property, so it was laid a couple of miles further north. With many of the early structures built and adorned by stone extracted from the construction of Box Tunnel , the first building – the locomotive repair shed –
7446-526: The turn of the century, the works were employing an estimated three-quarters of Swindon's entire workforce. George Churchward's tenure, first as Assistant Chief Superintendent in 1897, then Locomotive Superintendent in 1902, produced heavier locomotives, firstly the 4-4-0 City class , then the County class . Later in 1906, "North Star", originally 4-4-2 , was rebuilt as the first four-cylinder 4-6-0 . More four-cylindered 4-6-0 engines were built, and in 1908
7548-481: The use of larger, more economic goods wagons than were usual in Britain. It ran ferry services to Ireland and the Channel Islands , operated a network of road motor (bus) routes , was a part of the Railway Air Services , and owned ships , canals, docks and hotels. The Great Western Railway originated from the desire of Bristol merchants to maintain their city as the second port of the country and
7650-472: The village of Swindon and the locomotives of many trains were changed here in the early years. Up to this point the route had climbed very gradually westwards from London, but from here it changed into one with steeper gradients which, with the primitive locomotives available to Brunel, was better operated by types with smaller wheels better able to climb the hills. These gradients faced both directions, first dropping down through Wootton Bassett Junction to cross
7752-429: The volume of third-class passengers grew to the extent that second-class facilities were withdrawn in 1912. The Cheap Trains Act 1883 resulted in the provision of workmen's trains at special low fares at certain times of the day. The principal express services were often given nicknames by railwaymen but these names later appeared officially in timetables, on headboards carried on the locomotive, and on roofboards above
7854-429: The whole line from London to Penzance, it set about converting the remaining broad-gauge tracks. The last broad-gauge service left Paddington station on Friday, 20 May 1892; the following Monday, trains from Penzance were operated by standard-gauge locomotives. After 1892, with the burden of operating trains on two gauges removed, the company turned its attention to constructing new lines and upgrading old ones to shorten
7956-503: The wider loading gauge on that route. With the outbreak of World War II in 1939, the GWR returned to direct government control, and by the end of the war a Labour government was in power and again planning to nationalise the railways. After a couple of years trying to recover from the ravages of war, the GWR became the Western Region of British Railways on 1 January 1948. The Great Western Railway Company continued to exist as
8058-518: The windows of the carriages. For instance, the late-morning Flying Dutchman express between London and Exeter was named after the winning horse of the Derby and St Leger races in 1849. Although withdrawn at the end of 1867, the name was revived in 1869 – following a request from the Bristol and Exeter Railway – and the train ran through to Plymouth. An afternoon express was instigated on
8160-401: The work and prevented its opening until 1886. Brunel had devised a 7 ft ( 2,134 mm ) track gauge for his railways in 1835. He later added 1 ⁄ 4 inch (6.4 mm), probably to reduce friction of the wheel sets in curves. This became the 7 ft 1 ⁄ 4 in ( 2,140 mm ) broad gauge. Either gauge may be referred to as "Brunel's" gauge. In 1844,
8262-456: The work was concentrated at Swindon. Like most early railways, the GWR was built with gentle gradients and the minimum of curves, which meant that it was able to operate fast, lightweight 'single-wheelers', 2-2-2 and 4-2-2 . However, from 1849 Gooch also built 4-4-0 saddle tanks for the hillier routes in Devon . The Works transformed Swindon from a small 2,500-population market town into
8364-400: The works were employing over 2,000 men and were producing about one locomotive a week, with the first standard-gauge engine built in 1855. A rolling mill for manufacturing rails was installed in 1861, attracting workers from South Wales. Although some rolling stock was built at Wolverhampton (producing 800 standard-gauge locomotives up to 1908), Worcester and Saltney near Chester , most of
8466-448: The year, falling to 42 in 1954. From 1948 to 1956, the works made 452 steam engines to GWR designs, partly in parallel with producing 200 BR standard classes from 1951 until 1960. The decision in 1960 to move BR's main motive power from steam to diesel brought the works both new lines of employment and an end to an old one. The works became the southern UK's regional hub for the storage and scrapping of steam locomotives and rolling stock,
8568-702: Was nationalised and became the Western Region of British Railways . The GWR was called by some "God's Wonderful Railway" and by others the "Great Way Round" but it was famed as the "Holiday Line", taking many people to English and Bristol Channel resorts in the West Country as well as the far southwest of England such as Torquay in Devon, Minehead in Somerset , and Newquay and St Ives in Cornwall . The company's locomotives, many of which were built in
8670-475: Was appointed in 1850 and from 1857 this position was filled by James Grierson until 1863 when he became the first general manager. In 1864 the post of Superintendent of the Line was created to oversee the running of the trains. Early trains offered passengers a choice of first- or second-class carriages . In 1840 this choice was extended: passengers could be conveyed by the slow goods trains in what became third-class. The Railway Regulation Act 1844 made it
8772-462: Was built as a 2-2-2 locomotive in April 1846, but was soon converted to a 4-2-2 arrangement, with the leading wheels set rigidly within the sandwich framing , rather than in a separate bogie . The remainder of the class entered service between April 1847 and July The Iron Duke locomotives were fast for their time, and were recorded reaching 78.2 mph (125.9 km/h). They were used to haul
8874-438: Was built in 1891, with electric lighting introduced in 1900. In 1892, the GWR completed the process of converting their lines to standard gauge. 13 miles (21 km) of new broad gauge sidings were laid to accommodate the influx of rolling stock, so that by 21/22 May 1892 195 locomotives, 748 carriages and 3,400 wagons and vans were stored for conversion to the new gauge. Those that could not be converted were scrapped on site. By
8976-533: Was by far Brunel's largest contract to date. He made two controversial decisions. Firstly, he chose to use a broad gauge of 7 ft ( 2,134 mm ) to allow for the possibility of large wheels outside the bodies of the rolling stock which could give smoother running at high speeds. Secondly, he selected a route, north of the Marlborough Downs , which had no significant towns but which offered potential connections to Oxford and Gloucester . This meant
9078-477: Was completed in 1841 using contract labour, with the necessary machinery installed within it by 1842. Initially only employing 200 men, repairs began in 1843, with the first new locomotive, the "Premier", built in 1846 in under two weeks and renamed "Great Western". This was followed by six more, with the Iron Dukes , including The Lord of the Isles , considered the fastest broad-gauge engine of its day. By 1851,
9180-653: Was completed in 1849, extending the broad gauge to Plymouth , whence the Cornwall Railway took it over the Royal Albert Bridge and into Cornwall in 1859 and, in 1867, it reached Penzance over the West Cornwall Railway which originally had been laid in 1852 with the 4 ft 8 + 1 ⁄ 2 in ( 1,435 mm ) standard gauge or "narrow gauge" as it was known at the time. The South Wales Railway had opened between Chepstow and Swansea in 1850 and became connected to
9282-435: Was created by flattening land north of Worcester Shrub Hill Station , Reading Signal Works was established in buildings to the north of Reading railway station , and in later years a concrete manufacturing depot was established at Taunton where items ranging from track components to bridges were cast. More than 150 years after its creation, the original main line has been described by historian Steven Brindle as "one of
9384-560: Was handled by the GWR and its associated companies. By now the gauge war was lost and mixed gauge was brought to Paddington in 1861, allowing through passenger trains from London to Chester. The broad-gauge South Wales Railway amalgamated with the GWR in 1862, as did the West Midland Railway , which brought with it the Oxford, Worcester and Wolverhampton Railway , a line that had been conceived as another broad-gauge route to
9486-430: Was in around 1900 as a living museum. Gooch followed a policy of taking in-house any railway engineering discipline that could be enabled to scale. Hence in addition to locomotive building, from 1850 standardised goods wagons were produced, and in 1867 Swindon was made the central workshop for the construction of carriages and wagons. In 1864, when Joseph Armstrong took over, he took on the responsibility of improving
9588-619: Was in continual service and completed 789,300 miles on its original boiler. Lord of the Isles was a hereditary title of the Scottish nobility, given to the eldest son of the British monarch. A working replica of Iron Duke was constructed in 1985 using parts from two Hunslet Austerity tanks for the 'Great Western 150' celebrations. It is part of the National Railway Collection but is currently on long-term loan to
9690-547: Was known as the Alma Class . In May to July 1870, three locomotives ( Great Britain , Prometheus and Estaffete ) were extensively rebuilt with new frames and boilers, but retaining their original names. Following these, further locomotives were built to similar specifications, entering service between August 1871 and July 1888. These new locomotives are generally referred to as the Rover class . Although these locomotives took
9792-463: Was opened on 31 May 1841, as was Swindon Junction station where the Cheltenham and Great Western Union Railway (C&GWUR) to Cirencester connected. That was an independent line worked by the GWR, as was the Bristol and Exeter Railway (B&ER), the first section of which from Bristol to Bridgwater was opened on 14 June 1841. The GWR main line remained incomplete during the construction of
9894-458: Was removed. A decision was also made to specify all new classes of locomotive with diesel-electric transmission, making the works' specialist diesel-hydraulic knowledge redundant. As a result, with scrapping rolling stock keeping employment levels at the works high, a decision was made to cease building new locomotives at Swindon, and to reassign the works to become a heavy repair facility. Building of locomotives finished in 1965 with construction of
9996-778: Was revived by Great Western Trains , the train operating company providing passenger services on the old GWR routes to South Wales and the South West. This subsequently became First Great Western, as part of the FirstGroup , but in September 2015 changed its name to Great Western Railway in order to 'reinstate the ideals of our founder'. The operating infrastructure, however, was transferred to Railtrack and has since passed to Network Rail . These companies have continued to preserve appropriate parts of its stations and bridges so historic GWR structures can still be recognised around
10098-652: Was the Mechanics Institute , paid for via subscription by the workers. Designed and constructed by Edward Roberts, it was completed in 1855, contained the UK's first lending library and provided health services to workers; it was enlarged in 1892–93. Nye Bevan , mastermind of the National Health Service , later said "There was a complete health service in Swindon. All we had to do was expand it to
10200-650: Was the fastest train in the world when it was scheduled to cover the 77.25 miles (124.3 km) between Swindon and London at an average of 71.3 miles per hour (114.7 km/h). The train was nicknamed the 'Cheltenham Flyer' and featured in one of the GWR's 'Books for boys of all ages'. Other named trains included The Bristolian , running between London and Bristol from 1935, and the Torbay Express , which ran between London and Kingswear . Many of these fast expresses included special coaches that could be detached as they passed through stations without stopping,
10302-485: Was the furthest north that the broad gauge reached. In the same year the Shrewsbury and Birmingham Railway and the Shrewsbury and Chester Railway both amalgamated with the GWR, but these lines were standard gauge, and the GWR's own line north of Oxford had been built with mixed gauge. This mixed gauge was extended southwards from Oxford to Basingstoke at the end of 1856 and so allowed through goods traffic from
10404-552: Was the scene of a railway disaster two years later when a goods train ran into a landslip ; ten passengers who were travelling in open trucks were killed. This accident prompted Parliament to pass the Railway Regulation Act 1844 , requiring railway companies to provide better carriages for passengers. The next section, from Reading to Steventon crossed the Thames twice and opened for traffic on 1 June 1840. A 7 + 1 ⁄ 4 -mile (12 km) extension took
#849150