29-470: The IRT Eastern Parkway Line is one of the lines of the A Division of the New York City Subway . Built for the Interborough Rapid Transit Company (IRT), it stretches from Downtown Brooklyn south along Flatbush Avenue and east along Eastern Parkway to Crown Heights . After passing Utica Avenue , the line rises onto an elevated structure and becomes the New Lots Line to the end at New Lots Avenue in East New York, Brooklyn . The west end of

58-597: A $ 2.17 low bid for the Nostrand–Buffalo Avenues contract in July 1915. although New York City's acting mayor and the New York City Board of Estimate initially refused to approve the contract. The tunnel between Grand Army Plaza and Nostrand Avenue was built using the cut-and-cover method, with two steam shovels excavating an estimated 600,000 cubic yards (460,000 m). Dirt from the excavation of

87-558: A provision meant for a line over the Manhattan Bridge. Construction of the Clark Street Tunnel began on October 12, 1914, using a tunneling shield in conjunction with compressed air. The north tube was holed through on November 28, 1916. At 5,900 feet long, with about 3,100 feet underwater, the tunnel was finally opened for revenue service on April 15, 1919. The opening of the tunnel allowed access to Brooklyn via

116-552: The BMT Brighton Line beneath it. The first station along this segment is Nevins Street , which contains a never used lower level, and then joins Atlantic Avenue–Barclays Center , the end of the oldest section of the line. Between Bergen Street and Grand Army Plaza , the line splits around the BMT Brighton Line. East of Grand Army Plaza, the line finally moves under its namesake, the first station serving

145-836: The Brooklyn Museum . The next station is a complex near the Brooklyn Botanic Garden that serves the above ground BMT Franklin Avenue Line and the beginning of the IRT Nostrand Avenue Line , which branches off to the south shortly afterwards at Nostrand Junction. The last three stations are a two-over-two track layout with a platform on each level. Afterwards, the IRT Eastern Parkway Line ends under Ralph Avenue, one block east of its originally intended terminus, whereas

174-709: The Flatbush Avenue LIRR station . The application was approved, and the IRT extension opened on May 1, 1908. With the opening of the IRT to Brooklyn on May 1, 1908, ridership fell off on the BRT's elevated and trolley lines over the Brooklyn Bridge with Brooklyn riders choosing to use the new subway. During the construction of the Brooklyn extension, provisions were made for future subway extensions in Brooklyn by

203-599: The Franklin Avenue station , where all tracks would be on the same level. In April 1915, nineteen companies submitted bids to construct the section of line between Grand Army Plaza and Nostrand Avenue . The low bidder for this contract was the Inter-Continental Company. which bid $ 2.7 million; the contract was confirmed that May. The next contract was for the section between Nostrand Avenue and Buffalo Avenue, Rodgers & Hagerty Inc. submitted

232-705: The IRT Division , is a division of the New York City Subway , consisting of the lines operated with services designated by numbers ( 1 , 2 , 3 , 4 , 5 , 6 , 7 ) and the 42nd Street Shuttle . These lines and services were operated by the Interborough Rapid Transit Company before the 1940 city takeover. A Division cars are narrower, shorter, and lighter than those of the B Division , measuring 8.6 by 51 feet (2.62 by 15.54 m). The following lines are part of

261-683: The IRT Third Avenue Line at Canal Street and Bowery. In 1913, New York City, the Brooklyn Rapid Transit Company , and the Interborough Rapid Transit Company (IRT) reached an agreement, known as the Dual Contracts , to drastically expand subway service across New York City. As part of Contract 3 of the agreement, between New York City and the IRT, the original subway opened by the IRT in 1904 to City Hall , and extended to Atlantic Avenue in 1908,

290-631: The A Division (services shown in parentheses; lines with colors next to them are trunk lines ): Numbers were assigned to subway services in 1948: The 42nd Street Shuttle and Bowling Green–South Ferry Shuttle also provided subway services, and elevated service remained on the Third Avenue Line and Polo Grounds Shuttle . This New York City transportation –related article is a stub . You can help Misplaced Pages by expanding it . Franklin Avenue From Misplaced Pages,

319-709: The Eastern Parkway Line is at the Joralemon Street Tunnel under the East River . The IRT Nostrand Avenue Line splits from the local tracks of the Eastern Parkway Line south of the Franklin Avenue station. The Eastern Parkway Line to Atlantic Avenue is part of Contract 2 of the Interborough Rapid Transit Company's plan to construct an extension of the original subway, Contract 1. Contract 2 extended

SECTION 10

#1732771775504

348-622: The Eastern Parkway Line tunnels between Borough Hall and Franklin Avenue. The project was expected to take 33 months. The renovations were announced following two incidents in 2018, when ceilings at the Borough Hall and Atlantic Avenue stations partially collapsed, injuring passengers. The following services use part or all of the IRT Eastern Parkway Line: and weekends The IRT Eastern Parkway Line enters Brooklyn through

377-460: The IRT Division. The project was projected to take two years long and it would have involved the reconfiguration of the track layout in this area. The platforms at the two stations would be extended to accommodate 10-car trains, as opposed to the eight and nine-car trains that they could platform at the time. The tracks between the two stations would be straightened, removing some of the bend in

406-517: The IRT extension took place on May 23, 1914, but actual work did not start for several weeks. The groundbreaking was section 1A, stretching between Grand Army Plaza and St. Mark's Avenue. The Cranford Company received a construction contract for this section in March 1914 after making a low bid of about $ 2.2 million, The section between Atlantic Avenue and St. Mark's Avenue was placed for bidding in June 1914;

435-589: The IRT from both the East and West Sides of Manhattan. On February 2, 1948, the platform extensions at Hoyt Street opened, allowing 10-car express trains to board as opposed to only 5-car trains. In August 1961, the chairman of the New York City Transit Authority , Charles Patterson, announced a $ 2.5 million project that would get rid of a trouble spot on the line between Nevins Street and Atlantic Avenue that slows service and backs up

464-660: The Joralemon Street Tunnel from the IRT Lexington Avenue Line and continues to run under the street that the tunnel was named after, until after Borough Hall . East of the Borough Hall station, at Adams Street and Boerum Plaza, the IRT Broadway–Seventh Avenue Line merges with the line. The Eastern Parkway Line continues as a four-track line under Fulton Street , then turns southeast under Flatbush Avenue , which also has

493-539: The Transit Company made a low bid of $ 2.195 million for this contract. Before construction on Eastern Parkway even began, Brooklyn park commissioner Raymond Ingersoll recommended that the plans be modified to avoid damaging trees on Eastern Parkway. As a result, plans for the line were changed in October 1914. Under the revised plan, the four-track tunnel under Eastern Parkway was to be double-decked, except at

522-563: The West Side of Manhattan. South of Chambers Street, there were to be two branches constructed. One of these branches would turn eastward under Park Place and Beekman Street and down William Street and Old Slip. After going through Lower Manhattan, the second branch would go through a tunnel under the East River before running under Clark and Fulton Streets until a junction at Borough Hall with the existing Contract 2 IRT Brooklyn Line, using

551-513: The construction of four tracks between Borough Hall and Atlantic Avenue, and the construction of bellmouths at Fulton Street and Flatbush Avenue, at Flatbush Avenue and Lafayette Avenue, and at Atlantic Avenue and Fourth Avenue. On May 26, 1908, the IRT applied with the Public Service Commission to build a route connecting with these provisions along Flatbush Avenue from Fulton Street along the Manhattan Bridge, connecting with

580-427: The failure of the contractor to perform work as scheduled on the local stations. On October 10, 1920, the three stations that had not opened with the rest of the line, at Bergen Street , Grand Army Plaza and Eastern Parkway–Brooklyn Museum , were opened. In addition, as part of Contract 3, the IRT agreed to build a branch of the original subway line south down Seventh Avenue, Varick Street, and West Broadway to serve

609-657: The 💕 Franklin Avenue can refer to: Franklin Avenue (Los Angeles) Franklin Avenue Bridge , Minneapolis BMT Franklin Avenue Line , a New York City Subway line Franklin Avenue Shuttle , a shuttle service on the line See also [ edit ] Franklin Street (disambiguation) Franklin Avenue Station (disambiguation) [REDACTED] Topics referred to by

SECTION 20

#1732771775504

638-514: The local tracks become the IRT New Lots Line , branching off to the southeast emerging from the ground near Buffalo Avenue at Lincoln Terrace Park. The line was built mostly with two levels, with southbound trains on the upper level, and northbound trains on the lower level to protect the trees in the north median of Eastern Parkway to the greatest extent possible. A Division (New York City Subway) The A Division , also known as

667-545: The original line from City Hall in Manhattan to Atlantic Avenue in Brooklyn. The Board of Rapid Transit Commissioners approved the route on September 27, 1900, and the contract was signed on September 11, 1902. Construction commenced on Contract 2 on March 4, 1903. In order to cross the East River, a tunnel had to be constructed. That tunnel, the Joralemon Street Tunnel, was the first underwater subway tunnel connecting Manhattan and Brooklyn. It opened on January 9, 1908, extending

696-412: The same term This disambiguation page lists articles about roads and streets with the same name. If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=Franklin_Avenue&oldid=776689049 " Category : Road disambiguation pages Hidden categories: Short description

725-578: The subway from Bowling Green to Borough Hall. Clifford Milburn Holland served as the assistant engineer during the construction of the tunnel. It was added to the U.S. National Register of Historic Places on February 9, 2006. On April 28, 1908, the IRT formally applied with the New York Public Service Commission for permission to open the final section of the Contract 2 line from Borough Hall to Atlantic Avenue near

754-459: The tracks, but not removing it entirely. The tracks were to be straightened enough to allow for the running time between the two stations to be cut by one to two minutes. During the 1964–1965 fiscal year, the platforms at Bergen Street , Grand Army Plaza , Eastern Parkway , Nostrand Avenue and Kingston Avenue were lengthened to 525 feet to accommodate a ten-car train of 51-foot IRT cars. The MTA announced in October 2020 that it would renovate

783-418: The tunnel was used to infill the old Brighton Beach Race Course . Mayor John Francis Hylan inspected the line on August 20, 1920, prior to its official opening. At 12:40 a.m. on August 23, 1920, the Eastern Parkway Line was extended from Atlantic Avenue to Utica Avenue . The new lines would be served by trains from Seventh Avenue. Trains did not make stops between Atlantic Avenue and Franklin Avenue because of

812-602: Was to be constructed. The underground portion of the line became known as the Eastern Parkway Line, or Route 12, while the elevated portion became known as the New Lots Line. The IRT Eastern Parkway Line was built as part of Route 12 from 1915 to 1918, from the section east of the Atlantic Avenue station to Utica Avenue and down the Nostrand Avenue Subway to Flatbush Avenue. Groundbreaking for

841-426: Was to be extended eastward into Brooklyn. The line was to be extended along Flatbush Avenue and Eastern Parkway to Buffalo Street as a four-track subway line, and then along East 98th Street and Livonia Avenue to New Lots Avenue as an elevated two-track line, with provisions for the addition of a third track. In addition, a two-track branch line along Nostrand Avenue branching off east of the Franklin Avenue station