A narrow-body aircraft or single-aisle aircraft is an airliner arranged along a single aisle, permitting up to 6-abreast seating in a cabin less than 4 metres (13 ft) in width. In contrast, a wide-body aircraft is a larger airliner usually configured with multiple aisles and a fuselage diameter of more than 5 metres (16 ft), allowing at least seven-abreast seating and often more travel classes .
130-895: The Airbus A320 family is a series of narrow-body airliners developed and produced by Airbus . The A320 was launched in March 1984, first flew on 22 February 1987, and was introduced in April 1988 by Air France . The first member of the family was followed by the stretched A321 (first delivered in January 1994), the shorter A319 (April 1996), and the even shorter A318 (July 2003). Final assembly takes place in Toulouse in France; Hamburg in Germany; Tianjin in China since 2009; and Mobile, Alabama in
260-604: A flight deck similar to that of the A320 family. Costing $ 2 billion (€1.85 billion) to develop, aircraft production was to take place in China. Simultaneously, Airbus was developing the Airbus A318. In early 1998, Airbus revealed that it was designing a 100-seat aircraft based on the A320. The AE31X project was terminated by September 1998, and Airbus officially announced the A318 at that year's Farnborough Airshow. The aircraft
390-447: A 47% market share as the country should become the world's largest market ahead of the US before 2027. In June 2018, along a larger and modernised delivery centre, Airbus inaugurated its fourth Hamburg production line, with two seven-axis robots to drill 80% of fuselage upper side holes, autonomous mobile tooling platforms and following Design Thinking principles. By January 2019, Mobile
520-603: A VIP aircraft by the Mexican Air Force for 23 years under registration TP-03. TP-03 would be broken up in 2006. The first 737-100, NASA 515, is on static display in the Museum of Flight in Seattle and is the last surviving example of the type. The 737-200 was a 737-100 with an extended fuselage, launched by an order from United Airlines in 1965 and entered service with the launch customer in April 1968. Its unit cost
650-548: A design called the HS.134 "Airbus" in 1965, an evolution of the HS.121 (formerly DH.121) Trident , which shared much of the general arrangement of the later JET3 study design. The name "Airbus" at the time referred to a BEA requirement, rather than to the later international programme. In June 1977 a new Joint European Transport (JET) programme was set up, established by British Aerospace (BAe), Aerospatiale , Dornier and Fokker . It
780-464: A design team, which cooperated with CFM International to select, modify and deploy a new engine and nacelle that would make the 737-300 into a viable aircraft. They chose the CFM56-3B-1 high-bypass turbofan engine to power the aircraft, which yielded significant gains in fuel economy and a reduction in noise, but also posed an engineering challenge, given the low ground clearance of the 737 and
910-511: A dispute between the French, who claimed the move would incur $ 150 million (€135 million) in unnecessary expenditures associated with the new plant, and the Germans, who argued that it would be more productive for Airbus in the long run. The second production line was located at Hamburg , which would also subsequently produce the smaller Airbus A319 and A318. For the first time, Airbus entered
1040-437: A full glass cockpit, rather than the hybrid versions found in previous airliners. It is also equipped with an Electronic Flight Instrument System (EFIS) with side-stick controllers. The A320 has an Electronic Centralised Aircraft Monitor (ECAM) to give the flight crew information about all of the systems on the aircraft. The only analogue instruments were the radio-magnetic indicator and brake pressure indicator. Since 2003,
1170-662: A fuselage diameter of "the Boeing 707 and 727, or do something better" and settled on a wider cross-section with a 3.7 m (12 ft 2 in) internal width, compared to Boeing's 3.45 m (11 ft 4 in). Although heavier, this allowed the A320 to compete more effectively with the 737. The A320 wing went through several design stages, eventually measuring 33.91 m (111 ft 3 in). The UK, France and West Germany wanted responsibility over final assembly and its associated work, known as "work-share arguments". The Germans requested an increased work-share of 40%, while
1300-529: A gravel deflector on the nose gear and a vortex dissipator extending from the front of the engine. Alaska Airlines used the gravel kit for some of its combi aircraft rural operations in Alaska until retiring its -200 fleet in 2007. Air Inuit , Nolinor Aviation and Chrono Aviation still use the gravel kit in Northern Canada. Canadian North also operated a gravel-kitted 737-200 Combi, but this
1430-705: A large number of countries around the world. For example, the centre fuselage is made in Hamburg, Germany; the horizontal stabiliser is produced in Getafe, Spain; and the rudder is produced in Harbin, China. As Airbus targets a 60 monthly global production rate by mid-2019, the Tianjin line delivered 51 in 2016 and it could assemble six per month from four as it starts producing A320neos in 2017; 147 Airbus were delivered in 2016 in China, 20% of its production, mostly A320-family,
SECTION 10
#17327726867221560-423: A need for a new aircraft to supplement the 727 on short and thin routes. Preliminary design work began on May 11, 1964, based on research that indicated a market for a fifty to sixty passenger airliner flying routes of 50 to 1,000 miles (100 to 1,600 km). The initial concept featured podded engines on the aft fuselage, a T-tail as with the 727, and five-abreast seating. Engineer Joe Sutter relocated
1690-451: A new air purifier with filters and a catalytic converter , removing unpleasant smells from the air before it is pumped into the cabin, as well as LEDs for mood lighting and a new passenger service unit (PSU). Offering 10% more overhead bin volume, more shoulder room, a weight reduction, a new intercom and in-flight entertainment system, noise reduction and slimmer PSU, the enhanced cabin can be retrofitted. The flight crew controls
1820-459: A new Boeing aircraft. Lufthansa was the only significant customer to purchase the 737-100 and only 30 aircraft were produced. The -200 was rolled out on June 29, 1967, and had its maiden flight on August 8, 1967. It was then certified by the FAA on December 21, 1967. The inaugural flight for United Airlines took place on April 28, 1968, from Chicago to Grand Rapids, Michigan . The lengthened -200
1950-518: A production rate of 63 aircraft per month by 2021, which would result in the 10,000th delivery occurring early that year. Due to the impact of the COVID-19 pandemic on aviation , demand for new jets was reduced in 2020 and Airbus cut its monthly production from 60 to 40 A320s. In October 2020, the 500th A320 built in Tianjin, an A320neo, was delivered to China Southern , twelve years after the final assembly line start in 2008. In 2006, Airbus started
2080-509: A range similar to the Airbus A319LR . The 737-800 was a stretched version of the 737-700 launched on September 5, 1994. The -800 seats 162 passengers in a two-class or 189 passengers in a high-density, one-class layout. Launch customer Hapag-Lloyd Flug (now TUIfly ) received the first one in April 1998. The -800 replaced directly the -400 and aging 727-200 of US airlines. It filled also the gap left by Boeing's decision to discontinue
2210-414: A retractable tricycle landing gear and powered by two wing pylon-mounted turbofan engines . After the oil price rises of the 1970s , Airbus needed to minimise the trip fuel costs of the A320. To that end, it adopted composite primary structures for the empennage with a conventional tail configuration, centre-of-gravity control using fuel, a glass cockpit ( EFIS ) with side-stick controllers and
2340-416: A retrofit was provided for active aircraft. Longer nacelle/wing fairings were introduced, and the airflow over the flaps and slats was improved. The production line also introduced an improvement to the flap system, allowing increased use during takeoff and landing. All these changes gave the aircraft a boost to payload and range, and improved short-field performance. Both the first and last 737-100s became
2470-533: A shorter-range twinjet rather than a longer-range quadjet wanted by the West Germans, particularly Lufthansa . However, works proceeded, and the German carrier would eventually order the twinjet. In February 1981 the project was re-designated A320, with efforts focused on the blueprint formerly designated SA2. During the year, Airbus worked with Delta Air Lines on a 150-seat aircraft envisioned and required by
2600-488: A single-class layout with slimline seats requiring an extra pair of exit doors . The MAX 200 would be 20% more cost-efficient per seat, including 5% lower operating costs than the MAX 8 and would be the most efficient narrow-body on the market when entering service. In mid-November 2018, the first MAX 200 of the 135 ordered by Ryanair rolled out, in a 197-seat configuration. It was first flown from Renton on January 13, 2019, and
2730-502: A strengthened wing spar . The -400s first flight was on February 19, 1988, and, after a seven-month/500-hour flight-testing run, entered service with Piedmont Airlines that October. The last two -400s, i.e. the last 737 Classics series, were delivered to CSA Czech Airlines on February 28, 2000. The 737-400 was replaced by the 737-800 of the Next Generation series. The 737-400SF was a 737-400 converted to freighter, though it
SECTION 20
#17327726867222860-428: A two class and 189 in a high-density, one class layout. The launch customer Alaska Airlines received the delivery on May 15, 2001. The 737-900ER (Extended Range) is the newest and largest variant of the 737NG generation. An additional pair of exit doors and a flat rear pressure bulkhead increased its seating capacity to 180 passengers in a two-class and up to 220 passengers in a one-class configuration. The -900ER
2990-527: A two-class layout. Range was 5,700 kilometres (3,100 nmi; 3,500 mi), or 5,950 kilometres (3,210 nmi; 3,700 mi) with upcoming Sharklets . The 107-seater was launched on 26 April 1999 with the options and orders count at 109 aircraft. After three years of design, the maiden flight took place at Hamburg on 15 January 2002. Tests on the lead engine, the PW6000, revealed worse-than-expected fuel consumption. Consequently, Pratt & Whitney abandoned
3120-458: A two-crew flight deck. Airbus claimed the 737-300 burns 35% more fuel and has a 16% higher operating cost per seat than the V2500 -powered A320. A 150-seat A320 burns 11,608 kg (25,591 lb) of jet fuel over 2,151 nmi (3,984 km; 2,475 mi) (between Los Angeles and New York City), or 2.43 L/100 km (97 mpg ‑US ) per seat with a 0.8 kg/L fuel. Its wing
3250-567: Is 33.8 m (111 ft) long. The A320 is 37.6 m (123 ft) long and can accommodate 150 to 186 passengers. The 44.5 m (146 ft) A321 offers 185 to 230 seats. The Airbus Corporate Jets are modified business jet versions of the standard commercial variants. In December 2010, Airbus announced the re-engined A320neo ( new engine option ), which entered service with Lufthansa in January 2016. With more efficient turbofans and improvements including sharklets , it offers up to 15% better fuel economy . The previous A320 generation
3380-458: Is long and thin, offering better aerodynamic efficiency because of the higher aspect ratio than the competing 737 and MD-80. The Airbus A320 family are low-wing cantilever monoplanes with a conventional empennage with a single vertical stabiliser and rudder . Its wing sweep is 25 degrees. Compared to other airliners of the same class, the A320 features a wider single-aisle cabin of 3.95 metres (156 in) outside diameter, compared to
3510-691: Is now called A320ceo ( current engine option ). American Airlines is the largest A320 operator with 479 aircraft in its fleet, while IndiGo is the largest customer with 930 aircraft on order. In October 2019, the A320 family surpassed the Boeing 737 to become the highest-selling airliner. As of October 2024, a total of 18,994 A320 family aircraft had been ordered and 11,707 delivered , of which 10,803 aircraft were in service with more than 350 operators. The global A320 fleet had completed more than 176 million flights over 328 million block hours since its entry into service. The A320ceo initially competed with
3640-870: Is the name given to the 737-300/400/500 series after the introduction of the -600/700/800/900 series of the Boeing 737 family. Produced from 1984 to 2000, a total of 1,988 Classic series were delivered. Close to the next major upgrade of single aisle aircraft at Airbus and Boeing, the price of jet fuel reached a peak in 2008, when airlines devoted 40% of the retail price of an air ticket to pay for fuel, versus 15% in 2000. Consequently, in that year carriers retired Boeing 737 Classic aircraft to reduce fuel consumption; replacements consisted of more efficient 737 Next Generation or A320 family aircraft. On June 4, 2008, United Airlines announced it would retire all 94 of its Classic 737 aircraft (64 737-300 and 30 737-500 aircraft), replacing them with A320 family jets taken from its Ted subsidiary, which has been shut down. This intensified
3770-632: The 737 Classic and the MD-80 , then their successors, the 737 Next Generation (737NG) and the MD-90 respectively, while the 737 MAX is Boeing's response to the A320neo. When Airbus designed the A300 during the late 1960s and early 1970s, it envisaged a broad family of airliners with which to compete against Boeing and Douglas (later McDonnell Douglas ), two established US aerospace manufacturers. From
3900-526: The 737 MAX -7/8/9/10 variants, powered by improved CFM LEAP -1B high-bypass turbofans and accommodating 138 to 204 people, entered service in 2017. Boeing Business Jet versions have been produced since the 737NG, as well as military models. As of October 2024 , 16,705 Boeing 737s have been ordered and 11,898 delivered. Initially, its main competitor was the McDonnell Douglas DC-9 , followed by its MD-80 / MD-90 derivatives. In 2013,
4030-486: The Air Transport Association maintenance and engineering conference by chief project engineer Jack Steiner, where its elaborate high-lift devices raised concerns about maintenance costs and dispatch reliability. The original 737 continued to be developed into thirteen passenger, cargo, corporate and military variants. These were later divided into what has become known as the four generations of
Airbus A320 family - Misplaced Pages Continue
4160-1434: The Airbus A318 , while the Airbus A321LR could replace the less fuel efficient Boeing 757s used since their production ended in 2004. Boeing will face competition and pricing pressure from the Embraer E-Jet E2 family , Airbus A220 (formerly Bombardier CSeries) and Comac C919 . Between 2016 and 2035, FlightGlobal expects 26,860 single-aisles to be delivered for almost $ 1380 billion, 45% Airbus A320 family ceo and neo and 43% Boeing 737 NG and max. By June 2018, there were 10,572 Airbus A320neo and Boeing 737 MAX orders: 6,068 Airbuses (57%, 2,295 with CFMs, 1,623 with PWs and 2,150 with not yet decided engines) and 4,504 Boeings (43%); 3,446 in Asia-Pacific (33%), 2,349 in Europe (22%), 1,926 in North America (18%), 912 in Latin America (9%), 654 in Middle East (6%), 72 in Africa (1%) and 1,213 not yet bounded (11%). Many airlines have shown interest in
4290-659: The Airbus A318 . The 737-700, the first variant of the Next-Generation, was launched in November 1993 with an order of 63 aircraft. The -700 seats 126 passengers in a two-class or 149 passengers in a one-class layout. The launch customer Southwest Airlines took the first delivery in December 1997. The 737-700 replaced the 737-300 and competes with the Airbus A319 . The 737-700C is a convertible version where
4420-568: The Airbus A321LR or its A321XLR derivative, and other extended-range models, for thin transatlantic and Asia-Pacific routes. 737-200 The Boeing 737 is an American narrow-body airliner produced by Boeing at its Renton factory in Washington . Developed to supplement the Boeing 727 on short and thin routes, the twinjet retained the 707 fuselage width and six abreast seating but with two underwing Pratt & Whitney JT8D low-bypass turbofan engines. Envisioned in 1964,
4550-471: The BAC One-Eleven (BAC-111), Douglas DC-9 , and Fokker F28 were already into flight certification. To expedite development, Boeing used 60% of the structure and systems of the existing 727, particularly the fuselage, which differs in length only. This 148-inch (3.76 m) wide fuselage cross-section permitted six-abreast seating compared to the rivals' five-abreast. The 727's fuselage was derived from
4680-548: The CFM LEAP -1B engine, with American Airlines intending to order 100 of these aircraft. On August 30, 2011, Boeing confirmed the launch of the 737 new engine variant, to be called the Boeing 737 MAX . It was based on earlier 737 designs with more efficient LEAP-1B power plants, aerodynamic improvements (most notably split-tip winglets ), and airframe modifications. It competes with the Airbus A320neo family that
4810-567: The CFM56 . The 737 went on to become the highest-selling commercial aircraft in terms of orders until surpassed by the competing Airbus A320 family in October 2019, but maintains the record in total deliveries. The fuselage is manufactured in Wichita, Kansas , by Boeing spin-off company Spirit AeroSystems , before being moved by rail to Renton. The Renton factory has three assembly lines for
4940-646: The EUROPLANE , a 180- to 200-seat aircraft. It was abandoned after intruding on A310 specifications. VFW-Fokker , Dornier and Hawker Siddeley worked on a number of 150-seat designs. The design within the JET study that was carried forward was the JET2 (163 passengers), which then became the Airbus S.A1/2/3 series (Single Aisle), before settling on the A320 name for its launch in 1984. Previously, Hawker Siddeley had produced
5070-617: The U.S. Air Force . Some were modified into CT-43s, which are used to transport passengers, and one was modified as the NT-43A Radar Test Bed. The first was delivered on July 31, 1973, and the last on July 19, 1974. The Indonesian Air Force ordered three modified 737-200s, designated Boeing 737-2X9 Surveiller . They were used as Maritime reconnaissance (MPA)/transport aircraft, fitted with SLAMMAR (Side-looking Multi-mission Airborne Radar). The aircraft were delivered between May 1982 and October 1983. After 40 years, in March 2008,
5200-644: The bond market , through which it raised $ 480 million (€475 million) to finance development costs. An additional $ 180 million (€175 million) was borrowed from the European Investment Bank and private investors. The maiden flight of the Airbus A321 came on 11 March 1993, when the prototype , registration F-WWIA, flew with IAE V2500 engines; the second prototype, equipped with CFM56-5B turbofans, flew in May. Lufthansa and Alitalia were
5330-478: The dark cockpit (where an indicator is off when its system is running; useful for drawing attention to dysfunctions when an indicator is lit) from the A310, the first widebody designed to be operated without a flight engineer and influenced by Bernard Ziegler , first Airbus CEO Henri Ziegler 's son. The A320 is the world's first airliner with digital fly-by-wire (FBW) flight control system : input commands through
Airbus A320 family - Misplaced Pages Continue
5460-526: The side-stick are interpreted by flight control computers and transmitted to flight control surfaces within the flight envelope protection ; in the 1980s the computer-controlled dynamic system of the Dassault Mirage 2000 fighter cross-fertilised the Airbus team which tested FBW on an A300 . At its introduction, fly-by-wire and flight envelope protection was a new experience for many pilots. Narrow-body airliner Historically, beginning in
5590-479: The western district of Texas over Aviation Partners ' claims of infringement of its patents on winglet design and construction which were granted in 1993. Airbus' lawsuit seeks to reject responsibility to pay royalties to Aviation Partners for using its designs, despite work performed together with both parties to develop advanced winglets for the Airbus A320neo. The first sharklet-equipped Airbus A320
5720-410: The -500. The Boeing 737 Next Generation , abbreviated as 737 Next Gen or 737NG , is the name given to the main models 737-600/700/800/900 series and the extended range -700ER/900ER variants of the Boeing 737 family. It has been produced since 1996 and introduced in 1997, with a total order of 7,097 aircraft, of which 7,031 have been delivered as of May 2019 . The primary goal was to re-engine
5850-402: The 3,000 miles transatlantic flights between the eastern U.S. and Western Europe, previously dominated by wide-body aircraft. Norwegian Air Shuttle , JetBlue and TAP Portugal will open up direct routes bypassing airline hubs for lower fares between cheaper, smaller airports. The Boeing 737NG 3,300-mile range is insufficient for fully laden operations and operates at reduced capacity like
5980-448: The 3,588 nautical miles (6,645 km; 4,129 mi) great circle route to Winnipeg , Manitoba from Hamburg in 9 hours and 5 minutes. The A319 has proven popular with low-cost airlines such as EasyJet , which purchased 172 of them. The A318 was born out of mid-1990 studies between Aviation Industry Corporation of China (AVIC), Singapore Technologies Aerospace , Alenia and Airbus on a 95- to 125-seat aircraft project. The programme
6110-494: The 3.8 m (148 in) of the Boeing 737 or 757 , and larger overhead bins. Its cargo hold can accommodate unit load device containers. The A320 airframe includes composite materials and aluminium alloys to save weight and reduce the total number of parts to decrease the maintenance costs. Its tail assembly is made almost entirely of such composites by CASA, which also builds the elevators , main landing gear doors, and rear fuselage parts. The A320 flight deck features
6240-467: The 707. The proposed wing airfoil sections were based on those of the 707 and 727, but somewhat thicker; altering these sections near the nacelles achieved a substantial drag reduction at high Mach numbers. The engine chosen was the Pratt & Whitney JT8D -1 low-bypass ratio turbofan engine, delivering 14,500 pounds-force (64 kN ) of thrust. The concept design was presented in October 1964 at
6370-655: The 737 MAX; a fourth is planned to open at the Everett factory in 2024. The Boeing 737 Original is the name given to the -100/200 and -200 Advanced series of the Boeing 737 family. The initial model was the 737-100, the smallest variant of the 737 aircraft family, which was launched in February 1965 and entered service with Lufthansa in February 1968. In 1968, its unit cost was US$ 3.7M (1968), $ 32.4M today. A total of 30 737-100s were ordered: 22 by Lufthansa, 5 by Malaysia–Singapore Airlines (MSA) and 2 by Avianca with
6500-421: The 737 project would not be canceled. Consultation with Lufthansa over the previous winter had resulted in the seating capacity being increased to 100. On April 5, 1965, Boeing announced an order by United Airlines for 40 737s. United wanted a slightly larger capacity than the 737-100, so the fuselage was stretched 36 inches (91 cm) ahead of, and 40 inches (102 cm) behind the wing. The longer version
6630-532: The 737 with the high pressure ratio CFM56-7. By the early 1990s, as the MD-80 slowly withdrew from the competition following the introduction of the MD-90, it had become clear that the new A320 family was a serious threat to Boeing's market share. Airbus won previously loyal 737 customers, such as Lufthansa and United Airlines. In November 1993, to stay in the single aisle competition, Boeing's board of directors authorized
SECTION 50
#17327726867226760-432: The 737-100 for commercial flight on December 15, 1967. It was the first aircraft to have, as part of its initial certification, approval for Category II approaches , which refers to a precision instrument approach and landing with a decision height between 98 and 197 feet (30 and 60 m). Lufthansa received its first aircraft on December 28, 1967, and on February 10, 1968, became the first non-American airline to launch
6890-537: The 737-900 and competes with the Airbus A321neo . The 737 MAX 10 was proposed as a stretched MAX 9 in mid-2016, enabling seating for 230 in a single class or 189 in two-class layout, compared to 193 in two-class seating for the A321neo. The modest 66-inch (1.7 m) stretch of fuselage enables the MAX 10 to retain the existing wing and CFM Leap 1B engine from the MAX 9 with a trailing-link main landing gear as
7020-624: The A320 Enhanced (A320E) programme as a series of improvements targeting a 4–5% efficiency gain, with large winglets (2%), aerodynamic refinements (1%), weight savings and a new aircraft cabin . Engine improvements that reduced fuel consumption by 1% were made to the A320 in 2007 with the CFM56 Tech Insertion and in 2008 with the V2500Select (One) . In 2006, Airbus tested three styles of winglets intended to counteract
7150-524: The A320 has featured liquid crystal display (LCD) units on the flight deck instead of the original cathode-ray tube (CRT) displays. These include both main displays and the backup artificial horizon , which also previously had an analogue display. Airbus offers an avionics upgrade for older A320 aircraft, the In-Service Enhancement Package, to keep them updated. Digital head-up displays are also available. The A320 retained
7280-502: The A320 overall. The length increase required enlarged overwing exits, which were repositioned in front of and behind the wings. The centre fuselage and undercarriage were reinforced to accommodate an increase in maximum takeoff weight of 9,600 kg (21,200 lb), for a total of 83,000 kg (183,000 lb). Final assembly for the A321 would be, as a first for any Airbus, carried out in Germany (then West Germany). This came after
7410-406: The A320 was to be named A30X . In 2007, Airbus North America President Barry Eccleston stated that the earliest the aircraft could have been available was 2017. In January 2010, John Leahy , Airbus's chief operating officer-customers, stated that an all-new single-aisle aircraft was unlikely to be constructed before 2024 or 2025. The Airbus A320 family are narrow-body (single-aisle) aircraft with
7540-537: The A320 was to be supplied by two CFM56-5-A1s rated at 111 kN (25,000 pounds-force). It was the only engine available until the arrival of the IAE V2500 , offered by International Aero Engines , a group composed of Rolls-Royce plc , Pratt & Whitney , Japanese Aero Engine Corporation , Fiat and MTU . The first V2500 variant, the V2500-A1, has a thrust output of 110 kN (25,000 pounds-force ), hence
7670-408: The Boeing 737 family: The launch decision for the $ 150 million (~$ 1.11 billion in 2023) development was made by the board on February 1, 1965. The sales pitch was big-jet comfort on short-haul routes. Lufthansa became the launch customer on February 19, 1965, with an order for 21 aircraft, worth $ 67 million (~$ 494 million in 2023) after the airline had been assured by Boeing that
7800-501: The British wanted the major responsibilities to be swapped around to give partners production and research and development experience. In the end, British work-share was increased from that of the two previous Airbuses. France was willing to commit to launch aid, or subsidies, while the Germans were more cautious. The UK government was unwilling to provide funding for the tooling, requested by BAe and estimated at £ 250 million; it
7930-532: The CFM56 included the U.S. Air Force with its program to re-engine KC-135 tankers. The passenger capacity of the aircraft was increased to 149 by extending the fuselage around the wing by 9 feet 5 inches (2.87 m). The wing incorporated several changes for improved aerodynamics. The wingtip was extended 9 inches (23 cm), and the wingspan by 1 foot 9 inches (53 cm). The leading-edge slats and trailing-edge flaps were adjusted. The tailfin
SECTION 60
#17327726867228060-461: The FAA cleared the MAX to return to service. Before the aircraft can fly again, repairs must be implemented and airlines' training programs must be approved. Passenger flights in the U.S. are expected to resume before the end of the year. Worldwide, the first airline to resume passenger service was Brazilian low-cost Gol , on December 9, 2020. The 737 MAX 7, a shortened variant of the MAX ;8,
8190-535: The MD-80 and MD-90 aircraft, following Boeing's merger with McDonnell Douglas . The 737-800 is the most widely used narrowbody aircraft and competes primarily with the Airbus A320. The 737-900 was launched in 1997 and took its first flight on August 3, 2000. It retains the MTOW , fuel capacity, trading range for payload and also the exit configuration of the -800, limiting its seat capacity to approximately 177 in
8320-407: The Next Generation program to mainly upgrade the 737 Classic series. In late 1993, after engineering trade studies and discussions with major customers, Boeing proceeded to launch a second derivative of the Boeing 737, the 737 Next Generation (NG) -600/700/800/900 series. It featured a redesigned wing with a wider wingspan and larger area, greater fuel capacity, longer range and higher MTOWs . It
8450-403: The Next Generation series. The 737-500 was offered as a modern and direct replacement of the 737-200. It was launched in 1987 by Southwest Airlines , with an order for 20 aircraft, and it flew for the first time on June 30, 1989. A single prototype flew 375 hours for the certification process, and on February 28, 1990, Southwest Airlines received the first delivery. The -500 incorporated
8580-549: The Second Generation 737 Classic -300/400/500 variants were upgraded with more fuel-efficient CFM56-3 high-bypass turbofans and offered 110 to 168 seats. Introduced in 1997, the Third Generation 737 Next Generation (NG) -600/700/800/900 variants have updated CFM56-7 high-bypass turbofans, a larger wing and an upgraded glass cockpit , and seat 108 to 215 passengers. The latest, and Fourth Generation,
8710-715: The United States since April 2016. The twinjet has a six-abreast economy cross-section and came with either CFM56 or IAE V2500 turbofan engines, except the CFM56/ PW6000 powered A318. The family pioneered the use of digital fly-by-wire and side-stick flight controls in airliners. Variants offer maximum take-off weights from 68 to 93.5 tonnes (150,000 to 206,000 lb), to cover a 5,740–6,940 kilometres ; 3,570–4,320 miles (3,100–3,750 nmi) range . The 31.4 m (103 ft) long A318 typically accommodates 107 to 132 passengers. The 124-156 seat A319
8840-476: The aft fuselage instead of as a T-tail. Many designs for the engine attachment strut were tested in the wind tunnel and the optimal shape for high speed was found to be one which was relatively thick, filling the narrow channels formed between the wing and the top of the nacelle, particularly on the outboard side. At the time, Boeing was far behind its competitors; the SE 210 Caravelle had been in service since 1955, and
8970-501: The aircraft to modern specifications, while also retaining commonality with previous 737 variants. In 1980, preliminary aircraft specifications of the variant, dubbed 737-300, were released at the Farnborough Airshow . This first major upgrade series was later renamed 737 Classic. It competed primarily with the MD-80, its later derivative the MD-90 , and the newcomer Airbus A320 family . Boeing engineer Mark Gregoire led
9100-419: The airline. The A320 would carry 150 passengers over 2,850 or 1,860 nmi (5,280 or 3,440 km; 3,280 or 2,140 mi) using fuel from wing fuel tanks only. The -200 had the centre tank activated, increasing fuel capacity from 15,590 to 23,430 L (3,429 to 5,154 imp gal). They would measure 36.04 and 39.24 m (118 ft 3 in and 128 ft 9 in), respectively. Airbus considered
9230-420: The cabin through touchscreen displays. The A320neo ( neo for new engine option ) is a development launched on 1 December 2010, making its first flight on 25 September 2014 and introduced by Lufthansa on 25 January 2016. Re-engined with CFM International LEAP -1A or Pratt & Whitney PW1000G engines and with large sharklets, it was designed to be 15% more fuel efficient. Its three variants are based on
9360-467: The competition between the two giant aircraft manufacturers, which has since become a duopoly competition . An optional upgrade with winglets became available for the Classic and NG series. Development began in 1979 for the 737's first major revision, which was originally introduced as the 'new generation' of the 737. Boeing wanted to increase capacity and range, incorporating improvements to upgrade
9490-547: The consortium focused on its bigger siblings. After healthy sales of the A320/A321, Airbus focused once more on what was then known as the A320M-7 , meaning A320 minus seven fuselage frames . It would provide direct competition for the 737-300 / -700 . The shrink was achieved through the removal of four fuselage frames fore and three aft of the wing, cutting the overall length by 3.73 metres (12 ft 3 in). Consequently,
9620-450: The denser, 200-seat MAX 200), and MAX 9 replace the 737-700, -800, and -900 respectively. The further stretched 737 MAX 10 has also been added to the series. The aim was to re-engine the 737NG family using CFM LEAP-1B engines having very high bypass ratio, to compete with the Airbus A320neo family. On July 20, 2011, Boeing announced plans for a third major upgrade and respectively fourth generation of 737 series to be powered by
9750-713: The end of the month. The Toulouse Blagnac final assembly line builds A320s, whereas the Hamburg Finkenwerder final assembly line builds A318s, A319s, and A321s. The Airbus factory in Tianjin , China assembles A319s, A320s, and A321s; A320s and A321s are also assembled at the Airbus Americas factory in Mobile, Alabama . Airbus produced a total of 42 A320s per month in 2015, and expected to increase to 50 per month in 2017. Production of parts takes place in
9880-437: The engines to the wings which lightened the structure and simplified the accommodation of six-abreast seating in the fuselage. The engine nacelles were mounted directly to the underside of the wings, without pylons, allowing the landing gear to be shortened, thus lowering the fuselage to improve baggage and passenger access. Relocating the engines from the aft fuselage also allowed the horizontal stabilizer to be attached to
10010-611: The final 737-200 aircraft in the U.S. flying scheduled passenger service were phased out, with the last flights of Aloha Airlines . As of 2018, the variant still saw regular service through North American charter operators such as Sierra Pacific Airlines . The short-field capabilities of the 737-200 led Boeing to offer the "Unpaved Strip Kit" (see the Air North example, right). This option reduced foreign object damage when operated on remote, unimproved or unpaved runways, that competing jetliners could not use safely. The kit included
10140-411: The final commercial aircraft delivered to MSA on October 31, 1969. This variant was largely overshadowed by its bigger 737-200 sibling, which entered service two months later. The original engine nacelles incorporated thrust reversers taken from the 727 outboard nacelles. They proved to be relatively ineffective and tended to lift the aircraft up off the runway when deployed. This reduced the downforce on
10270-486: The first to order the stretched Airbuses, with 20 and 40 aircraft, respectively. The first of Lufthansa's V2500-A5-powered A321s arrived on 27 January 1994, while Alitalia received its first CFM56-5B-powered aircraft on 22 March. The A319 was the following derivative of the baseline A320. The design was a "shrink", with its origins in the 130- to 140-seat SA1, part of the Single-Aisle studies, which had been shelved as
10400-486: The first variant of the 737 MAX, has a longer fuselage than the MAX 7. On July 23, 2013, Boeing completed the firm configuration for the 737 MAX 8. Its first commercial flight was operated by Malindo Air on May 22, 2017. The MAX 8 replaced the 737-800 and competed with the A320neo. The 737 MAX 200 , a high-density version of the 737 MAX 8, was launched in September 2014 and named for seating for up to 200 passengers in
10530-589: The five-stage high-pressure compressor (HPC) for the MTU-designed six-stage HPC. The 129 order book for the A318 shrunk to 80 largely because of switches to other A320 family members. After 17 months of flight certification, during which 850 hours and 350 flights were accumulated, JAA certification was obtained for the CFM56-powered variant on 23 May 2003. On 22 July 2003, first delivery for launch customer Frontier Airlines occurred, entering service before
10660-546: The following day. The certification programme took 350 airborne hours involving two aircraft. Certification for the CFM56-5B6/2-equipped variant was granted in April 1996, and qualification for the V2524-A5 started the following month. Delivery of the first A319, to Swissair , occurred on 25 April 1996; it entered service by month's end. In January 1997, an A319 broke a record during a delivery flight by flying
10790-559: The global 737 fleet had completed more than 184 million flights over 264 million block hours since its entry into service. It was the highest-selling commercial aircraft until being surpassed by the competing Airbus A320 family in October 2019, but maintains the record in total deliveries. The 737 MAX, designed to compete with the A320neo , was grounded worldwide between March 2019 and November 2020 following two fatal crashes. Boeing had been studying short-haul jet aircraft designs, and saw
10920-487: The improvements of the 737 Classic series, allowing longer routes with fewer passengers to be more economical than with the 737-300. The fuselage length of the 737-500 is 1 foot 7 inches (48 cm) longer than the 737-200, accommodating up to 140 passengers. Both glass and older-style mechanical cockpits arrangements were available. Using the CFM56-3 engine also gave a 25 percent increase in fuel efficiency over
11050-456: The initial 737-100 made its first flight in April 1967 and entered service in February 1968 with Lufthansa . The lengthened 737-200 entered service in April 1968, and evolved through four generations, offering several variants for 85 to 215 passengers. The First Generation 737-100/200 variants were powered by Pratt & Whitney JT8D low-bypass turbofan engines and offered seating for 85 to 130 passengers. Launched in 1980 and introduced in 1984,
11180-438: The larger diameter of the engine over the original Pratt & Whitney engines. Gregoire's team and CFM solved the problem by reducing the size of the fan (which made the engine slightly less efficient than it had been forecast to be), placing the engine ahead of the wing, and by moving engine accessories to the sides of the engine pod, giving the engine a distinctive non-circular "hamster pouch " air intake. Earlier customers for
11310-428: The last 737-100s in service. The first aircraft used by Boeing as prototype under registration N73700 was later ordered by and delivered to NASA on July 26, 1973, which then operated it under registration N515NA and retired after 30 years on September 27, 2003. The last 737-100 built and also the last operating was originally sold to Malaysia–Singapore Airlines : it was transferred to Air Florida before being used as
11440-432: The late 1960s and continuing through the 1990s, twin engine narrow-body aircraft, such as the Boeing 737 Classic , McDonnell-Douglas MD-80 and Airbus A320 were primarily employed in short to medium-haul markets requiring neither the range nor the passenger-carrying capacity of that period's wide-body aircraft. The re-engined Boeing 737 MAX and Airbus A320neo jets offer 500 miles more range, allowing them to operate
11570-443: The long-range Airbus A310 . Airbus then focused its efforts on the single-aisle market, which was dominated by the 737 and McDonnell Douglas DC-9 . Plans from a number of European aircraft manufacturers called for a successor to the relatively successful BAC One-Eleven , and to replace the 737-200 and DC-9. Germany's MBB ( Messerschmitt-Bölkow-Blohm ), British Aircraft Corporation , Sweden's Saab and Spain's CASA worked on
11700-402: The longer length. Entry into service with launch operator Southwest Airlines was expected in January 2019, but the airline deferred these orders until 2023–2024. The 737 MAX 7 replaced the 737-700 and was predicted to carry 12 more passengers and fly 400 nautical miles (740 km; 460 mi) farther than the competing Airbus A319neo with 7% lower operating costs per seat. The 737 MAX 8,
11830-477: The main wheels thereby reducing the effectiveness of the wheel brakes. In 1968, an improvement to the thrust reversal system was introduced. A 48-inch tailpipe extension was added and new target-style thrust reversers were incorporated. The thrust reverser doors were set 35 degrees away from the vertical to allow the exhaust to be deflected inboard and over the wings and outboard and under the wings. The improvement became standard on all aircraft after March 1969, and
11960-608: The moment of formation, Airbus had begun studies into derivatives of the Airbus A300B in support of this long-term goal. Prior to the service introduction of the first Airbus airliners, engineers within Airbus had identified nine possible variations of the A300 known as A300B1 to B9. A 10th variation, conceived in 1973, later the first to be constructed, was designated the A300B10. It was a smaller aircraft which would be developed into
12090-499: The most significant orders occurred when Northwest Airlines placed an order for 100 A320s in October 1986, powered by CFM56 engines, later confirmed at the 1990 Farnborough Airshow . During A320 development, Airbus considered propfan technology, which was backed by Lufthansa . At the time unproven, the technology essentially consisted of a fan placed outside the engine nacelle , offering turbofan speeds and turboprop economics; ultimately, Airbus stuck with turbofans . Power on
12220-683: The name. It is 4% more efficient than the CFM56, with cruise thrust-specific fuel consumption for the -A5 at 16.3 and 16.9 g/kN/s (0.58 and 0.60 lb/lbf/h) for the CFM56-5A1. In the presence of then- French Prime Minister Jacques Chirac and the Prince and Princess of Wales , the first A320 was rolled out of the final assembly line at Toulouse on 14 February 1987 and made its maiden flight on 22 February in 3 hours and 23 minutes. The flight test programme took 1,200 hours over 530 flights. European Joint Aviation Authorities (JAA) certification
12350-451: The new model from 22 May 1992, with the actual launch of the $ 275 million (€250 million) programme occurring on 10 June 1993; the A319's first customer was ILFC , which signed for six aircraft. On 23 March 1995, the first A319 underwent final assembly at Airbus' German plant in Hamburg, where A321s were also assembled. It was rolled out on 24 August 1995, with the maiden flight taking place
12480-542: The number of overwing exits was reduced from four to two. The bulk-cargo door was replaced by an aft container door, which can take in reduced height LD3-45 containers . Minor software changes were made to accommodate the different handling characteristics; otherwise the aircraft was largely unchanged. Power is provided by the CFM56-5A, CFM56-5B, or V2500-A5, derated to 98 kN (22,000 lbf), with option for 105 kN (24,000 lbf) thrust. Airbus began offering
12610-413: The older 737-200s P&W engines. The 737-500 has faced accelerated retirement due to its smaller size, after 21 years in service compared to 24 years for the -300. While a few 737-300s were slated for freighter conversion, no demand at all existed for a -500 freighter conversion. The 737-500 was replaced by the 737-600 of the Next Generation series, though the -600 was not as successful in total orders as
12740-505: The only major change. The MAX 10 was launched on June 19, 2017, with 240 orders and commitments from more than ten customers. The variant configuration with a predicted 5% lower trip cost and seat cost compared to the A321neo was firmed up by February 2018, and by mid-2018, the critical design review was completed. The MAX 10 has a similar capacity to the A321XLR, but shorter range and much poorer field performance in smaller airports. It
12870-590: The original -200s and respectively -100s. The 737-200 Advanced became the production standard in June 1971. Boeing also provided the 737-200C ( Combi ), which allowed for conversion between passenger and cargo use and the 737-200QC (Quick Change), which facilitated a rapid conversion between roles. The 1,114th and last delivery of a -200 series aircraft was in August 1988 to Xiamen Airlines . Nineteen 737-200s, designated T-43 , were used to train aircraft navigators for
13000-465: The previous A319, A320 and A321. Airbus received 6,031 orders by March 2018 and delivered 318 by May 2018. The original family was renamed A320ceo, for current engine option . As of July 2024, IndiGo has 173 Airbus A320neos under service, making it the largest operator of this type of aircraft. In 2006, Airbus was studying a future replacement for the A320 series, tentatively dubbed as NSR or "New Short-Range aircraft". The follow-on aircraft to replace
13130-406: The primary competitor for the 737NG series remained only the A320 family. The 737-600, the smallest model of the Next-Generation, was launched by Scandinavian Airlines (SAS) in March 1995 with the first aircraft delivered in September 1998. A total of 69 aircraft without winglets have been produced with the last one delivered to WestJet in 2006. The 737-600 replaced the 737-500 and is similar to
13260-441: The prototype A320, which had been retained by Airbus for testing, and a new build aircraft which was fitted with both types of winglets before it was delivered to JetBlue . Despite the anticipated efficiency gains and development work, Airbus announced that those winglets would not be offered to customers, claiming that the weight of the modifications required negated any aerodynamic benefits. On 17 December 2008, Airbus announced it
13390-450: The seats can be removed to carry cargo instead. There is a large door on the left side of the aircraft. The United States Navy was the launch customer for the 737-700C under the military designation C-40 Clipper . The 737-700ER (Extended Range ) was launched on January 31, 2006, and featured the fuselage of the 737-700 and the wings and landing gear of the 737-800. A 737-700ER can typically accommodate 126 passengers in two classes with
13520-442: The series has received 5,011 firm orders. In March 2019, civil aviation authorities around the world grounded the 737 MAX following two hull loss crashes which caused 346 deaths. On December 16, 2019, Boeing announced that it would suspend production of the 737 MAX from January 2020, which was resumed in May 2020. In the midyear 2020, the FAA and Boeing conducted a series of recertification test flights. On November 18, 2020,
13650-478: The smaller version and 58 t (128,000 lb) for the AE317, the thrust requirement were 77.9–84.6 kN (17,500–19,000 lbf) and 84.6–91.2 kN (19,000–20,500 lbf), respectively. Range was settled at 5,200 km (2,800 nmi; 3,200 mi) and 5,800 km (3,100 nmi; 3,600 mi) for the high gross weights of both variants. Both share a wingspan of 31.0 m (101 ft 8 in) and
13780-520: The three European short-haul single aisles slowly withdrew from the competition. Sales were low in the early 1970s and, after a peak of 114 deliveries in 1969, only 22 737s were shipped in 1972 with 19 in backlog. The US Air Force saved the program by ordering T-43s , which were modified Boeing 737-200s. African airline orders kept the production running until the 1978 US Airline Deregulation Act , which improved demand for six-abreast narrow-body aircraft. Demand further increased after being re-engined with
13910-485: The wing's lift-induced drag and wingtip vortices more effectively than the previous wingtip fence . The first design type to be tested was developed by Airbus and based on work done by the AWIATOR programme. The second type of winglet incorporated a more blended design and was designed by Winglet Technology, a company based in Wichita , Kansas , USA. Two aircraft were used in the flight test evaluation campaign –
14040-400: Was US$ 4.0M (1968) ($ 35M today). The -200's unit cost was US$ 5.2M (1972) ($ 37.9M today). The 737-200 Advanced is an improved version of the -200, introduced into service by All Nippon Airways on May 20, 1971. After aircraft #135, the 737-200 Advanced has improved aerodynamics, automatic wheel brakes, more powerful engines, more fuel capacity, and hence a 15% increase in payload and range over
14170-626: Was awarded on 26 February 1988. The first A320 was delivered to Air France on 28 March, and began commercial service on 8 April with a flight between Paris and Berlin via Düsseldorf . In 1988, the clean-sheet aircraft program cost was 5.486 billion French francs . The first derivative of the A320 was the Airbus A321 , also known as the Stretched A320 , A320-500 and A325 . Its launch came on 24 November 1988 after commitments for 183 aircraft from 10 customers were secured. The aircraft
14300-467: Was based at the then BAe (formerly Vickers ) site in Weybridge , Surrey , UK. Although the members were all of Airbus' partners, they regarded the project as a separate collaboration from Airbus. This project was considered the forerunner of Airbus A320, encompassing the 130- to 188-seat market, powered by two CFM56s . It would have a cruise speed of Mach 0.84 (faster than the Boeing 737). The programme
14430-517: Was called the AE31X , and covered the 95-seat AE316 and 115- to 125-seat AE317. The former would have had an overall length of 31.3 m (102 ft 8 in), while the AE317 was longer by 3.2 m (10 ft 6 in), at 34.5 m (113 ft 2 in). The engines were to be two Rolls-Royce BR715s, CFM56-9s, or the Pratt & Whitney PW6000 ; with the MTOW of 53.3 t (118,000 lb) for
14560-467: Was delivered to Indonesia AirAsia on 21 December 2012, offering a 450 kg (990 lb) payload and 100 nmi (190 km; 120 mi) range increases over the original aircraft specifications. In 2007, Airbus introduced a new enhanced, quieter cabin with better luggage storage and a more modern look and feel, and a new galley that reduced weight, increased revenue space and improved ergonomics and design for food hygiene and recycling. It offered
14690-450: Was designated the -300SP ( Special Performance ). The 737-300 was replaced by the 737-700 of the Next Generation series. The 737-400 was launched in 1985 to fill the gap between the 737-300 and the 757-200. In June 1986, Boeing announced the development of the 737-400, which stretched the fuselage a further 10 feet (3.0 m), increasing the capacity to 188 passengers, and requiring a tail bumper to prevent tailstrikes during take-off and
14820-491: Was designated the 737-200, with the original short-body aircraft becoming the 737-100. Detailed design work continued on both variants simultaneously. The first -100 was rolled out on January 17, 1967, and took its maiden flight on April 9, 1967, piloted by Brien Wygle and Lew Wallick. After several test flights the Federal Aviation Administration (FAA) issued Type Certificate A16WE certifying
14950-502: Was due to be retired in early 2023. As of September 2023 , a relatively high number of 737-200s remain in service compared to other early jet airliners, with fifty examples actively flying for thirty carriers. During the 737 MAX groundings , older 737s, including the 200 and Classic series , were in demand for leasing. C-GNLK, one of Nolinor's 737-200s, is the oldest jet airliner in commercial service as of 2024, having entered service 50 years prior in 1974. The Boeing 737 Classic
15080-414: Was due to enter service in April 2019. The 737 MAX 9, the stretched variant of the MAX 8, was launched with an order of 201 aircraft in February 2012. It made its roll-out on March 7, 2017, and first flight on April 13, 2017; It was certified by February 2018. The launch customer, Lion Air Group, took the first MAX 9 on March 21, 2018, before entering service with Thai Lion Air . The 737 MAX 9 replaced
15210-405: Was equipped with CFM56-7 high pressure ratio engines, a glass cockpit , and upgraded interior configurations. The four main models of the series can accommodate seating for 108 to 215 passengers. It was further developed into additional versions such as the corporate Boeing Business Jet (BBJ) and military P-8 Poseidon aircraft. Following the merger between Boeing with McDonnell Douglas in 1997,
15340-500: Was introduced to meet the range and passenger capacity of the discontinued 757-200 and to directly compete with the Airbus A321 . The Boeing 737 MAX is the name given to the main models 737 MAX 7/8/9/10 series and the higher-density MAX 200 variant of the Boeing 737 family. It is offered in four main variants, typically offering 138 to 230 seats and a range of 3,215 to 3,825 nautical miles [nmi] (5,954 to 7,084 km; 3,700 to 4,402 mi). The 737 MAX 7, MAX 8 (including
15470-427: Was its first customer to sign a "letter of intent" for 25 A320s and options for 25 more at the 1981 Paris Air Show . In October 1983, British Caledonian placed seven firm orders, bringing total orders to more than 80. Cyprus Airways became the first customer to place an order for V2500-powered A320s in November 1984, followed by Pan Am with 16 firm orders and 34 options in January 1985, and then Inex Adria . One of
15600-534: Was later transferred to Airbus, leading up to the creation of the Single-Aisle (SA) studies in 1980, led by former leader of the JET programme, Derek Brown. The group looked at three different variants, covering the 125- to 180-seat market, called SA1 , SA2 and SA3 . Although unaware at the time, the consortium was producing the blueprints for the A319, A320 and A321, respectively. The single-aisle programme created divisions within Airbus about whether to design
15730-437: Was launched in December 2010 and reached 1,029 orders by June 2011, breaking Boeing's monopoly with American Airlines , which had an order for 130 A320neos that July. The 737 MAX had its first flight on January 29, 2016, and gained FAA certification on March 8, 2017. The first delivery was a MAX 8 on May 6, 2017, to Lion Air 's subsidiary Malindo Air , which put it into service on May 22, 2017. As of January 2019 ,
15860-402: Was not a model delivered by Boeing and hence the nickname Special Freighter (SF) . Alaska Airlines was the first to convert one of their 400s from regular service to an aircraft with the ability to handle 10 pallets. The airline had also converted five more into fixed combi aircraft for half passenger and freight. These 737-400 Combi aircraft were retired in 2017 and replaced by the 737-700F of
15990-497: Was originally based on the 737-700, flying 1,000 nautical miles (1,900 km; 1,200 mi) farther and accommodating two more seat rows at 18% lower fuel costs per seat. The redesign uses the 737-8 wing and landing gear; a pair of over-wing exits rather than the single-door configuration; a 46-inch-longer (1,200 mm) aft fuselage and a 30-inch-longer (760 mm) longer forward fuselage; structural re-gauging and strengthening; and systems and interior modifications to accommodate
16120-439: Was outputting 4.5 A320s per month, raising to five by the end of the year. In September 2019, Airbus reached a milestone with the delivery of the 9000th A320-family aircraft, to Easyjet. In October 2019, Airbus inaugurated a highly automated fuselage structure assembly line for A320 Family aircraft in Hamburg, showcasing an evolution in Airbus' industrial production system. Production rates continue to rise, and Airbus aims to reach
16250-438: Was postponed for three years. On 1 March 1984, the British government and BAe agreed that £50 million would be paid, whether the A320 flew or not, while the rest would be paid as a levy on each aircraft sold. In 1984, the program cost was then estimated at £2 billion ($ 2.8 billion) by Flight International, equivalent to £8 billion today. The programme was launched on 2 March 1984. At the time, Airbus had 96 orders. Air France
16380-450: Was redesigned, the flight deck was improved with the optional EFIS (Electronic Flight Instrumentation System), and the passenger cabin incorporated improvements similar to those developed on the Boeing 757 . The prototype -300, the 1,001st 737 built, first flew on February 24, 1984, with pilot Jim McRoberts. It and two production aircraft flew a nine-month-long certification program. The 737-300 retrofitted with Aviation Partners ' winglets
16510-461: Was the smallest in Airbus's product range, and was developed coincidentally at the same time as the largest commercial aircraft in history, the Airbus A380 . First called A319M5 in as early as March 1995, it was shorter by 0.79-metre (2 ft 7 in) ahead of the wing and 1.6 metres (5 ft 3 in) behind. These cuts reduced passenger capacity from 124 on the A319 to 107 passengers in
16640-444: Was to be a minimally changed derivative, apart from minor wing modifications and the fuselage stretch itself. The wing would incorporate double-slotted flaps and minor trailing edge modifications, increasing wing area from 124 m (1,330 sq ft) to 128 m (1,380 sq ft). The fuselage was lengthened by four plugs (two ahead and two behind the wings), making the A321 6.94 metres (22 ft 9 in) longer than
16770-640: Was to begin flight testing an existing blended winglet design developed by Aviation Partners Inc. as part of an A320 modernisation programme using the A320 prototype. Airbus launched the sharklet blended winglets during the November 2009 Dubai Airshow . Installation adds 200 kg (440 lb) but offers a 3.5% fuel burn reduction on flights over 2,800 km (1,500 nmi; 1,700 mi), saving approximately US$ 220,000 and 700 t of CO 2 per aircraft per year. The 2.5 metres (8 ft 2 in) tall wingtip devices are manufactured by Korean Air Aerospace Division. In December 2011, Airbus filed suit in
16900-502: Was widely preferred over the -100 by airlines. The improved version, the 737-200 Advanced, was introduced into service by All Nippon Airways on May 20, 1971. The 737 original model with its variants, known later as the Boeing 737 Original , initially competed with SE 210 Caravelle and BAC-111 due to their earlier entry into service and later primarily with the McDonnell Douglas DC-9, then its MD-80 derivatives as
#721278