New product development ( NPD ) or product development in business and engineering covers the complete process of launching a new product to the market . Product development also includes the renewal of an existing product and introducing a product into a new market. A central aspect of NPD is product design . New product development is the realization of a market opportunity by making a product available for purchase. The products developed by an commercial organisation provide the means to generate income .
117-677: The Improved Turbine Engine Program ( ITEP ), formerly the Advanced Affordable Turbine Engine ( AATE ) program, is a United States Army project to develop a General Electric T700 replacement for the UH-60 Black Hawk and AH-64 Apache , improving fuel consumption, power, durability and cost. Honeywell and Pratt & Whitney formed the ATEC joint venture to develop the T900 , while GE Aviation builds
234-614: A status quo antebellum. Two weeks after a treaty was signed (but not ratified), Andrew Jackson defeated the British in the Battle of New Orleans and siege of Fort St. Philip with an army dominated by militia and volunteers, and became a national hero. U.S. troops and sailors captured HMS Cyane , Levant and Penguin in the final engagements of the war. Per the treaty, both sides (the United States and Great Britain) returned to
351-450: A 35% reduction in production (less than $ 650k per engine) and maintenance cost , and a 15% reduction in product development cost. The 3,000-shp goal for AATE is a 50% increase over the most powerful T700-701D variant, but would also require upgrades to gearbox, transmission, rotor blades, and tail rotor. Both the ATEC and GE designs can start without an auxiliary power unit (APU), using
468-444: A Changing World, was published as an e-book on December 3, 2018. On September 8, 2022, Drotar and Morrissey published their second book, "Learn & Adapt: ExPD An Adaptive Product Development Process for Rapid Innovation and Risk Reduction, which also highlights their process. The book has three sections: Overview of ExPD, How to Do It, and Adaptive Practices that Support ExPD. According to Kirkus, "the (approach the) authors advocate
585-569: A Go/No-Go to Development decision. These decisions represent the Gates in the Stage-Gate model. The following are types of new product development management structures: Customer-centric new product development focuses on finding new ways to solve customer problems and create more customer-satisfying experiences. Companies often rely on technology, but real success comes from understanding customer needs and values. The most successful companies are
702-651: A few months. The war remains the deadliest conflict in U.S. history, resulting in the deaths of 620,000 men on both sides. Based on 1860 census figures, 8% of all white males aged 13 to 43 died in the war, including 6.4% in the North and 18% in the South . Following the Civil War, the U.S. Army had the mission of containing western tribes of Native Americans on the Indian reservations . They set up many forts, and engaged in
819-432: A few weeks to three years with an average of one year. Design and Commercialization phases usually start a very early collaboration. When the concept design is finished it will be sent to manufacturing plant for prototyping, developing a Concurrent Engineering approach by implementing practices such as QFD , DFM / DFA and more. The output of the design (engineering) is a set of product and process specifications – mostly in
936-534: A functional area. However, officers continue to wear the branch insignia of their former branch in most cases, as functional areas do not generally have discrete insignia. Some branches, such as Special Forces , operate similarly to functional areas in that individuals may not join their ranks until having served in another Army branch. Careers in the Army can extend into cross-functional areas for officers, warrant officers, enlisted, and civilian personnel. Before 1933,
1053-488: A glossary by the Product Development and Management Association , it is mentioned that the fuzzy front end generally consists of three tasks: strategic planning, idea generation, and pre-technical evaluation. These activities are often chaotic, unpredictable, and unstructured. In comparison, the subsequent new product development process is typically structured, predictable, and formal. The term fuzzy front end
1170-726: A month – known as battle assemblies or unit training assemblies (UTAs) – and conduct two to three weeks of annual training each year. Both the Regular Army and the Army Reserve are organized under Title 10 of the United States Code , while the National Guard is organized under Title 32 . While the Army National Guard is organized, trained, and equipped as a component of the U.S. Army, when it
1287-487: A new Army Command (ACOM) in 2018. The Army Futures Command (AFC), is a peer of FORSCOM, TRADOC, and AMC, the other ACOMs. AFC's mission is modernization reform: to design hardware, as well as to work within the acquisition process which defines materiel for AMC. TRADOC's mission is to define the architecture and organization of the Army, and to train and supply soldiers to FORSCOM. AFC's cross-functional teams (CFTs) are Futures Command's vehicle for sustainable reform of
SECTION 10
#17327798492921404-480: A predominantly combat support role. The army converted to an all-volunteer force with greater emphasis on training to specific performance standards driven by the reforms of General William E. DePuy , the first commander of United States Army Training and Doctrine Command . Following the Camp David Accords that was signed by Egypt, Israel that was brokered by president Jimmy Carter in 1978, as part of
1521-401: A regular development of new products. There are many uncertainties and challenges which companies must face throughout the process. The product development process typically consists of several activities that firms employ in the complex process of delivering new products to the market. A process management approach is used to provide a structure. Product development often overlaps much with
1638-618: A role in the invasions of Grenada in 1983 ( Operation Urgent Fury ) and Panama in 1989 ( Operation Just Cause ). By 1989 Germany was nearing reunification and the Cold War was coming to a close. Army leadership reacted by starting to plan for a reduction in strength. By November 1989 Pentagon briefers were laying out plans to reduce army end strength by 23%, from 750,000 to 580,000. A number of incentives such as early retirement were used. In 1990, Iraq invaded its smaller neighbor, Kuwait , and U.S. land forces quickly deployed to assure
1755-455: A stable market environment, ExPD is more suitable for product development in markets that are unstable and less predictable. Unstable and unpredictable markets cause uncertainty and risk in product development. Many factors contribute to the outcome of a project, and ExPD works on the assumption that the ones that the product team doesn't know enough about or are unaware of are the factors that create uncertainty and risk. The primary goal of ExPD
1872-738: A strategy of seizing the coastline, blockading the ports, and taking control of the river systems. By 1863, the Confederacy was being strangled. Its eastern armies fought well, but the western armies were defeated one after another until the Union forces captured New Orleans in 1862 along with the Tennessee River. In the Vicksburg Campaign of 1862–1863, General Ulysses Grant seized the Mississippi River and cut off
1989-409: A structured NPPD (New Product & Process Development) strategy. The second element is the opportunity analysis. It is done to translate the identified opportunities into implications for the business and technology specific context of the company. Here extensive efforts may be made to align ideas to target customer groups and do market studies and/or technical trials and research. The third element
2106-536: A tangible asset or intangible. A service or user experience is intangible. In law, sometimes services and other processes are distinguished from "products". NPD requires an understanding of customer needs and wants, the competitive environment, and the nature of the market. Cost, time, and quality are the main variables that drive customer needs. Aiming at these three variables, innovative companies develop continuous practices and strategies to better satisfy customer requirements and to increase their own market share by
2223-668: Is a five-step procedure. These steps are listed in chronological order: Lean Start-up approach. Lean startup is a methodology for developing businesses and products that aims to shorten product development cycles and rapidly discover if a proposed business model is viable; this is achieved by adopting a combination of business-hypothesis-driven experimentation, iterative product releases, and validated learning. Lean startup emphasizes customer feedback over intuition and flexibility over planning. This methodology enables recovery from failures more often than traditional ways of product development. Stage-gate model. A pioneer of NPD research in
2340-550: Is a senior person appointed to be responsible for implementing and managing the innovation management system. They are also responsible for ensuring that all aspects of new product development are taken into account and that the company is able to track and assess the progress of new products. A cross-functional innovation management committee is a team of individuals from different company departments, including marketing , engineering, design, manufacturing, and research and development , who are responsible for overseeing and managing
2457-462: Is because companies need to find ways to meet the changing needs and tastes of their customers. Innovation can help a company become more competitive and better positioned for the future. In difficult economic times, it is even more important for companies to focus on innovation and new product development. In addition, companies can use virtual product development to help reduce costs. Virtual product development uses collaboration technology to remove
SECTION 20
#17327798492922574-442: Is developed iteratively to solve a given problem. The design stage is very important because at this stage most of the product life cycle costs are engaged. Previous research shows that 70–80% of the final product quality and 70% of the product entire life-cycle cost are determined in the product design phase, therefore the design-manufacturing interface represent the greatest opportunity for cost reduction. Design projects last from
2691-434: Is even more important for companies to focus on innovation and new product development. Oftentimes, such situations result in a short-sighted focus on cost-cutting and a reduction in spending on new products. However, companies that are able to innovate and create new products will be better positioned for the future. Although counter-intuitive, tough times may even call for a greater emphasis on new product development. This
2808-431: Is important to a company's success. It is also important for companies to have a process in place for monitoring the competition and their products so that they can stay ahead of the curve. In order to successfully manage the new product development process, companies must have an innovation management system in place. This system helps to ensure that all aspects of new product development are taken into account and that
2925-408: Is much slower (often 10-plus years) than that deployed for many types of consumer goods. The development process is articulated and broken down in many different ways, many of which often include the following phases/stages: PHASE 1. Fuzzy front-end (FFE) is the set of activities employed before the more formal and well defined requirements specification is completed. Requirements speak to what
3042-533: Is not in federal service it is under the command of individual state and territorial governors. However, the District of Columbia National Guard reports to the U.S. president, not the district's mayor , even when not federalized. Any or all of the National Guard can be federalized by presidential order and against the governor's wishes. The U.S. Army is led by a civilian secretary of the Army , who has
3159-412: Is outwardly focused and premised on being adaptable enough to develop new competencies and create new models as complex situations evolve." Kirkus summarizes the text as "complex and visually stimulating; a serious blueprint for serious strategists." IDEO approach. The concept adopted by IDEO, a design and consulting firm, is one of the most researched processes in regard to new product development and
3276-670: Is that each brigade will be modular, i.e., all brigades of the same type will be exactly the same and thus any brigade can be commanded by any division. As specified before the 2013 end-strength re-definitions, the three major types of brigade combat teams are: In addition, there are combat support and service support modular brigades. Combat support brigades include aviation (CAB) brigades, which will come in heavy and light varieties, fires (artillery) brigades (now transforms to division artillery) and expeditionary military intelligence brigades . Combat service support brigades include sustainment brigades and come in several varieties and serve
3393-717: Is the development of both the high-level and detailed-level design of the product: which turns the what of the requirements into a specific how this particular product will meet those requirements. This typically has the most overlap with the engineering design process, but can also include industrial design and even purely aesthetic aspects of design. On the marketing and planning side, this phase ends at pre-commercialization analysis stage. PHASE 3: Product implementation often refers to later stages of detailed engineering design (e.g. refining mechanical or electrical hardware, or software, or goods or other product forms), as well as test process that may be used to validate that
3510-502: Is the idea and technology development. During this part of the front-end, the business case is developed based on estimates of the total available market, customer needs, investment requirements, competition analysis and project uncertainty. Some organizations consider this to be the first stage of the NPPD process (i.e., Stage 0). A universally acceptable definition for Fuzzy Front End or a dominant framework has not been developed so far. In
3627-492: Is the idea genesis, which is described as evolutionary and iterative process progressing from birth to maturation of the opportunity into a tangible idea. The process of the idea genesis can be made internally or come from outside inputs, e.g. a supplier offering a new material/technology or from a customer with an unusual request. The fourth element is the idea selection. Its purpose is to choose whether to pursue an idea by analyzing its potential business value. The fifth element
Improved Turbine Engine Program - Misplaced Pages Continue
3744-705: Is to reduce uncertainty and risk by reducing the unknown. When organizations adapt quickly to the changing environment (market, technology, regulations, globalization, etc.), they reduce uncertainty and risk, which leads to product success. ExPD is described as a two-pronged, integrated systems approach. Drotar and Morrissey state that product development is complex and needs to be managed as a system, integrating essential elements: strategy, portfolio management, organization/teams/culture, metrics, market/customer understanding, and process. Drotar and Morrissey have published two books on ExPD. The first, Exploratory Product Development: Executive Version: Adaptable Product Development in
3861-445: Is used in the exhaust stream downstream of the gas generator to extract power. Although the dual-spool design allows each compressor stage to run in their optimal ranges, it makes the machine more complex. The Advanced Turbine Engine Company (ATEC) is a 50/50 joint venture created in 2007 between Honeywell Aerospace and Pratt & Whitney Military Engines. ATEC completed a Core Engine (High Pressure system only) test in mid-2011 on
3978-820: The American Revolutionary War (1775–1783). After the Revolutionary War, the Congress of the Confederation created the United States Army on 3 June 1784 to replace the disbanded Continental Army. The United States Army considers itself a continuation of the Continental Army, and thus considers its institutional inception to be the origin of that armed force in 1775. The U.S. Army is a uniformed service of
4095-949: The Army Strategy 2018 articulated an eight-point addendum to the Army Vision for 2028. While the Army Mission remains constant, the Army Strategy builds upon the Army's Brigade Modernization by adding focus to corps and division -level echelons. The Army Futures Command oversees reforms geared toward conventional warfare . The Army's current reorganization plan is due to be completed by 2028. The Army's five core competencies are prompt and sustained land combat, combined arms operations (to include combined arms maneuver and wide–area security, armored and mechanized operations and airborne and air assault operations ), special operations forces , to set and sustain
4212-537: The Battle of 73 Easting were tank battles of historical significance. After Operation Desert Storm, the army did not see major combat operations for the remainder of the 1990s but did participate in a number of peacekeeping activities. In 1990 the Department of Defense issued guidance for "rebalancing" after a review of the Total Force Policy, but in 2004, USAF Air War College scholars concluded
4329-825: The Joint Multi-Role (JMR) helicopter. In 2007, Honeywell and Pratt & Whitney formed the Advanced Turbine Engine Company (ATEC) joint venture. The science & technology phase to subsidize development of AATE consisted of two contracts: one was awarded in May 2008 to ATEC for $ 108 million to develop the HPW3000, and the other was awarded to GE Aviation in late 2007 for the GE3000. The four-and-a-half year science and technology phase covered durability and performance demonstration testing and
4446-707: The Netherlands and the United Kingdom , until the 1990s in anticipation of a possible Soviet attack. During the Cold War, U.S. troops and their allies fought communist forces in Korea and Vietnam . The Korean War began in June 1950, when the Soviets walked out of a UN Security Council meeting, removing their possible veto. Under a United Nations umbrella, hundreds of thousands of U.S. troops fought to prevent
4563-775: The T901 . In February 2019, the US Army selected the GE T901 as the winner of the program. In December 2006, the U.S. Army's Aviation Applied Technology Directorate (AATD) solicited proposals for the 3000 shp Advanced Affordable Turbine Engine (AATE) free-turbine turboshaft to replace the GE T700 that currently power the UH-60 Black Hawk and AH-64 Apache rotorcraft, leveraging the DoD / NASA / DOE VAATE program. Refitting
4680-663: The engineering design process, particularly if the new product being developed involves application of math and/or science. Every new product will pass through a series of stages/phases, including ideation among other aspects of design , as well as manufacturing and market introduction. In highly complex engineered products (e.g. aircraft, automotive, machinery), the NPD process can be likewise complex regarding management of personnel, milestones, and deliverables. Such projects typically use an integrated product team approach. The process for managing large-scale complex engineering products
4797-572: The fiscal year 2022, the projected end strength for the Regular Army (USA) was 480,893 soldiers; the Army National Guard (ARNG) had 336,129 soldiers and the U.S. Army Reserve (USAR) had 188,703 soldiers; the combined-component strength of the U.S. Army was 1,005,725 soldiers. As a branch of the armed forces, the mission of the U.S. Army is "to fight and win our Nation's wars, by providing prompt, sustained land dominance, across
Improved Turbine Engine Program - Misplaced Pages Continue
4914-562: The guerrilla hit and run tactics of the communist Viet Cong and the People's Army Of Vietnam (NVA) . During the 1960s, the Department of Defense continued to scrutinize the reserve forces and to question the number of divisions and brigades as well as the redundancy of maintaining two reserve components, the Army National Guard and the Army Reserve . In 1967, Secretary of Defense Robert McNamara decided that 15 combat divisions in
5031-627: The land service branch of the United States Armed Forces . It is one of the eight U.S. uniformed services , and is designated as the Army of the United States in the U.S. Constitution . The Army is the oldest branch of the U.S. military and the most senior in order of precedence. It has its roots in the Continental Army , which was formed on 14 June 1775 to fight against the British for independence during
5148-522: The ATEC HPW3000 (T900) and the GE3000 (T901) engines is in the number of rotating compressor/turbine assemblies in the gas generator stage. The ATEC T900 is a dual-spool turboshaft, while the GE T901 is a single-spool design. In the single-spool design, the compressor is driven by a single turbine; the dual-spool design uses a separate shafts for a two-stage compressor, requiring two turbines. Both are free-turbine turboshafts, where an independent turbine
5265-460: The Army (HQDA): See Structure of the United States Army for a detailed treatment of the history , components , administrative and operational structure and the branches and functional areas of the Army. The U.S. Army is made up of three components: the active component, the Regular Army; and two reserve components, the Army National Guard and the Army Reserve. Both reserve components are primarily composed of part-time soldiers who train once
5382-472: The Army National Guard members were considered state militia until they were mobilized into the U.S. Army, typically at the onset of war. Since the 1933 amendment to the National Defense Act of 1916 , all Army National Guard soldiers have held dual status. They serve as National Guardsmen under the authority of the governor of their state or territory and as reserve members of the U.S. Army under
5499-411: The Army National Guard were unnecessary and cut the number to eight divisions (one mechanized infantry, two armored, and five infantry), but increased the number of brigades from seven to 18 (one airborne, one armored, two mechanized infantry and 14 infantry). The loss of the divisions did not sit well with the states. Their objections included the inadequate maneuver element mix for those that remained and
5616-625: The Army. On 1 February 2019, the US Army selected the GE T901 as the winner of the ITEP program, awarding the Engineering and Manufacturing Development (EMD) contract for $ 517 million. Later that same month, ATEC protested the selection of the GE T901 over its T900 in a filing with the Government Accountability Office (GAO). The GAO denied the protest in a filing posted on May 30, 2019. Critical design review in
5733-570: The British were weakest to wear down their forces. Washington led victories against the British at Trenton and Princeton , but lost a series of battles in the New York and New Jersey campaign in 1776 and the Philadelphia campaign in 1777. With a decisive victory at Yorktown and the help of the French, the Continental Army prevailed against the British. After the war, the Continental Army
5850-461: The Canadian province of Upper Canada, British troops who had dubbed the U.S. Army "Regulars, by God!", were able to capture and burn Washington , which was defended by militia, in 1814. The regular army, however, proved they were professional and capable of defeating the British army during the invasions of Plattsburgh and Baltimore , prompting British agreement on the previously rejected terms of
5967-545: The National Guard, while all states maintain regulations for state militias . State militias are both "organized", meaning that they are armed forces usually part of the state defense forces, or "unorganized" simply meaning that all able-bodied males may be eligible to be called into military service. The U.S. Army is also divided into several branches and functional areas . Branches include officers, warrant officers, and enlisted Soldiers while functional areas consist of officers who are reclassified from their former branch into
SECTION 50
#17327798492926084-585: The ORC and ERC were combined into the United States Army Reserve . The Army of the United States was re-established for the Korean War and Vietnam War and was demobilized upon the suspension of the draft . Currently, the Army is divided into the Regular Army , the Army Reserve, and the Army National Guard . Some states further maintain state defense forces , as a type of reserve to
6201-458: The Revolutionary War progressed, French aid, resources, and military thinking helped shape the new army. A number of European soldiers came on their own to help, such as Friedrich Wilhelm von Steuben , who taught Prussian Army tactics and organizational skills. The Army fought numerous pitched battles, and sometimes used Fabian strategy and hit-and-run tactics in the South in 1780 and 1781; under Major General Nathanael Greene , it hit where
6318-663: The Southwest. Grant took command of Union forces in 1864 and after a series of battles with very heavy casualties, he had General Robert E. Lee under siege in Richmond as General William T. Sherman captured Atlanta and marched through Georgia and the Carolinas . The Confederate capital was abandoned in April 1865 and Lee subsequently surrendered his army at Appomattox Court House. All other Confederate armies surrendered within
6435-538: The United States and is part of the Department of the Army , which is one of the three military departments of the Department of Defense . The U.S. Army is headed by a civilian senior appointed civil servant, the secretary of the Army (SECARMY), and by a chief military officer , the chief of staff of the Army (CSA) who is also a member of the Joint Chiefs of Staff . It is the largest military branch, and in
6552-540: The United States (the "Union" or "the North") formed the Union Army , consisting of a small body of regular army units and a large body of volunteer units raised from every state, north and south, except South Carolina . For the first two years, Confederate forces did well in set battles but lost control of the border states. The Confederates had the advantage of defending a large territory in an area where disease caused twice as many deaths as combat. The Union pursued
6669-405: The United States Army was maintained as a small peacetime force to man permanent forts and perform other non-wartime duties such as engineering and construction works. During times of war, the U.S. Army was augmented by the much larger United States Volunteers which were raised independently by various state governments. States also maintained full-time militias which could also be called into
6786-423: The acquisition process for the future. In order to support the Army's modernization priorities, its FY2020 budget allocated $ 30 billion for the top six modernization priorities over the next five years. The $ 30 billion came from $ 8 billion in cost avoidance and $ 22 billion in terminations. The task of organizing the U.S. Army commenced in 1775. In the first one hundred years of its existence,
6903-476: The acronym ExPD, is an emerging approach to new product development. Consultants Mary Drotar and Kathy Morrissey first introduced ExPD at the 2015 Product Development and Management Association annual meeting and later outlined their approach in the Product Development and Management Association's magazine Visions . In 2015, Drotar and Morrissey's firm Strategy2Market received the trademark on
7020-491: The agreement, both the United States and Egypt agreed that there would be a joint military training led by both countries that would usually take place every 2 years, that exercise is known as Exercise Bright Star . The 1980s was mostly a decade of reorganization. The Goldwater-Nichols Act of 1986 created unified combatant commands bringing the army together with the other four military services under unified, geographically organized command structures. The army also played
7137-650: The army began acquiring fixed-wing aircraft . In 1910, during the Mexican Revolution , the army was deployed to U.S. towns near the border to ensure the safety of lives and property. In 1916, Pancho Villa , a major rebel leader, attacked Columbus, New Mexico , prompting a U.S. intervention in Mexico until 7 February 1917. They fought the rebels and the Mexican federal troops until 1918. The United States joined World War I as an "Associated Power" in 1917 on
SECTION 60
#17327798492927254-619: The authority of the president, in the Army National Guard of the United States. Since the adoption of the total force policy, in the aftermath of the Vietnam War, reserve component soldiers have taken a more active role in U.S. military operations. For example, Reserve and Guard units took part in the Gulf War , peacekeeping in Kosovo , Afghanistan, and the 2003 invasion of Iraq . [REDACTED] Headquarters, United States Department of
7371-531: The battery alone. The UH-60 and AH-64 are currently equipped with Honeywell GTCP 36-150 APUs. Using ITEP, the combat radius is projected to increase by 500 km (270 nmi). The hot and high service ceiling will be increased from 4,000 to 6,000 ft (1,200 to 1,800 m) at 95 °F (35 °C). Performance targets have been determined in part by operations in Afghanistan and Iraq, as well as growing airframe weights. The major difference between
7488-662: The building, as part of the September 11 attacks . In response to the 11 September attacks and as part of the Global War on Terror , U.S. and NATO forces invaded Afghanistan in October 2001, displacing the Taliban government. The U.S. Army also led the combined U.S. and allied invasion of Iraq in 2003; it served as the primary source for ground forces with its ability to sustain short and long-term deployment operations. In
7605-466: The combatant commanders for use as directed by the secretary of defense. By 2013, the army shifted to six geographical commands that align with the six geographical unified combatant commands (CCMD): The army also transformed its base unit from divisions to brigades . Division lineage will be retained, but the divisional headquarters will be able to command any brigade, not just brigades that carry their divisional lineage. The central part of this plan
7722-591: The companies that adopt this system are reported to receive benefits such as improved teamwork, improved success rates, earlier detection of failure, a better launch, and even shorter cycle times – reduced by about 30%. These findings highlight the importance of the stage-gate model in the area of new product development. The Stage-Gate model of NPD predevelopment activities are summarised in Phase zero and one, in respect to earlier definition of predevelopment activities: These activities yield essential information to make
7839-490: The company is able to track and assess the progress of new products. The innovation management system should also help to foster a culture of innovation within the company, which can help to increase the chances of success for new products. Marketing writers Hyman and Wilkins argue that a company's rate of product innovation should fit between the extremes of being so rapid that "its core range decays" and so slow that its product range "become[s] obselete. An innovation manager
7956-601: The concept. Although the fuzzy front end may not be an expensive part of product development, it can consume 50% of development time (see Chapter 3 of the Smith and Reinertsen reference below), and it is where major commitments are typically made involving time, money, and the product's nature, thus setting the course for the entire project and final end product. Consequently, this phase should be considered as an essential part of development rather than something that happens "before development", and its cycle time should be included in
8073-454: The consumers goods sector is Robert G. Cooper. Over the last two decades he conducted significant work in the area of NPD. The Stage-Gate model developed in the 1980s was proposed as a new tool for managing new products development processes. This was mainly applied to the consumers goods industry. The 2010 APQC benchmarking study reveals that 88% of U.S. businesses employ a stage-gate system to manage new products, from idea to launch. In return,
8190-559: The end of FY2017. From 2016 to 2017, the Army retired hundreds of OH-58 Kiowa Warrior observation helicopters, while retaining its Apache gunships. The 2015 expenditure for Army research, development and acquisition changed from $ 32 billion projected in 2012 for FY15 to $ 21 billion for FY15 expected in 2014. By 2017, a task force was formed to address Army modernization, which triggered shifts of units: CCDC , and ARCIC , from within Army Materiel Command (AMC), and Army Training and Doctrine Command (TRADOC), respectively, to
8307-439: The end to the practice of rotating divisional commands among the states that supported them. Under the proposal, the remaining division commanders were to reside in the state of the division base. However, no reduction in total Army National Guard strength was to take place, which convinced the governors to accept the plan. The states reorganized their forces accordingly between 1 December 1967 and 1 May 1968. The Total Force Policy
8424-643: The existing fleet of twin-engine Black Hawks and Apaches would require a total of 6,215 engines, including spares. Any aircraft that currently uses the T700 or its commercial derivative, the CT7, also could be re-powered by the AATE, including commercial rotorcraft like the Sikorsky S-92 . Sikorsky is considering it for the single-turbine S-97 Raider instead of its single GE CT7/T700; in addition, AATE could also power
8541-580: The following years, the mission changed from conflict between regular militaries to counterinsurgency , resulting in the deaths of more than 4,000 U.S. service members (as of March 2008) and injuries to thousands more. 23,813 insurgents were killed in Iraq between 2003 and 2011. Until 2009, the army's chief modernization plan, its most ambitious since World War II, was the Future Combat Systems program. In 2009, many systems were canceled, and
8658-532: The forces that landed in French North Africa and took Tunisia and then moved on to Sicily and later fought in Italy . In the June 1944 landings in northern France and in the subsequent liberation of Europe and defeat of Nazi Germany , millions of U.S. Army troops played a central role. In 1947, the number of soldiers in the US Army had decreased from eight million in 1945 to 684,000 soldiers and
8775-435: The form of drawings, and the output of manufacturing is the product ready for sale. Basically, the design team will develop drawings with technical specifications representing the future product, and will send it to the manufacturing plant to be executed. Solving product/process fit problems is of high priority in information communication design because 90% of the development effort must be scrapped if any changes are made after
8892-528: The foundation of all the other models that have been developed afterwards. Significant work has been conducted in order to propose better models, but in fact these models can be easily linked to BAH model. The seven steps of the BAH model are: new product strategy , idea generation, screening and evaluation, business analysis, development, testing, and commercialization. Exploratory product development model (ExPD). Exploratory product development, which often goes by
9009-420: The full range of military operations and the spectrum of conflict, in support of combatant commanders ". The branch participates in conflicts worldwide and is the major ground-based offensive and defensive force of the United States of America. The United States Army serves as the land-based branch of the U.S. Armed Forces . Section 7062 of Title 10, U.S. Code defines the purpose of the army as: In 2018,
9126-459: The further development of an idea. It is the phase between first consideration of an opportunity and when it is judged ready to enter the structured development process (Kim and Wilemon, 2007; Koen et al., 2001). It includes all activities from the search for new opportunities through the formation of a germ of an idea to the development of a precise concept. The Fuzzy Front End phase ends when an organization approves and begins formal development of
9243-685: The geographical status quo. Both navies kept the warships they had seized during the conflict. The army's major campaign against the Indians was fought in Florida against Seminoles . It took long wars (1818–1858) to finally defeat the Seminoles and move them to Oklahoma. The usual strategy in Indian wars was to seize control of the Indians' winter food supply, but that was no use in Florida where there
9360-471: The guidance would reverse the Total Force Policy which is an "essential ingredient to the successful application of military force". On 11 September 2001, 53 Army civilians (47 employees and six contractors) and 22 soldiers were among the 125 victims killed in the Pentagon in a terrorist attack when American Airlines Flight 77 commandeered by five Al-Qaeda hijackers slammed into the western side of
9477-771: The last of the American Indian Wars . U.S. Army troops also occupied several Southern states during the Reconstruction Era to protect freedmen . The key battles of the Spanish–American War of 1898 were fought by the Navy. Using mostly new volunteers , the U.S. forces defeated Spain in land campaigns in Cuba and played the central role in the Philippine–American War . Starting in 1910,
9594-463: The middle of the five front-end stages and the possible outside barriers that can influence the process outcome. The engine represents the management driving the activities described. The front end of the innovation is the greatest area of weakness in the NPD process. This is mainly because the FFE is often chaotic, unpredictable and unstructured. Engineering design is the process whereby a technical solution
9711-468: The need for co-located teams, which can result in significant cost savings such as a reduction in G&A (general & administrative) overhead costs of consulting firms. Another way to reduce the cost of new product development is through the use of 24-hour development cycles. This approach allows companies to develop products more quickly and at a lower cost. By using a 24-hour cycle, companies can shorten
9828-438: The new product development process. This committee helps to ensure that all aspects of new product development are taken into account and that the company is able to track and assess the progress of new products. Companies may get a better overall picture of new product development by putting together a cross-functional team, which can help generate fresh ideas and give assistance in evaluating them. In difficult economic times, it
9945-446: The ones that differentiated from others, solved major customer problems, offer a compelling customer value proposition, and engage customers directly, and systematically. Systematic new product development focuses on creating a process that allows for the collection, review, and evaluation of new product ideas. Having a way in which employees, suppliers, distributors, and dealers become involved in finding and developing new products
10062-469: The product should do or have, at varying degrees of specificity, in order to meet the perceived market or business need The fuzzy front end (FFE) is the messy "getting started" period of new product engineering development processes. It is also referred to as the "Front End of Innovation", or "Idea Management". It is in the front end where the organization formulates a concept of the product to be developed and decides whether or not to invest resources in
10179-545: The protection of Saudi Arabia . In January 1991 Operation Desert Storm commenced, a U.S.-led coalition which deployed over 500,000 troops, the bulk of them from U.S. Army formations, to drive out Iraqi forces . The campaign ended in total victory, as Western coalition forces routed the Iraqi Army . Some of the largest tank battles in history were fought during the Gulf war. The Battle of Medina Ridge , Battle of Norfolk and
10296-537: The prototype actually meets all design specifications that were established. PHASE 4: Fuzzy back-end or commercialization phase represent the action steps where the production and market launch occur. The front-end marketing phases have been very well researched, with valuable models proposed. Peter Koen et al. provides a five-step front-end activity called front-end innovation: opportunity identification, opportunity analysis, idea genesis, idea selection, and idea and technology development. He also includes an engine in
10413-484: The release to manufacturing. Conceptual models have been designed in order to facilitate a smooth product development process. Booz, Allen and Hamilton Model : One of the first developed models that companies still use in the NPD process is the Booz, Allen and Hamilton (BAH) Model, published in 1982. This is the best known model because it underlies the NPD systems that have been put forward later. This model represents
10530-698: The remaining were swept into the BCT modernization program . By 2017, the Brigade Modernization project was completed and its headquarters, the Brigade Modernization Command, was renamed the Joint Modernization Command, or JMC. In response to Budget sequestration in 2013 , Army plans were to shrink to 1940 levels, although actual Active-Army end-strengths were projected to fall to some 450,000 troops by
10647-454: The second quarter of 2020 will lead to first engine testing in the third quarter of 2021 before flight tests, and a production decision in 2024. In addition to 3,000-shp output, the targets for AATE were a 25% reduction in fuel consumption (less than 0.347 lb/(hp⋅h), 211 g/kWh), a 65% improvement in power to weight (more than 6.5 hp/lb, 10.7 kW/kg), a 20% improvement in design life (more than 6000 hours and 15000 cycles),
10764-605: The service chiefs from each of the four military services belonging to the Department of Defense who advise the president of the United States , the secretary of defense and the National Security Council on operational military matters, under the guidance of the chairman and vice chairman of the Joint Chiefs of Staff . In 1986, the Goldwater–Nichols Act mandated that operational control of
10881-489: The service of the army. By the twentieth century, the U.S. Army had mobilized the U.S. Volunteers on four occasions during each of the major wars of the nineteenth century. During World War I, the " National Army " was organized to fight the conflict, replacing the concept of U.S. Volunteers. It was demobilized at the end of World War I and was replaced by the Regular Army, the Organized Reserve Corps, and
10998-456: The services follows a chain of command from the president to the secretary of defense directly to the unified combatant commanders , who have control of all armed forces units in their geographic or function area of responsibility, thus the secretaries of the military departments (and their respective service chiefs underneath them) only have the responsibility to organize, train and equip their service components. The army provides trained forces to
11115-533: The side of Britain , France , Russia , Italy and the other Allies . U.S. troops were sent to the Western Front and were involved in the last offensives that ended the war. With the armistice in November 1918, the army once again decreased its forces. In 1939, estimates of the Army's strength ranged between 174,000 and 200,000 soldiers, smaller than that of Portugal 's, which ranked it 17th or 19th in
11232-401: The standard support role in an army. The U.S. Army's conventional combat capability currently consists of 11 active divisions and 1 deployable division headquarters (7th Infantry Division) as well as several independent maneuver units. Product development Many technology-intensive organisations exploit technological innovation in a rapidly changing consumer market. A product can be
11349-443: The state militias. In the 1920s and 1930s, the "career" soldiers were known as the " Regular Army " with the "Enlisted Reserve Corps" and "Officer Reserve Corps" augmented to fill vacancies when needed. In 1941, the " Army of the United States " was founded to fight World War II. The Regular Army, Army of the United States, the National Guard, and Officer/Enlisted Reserve Corps (ORC and ERC) existed simultaneously. After World War II,
11466-545: The states of California , Nevada , Utah , Colorado , Arizona , Wyoming and New Mexico . The American Civil War was the costliest war for the U.S. in terms of casualties. After most slave states , located in the southern U.S., formed the Confederate States , the Confederate States Army , led by former U.S. Army officers, mobilized a large fraction of Southern white manpower. Forces of
11583-412: The statutory authority to conduct all the affairs of the army under the authority, direction, and control of the secretary of defense . The chief of staff of the Army , who is the highest-ranked military officer in the army, serves as the principal military adviser and executive agent for the secretary of the Army, i.e., its service chief; and as a member of the Joint Chiefs of Staff , a body composed of
11700-594: The takeover of South Korea by North Korea and later to invade the northern nation. After repeated advances and retreats by both sides and the Chinese People's Volunteer Army 's entry into the war, the Korean Armistice Agreement returned the peninsula to the status quo in July 1953. The Vietnam War is often regarded as a low point for the U.S. Army due to the use of drafted personnel ,
11817-408: The term "Exploratory PD." Rather than going through a set of discrete phases, like the phase-gate process , this exploratory product development process allows organizations to adapt to a landscape of shifting market circumstances and uncertainty by using a more flexible and adaptable product development process for both hardware and software. Where the traditional phase-gate approach works best in
11934-603: The theater for the joint force, and to integrate national, multinational, and joint power on land. The Continental Army was created on 14 June 1775 by the Second Continental Congress as a unified army for the colonies to fight Great Britain , with George Washington appointed as its commander. The army was initially led by men who had served in the British Army or colonial militias and who brought much of British military heritage with them. As
12051-456: The time it takes to get a product to market, which can give them a competitive advantage and capability that can be extremely useful in cases where there is a sudden change in market conditions or customer needs. In difficult economic times, it is even more important for companies to focus on innovation and new product development. By using a variety of methods, such as virtual product development and 24-hour development cycles, companies can reduce
12168-434: The total development cycle time. Koen et al. (2001) distinguish five different front-end elements (not necessarily in a particular order): The first element is the opportunity identification. In this element, large or incremental business and technological chances are identified in a more or less structured way. Using the guidelines established here, resources will eventually be allocated to new projects, which then leads to
12285-669: The total number of active divisions had dropped from 89 to 12. The leaders of the Army saw this demobilization as a success. In the Pacific War , U.S. Army soldiers participated alongside the United States Marine Corps in capturing the Pacific Islands from Japanese control. Following the Axis surrenders in May (Germany) and August (Japan) of 1945, army troops were deployed to Japan and Germany to occupy
12402-1147: The two defeated nations. Two years after World War II, the Army Air Forces separated from the army to become the United States Air Force in September 1947. In 1948, the army was desegregated by order 9981 of President Harry S. Truman . The end of World War II set the stage for the East–West confrontation known as the Cold War . With the outbreak of the Korean War , concerns over the defense of Western Europe rose. Two corps, V and VII , were reactivated under Seventh United States Army in 1950 and U.S. strength in Europe rose from one division to four. Hundreds of thousands of U.S. troops remained stationed in West Germany, with others in Belgium ,
12519-564: The two-spool HPW3000 and completed Gas Generator (both High and Low Pressure systems) testing in January 2012. Durability testing of the first HPW3000 completed in October 2013. A second HPW3000 was tested for performance and sand ingestion during late summer 2014. In February 2017, the Army designated the HPW3000 design as the T900-HPW-900 engine. Since 2010, GE has been developing and testing T901 -specific technologies. The second GE3000
12636-620: The unpopularity of the war with the U.S. public and frustrating restrictions placed on the military by U.S. political leaders. While U.S. forces had been stationed in South Vietnam since 1959, in intelligence and advising/training roles, they were not deployed in large numbers until 1965, after the Gulf of Tonkin Incident . U.S. forces effectively established and maintained control of the "traditional" battlefield, but they struggled to counter
12753-583: The world in size. General George C. Marshall became Army chief of staff in September 1939 and set about expanding and modernizing the Army in preparation for war. The United States joined World War II in December 1941 after the Japanese attack on Pearl Harbor . Some 11 million Americans were to serve in various Army operations. On the European front , U.S. Army troops formed a significant portion of
12870-523: Was adopted by Chief of Staff of the Army General Creighton Abrams in the aftermath of the Vietnam War and involved treating the three components of the army – the Regular Army , the Army National Guard and the Army Reserve as a single force. General Abrams' intertwining of the three components of the army effectively made extended operations impossible without the involvement of both the Army National Guard and Army Reserve in
12987-876: Was at first very small and after General St. Clair's defeat at the Battle of the Wabash, where more than 800 soldiers were killed, the Regular Army was reorganized as the Legion of the United States , established in 1791 and renamed the United States Army in 1796. In 1798, during the Quasi-War with France, the U.S. Congress established a three-year " Provisional Army " of 10,000 men, consisting of twelve regiments of infantry and six troops of light dragoons . In March 1799, Congress created an "Eventual Army" of 30,000 men, including three regiments of cavalry . Both "armies" existed only on paper, but equipment for 3,000 men and horses
13104-400: Was first popularized by Smith and Reinertsen (1991). R.G. Cooper (1988) it describes the early stages of NPPD as a four-step process in which ideas are generated (I), subjected to a preliminary technical and market assessment (II) and merged to coherent product concepts (III) which are finally judged for their fit with existing product strategies and portfolios (IV). PHASE 2: Product design
13221-498: Was no winter. The second strategy was to form alliances with other Indian tribes, but that too was useless because the Seminoles had destroyed all the other Indians when they entered Florida in the late eighteenth century. The U.S. Army fought and won the Mexican–American War (1846–1848), which was a defining event for both countries. The U.S. victory resulted in acquisition of territory that eventually became all or parts of
13338-590: Was procured and stored. The War of 1812 , the second and last war between the United States and Great Britain, had mixed results. The U.S. Army did not conquer Canada but it did destroy Native American resistance to expansion in the Old Northwest and stopped two major British invasions in 1814 and 1815. After taking control of Lake Erie in 1813, the U.S. Army seized parts of western Upper Canada, burned York and defeated Tecumseh , which caused his Western Confederacy to collapse. Following U.S. victories in
13455-505: Was quickly given land certificates and disbanded in a reflection of the republican distrust of standing armies. State militias became the new nation's sole ground army, except a regiment to guard the Western Frontier and one battery of artillery guarding West Point 's arsenal. However, because of continuing conflict with Native Americans , it was soon considered necessary to field a trained standing army. The Regular Army
13572-759: Was scheduled to conclude in 2013, but tests continued through 2014. In July 2009, the United States Army announced the development of AATE would continue under the Improved Turbine Engine Program (ITEP); ITEP would result in an engine that would improve the AH-64 and UH-60 hot and high capacities and increase combat radius . In August 2016, ATEC and GE were awarded 24-month contracts under ITEP to take their engines through preliminary design review ; this phase culminated in April 2018 with ATEC and GE demonstrating their prototypes to
13689-512: Was tested for performance, endurance, and sand ingestion in late spring 2014. In 2016, the Army awarded GE Aviation a 24-month contract for the T901 preliminary design review , and the prototype six month testing was completed in October 2017. The GE3000 engine was officially designated as the T901-GE-900 engine in January 2017. United States Army The United States Army ( USA ) is