Misplaced Pages

Apollo program

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#323676

175-612: The Apollo program , also known as Project Apollo , was the United States human spaceflight program carried out by the National Aeronautics and Space Administration (NASA), which succeeded in preparing and landing the first men on the Moon in 1969. It was first conceived in 1960 during President Dwight D. Eisenhower's administration as a three-person spacecraft to follow the one-person Project Mercury , which put

350-541: A mission module cabin separate from the command module (piloting and reentry cabin), and a propulsion and equipment module . On August 30, a feasibility study competition was announced, and on October 25, three study contracts were awarded to General Dynamics/Convair , General Electric , and the Glenn L. Martin Company . Meanwhile, NASA performed its own in-house spacecraft design studies led by Maxime Faget , to serve as

525-534: A mother ship , which carried a crew of three astronauts and the second Apollo spacecraft, the Apollo Lunar Module , to lunar orbit, and brought the astronauts back to Earth. It consisted of two parts: the conical command module, a cabin that housed the crew and carried equipment needed for atmospheric reentry and splashdown ; and the cylindrical service module which provided propulsion, electrical power and storage for various consumables required during

700-417: A spacecraft on a LVM 3 rocket and return them safely for a water landing at a predefined landing zone. On 15 August 2018, Indian Prime Minister Narendra Modi , declared India will independently send humans into space before the 75th anniversary of independence in 2022. In 2019, ISRO revealed plans for a space station by 2030, followed by a crewed lunar mission. The program envisages the development of

875-771: A 130-million-cubic-foot (3,700,000 m) Vertical Assembly Building (VAB). in which the space vehicle (launch vehicle and spacecraft) would be assembled on a mobile launcher platform and then moved by a crawler-transporter to one of several launch pads. Although at least three pads were planned, only two, designated A   and   B, were completed in October 1965. The LOC also included an Operations and Checkout Building (OCB) to which Gemini and Apollo spacecraft were initially received prior to being mated to their launch vehicles. The Apollo spacecraft could be tested in two vacuum chambers capable of simulating atmospheric pressure at altitudes up to 250,000 feet (76 km), which

1050-402: A Space Task Group to recommend follow-on human spaceflight programs after Apollo. The group proposed an ambitious Space Transportation System based on a reusable Space Shuttle , which consisted of a winged, internally fueled orbiter stage burning liquid hydrogen, launched with a similar, but larger kerosene -fueled booster stage, each equipped with airbreathing jet engines for powered return to

1225-467: A commitment on America's response to the Soviets. On April 20, Kennedy sent a memo to Vice President Lyndon B. Johnson , asking Johnson to look into the status of America's space program, and into programs that could offer NASA the opportunity to catch up. Johnson responded approximately one week later, concluding that "we are neither making maximum effort nor achieving results necessary if this country

1400-515: A flashing rendezvous beacon visible from 54 nautical miles (100 km) away as a navigation aid for rendezvous with the LM. The SM was connected to the CM using three tension ties and six compression pads. The tension ties were stainless steel straps bolted to the CM's aft heat shield. It remained attached to the command module throughout most of the mission, until being jettisoned just prior to re-entry into

1575-591: A fully-autonomous orbital vehicle capable of carrying 2 or 3 crew members to an about 300 km (190 mi) low Earth orbit and bringing them safely back home. Since 2008, the Japan Aerospace Exploration Agency has developed the H-II Transfer Vehicle cargo-spacecraft-based crewed spacecraft and Kibō Japanese Experiment Module –based small space laboratory. NASA is developing a plan to land humans on Mars by

1750-459: A gauge to judge and monitor the three industry designs. In November 1960, John F. Kennedy was elected president after a campaign that promised American superiority over the Soviet Union in the fields of space exploration and missile defense . Up to the election of 1960, Kennedy had been speaking out against the " missile gap " that he and many other senators said had developed between

1925-492: A great new American enterprise—time for this nation to take a clearly leading role in space achievement, which in many ways may hold the key to our future on Earth. ...   I believe that this nation should commit itself to achieving the goal, before this decade is out, of landing a man on the Moon and returning him safely to the Earth. No single space project in this period will be more impressive to mankind, or more important in

SECTION 10

#1732790820324

2100-664: A human into orbit independently. The goal of the second phase of CMS was to make technology breakthroughs in extravehicular activities (EVA, or spacewalk), space rendezvous , and docking to support short-term human activities in space. On 25 September 2008 during the flight of Shenzhou 7 , Zhai Zhigang and Liu Boming completed China's first EVA. In 2011, China launched the Tiangong 1 target spacecraft and Shenzhou 8 uncrewed spacecraft. The two spacecraft completed China's first automatic rendezvous and docking on 3 November 2011. About 9 months later, Tiangong 1 completed

2275-462: A limited Earth orbital mission, Apollo would carry three. Possible missions included ferrying crews to a space station , circumlunar flights , and eventual crewed lunar landings . In July 1960, NASA Deputy Administrator Hugh L. Dryden announced the Apollo program to industry representatives at a series of Space Task Group conferences. Preliminary specifications were laid out for a spacecraft with

2450-627: A means of docking the command module to a lunar excursion module (LEM) . But the change to lunar orbit rendezvous, plus several technical obstacles encountered in some subsystems (such as environmental control), soon made it clear that substantial redesign would be required. In 1963, NASA decided the most efficient way to keep the program on track was to proceed with the development in two versions: By January 1964, North American started presenting Block II design details to NASA. Block I spacecraft were used for all uncrewed Saturn 1B and Saturn V test flights. Initially two crewed flights were planned, but this

2625-466: A mission. An umbilical connection transferred power and consumables between the two modules. Just before reentry of the command module on the return home, the umbilical connection was severed and the service module was cast off and allowed to burn up in the atmosphere. The CSM was developed and built for NASA by North American Aviation starting in November 1961. It was initially designed to land on

2800-501: A plan for extended lunar geological and astrophysical exploration. Budget cuts forced the cancellation of three of these. Five of the remaining six missions achieved successful landings, but the Apollo 13 landing had to be aborted after an oxygen tank exploded en route to the Moon, crippling the CSM. The crew barely managed a safe return to Earth by using the lunar module as a "lifeboat" on

2975-480: A pore seal, a moisture barrier (a white reflective coating), and a silver Mylar thermal coating that looks like aluminum foil. The heat shield varied in thickness from 2 inches (5.1 cm) in the aft portion (the base of the capsule, which faced forward during reentry) to 0.5 inches (1.3 cm) in the crew compartment and forward portions. The Total weight of the shield was about 3,000 pounds (1,400 kg). The 1-foot-11-inch (0.58 m)-tall forward compartment

3150-403: A reaction control system. The initial LM model weighed approximately 33,300 pounds (15,100 kg), and allowed surface stays up to around 34 hours. An extended lunar module (ELM) weighed over 36,200 pounds (16,400 kg), and allowed surface stays of more than three days. The contract for design and construction of the lunar module was awarded to Grumman Aircraft Engineering Corporation , and

3325-580: A runway at the Kennedy Space Center launch site. Other components of the system included a permanent, modular space station; reusable space tug ; and nuclear interplanetary ferry, leading to a human expedition to Mars as early as 1986 or as late as 2000, depending on the level of funding allocated. However, Nixon knew the American political climate would not support congressional funding for such an ambition, and killed proposals for all but

3500-402: A so-called 'soft dock' state and enabled the pitch and yaw movements in the two vehicles to subside. Excess movement in the vehicles during the 'hard dock' process could cause damage to the docking ring and put stress on the upper tunnel. A depressed locking trigger link at each latch allowed a spring-loaded spool to move forward, maintaining the toggle linkage in an over-center locked position. In

3675-558: A spacecraft that could meet it while minimizing risk to human life, limiting cost, and not exceeding limits in possible technology and astronaut skill. Four possible mission modes were considered: In early 1961, direct ascent was generally the mission mode in favor at NASA. Many engineers feared that rendezvous and docking, maneuvers that had not been attempted in Earth orbit , would be nearly impossible in lunar orbit . LOR advocates including John Houbolt at Langley Research Center emphasized

SECTION 20

#1732790820324

3850-473: A third, successful attempt at crewed spaceflight. To achieve independent human spaceflight capability, China developed the Shenzhou spacecraft and Long March 2F rocket dedicated to human spaceflight in the next few years, along with critical infrastructures like a new launch site and flight control center being built. The first uncrewed spacecraft, Shenzhou 1 , was launched on 20 November 1999 and recovered

4025-514: Is spaceflight with a crew or passengers aboard a spacecraft , often with the spacecraft being operated directly by the onboard human crew. Spacecraft can also be remotely operated from ground stations on Earth, or autonomously , without any direct human involvement. People trained for spaceflight are called astronauts (American or other), cosmonauts (Russian), or taikonauts (Chinese); and non-professionals are referred to as spaceflight participants or spacefarers . The first human in space

4200-506: Is nearly a vacuum. Administrator Webb realized that in order to keep Apollo costs under control, he had to develop greater project management skills in his organization, so he recruited George E. Mueller for a high management job. Mueller accepted, on the condition that he have a say in NASA reorganization necessary to effectively administer Apollo. Webb then worked with Associate Administrator (later Deputy Administrator) Seamans to reorganize

4375-443: Is similar to the gap between the end of Apollo in 1975 and the first Space Shuttle flight in 1981, and is referred to by a presidential Blue Ribbon Committee as the U.S. human spaceflight gap. Since the early 2000s, a variety of private spaceflight ventures have been undertaken. As of November 2024, SpaceX and Boeing have launched humans to orbit, while Blue Origin has launched 8 crewed flights, six of which crossed

4550-493: Is sometimes criticized as imperialist and lacking. In addition to the lack of international inclusion, the inclusion of women and people of color has also been lacking. To make spaceflight more inclusive, organizations such as the Justspace Alliance and IAU -featured Inclusive Astronomy have been formed in recent years. The first woman to ever enter space was Valentina Tereshkova . She flew in 1963, but it

4725-469: Is to reach a position of leadership." His memo concluded that a crewed Moon landing was far enough in the future that it was likely the United States would achieve it first. On May 25, 1961, twenty days after the first US crewed spaceflight Freedom 7 , Kennedy proposed the crewed Moon landing in a Special Message to the Congress on Urgent National Needs : Now it is time to take longer strides—time for

4900-702: The Kibō Japanese Experiment Module and H-II Transfer Vehicle cargo spacecraft. As an alternative to HOPE-X, NASDA in 2001 proposed the Fuji crew capsule for independent or ISS flights, but the project did not proceed to the contracting stage. From 1993 to 1997, the Japanese Rocket Society , Kawasaki Heavy Industries , and Mitsubishi Heavy Industries worked on the proposed Kankoh-maru vertical-takeoff-and-landing single-stage-to-orbit reusable launch system. In 2005, this system

5075-441: The g -force experienced by the astronauts, permitted a reasonable amount of directional control and allowed the capsule's splashdown point to be targeted within a few miles. At 24,000 feet (7,300 m), the forward heat shield was jettisoned using four pressurized-gas compression springs. The drogue parachutes were then deployed, slowing the spacecraft to 125 miles per hour (201 kilometres per hour). At 10,700 feet (3,300 m)

5250-515: The Aerojet-General company to start developing the engine, resulting in a thrust level twice what was needed to accomplish the lunar orbit rendezvous (LOR) mission mode officially chosen in July of that year. The engine was actually used for mid-course corrections between the Earth and Moon, and to place the spacecraft into and out of lunar orbit. It also served as a retrorocket to perform

5425-615: The Apollo command and service module , succeeding the Mercury program . A lunar landing became the focus of the program only in 1961. Thereafter Project Gemini instead followed the Mercury program to test and study advanced crewed spaceflight technology. The Apollo program was conceived during the Eisenhower administration in early 1960, as a follow-up to Project Mercury. While the Mercury capsule could support only one astronaut on

Apollo program - Misplaced Pages Continue

5600-643: The Constellation program included plans for retiring the Space Shuttle program and replacing it with the capability for spaceflight beyond low Earth orbit. In the 2011 United States federal budget , the Obama administration canceled Constellation for being over budget and behind schedule, while not innovating and investing in critical new technologies. As part of the Artemis program , NASA is developing

5775-542: The Indian Human Spaceflight Program , India was planning to send humans into space on its orbital vehicle Gaganyaan before August 2022, but it has been delayed to 2024, due to the COVID-19 pandemic. The Indian Space Research Organisation (ISRO) began work on this project in 2006. The initial objective is to carry a crew of two or three to low Earth orbit (LEO) for a 3-to-7-day flight in

5950-785: The International Space Station (ISS). On 15 October 2003, the first Chinese taikonaut, Yang Liwei , went to space as part of Shenzhou 5 , the first Chinese human spaceflight. As of March 2024, humans have not traveled beyond low Earth orbit since the Apollo 17 lunar mission in December 1972. Currently, the United States, Russia, and China are the only countries with public or commercial human spaceflight-capable programs . Non-governmental spaceflight companies have been working to develop human space programs of their own, e.g. for space tourism or commercial in-space research . The first private human spaceflight launch

6125-727: The Kármán line , the 100 kilometres (62 mi) altitude used by the Fédération Aéronautique Internationale (FAI) to denote the edge of space. In 1961, US President John F. Kennedy raised the stakes of the Space Race by setting the goal of landing a man on the Moon and returning him safely to Earth by the end of the 1960s. That same year, the US began the Apollo program of launching three-man capsules atop

6300-530: The Kármán line . Virgin Galactic has launched crew to a height above 80 km (50 mi) on a suborbital trajectory. Several other companies, including Sierra Nevada and Copenhagen Suborbitals , have developed crewed spacecraft. SpaceX, Boeing, Blue Origin, and Virgin Galactic plan to fly commercial passengers in the emerging space tourism market. SpaceX has developed Crew Dragon flying on Falcon 9 . It first launched astronauts to orbit and to

6475-455: The Lynx single-passenger spaceplane since the 2000s, but development was halted in 2017. Participation and representation of humanity in space has been an issue ever since the first phase of space exploration. Some rights of non-spacefaring countries have been secured through international space law , declaring space the " province of all mankind ", though the sharing of space by all humanity

6650-723: The Orion spacecraft to be launched by the Space Launch System . Under the Commercial Crew Development plan, NASA relies on transportation services provided by the private sector to reach low Earth orbit, such as SpaceX Dragon 2 , the Boeing Starliner or Sierra Nevada Corporation 's Dream Chaser . The period between the retirement of the Space Shuttle in 2011 and the first launch into space of SpaceShipTwo Flight VP-03 on 13 December 2018

6825-471: The SPS ." Ironically, just such a failure happened on Apollo 13 when an oxygen tank explosion left the CSM without electrical power. The lunar module provided propulsion, electrical power and life support to get the crew home safely. Faget's preliminary Apollo design employed a cone-shaped command module, supported by one of several service modules providing propulsion and electrical power, sized appropriately for

7000-539: The Saturn V launch vehicle and LOR by forcing Shea, Seamans, and even Webb to defend themselves, delaying its formal announcement to the press on July 11, 1962, and forcing Webb to still hedge the decision as "tentative". Wiesner kept up the pressure, even making the disagreement public during a two-day September visit by the President to Marshall Space Flight Center . Wiesner blurted out "No, that's no good" in front of

7175-481: The Saturn family of launch vehicles . In 1962, the US began Project Gemini , which flew 10 missions with two-man crews launched by Titan II rockets in 1965 and 1966. Gemini's objective was to support Apollo by developing American orbital spaceflight experience and techniques to be used during the Moon mission. Meanwhile, the USSR remained silent about their intentions to send humans to the Moon and proceeded to stretch

Apollo program - Misplaced Pages Continue

7350-569: The Shuguang spacecraft. Nineteen PLAAF pilots were selected for this goal in March 1971. The Shuguang-1 spacecraft, to be launched with the CZ-2A rocket, was designed to carry a crew of two. The program was officially canceled on 13 May 1972 for economic reasons. In 1992, under China Manned Space Program (CMS), also known as "Project 921", authorization and funding was given for the first phase of

7525-454: The Tianhe core module , was launched into orbit by China's most powerful rocket Long March 5B on 29 April 2021. It was later visited by multiple cargo and crewed spacecraft and demonstrated China's capability of sustaining Chinese astronauts' long-term stay in space. According to CMS announcement, all missions of Tiangong Space Station are scheduled to be carried out by the end of 2022. Once

7700-526: The U.S. Air Force , so he got Webb's permission to recruit General Samuel C. Phillips , who gained a reputation for his effective management of the Minuteman program, as OMSF program controller. Phillips's superior officer Bernard A. Schriever agreed to loan Phillips to NASA, along with a staff of officers under him, on the condition that Phillips be made Apollo Program Director. Mueller agreed, and Phillips managed Apollo from January 1964, until it achieved

7875-735: The White Sands Missile Range between May 1964 and January 1966. Saturn I, the first US heavy lift launch vehicle, was initially planned to launch partially equipped CSMs in low Earth orbit tests. The S-I first stage burned RP-1 with liquid oxygen (LOX) oxidizer in eight clustered Rocketdyne H-1 engines, to produce 1,500,000 pounds-force (6,670 kN) of thrust. The S-IV second stage used six liquid hydrogen-fueled Pratt & Whitney RL-10 engines with 90,000 pounds-force (400 kN) of thrust. The S-V third stage flew inactively on Saturn I four times. The first four Saturn I test flights were launched from LC-34, with only

8050-466: The fuel cell gauges and controls, the electrical and battery controls, and the communications controls. Flanking the sides of the main panel were sets of smaller control panels. On the left side were a circuit breaker panel, audio controls, and the SCS power controls. On the right were additional circuit breakers and a redundant audio control panel, along with the environmental control switches. In total,

8225-662: The test flight phase of their development process. One large spaceliner concept currently in early development is the SpaceX Starship , which, in addition to replacing the Falcon 9 and Falcon Heavy launch vehicles in the legacy Earth-orbit market after 2020, has been proposed by SpaceX for long-distance commercial travel on Earth, flying 100+ people suborbitally between two points in under one hour, also known as "Earth-to-Earth". Small spaceplane or small capsule suborbital spacecraft have been under development for

8400-403: The transposition, docking, and extraction maneuver at the beginning of the translunar coast. The docking mechanism was a non-androgynous system, consisting of a probe located in the nose of the CSM, which connected to the drogue , a truncated cone located on the lunar module. The probe was extended like a scissor jack to capture the drogue on initial contact, known as soft docking . Then

8575-449: The "5" indicating Saturn V. The three-stage Saturn V was designed to send a fully fueled CSM and LM to the Moon. It was 33 feet (10.1 m) in diameter and stood 363 feet (110.6 m) tall with its 96,800-pound (43,900 kg) lunar payload. Its capability grew to 103,600 pounds (47,000 kg) for the later advanced lunar landings. The S-IC first stage burned RP-1/LOX for a rated thrust of 7,500,000 pounds-force (33,400 kN), which

8750-450: The 1960s, President Kennedy's target date. The LOR method had the advantage of allowing the lander spacecraft to be used as a "lifeboat" in the event of a failure of the command ship. Some documents prove this theory was discussed before and after the method was chosen. In 1964 an MSC study concluded, "The LM [as lifeboat]   ... was finally dropped, because no single reasonable CSM failure could be identified that would prohibit use of

8925-634: The 1978 flight of Vladimir Remek. As of 2010 , citizens from 38 nations (including space tourists ) have flown in space aboard Soviet, American, Russian, and Chinese spacecraft. Human spaceflight programs have been conducted by the Soviet Union–Russian Federation, the United States, Mainland China , and by American private spaceflight companies. The following space vehicles and spaceports are currently used for launching human spaceflights: The following space stations are currently maintained in Earth orbit for human occupation: Most of

SECTION 50

#1732790820324

9100-553: The 2030s. The first step has begun with Artemis I in 2022, sending an uncrewed Orion spacecraft to a distant retrograde orbit around the Moon and returning it to Earth after a 25-day mission. SpaceX is developing Starship , a fully reusable two-stage system, with near-Earth and cislunar applications and an ultimate goal of landing on Mars. The upper stage of the Starship system, also called Starship, has had 9 atmospheric test flights as of September 2021. The first test flight of

9275-649: The Block I service module propellant tanks were slightly larger than in Block II. The Apollo 1 spacecraft weighed approximately 45,000 pounds (20,000 kg), while the Block II Apollo 7 weighed 36,400 lb (16,500 kg). (These two Earth orbital craft were lighter than the craft which later went to the Moon, as they carried propellant in only one set of tanks, and did not carry the high-gain S-band antenna.) In

9450-521: The CM and faster break-up on re-entry. The service propulsion system ( SPS ) engine was originally designed to lift the CSM off the surface of the Moon in the direct ascent mission mode, The engine selected was the AJ10-137 , which used Aerozine 50 as fuel and nitrogen tetroxide (N 2 O 4 ) as oxidizer to produce 20,500 lbf (91 kN) of thrust. A contract was signed in April 1962 for

9625-472: The CM reaction control subsystem; water tanks; the crushable ribs of the impact attenuation system; and a number of instruments. The CM-SM umbilical, the point where wiring and plumbing ran from one module to the other, was also in the aft compartment. The panels of the heat shield covering the aft compartment were removable for maintenance of the equipment before flight. The components of the ELS were housed around

9800-533: The CSM umbilical cables . The command module was built in North American's factory in Downey, California , and consisted of two basic structures joined together: the inner structure (pressure shell) and the outer structure. The inner structure was an aluminum sandwich construction consisting of a welded aluminum inner skin, adhesively bonded aluminum honeycomb core, and outer face sheet. The thickness of

9975-522: The CSM's role to the translunar ferry used to transport the crew, along with a new spacecraft, the Lunar Excursion Module (LEM, later shortened to LM (Lunar Module) but still pronounced / ˈ l ɛ m / ) which would take two individuals to the lunar surface and return them to the CSM. The command module (CM) was the conical crew cabin, designed to carry three astronauts from launch to lunar orbit and back to an Earth ocean landing. It

10150-579: The Canaveral launch facilities in Florida . The two newest launch complexes were already being built for the Saturn I and IB rockets at the northernmost end: LC-34 and LC-37 . But an even bigger facility would be needed for the mammoth rocket required for the crewed lunar mission, so land acquisition was started in July 1961 for a Launch Operations Center (LOC) immediately north of Canaveral at Merritt Island . The design, development and construction of

10325-430: The Earth's atmosphere or return to Earth, its fuselage was designed totally without aerodynamic considerations and was of an extremely lightweight construction. It consisted of separate descent and ascent stages, each with its own engine. The descent stage contained storage for the descent propellant, surface stay consumables, and surface exploration equipment. The ascent stage contained the crew cabin, ascent propellant, and

10500-506: The Earth's atmosphere. At jettison, the CM umbilical connections were cut using a pyrotechnic-activated guillotine assembly. Following jettison, the SM aft translation thrusters automatically fired continuously to distance it from the CM, until either the RCS fuel or the fuel cell power was depleted. The roll thrusters were also fired for five seconds to make sure it followed a different trajectory from

10675-570: The Earth, Gilruth had moved his organization to rented space in Houston, and construction of the MSC facility was under way, Kennedy visited Rice to reiterate his challenge in a famous speech : But why, some say, the Moon? Why choose this as our goal? And they may well ask, why climb the highest mountain ? Why, 35 years ago, fly the Atlantic ?   ... We choose to go to the Moon. We choose to go to

SECTION 60

#1732790820324

10850-776: The ISS in May 2020 as part of the Demo-2 mission. Developed as part of NASA's Commercial Crew Development program, the capsule is also available for flights with other customers. A first tourist mission, Inspiration4 , launched in September 2021. Boeing developed the Starliner capsule as part of NASA's Commercial Crew Development program, which is launched on a United Launch Alliance Atlas V launch vehicle. Starliner made an uncrewed flight in December 2019. A second uncrewed flight attempt

11025-467: The Moon atop a landing rocket stage and return all three astronauts on a direct-ascent mission, which would not use a separate lunar module, and thus had no provisions for docking with another spacecraft. This, plus other required design changes, led to the decision to design two versions of the CSM: Block I was to be used for uncrewed missions and a single crewed Earth orbit flight ( Apollo 1 ), while

11200-436: The Moon between 1968 and 1972, and another two performed crewed test flights in low Earth orbit , all as part of the Apollo program. Before these, another four CSMs had flown as uncrewed Apollo tests, of which two were suborbital flights and another two were orbital flights . Following the conclusion of the Apollo program and during 1973–1974, three CSMs ferried astronauts to the orbital Skylab space station. Finally in 1975,

11375-568: The Moon in this decade and do the other things, not because they are easy, but because they are hard; because that goal will serve to organize and measure the best of our energies and skills; because that challenge is one that we are willing to accept, one we are unwilling to postpone, and one we intend to win   ... The MSC was completed in September 1963. It was renamed by the US Congress in honor of Lyndon Johnson soon after his death in 1973. It also became clear that Apollo would outgrow

11550-411: The Moon, and sent Frank Borman , James Lovell , and William Anders into 10 orbits around the Moon in Apollo 8 in December 1968. In 1969, Apollo 11 accomplished Kennedy's goal by landing Neil Armstrong and Buzz Aldrin on the Moon on 21 July and returning them safely on 24 July, along with Command Module pilot Michael Collins . Through 1972, a total of six Apollo missions landed 12 men to walk on

11725-422: The Moon, half of which drove electric powered vehicles on the surface. The crew of Apollo 13 — Jim Lovell , Jack Swigert , and Fred Haise —survived an in-flight spacecraft failure, they flew by the Moon without landing, and returned safely to Earth. During this time, the USSR secretly pursued crewed lunar orbiting and landing programs . They successfully developed the three-person Soyuz spacecraft for use in

11900-405: The Moon, the last, Apollo 17 , in December 1972. In these six spaceflights, twelve people walked on the Moon . Apollo ran from 1961 to 1972, with the first crewed flight in 1968. It encountered a major setback in 1967 when an Apollo 1 cabin fire killed the entire crew during a prelaunch test. After the first successful landing, sufficient flight hardware remained for nine follow-on landings with

12075-534: The October Cuban Missile Crisis , and fear of Kennedy's support for Webb. NASA announced the selection of Grumman as the LEM contractor in November 1962. Space historian James Hansen concludes that: Without NASA's adoption of this stubbornly held minority opinion in 1962, the United States may still have reached the Moon, but almost certainly it would not have been accomplished by the end of

12250-813: The Office of Manned Space Flight (OMSF). On July 23, 1963, Webb announced Mueller's appointment as Deputy Associate Administrator for Manned Space Flight, to replace then Associate Administrator D. Brainerd Holmes on his retirement effective September 1. Under Webb's reorganization, the directors of the Manned Spacecraft Center ( Gilruth ), Marshall Space Flight Center ( von Braun ), and the Launch Operations Center ( Debus ) reported to Mueller. Based on his industry experience on Air Force missile projects, Mueller realized some skilled managers could be found among high-ranking officers in

12425-673: The Russian Federal Space Agency, which became known as the Roscosmos State Corporation . The Shuttle-Mir Program included American Space Shuttles visiting the Mir space station, Russian cosmonauts flying on the Shuttle, and an American astronaut flying aboard a Soyuz spacecraft for long-duration expeditions aboard Mir . In 1993, President Bill Clinton secured Russia's cooperation in converting

12600-505: The Saturn V. The Saturn IB could send over 40,000 pounds (18,100 kg) into low Earth orbit, sufficient for a partially fueled CSM or the LM. Saturn IB launch vehicles and flights were designated with an AS-200 series number, "AS" indicating "Apollo Saturn" and the "2" indicating the second member of the Saturn rocket family. Saturn V launch vehicles and flights were designated with an AS-500 series number, "AS" indicating "Apollo Saturn" and

12775-406: The Shuttle, possibly to be followed by the space station. Plans for the Shuttle were scaled back to reduce development risk, cost, and time, replacing the piloted fly-back booster with two reusable solid rocket boosters , and the smaller orbiter would use an expendable external propellant tank to feed its hydrogen-fueled main engines . The orbiter would have to make unpowered landings. In 1973,

12950-468: The Soviet Union and the United States due to the inaction of President Eisenhower. Beyond military power, Kennedy used aerospace technology as a symbol of national prestige, pledging to make the US not "first but, first and, first if, but first period". Despite Kennedy's rhetoric, he did not immediately come to a decision on the status of the Apollo program once he became president. He knew little about

13125-641: The US launched the Skylab sortie space station and inhabited it for 171 days with three crews ferried aboard an Apollo spacecraft. During that time, President Richard Nixon and Soviet general secretary Leonid Brezhnev were negotiating an easing of Cold War tensions known as détente . During the détente, they negotiated the Apollo–Soyuz program, in which an Apollo spacecraft carrying a special docking adapter module would rendezvous and dock with Soyuz 19 in 1975. The American and Soviet crews shook hands in space, but

13300-496: The US's reusable Space Shuttle orbiter , which they called Buran -class orbiter or simply Buran , which was designed to be launched into orbit by the expendable Energia rocket, and was capable of robotic orbital flight and landing. Unlike the Space Shuttle, Buran had no main rocket engines, but like the Space Shuttle orbiter, it used smaller rocket engines to perform its final orbital insertion. A single uncrewed orbital test flight took place in November 1988. A second test flight

13475-493: The US. China was the third nation in the world, after the USSR and US, to send humans into space. During the Space Race between the two superpowers, which culminated with Apollo 11 landing humans on the Moon, Mao Zedong and Zhou Enlai decided on 14 July 1967 that China should not be left behind, and initiated their own crewed space program: the top-secret Project 714, which aimed to put two people into space by 1973 with

13650-569: The base, and a height of 11 feet 5 inches (3.48 m) including the docking probe and dish-shaped aft heat shield. The forward compartment contained two reaction control system thrusters, the docking tunnel, and the Earth Landing System. The inner pressure vessel housed the crew accommodation, equipment bays, controls and displays, and many spacecraft systems. The aft compartment contained 10 reaction control engines and their related propellant tanks, freshwater tanks, and

13825-506: The center piston. In a temperature degraded condition, a single motor release operation was done manually in the lunar module by depressing the locking spool through an open hole in the probe heads, while release from the CSM was done by rotating a release handle at the back of the probe to rotate the motor torque shaft manually. When the command and lunar modules separated for the last time, the probe and forward docking ring were pyrotechnically separated, leaving all docking equipment attached to

14000-470: The center was conducted by Kurt H. Debus , a member of Wernher von Braun 's original V-2 rocket engineering team. Debus was named the LOC's first Director. Construction began in November 1962. Following Kennedy's death , President Johnson issued an executive order on November 29, 1963, to rename the LOC and Cape Canaveral in honor of Kennedy. The LOC included Launch Complex 39 , a Launch Control Center , and

14175-425: The clear goal of a crewed landing replacing the more nebulous goals of space stations and circumlunar flights, NASA decided that, in order to make progress quickly, it would discard the feasibility study designs of Convair, GE, and Martin, and proceed with Faget's command and service module design. The mission module was determined to be useful only as an extra room, and therefore unnecessary. They used Faget's design as

14350-451: The command module panels included 24 instruments, 566 switches, 40 event indicators, and 71 lights. The three crew couches were constructed from hollow steel tubing and covered in a heavy, fireproof cloth known as Armalon. The leg pans of the two outer couches could be folded in a variety of positions, while the hip pan of the center couch could be disconnected and laid on the aft bulkhead. One rotation and one translation hand controller

14525-715: The construction is completed, Tiangong will enter the application and development phase, which is poised to last for no less than 10 years. The European Space Agency began development of the Hermes shuttle spaceplane in 1987, to be launched on the Ariane 5 expendable launch vehicle. It was intended to dock with the European Columbus space station . The projects were canceled in 1992 when it became clear that neither cost nor performance goals could be achieved. No Hermes shuttles were ever built. The Columbus space station

14700-459: The construction of which took place from 1986 to 1996. Mir orbited at an altitude of 354 kilometers (191 nautical miles), at an orbital inclination of 51.6°. It was occupied for 4,592 days and made a controlled reentry in 2001. The Space Shuttle started flying in 1981, but the US Congress failed to approve sufficient funds to make Space Station Freedom a reality. A fleet of four shuttles

14875-448: The contract to build the CSM, and also the second stage of the Saturn V launch vehicle for NASA. Because the CSM design was started early before the selection of lunar orbit rendezvous, the service propulsion engine was sized to lift the CSM off the Moon, and thus was oversized to about twice the thrust required for translunar flight. Also, there was no provision for docking with the lunar module. A 1964 program definition study concluded that

15050-431: The decades, a number of spacecraft have been proposed for spaceliner passenger travel. Somewhat analogous to travel by airliner after the middle of the 20th century, these vehicles are proposed to transport large numbers of passengers to destinations in space, or on Earth via suborbital spaceflights . To date, none of these concepts have been built, although a few vehicles that carry fewer than 10 persons are currently in

15225-456: The delivery of nuclear weapons , producing rockets large enough to be adapted to carry the first artificial satellites into low Earth orbit . After the first satellites were launched in 1957 and 1958 by the Soviet Union, the US began work on Project Mercury , with the aim of launching men into orbit. The USSR was secretly pursuing the Vostok program to accomplish the same thing, and launched

15400-409: The deorbit burn for Earth orbital flights. The propellants were pressure-fed to the engine by 39.2 cubic feet (1.11 m ) of gaseous helium at 3,600 pounds per square inch (25 MPa), carried in two 40-inch (1.0 m) diameter spherical tanks. The exhaust nozzle measured 152.82 inches (3.882 m) long and 98.48 inches (2.501 m) wide at the base. It was mounted on two gimbals to keep

15575-441: The drogues were jettisoned and the pilot parachutes, which pulled out the mains, were deployed. These slowed the CM to 22 miles per hour (35 kilometres per hour) for splashdown. The portion of the capsule that first contacted the water surface contained four crushable ribs to further mitigate the force of impact. The command module could safely parachute to an ocean landing with only two parachutes deployed (as occurred on Apollo 15 ),

15750-599: The end of 1969 required the most sudden burst of technological creativity, and the largest commitment of resources ($ 25 billion; $ 182 billion in 2023 US dollars) ever made by any nation in peacetime. At its peak, the Apollo program employed 400,000 people and required the support of over 20,000 industrial firms and universities. On July 1, 1960, NASA established the Marshall Space Flight Center (MSFC) in Huntsville, Alabama . MSFC designed

15925-491: The environmental control system). On the flight of Apollo 13 , the EPS was disabled by an explosive rupture of one oxygen tank, which punctured the second tank and led to the loss of all oxygen. After the accident, a third oxygen tank was added to obviate operation below 50% tank capacity. That allowed the elimination of the tank's internal stirring-fan equipment, which had contributed to the failure. Also starting with Apollo 14 ,

16100-502: The first American in orbit, aboard Friendship 7 on a Mercury-Atlas rocket . The USSR launched five more cosmonauts in Vostok capsules , including the first woman in space, Valentina Tereshkova , aboard Vostok 6 on 16 June 1963. Through 1963, the US launched a total of two astronauts in suborbital flights and four into orbit. The US also made two North American X-15 flights ( 90 and 91 , piloted by Joseph A. Walker ), that exceeded

16275-419: The first Americans in space. Apollo was later dedicated to President John F. Kennedy 's national goal for the 1960s of "landing a man on the Moon and returning him safely to the Earth" in an address to Congress on May 25, 1961. It was the third US human spaceflight program to fly, preceded by the two-person Project Gemini conceived in 1961 to extend spaceflight capability in support of Apollo. Kennedy's goal

16450-430: The first human into space, the cosmonaut Yuri Gagarin . On 12 April 1961, Gagarin was launched aboard Vostok 1 on a Vostok 3KA rocket and completed a single orbit. On 5 May 1961, the US launched its first astronaut , Alan Shepard , on a suborbital flight aboard Freedom 7 on a Mercury-Redstone rocket . Unlike Gagarin, Shepard manually controlled his spacecraft's attitude . On 20 February 1962, John Glenn became

16625-461: The first human landing in July 1969, after which he returned to Air Force duty. Charles Fishman, in One Giant Leap , estimated the number of people and organizations involved into the Apollo program as "410,000 men and women at some 20,000 different companies contributed to the effort". Once Kennedy had defined a goal, the Apollo mission planners were faced with the challenge of designing

16800-429: The first manual rendezvous and docking with Shenzhou 9 , which carried China's first female astronaut Liu Yang . In September 2016, Tiangong 2 was launched into orbit. It was a space laboratory with more advanced functions and equipment than Tiangong 1 . A month later, Shenzhou 11 was launched and docked with Tiangong 2 . Two astronauts entered Tiangong 2 and were stationed for about 30 days, verifying

16975-484: The first person to fly in space, reinforcing American fears about being left behind in a technological competition with the Soviet Union. At a meeting of the US House Committee on Science and Astronautics one day after Gagarin's flight, many congressmen pledged their support for a crash program aimed at ensuring that America would catch up. Kennedy was circumspect in his response to the news, refusing to make

17150-415: The first spacewalk, but overcame the early Soviet lead by performing several spacewalks, solving the problem of astronaut fatigue caused by compensating for the lack of gravity, demonstrating the ability of humans to endure two weeks in space, and performing the first space rendezvous and docking of spacecraft. The US succeeded in developing the Saturn V rocket necessary to send the Apollo spacecraft to

17325-421: The first stage live, carrying dummy upper stages filled with water. The first flight with a live S-IV was launched from LC-37. This was followed by five launches of boilerplate CSMs (designated AS-101 through AS-105 ) into orbit in 1964 and 1965. The last three of these further supported the Apollo program by also carrying Pegasus satellites, which verified the safety of the translunar environment by measuring

17500-584: The first woman to enter space through the United States program.Since then, eleven other countries have allowed women astronauts. The first all-female spacewalk occurred in 2018, by Christina Koch and Jessica Meir . These two women had both participated in separate spacewalks with NASA. The first mission to the Moon with a woman aboard is planned for 2024. Despite these developments, women are still underrepresented among astronauts and especially cosmonauts. More than 600 people have flown in space but only 75 have been women. Issues that block potential applicants from

17675-431: The forward docking tunnel. The forward compartment was separated from the central by a bulkhead and was divided into four 90-degree wedges. The ELS consisted of two drogue parachutes with mortars , three main parachutes , three pilot parachutes to deploy the mains, three inflation bags for uprighting the capsule if necessary, a sea recovery cable, a dye marker, and a swimmer umbilical. The command module's center of mass

17850-415: The forward heat shield was jettisoned to expose the Earth landing equipment and permit deployment of the parachutes. The 1-foot-8-inch (0.51 m)-tall aft compartment was located around the periphery of the command module at its widest part, just forward of (above) the aft heat shield. The compartment was divided into 24 bays containing 10 reaction control engines; the fuel, oxidizer, and helium tanks for

18025-442: The frequency and severity of micrometeorite impacts. In September 1962, NASA planned to launch four crewed CSM flights on the Saturn I from late 1965 through 1966, concurrent with Project Gemini. The 22,500-pound (10,200 kg) payload capacity would have severely limited the systems which could be included, so the decision was made in October 1963 to use the uprated Saturn IB for all crewed Earth orbital flights. The Saturn IB

18200-497: The fully integrated two-stage system occurred in April 2023. A modified version of Starship is being developed for the Artemis program . Apollo command and service module The Apollo command and service module ( CSM ) was one of two principal components of the United States Apollo spacecraft , used for the Apollo program , which landed astronauts on the Moon between 1969 and 1972. The CSM functioned as

18375-507: The heavy lift-class Saturn launch vehicles , which would be required for Apollo. It became clear that managing the Apollo program would exceed the capabilities of Robert R. Gilruth 's Space Task Group , which had been directing the nation's crewed space program from NASA's Langley Research Center . So Gilruth was given authority to grow his organization into a new NASA center, the Manned Spacecraft Center (MSC). A site

18550-404: The honeycomb varied from about 1.5 inches (3.8 cm) at the base to about 0.25 inches (0.64 cm) at the forward access tunnel. This inner structure was the pressurized crew compartment. The outer structure was made of stainless steel brazed-honeycomb brazed between steel alloy face sheets. It varied in thickness from 0.5 inch to 2.5 inches. Part of the area between the inner and outer shells

18725-488: The important weight reductions that were offered by the LOR approach. Throughout 1960 and 1961, Houbolt campaigned for the recognition of LOR as a viable and practical option. Bypassing the NASA hierarchy, he sent a series of memos and reports on the issue to Associate Administrator Robert Seamans; while acknowledging that he spoke "somewhat as a voice in the wilderness", Houbolt pleaded that LOR should not be discounted in studies of

18900-443: The initial design should be continued as Block I which would be used for early testing, while Block II, the actual lunar spacecraft, would incorporate the docking equipment and take advantage of the lessons learned in Block I development. The Apollo Lunar Module (LM) was designed to descend from lunar orbit to land two astronauts on the Moon and take them back to orbit to rendezvous with the command module. Not designed to fly through

19075-452: The inside of an 8-by-2.75-foot (2.44 by 0.84 m) skin panel. The primary fuel (MMH) tank contained 69.1 pounds (31.3 kg); the secondary fuel tank contained 45.2 pounds (20.5 kg); the primary oxidizer tank contained 137.0 pounds (62.1 kg), and the secondary oxidizer tank contained 89.2 pounds (40.5 kg). The propellant tanks were pressurized from a single tank containing 1.35 pounds (0.61 kg) of liquid helium. Back flow

19250-510: The last flown CSM docked with the Soviet craft Soyuz 19 as part of the international Apollo–Soyuz Test Project . Concepts of an advanced crewed spacecraft started before the Moon landing goal was announced. The three-person vehicle was to be mainly for orbital use around Earth. It would include a large pressurized auxiliary orbital module where the crew would live and work for weeks at a time. They would perform space station-type activities in

19425-490: The limits of their single-pilot Vostok capsule by adapting it to a two or three-person Voskhod capsule to compete with Gemini. They were able to launch two orbital flights in 1964 and 1965 and achieved the first spacewalk , performed by Alexei Leonov on Voskhod 2 , on 8 March 1965. However, the Voskhod did not have Gemini's capability to maneuver in orbit, and the program was terminated. The US Gemini flights did not achieve

19600-446: The long-range exploration of space; and none will be so difficult or expensive to accomplish. At the time of Kennedy's proposal, only one American had flown in space—less than a month earlier—and NASA had not yet sent an astronaut into orbit. Even some NASA employees doubted whether Kennedy's ambitious goal could be met. By 1963, Kennedy even came close to agreeing to a joint US-USSR Moon mission, to eliminate duplication of effort. With

19775-509: The lunar flights. On the extended lunar missions, an orbital scientific instrument package was carried. The service module was discarded just before reentry. The module was 24.6 feet (7.5 m) long and 12.83 feet (3.91 m) in diameter. The initial lunar flight version weighed approximately 51,300 pounds (23,300 kg) fully fueled, while a later version designed to carry a lunar orbit scientific instrument package weighed just over 54,000 pounds (24,000 kg). North American Aviation won

19950-461: The lunar module. In the event of an abort during launch from Earth, the same system would have explosively jettisoned the docking ring and probe from the CM as it separated from the boost protective cover. The central pressure vessel of the command module was its sole habitable compartment. It had an interior volume of 210 cubic feet (5.9 m ) and housed the main control panels, crew seats, guidance and navigation systems, food and equipment lockers,

20125-535: The lunar programs, but failed to develop the N1 rocket necessary for a human landing, and discontinued their lunar programs in 1974. Upon losing the Moon race they concentrated on the development of space stations , using the Soyuz as a ferry to take cosmonauts to and from the stations. They started with a series of Salyut sortie stations from 1971 to 1986. In 1969, Nixon appointed his vice president, Spiro Agnew , to head

20300-470: The module's pressure vessel. The fused silica outer pane served as both a debris shield and as part of the heat shield. Each pane had an anti-reflective coating and a blue-red reflective coating on the inner surface. Sources: The service module was an unpressurized cylindrical structure with a diameter of 12 feet 10 inches (3.91 m) and 14 feet 10 inches (4.52 m) long. The service propulsion engine nozzle and heat shield increased

20475-500: The module, while later versions would use the module to carry cargo to space stations. The spacecraft was to service the Project Olympus (LORL), a foldable rotating space station launched on a single Saturn V . Later versions would be used on circumlunar flights, and would be the basis for a direct ascent lunar spacecraft as well as used on interplanetary missions. In late 1960, NASA called on U.S. industry to propose designs for

20650-415: The more advanced Block II was designed for use with the lunar module. The Apollo 1 flight was cancelled after a cabin fire killed the crew and destroyed their command module during a launch rehearsal test. Corrections of the problems which caused the fire were applied to the Block II spacecraft, which was used for all crewed spaceflights. Nineteen CSMs were launched into space. Of these, nine flew humans to

20825-407: The next day, marking the first step of the realization of China's human spaceflight capability. Three more uncrewed missions were conducted in the next few years in order to verify the key technologies. On 15 October 2003 Shenzhou 5 , China's first crewed spaceflight mission, put Yang Liwei in orbit for 21 hours and returned safely back to Inner Mongolia , making China the third nation to launch

21000-532: The past decade or so; as of 2017 , at least one of each type is under development. Both Virgin Galactic and Blue Origin have craft in active development : the SpaceShipTwo spaceplane and the New Shepard capsule, respectively. Both would carry approximately a half-dozen passengers up to space for a brief time of zero gravity before returning to the launch location. XCOR Aerospace had been developing

21175-506: The planned Space Station Freedom into the International Space Station (ISS). Construction of the station began in 1998. The station orbits at an altitude of 409 kilometers (221 nmi) and an orbital inclination of 51.65°. Several of the Space Shuttle's 135 orbital flights were to help assemble, supply, and crew the ISS. Russia has built half of the International Space Station and has continued its cooperation with

21350-483: The press, during a presentation by von Braun. Webb jumped in and defended von Braun, until Kennedy ended the squabble by stating that the matter was "still subject to final review". Webb held firm and issued a request for proposal to candidate Lunar Excursion Module (LEM) contractors. Wiesner finally relented, unwilling to settle the dispute once and for all in Kennedy's office, because of the President's involvement with

21525-419: The pressure between the tunnel and the CM so the hatch could be removed. The unified crew hatch (UCH) measured 29 inches (74 cm) high, 34 inches (86 cm) wide, and weighed 225 pounds (102 kg). It was operated by a pump handle, which drove a ratchet mechanism to open or close fifteen latches simultaneously. Apollo's mission required the LM to dock with the CSM on return from the Moon, and also in

21700-637: The primary flight controls, and the main FDAI (Flight Director Attitude Indicator). The CM pilot served as navigator, so his control panel (center) included the Guidance and Navigation computer controls, the caution and warning indicator panel, the event timer, the Service Propulsion System and RCS controls, and the environmental control system controls. The LM pilot served as systems engineer, so his control panel (right-hand side) included

21875-471: The probe cylinder body engaged and retained the probe center piston in the retracted position. Before vehicle separation in lunar orbit, manual cocking of the twelve ring latches was accomplished. The separating force from the internal pressure in the tunnel area was then transmitted from the ring latches to the probe and drogue. In undocking, the release of the capture latches was accomplished by electrically energizing tandem-mounted DC rotary solenoids located in

22050-412: The probe was retracted to pull the vehicles together and establish a firm connection, known as "hard docking". The mechanism was specified by NASA to have the following functions: The probe head located in the CSM was self-centering and gimbal-mounted to the probe piston. As the probe head engaged in the opening of the drogue socket, three spring-loaded latches depressed and engaged. These latches allowed

22225-438: The programs, and limit the space missions they are able to go on, are, for example: Sally Ride became the first American woman in space, in 1983. Eileen Collins was the first female Shuttle pilot, and with Shuttle mission STS-93 in 1999 she became the first woman to command a U.S. spacecraft. For many years, the USSR (later Russia) and the United States were the only countries whose astronauts flew in space. That ended with

22400-555: The project was overseen by Thomas J. Kelly . Before the Apollo program began, Wernher von Braun and his team of rocket engineers had started work on plans for very large launch vehicles, the Saturn series , and the even larger Nova series. In the midst of these plans, von Braun was transferred from the Army to NASA and was made Director of the Marshall Space Flight Center. The initial direct ascent plan to send

22575-429: The purpose of the flight was purely symbolic. The two nations continued to compete rather than cooperate in space, as the US turned to developing the Space Shuttle and planning the space station, which was dubbed Freedom . The USSR launched three Almaz military sortie stations from 1973 to 1977, disguised as Salyuts. They followed Salyut with the development of Mir , the first modular, semi-permanent space station,

22750-517: The question. Seamans's establishment of an ad hoc committee headed by his special technical assistant Nicholas E. Golovin in July 1961, to recommend a launch vehicle to be used in the Apollo program, represented a turning point in NASA's mission mode decision. This committee recognized that the chosen mode was an important part of the launch vehicle choice, and recommended in favor of a hybrid EOR-LOR mode. Its consideration of LOR—as well as Houbolt's ceaseless work—played an important role in publicizing

22925-488: The reaction control system (RCS) computer, power distribution block, ECS controller, separation controller, and components for the high-gain antenna, and included eight EPS radiators and the umbilical connection arm containing the main electrical and plumbing connections to the CM. The fairing externally contained a retractable forward-facing spotlight ; an EVA floodlight to aid the command module pilot in SIM film retrieval; and

23100-555: The return journey. Apollo used the Saturn family of rockets as launch vehicles, which were also used for an Apollo Applications Program , which consisted of Skylab , a space station that supported three crewed missions in 1973–1974, and the Apollo–Soyuz Test Project, a joint United States - Soviet Union low Earth orbit mission in 1975. Apollo set several major human spaceflight milestones . It stands alone in sending crewed missions beyond low Earth orbit . Apollo 8

23275-400: The space station, cislunar, and lunar landing missions. Once Kennedy's Moon landing goal became official, detailed design began of a command and service module (CSM) in which the crew would spend the entire direct-ascent mission and lift off from the lunar surface for the return trip, after being soft-landed by a larger landing propulsion module. The final choice of lunar orbit rendezvous changed

23450-463: The specification for another competition for spacecraft procurement bids in October 1961. On November 28, 1961, it was announced that North American Aviation had won the contract, although its bid was not rated as good as the Martin proposal. Webb, Dryden and Robert Seamans chose it in preference due to North American's longer association with NASA and its predecessor . Landing humans on the Moon by

23625-524: The specifications given below, unless otherwise noted, all weights given are for the Block II spacecraft. The total cost of the CSM for development and the units produced was $ 36.9  billion in 2016 dollars, adjusted from a nominal total of $ 3.7 billion using the NASA New Start Inflation Indices. The command module was a truncated cone ( frustum ) with a diameter of 12 feet 10 inches (3.91 m) across

23800-425: The technical details of the space program, and was put off by the massive financial commitment required by a crewed Moon landing. When Kennedy's newly appointed NASA Administrator James E. Webb requested a 30 percent budget increase for his agency, Kennedy supported an acceleration of NASA's large booster program but deferred a decision on the broader issue. On April 12, 1961, Soviet cosmonaut Yuri Gagarin became

23975-543: The third parachute being a safety precaution. The command module attitude control system consisted of twelve 93-pound-force (410 N) attitude control thrusters, ten of which were located in the aft compartment, plus two in the forward compartment. These were supplied by four tanks storing 270 pounds (120 kg) of monomethylhydrazine fuel and nitrogen tetroxide oxidizer, and pressurized by 1.1 pounds (0.50 kg) of helium stored at 4,150 pounds per square inch (28.6 MPa) in two tanks. The forward docking hatch

24150-938: The three-person Apollo command and service module directly to the lunar surface, on top of a large descent rocket stage, would require a Nova-class launcher, with a lunar payload capability of over 180,000 pounds (82,000 kg). The June 11, 1962, decision to use lunar orbit rendezvous enabled the Saturn V to replace the Nova, and the MSFC proceeded to develop the Saturn rocket family for Apollo. Since Apollo, like Mercury, used more than one launch vehicle for space missions, NASA used spacecraft-launch vehicle combination series numbers: AS-10x for Saturn I, AS-20x for Saturn IB, and AS-50x for Saturn V (compare Mercury-Redstone 3 , Mercury-Atlas 6 ) to designate and plan all missions, rather than numbering them sequentially as in Project Gemini. This

24325-787: The thrust vector aligned with the spacecraft's center of mass during SPS firings. The combustion chamber and pressurant tanks were housed in the central tunnel. Four clusters of four reaction control system (RCS) thrusters (known as "quads") were installed around the upper section of the SM every 90°. The sixteen-thruster arrangement provided rotation and translation control in all three spacecraft axes. Each R-4D thruster measured 12 inches (30 cm) long by 6 inches (15 cm) diameter, generated 100 pounds-force (440 N) of thrust, and used helium-fed monomethylhydrazine (MMH) as fuel and nitrogen tetroxide (NTO) as oxidizer. Each quad assembly measured 2.2 by 2.7 feet (0.67 by 0.82 m) and had its own fuel, oxidizer, and helium tanks mounted on

24500-470: The time, the only humans in space are those aboard the ISS, which generally has a crew of 7, and those aboard Tiangong, which generally has a crew of 3. NASA and ESA use the term "human spaceflight" to refer to their programs of launching people into space. These endeavors have also formerly been referred to as "manned space missions", though this is no longer official parlance according to NASA style guides, which call for gender-neutral language . Under

24675-556: The time. After a thorough investigation by the Apollo 204 Review Board, it was decided to terminate the crewed Block I phase and redefine Block II to incorporate the review board's recommendations . Block II incorporated a revised CM heat shield design, which was tested on the uncrewed Apollo 4 and Apollo 6 flights, so the first all-up Block II spacecraft flew on the first crewed mission, Apollo 7 . The two blocks were essentially similar in overall dimensions, but several design improvements resulted in weight reduction in Block II. Also,

24850-575: The total height to 24 feet 7 inches (7.49 m). The interior was a simple structure consisting of a central tunnel section 44 inches (1.1 m) in diameter, surrounded by six pie-shaped sectors. The sectors were topped by a forward bulkhead and fairing, separated by six radial beams, covered on the outside by four honeycomb panels, and supported by an aft bulkhead and engine heat shield. The sectors were not all equal 60° angles, but varied according to required size. The forward fairing measured 1 foot 11 inches (58 cm) long and housed

25025-411: The upper end of the lunar module tunnel, the drogue, which was constructed of 1-inch-thick aluminum honeycomb core, bonded front and back to aluminum face sheets, was the receiving end of the probe head capture latches. After the initial capture and stabilization of the vehicles, the probe was capable of exerting a closing force of 1,000 pounds-force (4.4 kN) to draw the vehicles together. This force

25200-421: The vehicle. On May 25, 1961 President John F. Kennedy announced the Moon landing goal before 1970, which immediately rendered NASA's Olympus Station plans obsolete. When NASA awarded the initial Apollo contract to North American Aviation on November 28, 1961, it was still assumed the lunar landing would be achieved by direct ascent rather than by lunar orbit rendezvous . Therefore, design proceeded without

25375-420: The viability of astronauts' medium-term stay in space. In April 2017, China's first cargo spacecraft, Tianzhou 1 docked with Tiangong 2 and completed multiple in-orbit propellant refueling tests, which marked the successful completion of the second phase of CMS. The third phase of CMS began in 2020. The goal of this phase is to build China's own space station, Tiangong . The first module of Tiangong ,

25550-402: The waste management system, and the docking tunnel. Dominating the forward section of the cabin was the crescent-shaped main display panel measuring nearly 7 feet (2.1 m) wide and 3 feet (0.91 m) tall. It was arranged into three panels, each emphasizing the duties of each crew member. The mission commander's panel (left side) included the velocity , attitude, and altitude indicators,

25725-429: The workability of the approach. In late 1961 and early 1962, members of the Manned Spacecraft Center began to come around to support LOR, including the newly hired deputy director of the Office of Manned Space Flight, Joseph Shea , who became a champion of LOR. The engineers at Marshall Space Flight Center (MSFC), who were heavily invested in direct ascent, took longer to become convinced of its merits, but their conversion

25900-444: Was Soviet cosmonaut Yuri Gagarin , who launched as part of the Soviet Union's Vostok program on 12 April 1961 at the beginning of the Space Race . On 5 May 1961, Alan Shepard became the first American in space, as part of Project Mercury . Humans traveled to the Moon nine times between 1968 and 1972 as part of the United States' Apollo program , and have had a continuous presence in space for 24 years and 26 days on

26075-481: Was 11.42 feet (3.48 m) tall, 12.83 feet (3.91 m) in diameter, and weighed approximately 12,250 pounds (5,560 kg). A cylindrical service module (SM) supported the command module, with a service propulsion engine and an RCS with propellants, and a fuel cell power generation system with liquid hydrogen and liquid oxygen reactants. A high-gain S-band antenna was used for long-distance communications on

26250-516: Was a suborbital flight on SpaceShipOne on June 21, 2004. The first commercial orbital crew launch was by SpaceX in May 2020, transporting NASA astronauts to the ISS under United States government contract. Human spaceflight capability was first developed during the Cold War between the United States and the Soviet Union (USSR). These nations developed intercontinental ballistic missiles for

26425-471: Was accomplished on the Apollo 11 mission when astronauts Neil Armstrong and Buzz Aldrin landed their Apollo Lunar Module (LM) on July 20, 1969, and walked on the lunar surface, while Michael Collins remained in lunar orbit in the command and service module (CSM), and all three landed safely on Earth in the Pacific Ocean on July 24. Five subsequent Apollo missions also landed astronauts on

26600-618: Was an upgraded version of the Saturn I. The S-IB first stage increased the thrust to 1,600,000 pounds-force (7,120 kN) by uprating the H-1 engine. The second stage replaced the S-IV with the S-IVB-200 , powered by a single J-2 engine burning liquid hydrogen fuel with LOX, to produce 200,000 pounds-force (890  kN ) of thrust. A restartable version of the S-IVB was used as the third stage of

26775-495: Was announced by Wernher von Braun at a briefing on June 7, 1962. But even after NASA reached internal agreement, it was far from smooth sailing. Kennedy's science advisor Jerome Wiesner , who had expressed his opposition to human spaceflight to Kennedy before the President took office, and had opposed the decision to land people on the Moon, hired Golovin, who had left NASA, to chair his own "Space Vehicle Panel", ostensibly to monitor, but actually to second-guess NASA's decisions on

26950-417: Was built: Columbia , Challenger , Discovery , and Atlantis . A fifth shuttle, Endeavour , was built to replace Challenger , which was destroyed in an accident during launch that killed 7 astronauts on 28 January 1986. From 1983 to 1998, twenty-two Shuttle flights carried components for a European Space Agency sortie space station called Spacelab in the Shuttle payload bay. The USSR copied

27125-604: Was changed by the time human flights began. Since Apollo, like Mercury, would require a launch escape system (LES) in case of a launch failure, a relatively small rocket was required for qualification flight testing of this system. A rocket bigger than the Little Joe used by Mercury would be required, so the Little Joe II was built by General Dynamics / Convair . After an August 1963 qualification test flight , four LES test flights ( A-001 through 004 ) were made at

27300-544: Was chosen in Houston , Texas, on land donated by Rice University , and Administrator Webb announced the conversion on September 19, 1961. It was also clear NASA would soon outgrow its practice of controlling missions from its Cape Canaveral Air Force Station launch facilities in Florida, so a new Mission Control Center would be included in the MSC. In September 1962, by which time two Project Mercury astronauts had orbited

27475-451: Was filled with a layer of fiberglass insulation as additional heat protection. An ablative heat shield on the outside of the CM protected the capsule from the heat of reentry , which is sufficient to melt most metals. This heat shield was composed of phenolic formaldehyde resin . During reentry, this material charred and melted away, absorbing and carrying away the intense heat in the process. The heat shield has several outer coverings:

27650-451: Was generated by gas pressure acting on the center piston within the probe cylinder. Piston retraction compressed the probe and interface seals and actuated the 12 automatic ring latches which were located radially around the inner surface of the CSM docking ring. The latches were manually re-cocked in the docking tunnel by an astronaut after each hard docking event (lunar missions required two dockings). An automatic extension latch attached to

27825-529: Was installed on the armrests of the left-hand couch. The translation controller was used by the crew member performing the transposition, docking, and extraction maneuver with the LM, usually the CM Pilot. The center and right-hand couches had duplicate rotational controllers. The couches were supported by eight shock-attenuating struts, designed to ease the impact of touchdown on water or, in case of an emergency landing, on solid ground. The contiguous cabin space

28000-720: Was launched in May 2022. A crewed flight to fully certify Starliner was launched in June 2024. Similar to SpaceX, development funding has been provided by a mix of government and private funds. Virgin Galactic is developing SpaceshipTwo , a commercial suborbital spacecraft aimed at the space tourism market. It reached space in December 2018. Blue Origin is in a multi-year test program of their New Shepard vehicle and has carried out 16 uncrewed test flights as of September 2021, and one crewed flight carrying founder Jeff Bezos , his brother Mark Bezos , aviator Wally Funk , and 18-year old Oliver Daemen on July 20, 2021. Over

28175-431: Was mounted at the top of the docking tunnel. It was 30 inches (76 cm) in diameter and weighed 80 pounds (36 kg), constructed from two machined rings that were weld-joined to a brazed honeycomb panel. The exterior side was covered with 0.5-inch (13 mm) of insulation and a layer of aluminum foil. It was latched in six places and operated by a pump handle. The hatch contained a valve in its center, used to equalize

28350-576: Was named after Apollo , the Greek god of light, music, and the Sun, by NASA manager Abe Silverstein , who later said, "I was naming the spacecraft like I'd name my baby." Silverstein chose the name at home one evening, early in 1960, because he felt "Apollo riding his chariot across the Sun was appropriate to the grand scale of the proposed program". The context of this was that the program focused at its beginning mainly on developing an advanced crewed spacecraft,

28525-427: Was not until the 1980s that another woman entered space. At the time, all astronauts were required to be military test pilots; women were not able to enter this career, which is one reason for the delay in allowing women to join space crews. After the rules were changed, Svetlana Savitskaya became the second woman to enter space; she was also from the Soviet Union . Sally Ride became the next woman to enter space and

28700-410: Was offset a foot or so from the center of pressure (along the symmetry axis). This provided a rotational moment during reentry, angling the capsule and providing some lift (a lift to drag ratio of about 0.368 ). The capsule was then steered by rotating the capsule using thrusters; when no steering was required, the capsule was spun slowly, and the lift effects cancelled out. This system greatly reduced

28875-551: Was organized into six equipment bays: The CM had five windows. The two side windows measured 9 inches (23 cm) square next to the left and right-hand couches. Two forward-facing triangular rendezvous windows measured 8 by 9 inches (20 by 23 cm), used to aid in rendezvous and docking with the LM. The circular hatch window was 9 inches (23 cm) in diameter located directly over the center couch. Each window assembly consisted of three thick panes of glass. The inner two panes, which were made of aluminosilicate , made up part of

29050-516: Was planned by 1993, but the program was canceled due to lack of funding and the dissolution of the Soviet Union in 1991. Two more orbiters were never completed, and the one that performed the uncrewed flight was destroyed in a hangar roof collapse in May 2002. The dissolution of the Soviet Union in 1991 brought an end to the Cold War and opened the door to true cooperation between the US and Russia. The Soviet Soyuz and Mir programs were taken over by

29225-530: Was prevented by a series of check valves, and back flow and ullage requirements were resolved by containing the fuel and oxidizer in Teflon bladders which separated the propellants from the helium pressurant. The four completely independent RCS clusters provided redundancy; only two adjacent functioning units were needed to allow complete attitude control. The lunar module used a similar four-quad arrangement of R-4D thruster engines for its RCS. Electrical power

29400-552: Was produced by three fuel cells , each measuring 44 inches (1.1 m) tall by 22 inches (0.56 m) in diameter and weighing 245 pounds (111 kg). These combined hydrogen and oxygen to generate electrical power, and produced drinkable water as a byproduct. The cells were fed by two hemispherical-cylindrical 31.75-inch (0.806 m) diameter tanks, each holding 29 pounds (13 kg) of liquid hydrogen , and two spherical 26-inch (0.66 m) diameter tanks, each holding 326 pounds (148 kg) of liquid oxygen (which also supplied

29575-643: Was proposed for space tourism. According to a press release from the Iraqi News Agency dated 5 December 1989, there was only one test of the Al-Abid space launcher, which Iraq intended to use to develop its own crewed space facilities by the end of the century. These plans were put to an end by the Gulf War of 1991 and the economic hardships that followed. Under the George W. Bush administration,

29750-533: Was reconfigured as the European module of the same name on the International Space Station. Japan ( NASDA ) began the development of the HOPE-X experimental shuttle spaceplane in the 1980s, to be launched on its H-IIA expendable launch vehicle. A string of failures in 1998 led to funding reductions, and the project's cancellation in 2003 in favor of participation in the International Space Station program through

29925-469: Was reduced to one in late 1966. This mission, designated AS-204 but named Apollo 1 by its flight crew, was planned for launch on February 21, 1967. During a dress rehearsal for the launch on January 27, all three astronauts ( Gus Grissom , Ed White and Roger Chaffee ) were killed in a cabin fire, which revealed serious design, construction and maintenance shortcomings in Block I, many of which had been carried over into Block II command modules being built at

30100-466: Was the area outside the inner pressure shell in the nose of the capsule, located around the forward docking tunnel and covered by the forward heat shield. The compartment was divided into four 90-degree segments that contained Earth landing equipment (all the parachutes, recovery antennas and beacon light, and sea recovery sling), two reaction control thrusters, and the forward heat shield release mechanism. At about 25,000 feet (7,600 m) during reentry,

30275-662: Was the first crewed spacecraft to orbit another celestial body, and Apollo 11 was the first crewed spacecraft to land humans on one. Overall, the Apollo program returned 842 pounds (382 kg) of lunar rocks and soil to Earth, greatly contributing to the understanding of the Moon's composition and geological history. The program laid the foundation for NASA's subsequent human spaceflight capability and funded construction of its Johnson Space Center and Kennedy Space Center . Apollo also spurred advances in many areas of technology incidental to rocketry and human spaceflight, including avionics , telecommunications, and computers. The program

30450-403: Was the only component of the Apollo spacecraft to survive without major configuration changes as the program evolved from the early Apollo study designs. Its exterior was covered with an ablative heat shield , and had its own reaction control system (RCS) engines to control its attitude and steer its atmospheric entry path. Parachutes were carried to slow its descent to splashdown. The module

30625-436: Was upgraded to 7,610,000 pounds-force (33,900 kN). The second and third stages burned liquid hydrogen; the third stage was a modified version of the S-IVB, with thrust increased to 230,000 pounds-force (1,020 kN) and capability to restart the engine for translunar injection after reaching a parking orbit . Human spaceflight Human spaceflight (also referred to as manned spaceflight or crewed spaceflight )

#323676