183-620: The Second Avenue Subway (internally referred to as the IND Second Avenue Line by the MTA and abbreviated to SAS ) is a New York City Subway line that runs under Second Avenue on the East Side of Manhattan . The first phase of this new line, with three new stations on Manhattan's Upper East Side , opened on January 1, 2017. The full Second Avenue Line (if it will be funded) will be built in three more phases to eventually connect Harlem–125th Street in East Harlem to Hanover Square in Lower Manhattan. The proposed full line would be 8.5 miles (13.7 km) and 16 stations long, serve

366-543: A contactless fare payment system, with fare payment being made using Apple Pay , Google Wallet , debit/credit cards with near-field communication enabled, or radio-frequency identification cards. As of December 31, 2020, the entire bus and subway system is OMNY-enabled. However, support of the MetroCard is slated to remain until at least 2025. MTA also plans to use OMNY in the LIRR and Metro-North. The MTA has reported

549-729: A $ 25 million modernization project on the railway. The city's Board of Estimate approved this purchase in December 1969. The MTA took ownership of the Staten Island Rapid Transit in January 1971. The agency entered into a long-term lease of Penn Central 's Hudson , Harlem , and New Haven Lines. Before 1968, the Hudson and Harlem Lines had been operated by the New York Central Railroad , while

732-541: A 12.6 percent increase in toll evasion on New York City bridges and tunnels during the first four months of 2024. This equates to an average of 398,975 missed monthly toll transactions, primarily due to drivers obscuring their license plate . The MTA estimates that this evasion costs the agency approximately $ 50 million annually. Of the unbillable toll transactions, roughly 80,000 per month are attributed to fake or unreadable license plates, while 155,000 are due to obstructed plates. Unregistered or temporary plates primarily cause

915-538: A 35-page opinion that the rejected ad was "not only protected speech — it is core political speech ... [which as such] is afforded the highest level of protection under the First Amendment." The MTA had received $ 116.4 million in revenue in 2011 from advertising sold throughout its subway, commuter rail, and bus systems. In April 2015, another ad became the subject of controversy when the MTA refused to display it,

1098-539: A Metropolitan Commuter Transportation Mobility Tax, a payroll tax levied on employers in the 12-county area served by the MTA. Historically, some but not all chairmen of the MTA Board have also held the chief executive officer role, with the chairman providing an advisory and policy role and the Executive Director running day-to-day operations. The roles were combined in 2009 following the recommendation

1281-519: A Second Avenue line to be built in two phases: a first phase north of 34th Street and a second phase south of there. The Second Avenue project, for a line from 34th Street to the Bronx, was given top priority. The line's planned stops in Manhattan, spaced farther apart than those on existing subway lines, proved controversial. The Second Avenue line was criticized as a "rich man's express, circumventing

1464-466: A Second Avenue subway line would be vital to both increasing capacity on existing lines and allowing new branch lines to be built. Bingham's proposal involved more branch lines and track connections than did Phiefer's, and similar to the 1960s and 1990s phased proposals, was to be built in sections. In 1948, New York City was short $ 145 million of the $ 800 million program needed for rehabilitation and proposed capital improvements. The City petitioned

1647-613: A bill that allowed the MCTA to oversee the mass transit policies of New York City-area transit systems. The unification agreement took place the following March, with the MCTA taking over the operations of the LIRR, NYCTA, TBTA, New Haven commuter services, New York Central commuter services, and the Staten Island Rapid Transit Railway . Initially, the TBTA was resistant to the MCTA's efforts to acquire it. Moses

1830-521: A central bus lane and tram line on the outside. Similarly, light rail–bus connections can be found at Juniors Kingsford and Haymarket light rail stations in Sydney. Ormskirk railway station in Lancashire , United Kingdom , was a double-track railway until 1970, when it was converted into single-track railway with the track split in the centre by buffer stops placed back-to-back. The two ends of

2013-592: A certain waiting time window for each guaranteed interchange. Some railway operators will briefly delay train departure signals to allow imminently arriving passengers time to interchange. For example, the Vienna U-Bahn metro signals train drivers to wait briefly, by operating a special white light signal triggered by the approach of an interchange train on another track. In most cases, only cross-platform interchanges used for both directions of travel are listed, with some exceptions. Siam Station allows for

SECTION 10

#1732765803218

2196-444: A commission to study capital spending. The commission was appointed by then-Governor David Paterson and run by former chairman Richard Ravitch However, following Thomas Prendergast's retirement in 2017, they were split back again. The positions were merged back into one position in 2019 when Pat Foye was appointed Chairman & Chief Executive Officer. The current chairman, Janno Lieber, holds both positions. The following

2379-551: A connection to the Second Avenue line. Of this failure to complete construction, Gene Russianoff , an advocate for subway riders since 1981, stated: "It's the most famous thing that's never been built in New York City, so everyone is skeptical and rightly so. It's much-promised and never delivered." With the city's economic and budgetary recovery in the 1990s, there was a revival of efforts to complete construction of

2562-577: A contract for subway design was awarded to DMJM Harris/ Arup Joint Venture. A new draft statement proposed the full-length line from 125th to 14th Streets; in Lower Manhattan; it was decided to build the line under Water Street. In December 2001, the Federal Transit Administration approved the start of preliminary engineering on a full-length Second Avenue Subway. The MTA's final environmental impact statement (FEIS)

2745-616: A cross-platform transfer at a dedicated platform 0.6 miles (0.97 km) east of the main station platform. Despite this transfer, the Yellow Line is mapped and signed as one continuous route. Konggangxinchengjiangning station of Nanjing Metro , China is also a cross-platform terminal station for both Line S1 and S7, with a single island platform and crossovers set at both ends of station, letting trains of both lines to switch back. Zhongli railway station in Taoyuan, Taiwan has

2928-1050: A cross-platform transfer between the Sukhumvit line and the Silom line , both operated by the BTS , for trains heading in the same direction. Eastbound trains use the lower-level island platform, while the westbound trains depart from the upper-level platforms. Guogongzhuang station offers cross-platform interchange between Line 9 and Fangshan Line . National Library station offers cross-platform interchange between Lines 4 and 9. In addition Nanluoguxiang station (Lines 6 and 8), Zhuxinzhuang station ( Changping Line and Line 8), Beijing West railway station (Lines 7 and 9), Yancun East station (Fangshan Line and Yanfang Line) offer cross-platform interchange. Xipu Station in Chengdu provides cross-platform interchange between Line 2 of Chengdu Metro and Chengdu–Dujiangyan Intercity Railway of

3111-545: A disclaimer that the display of the ad did not reflect the opinion of the MTA. U.S. District Judge John Koeltl of the US District Court for the Southern District of New York in Manhattan said the ad was protected speech under the First Amendment of the U.S. Constitution, and rejected the MTA's argument that the ad might endorse terrorism or violence. Pamela Geller , president of the group that sued

3294-543: A half-century. It would add two tracks to fill the gap that has existed since the elevated Second and Third Avenue Lines were demolished in the 1950s. According to the line's final environmental impact statement , the catchment area of the line's first phase would include 200,000 daily riders. New York voters passed a transportation bond issue in November 2005, allowing for dedicated funding allocated for that phase. Its passage had been seen as critical to its construction, but

3477-515: A new T train will serve the entire line from Harlem to Houston Street. Phase 4 will again extend the line south from Houston Street to Hanover Square, maintaining the T designation for the entire line. The T will be colored turquoise since it will use the Second Avenue Line through Midtown Manhattan . Services that use the Second Avenue Line through Midtown Manhattan are to be colored turquoise. The following services use part or all of

3660-722: A new bond issue", wrote one reporter. As the early 1960s progressed, the East Side experienced an increase in development, and the Lexington Avenue Line became overcrowded. In 1962, construction began on a connection between the Manhattan and Williamsburg Bridges and the Sixth Avenue Line. This segment, the Chrystie Street Connection, was first proposed in the 1947 plan as the southern end of the Second Avenue line, which would feed into

3843-471: A new service will operate running between 125th and Houston Streets. Phases 2 and 3, classified as a high-priority project by the Trump administration , may cost up to a combined total of $ 14.2 billion. Phase 4, which also has no funding commitments, will provide an extension from Houston Street to a permanent terminus, with storage tracks, at Hanover Square . These storage tracks, initially recommended in

SECTION 20

#1732765803218

4026-448: A number of previously existing agencies which have come under the MTA umbrella. These previously existing agencies were, with the exception of MTA Bridges and Tunnels , MTA Construction and Development & MTA Grand Central Madison Concourse , successors to the property of private companies that provided substantially the same services. In 1994, the MTA spent $ 3 million rebranding its five subsidiaries with simpler names to convey that

4209-520: A political message" about "disputed economic, political, moral, religious or social issues," and any ad that "promotes or opposes" a political party, ballot referendum, and "the election of any candidate". The board estimated that the ads that the board was banning made up less than $ 1 million of the MTA's advertising revenue of $ 138 million in 2014. Nevertheless, lawyers for the American Freedom Defense Initiative called

4392-617: A project. Similar construction projects in New York City, such as the Second Avenue Subway and 7 Subway Extension , had been more expensive than comparable projects elsewhere for the same reasons, even though other cities' transit systems faced similar, or greater, problems compared to the MTA. In March 2018, the federal Government Accountability Office ordered an audit of the United States' transit costs, which were generally higher than in any other developed country in

4575-579: A projected 560,000 daily riders, and cost more than $ 17 billion. The line was originally proposed in 1920 as part of a massive expansion of what would become the Independent Subway System (IND). In anticipation of the Second Avenue Subway being built to replace them, parallel elevated lines along Second Avenue and Third Avenue were demolished in 1942 and 1955, respectively, despite several factors causing plans for

4758-581: A projected price of $ 3.5 billion per mile of track. Over the years, the projected cost of East Side Access had risen by billions of dollars due to unnecessary expenses. In addition to overpaying workers and overspending, politicians and trade unions had forced the MTA to hire more workers than was needed. In 2010, an accountant found that the project was hiring 200 extra workers, at a cost of $ 1,000 per worker per day, for no apparent reason. The bidding process for MTA construction contracts also raised costs because, in some cases, only one or two contractors would bid on

4941-405: A proposal for Second Avenue Subway services, which would branch extensively off to B Division . The subway was originally to be opened by 1951, but in 1945, plans for the Second Avenue Subway were again revised. Another plan was put forth in 1947 by Colonel Sidney H. Bingham, a city planner and former Interborough Rapid Transit Company (IRT) engineer. O'Dwyer and Gross believed that construction of

5124-432: A proposed cross-platform terminal plan for both Taoyuan Airport MRT and Green line of Taoyuan Metro . The station layout will be composed of two island platform, between which a connecting zone set to integrated the two into a single "large platform". Buffer stops will also be placed back-to back between Airport-bound trains and Green Line trains. The scheme is scheduled to complete in 2031. In some, but not all, cases,

5307-414: A rate of approximately 50 feet (15 m) per day, finished its run at the planned endpoint under 65th Street on February 5, 2011, and started digging the eastern tunnel. On March 28, 2011, S3, having completed its task of completing the 7,200-foot (2,200 m) west tunnel to 65th Street, began drilling the east tunnel to the bellmouth at the existing Lexington Avenue–63rd Street station. The portion of

5490-567: A same-direction cross-platform interchange at Tai Wai station to the East Rail line while keeping the two southbound platforms connected via ramps. Another configuration found in Lai King station makes commuting in both directions more convenient by aligning both tracks leading towards the city next to each other on one level, and both tracks leading away from city next to each other on another level. The configuration for North Point station

5673-462: A same-direction cross-platform interchange between the Line 2 Pudong International Airport bound trains and Line 10 Xinjiangwancheng bound trains. Shanghai Railway Station and Zhongshan Park also offer cross-platform interchanges between Outer Loop Line 4 trains and Shanghai South Railway Station bound Line 3 trains and Inner Loop Line 4 trains and North Jiangyang Road bound Line 3 trains, as

Second Avenue Subway - Misplaced Pages Continue

5856-431: A similar two-station transfer arrangement to allow quick transfers between North–South and East–West lines. Both City Hall MRT station and Raffles Place MRT station have double underground island platforms stacked on top the other, allowing commuters to switch trains to a different line by walking across the same platform at the appropriate station. Jurong East MRT station has a less complicated arrangement, with

6039-754: A subsidiary of the Pennsylvania Railroad (PRR), had been operating under bankruptcy protection since 1949. The proposed authority would also have the power to make contracts or arrangements with other commuter rail operators in the New York City area . On June 1, 1965, the legislature chartered the Metropolitan Commuter Transportation Authority (MCTA) to take over the operations of the LIRR. Governor Rockefeller appointed his top aide, William J. Ronan , as chairman and chief executive officer of

6222-461: A year) and employ about 74,000 people. The MTA's systems carry over 11 million passengers on an average weekday systemwide, and over 850,000 vehicles on its seven toll bridges and two tunnels per weekday. MTA carries out these planning and other responsibilities both directly and through its subsidiaries and affiliates, and provides oversight to these subordinate agencies, known collectively as "The Related Entities". The Related Entities represent

6405-536: Is a list of chairmen of the authority: Lhota did not serve as CEO in his second stint as chairman, as CEO responsibilities were carried out by Executive Director Ronnie Hakim. Lieber served as Chair and CEO in an acting capacity from July 30, 2021 to January 19, 2022. The following is a list of members of the MTA Board. The MTA has developed several official web and mobile apps for its subway and bus services, and also provides data to private app developers to create their own unofficial MTA apps. In 2012,

6588-548: Is a type of interchange between different lines at a metro (or other railway) station. The term originates with the London Underground ; such layouts exist in other networks but are not commonly so named. In the United States and Canada, it is often referred to as a cross-platform transfer . This configuration occurs at a station with island platforms , with a single platform in between the tracks allocated to two directions of travel, or two side platforms between

6771-418: Is almost ready to start construction as of 2024. Phase 1 is served by the Q train at all times and limited rush-hour N and R trains. Phase 2 will extend the line's northern terminus from 96th Street to Harlem–125th Street. Both the Q and limited N services will be extended to 125th Street. Phase 3 will extend the line south from 72nd Street to Houston Street in Manhattan's Lower East Side. Upon completion,

6954-527: Is also a cross-platform interchange with double underground island platforms between the Marina Bay branch of the Circle Line and Downtown Line . The original plans for Promenade MRT station contained a similar arrangement but the existing Circle Line tracks to and from Dhoby Ghaut need to be crossed at the same levels by Downtown Line trains. Thus, Bayfront MRT station is the only station on

7137-655: Is available between Line 1 and Line 2 at Nanning railway station and Chaoyang Square station. The Osaka Metro has a cross-platform interchange between the Midosuji Line and the Yotsubashi Line at Daikokuchō , where the platforms are at the same level. Kintetsu Railway also has a cross-platform interchange between the Nara Line and the Osaka Line at Tsuruhashi , where the platforms are at

7320-399: Is governed by a 21-member board representing the 5 boroughs of New York City , each of the counties in its New York State service area, and worker and rider interest groups. Of these, there are 14 voting members, broken down into 13 board members who cast individual votes, 4 board members who cast a single collective vote, and 6 group representatives who do not vote. Five members as well as

7503-540: Is offered between Line 2 and Line 4 at Qianjiang Road station , Coach Center between Line 1 and Line 9 , Zhejiang Chinese Medical University station between Lines 4 and Line 6 , Xintiandi Street station between Line 3 and Line 4. In the Mass Transit Railway (MTR) system, cross-platform interchange stations first appeared at Mong Kok and Prince Edward stations in Kowloon when Tsuen Wan line

Second Avenue Subway - Misplaced Pages Continue

7686-462: Is only found at some interchange stations in metro and other rail networks worldwide. Some railway lines, usually in more congested areas, also offer cross-platform interchanges between different categories of trains, for example between express and stopping ("local") trains. For instance, this kind of interchange is used at many European railway minor hubs to connect fast trains to local feeder services, as well as surface sections of suburban lines like

7869-410: Is planned to have 14 TPH on the Q and 14 TPH on the T, for a combined 28 trains per hour on both routes. South of there, only 14 TPH on the T are planned, although 12 additional TPH could be provided in the future via the 63rd Street Tunnel. The 2004 plans for the Second Avenue Subway include the construction of short track segments to allow a future extension north under Second Avenue past 125th Street to

8052-454: Is provided at Jiangbeicheng between Line 6 and Line 9. Aside from these, Min'an Ave. between Loop line and Line 4 is an exception. Due to the fact that Line 4 only uses one side of the platforms at this station, there formed a half cross-platform interchange. The Dalian Metro has a cross platform interchange between Line 1 and Line 12 at Hekou Station. The Delhi Metro has 4 cross-platform interchanges in total. These are located at

8235-477: Is similar, to provide convenience for passengers traveling inbound, although the distance between the two platforms is longer compared to other stations. Before the MTR–KCR merger in 2007, Nam Cheong station was served by MTR 's Tung Chung line and KCR 's West Rail line. Due to the different fare systems, platforms of southbound Tung Chung Line and northbound West Rail were separated by barriers despite being at

8418-415: Is used on the LIRR and Metro-North. Both railroads sell tickets based on geographical "zones" and time of day, charging peak and off-peak fares. Tickets may be bought from a ticket office at stations, ticket vending machines (TVMs), online through the "WebTicket" program, or through apps for iOS and Android devices. In 2017 it was announced that the MetroCard would be phased out and replaced by OMNY ,

8601-524: The BMT Canarsie Line . A combination of Federal and State funding was obtained for the project. In March 1972, the entire cost of the section between 34th Street and 126th Street, according to the project's Draft Environmental Study, was estimated to be $ 381 million. In June 1972, it was announced that UMTA would grant $ 25 million for the construction of this section of the line. The MTA had requested $ 254 million in federal funds for

8784-601: The Chongqing Rail Transit offer a paired cross-platform interchange for passengers transferring among four directions between the two lines at Ranjiaba and Dalongshan stations. Same-direction cross-platform interchanges are also provided at Chongqing West Station between Line 5 and Loop line , Baoshuigang between Line 4 and Line 9 , Shangwanlu between Line 10 and Line 9 and Wangjiazhuang between Line 6 (International Expo Branch) and Line 10. Meanwhile, an opposite-direction cross-platform interchange

8967-639: The Connecticut Department of Transportation , carrying over 11 million passengers on an average weekday systemwide, and over 850,000 vehicles on its seven toll bridges and two tunnels per weekday. In February 1965, New York Governor Nelson Rockefeller suggested that the New York State Legislature create an authority to purchase, operate, and modernize the Long Island Rail Road (LIRR). The LIRR, then

9150-630: The Democratic and Republican parties, at the mayoral and gubernatorial levels, had gradually removed $ 1.5 billion of MTA funding. Other actions by city and state politicians, according to the Times , included overspending; overpaying unions and interest groups; advertising superficial improvement projects while ignoring more important infrastructure; and agreeing to high-interest loans that would have been unnecessary without their other interventions. The Times stressed that no single event directly caused

9333-562: The L train were also given to developers. When Bluetooth -enabled countdown clocks were installed in the B Division (lettered services) in 2016 and 2017, they were also configured to feed data to the Subway Time app as well as in an open-data format. MTA's Bus Time app originated as a pilot program to install bus countdown clocks along the M16 and M34 routes in August 2009. At

SECTION 50

#1732765803218

9516-708: The Lower East Side with its complexes of high-rise low- and middle-income housing and slums in favor of a silk stocking route." In response to protests, the MTA added stations at 72nd Street and 96th Street. The MTA issued a plan for a spur line, called the "cuphandle", to serve the heart of the Lower East Side. Branching off from the IND Sixth Avenue Line near the Second Avenue station, the spur would run east on Houston Street, turn north on Avenue C, and turn west on 14th Street, connecting to

9699-569: The New York Central Railroad as part of a plan to prevent the New Haven Railroad from going bankrupt. If the operational merger occurred, the proposed MCTA and the existing Connecticut Transportation Authority would contract with New York Central to operate the New Haven Line to Grand Central Terminal . A September 1965 joint report from both agencies, recommended that the line be leased to New York Central for 99 years, with

9882-418: The New York State Legislature , Governor Kathy Hochul proposed raising the MTA payroll tax, a move projected to increase revenue by $ 800 million, and also giving the MTA some of the money from casinos expected at present to be licensed soon for business in Manhattan. On November 18, 2017, The New York Times published an investigation into the problems underlying the MTA. It found that politicians from both

10065-594: The Penn Central Transportation Company . In February 1968, the MCTA published a 56-page report for Governor Rockefeller, proposing several subway and railroad improvements under the name " Metropolitan Transportation, a Program for Action " alternatively called the "Grand Design". The city had already intended to build subway extensions in all four boroughs, so that most riders would need at most one transfer to get to their destination. The Program for Action also called for upgrades to

10248-613: The Queensboro Bridge to Queens, closed on June 13, 1942. The demolition of the Second Avenue elevated caused overcrowding on the Astoria and Flushing Lines in Queens, which no longer had direct service to Manhattan's far East Side. The elevated line's closure, as well as a corresponding increase in the East Side's population, increased the need for a Second Avenue subway. In 1944, BOT superintendent Philip E. Pheifer put forth

10431-744: The RER E in Paris or the Metro North Hudson Line in New York State. However, local–express interchanges are found in only a few metro networks, such as Chicago , Chengdu , London (as in the case of Stratford discussed below ), New York City , and Philadelphia . The New York City Subway system has numerous stations facilitating cross-platform transfers between local and express trains, typically using pairs of island platforms, each serving express trains on one side, and local trains on

10614-516: The national rail transport system . It is the first implementation of cross-platform interchanges between different train categories in China. Metro-only cross-platform interchanges exist between Lines 2 and 4 at Chengdu University of TCM & Sichuan Provincial People's Hospital station , between Lines 5 and 6 at Xibeiqiao station and outbound direction interchanges between Lines 3 and 10 at Taipingyuan station . Line 5 and Line 6 of

10797-780: The "Metropolitan Commuter Transportation District" (MCTD), within which the New York State Department of Taxation and Finance levies a "metropolitan commuter transportation mobility tax" . On April 1, 2019, Patrick J. Foye was appointed chairman and CEO. The MTA's immediate past chairpersons were William J. Ronan (1965–1974), David Yunich (1974–1975), Harold L. Fisher (1975–1979), Richard Ravitch (1979–1983), Robert Kiley (1983–1991), Peter Stangl (1991–1995), Virgil Conway (1995–2001), Peter S. Kalikow (2001–2007), H. Dale Hemmerdinger (2007–2009), Jay Walder (2009–2011), Joseph Lhota (2012), Thomas F. Prendergast (2013–2017), and Joseph Lhota (2017–2018). Lhota

10980-417: The 1951 bond measure was diverted to buy new cars, lengthen platforms, and maintain other parts of the aging New York City Subway system. Out of a half-billion-dollar bond measure, only $ 112 million (equivalent to $ 1.31 billion in 2023), or 22% of the original amount, went toward the Second Avenue Subway. By then, construction was due to start by either 1952 or 1957, with estimated completion by 1958 at

11163-478: The 1970s rather than demolishing them. Although the MTA awarded an $ 182 million contract in January 2024 to relocate utilities, work on that contract was delayed after Governor Kathy Hochul paused the implementation of congestion pricing in New York City in June 2024. Phase 3, which has no funding commitments, would extend the line southward along Second Avenue from 63rd Street to Houston Street. Upon its completion,

SECTION 60

#1732765803218

11346-625: The 5% margin of error for the 200,000-daily-rider estimate given in the Environmental Impact Statement. Rush-hour ridership was within 2% of projections. In November 2017, because of the increasing demand, Q service was increased by one trip during each rush hour, and one northbound R trip was rerouted from the IND Queens Boulevard Line to further boost service. This trip returns southbound in Q service. The second phase, between 125th and 96th Streets,

11529-493: The 8.5-mile (13.7 km) line is expected to exceed $ 17 billion. In 2014, MTA Capital Construction President Dr. Michael Horodniceanu stated that the whole line may be completed as early as 2029, and would serve 560,000 daily passengers upon completion. As of December 2016, only Phases 1 and 2 would be completed by 2029. The line is described as the New York City Subway's "first major expansion" in more than

11712-576: The 86th Street stations. The TBM began boring the western tunnel southward from 96th Street in 2010. Contracts for tunnels to the Lexington Avenue–63rd Street station , and for the excavation of the 72nd Street station, were awarded in 2010. The following year, contracts were awarded for excavation of the cavern at the 86th Street station, as well as construction for the Lexington Avenue–63rd Street station. The TBM, digging at

11895-516: The BMT 63rd Street Line and north along Second Avenue, to the Upper East Side at 96th Street . Phase 2 will extend the rerouted Q train to 125th Street and Lexington Avenue. In Phase Three, the new T train will run from 125th Street to Houston Street . The final phase will extend T train service from Houston Street to Hanover Square in Lower Manhattan. The 1.8-mile (2.9 km) first phase

12078-609: The Board of Transportation modified the plan to further reduce costs, omitting a branch in the Bronx, and truncating the line's southern terminus to the Nassau Street Loop . Further revision of the plan and more studies followed. By 1939, construction had been postponed indefinitely, with only a short length being completed above the Second Avenue station. The Second Avenue Line was relegated to "proposed" status, and

12261-648: The Bronx, as well as an extension south to Brooklyn. In order to store the 330 additional subway cars needed for the operation of the line, storage tracks would be built between 21st Street and 9th Street along the main alignment. The 36th–38th Street Yard in Sunset Park, Brooklyn , would also be reconfigured. The Second Avenue Subway is chained as "S". The track map in the 2004 FEIS showed that all stations, except for 125th Street, would have two tracks and one island platform. 72nd Street and 125th Street were conceived as three-track, two-platform stations. 72nd Street

12444-565: The IND Queens Boulevard Line were increased, or if the Queens Bypass were built. Service from Queens via the 63rd Street Tunnel would allow for the full capacity of the line south of 63rd Street to be used. The whole line will be designed to accommodate 30 trains per hour, with the exception of the terminal at Hanover Square, which will only be able to handle 26 trains per hour (TPH). The portion north of 63rd Street

12627-545: The Lower Manhattan Access Study (LMA) in November 1997. The construction of the Second Avenue Subway from 63rd Street to Lower Manhattan was one of the five building alternatives developed by the study. A 1999 DEIS only proposed new subway service on Second Avenue from 63rd to 125th Street, as well as swapping the local and express services on the Broadway Line. A spur to Grand Central Terminal

12810-403: The Lower Manhattan-bound tracks on the Second Avenue Line with the Queens-bound tracks on the IND 63rd Street Line , using existing bellmouths at 63rd Street and First Avenue. Current plans do not call for it to be used by regular service. Instead, it would be used for moving out-of-service trains. The connection would allow for trains to run from the Financial District to Queens if the capacity of

12993-435: The MCTA and CTA acting as agents for both states. In October 1965, the MCTA found that the New Haven Line's stations and infrastructure were even more decrepit than those of the LIRR. The New Haven Railroad's trustees initially opposed New York Central's takeover of the New Haven Line, as they felt that the $ 140 million offer for the New Haven Line was too low. After some discussion, the trustees decided to continue operating

13176-637: The MCTA. In June 1965, the state finalized an agreement to buy the LIRR from the PRR for $ 65 million. The MCTA made a down payment of $ 10 million for the LIRR in December 1965, and it completed the rest of the payment the next month. In February 1965, Rockefeller and Connecticut Governor John N. Dempsey jointly suggested that operations of the New Haven Line , the New Haven Railroad 's struggling commuter rail operation, be transferred to

13359-794: The MRT Putrajaya Line . There is a cross-platform interchange between the Kyoto Municipal Subway Tozai Line and the Keihan Keishin Line at Misasagi . Nanjing Metro 's Nanjing South Railway Station offers cross-platform interchange between Lines 1 and 3 and same-direction cross-platform interchange between Line S1 and Line S3 . In addition, a cross platform interchange is available at Xiangyulunan Station between Line S1 and Line S9 , and Konggangxinchengjiangning Station between Line S1 and Line S7 . A paired cross platform interchange

13542-595: The MRT system which offers cross-platform interchange between two different operators' MRT lines ( SBS Transit operates the Downtown Line whilst SMRT operates the Circle Line). Sadeghieh metro station of Tehran metro offers cross-platform interchanges between both terminating metro lines 2 and 5; while suburban line 5 uses the outer tail tracks of each platform, metro line 2 uses one platform for alighting and

13725-403: The MTA awarded a contract for constructing the tunnels, a launch box for the tunnel boring machine (TBM), and access shafts to S3, a joint venture of Schiavone Construction, Skanska USA Civil, and J.F. Shea Construction. A ceremonial groundbreaking took place on April 12, 2007, at the 99th Street tunnel segment built in the 1970s. Actual construction work began on April 23, 2007. At the time, it

13908-481: The MTA in order to run the ads, lauded the decision, and a lawyer for the organization said the same decision had been made in Washington and Philadelphia. A week afterward, the MTA's board in a 9–2 vote banned all political, religious, and opinion advertisements on subways and buses, limiting any ads to commercial ones. Specifically, it banned advertisements that "prominently or predominately advocate or express

14091-466: The MTA introduced a Vignelli -style interactive subway map , "The Weekender", to its website. The web app provided a way for riders to get information about any planned work, from late Friday night to early Monday morning, that is going on either on a service(s) or station(s) of the subway during the weekends. On June 11, 2012, the MTA duplicated "The Weekender" site as a free mobile app download for iOS . On November 29, 2012, an Android version of

14274-449: The MTA officially released the Subway Time app, which uses subway countdown clock data to determine the next-train arrival times on seven services. Real-time station information for the "mainline" A Division (numbered routes) , comprising all numbered services except the 7 train, was made available to third-party developers via an API . This was achieved through both the Subway Time mobile app and as open data . In early 2014, data for

14457-448: The MTA passed the $ 29 billion 2015–2019 Capital Plan, the largest capital plan in MTA's history; it will be funded by federal, state and city government as well as riders' fares and tolls. Three months later, New York Governor Andrew Cuomo and MTA chairman Thomas Prendergast unveiled their plan to spend $ 26 billion to modernize the subway network, which includes adding Wi-Fi and cellphone services throughout all 278 underground stations by

14640-514: The MTA published a Supplemental Environmental Assessment for the SAS FEIS. The FTA issued a Finding of No Significant Impact for the project on November 15, 2018. A Second Avenue Subway Community Information Center for Phase 2, along 125th Street between Park and Madison Avenues, opened in September 2017, delayed by four months. The administration of Joe Biden approved funding for Phase 2 of

14823-423: The MTA states it needs. If this is not funded, the MTA will fund the repairs with debt and raise fares to cover repayments. The MTA has consistently run on a deficit, but increased spending in 2000–04 coupled with the economic downturn led to a severe increase in the financial burden that the MTA bore. The budget problems stem from multiple sources. The MTA cannot be supported solely by rider fares and road tolls. In

15006-585: The MTA's Trip Planner; whereas the existing Trip Planner can only plan trips along MTA-operated modes of transportation, MYmta's Trip Planner can also suggest routes via other operators such as the Staten Island Ferry , NYC Ferry , PATH , and NJ Transit . A beta version of MYmta was released to the general public in July of that year. In future versions of the MYmta app, the MTA planned to integrate

15189-566: The MTA's action a "disingenuous attempt to circumvent" the judge's order. Another controversy regarding MTA ads arose in 2018. After initially rejecting proposed advertisements from Unbound, a sex-toy retailer, the MTA allowed the ads. Previous advertisement proposals from companies, such as female-hygiene retailer Thinx 's ad proposal in 2015, had been rejected and later approved due to "dissemination of indecent material to minors" and "public display[s] of offensive sexual material." Cross-platform interchange A cross-platform interchange

15372-531: The MTA's inception until 2003, the agency collected subway and bus fares via a series of small metal tokens. The MTA cycled through several series of tokens throughout the late 20th century. In 1993, MTA started testing the MetroCard , a magnetic stripe card that would replace the tokens used to pay fares. By 1997, the entire bus and subway system accepted MetroCard, and tokens were no longer accepted for fare payment in 2003. A different fare payment system

15555-470: The MTA's systems, the agency requested $ 4 billion in federal funds, since the decreased fare revenue left the already-struggling agency in a financially tenuous position. After the subway was temporarily shuttered at night starting in May 2020, trains and stations were cleaned more than usual. Over 132 employees died of COVID-19 as of June 2020 . On February 1, 2023, as part of her Executive Budget proposal to

15738-601: The Narrows to Staten Island . Among the plans was a massive trunk line under Second Avenue consisting of at least six tracks and numerous branches throughout Brooklyn, Queens, and the Bronx . The Second and Third Avenue elevated lines were to be knocked down to make room for the 6-track subway. The paper was revised in January 1927. In September 1929, the Board of Transportation of the City of New York (BOT) tentatively approved

15921-512: The New Haven Line had been part of the New York, New Haven and Hartford Railroad . Penn Central continued to operate the lines under contract to the MTA. In April 1970, Rockefeller proposed that the state take over the Hudson and Harlem Lines. The next month, he signed a bond issue that provided $ 44.4 million in funding to these lines. Penn Central's operations were folded into Conrail in 1976. The MTA took over full operations in 1983, and merged

16104-629: The New Haven Line until June 1967. In January 1966, New York City Mayor John Lindsay proposed merging the New York City Transit Authority (NYCTA), which operated buses and subways in New York City, and the Triborough Bridge and Tunnel Authority (TBTA), which operated toll bridges and tunnels within the city. Rockefeller offered his "complete support" for Lindsay's proposed unified transit agency, while longtime city planner and TBTA chair Robert Moses called

16287-471: The New York City Subway was at its lowest point in its existence, State Comptroller Arthur Levitt stated that there were no plans to finish the line. During the 1980s, plans for the Second Avenue line stagnated. Construction on the 63rd Street Lines continued. The IND portion of the line opened in 1989 and extended to 21st Street–Queensbridge in Long Island City , Queens , but it did not include

16470-630: The New York State Legislature to exceed its $ 655 million debt ceiling so that the city could spend $ 500 million on subway construction, but this request was denied. The BOT then ordered ten new prototype subway cars made of stainless steel from the Budd Company . These R11 cars, so called because of their contract number, were delivered in 1949 and specifically intended for the Second Avenue Subway. They cost US$ 100,000 (equivalent to $ 1.28 million in 2023) each;

16653-480: The Penn Central railroads and area airports. The Program for Action was put forward simultaneously with other development and transportation plans under the administration of Mayor Lindsay. This included Lindsay's Linear City plan for housing and educational facilities, and the projected construction of several Interstate Highways , many of which had originally been proposed by Robert Moses. On March 1, 1968,

16836-574: The Permanent Citizens Advisory Committee, which represent customers of MTA transit and commuter facilities. Board members are confirmed by the New York State Senate . In 2017, the MTA had operating expenses of $ 16.85 billion, an outstanding debt of $ 38.083 billion, and a level of staffing of 79,832 people (staff compensation totaled $ 6.762 billion). It collects revenue from passenger fees and from

17019-657: The SAS. Rising ridership on the IRT Lexington Avenue Line , the only subway trunk line east of Central Park , demonstrated the need for the Second Avenue Line, as capacity and safety concerns rose. The four-track IRT Lexington Avenue Line, the lone rapid transit option in the Upper East Side and East Harlem since the 1955 closure of the Third Avenue elevated, is the most crowded subway line in

17202-479: The SDEIS, would allow for the storage of four trains, and they would run south of Hanover Square from Coenties Slip to a traffic island near Peter Minuit Plaza at a depth of 110 feet (34 m). The Hanover Square terminal is only planned to be able to turn back 26 trains per hour instead of 30 as less capacity will be needed on the line south of 63rd Street. The Hanover Square station will be deep enough to allow for

17385-476: The Second Avenue Line near 65th Street. This connection also connects to the Sixth Avenue Line allowing for trains from the Sixth Avenue line to access the Second Avenue Subway, though this connection has been unused in regular service since April 2020. The northbound 63rd Street Connector track dips below the level of Phase 3's planned tunnels, providing for a future flying junction between the connector and

17568-576: The Second Avenue Line: Phase 1 of the Second Avenue Line opened in January 2017. It runs under Manhattan's Second Avenue from 65th Street to 105th Street, with stations at 72nd Street , 86th Street , and 96th Street . It is double-tracked along its entire length, with tracks in parallel tubes bored by tunnel boring machines , and central island platforms at all stations. North of 96th Street, both tracks continue as storage tracks until they end at 105th Street. As part of Phase 1,

17751-475: The Second Avenue Subway and that the federal share of such costs would be reimbursed with FTA transit funds, subject to appropriations and final labor certification. The USDOT also later gave $ 1.3 billion in federal funding for the project's first phase, to be funded over a seven-year period. Preliminary engineering and a final tunnel design was completed by a joint venture between AECOM and Arup . In March 2007, upon completion of preliminary engineering,

17934-498: The Second Avenue Subway connects to the BMT Broadway Line using an existing connection via the 63rd Street Line. The Q, as well as limited rush-hour N and R, operates northward from 57th Street–Seventh Avenue on the Broadway Line, curving east under Central Park on the 63rd Street Line. Broadway Line trains then stop at Lexington Avenue–63rd Street with a cross-platform interchange to the F train before merging with

18117-481: The Second Avenue Subway in November 2021, and land acquisition for Phase 2 started in April 2022. The MTA began soliciting bids for the first construction contracts in July 2023, and estimated that construction would start by the end of the year. The MTA stated it would reduce the cost of Phase 2 by at least $ 1 billion through methods such as constructing smaller stations and platforms while also reutilizing tunnels built in

18300-657: The Second Avenue Subway to be cancelled. Construction on the line began in 1972 as part of the Program for Action . It was halted in 1975 because of the city's fiscal crisis , leaving only a few short segments of tunnels completed. Work on the line restarted in April 2007 following the development of a financially secure construction plan. The first phase of the line, consisting of the 96th Street , 86th Street and 72nd Street stations, as well as 1.8 mi (2.9 km) of tunnel, cost $ 4.45 billion. A 1.5-mile (2.4 km), $ 6 billion second phase from 96th to 125th Streets

18483-503: The Second Avenue Subway would not create better transit options for them. In 1950, a revised plan involved connections from Queens. New York voters approved a bond measure for its construction in 1951, and the city was barely able to raise the requisite $ 559 million for the construction effort. However, the onset of the Korean War caused soaring prices for construction materials and saw the beginning of massive inflation . Money from

18666-413: The Second Avenue line, but two years later, the MTA, facing budget cuts, removed these funds from its capital budget. In 1995, the MTA began its Manhattan East Side Alternatives (MESA) study, both a MIS and a DEIS, seeking ways to alleviate overcrowding on the Lexington Avenue Line and improve mobility on Manhattan's East Side. Second Avenue was chosen over First Avenue for logistical reasons. The MTA started

18849-453: The Sixth Avenue and Second Avenue Lines. Separately, in 1967, voters approved a $ 2.5 billion (worth about $ 22,844,000,000 in current dollars) Transportation Bond Issue, which provided over $ 600 million (worth $ 5,483,000,000 today) for New York City projects, including for a 1968 Program for Action . The City secured a $ 25 million Urban Mass Transportation Act (UMTA) grant for initial construction. The Program for Action proposed

19032-461: The aftermath of Hurricane Sandy , created and awarded contracts to his own engineering firm staffed with friends with few formal qualifications in engineering. After deleting thousands of company emails, Patel pleaded guilty to obstructing federal bid rigging and fraud investigations in March 2020. In 2022, construction manager Ramnarace Mahabir was found to have provided jobs for family members through

19215-432: The agency $ 4.5 million in annual advertising revenue. The tobacco advertisements were removed once the advertising contracts expired. They were removed from subways, buses, and bus shelters by the start of 1993, from the commuter rail lines by the start of 1994, and from Long Island Bus vehicles by the start of 1997. The MTA refused to display an ad in the New York City Subway system in 2012, which read: "In any war between

19398-520: The app was released. The MTA announced plans to integrate all three apps in 2017. The combined app, which was scheduled for release in 2018, would include real-time arrival information for all subway and bus routes, as well as weekend service changes and travel planners. In April 2018, the MTA started testing MYmta , which provides arrival information for MTA railroad, subway, and bus routes; escalator and elevator outage information; and real-time service changes. The app also includes an improved version of

19581-494: The bond was passed only by a narrow margin, with 55% of voters approving and 45% disapproving. At the time, the MTA said that the project would be done in 2012 in case the city's 2012 Summer Olympics bid succeeded, which it had not. In December 2006, the United States Department of Transportation (USDOT) announced that they would allow the MTA to commit up to $ 693 million in funds to begin construction of

19764-571: The chairman/CEO are directly nominated by the Governor of New York , while four are recommended by New York City's mayor . The county executives of Nassau, Suffolk and Westchester counties nominate one member each. Each of these members has one vote. The county executives of Dutchess , Orange , Rockland , and Putnam counties also nominate one member each, but these members cast one collective vote. The Board has six rotating nonvoting seats held by representatives of MTA employee organized labor and

19947-682: The civilized man and the savage, support the civilized man. Support Israel. Defeat Jihad ." The authority's decision was overturned in July 2012 when Judge Paul A. Engelmayer of the United States District Court for the Southern District of New York ruled that the ad of the American Freedom Defense Initiative is protected speech under the First Amendment , and that the MTA's actions were unconstitutional . The judge held in

20130-586: The coordination of the lines' timetables to reduce the scheduled changing time, either from one line to the other, or ideally bidirectionally, between both trains simultaneously. Coordinated interchange is widely used in Dutch , German , and Swiss railway networks, where trains of different lines meet at the same platforms in numerous hubs all over the country. Most advanced are coordinated cross-platform interchanges wherein interconnected trains also wait for each other, to "guarantee" scheduled interchanges even in

20313-704: The country. The line saw an average of 1.3 million daily riders in 2015. This is more than the daily ridership of the second-busiest subway system in the U.S., the Washington Metro , as well as more than the combined daily riderships of San Francisco's and Boston's transit systems. Local bus routes are just as crowded during various times of the day, with the parallel M15 local and M15 Select Bus Service routes seeing 46,000 passengers per weekday in 2016, translating to 14.5 million passengers that year. In 1991, then-New York Governor Mario Cuomo allocated $ 22 million to renew planning and design efforts for

20496-417: The crisis; rather, it was an accumulation of small cutbacks and maintenance deferments. The MTA funds were described as a "piggy bank" for the state, with the issuance of MTA bonds benefiting the state at the MTA's expense. By 2017, a sixth of the MTA's budget was allocated to paying off debt, a threefold increase from the proportion in 1997. The city's $ 250 million annual contribution to the MTA budget in 2017

20679-633: The day after the release of the Program for Action, the MCTA dropped the word "Commuter" from its name and became the Metropolitan Transportation Authority (MTA). The MTA took over the operations of the other New York City-area transit systems. Moses was let go from his job as chairman of the TBTA, although he was retained as a consultant. The construction of two proposed bridges over the Long Island Sound

20862-663: The different agencies were part of one agency. Surveys found that a majority of riders did not know that the MTA owned the Long Island Rail Road or the Metro-North Railroad. As part of the changes, the Triborough Bridge and Tunnel Authority was renamed MTA Bridges and Tunnels; Staten Island Rapid Transit was renamed MTA Staten Island Railway; Metropolitan Suburban Bus Authority was renamed MTA Long Island Bus. The New York City Transit Authority

21045-465: The eTix functionality, as well as make it easier for Access-A-Ride customers to view when their vehicle will arrive at a certain point. In October 2020, the MTA unveiled a new digital map providing real-time arrival estimates and service updates. It was developed pro bono by technology and design company Work & Co . The subway, buses, and Staten Island Railway charge a single flat fare for each trip, regardless of time or distance traveled. From

21228-468: The earliest. The Third Avenue Elevated , the only other elevated line in the area, closed on May 13, 1955, and was demolished in 1956. The Lexington Avenue Line was now the only subway transportation option on the East Side, leading to overcrowding. By 1957, the 1951 bond issue had been almost entirely used for other projects, and The New York Times despaired of the line's ever being built. "It certainly will cost more than $ 500 million and will require

21411-470: The end of 2016. Other plans call for making extensive renovations to 30 subway stations , allowing mobile ticketing by cellphone or bank cards, and adding security cameras on buses, charging stations for electronics, and more countdown clocks. Roughly $ 3 billion will be spent to improve bridges and tunnels. During the COVID-19 pandemic in New York City , following a 50% to 90% drop in ridership on all of

21594-521: The end of the 5-year cycle in 2019. In April 2016, the MTA and the State of New York reached a deal to restore funding to Phase 2, with a total of $ 1.035 billion allocated. This budget was raised by $ 700 million in May 2017. By August 2017, preliminary work on the line was underway, and design of the project was being performed by Phase 2 Partnership, a joint venture of Parsons-Brinckerhoff and STV. The EIS and design were finished in 2018. In July 2018,

21777-414: The event of modest delays. To limit schedule disruption propagation throughout the entire network, additional waiting time for trains is usually limited to a certain period of time, depending on general network performance, further connections to be guaranteed, train category, train line, and a balanced consideration of other factors. In practice, most railways coordinating cross-platform interchanges define

21960-430: The existing infrastructure, which was rapidly deteriorating and in dire need of repair. Beame issued a stop-work order for the line in September 1975, whereupon construction of the section between Second and Ninth Streets was halted, and no other funding was allocated to the line's construction. Besides the Chrystie Street Connection, only three sections of tunnel had been completed. These tunnels were sealed. In 1978, when

22143-713: The expansion, which included a Second Avenue Line with a projected construction cost of $ 98.9 million (equivalent to $ 1.74 billion in 2023), not counting land acquisition. In the north, several spur lines in the Bronx would merge into a four-track trunk line , crossing the Harlem River south to 125th Street . There would be six tracks from 125th Street to a link with the IND Sixth Avenue Line at 61st Street, then four tracks from 61st Street to Chambers Street , and two tracks from Chambers Street to Pine Street. The Great Depression began that year and

22326-576: The following stations:- Fuzhou Metro 's Difengjiang station offers a cross-platform transfer between Line 4 and Line 5 and Liangcuo station between Line 1 and Line 6 . Guangzhou Metro offers three two way cross-platform interchanges by 2016, between Line 2 and Line 3 at Jiahewanggang station , between Line 8 and the Guangfo Line at Shayuan station , Between Line 22 and 18 at Panyu Square station and one between both branches of Line 3 at Tiyu Xilu station . At Tiyu Xilu Station

22509-560: The foot of the Manhattan Bridge between Canal and Division Streets. A fourth segment started construction in July 1974, between Second and Ninth Streets in the East Village . In total, construction on the Second Avenue Line during the 1970s spanned over 27 blocks. The city soon experienced its most dire fiscal crisis yet, due to the stagnant economy of the early 1970s, combined with the massive outflow of city residents to

22692-429: The line will utilize the 99th–105th and 110th–120th Streets tunnel sections built during the 1970s, with a cut-and-cover tunnel connecting the segments between 105th and 110th Streets. The Phase 2 budget was originally $ 1.5 billion, which would be used to start construction of the tunnels. The MTA reduced the amount of money allocated in the budget, projecting that the agency would not be able to start construction by

22875-428: The line's terminal will more efficiently facilitate subway service. A bellmouth provision for extension to the Bronx remains, though shifted closer to the 116th Street station at 118th Street. Here, two outer tracks will head west toward 125th Street while space for two inner tracks will allow for an extension to the Bronx. North of 120th Street, the line will be constructed through the use of TBMs. South of 120th Street,

23058-430: The line's timely opening persisted through October and November. Test trains started running on October 9, 2016, and out-of-service Q trains started running through the subway in November 2016. The new Third Avenue entrance to the Lexington Avenue–63rd Street station opened on December 30, 2016. The ceremonial first train, with several prominent officials in attendance, ran on New Year's Eve, and regular service began at noon

23241-598: The lines into the Metro-North Commuter Railroad . In 1994, the MTA rebranded its five subsidiaries with simpler names to convey that the different agencies were part of one agency. The MTA has the responsibility for developing and implementing a unified mass transportation policy for the New York metropolitan area , including all five boroughs of New York City and the suburban counties of Dutchess , Nassau , Orange , Putnam , Rockland , Suffolk and Westchester . This twelve-county area make up

23424-419: The main line to turn west onto 125th Street with tail tracks to Fifth Avenue , while tail tracks would continue north on a spur via Second Avenue to 129th Street. However, the tail tracks to 129th Street, as well as a proposed ancillary building at 127th Street and Second Avenue, were removed in a June 2018 update to the plans. The change in tail tracks was made because it was found that providing tail tracks at

23607-493: The mid-2000s, the popular name has also been used for legal documents related to contract procurements where the legal name was used heretofore. Both are listed below. The Office of the MTA Inspector General (OIG), founded in 1983, is the independent Office of Inspector General specific to the MTA that is responsible for conducting monitoring and oversight of MTA activities, programs, and employees. The MTA

23790-402: The monthly MetroCard fare from $ 116 to $ 132. Each fare raise was met with increasing resistance by MTA customers, and many are beginning to find the fare increases prohibitive. 2010 also saw heavy service cuts for many MTA subsidiaries. Fewer trains spaced farther between resulted in heavy overcrowding beyond normal rush hours, leading to frustration for many subway and bus riders. In 2013,

23973-552: The most urgent public works projects, delaying the Second Avenue Line once again. As part of the unification of the three subway companies that comprised the New York City Subway in 1940, elevated lines were being shut down all over the city and replaced by subways. The northern half of the Second Avenue Elevated , serving the Upper East Side and East Harlem , closed on June 11, 1940. The southern half, running through Lower Manhattan , East Midtown and across

24156-539: The network including Chishajiao Station (Line 11 and 12), Tangxi Station (Line 12 and 28), Caihongqiao station (Line 13 and 11), Tianhe Park station (Line 11 and 21). Hangzhou Metro 's East Railway Station and Pengbu station offer paired cross-platform interchange between Line 1 and Line 4 and another paired cross-platform interchange at West Lake Cultural Square and Wulin Square stations between Line 1 and Line 3 . Same-direction cross-platform interchange

24339-420: The next day. About 48,200 passengers entered the new stations on January 1, excluding passengers who toured the line by entering at a station in the rest of the system. Because of the opening of Phase 1, ridership on the Lexington Avenue Line at the 68th Street , 77th Street , 86th Street , and 96th Street stations decreased in January 2017 compared to January 2016. The Second Avenue Line's three stations and

24522-523: The northern part of the line. Preliminary estimates of the cost of the southern portion of the line came to $ 450 million. Construction on a tunnel segment between 99th and 105th Streets began in October 1972. A second segment between 110th and 120th Street in East Harlem started construction in March 1973. In October 1973, the line's Chinatown segment began construction at Canal Street under

24705-401: The northern section of Line 3 terminates at the center track serving both island platforms connecting to the southern section of Line 3 stopping at the outer tracks. In 2016, a same-direction cross platform interchange started operating between the westbound Line 7 and northbound Line 2 trains at Guangzhou South Railway Station . Several cross platform interchanges are under construction across

24888-410: The older "M" logos survive on existing cube-shaped lamps on station lampposts dating to the 1980s, though such lamps have been updated with more modern spherical lamps over time. Today, each of these Related Entities has a popular name and in some cases, a former legal name . Since 1994, the legal name has only been used for legal documents, such as contracts, and have not been used publicly. Since

25071-565: The other side, with both alternatives headed in the same direction. As express and stopping trains usually head for different directions, cross-platform interchange between different train categories (e.g. interchanges between metros and railways) is commonly combined with cross-platform interchanges between different lines. Some stations offer cross-platform transfers between different modes, such as tram and bus, such as at Madeleine station in Charleroi, where two island platforms sit between

25254-575: The outer two tracks used to store trains. After Phase 4 is completed, the residents of East Harlem and the Upper East Side will have mass transit service down both Second Avenue and Broadway to the Financial District (the latter via transfer to Broadway local trains), as well as across the Manhattan Bridge to Brooklyn via the Q train. An additional two-track connection is planned at around 63rd Street that will connect

25437-835: The past terminated in the south there, alternating on both East/West Rail platforms to offer cross-platform interchanges. At Sunny Bay , passengers on the Tung Chung line from the city can make a cross-platform interchange to a Disneyland Resort line train. However, the inverse is not the case, so passengers returning to the city from Hong Kong Disneyland need to use an overpass to catch a Hong Kong -bound train. Putra Heights offers cross-platform interchange between Sri Petaling Line (Line 4) and Kelana Jaya Line (Line 5) while Chan Sow Lin offers cross-platform interchange between Ampang Line (Line 3) and Sri Petaling Line (Line 4). Tun Razak Exchange and Kwasa Damansara also offers cross-platform interchange between MRT Kajang Line and

25620-784: The potential extension of Second Avenue Subway service to Brooklyn through a new tunnel under the East River. Metropolitan Transportation Authority The Metropolitan Transportation Authority ( MTA ) is a public benefit corporation in New York State responsible for public transportation in the New York City metropolitan area . The MTA is the largest public transit authority in North America, serving 12 counties in Downstate New York , along with two counties in southwestern Connecticut under contract to

25803-488: The preliminary 2011 budget, MTA forecasted operating revenue totaled at $ 6.5 billion, amount to only 50% of the $ 13 billion operating expenses. Therefore, the MTA must rely on other sources of funding to remain operational. Revenue collected from real estate taxes for transportation purposes helped to contain the deficit. However, due to the weak economy and unstable real estate market, money from these taxes severely decreased; in 2010, tax revenue fell at least 20% short of

25986-477: The projected value. Beyond this, steadily reducing support from city and state governments led to borrowing money by issuing bonds, which contributed heavily to the debt. This budget deficit has resulted in various problems, mainly concentrated in New York City . New York City Subway fares have been increased four times since 2008, with the most recent occurring August 20, 2023, raising single-ride fares from $ 2.75 to $ 2.90, express service from $ 6.75 to $ 7.00 and

26169-484: The proposed merger "absurd" and "grotesque" for its unwieldiness. In June 1966, Rockefeller announced his plans to expand the MCTA's scope to create a new regional transit authority. The new authority would encompass the existing MCTA, as well as the NYCTA and TBTA. Lindsay disagreed, saying that the state and city should have operationally separate transit authorities that worked in tandem. In May 1967, Rockefeller signed

26352-419: The refusal was again challenged in court, and the MTA again lost in court and was ordered by a federal judge to display the ad. The ad, paid for by the American Freedom Defense Initiative, showed a man with a scarf covering his face, with the caption "Killing Jews is Worship that draws us close to Allah ", which was attributed to " Hamas MTV," and then stated: "That's His Jihad . What's yours?" The ad included

26535-416: The remaining balance. The budget deficit of the MTA is a growing crisis for the organization as well as for New York City and State residents and governments. The MTA held $ 31 billion in debt in 2010 and it also suffered from a $ 900 million gap in its operating budget for 2011. The capital budget, which covers repairs, technological upgrades, new trains, and expansions, is currently $ 15 billion short of what

26718-412: The renovated Lexington Avenue–63rd Street station saw an average weekday ridership of more than 150,000 by the end of January. The 72nd Street station was the busiest of the line's new stations, with an average daily ridership of 44,000. By April, taxi usage in the area also saw a decline of more than 20% compared to before the line's opening. By February 2018, there were 190,000 riders per weekday, within

26901-567: The respective return directions of both lines sharing a different island platform in the same station complex. Less common is a cross-platform interchange to transfer onto a continuation of same single line served by that station, for example in Kirkby , Ormskirk , and Pittsburg/Bay Point . Common cross-platform interchanges allow passengers to change trains without changing to another platform. This applies at places where trains of different directions meet in minor and major hubs, but this arrangement

27084-480: The rest of the Second Avenue Line. The long-term plans for the Second Avenue Subway involve digging 8.5 miles (13.7 km) of new tunnels north to Harlem–125th Street in Harlem and south to Hanover Square in the Financial District of Lower Manhattan . The entire line would also be double-tracked, except for a tentatively four-tracked segment between 21st and 9th Streets, including the 14th Street station, with

27267-401: The routing of $ 18 million in bus depot contracts. At one 2018 board meeting, an MTA executive explicitly noted the sentiment that the authority is willing to assign jobs to contractors with prior histories of corruption. The MTA collected $ 707 million from advertising on its trains and buses in 2018. In June 1992, the MTA banned tobacco advertising on subways, buses and commuter rail, costing

27450-604: The same elevation, and interconnecting passageways were regulated with one instead of two sets of ticketing barriers. After the merger, some sections of the barrier were demolished in order to provide free cross-platform interchange between southbound Tung Chung Line and northbound West Rail line trains. However, this arrangement does not serve the dominant rush hour passenger flows, which are between New Territories and Hong Kong Island , as well as between Lantau Island and Tsim Sha Tsui . To connect East Rail and West Rail lines at Hung Hom without through-running, both lines were in

27633-1140: The same level. Hanshin Railway has a same direction cross-platform interchange between the Namba Line and Hanshin Main Line at Amagasaki . Cross-platform interchange is available between Line 2 and Line 3 at May 4th Square . Provisions for cross-platform interchange between Line 3 and Line 8 were made at Qingdao North Railway Station . Seoul Subway Geumjeong Station offers cross-platform transfer between Line 1 local services and all 4 services. Gimpo Airport Station also offers cross-platform transfer between all Line 9 services and AREX local service. Also several Line 1 stations offer cross-platform transfer between trains heading to Incheon or Cheonan / Sinchang . Oriental Sports Center Station offers cross-platform interchange between Lines 6 and 11 . In addition, Hongqiao Railway Station provides cross platform interchange between Lines 2 and 17 . While Hongqiao Airport Terminal 2 Station provides

27816-746: The same time, many new buses were retrofitted with GPS -enabled automatic vehicle location systems. In October 2010, the developers of the buses' GPS devices implemented the MTA system's first bus-tracking app, which monitored buses along the M16 and M34 routes. This evolved into the current web app, which originally tracked buses along the B63 route in Brooklyn when it started in February 2011. By January 2012, every local and express bus in Staten Island

27999-578: The single platform terminate different routes, and interchange for through service is by walking along the platform. Another peculiar configuration exists at Pittsburg/Bay Point station on the BART system in the San Francisco Bay area, California , United States . Mainline BART trains terminate at that station, but onward service is available via an eBART diesel multiple unit (DMU) train. At this station, eBART trains are only accessible through

28182-458: The soaring costs of the expansion became unmanageable. Construction on the first phase of the IND was already behind schedule, and the city and state were no longer able to provide funding. In 1930, the line was scaled down, with the line from 125th to Houston Streets to be complete by 1940, as well as a spur along 34th Street to be done by 1948. This scaled-down plan was postponed in 1931. In 1932,

28365-454: The suburbs . The system was already in decline. The subway had seen a 40% decrease in ridership since 1947, and a $ 200 million subsidy for the MTA, as well as a 1952 fare increase had not been enough to pay for basic upkeep for the subway system, let alone fund massive expansion projects like the Second Avenue Subway. When plans were finalized in 1971, the subway had been proposed for completion by 1980, but two years later, its completion date

28548-465: The subway had the highest ridership since 1947. MTA employees also suffered due to the budget issues. By mid-July 2010, MTA layoffs had reached over 1,000, and many of those affected were low-level employees who made less than $ 55,000 annually. As of 2015 , the MTA was running a $ 15 billion deficit in its $ 32 billion 2015–2019 Capital Plan. Without extra funding, many necessary construction and renovation projects would not be performed. In October 2015,

28731-693: The terminating rail for the North–South Line aligned between that of the East–West Line, allowing commuters to alight and board simultaneously on either side, with an additional rail for the North–South Line used during peak hours. Tanah Merah MRT station also has a similar arrangement, with the terminating rail for the East West line Changi Airport Extension aligned between the two the East West line platforms, allowing commuters to alight and board simultaneously on either side too. The Bayfront MRT station

28914-541: The tracks, connected by level corridors. The benefit of this design is that passengers do not need to use stairs to another platform level for transfer. A cross-platform interchange arrangement may be costly to build due to the complexity of rail alignment, especially if the railway designers also arrange the track with flyovers (which is typically done to increase efficiency). A typical bidirectional cross-platform interchange configuration consists of two outbound directions of two different lines sharing an island platform, and

29097-458: The train became known as the "million dollar train". The cars featured porthole style round windows and a new public address system . Reflecting public health concerns of the day, especially regarding polio , the R11 cars were equipped with electrostatic air filters and ultraviolet lamps in their ventilation systems to kill germs. In 1949, Queens and Lower Manhattan residents complained that

29280-458: The trains are coordinated in the timetable. In this case, the cross-platform infrastructure offers the possibility of easily changing trains, independently from the waiting time for the second train. In metro systems with short headways, typical waiting time is small, but such a noncoordinated approach could reduce the advantages of stairless cross-platform interchange in railway networks with sparser train traffic. A more-advanced approach involves

29463-412: The two bridges. When opened in November 1967, the connection included the new Grand Street station on the Sixth Avenue Line (another station, 57th Street , opened in July 1968), and introduced the most significant service changes ever carried out in the subway's history. Grand Street, located under Chrystie Street (the southern end of Second Avenue) was designed to include cross-platform transfers between

29646-699: The two lines share a portion of the same track. Shenzhen metro network includes cross-platform interchanges at Laojie (Lines 1 and 3), Huangbeiling (Lines 2 and 5), Chegongmiao (Lines 7 and 9), Hongshuwan South (Lines 9 and 11), Nanyou (Lines 9 and 12), Huangmugang (Lines 7 and 14), Gangxia North (Lines 11 and 14), and Universiade (Lines 14 and 16) stations. Reservations have been made for future cross platform interchanges at Luohu North (Lines 14 and 17), Xiangmihu West (Lines 14 and 20), Xinsheng (Lines 3 and 21), and Aobei (Lines 14 and 21) stations. The Mass Rapid Transit system in Singapore has

29829-587: The war. In 1919, the New York Public Service Commission launched a study at the behest of engineer Daniel L. Turner to determine what improvements were needed in the city's public transport system. Turner's final paper, titled Proposed Comprehensive Rapid Transit System , was a massive plan calling for new routes under almost every north-south Manhattan avenue, extensions to lines in Brooklyn and Queens , and several crossings of

30012-508: The west tunnel remaining to be created was then mined using conventional drill-and-blast methods. In September 2011, the TBM completed its run to the Lexington Avenue–63rd Street station's bellmouth. In July 2013, the MTA opened a Second Avenue Subway Community Information Center for Phase 1 at 1628 Second Avenue between 84th and 85th Streets . In the three years that followed, the center was visited over 20,000 times. The final contract for Phase 1

30195-405: The world. The GAO planned to devote special attention to the MTA's transit costs. The MTA has long struggled to control costs due to contracting fraud and corruption. In 2012, MTA executive Mario Guerra attempted to secure a job with train manufacturer Bombardier while evaluating their bid for a $ 600 million project. Paresh Patel, an MTA manager responsible for the oversight of repair contracts in

30378-411: Was a quarter of the contribution in 1990. David L. Gunn , who helped end a transit crisis when he led the NYCTA in the mid-1980s, described the 2017 crisis as "heartbreaking". In December of the same year, the Times reported that the $ 12 billion East Side Access project, which would extend the LIRR to Grand Central Terminal upon its completion, was the most expensive of its kind in the world, with

30561-423: Was afraid that the enlarged MCTA would "undermine, destroy or tarnish" the integrity of the TBTA, One source of contention was Rockefeller's proposal to use TBTA tolls in order to subsidize the cheap fares of the NYCTA, since Moses strongly opposed any use of TBTA tolls by outside agencies. In February 1968, Moses acquiesced to the MCTA's merger proposal. New York Central and the PRR merged in February 1968, forming

30744-467: Was allocated $ 535 million in the MTA's 2015–2019 Capital Plan for planning, design, environmental studies and utility relocation. Three new stations will be constructed at 125th Street, 116th Street and 106th Street. A transfer to the Lexington Avenue Line and an intermodal connection with Metro-North Railroad would be available at the Harlem–125th Street station. The original plan called for

30927-540: Was also scaled down to a two-track, one-platform station because the MTA had ascertained that two-tracked terminals would be sufficient to handle train capacities, and that building a third track would have caused unnecessary impacts to surrounding buildings. After World War I , the New York City Subway experienced a surge in ridership. By 1920, 1.3 billion annual passengers were riding the subway, compared to 523 million annual riders just seven years before

31110-419: Was announced that passengers would be able to ride trains on the new line by the end of 2013. Due to cost increases, several features of the subway were cut back soon after construction started: for instance, the 72nd Street station was downsized. The MTA also postponed its completion date several times to 2016. In 2009, contracts were awarded for the 96th Street station box , as well as for excavation around

31293-472: Was approved in April 2004. This latest proposal is for a two-track line from 125th Street and Lexington Avenue in Harlem, down Second Avenue to Hanover Square in the Financial District . The final plan called for the full-length Second Avenue line to carry two services: the T , with a route emblem colored turquoise, as well as a rerouted Q train. Phase 1 rerouted the Q, the Broadway Express via

31476-450: Was awarded in June 2013. Blasting for the station caverns was finished in November 2013, and the muck houses were taken down at around the same time. In late 2013, many of the tracks and signal panels began to arrive at the construction site, to be installed on the line over the next few years. In February 2016, the MTA allocated $ 66 million to speed up the construction of the first phase so that it could open in December. Concerns about

31659-431: Was built within budget, at $ 4.45 billion. Its construction site was designated as being from 105th Street and Second Avenue to 63rd Street and Third Avenue. Deep bore tunneling methods were to be used in order to avoid the disruptions for road traffic, pedestrians, utilities and local businesses produced by cut-and-cover methods of past generations. Stations were to retain cut-and-cover construction. The total cost of

31842-404: Was considered, but later dropped. Due in part to strong public support, the MTA Board committed in April 2000 to building a full-length subway line along the East Side, from East Harlem to Lower Manhattan. In May 2000, the MTA Capital Program Review Board approved the MTA's 2000–2004 Capital Program, which allocated $ 1.05 billion for the construction of the Second Avenue Subway. The next year,

32025-415: Was equipped with the system. The M34 corridor began using the system on April 6, 2012 with nearly every Bronx bus route using the system by the end of 2012. All five boroughs of the city used the system by March 2014, and a mobile app was released in 2015. In 2011, the MTA began to look at ways of displaying service disruptions due to weekend engineering works in a visual format. On September 16, 2011,

32208-407: Was eventually scaled down to a two-track, center island platform station in order to reduce costs, A three-tracked 72nd Street station would have allowed trains from the Broadway Line to short-turn (reverse) without interfering with mainline service on Second Avenue, as well as provided additional operational flexibility for construction work and non-revenue moves. In July 2018, the 125th Street station

32391-428: Was forecast as 2000. In October 1974, the MTA chairman, David Yunich, announced that the completion of the line north of 42nd Street was pushed back to 1983 and the portion to the south in 1988. In December 1974, New York City mayor Abraham Beame proposed a six-year transit construction program that would reallocate $ 5.1 billion of funding from the Second Avenue Line to complete new lines in Queens and to modernize

32574-515: Was number 14 on the Board of Transportation's list of important transportation projects. The line was cut to two tracks with single northern branch through Throggs Neck, Bronx , a connection to the BMT Broadway Line in Manhattan, and a continuation south onto the IND Fulton Street Line in Brooklyn via that line's Court Street station . The subway's projected cost went up to US$ 249 million (equivalent to $ 5.16 billion in 2023). The United States' entry into World War II in 1941 halted all but

32757-423: Was opened and took over the southern half of the Modified Initial System . The interchange is two platforms in sequence, with an opposite-direction cross-platform interchange assigned to Prince Edward and a same-direction interchange to Mong Kok, as large volumes of traffic had been anticipated in both modes. Popular with passengers, this design was repeated on Admiralty station when the Island line in Victoria

32940-483: Was opened to deal with anticipated heavy opposite-direction interchange ridership. Years later, another interchange spanning Tiu Keng Leng station (same direction) in the New Territories and Yau Tong station (opposite direction) in New Kowloon was built to the same configuration as the earlier Mong Kok and Prince Edward interchanges. The Ma On Shan line is specifically designed to follow right-hand traffic rules (unlike other railway lines in Hong Kong), to enable

33123-407: Was put under the jurisdiction of the MTA. Moses stated that TBTA construction projects would reduce the MTA's budget surplus through to 1970. Chairman Ronan pushed for the MTA to pursue the Program for Action, saying, "We're making up for 30 years of do-nothingism". Ronan proposed that the MTA take over the Staten Island Rapid Transit Railway Company from the Baltimore and Ohio Railroad and start

33306-461: Was re-appointed in 2017 and resigned on November 9, 2018. The MTA considers itself to be the largest regional public transportation provider in the Western Hemisphere. As of 2018 , its agencies serve a region of approximately 15.3 million people spread over 5,000 square miles (13,000 km ) in 12 counties in New York and two in Connecticut. MTA agencies now move about 8.6 million customers per day (translating to 2.65 billion rail and bus customers

33489-547: Was renamed MTA New York City Transit to seem less authoritarian, Metro–North Commuter Railroad was renamed MTA Metro-North Railroad to recognize the increase in non-commuter ridership. The MTA logo was changed from a two-toned "M" logo, to a blue circle with the MTA initials written in perspective, as if they were rushing by like a train. The large "M" logos on trains and buses were replaced with decals that state MTA New York City Bus, MTA New York City Subway or MTA Staten Island Railway, eliminating inconsistencies in signage. Today,