81-666: The Pleasant Street incline or Pleasant Street portal was the southern access point for the Tremont Street subway in Boston, Massachusetts , which became part of the Green Line after the incline was closed. The portal and the section of tunnel connecting it to Boylston served streetcars from 1897 to 1901, Main Line Elevated trains from 1901 to 1908, and streetcars again from 1908 to 1962. The Pleasant Street incline

162-534: A National Historic Landmark in recognition for its pioneering role in the development of the subway as a public transit system in the United States. The landmark designation encompasses the still-extant portions of the early tunnel, roughly from Court Street to Charles Street, and includes the original Classical Revival head houses of the Park and Boylston stations which are still in use. The original owner of

243-402: A (nearly) continuous conductor running along the track that usually takes one of two forms: an overhead line , suspended from poles or towers along the track or from structure or tunnel ceilings, or a third rail mounted at track level and contacted by a sliding " pickup shoe ". Both overhead wire and third-rail systems usually use the running rails as the return conductor, but some systems use

324-573: A higher total efficiency. Electricity for electric rail systems can also come from renewable energy , nuclear power , or other low-carbon sources, which do not emit pollution or emissions. Electric locomotives may easily be constructed with greater power output than most diesel locomotives. For passenger operation it is possible to provide enough power with diesel engines (see e.g. ' ICE TD ') but, at higher speeds, this proves costly and impractical. Therefore, almost all high speed trains are electric. The high power of electric locomotives also gives them

405-467: A historical concern for double-stack rail transport regarding clearances with overhead lines but it is no longer universally true as of 2022 , with both Indian Railways and China Railway regularly operating electric double-stack cargo trains under overhead lines. Railway electrification has constantly increased in the past decades, and as of 2022, electrified tracks account for nearly one-third of total tracks globally. Railway electrification

486-474: A number of European countries, India, Saudi Arabia, eastern Japan, countries that used to be part of the Soviet Union, on high-speed lines in much of Western Europe (including countries that still run conventional railways under DC but not in countries using 16.7   Hz, see above). Most systems like this operate at 25   kV, although 12.5   kV sections exist in the United States, and 20   kV

567-499: A possibility of future re-use (see above). The subway uses trolleys powered by electricity from overhead lines , which had been made possible by the invention of the trolley pole in 1880 by Frank J. Sprague , from his design for the Richmond Union Passenger Railway . The line has been pantograph -only since the trolley wires were modified in the 1990s. The Tremont Street subway was designated

648-457: A power grid that is delivered to a locomotive, and within the locomotive, transformed and rectified to a lower DC voltage in preparation for use by traction motors. These motors may either be DC motors which directly use the DC or they may be three-phase AC motors which require further conversion of the DC to variable frequency three-phase AC (using power electronics). Thus both systems are faced with

729-498: A relative lack of flexibility (since electric trains need third rails or overhead wires), and a vulnerability to power interruptions. Electro-diesel locomotives and electro-diesel multiple units mitigate these problems somewhat as they are capable of running on diesel power during an outage or on non-electrified routes. Different regions may use different supply voltages and frequencies, complicating through service and requiring greater complexity of locomotive power. There used to be

810-481: A separate fourth rail for this purpose. In comparison to the principal alternative, the diesel engine , electric railways offer substantially better energy efficiency , lower emissions , and lower operating costs. Electric locomotives are also usually quieter, more powerful, and more responsive and reliable than diesel. They have no local emissions, an important advantage in tunnels and urban areas. Some electric traction systems provide regenerative braking that turns

891-418: A third rail. The key advantage of the four-rail system is that neither running rail carries any current. This scheme was introduced because of the problems of return currents, intended to be carried by the earthed (grounded) running rail, flowing through the iron tunnel linings instead. This can cause electrolytic damage and even arcing if the tunnel segments are not electrically bonded together. The problem

SECTION 10

#1732771892073

972-411: Is derived by using resistors which ensures that stray earth currents are kept to manageable levels. Power-only rails can be mounted on strongly insulating ceramic chairs to minimise current leak, but this is not possible for running rails, which have to be seated on stronger metal chairs to carry the weight of trains. However, elastomeric rubber pads placed between the rails and chairs can now solve part of

1053-451: Is effected by one contact shoe each that slide on top of each one of the running rails . This and all other rubber-tyred metros that have a 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ) standard gauge track between the roll ways operate in the same manner. Railways and electrical utilities use AC as opposed to DC for the same reason: to use transformers , which require AC, to produce higher voltages. The higher

1134-526: Is electrified, companies often find that they need to continue use of diesel trains even if sections are electrified. The increasing demand for container traffic, which is more efficient when utilizing the double-stack car , also has network effect issues with existing electrifications due to insufficient clearance of overhead electrical lines for these trains, but electrification can be built or modified to have sufficient clearance, at additional cost. A problem specifically related to electrified lines are gaps in

1215-486: Is limited and losses are significantly higher. However, the higher voltages used in many AC electrification systems reduce transmission losses over longer distances, allowing for fewer substations or more powerful locomotives to be used. Also, the energy used to blow air to cool transformers, power electronics (including rectifiers), and other conversion hardware must be accounted for. Standard AC electrification systems use much higher voltages than standard DC systems. One of

1296-778: Is no longer exactly one-third of the grid frequency. This solved overheating problems with the rotary converters used to generate some of this power from the grid supply. In the US , the New York, New Haven, and Hartford Railroad , the Pennsylvania Railroad and the Philadelphia and Reading Railway adopted 11   kV 25   Hz single-phase AC. Parts of the original electrified network still operate at 25   Hz, with voltage boosted to 12   kV, while others were converted to 12.5 or 25   kV 60   Hz. In

1377-403: Is now abandoned, but plans have been floated at various times to reuse it. The incline opened on October 1, 1897, one month after the first section of the Tremont Street subway , allowing streetcar lines from Roxbury , Dorchester , and points south to operate via the subway. The new tunnel stretched from the outer tracks at Boylston south under Tremont Street , with a four-track portal in

1458-622: Is now covered by Elliot Norton Park at the intersection of Tremont Street, Shawmut Avenue, and Oak Street West. Reuse of part of the tunnel for the Silver Line Phase III was briefly considered, but the narrow bore was found too small for the Silver Line buses which (unlike trolleys) are not fixed to their guideway. Plans for the Phase III tunnel were shifted further west to new alignments, then canceled due to questions over

1539-673: Is splits into two forks. One fork connects to the Boylston Street subway , which turns westward under Boylston Street. The other fork continues south under Tremont Street to the Pleasant Street incline . This portal was used by streetcars that went southwest to Egleston via the South End, along Tremont Street ( route 43 ), or southeast to City Point in South Boston via Broadway ( route 9 ). Streetcar service through

1620-447: Is sufficient traffic, the reduced track and especially the lower engine maintenance and running costs exceed the costs of this maintenance significantly. Newly electrified lines often show a "sparks effect", whereby electrification in passenger rail systems leads to significant jumps in patronage / revenue. The reasons may include electric trains being seen as more modern and attractive to ride, faster, quieter and smoother service, and

1701-410: Is that the power-wasting resistors used in DC locomotives for speed control were not needed in an AC locomotive: multiple taps on the transformer can supply a range of voltages. Separate low-voltage transformer windings supply lighting and the motors driving auxiliary machinery. More recently, the development of very high power semiconductors has caused the classic DC motor to be largely replaced with

SECTION 20

#1732771892073

1782-894: Is the countrywide system. 3   kV DC is used in Belgium, Italy, Spain, Poland, Slovakia, Slovenia, South Africa, Chile, the northern portion of the Czech Republic, the former republics of the Soviet Union , and in the Netherlands on a few kilometers between Maastricht and Belgium. It was formerly used by the Milwaukee Road from Harlowton, Montana , to Seattle, across the Continental Divide and including extensive branch and loop lines in Montana, and by

1863-580: Is the development of powering trains and locomotives using electricity instead of diesel or steam power . The history of railway electrification dates back to the late 19th century when the first electric tramways were introduced in cities like Berlin , London , and New York City . In 1881, the first permanent railway electrification in the world was the Gross-Lichterfelde Tramway in Berlin , Germany. Overhead line electrification

1944-420: Is typically generated in large and relatively efficient generating stations , transmitted to the railway network and distributed to the trains. Some electric railways have their own dedicated generating stations and transmission lines , but most purchase power from an electric utility . The railway usually provides its own distribution lines, switches, and transformers . Power is supplied to moving trains with

2025-838: Is used on some narrow-gauge lines in Japan. On "French system" HSLs, the overhead line and a "sleeper" feeder line each carry 25   kV in relation to the rails, but in opposite phase so they are at 50   kV from each other; autotransformers equalize the tension at regular intervals. Various railway electrification systems in the late nineteenth and twentieth centuries utilised three-phase , rather than single-phase electric power delivery due to ease of design of both power supply and locomotives. These systems could either use standard network frequency and three power cables, or reduced frequency, which allowed for return-phase line to be third rail, rather than an additional overhead wire. The majority of modern electrification systems take AC energy from

2106-710: The City and South London Railway in 1890, and the Budapest Metro's Line 1 in 1896), opening on September 1, 1897. It was originally built, under the supervision of Howard A. Carson as chief engineer, to get streetcar lines off the traffic-clogged streets, instead of as a true rapid transit line. It now forms the central part of the Green Line , connecting Boylston Street to Park Street and Government Center stations. The tunnel originally served five closely spaced stations: Boylston , Park Street, Scollay Square , Adams Square , and Haymarket , with branches to

2187-500: The D branch was opened in 1959. The northern portal at Canal Street was replaced in 2004 when the subway was extended beneath North Station to a new portal next to Martha Road. The southern portal at Pleasant Street was abandoned in 1962 following the end of streetcar service through the South End . The portal has since been sealed up and covered by Elliot Norton Park, but the dead-ended tunnel to Boylston survives underground, for

2268-656: The Delaware, Lackawanna and Western Railroad (now New Jersey Transit , converted to 25   kV   AC) in the United States, and the Kolkata suburban railway (Bardhaman Main Line) in India, before it was converted to 25   kV 50   Hz. DC voltages between 600   V and 750   V are used by most tramways and trolleybus networks, as well as some metro systems as the traction motors accept this voltage without

2349-711: The HSL-Zuid and Betuwelijn , and 3,000   V south of Maastricht . In Portugal, it is used in the Cascais Line and in Denmark on the suburban S-train system (1650   V DC). In the United Kingdom, 1,500   V   DC was used in 1954 for the Woodhead trans-Pennine route (now closed); the system used regenerative braking , allowing for transfer of energy between climbing and descending trains on

2430-701: The Innovia ART system. While part of the SkyTrain network, the Canada Line does not use this system and instead uses more traditional motors attached to the wheels and third-rail electrification. A few lines of the Paris Métro in France operate on a four-rail power system. The trains move on rubber tyres which roll on a pair of narrow roll ways made of steel and, in some places, of concrete . Since

2511-657: The Public Garden portal and Pleasant Street incline south of Boylston. Park Street, Scollay Square, and Haymarket stations were altered over the next two decades as transfers were added to the Cambridge–Dorchester subway , East Boston Tunnel , and Main Line Elevated (now part of the Red , Blue , and Orange Lines , respectively). Boylston and Park Street were built with rectangular stone headhouses designed by Edmund M. Wheelwright that did not aesthetically match

Pleasant Street incline - Misplaced Pages Continue

2592-636: The Southern Railway serving Coulsdon North and Sutton railway station . The lines were electrified at 6.7   kV 25   Hz. It was announced in 1926 that all lines were to be converted to DC third rail and the last overhead-powered electric service ran in September 1929. AC power is used at 60   Hz in North America (excluding the aforementioned 25   Hz network), western Japan, South Korea and Taiwan; and at 50   Hz in

2673-461: The United States , the New York, New Haven and Hartford Railroad was one of the first major railways to be electrified. Railway electrification continued to expand throughout the 20th century, with technological improvements and the development of high-speed trains and commuters . Today, many countries have extensive electrified railway networks with 375 000  km of standard lines in

2754-522: The Common. Scollay Square and Adams Square had similar baroque headhouses with four-sided clock towers. Unlike the interior decor, the headhouses were sharply criticized as "resembling mausoleums" and "pretentiously monumental". Later stations on the East Boston Tunnel and Washington Street Tunnel incorporated this criticism into their more modest headhouses. In 1963, the northern part of

2835-717: The Netherlands, New Zealand ( Wellington ), Singapore (on the North East MRT line ), the United States ( Chicago area on the Metra Electric district and the South Shore Line interurban line and Link light rail in Seattle , Washington). In Slovakia, there are two narrow-gauge lines in the High Tatras (one a cog railway ). In the Netherlands it is used on the main system, alongside 25   kV on

2916-644: The Roxbury-Dorchester-Mattapan Transit Needs Study recommended the conversion to light rail and reuse of the tunnel as a long-term project, with the additional possibility of extending the line down Blue Hill Avenue to Mattapan along the # 28 route. Tremont Street subway The Tremont Street subway in Boston's MBTA subway system is the oldest subway tunnel in North America and the third-oldest still in use worldwide to exclusively use electric traction (after

2997-877: The Tremont Street subway was the private West End Street Railway , later the Boston Elevated Railway . Public ownership began in 1947 with the Metropolitan Transit Authority, now the Massachusetts Bay Transportation Authority . Electric traction Railway electrification is the use of electric power for the propulsion of rail transport . Electric railways use either electric locomotives (hauling passengers or freight in separate cars), electric multiple units ( passenger cars with their own motors) or both. Electricity

3078-745: The UK, the London, Brighton and South Coast Railway pioneered overhead electrification of its suburban lines in London, London Bridge to Victoria being opened to traffic on 1   December 1909. Victoria to Crystal Palace via Balham and West Norwood opened in May 1911. Peckham Rye to West Norwood opened in June 1912. Further extensions were not made owing to the First World War. Two lines opened in 1925 under

3159-494: The ability to pull freight at higher speed over gradients; in mixed traffic conditions this increases capacity when the time between trains can be decreased. The higher power of electric locomotives and an electrification can also be a cheaper alternative to a new and less steep railway if train weights are to be increased on a system. On the other hand, electrification may not be suitable for lines with low frequency of traffic, because lower running cost of trains may be outweighed by

3240-516: The advantages of raising the voltage is that, to transmit certain level of power, lower current is necessary ( P = V × I ). Lowering the current reduces the ohmic losses and allows for less bulky, lighter overhead line equipment and more spacing between traction substations, while maintaining power capacity of the system. On the other hand, the higher voltage requires larger isolation gaps, requiring some elements of infrastructure to be larger. The standard-frequency AC system may introduce imbalance to

3321-734: The demolition of the Washington Street Elevated southern section of the Orange Line. This proposed new streetcar service could go as far south as the Red Line's Mattapan station , with a northern turnaround terminus at Government Center , according to a 2012-dated proposal. The three original tunnel entrances were in the Boston Public Garden , at North Station/Canal Street , and at Pleasant Street. Over time, these portals were replaced and abandoned as

Pleasant Street incline - Misplaced Pages Continue

3402-410: The distance they could transmit power. However, in the early 20th century, alternating current (AC) power systems were developed, which allowed for more efficient power transmission over longer distances. In the 1920s and 1930s, many countries worldwide began to electrify their railways. In Europe, Switzerland , Sweden , France , and Italy were among the early adopters of railway electrification. In

3483-448: The electrification. Electric vehicles, especially locomotives, lose power when traversing gaps in the supply, such as phase change gaps in overhead systems, and gaps over points in third rail systems. These become a nuisance if the locomotive stops with its collector on a dead gap, in which case there is no power to restart. This is less of a problem in trains consisting of two or more multiple units coupled together, since in that case if

3564-404: The end of funding. Most electrification systems use overhead wires, but third rail is an option up to 1,500   V. Third rail systems almost exclusively use DC distribution. The use of AC is usually not feasible due to the dimensions of a third rail being physically very large compared with the skin depth that AC penetrates to 0.3 millimetres or 0.012 inches in a steel rail. This effect makes

3645-591: The experiment was curtailed. In 1970 the Ural Electromechanical Institute of Railway Engineers carried out calculations for railway electrification at 12 kV DC , showing that the equivalent loss levels for a 25 kV AC system could be achieved with DC voltage between 11 and 16   kV. In the 1980s and 1990s 12 kV DC was being tested on the October Railway near Leningrad (now Petersburg ). The experiments ended in 1995 due to

3726-500: The fact that electrification often goes hand in hand with a general infrastructure and rolling stock overhaul / replacement, which leads to better service quality (in a way that theoretically could also be achieved by doing similar upgrades yet without electrification). Whatever the causes of the sparks effect, it is well established for numerous routes that have electrified over decades. This also applies when bus routes with diesel buses are replaced by trolleybuses. The overhead wires make

3807-1012: The general power grid. This is especially useful in mountainous areas where heavily loaded trains must descend long grades. Central station electricity can often be generated with higher efficiency than a mobile engine/generator. While the efficiency of power plant generation and diesel locomotive generation are roughly the same in the nominal regime, diesel motors decrease in efficiency in non-nominal regimes at low power while if an electric power plant needs to generate less power it will shut down its least efficient generators, thereby increasing efficiency. The electric train can save energy (as compared to diesel) by regenerative braking and by not needing to consume energy by idling as diesel locomotives do when stopped or coasting. However, electric rolling stock may run cooling blowers when stopped or coasting, thus consuming energy. Large fossil fuel power stations operate at high efficiency, and can be used for district heating or to produce district cooling , leading to

3888-411: The high cost of the electrification infrastructure. Therefore, most long-distance lines in developing or sparsely populated countries are not electrified due to relatively low frequency of trains. Network effects are a large factor with electrification. When converting lines to electric, the connections with other lines must be considered. Some electrifications have subsequently been removed because of

3969-497: The losses (saving 2   GWh per year per 100   route-km; equalling about €150,000 p.a.). The line chosen is one of the lines, totalling 6000   km, that are in need of renewal. In the 1960s the Soviets experimented with boosting the overhead voltage from 3 to 6   kV. DC rolling stock was equipped with ignitron -based converters to lower the supply voltage to 3   kV. The converters turned out to be unreliable and

4050-422: The maximum power that can be transmitted, also can be responsible for electrochemical corrosion due to stray DC currents. Electric trains need not carry the weight of prime movers , transmission and fuel. This is partly offset by the weight of electrical equipment. Regenerative braking returns power to the electrification system so that it may be used elsewhere, by other trains on the same system or returned to

4131-402: The need for overhead wires between those stations. Maintenance costs of the lines may be increased by electrification, but many systems claim lower costs due to reduced wear-and-tear on the track from lighter rolling stock. There are some additional maintenance costs associated with the electrical equipment around the track, such as power sub-stations and the catenary wire itself, but, if there

SECTION 50

#1732771892073

4212-603: The new El, until late November 1909. After the Washington Street Tunnel opened on November 30, 1908, the elevated trains were rerouted through it, and the streetcars returned to the incline by their old routes, while the Pleasant Street station closed. On March 2, 1953, the City Point line was replaced by the 9 bus route. The tracks to Tremont Street, formerly connected to the west tracks of

4293-505: The phase separation between the electrified sections powered from different phases, whereas high voltage would make the transmission more efficient. UIC conducted a case study for the conversion of the Bordeaux-Hendaye railway line (France), currently electrified at 1.5   kV DC, to 9   kV DC and found that the conversion would allow to use less bulky overhead wires (saving €20 million per 100   route-km) and lower

4374-462: The portal stopped, as the Washington Street Elevated (later part of the Orange Line ) was connected to the two outermost tracks. El trains came out of the portal, stopped at a new Pleasant Street station with a center island platform in an open cut, passed under Pleasant Street, and then rose onto an elevated structure. Many surface streetcar lines were truncated to Dudley , the south end of

4455-409: The portal, were realigned to the east tracks, allowing a bus transfer station to be built where the west tracks had been. The Tremont Street line was bustituted as the 43 route on November 20, 1961, and a streetcar shuttle started between the portal and Boylston, with transfers to the subway. This shuttle was short-lived, ending with closure of the portal on April 6, 1962. The Pleasant Street portal

4536-508: The problem by insulating the running rails from the current return should there be a leakage through the running rails. The Expo and Millennium Line of the Vancouver SkyTrain use side-contact fourth-rail systems for their 650 V DC supply. Both are located to the side of the train, as the space between the running rails is occupied by an aluminum plate, as part of stator of the linear induction propulsion system used on

4617-549: The project's cost-effectiveness. The 2003 Program for Mass Transportation included the possibility of converting the Washington Street section of the Silver Line to Dudley Square to light rail (as had originally been promised) using the abandoned southern section of the subway to connect to the central subway at Boylston. However, the Phase III tunnel and continued bus service was recommended instead. In 2012,

4698-465: The resistance per unit length unacceptably high compared with the use of DC. Third rail is more compact than overhead wires and can be used in smaller-diameter tunnels, an important factor for subway systems. The London Underground in England is one of few networks that uses a four-rail system. The additional rail carries the electrical return that, on third-rail and overhead networks, is provided by

4779-570: The revenue obtained for freight and passenger traffic. Different systems are used for urban and intercity areas; some electric locomotives can switch to different supply voltages to allow flexibility in operation. Six of the most commonly used voltages have been selected for European and international standardisation. Some of these are independent of the contact system used, so that, for example, 750   V   DC may be used with either third rail or overhead lines. There are many other voltage systems used for railway electrification systems around

4860-498: The running rails. On the London Underground, a top-contact third rail is beside the track, energized at +420 V DC , and a top-contact fourth rail is located centrally between the running rails at −210 V DC , which combine to provide a traction voltage of 630 V DC . The same system was used for Milan 's earliest underground line, Milan Metro 's line 1 , whose more recent lines use an overhead catenary or

4941-467: The same task: converting and transporting high-voltage AC from the power grid to low-voltage DC in the locomotive. The difference between AC and DC electrification systems lies in where the AC is converted to DC: at the substation or on the train. Energy efficiency and infrastructure costs determine which of these is used on a network, although this is often fixed due to pre-existing electrification systems. Both

SECTION 60

#1732771892073

5022-475: The southern portal ended in 1962; for the last several months, service consisted of a shuttle between the portal and Boylston station. The tunnel still exists, dead-ended at the now-buried portal, which has been converted to a public park. However, there have been proposals for the disused tunnel to become part of a new streetcar line that would partly replace access to rapid transit for southern Metro Boston neighborhoods that lost rapid transit service in 1987 with

5103-569: The steep approaches to the tunnel. The system was also used for suburban electrification in East London and Manchester , now converted to 25   kV   AC. It is now only used for the Tyne and Wear Metro . In India, 1,500   V DC was the first electrification system launched in 1925 in Mumbai area. Between 2012 and 2016, the electrification was converted to 25   kV 50   Hz, which

5184-528: The subway was extended. Vestiges of various closed portals are still visible inside the main Green Line's Boylston Street subway tunnel extending west of Boylston station towards Kenmore Square station. The western Public Garden portal was replaced in 1914 with two portals, one in the middle of Boylston Street adjacent to the old portal, and the other at the west end of the Boylston Street subway , just east of Kenmore Square . The Boylston Street portal

5265-443: The supply grid, requiring careful planning and design (as at each substation power is drawn from two out of three phases). The low-frequency AC system may be powered by separate generation and distribution network or a network of converter substations, adding the expense, also low-frequency transformers, used both at the substations and on the rolling stock, are particularly bulky and heavy. The DC system, apart from being limited as to

5346-694: The three-phase induction motor fed by a variable frequency drive , a special inverter that varies both frequency and voltage to control motor speed. These drives can run equally well on DC or AC of any frequency, and many modern electric locomotives are designed to handle different supply voltages and frequencies to simplify cross-border operation. Five European countries – Germany, Austria, Switzerland, Norway and Sweden – have standardized on 15   kV 16 + 2 ⁄ 3   Hz (the 50   Hz mains frequency divided by three) single-phase AC. On 16 October 1995, Germany, Austria and Switzerland changed from 16 + 2 ⁄ 3   Hz to 16.7   Hz which

5427-575: The through traffic to non-electrified lines. If through traffic is to have any benefit, time-consuming engine switches must occur to make such connections or expensive dual mode engines must be used. This is mostly an issue for long-distance trips, but many lines come to be dominated by through traffic from long-haul freight trains (usually running coal, ore, or containers to or from ports). In theory, these trains could enjoy dramatic savings through electrification, but it can be too costly to extend electrification to isolated areas, and unless an entire network

5508-466: The train stops with one collector in a dead gap, another multiple unit can push or pull the disconnected unit until it can again draw power. The same applies to the kind of push-pull trains which have a locomotive at each end. Power gaps can be overcome in single-collector trains by on-board batteries or motor-flywheel-generator systems. In 2014, progress is being made in the use of large capacitors to power electric vehicles between stations, and so avoid

5589-713: The train's kinetic energy back into electricity and returns it to the supply system to be used by other trains or the general utility grid. While diesel locomotives burn petroleum products, electricity can be generated from diverse sources, including renewable energy . Historically, concerns of resource independence have played a role in the decision to electrify railway lines. The landlocked Swiss confederation which almost completely lacks oil or coal deposits but has plentiful hydropower electrified its network in part in reaction to supply issues during both World Wars. Disadvantages of electric traction include: high capital costs that may be uneconomic on lightly trafficked routes,

5670-413: The transmission and conversion of electric energy involve losses: ohmic losses in wires and power electronics, magnetic field losses in transformers and smoothing reactors (inductors). Power conversion for a DC system takes place mainly in a railway substation where large, heavy, and more efficient hardware can be used as compared to an AC system where conversion takes place aboard the locomotive where space

5751-484: The triangle bounded by Tremont Street, Pleasant Street (later part of Broadway), and Shawmut Avenue. The tunnel carried two tracks, splitting into four tracks at a flying junction near the portal, with the northbound (western) track going over the southbound (eastern) track. The two western tracks continued down Tremont Street, while the eastern tracks turned east on Pleasant Street via Broadway to City Point in South Boston . On June 10, 1901, streetcar service through

5832-411: The tunnel was extensively altered during the construction of Government Center and a new Boston City Hall on what had been the neighborhood of Scollay Square. The northbound tunnel to Haymarket station was rerouted to the west (the southbound tunnel is still original). Scollay Square station was rebuilt as Government Center station, and Adams Square station was closed. Much of the old northbound tunnel

5913-470: The tyres do not conduct the return current, the two guide bars provided outside the running ' roll ways ' become, in a sense, a third and fourth rail which each provide 750 V DC , so at least electrically it is a four-rail system. Each wheel set of a powered bogie carries one traction motor . A side sliding (side running) contact shoe picks up the current from the vertical face of each guide bar. The return of each traction motor, as well as each wagon ,

5994-432: The voltage, the lower the current for the same power (because power is current multiplied by voltage), and power loss is proportional to the current squared. The lower current reduces line loss, thus allowing higher power to be delivered. As alternating current is used with high voltages. Inside the locomotive, a transformer steps the voltage down for use by the traction motors and auxiliary loads. An early advantage of AC

6075-405: The weight of an on-board transformer. Increasing availability of high-voltage semiconductors may allow the use of higher and more efficient DC voltages that heretofore have only been practical with AC. The use of medium-voltage DC electrification (MVDC) would solve some of the issues associated with standard-frequency AC electrification systems, especially possible supply grid load imbalance and

6156-532: The world, and the list of railway electrification systems covers both standard voltage and non-standard voltage systems. The permissible range of voltages allowed for the standardised voltages is as stated in standards BS   EN   50163 and IEC   60850. These take into account the number of trains drawing current and their distance from the substation. 1,500   V DC is used in Japan, Indonesia, Hong Kong (parts), Ireland, Australia (parts), France (also using 25 kV 50 Hz AC ) ,

6237-534: The world, including China , India , Japan , France , Germany , and the United Kingdom . Electrification is seen as a more sustainable and environmentally friendly alternative to diesel or steam power and is an important part of many countries' transportation infrastructure. Electrification systems are classified by three main parameters: Selection of an electrification system is based on economics of energy supply, maintenance, and capital cost compared to

6318-437: Was exacerbated because the return current also had a tendency to flow through nearby iron pipes forming the water and gas mains. Some of these, particularly Victorian mains that predated London's underground railways, were not constructed to carry currents and had no adequate electrical bonding between pipe segments. The four-rail system solves the problem. Although the supply has an artificially created earth point, this connection

6399-487: Was filled in to support the City Hall foundation; another section was turned into a delivery tunnel. Another section was rediscovered by a City Hall employee in 1983; a 150-foot (46 m) piece was renovated for use as records storage. In 1971, the original Haymarket station was replaced with a new station just to the south. The subway in 1897 consisted of a main line under Tremont Street running to Park Street, where

6480-553: Was first applied successfully by Frank Sprague in Richmond, Virginia in 1887-1888, and led to the electrification of hundreds of additional street railway systems by the early 1890s. The first electrification of a mainline railway was the Baltimore and Ohio Railroad's Baltimore Belt Line in the United States in 1895–96. The early electrification of railways used direct current (DC) power systems, which were limited in terms of

6561-552: Was sealed in 1941 when the Huntington Avenue subway was opened (with a new portal at Northeastern University ). The portal at Kenmore Square was replaced in 1932 when the subway was extended west beyond the Square, to the existing portals on Commonwealth Avenue (the "B" branch ) and Beacon Street (the "C" branch ), although the top arch of the original portal survives as part of a ventilation shaft. The Fenway portal for