159-786: The Lincoln Tunnel is an approximately 1.5-mile-long (2.4 km) tunnel under the Hudson River , connecting Weehawken, New Jersey , to the west with Midtown Manhattan in New York City to the east. It carries New Jersey Route 495 on the New Jersey side and unsigned New York State Route 495 on the New York side. It was designed by Ole Singstad and named after Abraham Lincoln . The tunnel consists of three vehicular tubes of varying lengths, with two traffic lanes in each tube. The center tube contains reversible lanes , while

318-695: A canal . The central portions of a rapid transit network are usually in the tunnel. Some tunnels are used as sewers or aqueducts to supply water for consumption or for hydroelectric stations. Utility tunnels are used for routing steam, chilled water, electrical power or telecommunication cables, as well as connecting buildings for convenient passage of people and equipment. Secret tunnels are built for military purposes, or by civilians for smuggling of weapons , contraband , or people . Special tunnels, such as wildlife crossings , are built to allow wildlife to cross human-made barriers safely. Tunnels can be connected together in tunnel networks . A tunnel

477-599: A 360 degree looped spiral bridge to reach the entrance to the Lincoln Tunnel under the Hudson River . At the start of the Helix, Route 495 passes Weehawken stadium to the north and east, and would later go under it at the start of the Lincoln Tunnel. The route has a westbound exit and eastbound entrance for and from CR 677 (John F. Kennedy/Hudson Boulevard East). After interchanging with Boulevard East,

636-506: A contract for the "helix" ramp to the express highway was awarded in April of that year. Boring work on the tube itself proceeded quickly, and in May 1938, the two segments of the second tube were holed-through. This was significant because the second tube was only 75 feet (23 m) away from the first tube, and for the past five months, boring operations had proceeded while traffic was running in

795-602: A cost of between $ 9 million and $ 12 million. The Manhattan portal of the new tube was to be located one block west of the original tube's portal, and in August 1941, the Port Authority awarded a contract to build a roadway connecting from the original tube's plaza to the new tube's portal. A new street, Galvin Avenue, was created from 42nd to 40th Streets, running between 10th and 11th Avenues and carrying southbound traffic to

954-503: A cumulative 3.4 million hours per year sitting in congestion on Route 495. The road was built as an approach to the Lincoln Tunnel , with the first section opening December 22, 1937, when the first (now the center) tube of the tunnel was completed. This section ran only from the tunnel portal south through the toll booths to a plaza with Park Avenue and Hudson County Boulevard East . Marginal Street, providing access from Hudson County Boulevard East west over Park Avenue to 32nd Street and

1113-415: A descriptive account of the construction work, comparing the tunnel shield to a "Steel Hercules", calling the sandhogs "ox-strong, rough-clad", and describing the tunnel itself as being like "a bit of the realm of Tartarus". The Midtown Hudson Tunnel's vehicular tube was being excavated from both ends, but the teams on the New Jersey side worked faster because the ground there was softer. As a result, most of

1272-449: A large factor in the decision making process. Civil engineers usually use project management techniques for developing a major structure. Understanding the amount of time the project requires, and the amount of labor and materials needed is a crucial part of project planning. The project duration must be identified using a work breakdown structure and critical path method . Also, the land needed for excavation and construction staging, and

1431-467: A pipe jack, with the span of some box jacks in excess of 20 metres (66 ft). A cutting head is normally used at the front of the box being jacked, and spoil removal is normally by excavator from within the box. Recent developments of the Jacked Arch and Jacked deck have enabled longer and larger structures to be installed to close accuracy. There are also several approaches to underwater tunnels,

1590-455: A rock shelf and then onto a viaduct, which descends before turning west and then north. While it curves west, the helix crosses JFK Boulevard East again, this time in an east-to-west direction. As the viaduct turns north, Park Avenue begins to follow the viaduct along its west side. The two directions split, and the ramp from the center tube to southbound Park Avenue rises between the two directions of traffic. The ramp from northbound Park Avenue to

1749-513: A second tube, which was expected to cost an additional $ 33 million, bringing the total cost of the project to around $ 80 million. The next month, the Port Authority sold a $ 10 million bond issue at a 3% interest rate. In August 1937, the PWA issued $ 29.1 million in funds for the second tube, consisting of a $ 26 million loan and a $ 3.1 million grant. By the time the first tube had opened in December 1937,

SECTION 10

#1732758329674

1908-515: A share of the tunnel's cost. In January 1931, the Port Authority decided that the Midtown Hudson Tunnel's construction was feasible. It recommended that the tunnel be constructed immediately so that the tube could begin carrying traffic in 1937. The $ 95 million cost was proposed to be offset by the 12.5 million vehicles that would use the tunnel in its first year. The preliminary plans included a "mixing plaza", where traffic to and from

2067-502: A short tunnel between the Lincoln Tunnel and the new terminal. The city approved the construction of the new terminal and connecting tunnel in January 1941. Plans for a bus terminal were delayed because of World War II , which used the resources intended for most projects that were not directly involved in the war effort. In November 1936, as construction on the first tube was winding down, the Port Authority's commissioners met to discuss

2226-416: A six-lane divided road running in an open cut , was designated as an eastern extension of NJ 3. Work on the second tube resumed in April 1941 as part of the Port Authority's 20th-anniversary ceremony, the "Port Preparedness Dedication." The United States Army had deemed the Lincoln Tunnel to be an important part of wartime defense, and so the Port Authority expedited plans for completing the tube by 1943 at

2385-421: A specialized method called clay-kicking for digging tunnels in clay-based soils. The clay-kicker lies on a plank at a 45-degree angle away from the working face and rather than a mattock with his hands, inserts with his feet a tool with a cup-like rounded end, then turns the tool with his hands to extract a section of soil, which is then placed on the waste extract. Clay-kicking is a specialized method developed in

2544-579: A tentative agreement to market these bonds at a 4 + 1 ⁄ 2 % rate. The Federal Emergency Administration of Public Works (later the Public Works Administration , or PWA) advanced the Midtown Hudson Tunnel project a $ 37.5 million loan that August. The Port Authority accepted the loan, with the intent to start construction within two months. The loan would be repaid at a relatively low interest rate of 4%, although Galvin stated that this loan would only be sufficient to pay for one of

2703-659: A three-tube vehicular tunnel under the Hudson River , connecting Weehawken, New Jersey , with the West Side of Manhattan , New York, was first proposed by Darwin R. James in 1923. The tube's Manhattan entrance could be built at any point between 23rd and 42nd Streets, while the New Jersey entrance would be located directly across the river in either Hoboken or Weehawken. According to the New Jersey Chamber of Commerce, James's company had enough resources to commence construction. The first trans-Hudson vehicular tunnel,

2862-434: A tube can be sunk into a body of water, which is called an immersed tunnel. Cut-and-cover is a simple method of construction for shallow tunnels where a trench is excavated and roofed over with an overhead support system strong enough to carry the load of what is to be built above the tunnel. There are two basic forms of cut-and-cover tunnelling: Shallow tunnels are often of the cut-and-cover type (if under water, of

3021-747: A tunnel than a sufficiently strong bridge). Some water crossings are a mixture of bridges and tunnels, such as the Denmark to Sweden link and the Chesapeake Bay Bridge-Tunnel in Virginia . There are particular hazards with tunnels, especially from vehicle fires when combustion gases can asphyxiate users, as happened at the Gotthard Road Tunnel in Switzerland in 2001. One of the worst railway disasters ever,

3180-432: A tunnel. Bridges usually require a larger footprint on each shore than tunnels. In areas with expensive real estate, such as Manhattan and urban Hong Kong , this is a strong factor in favor of a tunnel. Boston's Big Dig project replaced elevated roadways with a tunnel system to increase traffic capacity, hide traffic, reclaim land, redecorate, and reunite the city with the waterfront. The 1934 Queensway Tunnel under

3339-471: Is allowed in this tunnel tube, and motorcyclists are directed to the other tube. Each level was built with a three-lane roadway, but only two lanes per level are used – the third serves as a hard shoulder within the tunnel. The A86 Duplex is Europe's longest double-deck tunnel. New Jersey Route 495 Route 495 is a 3.45-mile-long (5.55 km) state highway in Hudson County, New Jersey , in

SECTION 20

#1732758329674

3498-528: Is an eastbound exit and westbound entrance for Park Avenue, which provides access to Weehawken and Hoboken , where Route 495 becomes maintained by the PANYNJ . It enters Weehawken and comes to a westbound exit and eastbound entrance for Park Avenue. At this point, the highway loops around itself at a section of the highway locally known as The Helix , descending the New Jersey Palisades on

3657-609: Is by far the busiest and most productive bus lane in the United States. The lane operates weekday mornings from 6:00 to 10:00 a.m., accommodating approximately 1,850 buses and 70,000 commuters, most of whom continue to the Port Authority Bus Terminal . The ridership on the buses using the XBL is higher than that on NJ Transit 's commuter rail into Penn Station . Over 100 bus carriers utilize

3816-502: Is dug through surrounding soil, earth or rock, or laid under water, and is usually completely enclosed except for the two portals common at each end, though there may be access and ventilation openings at various points along the length. A pipeline differs significantly from a tunnel, though some recent tunnels have used immersed tube construction techniques rather than traditional tunnel boring methods. A tunnel may be for foot or vehicular road traffic , for rail traffic, or for

3975-505: Is intended to carry both the Istanbul metro and a two-level highway, over a length of 6.5 km (4.0 miles). The French A86 Duplex Tunnel  [ fr ] in west Paris consists of two bored tunnel tubes, the eastern one of which has two levels for light motorized vehicles, over a length of 10 km (6.2 miles). Although each level offers a physical height of 2.54 m (8.3 ft), only traffic up to 2 m (6.6 ft) tall

4134-592: Is located right above the tunnel portal. The helix roadway extends over a distance of 4,000 feet (1,200 m). Route 495 approaches the Helix from the west, crossing over John F. Kennedy Boulevard East. To the east of the JFK Boulevard East overpass, the roadway of Route 495 curves to the south and starts its descent. At this point, the westbound direction has a northbound ramp that diverges to two streets: northbound JFK Boulevard East, and northbound Park Avenue. Both directions of Route 495 continue south onto

4293-494: Is relatively long and narrow; the length is often much greater than twice the diameter , although similar shorter excavations can be constructed, such as cross passages between tunnels. The definition of what constitutes a tunnel can vary widely from source to source. For example, in the United Kingdom, a road tunnel is defined as "a subsurface highway structure enclosed for a length of 150 metres (490 ft) or more." In

4452-549: Is responsible for daily operation of the XBL, including its opening and closing, removal of disabled vehicles, and response to emergencies. It is used by buses headed east from the New Jersey Turnpike and Route 3, mainly to the Port Authority Bus Terminal just past the Lincoln Tunnel in Manhattan, serving over 1,800 buses and 65,000 bus commuters on regular weekday mornings, (6-10 a.m.). This bus lane

4611-401: Is sometimes necessary during the excavation of a tunnel. They are usually circular and go straight down until they reach the level at which the tunnel is going to be built. A shaft normally has concrete walls and is usually built to be permanent. Once the access shafts are complete, TBMs are lowered to the bottom and excavation can start. Shafts are the main entrance in and out of the tunnel until

4770-515: Is that the open building pit is muted after tunnel construction; no roof is placed. Some tunnels are double-deck, for example, the two major segments of the San Francisco–Oakland Bay Bridge (completed in 1936) are linked by a 160-metre (540 ft) double-deck tunnel section through Yerba Buena Island , the largest-diameter bored tunnel in the world. At construction this was a combination bidirectional rail and truck pathway on

4929-698: Is the Siloam Tunnel , built in Jerusalem by the kings of Judah around the 8th century BC. Another tunnel excavated from both ends, maybe the second known, is the Tunnel of Eupalinos , which is a tunnel aqueduct 1,036 m (3,400 ft) long running through Mount Kastro in Samos , Greece. It was built in the 6th century BC to serve as an aqueduct . In Ethiopia , the Siqurto foot tunnel , hand-hewn in

Lincoln Tunnel - Misplaced Pages Continue

5088-573: Is the 8,216-foot (2,504 m) center tube, which runs parallel to the 8,006-foot (2,440 m) southern tube. The northern tube is 7,482 feet (2,281 m) long. On the Manhattan side, there is an Art Deco ventilation shaft located west of 12th Avenue. Emergency services at the Lincoln Tunnel are provided by the Port Authority's Tunnel and Bridge Agents, who are stationed at the Port Authority's crossings. They maintain various apparatus such as fire trucks, rescue trucks, and wreckers for serious incidents. Port Authority workers also use cameras to monitor

5247-458: Is the busiest in the United States. Each of the travel lanes in the Lincoln Tunnel's center tube is reversible. In general, both of the lanes, including the exclusive bus lane, serve Manhattan-bound traffic during the weekday morning rush hour, both of the lanes serve New Jersey-bound traffic during the weekday evening rush hour, and one lane is provided in each direction during other time periods. New Jersey-bound traffic normally uses both lanes of

5406-569: The Balvano train disaster , was caused by a train stalling in the Armi tunnel in Italy in 1944, killing 426 passengers. Designers try to reduce these risks by installing emergency ventilation systems or isolated emergency escape tunnels parallel to the main passage. Government funds are often required for the creation of tunnels. When a tunnel is being planned or constructed, economics and politics play

5565-465: The Bergen Turnpike , was also opened at that time. In 1939, the Port Authority opened the rest of the approach, up the helix and west to Route 3 , and it was designated as an eastern extension of Route 3. The final section of today's Route 495 opened on January 15, 1952, with the completion of the New Jersey Turnpike . The turnpike interchange (exit 16) only served Route 3 traffic to and from

5724-868: The Holland Tunnel downstream connecting Jersey City, New Jersey , with Lower Manhattan , was under construction at the time. Upon the Holland Tunnel's opening in 1927, it was popular among motorists, leading to the proposal for the Weehawken–Manhattan tunnel in early-1928. The Weehawken–Manhattan tunnel, along with the Triborough Tunnel linking the East Side of Manhattan with the New York City borough of Queens , would help facilitate traffic to and from Midtown Manhattan . It

5883-665: The Port Authority of New York and New Jersey (formerly Port of New York Authority), comprise six traffic lanes in total and carry a combined total of 112,995 vehicles per day as of 2016. In 2017, there were 19,039,210 tolls collected in the eastbound direction. Although the center tube normally provides one travel lane in each direction, both of the travel lanes in the tunnel's center tube are reversible and can be configured for peak-hour traffic demand if needed. The northern and southern tubes respectively carry westbound and eastbound traffic exclusively. Normally, only motor traffic uses

6042-408: The Port Authority of New York and New Jersey was not aware of this bill and had not asked for a grant for such a project. Increased taxes to finance a large project may cause opposition. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the groundwater conditions, the length and diameter of

6201-848: The Queens-Midtown Tunnel between Manhattan and the borough of Queens on Long Island ; the Detroit-Windsor Tunnel between Michigan and Ontario ; and the Elizabeth River tunnels between Norfolk and Portsmouth, Virginia ; the 1934 River Mersey road Queensway Tunnel ; the Western Scheldt Tunnel , Zeeland, Netherlands; and the North Shore Connector tunnel in Pittsburgh, Pennsylvania . The Sydney Harbour Tunnel

6360-472: The River Mersey at Liverpool was chosen over a massively high bridge partly for defense reasons; it was feared that aircraft could destroy a bridge in times of war, not merely impairing road traffic but blocking the river to navigation. Maintenance costs of a massive bridge to allow the world's largest ships to navigate under were considered higher than for a tunnel. Similar conclusions were reached for

6519-474: The Union City –Weehawken border, and by the Port Authority of New York and New Jersey (PANYNJ) east of Park Avenue, including the helix viaduct used to descend the New Jersey Palisades to reach the entrance of the Lincoln Tunnel. Route 495 is mostly a six-lane freeway with a reversible bus lane used during the morning rush hour. The bus lane, which runs the entire length of the freeway, continues into

Lincoln Tunnel - Misplaced Pages Continue

6678-679: The United Kingdom of digging tunnels in strong clay-based soil structures. This method of cut and cover construction required relatively little disturbance of property during the renewal of the United Kingdom's then ancient sewerage systems. It was also used during the First World War by Royal Engineer tunnelling companies placing mines beneath German lines, because it was almost silent and so not susceptible to listening methods of detection. Tunnel boring machines (TBMs) and associated back-up systems are used to highly automate

6837-610: The canton of Glarus . The borehole has a diameter of 8.03 metres (26.3 ft). The four TBMs used for excavating the 57-kilometre (35 mi) Gotthard Base Tunnel , in Switzerland , had a diameter of about 9 metres (30 ft). A larger TBM was built to bore the Green Heart Tunnel (Dutch: Tunnel Groene Hart) as part of the HSL-Zuid in the Netherlands, with a diameter of 14.87 metres (48.8 ft). This in turn

6996-489: The water table . This pressurizes the ground ahead of the TBM cutter head to balance the water pressure. The operators work in normal air pressure behind the pressurized compartment, but may occasionally have to enter that compartment to renew or repair the cutters. This requires special precautions, such as local ground treatment or halting the TBM at a position free from water. Despite these difficulties, TBMs are now preferred over

7155-689: The 16th century as a metaphor for a narrow, confined space like the inside of a cask. Some of the earliest tunnels used by humans were paleoburrows excavated by prehistoric mammals. Much of the early technology of tunneling evolved from mining and military engineering . The etymology of the terms "mining" (for mineral extraction or for siege attacks ), " military engineering ", and " civil engineering " reveals these deep historic connections. Predecessors of modern tunnels were adits that transported water for irrigation , drinking, or sewerage . The first qanats are known from before 2000 BC. The earliest tunnel known to have been excavated from both ends

7314-638: The 1960s. The main idea of this method is to use the geological stress of the surrounding rock mass to stabilize the tunnel, by allowing a measured relaxation and stress reassignment into the surrounding rock to prevent full loads becoming imposed on the supports. Based on geotechnical measurements, an optimal cross section is computed. The excavation is protected by a layer of sprayed concrete, commonly referred to as shotcrete . Other support measures can include steel arches, rock bolts, and mesh. Technological developments in sprayed concrete technology have resulted in steel and polypropylene fibers being added to

7473-591: The 1971 Kingsway Tunnel under the Mersey. In Hampton Roads, Virginia , tunnels were chosen over bridges for strategic considerations; in the event of damage, bridges might prevent US Navy vessels from leaving Naval Station Norfolk . Water-crossing tunnels built instead of bridges include the Seikan Tunnel in Japan; the Holland Tunnel and Lincoln Tunnel between New Jersey and Manhattan in New York City ;

7632-551: The Exclusive Bus Lane. New Jersey Transit operates fifty-seven interstate bus routes through the Lincoln Tunnel, as do numerous regional and long-distance companies. The XBL was first proposed in 1964, when studies were conducted to address the feasibility of such a bus lane during the weekday morning peak period. The XBL was approved on a trial basis in September 1970, since buses from New Jersey would be stuck in

7791-481: The George Washington Bridge, and the three bridges between Staten Island and New Jersey. If passenger-car drivers were traveling to or from Staten Island within the same trip, they paid 75 cents. Different toll rates applied to tractor-trailers, who paid $ 2, and motorcycles, who paid 25 cents. Pedestrians, animals, and bicyclists were prohibited from using the tunnel. Due to the limited capacity of

7950-545: The Lincoln Tunnel Approach and Helix, as well as the tunnels, toll booths, and ventilation towers. The Helix has traditionally been known for offering a panoramic view of the Manhattan skyline . While local zoning laws prohibit the construction of high-rise buildings that would obstruct sight-lines from higher points in town, as of June 2013 construction of a new residential building partially blocked

8109-550: The Lincoln Tunnel Expressway, which continues to 31st Street (for westbound traffic) and 30th Street (for eastbound traffic). The surface section of Dyer Avenue continues to 35th Street, where westbound traffic can turn right, and then to 34th Street, where traffic can turn either left or right for eastbound and westbound traffic, respectively. The center tube, which is reversible, ascends to ground level just southeast of 39th Street and Tenth Avenue, parallel to

SECTION 50

#1732758329674

8268-549: The Lincoln Tunnel approach was included in the Interstate Highway System and in 1959, it was renumbered from Route 3 to I-495 despite the fact it does not meet Interstate Highway standards. Shortly after the road became I-495, the western portion of the road was brought up to Interstate Highway standards with the improvements of the interchanges with the New Jersey Turnpike and Route 3. I-495

8427-540: The Lincoln Tunnel has undergone a series of gradual improvements, including changes to security and tolling methods. The Lincoln Tunnel is one of two automobile tunnels built under the Hudson River, the other being the Holland Tunnel between Jersey City, New Jersey , and Lower Manhattan . The Lincoln Tunnel is also one of six tolled crossings in the New York area owned by the Port Authority of New York and New Jersey . The tolls on each crossing are only collected in

8586-499: The Lincoln Tunnel in Manhattan typically uses either Dyer Avenue , which also offers direct access to the Port Authority Bus Terminal , or the Lincoln Tunnel Expressway . Dyer Avenue runs in between Ninth and Tenth Avenues and exists in three segments: 30th–31st Streets, 34th–36th Streets, and 40th–42nd Streets. The Lincoln Tunnel Expressway, a bidirectional divided highway that passes below street level, connects

8745-447: The Lincoln Tunnel's center tube. The first portion of the present-day Route 495, at the entrance to the Lincoln Tunnel, was constructed in 1937 when the Lincoln Tunnel opened. In 1939, the section known as The Helix was finished, which is an oval-shaped loop that descends Route 495 down to the entrance of the tunnel. In that same year, the route’s path was extended west to Route 3 and it became an eastern extension of that route. In 1952,

8904-515: The Manhattan-Queens tunnel to New Jersey. The New York State Legislature considered two proposals for the Weehawken–Manhattan tunnel in January 1930. Although both would connect Weehawken to 38th Street in Manhattan, one proposal called for the Port Authority to build and operate the tunnel, while the other would entail operations by the "Joint Tunnel Committee", composed of the bridge and tunnel commissions of both states. Later that month,

9063-709: The Middle Ages, crosses a mountain ridge. In the Gaza Strip , the network of tunnels was used by Jewish strategists as rock-cut shelters, in first links to Judean resistance against Roman rule in the Bar Kokhba revolt during the 2nd century AD. A major tunnel project must start with a comprehensive investigation of ground conditions by collecting samples from boreholes and by other geophysical techniques. An informed choice can then be made of machinery and methods for excavation and ground support, which will reduce

9222-552: The Midtown Hudson and Queens-Midtown Tunnels would either enter the tunnels, exit into local traffic, or continue through the other tunnel. The start of construction was delayed due to the onset of the Great Depression , a result of the 1929 stock market crash. The Port Authority could not market enough of its bonds at the 4 + 1 ⁄ 4 % interest rate that it had decided on. The Port Authority applied to

9381-521: The New Jersey State Legislature created a committee that, among other things, would confer with New York officials regarding the plans for the Weehawken–Manhattan tunnel. In February of that year, New Jersey Governor Larson and New York Lieutenant Governor Herbert H. Lehman agreed to send bills to their respective state legislatures, which would authorize the construction of the tunnel. Even though both states had agreed to build

9540-409: The New Jersey shaft would be sunk later. Thirty-two ventilation buildings would be constructed, of which 15 would pull air into the tunnel, and 17 would exhaust air from the tunnel. The Port Authority received five bids for the construction of the Midtown Hudson Tunnel. Construction began on the first tube, now the center of the three tubes, on May 18, 1934, with ceremonies on both sides. Officials from

9699-435: The New Jersey side had dug past the state border. By June, half of the tunnel had been excavated. During one week that month, sandhogs dug 250 feet (76 m) of tunnel, which the Port Authority proclaimed was world record in tunnel-digging. The two parts of the tube were connected in a ceremony in August 1935, four months ahead of schedule. The method of financing the Midtown Hudson Tunnel was revised in late 1935. Originally,

SECTION 60

#1732758329674

9858-591: The New Jersey side. Two telephone systems were also installed within the tunnel, one for communicating with workers in the administration building and the other for contacting emergency services. The tube was used by 3,700 vehicles within the first 12 hours of its opening, and by 7,661 vehicles within the first 24 hours. The Port Authority devised a slogan to encourage motorists to use the tunnel, advertising it as "the Direct Way to Times Square" and erecting road signs to that effect. Daily traffic counts decreased with

10017-496: The New York approach plaza was already being excavated. By April 1937, the Midtown Hudson Tunnel was 75% completed, and its opening was projected for the next year. As the tunnel could be confused with the Queens–Midtown Tunnel on the other side of Manhattan, the Port Authority decided to rename the project that month. According to Gillespie, the Midtown Hudson Tunnel was renamed after U.S. President Abraham Lincoln because

10176-493: The New York-bound direction. As of 2016, both directions of the tunnel carry a combined average of 112,995 vehicular crossings every day. The tunnel is part of New Jersey Route 495 on the western half of the river, and New York State Route 495 on the eastern half of the river. However, the New York state highway designation is not signed , and its use is inconsistent in official documents. The three tubes, operated by

10335-441: The Port Authority announced that the tunnel would be called "Midtown Hudson Tunnel". The same month, the agency began conducting a study of traffic patterns around the proposed tunnel's portals. By December, officials from both states were discussing preliminary plans for the tunnel. At the time, it was expected to begin construction the next year with an opening of 1938, and it was projected to cost $ 95 million, with both states paying

10494-440: The Port Authority believed that the tunnel was "parallel to the importance of the George Washington Bridge", which had been named after the first U.S. President . Several other names had been considered and rejected. At the same time, the two under-construction approaches on the New York side were named after Port Authority chairmen who had been important figures in the Lincoln Tunnel's construction. Galvin Avenue, which would connect

10653-458: The Port Authority had advertised $ 34.3 million in bonds at a 4% interest rate, with the first issue of bonds set to mature in 1975. In November, the PWA announced that it would change the $ 37.5 million loan to a $ 4.78 million grant once the Port Authority had sold the PWA $ 22.3 million in bonds. The rest of the outstanding balance, approximately $ 10.4 million, was to be raised privately, and the Port Authority would have raised $ 32.7 million in bonds by

10812-749: The Route 3 exit to get there. Past this interchange, Route 495 becomes a six-lane freeway maintained by NJDOT that passes over New York, Susquehanna and Western Railway 's New Jersey Subdivision line and Conrail Shared Assets Operations ' Northern Branch line before intersects US 1/9 at a partial interchange, with a westbound exit and eastbound entrance. Past US 1/9, the freeway has an interchange with County Route 501 (CR 501, John F. Kennedy Boulevard), which uses 30th Street and 31st Street as collector–distributor roads . East of this junction, Route 495 enters Union City and heads through developed residential areas, passing under numerous streets. There

10971-734: The United States that connects the New Jersey Turnpike ( Interstate 95 ) at exits 16E-17 in Secaucus to New York State Route 495 (NY 495) inside the Lincoln Tunnel in Weehawken , providing access to Midtown Manhattan in New York City . The road is owned and operated by the New Jersey Turnpike Authority (NJTA) between the New Jersey Turnpike and Route 3 , the New Jersey Department of Transportation (NJDOT) between Route 3 and Park Avenue near

11130-536: The United States, the NFPA definition of a tunnel is "An underground structure with a design length greater than 23 m (75 ft) and a diameter greater than 1,800 millimetres (5.9 ft)." The word "tunnel" comes from the Middle English tonnelle , meaning "a net", derived from Old French tonnel , a diminutive of tonne ("cask"). The modern meaning, referring to an underground passageway, evolved in

11289-426: The Weehawken–Manhattan tunnel, there were disagreements on who would fund and construct the tunnels. The Port Authority and the two states' tunnel commissions both wanted to build the tunnel, but the Port Authority believed the tunnel would cost $ 95.5 million while the two states' tunnel commissions thought the tunnel would only be $ 66.9 million. Ole Singstad , chief engineer for both states' tunnel commissions, believed

11448-517: The adjacent first tube. However, work on the second tube was halted the same month because New Jersey had failed to build sufficient approach roads to accommodate the extra traffic load. Economic considerations also played a significant role in the work stoppage, since the New Jersey Highway Commissioner had said that the state lacked enough money to build these new highways. The ends of the second tube were sealed because it

11607-461: The approach would then split in two directions with one roadway going south to 34th Street and the other going north to 42nd Street . The United States Department of War held a hearing about the proposed tunnel, in which it received only two complaints, both from shipping lines that were concerned about the Port Authority's intention to use "blankets" to cover the tubes. The blankets were to be located 40 feet (12 m) below mean water level, about

11766-459: The approach, since Weehawken had been built on a sharp ledge called King's Bluff. In July 1935, after discussing 75 proposals for two and a half years, the Weehawken town council voted to approve a distinctive "loop" approach. At the western end of the Midtown Hudson Tunnel in New Jersey, the tube would curve south and then end at a portal, where there would be a toll plaza. A road would diverge to

11925-586: The author Angus Gillespie states in his book Crossing Under the Hudson . After twenty days, officials guaranteed that skilled jobs would be awarded only to skilled laborers, and work resumed. Meanwhile, the Port Authority still had not acquired and cleared all of the land in the way of the Midtown Hudson Tunnel's approaches. Construction of the approaches on the New York side necessitated the demolition of 91 buildings, mainly tenements, between Ninth and Tenth Avenues from 34th to 42nd Street. These buildings, located in

12084-400: The blocky nature of rocks, the exact location of fault zones, or the stand-up times of softer ground. This may be a particular concern in large-diameter tunnels. To give more information, a pilot tunnel (or "drift tunnel") may be driven ahead of the main excavation. This smaller tunnel is less likely to collapse catastrophically should unexpected conditions be met, and it can be incorporated into

12243-655: The caisson was so large. Also in July, issues arose when the City of Weehawken refused to let the Port Authority conduct blasting for the New Jersey ventilation shaft for more than 12 hours a day. The Port Authority warned that this could delay construction. Another disagreement concerned the hiring of unskilled laborers to work on the Midtown Hudson Tunnel construction project. Unionized skilled laborers, who feared that their specialized jobs were being given to unskilled laborers, briefly threatened to strike over "unfair labor practices", as

12402-544: The chairman of New York's Bridge and Tunnel Commission, and Theodore Boettger , the chairman of the New Jersey's Interstate Bridge and Tunnel Commission jointly co-signed letters to each state's governor. After the Manhattan-Queens tunnel was formally recommended by the New York City Board of Estimate in June 1929, the heads of each state's respective bridge and tunnel commissions reiterated their proposal to extend

12561-502: The concrete mix to improve lining strength. This creates a natural load-bearing ring, which minimizes the rock's deformation . By special monitoring the NATM method is flexible, even at surprising changes of the geomechanical rock consistency during the tunneling work. The measured rock properties lead to appropriate tools for tunnel strengthening . In pipe jacking , hydraulic jacks are used to push specially made pipes through

12720-415: The construction effort. The first tube was formally dedicated on December 21, 1937. The opening ceremony was accompanied by a military parade on the New Jersey side, as well as the detonation of a series of aerial bombs launched from military ships. It was also marked by separate speeches from New York City Mayor La Guardia and the governors of New York and New Jersey. The first vehicles began passing through

12879-436: The construction of the proposed entrance plaza in Weehawken would bring the project's cost to $ 46.5 million. This cost would be composed of $ 42 million raised in bonds plus the $ 4.78 million PWA grant. That November, the Port Authority's commissioners authorized the agency to seek an additional $ 9 million in funds from the PWA. Simultaneously, work began on retrofitting the tunnel for vehicular use, so it could be in operation by

13038-473: The cost of construction had risen to $ 85 million. At the time, the second tube was set to be completed in 1940. A contract for the second tube was released in February 1937, at a cost of $ 8.7 million. That July, a steel caisson, similar to that for the first tube, was sunk into the Manhattan side at the western end of 39th Street. The next month, three parcels of land in New Jersey were acquired to make way for

13197-780: The decommissioning of I-495 between I-95 and Pleasant Avenue/Park Avenue in Union City in 1980. In 1986, AASHTO approved the decommissioning of the rest of the I-495 designation in New Jersey. Starting with the viaduct , which passes over the Conrail rail lines just west of US 1/9, the roadway going east is listed as being eligible for state registry in the New Jersey Register of Historic Places for its engineering, architecture and history. The designations for eligibility were given in segments between 1991 and 2003 and include

13356-591: The distance between the two existing Hudson River vehicular crossings, the Holland Tunnel and George Washington Bridge , was large enough that the Weehawken–Manhattan tunnel would carry 10 million vehicles in its first year. By contrast, the Port Authority believed that the tunnel would only carry 7 million vehicles in its first year. Another funding issue arose after the Wall Street Crash of 1929 , which caused several potential funding sources to be depleted. The jurisdictional disagreement held up financing for

13515-428: The division that would oversee construction. The Port Authority's former chairman, John Galvin, would be retained as a consultant. The construction work itself would be supervised by George Breck Montgomery , who had served in the same position for the Holland Tunnel's construction. The tube would stretch 6,000 feet (1,800 m) from the New Jersey side's ventilation shaft to the New York side's construction shaft, but

13674-414: The east, then quickly turn north and then west while ascending the ledge. This loop would lead from Hudson Boulevard East at the bottom of King's Bluff to Pleasant Avenue at the top. Sandhogs , specialized construction workers, proceeded to dig the Midtown Hudson Tunnel from both ends, boring a tube that measured 32 feet (9.8 m) in diameter and 8,000 feet (2,400 m) between ventilation shafts. It

13833-409: The eastbound direction and to westbound Route 3 in the westbound direction, a major intersection for Route 495 and Route 3, as many people use Route 3 to get to Route 495 for the Lincoln Tunnel. Route 3 ends almost immediately after its interchange with Route 495, at US 1/9. The three routes form a triangular-like junction, however, Route 495 doesn’t have direct access to US 1/9; instead drivers must take

13992-406: The eastbound tunnel merges to the outside (east) of the viaduct, while the ramp from the westbound tunnel to southbound Park Avenue dips into a short tunnel underneath the avenue. The avenue itself ascends King's Bluff in a relatively straight line from south to north. As Park Avenue continues to ascend the ledge, the viaduct descends to ground level. The highway lanes then split into the portals for

14151-409: The entire tunnelling process, reducing tunnelling costs. In certain predominantly urban applications, tunnel boring is viewed as a quick and cost-effective alternative to laying surface rails and roads. Expensive compulsory purchase of buildings and land, with potentially lengthy planning inquiries, is eliminated. Disadvantages of TBMs arise from their usually large size – the difficulty of transporting

14310-413: The existing tube now had heavy congestion in both directions during rush hours, as opposed to the situation in mid-1942, where congestion generally only accumulated toward New York in the morning and New Jersey in the evening. At this stage, much of the second tube had been completed to the point where traffic could use it in case of an emergency, and the tube was planned to be opened that July. However, work

14469-419: The feasibility of adding a second tube, located north of and parallel to the first tube. Although the original design in 1933 had called for two tubes, the PWA funds had only covered the cost of the first tube. It was estimated that if a second tube were to be built immediately, the cost of that tube would be cheaper because the workers and machinery were already on site. The commissioners thus agreed to construct

14628-460: The federal Reconstruction Finance Corporation (RFC) for funds, but the RFC wanted the Port Authority to market these bonds at a 5% rate, which the Port Authority thought was too high. The Port Authority wanted to be able to market the bonds at a 4 + 1 ⁄ 2 % rate, and so it would wait until such a rate was feasible. Despite a lack of funds for the Midtown Hudson Tunnel itself, the Port Authority

14787-488: The federal, state, and city levels were in attendance at the ceremony on the New York side, where New York City Mayor Fiorello H. La Guardia and New Jersey Governor A. Harry Moore wielded picks to dig up the ceremonial first mound of dirt. The 700-ton cubical caisson for the New York side was floated into place and sunk into the riverbed in July. Even though the caisson had been manufactured in nearby Kearny, New Jersey , it had taken two days to be floated to Manhattan because

14946-441: The final tunnel or used as a backup or emergency escape passage. Alternatively, horizontal boreholes may sometimes be drilled ahead of the advancing tunnel face. Other key geotechnical factors: For water crossings, a tunnel is generally more costly to construct than a bridge. However, both navigational and traffic considerations may limit the use of high bridges or drawbridges intersecting with shipping channels, necessitating

15105-408: The first month of the tube's opening, since the opening ceremony had coincided with the holiday travel season at the end of December 1937. In any case, the Lincoln Tunnel had carried less than 10,000 daily vehicles during the December holiday season, compared to the Holland Tunnel's 40,000 daily vehicles, since the Holland Tunnel contained two 2-lane tubes. The Port Authority marketed the new tunnel with

15264-834: The geology of the tunnel's route. In November 1933, the Port Authority announced that it had picked the chief engineers for the Midtown Hudson Tunnel. These officials included O. H. Ammann as the Chief Engineer; Ole Singstad, the New York and New Jersey Tunnel Commissions' former chief engineer, as the Chief Tunnel Consulting Engineer; Ralph Smillie , the Triborough Bridge and Tunnel Authority chief engineer, as Design Engineer; Robert Ridgway and James Forgie as tunnel consultants; Charles S. Gleim as Engineer of Construction; and Port Authority Commissioner Alexander J. Shamberg as chief of

15423-405: The ground behind a TBM or shield. This method is commonly used to create tunnels under existing structures, such as roads or railways. Tunnels constructed by pipe jacking are normally small diameter bores with a maximum size of around 3.2 metres (10 ft). Box jacking is similar to pipe jacking, but instead of jacking tubes, a box-shaped tunnel is used. Jacked boxes can be a much larger span than

15582-575: The heavy congestion within the tunnel approaches. This bus lane was implemented in December of the same year, exclusively carrying buses during morning rush hours. Due to the success of the bus lane, it was made permanent after the year-long trial ended. The XBL was suspended in March 2020 in conjunction with restrictions related to the COVID-19 pandemic in the United States , and was reinstated in September as traffic reached pre-pandemic levels. The idea for

15741-424: The highway surfaces and there is an option to exit on the left, to westbound 39th Street. This is marked as the last exit in New York. The fourth ramp merges with highway traffic at this point, carrying traffic from the intersection of 40th Street and Galvin Avenue. Traffic traveling eastbound on 40th Street is forced to enter this ramp, while westbound traffic on 40th Street and southbound traffic on Galvin Avenue have

15900-640: The immersed-tube type), while deep tunnels are excavated, often using a tunnelling shield . For intermediate levels, both methods are possible. Large cut-and-cover boxes are often used for underground metro stations, such as Canary Wharf tube station in London. This construction form generally has two levels, which allows economical arrangements for ticket hall, station platforms, passenger access and emergency egress, ventilation and smoke control, staff rooms, and equipment rooms. The interior of Canary Wharf station has been likened to an underground cathedral, owing to

16059-435: The inevitable smoke and steam. A major disadvantage of cut-and-cover is the widespread disruption generated at the surface level during construction. This, and the availability of electric traction, brought about London Underground's switch to bored tunnels at a deeper level towards the end of the 19th century. Prior to the replacement of manual excavation by the use of boring machines, Victorian tunnel excavators developed

16218-401: The intersection of 38th Street and Tenth Avenue. It leads directly to both the northern and southern legs of Dyer Avenue. The northern leg leads to 40th through 42nd Streets and carries northbound traffic only, while the southern leg leads to 36th through 34th Streets and carries both directions of traffic between these streets. At 36th Street, an exit ramp from the southbound Dyer Avenue leads to

16377-468: The large TBM to the site of tunnel construction, or (alternatively) the high cost of assembling the TBM on-site, often within the confines of the tunnel being constructed. There are a variety of TBM designs that can operate in a variety of conditions, from hard rock to soft water-bearing ground. Some TBMs, the bentonite slurry and earth-pressure balance types, have pressurized compartments at the front end, allowing them to be used in difficult conditions below

16536-629: The lower deck with automobiles above, now converted to one-way road vehicle traffic on each deck. In Turkey, the Eurasia Tunnel under the Bosphorus , opened in 2016, has at its core a 5.4 km (3.4 miles) two-deck road tunnel with two lanes on each deck. Additionally, in 2015 the Turkish government announced that it will build three -level tunnel, also under the Bosporus. The tunnel

16695-489: The neighborhood of Hell's Kitchen , were seen as either being already dilapidated, or nearing such a condition. The demolition process was inadvertently aided by a fire that burned down one of the condemned buildings in October 1934. Bidding for the New York approach was opened in June 1935, by which point the demolition of the 91 buildings was well underway. On the New Jersey side, there were disagreements over how to construct

16854-421: The new tube, heavy trucks were temporarily banned, and a minimum speed limit of 20 miles per hour (32 km/h) was imposed until a second tube could be completed. Two gasoline-electric tow trucks, dubbed as the largest of their kind, were delivered to the Lincoln Tunnel in case a vehicle broke down. Two hundred staff were hired to oversee day-to-day operations of the tunnel, working at an administration building on

17013-584: The north tube and Manhattan-bound traffic normally uses both lanes of the south tube. Route 495 is a busy route that carries approximately 74,571 vehicles at its western terminus and approximately 119,432 vehicles by the time it reaches the Lincoln Tunnel. According to the American Highway Users Alliance, Route 495 is considered one of the most congested corridors on the East Coast of the United States; as of 2018 , drivers spent

17172-412: The northbound expressway. The third ramp leads from the segment of Dyer Avenue that runs between 34th Street and 36th Street. This ramp carries traffic only from westbound 34th Street, but also contains interchanges with westbound 35th Street and both directions of 36th Street. The third ramp then merges with the expressway, which descends into a short tunnel until 10th Avenue and 40th Street. At this point,

17331-556: The northern and southern tubes exclusively carry westbound and eastbound traffic, respectively. The Lincoln Tunnel was originally proposed in the late 1920s and early 1930s as the Midtown Hudson Tunnel . The tubes of the Lincoln Tunnel were constructed in stages between 1934 and 1957. Construction of the central tube, which originally lacked sufficient funding due to the Great Depression , started in 1934 and it opened in 1937. The northern tube started construction in 1936,

17490-483: The older method of tunnelling in compressed air, with an airlock/decompression chamber some way back from the TBM, which required operators to work in high pressure and go through decompression procedures at the end of their shifts, much like deep-sea divers . In February 2010, Aker Wirth delivered a TBM to Switzerland, for the expansion of the Linth–Limmern Power Stations located south of Linthal in

17649-540: The operation of empty and loaded trains at the same time. The temporary way is replaced by the permanent way at completion, thus explaining the term " Perway ". The vehicles or traffic using a tunnel can outgrow it, requiring replacement or enlargement: An open building pit consists of a horizontal and a vertical boundary that keeps groundwater and soil out of the pit. There are several potential alternatives and combinations for (horizontal and vertical) building pit boundaries. The most important difference with cut-and-cover

17808-521: The option to either enter the ramp or continue on 40th Street. After the fourth ramp merges into the westbound expressway, the roadway dips into the northern tube just east of Eleventh Avenue. During the morning rush hour, one traffic lane in the center tube, the Lincoln Tunnel Exclusive Bus Lane (XBL), is used only by buses. It is fed by the New Jersey Turnpike at Exits 16E and 17, and New Jersey Route 3 . The XBL

17967-571: The portion of the route west of Route 3 was opened when the New Jersey Turnpike was completed. In 1959, the road was incorporated into the Interstate Highway System and was designated as part of Interstate 495 ( I-495 ). Since the Mid-Manhattan Expressway that would have connected the route to New York's I-495 (Long Island Expressway) was canceled, I-495 officially became New Jersey Route 495 in 1979, and

18126-612: The pressurized chamber. An airlock was provided in order to prevent workers from undergoing sudden depressurization. Each sandhog worked two 3-hour-long shifts per day, punctuated by a break of three hours. After a section of the bore was completed, the sandhogs assembled segments of 14 curved metal pieces into rings that measured 31 feet in diameter and weighed 20 tons. During the process of construction, 145,000 cubic yards (111,000 m) of sediment and earth and 28,000 cubic yards (21,000 m) of rocky dirt were displaced, and 2,370 metal rings were installed. The reporter L.H. Robbins wrote

18285-522: The project is completed. If a tunnel is going to be long, multiple shafts at various locations may be bored so that entrance to the tunnel is closer to the unexcavated area. Once construction is complete, construction access shafts are often used as ventilation shafts , and may also be used as emergency exits. The New Austrian Tunnelling method (NATM)—also referred to as the Sequential Excavation Method (SEM) —was developed in

18444-490: The proper machinery must be selected. Large infrastructure projects require millions or even billions of dollars, involving long-term financing, usually through issuance of bonds . The costs and benefits for an infrastructure such as a tunnel must be identified. Political disputes can occur, as in 2005 when the US House of Representatives approved a $ 100 million federal grant to build a tunnel under New York Harbor. However,

18603-482: The risk of encountering unforeseen ground conditions. In planning the route, the horizontal and vertical alignments can be selected to make use of the best ground and water conditions. It is common practice to locate a tunnel deeper than otherwise would be required, in order to excavate through solid rock or other material that is easier to support during construction. Conventional desk and preliminary site studies may yield insufficient information to assess such factors as

18762-482: The road enters the Lincoln Tunnel. At the New York state line, which is located at the midpoint of the Hudson River, the road continues as NY 495 , which is separate from I-495 , and heads into Midtown Manhattan in New York City . Since 1970, the left lane of the three westbound lanes is converted during the morning rush hour to a reversible bus lane, known as the "Exclusive Bus Lane" (XBL). The Port Authority

18921-438: The same depth as the bottoms of the shipping companies' vessels. The Department of War gave permission for the Midtown Hudson Tunnel's construction in October 1933, noting that the top of the new tunnel would be at least 60 feet (18 m) below mean water level, which would allow the Hudson River to be dredged to a lower depth if necessary. Preliminary borings were drilled in the bottom of the riverbed so builders could determine

19080-420: The second tube. The second-tube project would include the construction of the "express highway" in New Jersey, which would connect to NJ 1 (now part of U.S. 1 ) and NJ 3 in western North Bergen. At the time of the first tube's opening, the express highway ended at the toll plaza just outside the tunnel portal, leading to Boulevard East and Park Avenue. Bidding for the express highway began in January 1938, and

19239-542: The sheer size of the excavation. This contrasts with many traditional stations on London Underground , where bored tunnels were used for stations and passenger access. Nevertheless, the original parts of the London Underground network, the Metropolitan and District Railways, were constructed using cut-and-cover. These lines pre-dated electric traction and the proximity to the surface was useful to ventilate

19398-472: The signs were changed in 1989. Route 495 officially begins at the exit 16E off-ramp from the northbound lanes of the New Jersey Turnpike near the boundary of Secaucus and North Bergen . The main roadway heads east through North Bergen as a six-lane freeway maintained by the NJTA . The route has an interchange with Route 3 , with access to eastbound Route 3 and U.S. Route 1/9 (US 1/9) for traffic in

19557-591: The slogan "Don't Mark Time, Make Time, Use the Lincoln Tunnel", which was selected from a set of 3,500 Port Authority employees' proposals. The Lincoln Tunnel saw 1,790,640 vehicles during its first year of operation, but it was not yet profitable: even after all toll revenues were accounted for, the Port Authority had spent a net $ 953,857 on operating the tunnel. By 1940, the tunnel was carrying 4 million vehicles annually, and by 1942, that count had increased to 4.5 million. A preliminary 1944 estimate put that year's vehicular count at 5.5 million, due to traffic increases during

19716-418: The south; exit 17 served Route 3 traffic to and from the north. With the creation of the Interstate Highway System in 1956, the approach to the Lincoln Tunnel was planned to become an Interstate Highway along with present-day Route 3, which itself was not included in the Interstate Highway System because New Jersey thought it would be too expensive to bring it up to Interstate Highway standards . However,

19875-437: The southernmost section of Dyer Avenue with the Lincoln Tunnel. The primary entrance roadways for the Lincoln Tunnel are Galvin Avenue , as well as the Lincoln Tunnel Expressway and the southern two sections of Dyer Avenue. Galvin Avenue runs in between Tenth and Eleventh Avenues and carries traffic southbound from 41st to 40th Streets. The southernmost tube, which carries eastbound traffic to New York, surfaces just northeast of

20034-606: The southernmost tube. The tube funnels directly into the southbound Lincoln Tunnel Expressway, while an exit ramp leads to both legs of Dyer Avenue. A ramp from the northbound expressway also leads to the center tube. The northern tube, carrying westbound traffic to New Jersey, is fed from four ramps. The first ramp originates from the intersection of 30th Street and Dyer Avenue, and leads to the northbound Lincoln Tunnel Expressway. This ramp carries traffic from both northbound Tenth Avenue and southbound Ninth Avenue. The second ramp diverges from eastbound 33rd Street and merges directly into

20193-491: The structure of the Helix over the course of more than two years. According to the American Highway Users Alliance, the Helix is considered one of the most congested corridors in the east coast of the United States: as of 2018, drivers spent a cumulative 3.4 million hours per year sitting in congestion at the Helix. An administration building is also located on the New Jersey side, along Boulevard East. Traffic exiting

20352-525: The three tubes, which are ornamented with stone. The tubes then curve east and cross under the Hudson River. This tollbooth has 13 toll lanes. As of 2015, the Port Authority considered the Helix to have a working lifespan of ten years. Alternatives to its replacement included tunnels under the Palisades directly to the Lincoln Tunnel portals. In June 2018, the New Jersey Department of Transportation , which maintains Route 495, announced that it would renovate

20511-454: The time the 1939 New York World's Fair started. The retrofits consisted of installing ceiling panels with exhaust pipes; a roadway with air ducts; and straight retaining walls with ceramic tiles, metal police booths, and a catwalk for maintenance and emergency uses. Workers installed 800,000 glass tiles, each 6 inches (15 cm) square, along the ceiling of the tube, comprising what The New York Times described as "the largest glass ceiling in

20670-465: The time the grant was awarded. The next month, the Port Authority awarded a $ 16.5 million bond issue at 3 + 3 ⁄ 4 % interest rate. The PWA advanced the grant to the Port Authority in January 1936. In December 1935, the Port Authority advertised bids for the Weehawken entrance plaza. The plaza consisted of the loop approach; garages for maintenance buildings; a tollbooth; a 145-foot (44 m) steel, brick, and sandstone ventilation building above

20829-411: The total length between portals would be 8,218 feet (2,505 m). It was slated to have a diameter of 31 feet (9.4 m) carrying a 21-foot-wide (6.4 m) roadway, with a cast-iron and steel outer lining and a concrete inner lining. This contract would also include the construction of ventilation shafts on each side, as well as 60 feet (18 m) of additional tunnel on the New Jersey side. The tube

20988-405: The tube at 4:00 AM the next day. The sculptor Julio Kilenyi created a commemorative medal for the tunnel's opening ceremony, having created similar medals for the opening of the Holland Tunnel and George Washington Bridge. The newly opened tube carried traffic in both directions. Passenger cars traveling in either direction were charged 50 cents for single trips, the same as on the Holland Tunnel,

21147-400: The tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and the shape of the tunnel and appropriate risk management. There are three basic types of tunnel construction in common use. Cut-and-cover tunnels are constructed in a shallow trench and then covered over. Bored tunnels are constructed in situ, without removing the ground above. Finally,

21306-402: The tunnel north to 42nd Street, was named after John F. Galvin. Dyer Avenue , which would lead south to 34th Street, was named for General George R. Dyer, who had died by that point. A contract for the Weehawken approach, the first part of a future "express highway" to the tunnel (now New Jersey Route 495 ), was awarded in July 1937. By October of the same year, the Lincoln Tunnel's first tube

21465-412: The tunnel, but every year, a few bicycle tours and foot races pass through by special arrangement. Each tube provides a 21.5-foot-wide (6.6 m) roadway with two lanes and 13 feet (4.0 m) of vertical clearance. Most vehicles carrying hazmats are not allowed in the tunnel, and trucks cannot use the center tube. There is a width limit of 8 feet 6 inches (2.59 m) for vehicles entering

21624-503: The tunnel, but only briefly. In April 1930, the two states' tunnel commissions agreed to merge with the Port of New York Authority. The combined agency, a reorganized Port Authority, would build and operate the Weehawken–Manhattan tunnel. Six Port Authority board members were appointed by New Jersey Governor Larson as part of this merger. The agency would be headed by chairman John F. Galvin and vice chairman Frank C. Ferguson . In June 1930,

21783-421: The tunnel. Although the three portals are side by side in New Jersey, the north tube portal is one block west of the other two tubes' portals in New York City. The north tube's eastern portal is near Eleventh Avenue between 38th and 39th Streets, while the center and south tubes emerge side by side at Tenth Avenue between 38th and 39th Streets. As a result, the three tubes are of different lengths. The longest tube

21942-404: The tunnel. The main approach road on the New Jersey side is Route 495 , a state highway running in a west–east direction within an open cut through Union City . The New Jersey approach roadway, known as the "Helix" and formerly as the "Corkscrew", turns in a three-quarters circle before arriving at the entrance to the tunnel. This is because of the steep King's Bluff ledge in Weehawken, which

22101-434: The tunnel; a section of tube connecting the plaza to the existing underwater segment; and space for a second tunnel portal to the north of the first portal. By this time, the Midtown Hudson Tunnel project was one-third completed. The part of the tube that connected to the entrance plaza was holed-through in September of the same year. New Jersey civic groups stated that they needed to raise another $ 9 million in bond funds, since

22260-428: The two most common being bored tunnels or immersed tubes , examples are Bjørvika Tunnel and Marmaray . Submerged floating tunnels are a novel approach under consideration; however, no such tunnels have been constructed to date. During construction of a tunnel it is often convenient to install a temporary railway, particularly to remove excavated spoil , often narrow gauge so that it can be double track to allow

22419-517: The two tubes that were planned. At the time, the final properties in the tunnel's right-of-way had not yet been purchased. Plans for the New Jersey approach were filed in September 1933. Initially, the approach would curve south to Bergenline Avenue in Union City , and in future phases, the approach would be extended across The Palisades to North Bergen . On the Manhattan side, the tube approach would rise to ground level at around 39th Street east of Tenth Avenue . Between Ninth and Tenth Avenues,

22578-418: The two tunnels had cost a combined $ 80 million. Unlike for the first tube, there was no official ceremony, although three Port Authority officials drove through the second tube. The first motorist to drive through the second tube was Michael Katen, the brother of Omero C. Catan, the first motorist to drive through the original tube in 1937. Tunnel A tunnel is an underground or undersea passageway. It

22737-618: The view from the lower portion of the roadway. As of 2015 , the Helix is considered by the PANYNJ to have a working life-span of ten years. Alternatives to its replacement include tunnels under the Palisades directly to the Lincoln Tunnel portals. In June 2018, the New Jersey Department of Transportation announced that it would renovate the North Bergen Viaduct (the section passing over US 1/9 and Conrail) over

22896-710: The war. At the time of the tube's opening, six interstate bus companies filed plans to run a combined 250 buses per day through the tunnel. Previously, buses from Weehawken had to drive onto ferries to access Manhattan, but in July 1938, the Interstate Commerce Commission granted the bus companies permission to use the tunnel. Buses paid a toll of $ 1 per direction. By March 1939, there were 600 buses per day using Lincoln Tunnel, running on twelve routes operated by five companies. That month, three more bus companies were given permission to operate an additional combined total of 600 buses. After this permission

23055-428: The westbound tunnel. On the New Jersey side, contracts were awarded for the westward extension of NJ 3 to Little Falls, New Jersey , as well as the construction of a portion of what is now US 46 . Due to wartime material shortages, further construction was delayed for the next two years. Significant progress on the second tube only resumed in late 1943. By January 1944, work on the new tube was being accelerated because

23214-458: The work had been undertaken by the teams working from the New Jersey side, and the two ends of the tube were ultimately connected at the caisson on the New York side. The tunneling work posed some danger: three workers were killed in tunneling incidents during the first year of construction, and a dynamite accident in April 1935 killed three more sandhogs. The sandhogs dug at an average rate of 25 feet (7.6 m) per day, and by May 1935, workers from

23373-476: The world". After an unexpected gasoline leak from gas stations near the Midtown Hudson Tunnel, workers installed fireproof copper sheeting within the tunnel. By that October, most of the tube-retrofitting work had been completed, and the Midtown Hudson Tunnel was scheduled to open in fall 1937, several months ahead of schedule. The only major parts of the tunnel that had not been completed were the approaches on either side, but these were progressing quickly as well, as

23532-500: Was again delayed, and in November of the same year, the Port Authority announced that the new tube would open the following February. The second tube opened at noon on February 1, 1945. The new tube was located to the north of the existing tube. The northern tube was configured to carry westbound traffic to New Jersey, while the southern tube was converted from a two-way tunnel to an eastbound-only tunnel to New York. The construction of

23691-460: Was buying real estate within the tunnel's right of way , and by April 1932, had purchased much of the real estate within the tunnel's future path. In February 1933, Herbert Lehman, now the Governor of New York, announced that his Emergency Public Works Commission would seek a $ 75 million loan for the Midtown Hudson Tunnel from the RFC. In March, after nearly a year of negotiations, the RFC announced

23850-575: Was constructed to provide a second harbour crossing and to alleviate traffic congestion on the Sydney Harbour Bridge , without spoiling the iconic view. Other reasons for choosing a tunnel instead of a bridge include avoiding difficulties with tides, weather, and shipping during construction (as in the 51.5-kilometre or 32.0-mile Channel Tunnel ), aesthetic reasons (preserving the above-ground view, landscape, and scenery), and also for weight capacity reasons (it may be more feasible to build

24009-414: Was delayed due to World War II -related material shortages, and opened in 1945. Although the original plans for the Lincoln Tunnel called for two tubes, a third tube to the south of the existing tunnels was planned in 1950 due to high traffic demand on the other two tubes. The third tube started construction in 1954, with the delay attributed to disputes over tunnel approaches, and opened in 1957. Since then,

24168-407: Was generally easier to dig from the New Jersey side, which consisted mostly of muddy sediment, than from the New York side, which contained many tons of rocks. Compressed air was used to prevent river water from flooding the tunnel, and a temporary bulkhead was built a few yards past the construction shaft, through which air was pumped. The tunneling shields continued digging past the bulkhead, within

24327-403: Was granted, the New York City government opposed any further authorizations for bus companies, since they would cause congestion in Manhattan streets. In December 1940, it was announced that a new bus terminal would be built on the Manhattan side of the Lincoln Tunnel, between Eighth Avenue, 41st Street, Ninth Avenue, and 42nd Street. Manhattan Borough President Stanley M. Isaacs proposed building

24486-465: Was intended to connect with New York's I-495 by way of the Mid-Manhattan Expressway ; however, this proposed freeway through Manhattan was canceled in 1971 due to strong opposition to the road running through the heart of Midtown Manhattan . Because New Jersey's I-495 would not be connected to New York's, NJDOT started referring to the route as Route 495 in 1979. The American Association of State Highway and Transportation Officials (AASHTO) approved

24645-462: Was proposed that the two tunnels would eventually form a direct route from New Jersey to eastern Long Island via Manhattan and Queens. Another person proposed linking New Jersey and Queens directly via one continuous tunnel. By late 1928, both New York and New Jersey had elected new governors, Franklin D. Roosevelt of New York and Morgan F. Larson of New Jersey, and both supported the construction of new transportation links. General George R. Dyer ,

24804-732: Was superseded by the Madrid M30 ringroad , Spain, and the Chong Ming tunnels in Shanghai , China. All of these machines were built at least partly by Herrenknecht . As of August 2013 , the world's largest TBM was " Big Bertha ", a 17.5-metre (57.5 ft) diameter machine built by Hitachi Zosen Corporation , which dug the Alaskan Way Viaduct replacement tunnel in Seattle, Washington (US). A temporary access shaft

24963-476: Was thought that there would not be enough traffic flows to the first tube to allow for the completion of the second tube. The six-lane "loop" road, an approach to the future express highway, opened in October 1938 and extended west to Pleasant Avenue, located at the top of the King's Bluff ledge. In June 1939, the Port Authority opened the section of the express highway from Pleasant Avenue west to NJ 3. The new highway,

25122-411: Was to be bored using the shield-tunneling method , and shields would proceed from both sides at the same time. The shield on the New York side would pass through a caisson , which allowed air pressure in the tunnel to be maintained while the tube was being bored. Tunneling work would start on the New York side first because a construction shaft had already been sunk to the west of Eleventh Avenue , while

25281-439: Was very close to completion, and an inspection ceremony was held for New York and New Jersey politicians. The tube's opening was pushed forward several weeks from spring 1938 to late 1937. It was estimated that the construction of the Lincoln Tunnel had directly employed 2,800 workers at its peak, working a combined 6.3 million hours, and that workers across 40 states had worked for a combined 15 million hours to produce materials for