Misplaced Pages

Redfest

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#276723

83-450: Redfest was an annual music festival at Robins Cook Farm, Kings Mill Lane, Nutfield , Redhill, Surrey , England. It was established in 2007 as a small (5,000 capacity) independent music festival geared toward youth, with over 70 per cent of its initial attenders expected to be under 17, and promised to be safer than its competitors such as GuilFest and Reading . The 2014 event took place over three days, from 24 to 26 July 2012. It featured

166-461: A detailed account of the construction in his book, Practical Tunnelling , published in 1844. The Redhill–Tonbridge line was the first section of the SER to open on 26 May 1842. Five stations opened with the line: Redhill (then called "Reigate"), Godstone, Edenbridge, Penshurst and Tonbridge (then spelled "Tunbridge"). The initial service was four trains per day in each direction, increased to six once

249-631: A main stage, the Total Uprawr Stage, the Introducing Stage and two dance tents. The headliners on the main stage are Peace and Skindred . Other artists who are performing include The Blackout , Lewis Watson , Krept and Konan , Lulu James , The Skints , Lost Alone amongst many others. Nutfield, Surrey Nutfield is a village and civil parish in the Tandridge District of Surrey , England. It lies in

332-511: A main stage, the Total Uprawr Stage, the Introducing Stage and two dance tents. The headliners on the main stage were Peace and Skindred . The first Redfest was held as a one-day event on 21 July with a line-up including The Ordinary Boys , Laura Marling , Newton Faulkner , Blood Red Shoes , The Silversun Pickups and Nizlopi . The 2008 festival was scheduled for 4–5 July with a line-up including Patrick Wolf , The Maccabees , Crystal Castles , Los Campesinos! and Johnny Foreigner , but

415-754: A new chord at Cuxton , linking the Medway Valley line and North Kent Main Line , could also be used to improve connectivity been the airport and the Medway Towns . Finally, the study noted the importance of the Redhill–Tonbridge line to local school and college students travelling between Edenbridge and Tonbridge. The Surrey Rail Strategy, published in March 2021 under the title "A new rail strategy for Surrey", expressed support for extending services on

498-484: A new maintenance facility for its Class 66 , Class 69 and Class 73 locomotives at the site. The travelling post office train from Manchester Piccadilly to Dover via Reading, Redhill and Tonbridge was routed along the line from May 1988 until 1996, when a new road and rail postal hub opened at Willesden . Despite the electrification scheme of the mid-1990s, dual-voltage Class 92 locomotives , specifically designed to haul freight and overnight passenger trains via

581-432: A non-stop passenger service between Redhill and Tonbridge was to be retained. Instead of the proposed partial closure, steam-hauled passenger trains were replaced on 4 January 1965 by Class 206 units . Nicknamed "Tadpoles" and officially designated 3R, these diesel multiple units began operating an hourly stopping service between Reading and Tonbridge, calling at all stations except Winnersh and Earley , and requiring

664-425: A planned housing development in the area. The "Kent–Gatwick Rail Connectivity" study, published in March 2024, examined the potential for enhancing services on the Redhill–Tonbridge line to encourage greater use of rail by those travelling to the airport. It noted that online planners frequently recommend routes via London, in preference to journeys requiring changes at both Redhill and Tonbridge. The study examined

747-409: A regular service between London Victoria and Tunbridge Wells , running via the Redhill–Tonbridge line, was added. No new trains were purchased for the electric services, which were operated by rolling stock from the existing Network SouthEast fleet. The first privatised franchise holder for the Redhill–Tonbridge line, Connex South Eastern , began running services on 13 October 1996. In 1998,

830-527: A reversal at Redhill. At the same time, the final through trains between London and Tonbridge via Redhill were withdrawn. The second Beeching report, published in February 1965, recommended that the Redhill–Tonbridge line should be developed as a trunk route for freight services. With the transition to diesel traction, Redhill shed, which had maintained steam locomotives for use on the line, closed on 14 June 1965. The Crowhurst spur closed on 27 May 1965 and

913-779: Is a 19-mile-56-chain (31.7 km) railway line in South East England . It runs from the Brighton Main Line at Redhill in Surrey to the South Eastern Main Line at Tonbridge in Kent . There are five intermediate stations: Nutfield , Godstone , Edenbridge , Penshurst and Leigh . All passenger services run as all-stations shuttles between Redhill and Tonbridge, and are operated by Southern using Class 377 electric multiple units . The route

SECTION 10

#1732797640277

996-523: Is around 3 mi (4.8 km) south of Godstone village and Penshurst station is in the hamlet of Chiddingstone Causeway , around 2 mi (3.2 km) north of Penshurst itself. All passenger services on the Redhill–Tonbridge line are operated using Class 377 electric multiple units . Since 2022, the timetable has consisted of an hourly, all-stations service between Redhill and Tonbridge, supplemented with additional services at peak times. The typical journey time between Redhill and Tonbridge

1079-557: Is around 30–35 minutes. Since December 2023, two units have been required to operate the weekday timetable. Although Southern provides the rolling stock, the drivers and guards working services on the line are employed by Southeastern. The earliest formal proposal for a railway line linking London and Dover via Tonbridge was advanced in October 1835. The route, surveyed by the former Royal Engineer , Captain John Pringle, and

1162-723: Is one representative on Surrey County Council , Chris Farr of the Independent group, for Godstone Division which includes Nutfield. Following the 2024 Tandridge District Council election , Nutfield has three representatives on Tandridge District Council : The parish council has 8 members. The parish council was set up in 1894 under the terms of the Local Government Act 1894 . The council's work ranges from planning applications , allotments , cemetery , meeting and cultural venues, overgrown footpaths to dog fouling. The Metropolitan Green Belt has been used to retain

1245-620: Is served by the Metrobus route 400 and Southdown PSV route 410. These buses provide connections to Oxted , Caterham , Redhill , Gatwick Airport , Crawley and East Grinstead . Within the bounds of Nutfield is the Aqua Sports Company's Mercers Park country park. Part of Redhill Aerodrome is situated within the parish. The Brewing Industry Research Foundation is also based in Nutfield. There are two churches in

1328-637: The East Grinstead and Uckfield branches of the Oxted line , but there are no direct interchanges between them. The bridge over the Uckfield branch is positioned near the mid-point of Edenbridge Tunnel (also known as Little Browns Tunnel), which opens out briefly at the crossing point. The Redhill–Tonbridge line also passes over Redhill Tunnel , part of the Quarry line that enables express services on

1411-619: The Hastings line coupled to an adapted 2-EPB driving trailer coach. As a result of the visible difference in width between the narrow Hastings line stock and the standard-width trailer, the units were nicknamed "Tadpoles". Three-car Class 119 units were introduced to the Redhill–Tonbridge line in April 1979 enabling the withdrawal of the Tadpoles in May 1981. Following the electrification of

1494-596: The River Mole , Nutfield Brook, runs through South Nutfield. The village centre stretches south from the A25 towards Nutfield station where the neighbourhood of South Nutfield has grown up, exceeding its parent village in size. North of the A25 is Nutfield Marsh. Also to the north of the A25 is Nutfield Court, a former country house that has been redeveloped into apartments, adjacent to St Peter & St Paul's church. There

1577-660: The South Eastern Railway (SER) took place on 2 July 1836, chaired by Pascoe St Leger Grenfell . The board had intended to appoint Henry Palmer as company engineer, but he declined owing to ill health and William Cubitt was appointed instead. Cubitt recommended that the junction between the L&;CR and the SER should be further north than that proposed by Pringle and Burton. The board agreed Cubitt's suggested alterations and construction work began at Riddlesdown on 11 March 1837. The act of Parliament authorising

1660-488: The 1880s, the works were purchased by Sir Henry Edwards to provide building materials for his new housing development. In 1925, the site was acquired by the Nutfield Manufacturing Company for the production of hydrofluoric acid and other chemicals. The plant was demolished in the mid-1980s and houses were built in its place. One of the earliest private companies to transport goods via the line

1743-546: The Brighton Main Line to bypass the junctions at Redhill station. The pedestrian level crossing at Medhurst Row, between Edenbridge and Penshurst, also provides private vehicle access for local landowners and permission to cross must be sought from the signaller by telephone. There is a speed restriction of 40 mph (64 km/h) on both tracks on the approaches to the Medhurst Row crossing. To

SECTION 20

#1732797640277

1826-496: The Channel Tunnel, cannot be used on the Redhill–Tonbridge line owing to incompatibility with the signalling system. The Network Rail 2008 Strategic Business Plan recommended an enhancement project to enable international freight traffic to use the line. In 2024, the Redhill–Tonbridge line is used by regular freight services, including those operated from Tonbridge West Yard by GB Railfreight. Other freight operators using

1909-552: The Crowhurst Spur diverged. The spur opened to freight on 10 March 1884 and to passenger services on 1 August that year. Initially there were three trains per day between London and Edenbridge via Oxted, of which one continued to Tonbridge. The final intermediate station to be built between Redhill and Tonbridge was Leigh, which opened as "Leigh Halt" on 1 September 1911. The station was immediately adjacent to Leigh signal box, which had been commissioned in 1902 to reduce

1992-706: The Friday night, with Hadouken! closing the event on the main stage on Saturday. The event had a 2000-strong turn-out. Ed Sheeran played Redfest in 2011 on 23 July. The 2012 event took place over three days, from 20 to 22 July 2012. It featured a main stage, the Gozibe Introducing Stage, an acoustic stage and two dance tents. The headliners on the main stage were Modestep , Kids in Glass Houses and Foreign Beggars . The 2014 event took place over three days, from 24 to 26 July 2014. It features

2075-579: The London terminus of the off-peak services was switched back to Victoria, although trains continued to serve London Bridge at peak times and on Sundays. In May 2018, the London–Redhill portions of all services were withdrawn, leaving the line with the current shuttle between Redhill and Tonbridge. In 2023, Southern reduced the number of units required to operate the weekday timetable on the line from three to two. The first steam locomotives to be used on

2158-693: The Reading–Tonbridge service (along with the Reading–Gatwick Airport service) was branded the "North Downs Line" and the crest of the former Tonbridge Urban District Council was applied to the trains. Resignalling of the line began with the section between Redhill and Godstone (exclusive), with control transferred to Three Bridges Area Signalling Centre on 12 May 1985. Penshurst and Edenbridge boxes closed in March and May 1986, with control transferred to Ashford Integrated Electronic Control Centre. The signal box at Godstone closed on 31 May 1986 and

2241-533: The Redhill–Tonbridge line in 1994, services were worked by electric multiple units from the existing Network SouthEast fleet. The first electric train to run in public service, on 29 May 1994, was a four-carriage Class 423 "4-VEP" unit and initially only Class 421 , Class 422 and Class 423 units were cleared to use the line. Between 1998 and 2008, Class 508s operated services on the line. In 2024, all passenger services are operated by Class 377 electric multiple units. The first goods trains began running on

2324-415: The Redhill–Tonbridge line to Gatwick Airport, but warned that the reintroduction of services to London was unlikely unless capacity at East Croydon could be increased. It also reported that a programme to improve weather resilience was planned, which would reduce the likelihood of line closures caused by landslips . Finally, the study noted that improvements to facilities at Godstone station could accompany

2407-612: The Redhill–Tonbridge line was transferred to Connex South Eastern . The company was stripped of its franchise in 2003 and operations were passed to the publicly owned South Eastern Trains . On 1 April 2006, the line was taken over by Southeastern as part of the Integrated Kent Franchise , but in 2008, Southern assumed responsibility for all operations. Southern withdrew the Gatwick services that year and trains to-and-from London were discontinued in 2018, establishing

2490-434: The Redhill–Tonbridge line were SER 2-2-2 engines, built in 1841 by Sharp and Roberts . The following year, 2-2-0 locomotives manufactured by Bury Curtis were delivered. From late 1842 to the end of January 1846, the SER, L&CR and L&BR used engines from a common pool. E class 2-4-0 locomotives were introduced in the early 1860s and hauled passenger services until the end of the 19th century. James Stirling , who

2573-428: The Redhill–Tonbridge line when it opened in 1842 and facilities for handling freight were provided at Gomshall, Edenbridge and Penshurst in 1844. The yard at Godstone was equipped with a crane with a lifting capacity of 3 long tons 7 cwt (7,500 lb or 3.4 t) and one of the sidings sloped steeply down to road level, to allow for onward transport of materials. In the early 20th century, Edenbridge

Redfest - Misplaced Pages Continue

2656-721: The Village Hall. The Queens Head public house is located on the High Street, the east wing of which has been dendro-dated to 1505. Another public house, the Inn on the Pond, is based in Nutfield Marsh with earliest construction dated to the 17th century. According to the 2021 census, 94.1% of parish residents were White, 3.0% were mixed race, 1.2% were Black, and 1.2% were Asian. The average level of accommodation in

2739-928: The Weald immediately south of the Greensand Ridge and has a railway station at South Nutfield which is one stop from Redhill , on the Redhill to Tonbridge Line . It includes a watersports park and picnic destination, Mercers Country Park . The village lay within the Reigate hundred . Nutfield appears in Domesday Book of 1086 as Notfelle . It was held by Countess Ida of Boulogne (2nd wife of Count Eustace ). Its domesday assets were: 3 hides ; 1 church, 16 ploughs , 1 mill worth 2s, 10 acres (40,000 m ) of meadow , herbage worth 12 hogs . It rendered £ 15 per year to its feudal overlords. At

2822-504: The act gave the two companies permission to share a single pair of tracks to avoid duplication. Furthermore, the SER was given the ability to branch from the L&BR at any point north of Earlswood , Surrey. The possibility of sharing part of the L&BR line appealed to the SER, which was experiencing financial difficulties. William Cubitt was instructed to cooperate with Joseph Gibbs , the L&BR engineer, and to explore potential route changes that might result in cost savings. Agreement

2905-695: The architect, Decimus Burton , was to run from the London and Croydon Railway (L&CR) terminus at West Croydon via Oxted , Godstone and Tonbridge. Although the parliamentary committee scrutinising the plans was sceptical of the cost estimates for the embankments and tunnels required, the South Eastern Railway Act was passed on 21 June 1836. It authorised the company to acquire capital of £1.4 million (equivalent to £166 million in 2023) and awarded borrowing powers of up to £450,000 (£53.2 million in 2023). The first board meeting of

2988-425: The associated Crowhurst Junction signal box closed that October. The station yard at Edenbridge was the first on the line to be shut on 10 September 1962 and was followed by the closure of goods facilities at Penshurst on 9 September 1963, Godstone on 4 May 1964 and finally Nutfield on 3 January 1966. Staff were withdrawn from the intermediate stations on 5 November 1976 and the station buildings were demolished in

3071-481: The changes to the route was given royal assent on 3 July 1837. Less than two weeks later, on 15 July 1837, the act of Parliament authorising the London and Brighton Railway (L&BR) was passed. This line would also branch from the L&CR in the Croydon area and would run via Redhill and Haywards Heath to the south coast. Since the SER and L&BR would run alongside each other between Norwood and Purley ,

3154-414: The company switched the London terminus of the services to Tunbridge Wells from Victoria to London Bridge. In 2003, Connex also modified the hourly Three Bridges–Maidstone West service, to run between Horsham and Tunbridge Wells. That June, the company was stripped of its franchise and services were transferred to the publicly owned South Eastern Trains on 9 November 2003. The Integrated Kent Franchise

3237-440: The current shuttle service between Redhill and Tonbridge. The Redhill–Tonbridge line is a standard-gauge railway line in Surrey and Kent , England. It runs for 19 miles 56 chains (31.7 km) from the Brighton Main Line at Redhill to the South Eastern Main Line at Tonbridge . The line is electrified using the 750 V DC third-rail system and is double track throughout. Between Redhill and Godstone ,

3320-478: The early 15th century but was partly rebuilt in 1786 and then restored in 1882. The roofs of the nave and chancel are covered with slabs of Horsham Stone while the spire is tiled with wood shingles. A sacristy was constructed in 1884. There are two stained glass windows by Edward Burne-Jones . In 1755, around 900 Roman brass coins dating to the Later Empire were found in an earthenware pot along one of

3403-485: The east end of the Redhill–Tonbridge line, was opened in 1941 to facilitate freight traffic movements during the Second World War. It was extended in the late 1950s to allow the closure of Paddock Wood Marshalling Yard and to relieve freight depots in the London area. It is primarily used by engineering trains and has 16 non-electrified tracks. In September 2024, the freight operator, GB Railfreight , opened

Redfest - Misplaced Pages Continue

3486-429: The emphasis on championing new talent, the 2009 line-up included The Whip , White Rabbits , The Kabeedies , Gloria Cycles , Floors and Walls , Subsource , Post War Years , Sukie , Dead Pixels , Andrew Morris and Us And Them (Now Run Young Lovers). The 2010 event took place over 23 and 24 July on Robins Cook Farm and featured a main stage, an acoustic stage and a Dance Tent. It was headlined by Enter Shikari on

3569-404: The end of the 12th century, Nutfield was held by Hubert de Anstey and his wife Dionysia, then in 1210 it passed to his son and heir Nicholas de Anstey. The Grade II* listed St Peter and St Paul's church was built in the early 13th century, with the lower part of the chancel wall still surviving. The chancel was extended and the upper part rebuilt in the early 14th century. The tower dates from

3652-600: The end of the decade by Standard Class 4 tender and tank engines . From 1959 onwards, electrification schemes elsewhere in Kent allowed LSWR N15 class "King Arthurs" and SR V class "Schools" steam engines to be transferred to the line. Class 33 diesel-electric locomotives began hauling trains in 1962. A new timetable was introduced on 4 January 1965, with Class 206 diesel-electric multiple units operating an hourly, all-stations service between Reading and Tonbridge. The new trains consisted of two 6S ( Class 201 ) coaches from

3735-535: The engineer Samuel Morton Peto , was presented to Parliament in January 1845, but did not gain approval. In 1859, the line linking Swanley to Sevenoaks , proposed by the Sevenoaks Railway company, was authorised. The SER, fearing further encroachment into its territory from rivals, decided to revive its proposal for a "cut off" line. The "Direct Tonbridge" route, as the new main line was initially known,

3818-432: The exception of Tonbridge, which is managed by Southeastern . The intermediate stations have two platforms each and the two termini have four platforms. Since the line was built for express services, serving the then sparsely populated areas of east Surrey and west Kent was a secondary concern and the majority of the intermediate stations are some distance from the settlements for which they are named: Godstone station

3901-454: The former MP for Weymouth and Melcombe Regis , who had acquired land on both sides of the railway in the 1860s. By the early 1880s, he was selling plots for housebuilding and had laid out roads, water mains and sewers. Early landowners of South Nutfield included Myles Fenton , the general manager of the SER, who lived at Ridge Haw from 1886, and Edward Watkin , the then chairman of the railway, who purchased two plots about 1 mile south of

3984-617: The largely agricultural green belt around the village. The village is served by Nutfield railway station on the Redhill–Tonbridge line which is located in South Nutfield, approximately 1 mile to the south of the village. The station is served by hourly train services between Redhill and Tonbridge . The A23 has road junctions to the village in Redhill and Salfords to the west, each 2 miles (3.2 km) away. The village

4067-413: The length of the block sections between Penshurst and Tonbridge. Initially the station was constructed entirely in wood, but the platforms were rebuilt in concrete in 1961 and gas lighting was provided around the same time. Work at Godstone station in 1914 and 1915 included the replacement of the original station building with a new two-storey structure, the provision of a footbridge and the lengthening of

4150-417: The line had been extended to Headcorn on 31 August. The section to Ashford opened on 1 December 1842. Initially the revenue generated was disappointing, but the SER anticipated that passenger numbers would rise once the railway began serving the channel ports. The service was increased to seven trains per day in each direction following the opening of Folkestone Central station on 28 June 1843. The SER

4233-423: The line include DB Cargo, Freightliner and Colas Rail. The "Kent Rail Strategy", published in March 2021, proposed re-extending services on the Redhill–Tonbridge line to provide better rail connections between Gatwick Airport and the county east of Tonbridge. In particular, it suggested extending Great Western Railway (GWR) services between Reading and Gatwick to Canterbury West and Ashford. The construction of

SECTION 50

#1732797640277

4316-540: The line is controlled by Three Bridges Area Signalling Centre and from Godstone to Tonbridge by Ashford Integrated Electrical Control Centre. With the exception of the Godstone– Edenbridge section, which uses the absolute block method, the signalling system uses track circuits . The maximum permitted speed on the line is 85 mph (137 km/h) and there are speed restrictions on the approaches to Redhill and Tonbridge stations. The underlying geology for

4399-550: The line via Tonbridge to Dover, but also for the Reading, Guildford and Reigate Railway , which had opened in 1849 and had been purchased by the SER in 1852. Within a few years of the opening of their main line from London to Dover, the SER began to consider building a more direct line between the capital and Tonbridge to reduce journey times and to avoid conflict with the LB&;SCR north of Redhill. The first proposal, surveyed by

4482-405: The line was electrified using the 750 V DC third-rail system, to provide a diversionary route for Channel Tunnel traffic. A new service between Gatwick Airport and Kent was introduced, operated by electric multiple units , which replaced the diesel service from Reading. In 1995, trains running to-and-from London via East Croydon were added. At privatisation in 1996, responsibility for

4565-536: The line, the SER refused to certify the locomotive that the UMNC had purchased. The SER and its successors ran trains serving the coal sidings at the intermediate stations between Redhill and Tonbridge until the 1950s. In 1896, a private siding was opened to serve a new brickworks on the south side of the line around 3 ⁄ 4  mi (1.2 km) west of Godstone station. The works had an internal, 18 in ( 457 mm ) cable-hauled railway in addition to

4648-573: The majority of the line is Weald Clay , but to the west of Penshurst the line is on Tunbridge Wells Sand . The line descends from Redhill to Tonbridge and the steepest gradient, to the west of Edenbridge, is 1 in 240. The M23 motorway and A21 dual carriageway cross over the line on the Coopers Hill and Medway Viaducts respectively. There are two tunnels, the longest of which is the 1,327 yd (1,213 m) Bletchingley Tunnel between Nutfield and Godstone. Between Penshurst and Leigh ,

4731-503: The mid-1930s, the track layout at Tonbridge was altered to increase the speed limit for trains arriving and departing via Sevenoaks . At the same time, Platform 1, on the south side of the station was converted from a bay to a through platform, and thereafter was used by most trains travelling via Redhill. The line played a major role in the evacuation of troops from Dunkirk and 565 trains were routed via Tonbridge and Redhill between 27 May and 4 June 1940. In 1941, Tonbridge West Yard

4814-647: The new station. In the mid-1880s, Edwards was given a "free pass", allowing him to travel on the SER with no payment due. In 1884, the East Grinstead branch of the Oxted line was opened and with it the Crowhurst spur, linking it to the Redhill–Tonbridge line. The new line was authorised by Parliament in June 1878 and was jointly owned by the SER and LB&SCR between South Croydon and Crowhurst Junction, where

4897-644: The north of the parish, in the Vale of Holmesdale . The area contains a series of wetland nature reserves restored from mining activities. Fuller's earth pits are worked along the ridge of the Lower Green Sand , and have accounted for 65% of the United Kingdom's bentonite production since records began. Both blue and yellow varieties of fuller's earth are extracted, with the clays in Nutfield considered to be of exceptional quality. A branch of

4980-731: The opening of the new main line via Orpington and Sevenoaks , which provided a shorter route from the capital, the Redhill–Tonbridge line was downgraded to secondary status. The line became part of the Southern Railway in 1923 and was incorporated into the Southern Region of British Railways in 1948. Steam-hauled trains were withdrawn from the Redhill–Tonbridge line in 1965, when diesel multiple units were introduced. The new timetable consisted of an hourly service between Reading and Tonbridge via Redhill. From 1989, these trains were branded as "North Downs" services. In 1994,

5063-436: The options for extending existing services to Gatwick and also for providing additional semi-fast services that might skip some stations on the Redhill–Tonbridge line. It noted that the reduction in the number of units allocated to the line on a typical weekday from three to two, means that additional units would be required to add a significant number of new services or to extend existing ones. The study also observed that there

SECTION 60

#1732797640277

5146-531: The platforms. During the First World War, the line was heavily used by trains transporting troops to and from the channel ports. As a result of the Railways Act 1921 , the Redhill–Tonbridge line became part of the Southern Railway in 1923. The following year, the wooden station building at Penshurst was destroyed by fire. It was replaced in 1925 by a new building in the mock-Tudor style. In

5229-483: The region composed of detached houses was 28%, the average that was apartments was 22.6%. The proportion of households in the civil parish who owned their home outright compares to the regional average of 35.1%. The proportion who owned their home with a loan compares to the regional average of 32.5%. The remaining % is made up of rented dwellings (plus a negligible % of households living rent-free). Redhill to Tonbridge Line The Redhill–Tonbridge line

5312-633: The route runs through the 78 yd (71 m) Penshurst Tunnel and crosses the watershed between the Rivers Eden and Medway . The main channel of the Medway is bridged via a six-arch viaduct, the footings of which were strengthened in the early 1980s as part of the Medway Flood Relief Scheme. The line passes through several areas that are prone to flooding, including the river valley between Leigh and Tonbridge. Since it

5395-407: The same decade. From 1982, the Redhill–Tonbridge line came under the control of Network SouthEast , one of the five business sectors of British Rail . For three years from May 1986, Reigate became the western terminus for most trains running to Tonbridge via Redhill, with services only extended to Reading at peak times. In 1989, groups of lines in the sector were given names and identities;

5478-547: The standard-gauge connection to the main line. During the First World War, part of the site was requisitioned as an ammunition dump . The works were closed during the early 1940s for use by the Canadian Army as an armoured vehicle depot. Brickmaking resumed after the Second World War and eventually ceased in March 2001. The western part of the site was used as a landfill facility for processing spent railway ballast between 1979/1980 and 1993. Tonbridge West Yard, at

5561-528: The station is now the interface between the two signalling areas. Construction of the Channel Tunnel was authorised by the Treaty of Canterbury in February 1986 and the subsequent Concession Agreement was concluded the following month. As part of the works to connect the tunnel to the existing UK rail network, the Redhill–Tonbridge line was electrified using the 750 V DC third-rail system. The scheme

5644-521: The village's roads. The Grade II listed Nutfield Priory , to the west of the village centre, was constructed by John Gibson in 1872–4. The railway reached Nutfield in 1842, but it was not until 1884 that Nutfield station was opened, around which time many mansion houses were constructed by the Victorians, exploiting the views over the South Downs . The Nutfield Marshes are located at

5727-478: The village, serving the separate Anglican parishes of Nutfield and South Nutfield: the mediaeval St Peter and St Paul's Church in Nutfield, and Christ Church in South Nutfield, constructed of red brick and opened in 1888. A village hall is located at the centre of South Nutfield. Around 200 children are enrolled in Nutfield Church of England Primary School, which opened in 1969 and is located next to

5810-483: The west of Tonbridge station are the Jubilee Sidings, used to stable electric multiple units, and the adjacent Tonbridge West Yard, operated by GB Railfreight . Other freight operators using the line include DB Cargo , Freightliner and Colas Rail . There are seven stations on the line: Redhill, Nutfield, Godstone, Edenbridge, Penshurst, Leigh and Tonbridge. All stations are managed by Southern , with

5893-461: Was appointed locomotive superintendent at the SER in 1878, introduced F class 4-4-0 engines to the line in 1897. During the 1930s, the majority of services were worked by F1 and D class 4-4-0s, and H class 0-4-4Ts . Less frequently, passenger trains were hauled by LB&SCR D3 class 0-4-4Ts and E5 class 0-6-2Ts . In the 1950s, the majority of passenger trains were hauled by Maunsell N and U class locomotives, supplemented towards

5976-432: Was authorised on 30 August 1862 and opened in stages in the first half of 1868. On 1 June of that year, most express services were routed along the new line and the Redhill–Tonbridge line was reduced to secondary status. Nutfield station was opened on 1 January 1884 and was built to serve the new area of residential development that became the village of South Nutfield. The scheme was initiated by Sir Henry Edwards ,

6059-542: Was awarded to Southeastern, a subsidiary of Govia , for an eight-year period from 1 April 2006. However, in 2008, the services on the Redhill–Tonbridge line and management of the intermediate stations were transferred to Southern. The eastern terminus of the London Bridge–Tunbridge Wells services was cut back to Tonbridge and the Horsham–Tunbridge Wells services were withdrawn. In December 2015,

6142-467: Was built as part of the London– Dover main line, the route was engineered for high-speed running. The sharpest curve, of radius 9 ch (180 m), is immediately to the southeast of Redhill, where the line diverges from the Brighton Main Line. The only other significant curve is to the west of Edenbridge station and has a radius of 92 ch (1,900 m). The Redhill–Tonbridge line crosses over

6225-484: Was cancelled in early June due to poor ticket sales. After cancellation, ticket holders were able to transfer their tickets to Standon Calling . Redfest was rescheduled with a smaller lineup for 8–10 August. Held on 25 and 26 July Redfest had expanded for 2009 and featured a main stage, an acoustic stage and a local bands stage. Still aimed at a younger audience and remaining steadfastly independent and non-corporate, Redfest achieved its best attendance in 2009. With

6308-427: Was completed to Dover on 7 February 1844. The first major alteration to be made to the line was the relocation of Redhill station in 1844. Originally called "Reigate" and sited on Hooley Lane, it was resited to allow better interchange with LB&SCR services to-and-from Brighton . SER trains began using the new station in April 1844. Redhill shed was opened by the SER in 1855. It not only provided locomotives for

6391-493: Was greater demand for travel between Reading and Gatwick than between Reading and Tonbridge, and that diverting GWR trains away from the airport to Kent would not be beneficial. The report concluded by stating that current rail links between Kent and Gatwick are not attractive and that any future service enhancements are dependent on the development of a full business case, which might require subsidy to cover increased staff and rolling stock costs. [REDACTED] Media related to

6474-499: Was intended to provide a route for freight trains to access the West London Line via Clapham Junction , whilst avoiding the gauge -restricted Sevenoaks Tunnel. The third rail was energised in March 1994 and the new electric timetable began on 29 May that year. An hourly service was established between Three Bridges and Maidstone West , replacing the previous diesel trains between Reading and Tonbridge. In May 1995,

6557-415: Was opened by the South Eastern Railway in 1842 as part of the London to Dover main line. Since it was to be used primarily by express services, the line was engineered with few curves to allow high-speed running. At the time of construction, east Surrey and west Kent were sparsely populated and most of the intermediate stations are some distance from the settlements they purport to serve. In 1868, following

6640-758: Was opened to facilitate freight movements for the war effort and in the same year, two-aspect colour light signalling was installed in the Penshurst area to increase the capacity of the line. For much of the Second World War, there was a Home Guard post at the east end of Bletchingley Tunnel. Under the Transport Act 1947 , the Redhill–Tonbridge line became part of the Southern Region of British Railways in 1948. The first Beeching report , published in 1963, recommended shutting all five intermediate stations between Nutfield and Leigh inclusive, although

6723-425: Was provided with a crane capable of lifting 4 long tons 0 cwt (9,000 lb or 4.1 t). The station yards at Gomshall, Edenbridge and Penshurst were closed in the early 1960s. While the line was still being constructed, the SER established a brickworks at South Nutfield. The bricks and tiles produced were transported from a dedicated siding at Mid Street, later the site of Nutfield station. In

6806-620: Was reached in November 1838 for the SER to branch from the L&BR at Redhill and the revised plan was approved by act of Parliament on 19 July 1839. Construction of the Redhill–Tonbridge section of the SER began at Tonbridge under the supervision of Peter Barlow . Materials were delivered via the River Medway Navigation and rails had been laid as far as Edenbridge by 20 November 1841. The works at Bletchingley Tunnel were supervised by Frederick Walter Simms , who wrote

6889-536: Was the Upper Medway Navigation Company (UMNC), which constructed a tramway from Tonbridge Wharf to Tonbridge station in 1844. The company intended to use the railway to expand its coal delivery business into Surrey. It purchased land for sidings at Godstone, Edenbridge and Penshurst and hired its own trucks, when the SER refused to provide its own. Although the South Eastern Railway Act 1836 permitted independent operators to run trains on

#276723