Misplaced Pages

Great Eastern Main Line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#419580

124-635: The Great Eastern Main Line ( GEML , sometimes referred to as the East Anglia Main Line ) is a 114.5-mile (184.3 km) major railway line on the British railway system which connects Liverpool Street station in central London with destinations in east London and the East of England , including Shenfield , Chelmsford , Colchester , Ipswich and Norwich . Its numerous branches also connect

248-558: A Bill authorising the amalgamation of the Y&;NR with the N&;BR came into effect and Norwich station became a Norfolk Railway asset. The N&BR line arrived at the station on 15 December 1845, which offered a route to Shoreditch in London via Cambridge and Bishop's Stortford . The Eastern Union Railway (EUR) was building a line towards Norwich and that led to great rivalry between

372-490: A UK domestic train service was the Hull Trains 07.30 King's Cross to Hull , which covered the 125.4 km (77.9 miles) from Stevenage to Grantham in 42   minutes at an average speed of 179.1 km/h (111.3 mph). This was operated by a Class 180 diesel unit running "under the wires" at the time, and is now operated by Class 802 Paragon bi-mode units, operating on electric power on this section. This

496-503: A combination of Smiths clamp-lock and GEC-Alsthom HW2000 point machines. The first signal box to be closed and transferred to Liverpool Street IECC was Shenfield in 1992, which had only opened 10 years earlier. The last boxes to be transferred were at Romford and Gidea Park in 1998; these were the oldest of those being transferred, having been opened under the GER/LNER 1924 resignalling scheme. A number of fatal accidents have occurred on

620-897: A direct rail link between the GEML and the Great Western Main Line . The first section of the line, built by the Eastern Counties Railway (ECR), opened in June 1839 between a short-lived temporary terminus at Devonshire Street in the East End of London and Romford , then in the Havering Liberty in Essex. The London terminus was moved in July 1840 to Shoreditch (later renamed Bishopsgate), after 1900 in

744-414: A disused suburban station, was put back into service as the temporary terminus of the line. It closed again when Norwich re-opened. The signalling was also modernised at that time and the track layout simplified. On completion of the electrification project, Norwich- London InterCity trains switched from being hauled by Class 47 diesel locomotives to Class 86 electric locomotives. On 1 April 1994, under

868-537: A flyover would be built at the country-end of the carriage sidings at Gidea Park to allow trains bound for the Southend line to change from the main line to the electric line, instead of at the London-end of Shenfield as they do now. Plans were drawn up in the 1930s to electrify the suburban lines from Liverpool Street to Shenfield at 1,500   V   DC and work was started on implementing this. However,

992-738: A limited number of c2c trains, were all operated by National Express East Anglia . Since 2012, the franchise has been operated by Abellio Greater Anglia ; in May 2015, the Shenfield "metro" stopping service transferred to TfL Rail , as a precursor to Elizabeth Line services. Liverpool Street IECC replaced signal boxes at Bethnal Green (closed 1997), Bow (closed 1996), Stratford (GE panel closed 1997), Ilford (closed 1996), Romford (closed 1998), Gidea Park (closed 1998), Shenfield (closed 1992) and Chelmsford (closed 1994). The system uses BR Mark 3 solid state interlockings, predominantly four-aspect signals and

1116-474: A network of 9,824 miles (15,811 km) of standard-gauge lines, of which 3,339 miles (5,374 km) were electrified . In addition, some cities have separate metro, light rail and tram systems, among them the historic London Underground and the Glasgow Subway . There are also many private railways , some of them narrow-gauge , which are primarily short lines for tourists. The main rail network

1240-659: A new high-speed railway in the UK. This study began on the assumption the route would be a new purpose-built high-speed line connected to High-Speed 1 to the Channel tunnel and from London to the West Midlands , via Heathrow Airport , relieving traffic on the West Coast Main Line (WCML). Conventional high-speed rail technology would be used as opposed to Maglev . The rolling stock would be capable of travelling on

1364-516: A new junction at Haughley to Norwich Victoria opened in December 1849, although the position of the latter station was poor and a spur to allow some trains to operate into Norwich (Thorpe) station was opened to regular traffic in November 1851. In the late 19th century, the double-track main line was expanded with additional tracks being added to cope with more traffic. In 1854, a third track

SECTION 10

#1732772958420

1488-665: A number of heritage (mainly steam) standard and narrow gauge railways, and a few industrial railways and tramways. Some lines which appear to be heritage operations sometimes claim to be part of the public transport network; the Romney, Hythe and Dymchurch Railway in Kent regularly transports schoolchildren. Most major cities have some form of commuter rail network . These include Belfast , Birmingham, Bristol, Cardiff , Edinburgh, Exeter , Glasgow , Leeds , Liverpool, London and Manchester . There are four main goods operating companies in

1612-685: A number of other joint railways such as the Midland and Great Northern Joint Railway and the Cheshire Lines Committee as well as special joint railways such as the Forth Bridge Railway, Ryde Pier Railway and at one time the East London Railway ). The "Big Four" were joint-stock public companies and they continued to run the railway system until 31 December 1947. The growth in road transport during

1736-547: A proposal, in 1980, to electrify the remainder of the Great Eastern Main Line. The early 1980s saw track rationalisation and signalling work carried out in the Ipswich area and, on 9 April 1985, the first electric train consisting of two Class 305 electric multiple units (EMUs) worked into Ipswich station. The previous year, another member of the class had been dragged to Ipswich by a diesel locomotive and

1860-422: A record 22.7 billion net tonne kilometres (14 billion net ton miles) of freight movement were recorded in 2013–4, against 16.6 billion (10.1 billion) in 1986–7, an increase of 38%. Coal made up 36% of the total net tonne kilometre , though its share was declining. Rail freight had increased its market share since privatisation (by net tonne kilometres) from 7.4% in 1998 to 11.1% in 2013. Growth

1984-518: A renaissance in recent years, with passenger numbers approaching their highest ever level (see usage figures below). This has coincided with the privatisation of British Rail , but the cause of this increase is unclear . The growth is partly attributed to a shift away from private motoring due to growing road congestion and increasing petrol prices, but also to the overall increase in travel due to affluence. Passenger journeys in Britain grew by 88% over

2108-477: A tunnel through central London and link up with the Great Western Main Line to Reading and Heathrow Airport . The first new Class 345 rolling stock entered service on the service on 22 June 2017. The new trains, built at Bombardier's Derby factory, provide air conditioned walk-through carriages, intelligent lighting and temperature control, closed-circuit television and passenger information displays showing travel information, including about onward journeys. It

2232-596: Is one of the busiest railways in Europe , with 20% more train services than France , 60% more than Italy , and more than Spain , Switzerland , the Netherlands , Portugal and Norway combined, as well as representing more than 20% of all passenger journeys in Europe. The rail industry employs 115,000 people and supports another 250,000 through its supply chain. After the initial period of rapid expansion following

2356-417: Is 100 mph (160 km/h). The main line is electrified at 25 kV AC using overhead wires and comes under the control of Romford Electrical Control Room. The branches to Upminster , Southend Victoria , Southminster , Braintree , Clacton-on-Sea , Walton-on-the-Naze and Harwich Town are also electrified. Between Romford and Chadwell Heath , there is a Network Rail maintenance depot adjacent to

2480-452: Is a large programme of upgrades to the network, including Thameslink , Crossrail , electrification of lines , in-cab signalling , new inter-city trains and new high-speed lines . According to historians David Brandon and Alan Brooke, the railways brought into being our modern world: The railways started with the local isolated wooden wagonways in 1560s using horses. These wagonways then spread, particularly in mining areas. The system

2604-695: Is according to the Office of Rail and Road and includes open access operators such as Grand Central and Hull Trains . There are 2,579 passenger railway stations on the Network Rail network. This does not include the London Underground , nor other systems which are not part of the national network, such as heritage railways. Most date from the Victorian era and a number are in or on the edge of town and city centres. Major stations lie for

SECTION 20

#1732772958420

2728-584: Is also heavily used by leisure travellers, as it and its branches serve a number of seaside resorts, shopping areas and countryside destinations. The route also provides the main artery for substantial freight traffic to and from Felixstowe and Harwich , via their respective branch lines. Trains from Southend Airport also run into London via the GEML. The Elizabeth line, which fully opened in November 2022, operates services from Shenfield to London Paddington via Liverpool Street , connecting Essex with Central London and West London . Additionally, it provides

2852-645: Is connected with that of continental Europe by the Channel Tunnel and High Speed 1 , opened in 1994 and 2007 respectively. In 2019, there were 1.738 billion journeys on the National Rail network, making the British network the fifth most used in the world (Great Britain ranks 23rd in world population). Unlike a number of other countries, rail travel in the United Kingdom has enjoyed

2976-482: Is currently managed by Greater Anglia , which also operates the majority of the trains that serve the station. East Midlands Railway operates the services to Liverpool Lime Street via Nottingham , Sheffield and Manchester Piccadilly . At one time, there were three railway stations in Norwich. Norwich Thorpe is the current and only remaining station and still known locally as "Thorpe station". Norwich Victoria

3100-657: The Class 252 , reached a world speed record for diesel trains of 143.2 mph, while the main fleet entered service limited to a service speed of 125 mph, and were introduced progressively on main lines across the country, with a rebranding of their services as the InterCity 125 . With electrification of the East Coast Main Line , high-speed rail in Great Britain was augmented with the introduction of

3224-525: The Class 91 , intended for passenger service at up to 140 mph (225 km/h), and thus branded as the InterCity 225 . The Class 91 units were designed for a maximum service speed of 140 mph, and running at this speed was trialled with a 'flashing green' signal aspect under the British signalling system . The trains were eventually limited to the same speed as the HST, to 125 mph, with higher speeds deemed to require cab signalling , which as of 2010

3348-614: The Department for Transport (DfT), with the exception of Merseyrail , where the franchise is awarded by the Merseyside Passenger Transport Executive . In Scotland, contracts for ScotRail , is awarded by Transport Scotland , and in Wales , contracts for Transport for Wales Rail , is awarded by Transport for Wales , although the latter is currently publicly owned with no plans for franchising in

3472-409: The Department for Transport 's Transport Ten Year Plan called for an 80% increase in rail freight. Statistics on freight are specified in terms of the weight of freight lifted, and the net tonne kilometre , being freight weight multiplied by distance carried. 116.6 million tonnes of freight was lifted in the 2013–4 period, against 138 million tonnes in 1986–7, a decrease of 16%. However,

3596-485: The Department for Transport . Transport for Wales Rail is owned by Transport for Wales , a Welsh Government owned company, with no current plans to re-privatise the latter. On 1 April 2022, ScotRail was put under public ownership by the Scottish Government , under Transport Scotland as ScotRail operating on the same day. The COVID-19 pandemic caused a huge fall in the number of passengers using

3720-610: The East of England , serving the cathedral city of Norwich , Norfolk. It is 114  miles 77  chains (185.0 km) down the main line (measured via Ipswich) from London Liverpool Street , the western terminus. It is also the terminus of numerous secondary lines: the Breckland Line to Cambridge ; the Bittern Line to Sheringham ; and the Wherry Lines to Great Yarmouth and Lowestoft . The station

3844-717: The Hatfield crash in October 2000. However, in June 2015 the PPM stood at 91.2% after a period of steady increases in the annual moving average since 2003 until around 2012 when the improvements levelled off. Train fares cost 2.7% more than under British Rail in real terms on average. For some years, Britain has been said to have the highest rail fares in Europe, with peak-time and season tickets considerably higher than other countries, partly because rail subsidies in Europe are higher. However, passengers are also able to obtain some of

Great Eastern Main Line - Misplaced Pages Continue

3968-625: The Ice Age . This tunnel had the trackbed lowered so the line could accommodate taller freight trains. Steam-hauled inter-city trains on the London-Norwich service were replaced by diesel power in the 1960s; locomotives from classes 40 , 37 and 47 hauled services until the mid-1980s. Electric locomotives replaced diesel haulage from the mid-1980s, when the remainder of the GEML was electrified north of Colchester; their utilisation continued until March 2020. Class 86 locomotives powered

4092-541: The Metropolitan Borough of Bethnal Green , and at the eastern end the line was extended 6 miles (9.7 km) out to Brentwood in the same year. A further 34 miles (55 km) of track was added out to Colchester by 1843. The original gauge for the line was 5 ft ( 1,524 mm ), but this was converted to 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ) standard gauge in 1844. The section of line between Colchester and Ipswich

4216-501: The North London Line and Temple Mills. The GEML has six tracks up to the London-end of Stratford and the junction to Temple Mills; there are five lines through the station, dropping to four at the country end. At Shenfield , the line to Southend Victoria diverges and the main line route drops from four tracks to two; this arrangement continues for the vast majority of the way to Norwich. There are several locations where

4340-628: The Tyne and Wear Metro centred on Newcastle upon Tyne . Light rail systems in the form of trams are in Birmingham , Croydon , Manchester , Nottingham , Sheffield and Edinburgh . These systems use a combination of street running tramways and, where available, reserved right of way or former conventional rail lines in some suburbs. Blackpool has the one remaining traditional tram system. Monorails, heritage tramways, miniature railways and funiculars also exist in several places. In addition, there are

4464-586: The 1860s, the railways in East Anglia were in financial trouble and most were leased to the ECR; they wished to amalgamate formally, but could not obtain government agreement for this until 1862, when the Great Eastern Railway (GER) was formed out of the consolidation. From November 1872, Bishopsgate (Low Level) became a temporary terminus to relieve the main high level Bishopsgate station while

4588-421: The 1920s and 1930s greatly reduced revenue for the rail companies. Rail companies accused the government of favouring road haulage through the subsidised construction of roads. The railways entered a slow decline owing to a lack of investment and changes in transport policy and lifestyles. During World War II , the companies' managements joined, effectively forming one company. A maintenance backlog developed during

4712-927: The 2010s, many upgrades have been under way, such as Thameslink , Crossrail , the Northern Hub and electrification of the Great Western Main Line . Electrification plans for the Midland Main Line and the Transpennine line between Manchester and Leeds have been scaled back. Construction of High Speed 2 is underway, with a projected completion date of 2026 for Phase 1 (London to Birmingham) and 2033 for Phase 2. A poll of 1,500 adults in Britain in June 2018 showed that 64% support renationalising Britain's railways. Currently, six franchises are under public ownership, and thus effectively nationalised. Four, LNER , Northern Trains , Southeastern and TransPennine Express , are operators of last resort owned by

4836-638: The BBC, this represents the largest shake-up in the UK's railways since privatisation. On 18 November 2021, the government announced the biggest ever public investment in Britain's rail network costing £96 billion and promising quicker and more frequent rail connections in the North and Midlands: the Integrated Rail Plan includes substantially improved connections north–south as well as east–west and includes three new high speed lines. In July 2024,

4960-637: The Central Trains franchise was broken up and West Midlands services to Norwich were taken over by East Midlands Trains . The National Express East Anglia franchise passed to Abellio Greater Anglia on 5 February 2012. All services operated by East Midlands Trains were transferred to East Midlands Railway in August 2019, after EMT's franchise expired. The station is served by Greater Anglia and East Midlands Railway . The typical off-peak service frequency (Monday to Saturday) is: Norwich engine shed

5084-517: The EUR and the ECR. The ECR trumped the EUR by taking over the Norfolk Railway, including Norwich Station, on 8 May 1848. The following year, the EUR started services to Norwich Victoria. The opening of Norwich Victoria on 12 December 1849 led to the ECR naming its station Norwich Thorpe. On 27 August 1851, EUR services from Ipswich started serving the better-placed Thorpe station. By the 1860s,

Great Eastern Main Line - Misplaced Pages Continue

5208-658: The GEML at Stratford (on the Cambridge line platforms). The GER was grouped in 1923 into the London and North Eastern Railway (LNER). In 1931–32, the LNER quadrupled the tracks to Shenfield which became the terminus for inner-suburban operation. In the 1930s, a flyover was constructed just west of Ilford to switch the main and electric lines over, to enable main line trains to utilise Liverpool Street's longer west side platforms without having to cross east side suburban traffic in

5332-660: The GEML. However, not everyone was a fan; British Railways' chairman Sir Michael Barrington Ward exclaimed "What? Send the first British Railways standard engines to that tramline? No!" Twenty-three Britannias were allocated to the GE section and, in summer 1951, the Liverpool Street–Norwich service went over to an hourly clockface interval service. The British Railways 1955 Modernisation Plan called for overhead line systems in Great Britain to be standardised at 25   kV   AC. However, due to low clearances under bridges,

5456-588: The GER reopened Trowse station. The GER went out of existence following the creation of the "Big Four" railway companies in 1923. On 1 January 1923, the GER amalgamated with several other railways to form the London and North Eastern Railway (LNER). This was as a result of the Railways Act 1921 , which saw most of the 120 railway companies grouped into four main companies, in an effort to stem their losses. Norwich Thorpe became an LNER asset. During World War II

5580-664: The GER took over the ECR and the EUR before the Bill had received the Royal Assent. A decade after the GER was formed, the latter promoted a new line from Norwich to Cromer . That line was opened on 20 October 1874 and a new station was constructed at the junction of the Cromer line and Yarmouth & Norwich line. The new station, Whitlingham, stood between Norwich Thorpe and Brundall on the Yarmouth line. With traffic growing, it

5704-478: The GER was building its new permanent terminus at Liverpool Street . The latter opened in stages from February 1874, beginning with the first four platforms, until it was fully open from November 1875. At that time the original 1840 Bishopsgate station closed to passengers and was converted into a goods yard. By the 1870s, suburbia in the Forest Gate area was developing quickly and in 1872 suburban trains (this

5828-481: The Great Eastern Main Line, with its easy access to the Port of Felixstowe . A pool of Class 90s, including most of the locomotives that operated inter-city services on the GEML, provide electric haulage with Class 66 and Class 70 providing diesel power. In 2015, TfL Rail , the precursor of Crossrail , took over operation of the Shenfield stopping "metro" service and, from 2022, the full Crossrail service will run via

5952-805: The Jutsums Lane overbridge. In addition, at the London-end of the depot, is Network Rail's Electrical Control Room that controls the supply and switching of the overhead line system for the whole of the former Anglia Region. Signalling is controlled by two main signalling centres: Liverpool Street IECC (opened in 1992) and Colchester PSB (opened in December 1983). Liverpool Street IECC controls signalling up to Marks Tey , where it fringes with Colchester PSB, which has control to Norwich . There are also several small signal boxes that control local infrastructure, such as Ingatestone box, which has jurisdiction over several local level crossings. Line-side train monitoring equipment includes hot axle box detectors (HABD) on

6076-786: The Railways Act 1993, ownership of the station passed to a new private company, Railtrack , which was transferred to the state-controlled non-profit Network Rail in October 2002 after experiencing financial difficulties. Train services to Norwich were later privatised, with most services passing to Anglia Railways in January 1997. Services towards the West Midlands were taken over by Central Trains in March 1997. Anglia trains handed over their franchise to National Express East Anglia in 2004. Three years later, on 11 November 2007,

6200-401: The UK Government permanently got rid of the rail franchising system. On 20 May 2021, the Government announced a white paper that would transform the operation of the railways. The rail network will be partly renationalised, with infrastructure and operations brought together under the state-owned public body Great British Railways . Operations will be managed on a concessions model. According to

6324-401: The UK, the largest of which is DB Cargo UK (formerly DB Schenker, formerly English Welsh & Scottish (EWS)). There are also several smaller independent operators including Mendip Rail . Types of freight carried include intermodal – in essence containerised freight – and coal, metals, oil, and construction materials. The Beeching Cuts, in contrast to passenger services, greatly modernised

SECTION 50

#1732772958420

6448-497: The average Advance ticket in 1995 cost £9.14 (in 2014 prices) compared to £5.17 in 2014. Rail subsidies have increased from £3.4bn in 1992–93 to £4.5bn in 2015–16 (in current prices), although subsidy per journey has fallen from £4.57 per journey to £2.61 per journey. However, this masks great regional variation, as in 2014–15 funding varied from "£1.41 per passenger journey in England to £6.51 per journey in Scotland and £8.34 per journey in Wales." The public image of rail travel

6572-544: The average age to around 15 years by March 2021. Although passengers rarely have cause to refer to either document, all travel is subject to the National Rail Conditions of Travel and all tickets are valid subject to the rules set out in a number of so-called technical manuals , which are centrally produced for the network. Below are the estimated total number of journeys using heavy rail transport in Britain for each financial year. (This table does not include Eurostar, Underground or light rail services) The following table

6696-624: The case of the InterCity West Coast and InterCity East Coast franchises, applicants submit bids to return the most money to the government from operating the service. This has led to franchisees collapsing when passenger growth targets are not met as promised payments to the government cannot be paid and the franchise is exited early. In 2023, Network Rail held over £59.1   billion in debt, and £1.176   billion interest payments. Many of these debts were incurred by Railtrack and transferred to Network Rail when it collapsed. British Rail operations were privatised during 1994–1997. Ownership of

6820-480: The cheapest fares in Europe if they book in advance or travel at off-peak times or purchase 'day-return' tickets which cost little more than a single ticket. UK rail operators point out rail fare increases have been at a substantially lower rate than petrol prices for private motoring. The difference in price has also been blamed on the fact Britain has the most restrictive loading gauge (maximum width and height of trains that can fit through tunnels, bridges etc.) in

6944-440: The coordination of transport in Great Britain. Rail revenue fell and in 1955 the network again ceased to be profitable. The mid-1950s saw the rapid introduction of diesel and electric rolling stock, but the expected transfer back from road to rail did not occur and losses began to mount. The desire for profitability led to a major reduction in the network during the mid-1960s, with ICI manager Dr. Richard Beeching commissioned by

7068-436: The domestic fleet of InterCity 125 and 225 trains on the existing national network was announced. In 2009 it was announced that the preferred rolling stock option for this project was the Hitachi Super Express family of multiple units, and they entered service in 2017 on the Great Western Main Line and in 2019 on the East Coast Main Line. The trains will be capable of a maximum speed of 140 mph with "minor modifications", with

7192-407: The down main and down electric lines near Brentwood (17 miles 35 chains from Liverpool Street) and on the up main near Margaretting (25 miles 78 chains). Other equipment includes wheel impact load detectors (WILD) ‘Wheelchex’ on the down main and up main west of Church Lane level crossing (24 miles 75 chains). On leaving Liverpool Street, the route comprises two pairs of tracks, known as the mains and

7316-429: The electrics, with a further pair of tracks, the suburbans, which carry the West Anglia Main Line alongside the GEML to Bethnal Green . From Bethnal Green, the GEML has four lines to Bow junction, where there is a complex set of switches and crossings. A line from the LTS (Fenchurch Street) route joins the "up" (London-bound) electric and there are a further two lines, the "up" and "down" Temple Mills, giving access to

7440-404: The end of September 2003, the first part of High Speed 1 , a high-speed link to the Channel Tunnel and onward to France and Belgium, was completed, significantly adding to the rail infrastructure of the country. The rest of the link, from north Kent to London St Pancras opened in 2007. A major programme of remedial work on the West Coast Main Line started in 1997 and finished in 2008. Since

7564-545: The existing Network Rail infrastructure if required, with the route intersecting with the existing WCML and the East Coast Main Line (ECML). A cancelled second phase of the project was planned to reach further north to Manchester, Sheffield and Leeds, as well as linking into the Midland Main Line . In June 2014, the chancellor of the Exchequer, George Osborne , proposed a high-speed rail link Northern Powerhouse Rail (also known as High Speed 3 or High Speed North) between Liverpool and Newcastle/Sheffield/Hull. The line would use

SECTION 60

#1732772958420

7688-399: The existing route between Liverpool and Newcastle/Hull and a new route from to Sheffield will follow the same route to Manchester Victoria and then a new line from Victoria to Sheffield, with additional tunnels and other infrastructure. As of August 2023 the following rolling stock on the British network is capable of 125 mph or more: In 2011, the fastest timetabled start-to-stop run by

7812-589: The financial effects of the COVID-19 pandemic . The UK government proposed a new state-owned public body, Great British Railways , which would operate a concession contract system on the network from 2023. As of November 2023 , legislation to establish the new body was said to be "unlikely" within the 2023–2024 parliamentary session. In the 2015–16 operating year, franchised services provided 1,718 million journeys totalling (64.7 billion billion passenger km) of travel, an increase over 1994–5 of 117% in journeys (from 761 million) and just over doubling

7936-414: The first of a new Class 395 train fleet for use partly on High Speed 1 and parts of the rest of the UK rail network, the first domestic high-speed running over 125 mph (to about 140 mph) began in December 2009, including a special Olympic Javelin shuttle for the 2012 Summer Olympics . These services are operated by the South Eastern franchise . The Intercity Express Programme for replacement of

8060-462: The first public railways in the early 19th century, from about 1900 onwards the network suffered from gradual attrition, and more severe rationalisation in the 1950s and 1960s. However, the network has again been growing since the 1980s. The UK was ranked eighth among national European rail systems in the 2017 European Railway Performance Index for intensity of use, quality of service and safety performance. To cope with increasing passenger numbers, there

8184-668: The five geographical Regions were replaced by a Sectored organisation, in which passenger services were organised into InterCity , Network SouthEast and Regional Railways sectors. The Railways Act 1993 divided the railways up, with Railtrack taking ownership of British Rail's property portfolio, tracks, signals, bridges and tunnels, Rolling Stock Operating Companies, and train operating companies. Passenger transport services were bundled together into franchises to facilitate cross-subsidy within franchises, with many regulations on ticket prices and types, regulated fare increases and "Parliamentary service" obligations. Companies submit bids to

8308-705: The franchising authority - often the Secretary of State for Transport, Passenger Transport Authority, or devolved government - competing for the lowest subsidy requirement and to invest in the railway over the lifespan of the franchise. There is also provision for subsidy between franchises, with profitable franchises demanding payments made to the government to cover a share of the losses from others. Examples of franchises include ScotRail , Great Western , and Southern Trains . Open Access Operators are entirely free to set their own services and fares unaffected by government regulations. Examples of such operators are Lumo and Grand Central , Hull Trains and Heathrow Express . In

8432-452: The goods sector, replacing inefficient wagons with containerised regional hubs. Freight services had been in steady decline since the 1930s, initially because of the reduction in manufacturing and then road haulage's cost advantage in combination with higher wages. Since 1995, however, the amount of freight carried on the railways has increased sharply due to increased reliability and competition, as well as international services. In 2000,

8556-427: The government resisted calls for the nationalisation of the network (first proposed by 19th century Prime Minister William Gladstone as early as the 1830s). Instead, from 1 January 1923, almost all the remaining companies were grouped into the "big four": the Great Western Railway , the London and North Eastern Railway , the London Midland and Scottish Railway and the Southern Railway companies (there were also

8680-409: The government under Ernest Marples with reorganising the railways. Many branch lines (and a number of main lines) were closed because they were deemed uneconomic ("the Beeching Axe " of 1963), removing much feeder traffic from main line passenger services. In the second Beeching report of 1965, only the "major trunk routes" were selected for large-scale investment, leading many to speculate the rest of

8804-410: The hour. Summer Saturdays in 1950 also saw the introduction of the Holiday Camps Express workings to Gorleston, near Lowestoft. The latter half of 1950 and early 1951 saw the testing of new EM1 electric locomotives for use over the Woodhead Line between Manchester and Sheffield . January 1951 saw the introduction of the Britannia class 4-6-2 express locomotives and a speeding up of services on

8928-639: The introduction of the Class 390 Pendolino stock on that route. By March 2020, new Class 745 EMUs had fully replaced Class 90 and Mark 3 coaches; thereby ending locomotive operation on the inter-city services on the Great Eastern Main Line. Electric multiple units are used for inner and outer suburban passenger trains and diesel multiple units are used on non-electrified branch lines. The main passenger units utilised are: On weekends and when engineering work occurs, c2c run services into Liverpool Street via Stratford using Class 357 electric multiple units (EMU). Freight services also operate frequently on

9052-538: The issue of £200,000 worth of shares to build a line between the two towns, via Reedham and the Yare valley . The chairman was George Stephenson and the chief engineer was his son, Robert Stephenson . Construction started in April 1843 and the 20 + 1 ⁄ 2 -mile (33 km) line was completed within a year. There was an inspection and inaugural run on 12 April 1844 and a ceremonial opening on 30 April 1844, followed

9176-566: The likes of Heathrow Airport and Reading . Instead, these services start from Abbey Wood , The Elizabeth line's southeast branch. Rail transport in Great Britain The railway system in Great Britain is the oldest railway system in the world. The first locomotive-hauled public railway opened in 1825, which was followed by an era of rapid expansion. Most of the track is managed by Network Rail , which in 2017 had

9300-568: The line as far as Manningtree became part of Network SouthEast , although some NSE services actually terminated at Ipswich, whilst longer-distance Norwich services were operated by InterCity. Local services operating from the Ipswich and Norwich areas were operated by Regional Railways . Between 1997 and 2004, services into Essex and some into Suffolk were operated by First Great Eastern , whilst services into Norfolk and other Suffolk services were operated by Anglia Railways . Between 2004 and 2012, services out of Liverpool Street, except for

9424-551: The line is immediately south of Ipswich station. The 361-yard (330 m) long tunnel was built by Peter Bruff as part of the Ipswich & Bury Railway . It was completed in 1846 and it is thought to be the earliest driven on a sharp continuous curve. During the excavation of the tunnel, many important fossils were discovered, including rhinoceros, lion and mammoth; the site was known as the "Stoke Bone Beds". The finds are considered important in understanding climate change during

9548-418: The line throughout its history: The line is owned and maintained by Network Rail . It is part of Network Rail Strategic Route 7 , which is composed of SRSs 07.01, 07.02 and 07.03, and is classified as a primary line. The GEML has a loading gauge of W10 between Liverpool Street and Haughley Junction (approximately 13 miles 63 chains north of Ipswich) and from there is W9 to Norwich . The maximum line speed

9672-588: The main line to Southminster , Braintree , Sudbury , Harwich and a number of coastal towns including Southend-on-Sea , Clacton-on-Sea , Walton-on-the-Naze and Lowestoft . Its main users are commuters travelling to and from London, particularly the City of London , which is served by Liverpool Street, and areas in east London, including the Docklands financial district via the London Underground and Docklands Light Railway connections at Stratford . The line

9796-630: The most part in large cities, with the largest conurbations (e.g. Birmingham, Bristol, Cardiff , Edinburgh, Glasgow , Liverpool , and Manchester ) typically having more than one main station. London is a major hub of the network, with 12 main-line termini forming a "ring" around central London . Birmingham, Leeds, Manchester, Glasgow, Bristol and Reading are major interchanges for many cross-country journeys that do not involve London. However, some important railway junction stations lie in smaller cities and towns, for example York , Crewe and Ely . Some other places expanded into towns and cities because of

9920-482: The national network and the company's spiralling costs set in motion a series of events which resulted in the collapse of the company and its replacement with Network Rail , a state-owned, "not-for-profit" company, with risks underwritten by the taxpayer. According to the European Railway Agency , in 2013 Britain had the safest railways in Europe based on the number of train safety incidents. At

10044-411: The near future and ScotRail was brought into public ownership in 2022. Initially, there were 25 franchises, some franchises have since been combined, others nationalised. There are also a number of local or specialised rail services operated on an open access basis outside the franchise arrangements; examples include Heathrow Express and Hull Trains . Many franchises were effectively abolished due to

10168-734: The necessary signalling modifications required of the Network Rail infrastructure in Britain likely to come from the phased rollout of the Europe-wide European Rail Traffic Management System (ERTMS). Following several studies and consultations on high-speed rail, in 2009 the UK Government formally announced the High Speed 2 project, establishing a company to produce a feasibility study to examine route options and financing for

10292-448: The need to shunt the carriages out of the station. The GER and Norwich Thorpe changed little for the next 30 years. On 22 May 1916, the GER closed Trowse station as a wartime economy measure. That meant the first station south of Thorpe on the Ipswich line was Swainsthorpe and the next station west of Thorpe on the Ely line was Hethersett. On 1 April 1919, five months after the end of the war,

10416-467: The network would eventually be closed. This was never implemented by BR. Passenger services experienced a renaissance with the introduction of the InterCity 125 trains in the 1970s. Passenger levels fluctuated since then, increasing during periods of economic growth and falling during recessions. The 1980s saw severe cuts in government funding and above-inflation increases in fares, In the early 1990s,

10540-564: The new Labour government confirmed that passenger services would be brought back into public ownership upon the expiration of their contracts as part of the wider renationalisation of the rail network. Passenger services in Great Britain were divided into regional franchises and run by mostly private (that is, non-state owned) train operating companies from 1995 to 2020. These companies bid for seven- to eight-year contracts to run individual franchises. Most contracts in England are awarded by

10664-521: The next day by the beginning of regular passenger services. On 18 May 1844, 17 days after the Y&NR started running train services, Parliament gave the Royal Assent to the Norwich & Brandon Railway (N&BR). This was part of a plan to link the Y&NR with London, by linking up with the Eastern Counties Railway (ECR) being built from Newport, Essex , to Brandon, Suffolk . Work started quickly during 1844 and went on into 1845. On 30 June 1845,

10788-529: The outbreak of the Second World War brought the project to a temporary halt and it was not until 1949 that the scheme was completed with electrification being extended to Chelmsford in 1956. During World War II , the long-distance named trains were withdrawn, and these returned after the war with the reintroduction of the "Hook Continental" and "Scandinavian" boat trains to Harwich Parkeston Quay in 1945. The East Anglian (Liverpool Street – Norwich)

10912-549: The passenger miles. The passenger-miles figure, after being flat from 1965 to 1995, surpassed the 1947 figure for the first time in 1998 and continues to rise steeply. The key index used to assess passenger train performance is the Public Performance Measure , which combines figures for punctuality and reliability. From a base of 90% of trains arriving on time in 1998, the measure dipped to 75% in mid-2001 due to stringent safety restrictions put in place after

11036-690: The period 1997–98 to 2014 as compared to 62% in Germany, 41% in France and 16% in Spain. The United Kingdom is a member of the International Union of Railways (UIC). The UIC country code for United Kingdom is 70. The UK has the 17th largest railway network in the world ; despite many lines having closed in the 20th century, due to the Beeching cuts , it remains one of the densest networks. It

11160-546: The railway network. Swindon , for example, was little more than a village before the Great Western Railway chose to site its locomotive works there. In many instances geography, politics or military considerations originally caused stations to be sited further from the towns they served until, with time, these issues could be overcome (for example, Portsmouth had its original station at Gosport ). High-speed inter-city rail (above 124 mph or 200 km/h)

11284-400: The railways in East Anglia were in financial trouble and most were leased to the Eastern Counties Railway . They wanted to amalgamate them formally, but government agreement could not be obtained until an Act of Parliament on 7 August 1862, when the Great Eastern Railway (GER) was formed by the amalgamation. Actually, Norwich Thorpe and Norwich Victoria became GER stations on 1 July 1862, when

11408-435: The railways, with journeys in 2020 being about 22% of the previous year, before rising again as travel restrictions eased. During 2020, all train operating companies entered into emergency measures agreements with the UK and Scottish governments. Normal franchise mechanisms were amended, transferring almost all revenue and cost risk to the government, effectively 'renationalising' the network temporarily. In September 2020,

11532-536: The route has more than two tracks, predominantly through stations such as Colchester and Ipswich, along with goods loops, such as at the London end of Ingatestone . There is also a short stretch of single track on approach to Norwich, as the line passes over the River Wensum on the Trowse Bridge. Major civil engineering structures on the Great Eastern Main Line include the following: The only tunnel on

11656-466: The route to obtain larger clearances. The route between Liverpool Street and Southend Victoria was converted to 25   kV AC between 1976 and 1980. By the late 1970s, the costs of running the dated mechanical signalling systems north of Colchester was recognised and, in 1978, a scheme for track rationalisation and re-signalling was duly submitted to the Department of Transport. This was followed by

11780-411: The route was electrified at 6.25   kV   AC. The section between Liverpool Street and Southend Victoria was completed in November 1960. Extensive testing showed that smaller electrical clearances could be tolerated for the 25   kV system than originally thought necessary. As a result, it was now possible to increase the voltage without having to either raise bridges or lower the tracks along

11904-486: The service from 1985 until 2005, with rakes of Mark 2 coaches. Push-pull services were introduced during their tenure, initially using a DBSO coach at the Norwich end and latterly with Mark 3 Driving Van Trailers , cascaded from the West Coast Main Line . From 2004, Class 90 locomotives replaced the ageing Class 86s and rolling stock was updated with refurbished former West Coast Main Line Mark 3 coaches, following

12028-512: The station throat. The new arrangement also facilitated cross-platform interchange with the Central line at Stratford , with services commencing in 1946. Either side of the Ilford flyover there are single-track connections between each pair of lines, with the westbound track extending to Manor Park and just beyond. The eastbound track extends as far as Ilford station. It was also envisaged that

12152-532: The station was bombed in June 1940 and April 1942. Following the Transport Act 1947 the Big Four railway companies, including the LNER, were amalgamated into the nationalised British Railways (BR). On 1 January 1948, the nationalisation of Britain's railways saw the operation of Norwich Thorpe station pass to British Railways (Eastern Region) . Platform 6 was added in 1954 and a modern booking hall

12276-454: The survey started) to 83% in 2013 and the number of passengers not satisfied with their journey dropped from 10% to 6%. Since privatisation, passenger levels have more than doubled, and have surpassed their level in the late 1940s. Train fares cost 2.7% more than under British Rail in real terms on average. However, while the price of anytime and off-peak tickets has increased, the price of Advance tickets has dramatically decreased in real terms:

12400-606: The tilting train Class 390 Pendolino fleet designed for this maximum speed of service were still built and entered service in 2002, and operates limited to 125 mph. Other routes in the UK were upgraded with trains capable of top speeds of up to 125 mph running with the introduction between 2000 and 2005 of Class 180 Adelante DMUs and the Bombardier Voyager DEMUs (Classes 220 , 221 and 222 ). The first implementation of high-speed rail up to 186 mph in regular passenger service in Great Britain

12524-551: The track and infrastructure passed to Railtrack , whilst passenger operations were franchised to individual private sector operators (originally there were 25 franchises) and the goods services sold outright (six companies were set up, but five of these were sold to the same buyer). The government said privatisation would see an improvement in passenger services and satisfaction (according to the National Rail Passenger survey) has indeed gone up from 76% in 1999 (when

12648-482: The war and the private sector only had two years to deal with this after the war ended. After 1945, for both practical and ideological reasons, the government decided to bring the rail service into the public sector . From the start of 1948, the "big four" were nationalised to form British Railways (latterly British Rail ) under the control of the British Transport Commission . Although BR

12772-469: The world which means any trains must be significantly narrower and less tall than those used elsewhere. This means British trains cannot be bought "off-the-shelf" and must be specially built to fit British standards. Average rolling-stock age fell slightly from the third quarter of 2001–02 to 2017–18, from 20.7 years old to 19.6 years old, and recent large orders from Bombardier and its acquirer Alstom , as well as CAF , Hitachi and Stadler , brought down

12896-498: Was a single entity, it was divided into six (later five) regional authorities in accordance with the existing areas of operation. Though there were few initial changes to the service, usage increased and the network became profitable. Regeneration of track and railway stations was completed by 1954. In the same year, changes to the British Transport Commission, including the privatisation of road haulage, ended

13020-464: Was added between Bow Junction and Stratford to help accommodate London, Tilbury and Southend Railway services which at that time were operating via Stratford. Until 1860, trains serving the town of Ipswich used a station called Ipswich Stoke Hill which was located south of the Stoke tunnel. The town's current station is located to the north of the tunnel. The ECR had leased the EUR from 1854 but by

13144-452: Was apparent a new station was required in Norwich. It was built to the north of the original station, opening on 3 May 1886 and is the structure surviving today. The old terminus became part of the expanded goods facilities. The new station was built, at the cost of £60,000, by Messrs Youngs and Son, of Norwich, from designs by Messrs J Wilson and W. N. Ashbee , the company's engineer and architect respectively. The attractive station building

13268-476: Was built by the Eastern Union Railway (EUR) to standard gauge and opened to passenger traffic in June 1846. Its sister company, the Ipswich and Bury Railway, built a line to Bury St Edmunds and this was completed in November 1846. Both companies shared the same office, many directors and key staff, and started operating as a unified company with the EUR name from 1 January 1847. An extension from

13392-465: Was built in 1955. During the late 1950s, steam locomotives were phased out across the East Anglian network and replaced by diesel-powered trains. After Norwich City station was closed as part of the Beeching cuts , British Rail decided to revert the name of the station to Norwich , which took effect on 5 May 1969. When the station closed briefly for electrification works in 1986, Trowse ,

13516-617: Was constructed around a central clock tower (the clock was supplied by Dixons and Co of London Street, Norwich) with two-storey matching wings either side. A portico was built onto the clock-tower section. There was a circulating area with a high ceiling and the roof was supported by ironwork supplied by contractor Barnard Bishop and Barnard. The roof extended partly down the platforms, which were then covered by canopies for part of their length. There were initially five platforms, with engine-release roads between platforms 2 and 3, and 4 and 5, which allowed locomotives to be detached from trains without

13640-445: Was extended back to James Street Junction (near Globe Road station which opened the same year) in 1884, but Bethnal Green to James Street did not follow until 1891. It was also in this year that two extra tracks were added between Bethnal Green and Liverpool Street which were for the use of West Anglia Main Line services. These tracks were built through the basement warehousing associated with Bishopsgate station located above. The line

13764-649: Was first introduced in Great Britain in the 1970s by British Rail. BR had pursued two development projects in parallel, the development of a tilting train technology, the Advanced Passenger Train (APT), and development of a conventional high-speed diesel train, the High Speed Train (HST). The APT project was abandoned, but the HST design entered service as the British Rail Classes 253, 254 and 255 trains. The prototype HST,

13888-494: Was later built as a patchwork of local lines operated by small private railway companies. Over the course of the 19th and early 20th centuries, these amalgamated or were bought by competitors until only a handful of larger companies remained (see Railway Mania ). The entire network was brought under government control during the First World War and a number of advantages of amalgamation and planning were revealed. However,

14012-435: Was located to the south west of the station. This depot closed in 1982 and was replaced by a new facility at Crown Point which, in 2015, is responsible for the maintenance of the main line electric fleet and local diesel multiple units. Before carriages were lit by electric lighting they were lit by gas. Norwich had an oil gas works and carriages north of a line from Harwich to Cambridge were supplied with oil gas. The gas

14136-591: Was matched by several Leeds to London Class 91 -operated East Coast trains if their two-minute recovery allowance for this section is excluded from the public timetable. A number of towns and cities have rapid transit networks. Underground technology is used in the Glasgow subway , Merseyrail centred on Liverpool, London Underground centred on London, London Overground and the London Docklands Light Railway centred on London, and

14260-569: Was not in place on the normal British railway network (but was used on the Channel Tunnel Rail Link). A final attempt by the nationalised British Rail at High Speed Rail was the cancelled InterCity 250 project in the 1990s for the West Coast Main Line. Post privatisation, a plan to upgrade the West Coast Main Line to speeds of up to 140 mph with infrastructure improvements were finally abandoned, although

14384-555: Was partly due to more international services including the Channel Tunnel and Port of Felixstowe , which is containerised. Nevertheless, as of 2008, network bottlenecks and insufficient investment in catering for 9' 6" high shipping containers restricted growth. Norwich railway station Norwich railway station (formerly Norwich Thorpe ) is the northern terminus of the Great Eastern Main Line in

14508-528: Was planned that by September 2017, half of the services between Shenfield and Liverpool Street will have switched to the new Class 345 trains. From May 2015, Crossrail services (re-branded as TfL Rail ) have an interchange with existing GEML services at Liverpool Street (via new underground platforms) as well as Stratford , Romford and Shenfield . In November 2022, Crossrail services began to operate between Shenfield and London Paddington via Farringdon . However no services operate further than Paddington onto

14632-568: Was quadrupled to Ilford in 1895, and in 1899 out to Seven Kings . In 1902, the quadruple track was extended from Seven Kings to Romford, but it wasn't until 1913 that four-tracking out to Shenfield was suggested and the First World War caused delay to this plan. In 1903, the Fairlop Loop opened and a number of services that had previously terminated at Ilford were extended onto it. These services generally looped round and back to

14756-483: Was restored in October 1946, and in 1947 the "Day Continental" which pre-war had operated as the "Flushing Continental", recommenced operation. After nationalisation in 1948, the GEML formed part of the Eastern Region of British Railways . The Summer 1950 timetable saw the introduction of a regular interval service between Liverpool Street and Clacton, which left Liverpool Street on the half-hour and Clacton on

14880-441: Was severely damaged by a series of significant accidents after privatisation. These included the Hatfield accident , caused by a rail fragmenting due to the development of microscopic cracks. Following this, the rail infrastructure company Railtrack imposed over 1,200 emergency speed restrictions across its network and instigated an extremely costly nationwide track replacement programme. The consequent severe operational disruption to

15004-546: Was the Channel Tunnel Rail Link (now known as High Speed 1 ), when its first phase opened in 2003 linking the British end of the Channel Tunnel at Folkestone with Fawkham Junction in Kent. This is used by international only passenger trains for the Eurostar service, using Class 373 and Class 374 trains. The line was later extended all the way into London St Pancras in 2007. After the building of

15128-518: Was the first distinctive suburban service on the main line as previously main line trains had performed this duty) terminated at a bay platform at Forest Gate . These were followed by trains from Fenchurch Street in 1877. By 1882, these services had been extended and were terminating at Ilford, Romford or Brentwood. In 1877, a fourth track was added between Bow Junction and Stratford and two goods-only tracks were added between Stratford and Maryland Point . The four-track Bow Junction to Stratford section

15252-586: Was the terminus for some passenger services from London until 1916, as well as being a goods station until its demolition in the 1970s. Norwich City was the terminus of the Midland and Great Northern Joint Railway line from Melton Constable until it was closed to passengers in 1959. The original station was opened by the Yarmouth & Norwich Railway (Y&NR), which was the earliest railway in Norfolk. The YNR's Act of Parliament of 18 June 1842 authorised

15376-485: Was used for crew training. The first passenger carrying train was formed of Class 309 EMUs, which ran on 17 April 1985. InterCity electric-hauled trains commenced on the route on 1 May 1985. Class 86 locomotives initially only powered services between Liverpool Street and Ipswich; after a switchover, Class 47s would complete the journey between Ipswich and Norwich. This last section was finally energised in May 1987, when through electric services commenced. In 1986,

#419580