The Robotic Refueling Mission (RRM) is a NASA technology demonstration mission with equipment launches in both 2011 and 2013 to increase the technological maturity of in-space rocket propellant transfer technology by testing a wide variety of potential propellant transfer hardware, of both new and existing satellite designs.

#188811

68-626: The first phase of the mission was successfully completed in 2013. The second phase experiments continued in 2015. The third phase ~2018 suffered a cryocooler failure in 2019 and loss of methane. The Robotic Refueling Mission was developed by the Satellite Servicing Capabilities Office at the Goddard Space Flight Center (GSFC). It was planned to demonstrate the technology and tools to refuel satellites in orbit by robotic means. After

136-527: A NASA Inspector General report had this mission manifested for November 2016. The launch was then put on hold pending investigation of the pad explosion in September 2016 , with a tentative date no earlier than January 2017, subsequently set for 18 February. On 12 February 2017, SpaceX successfully completed a static fire test of the Falcon 9 engines on Pad 39A. An initial launch attempt on 18 February 2017

204-592: A broad range of scientific questions generally classified around four key areas: Earth sciences, astrophysics, heliophysics, and the Solar System. To simplify, Goddard studies Earth and Space. Within the Earth sciences area, Goddard plays a major role in research to advance our understanding of the Earth as an environmental system, looking at questions related to how the components of that environmental system have developed, how they interact and how they evolve. This

272-523: A console based workspace for various network elements to collaborate and provide the highest possible level of service to NASA and its customers. Some of the network elements included in the NSOCC support structure are Flight Dynamics Facility (FDF), Human Space Flight (HSF), Launch Vehicles (LV), and Robotics mission support leadership, Search and Rescue (SAR), and “Data Acquisition Processing and Handling Network Environment (DAPHNE+). The Goddard Visitor Center

340-720: A fuel nozzle into a refuelling port. In Oct 2020 the 2nd set of robotic tool operations for RRM3 was completed using the Dextre robot manipulators. Having completed its mission, RRM3 was transferred to ELC-3 in June 2022. On October 26, 2023, it was installed on an external mounting point on the Cygnus NG-19 cargo spacecraft for eventual disposal when Cygnus departed the ISS and reentered several months later. Goddard Space Flight Center The Goddard Space Flight Center ( GSFC )

408-642: A lead role for the project in its early days and managed the first 250 employees involved in the effort, who were stationed at Langley Research Center in Hampton, Virginia . However, the size and scope of Project Mercury soon prompted NASA to build a new Manned Spacecraft Center, now the Johnson Space Center , in Houston , Texas. Project Mercury's personnel and activities were transferred there in 1961. Goddard Space Flight Center remained involved in

476-630: A mission, and Goddard engineers and technicians can design and build the spacecraft for that mission. Goddard scientist John C. Mather shared the 2006 Nobel Prize in Physics for his work on COBE . GSFC also operates two spaceflight tracking and data acquisition networks (the Space Network and the Near Earth Network ), develops and maintains advanced space and Earth science data information systems, and develops satellite systems for

544-811: A range of partners. One of the instruments, the Lunar Orbiter Laser Altimeter (LOLA), was developed by Goddard. LOLA measures landing site slopes and lunar surface roughness in order to generate a 3-D map of the Moon. Another mission to be managed by Goddard is MAVEN . MAVEN is the second mission within the Mars Scout Program that is exploring the atmosphere of Mars in support of NASA's broader efforts to go to Mars. MAVEN carries eight instruments to measure characteristics of Mars' atmospheric gases, upper atmosphere, solar wind , and ionosphere . Instrument development partners include

612-537: A set of scientific questions to be answered, and a set of scientific requirements for the mission, which build on what has already been discovered by prior missions. Scientific requirements spell out the types data that will need to be collected. These scientific requirements are then transformed into mission concepts that start to specify the kind of spacecraft and scientific instruments need to be developed for these scientific questions to be answered. Within Goddard,

680-508: A stow position below the station where it stayed overnight, and was released at 09:11 UTC. Dragon performed three departure burns to move it away from the station before conducting a final de-orbit burn at around 14:00 UTC. The spacecraft splashed down in the Pacific Ocean at 14:46 UTC, about 320 km (200 mi) southwest from Long Beach, California . Dragon returned 1,652 kg (3,642 lb) of material from

748-508: A tetrahedral formation. Each of the four spacecraft carries identical instrument suites. MMS is part of a larger program (Solar Terrestrial Probes) that studies the impact of the Sun on the Solar System. In many cases, Goddard works with partners (US Government agencies, aerospace industry, university-based research centers, other countries) that are responsible for developing the scientific instruments. In other cases, Goddard develops one or more of

SECTION 10

#1732797640189

816-618: A train station with access to the Washington Metro system and the MARC commuter train's Camden line. The High Bay Cleanroom located in building 29 is the world's largest ISO 7 cleanroom with 1.3 million cubic feet (37,000 m ) of space. Vacuum chambers in adjacent buildings 10 and 7 can be chilled or heated to ±200 °C (392 °F). Adjacent building 15 houses the High Capacity Centrifuge which

884-631: A variety of space science disciplines. Goddard's most famous project is the Hubble Space Telescope , a unique science platform that has been breaking new ground in astronomy for nearly 20 years. Other missions such as the Wilkinson Microwave Anisotropy Probe (WMAP) study the structure and evolution of the universe. Other missions such as the Solar and Heliospheric Observatory (SOHO) are currently studying

952-433: Is a NASA department founded in 1992 as part of their Systems Reliability and Safety Office at Goddard Space Flight Center. Its purpose was "to become a center of excellence in software assurance, dedicated to making measurable improvement in both the quality and reliability of software developed for NASA at GSFC". The center has been the source of research papers on software metrics, assurance, and risk management. While NASA

1020-455: Is a major NASA space research laboratory located approximately 6.5 miles (10.5 km) northeast of Washington, D.C., in Greenbelt, Maryland , United States. Established on May 1, 1959, as NASA's first space flight center, GSFC employs about 10,000 civil servants and contractors. Named for American rocket propulsion pioneer Robert H. Goddard , it is one of ten major NASA field centers. GSFC

1088-654: Is all important to enable scientists to understand the practical impacts of natural and human activities during the coming decades and centuries. Within Space Sciences, Goddard has distinguished itself with the 2006 Nobel Physics Prize given to John Mather and the COBE mission. Beyond the COBE mission, Goddard studies how the universe formed, what it is made of, how its components interact, and how it evolves. The center also contributes to research seeking to understand how stars and planetary systems form and evolve and studies

1156-665: Is capable of generating 30   G on up to a 2.3-tonne (2.5-short-ton) load. Parsons Corporation assisted in the construction of the Class 10,000 cleanroom to support Hubble Space Telescope as well as other Goddard missions. The High Energy Astrophysics Science Archive Research Center (HEASARC) is NASA 's designated center for the archiving and dissemination of high energy astronomy data and information. Information on X-ray and gamma ray astronomy and related NASA mission archives are maintained for public information and science access. The Software Assurance Technology Center (SATC)

1224-501: Is one of the largest concentrations of the world's premier space scientists and engineers. The center is organized into 8 directorates, which includes Applied Engineering and Technology, Flight Projects, Science and Exploration, and Safety & Mission Assurance. Co-op students from universities in all 50 States can be found around the campus every season through the Cooperative Education Program. During

1292-479: Is open to the public Tuesdays through Sundays, free of charge, and features displays of spacecraft and technologies developed there. The Hubble Space Telescope is represented by models and deep space imagery from recent missions. The center also features a Science On a Sphere projection system. The center also features an Educator's Resource Center available for use by teachers and education volunteers such as Boy and Girl Scout leaders, and hosts special events during

1360-832: Is organized into several directorates , each charged with one of these key functions. On May 1, 1959, the center was renamed the Goddard Space Flight Center (GSFC) for Robert H. Goddard . Its first 157 employees transferred from the United States Navy 's Project Vanguard missile program, and continued their work at the Naval Research Laboratory in Washington, D.C., while the center was under construction. Goddard Space Flight Center contributed to Project Mercury , America's first human spaceflight program. The Center assumed

1428-821: Is partially within the former Goddard census-designated place ; it has a Greenbelt mailing address. GSFC is the largest combined organization of scientists and engineers in the United States dedicated to increasing knowledge of the Earth , the Solar System , and the Universe via observations from space. GSFC is a major US laboratory for developing and operating uncrewed scientific spacecraft. GSFC conducts scientific investigation, development, manufacturing and operation of space systems, and development of related technologies. Goddard scientists can develop and support

SECTION 20

#1732797640189

1496-654: Is the first in-space refueling demonstration using a platform of fuel valves and spacecraft plumbing representative of most existing satellites, which were not designed for refueling. Phase 2 of the RRM mission began in August 2013 with the launch of the phase 2 RRM hardware to the ISS aboard the Japanese H-II Transfer Vehicle 4 ( HTV-4 ) for test operations expected to be carried out in 2014. The Phase 2 hardware complement consists of: In February 2014

1564-679: The Cosmic Background Explorer , provided unique scientific data about the early universe. Goddard currently supports the operation of dozens of spacecraft collecting scientific data. These missions include Earth science projects like the Earth Observing System (EOS) that includes the Terra , Aqua , and Aura spacecraft flying alongside several projects from other Centers or other countries. Other major Earth science projects that are currently operating include

1632-547: The Harmony module taking place a few hours later at 13:12 UTC. This abort was later revealed in a NASA Inspector General audit to have resulted from incompatibilities between NASA's and SpaceX's software development processes. The CRS-10 mission ended on 19 March 2017. The Dragon spacecraft was detached from the International Space Station by Canadarm2 on 18 March 2017 at 21:20 UTC, moved to

1700-584: The James Webb Space Telescope , which was launched in 2022 and enables investigations across many fields of astronomy and cosmology, such as observation of the first stars and the formation of the first galaxies. The Goddard community continually works on numerous operations and projects that have launch dates ranging from the upcoming year to a decade down the road. These operations also vary in what scientists hope they will uncover. NASA's missions (and therefore Goddard's missions) address

1768-625: The National Aeronautics and Space Act of 1958 calls for "the establishment of long-range studies of the potential benefits to be gained from, the opportunities for, and the problems involved in the utilization of aeronautical and space activities for peaceful and scientific purposes." Because of this mandate, the Technology Utilization Program was established in 1962 which required technologies to be brought down to Earth and commercialized in order to help

1836-828: The National Oceanic and Atmospheric Administration (NOAA). GSFC manages operations for many NASA and international missions including the James Webb Space Telescope (JWST) and Hubble Space Telescope (HST), the Explorers Program , the Discovery Program , the Earth Observing System (EOS), INTEGRAL , MAVEN , OSIRIS-REx , the Solar and Heliospheric Observatory ( SOHO ), the Solar Dynamics Observatory ( SDO ), Tracking and Data Relay Satellite System (TDRS) , Fermi , and Swift . Past missions managed by GSFC include

1904-493: The Rossi X-ray Timing Explorer ( RXTE ), Compton Gamma Ray Observatory , SMM , COBE , IUE , and ROSAT . Founded as Beltsville Space Center, Goddard was NASA's first of four space centers . Its original charter was to perform five major functions on behalf of NASA: technology development and fabrication, planning, scientific research , technical operations, and project management. The center

1972-586: The Solar System . The center's contribution to the Earth Science Enterprise includes several spacecraft in the Earth Observing System fleet as well as EOSDIS , a science data collection, processing, and distribution system. For the crewed space flight program, Goddard develops tools for use by astronauts during extra-vehicular activity , and operates the Lunar Reconnaissance Orbiter , a spacecraft designed to study

2040-838: The Tropical Rainfall Measuring Mission (TRMM) and the Global Precipitation Measurement mission (GPM), missions that provide data critical to hurricane predictions. Many Goddard projects support other organizations, such as the US Geological Survey on Landsat-7 and -8, and the National Oceanic and Atmospheric Administration (NOAA) on the Geostationary Operational Environmental Satellite (GOES) system that provide weather predictions. Other Goddard missions support

2108-575: The University of Colorado at Boulder , and the University of California, Berkeley . Goddard contributed overall project management as well as two of the instruments, two magnetometers. Once a mission is launched and reaches its destination, its instruments start collecting data. The data is transmitted back to Earth where it needs to be analyzed and stored for future reference. Goddard manages large collections of scientific data resulting from past and ongoing missions. The Earth Science Division hosts

Robotic Refueling Mission - Misplaced Pages Continue

2176-600: The 135th and final flight mission of the American Space Shuttle program. The experiment suite included a number of propellant valves , nozzles and seals similar to those used on a wide variety of commercial and U.S. government satellites, plus a series of four prototype tools that could be attached to the distal end of the Dextre robotic arm . Each tool was a prototype of a device that could be used by future satellite servicing missions to refuel spacecraft in orbit. NASA successfully completed

2244-520: The CRS-10 mission from SpaceX and therefore determined the primary payload, date/time of launch, and orbital parameters for the Dragon space capsule . CRS-10 carried a total of 2,490 kg (5,490 lb) of cargo to the International Space Station, including 1,530 kg (3,373 lb) of pressurized cargo including packaging and 960 kg (2,116 lb) of unpressurized cargo. External payloads on

2312-595: The CRS-10 spacecraft are the SAGE III Earth observation experiment and its Nadir Viewing Platform (NVP), and the U.S. Department of Defense's Space Test Program Houston 5 (STP-H5) package including the Raven navigation investigation and the Lightning Imaging Sensor. Some science payloads include ACME, LMM Biophysics, ZBOT, and CIR/Cool Flames. The following is a breakdown of cargo bound for

2380-545: The Earth's resources since the launch of the first mission in 1972. TIROS-1 launched in 1960 as the first success in a long series of weather satellites . The Spartan platform deployed from the space shuttle, allowing simple, low-cost 2–3 day missions. The second of NASA's Great Observatories , the Compton Gamma Ray Observatory , operated for nine years before re-entering the Earth's atmosphere in 2000. Another of Goddard's space science observatories,

2448-504: The Goddard Earth Science Data and Information Services Center (GES DISC). It offers Earth science data, information, and services to research scientists, applications scientists, applications users, and students. The NASA Space Science Data Coordinated Archive (NSSDCA), created at Goddard in 1966, hosts a permanent archive of space science data, including a large collection of images from space. Section 102(d) of

2516-697: The Greenbelt site. These facilities are: GSFC is also responsible for the White Sands Complex , a set of two sites in Las Cruces, NM , but the site is owned by Johnson Space Center as part of the White Sands Test Facility . Goddard Space Flight Center has a workforce of over 3,000 civil servant employees, 60% of whom are engineers and scientists. There are approximately 7,000 supporting contractors on site every day. It

2584-462: The ISS, including research samples, science and crew equipment, and spacewalking hardware. Also removed from the station was 811 kg (1,788 lb) of external payload—including a MISSE module, the OPALS experiment, and Robotic Refueling Mission demonstration equipment—which was placed in Dragon's unpressurized trunk and disposed of when the trunk section burned up on re-entry. NASA contracted

2652-788: The ISS: SpaceX's CRS-10 launch was the "first operational use" of the Autonomous Flight Safety System (AFSS) on "either of Air Force Space Command 's Eastern or Western Ranges ." AFSS is replacing "the ground-based mission flight control personnel and equipment with on-board Positioning, Navigation and Timing sources and decision logic. The benefits of AFSS include increased public safety, reduced reliance on range infrastructure, reduced range spacelift cost, increased schedule predictability and availability, operational flexibility, and launch slot flexibility." The system consists of software developed by NASA,

2720-574: The Kibo airlock and picked up by the JEM Robotic Arm who handed it off to Dextre for installation on the main module. On April 30, 2015, The RRM On-Orbit Transfer Cage was installed on the main module and the Phase 1 hardware was removed and placed in the cage for disposal on HTV-4. The experiment was then activated that same day. Phase 2 experiments over some days were successful? February 2016

2788-1000: The MSFNOCC, the facility was renamed to the Network Control Center (NCC). It remained the NCC until 1997-1999 when the NIC was born. The NIC supported the beginning of the new age of growing space communications which included the International Space Station (ISS). The facility was later renovated from the floor up to become the Near Space Operations Control Center (NSOCC) in 2023. The NSOCC currently provides critical mission support for various launch efforts including SpaceX Crew & Cargo, Science missions such as JWST & PACE, and provides critical data services for Japan Aerospace Exploration Agency (JAXA) and European Space Agency (ESA). The NSOCC provides

Robotic Refueling Mission - Misplaced Pages Continue

2856-453: The Moon in preparation for future crewed exploration . A fact sheet highlighting many of Goddard's previous missions is recorded on a 40th anniversary webpage. Goddard has been involved in designing, building, and operating spacecraft since the days of Explorer 1 , the nation's first artificial satellite. The list of these missions reflects a diverse set of scientific objectives and goals. The Landsat series of spacecraft has been studying

2924-474: The Phase 2 experiment was deactivated and all fuel and cooling lines were turned off in preparation for disposal of the RRM payload and its fuel on SpaceX Dragon CRS-10. On February 23, 2017, The main module of the RRM experiment and the Phase 2 hardware were removed and stored in the trunk of SpaceX CRS-10 for disposal and the STP H5 experiment with Raven was activated beginning Phase 3. Phase 3 testing needed

2992-554: The Sciences and Exploration Directorate (SED) leads the center's scientific endeavors, including the development of technology related to scientific pursuits. Some of the most important technological advances developed by Goddard (and NASA in general) come from the need to innovate with new scientific instruments in order to be able to observe or measure phenomena in space that have never been measured or observed before. Instrument names tend to be known by their initials. In some cases,

3060-480: The Sun and how its behavior affects life on the Earth. The Lunar Reconnaissance Orbiter (LRO) is mapping out the composition and topography of the Moon and the Solar Dynamics Observatory (SDO) is tracking the Sun's energy and influence on the Earth. The OSIRIS-REx asteroid sample return mission returned a sample from asteroid 101955 Bennu in 2023 and under the name OSIRIS-APEX is headed to asteroid 99942 Apophis in 2029. Particularly noteworthy operations include

3128-783: The US economy and improve the quality of life. Documentation of these technologies that were spun off started in 1976 with "Spinoff 1976". Since then, NASA has produced a yearly publication of these spinoff technologies through the Innovative Partnerships Program Office. Goddard Space Flight Center has made significant contributions to the US economy and quality of life with the technologies it has spun off. Here are some examples: Weather balloon technology has helped firefighters with its short-range radios; aluminized Mylar in satellites has made sports equipment more insulated; laser optics systems have transformed

3196-478: The camera industry and life detection missions on other planets help scientists find bacteria in contaminated food. Goddard's partly wooded campus is 6.5 miles (10.5 km) northeast of Washington, D.C., in Prince George's County . The center is on Greenbelt Road, which is Maryland Route 193 . Baltimore, Annapolis, and NASA Headquarters in Washington are 30–45 minutes away by highway. Greenbelt also has

3264-679: The crewed space flight program, providing computer support and radar tracking of flights through a worldwide network of ground stations called the Spacecraft Tracking and Data Acquisition Network (STDN). However, the Center focused primarily on designing uncrewed satellites and spacecraft for scientific research missions. Goddard pioneered several fields of spacecraft development, including modular spacecraft design, which reduced costs and made it possible to repair satellites in orbit. Goddard's Solar Max satellite, launched in 1980,

3332-522: The delivery of Raven (autonomous space navigation demonstration) on CRS-10 . The new Phase 3 module was delivered to the station on December 8, 2018, on SpaceX CRS-16 and installed on the ELC 1 on December 19, 2018. Zero boil off storage of cryogens (methane) was demonstrated for 4 months, but following a cryocooler failure the methane was vented in April 2019. Remaining tests were deferred; these include plugging

3400-516: The engineers to develop these instruments. Typically, a mission consists of a spacecraft with an instrument suite (multiple instruments) on board. In some cases, the scientific requirements dictate the need for multiple spacecraft. For example, the Magnetospheric Multiscale Mission (MMS) studies magnetic reconnection, a 3-D process. In order to capture data about this complex 3-D process, a set of four spacecraft fly in

3468-539: The final preparations for space flight. Once up on the International Space Station, RRM was planned to be installed into the ELC-4. The Dextre robot was planned to be used in 2012 and 2013 during the refueling demonstration experiments. The RRM phase 1 experiment platform was launched to the International Space Station (ISS) on 8 July 2011, transported by Space Shuttle Atlantis on STS-135 ,

SECTION 50

#1732797640189

3536-488: The first daytime landing of a Falcon rocket on land. The Dragon spacecraft rendezvoused with the International Space Station on 22 February, but its approach was automatically aborted by an on-board computer at 08:25 UTC when a data error was reported in its navigation system. This is the first rendezvous abort by a Dragon spacecraft. The problem was traced to an incorrect data value in the spacecraft's Global Positioning System , critical to operations as this data informs

3604-415: The first launch from the complex since STS-135 on 8 July 2011, the last flight of the Space Shuttle program , and the first uncrewed mission from the site since the launch of the Skylab space station on 14 May 1973; this complex is also where the Apollo missions were launched. Following the successful launch, the first stage proceeded through a three-burn flyback and landed safely in Landing Zone 1 ,

3672-500: The general public, but attendees must sign up in advance to procure a visitors pass for access to the center's main grounds. Passes can be obtained at the security office main gate on Greenbelt Road. Goddard also hosts several different internship opportunities, including NASA DEVELOP at Goddard Space Flight Center. Queen Elizabeth II of the United Kingdom and her husband Prince Philip, Duke of Edinburgh visited Goddard Space Flight Center on Tuesday, May 8, 2007. The tour of Goddard

3740-411: The ground-based 'Remote Robotic Oxidizer Transfer Test' (RROxiTT) transferred nitrogen tetroxide (NTO) via a standard satellite-fueling valve at the satellite fuelling facility, Kennedy Space Center (KSC), using a robot controlled remotely from the Goddard Space Flight Centre , 800 miles (1,300 km) away in Greenbelt, Maryland . On March 26, 2015, The RRM On-orbit Transfer Cage was loaded into

3808-470: The instruments. The individual instruments are then integrated into an instrument suite which is then integrated with the spacecraft. In the case of MMS, for example, Southwest Research Institute (SwRI) was responsible for developing the scientific instruments and Goddard provides overall project management, mission systems engineering, the spacecraft, and mission operations. On the Lunar Reconnaissance Orbiter (LRO), six instruments have been developed by

3876-460: The mission's name gives an indication of the type of instrument involved. For example, the James Webb Space Telescope is, as its name indicates, a telescope, but it includes a suite of four distinct scientific instruments: Mid-Infrared Instrument (MIRI); Near-Infrared Camera (NIRCam); Near-Infrared Spectrograph (NIRSpec); Fine Guidance Sensor and Near Infrared Imager and Slitless Spectrograph (FGS-NIRISS). Scientists at Goddard work closely with

3944-465: The nature of the Sun's interaction with its surroundings. Based on existing knowledge accumulated through previous missions, new science questions are articulated. Missions are developed in the same way an experiment would be developed using the scientific method. In this context, Goddard does not work as an independent entity but rather as one of the 10 NASA centers working together to find answers to these scientific questions. Each mission starts with

4012-419: The phase 1 demonstration mission in January 2013, performing a series of robotic refuelings of satellite hardware that had not been designed for refueling . An extensive series of robotically actuated propellant transfer experiments on the exposed facility platform of the International Space Station (ISS) were completed by the RRM equipment suite and the Canadarm / Dextre robotic arm combination. RRM

4080-410: The proof of concept, the long-term goal of NASA is to transfer the technology to the commercial sector. RRM was designed with four tools, each with electronics and two cameras and lights. Additionally, it had pumps and controllers and electrical systems such as electrical valves and sensors. The RRM payload was transported to the Kennedy Space Center in early March 2011, where the GSFC team performed

4148-680: The summers, programs such as the Summer Institute in Engineering and Computer Applications (SIECA) and Excellence through Challenging Exploration and Leadership (EXCEL) provide internship opportunities to students from the US and territories such as Puerto Rico to learn and partake in challenging scientific and engineering work. The Goddard Space Flight Center maintains ties with local area communities through external volunteer and educational programs. Employees are encouraged to take part in mentoring programs and take on speaking roles at area schools. On Center, Goddard hosts regular colloquiums in engineering, leadership and science. These events are open to

SECTION 60

#1732797640189

4216-400: The vehicle of its relative position to the space station. The abort resulted in a 24-hour hold on its approach. The error was corrected in this time, during which the spacecraft entered a "racetrack" trajectory around the station to reset its approach. An error-free second attempt resulted in Dragon being captured by the station's Canadarm2 on 23 February at 10:44 UTC, with berthing to

4284-419: The year. As an example, in September 2008 the Center opened its gates for Goddard LaunchFest. The event, free to the public, included; robot competitions, tours of Goddard facilities hosted by NASA employees, and live entertainment on the Goddard grounds. GSFC also has a large ballroom for guest events such as lectures, presentations and dinner parties. GSFC operates three facilities that are not located at

4352-403: Was contracted by NASA as part of its Commercial Resupply Services program and was launched by SpaceX aboard the 30th flight of the Falcon 9 rocket. The mission ended on 19 March 2017 when the Dragon spacecraft left the ISS and safely returned to Earth. CRS-10 is part of the original order of twelve missions awarded to SpaceX under the Commercial Resupply Services contract. In June 2016,

4420-438: Was in the midst of the Gemini mission era there was a need for a new kind of operations hub and the Manned Space Flight Network Control Center (MSFNOCC) was created in building 13. The name has changed over the years and as such, the capability has grown; the facility has been the GSFC hub for human space flight and launch vehicle missions for years and has the distinct honor of having supported every single Shuttle mission. After

4488-477: Was near the end of the Queen's visit to commemorate the 400th anniversary of the founding of Jamestown in Virginia. The Queen spoke with crew aboard the International Space Station from the Network Integration Center (NIC, now NSOCC) located in Building 13. SpaceX CRS-10 SpaceX CRS-10 , also known as SpX-10 , was a Dragon Commercial Resupply Service mission to the International Space Station (ISS) which launched on 19 February 2017. The mission

4556-478: Was repaired by astronauts on the Space Shuttle Challenger in 1984. The Hubble Space Telescope, launched in 1990, remains in service and continues to grow in capability thanks to its modular design and multiple servicing missions by the Space Shuttle. Today, the center remains involved in each of NASA's key programs. Goddard has developed more instruments for planetary exploration than any other organization, among them scientific instruments sent to every planet in

4624-499: Was scrubbed 13 seconds before its 15:01:32 UTC launch due to a thrust vector control system issue in the rocket's second stage, resulting in a 24-hour hold for launch no earlier than 19 February at 14:39 UTC. The faulty actuator was repaired at the launch pad overnight, and the rocket was returned to vertical approximately six hours before the scheduled launch time. CRS-10 was launched from Kennedy Space Center Launch Complex 39 Pad A on 19 February 2017 at 14:39 UTC,