112-633: The Great Northern route, formerly known as Great Northern Electrics , is the name given to suburban rail services run on the southern end of Britain's East Coast Main Line and its associated branches. Services operate to or from London King's Cross and London Moorgate . Destinations include Hertford North , Welwyn Garden City , Stevenage , and Cambridge , and in peak hours, additional services run to Peterborough and King's Lynn . Services run through parts of Greater London , Hertfordshire , Bedfordshire , Cambridgeshire , and Norfolk . The route forms
224-518: A Class 41 (an HST prototype) achieved a top speed of 143 mph (230 km/h) in a test run. In the 1980s, the line was electrified and InterCity 225 trains introduced. These have in turn been largely replaced by Class 800 and Class 801 units. The November 2021 Integrated Rail Plan for the North and Midlands stated that the linespeed would be upgraded to 140 mph (225 km/h). The line links London, South East England , East Anglia and
336-790: A Stadler FLIRT fleet, with 20 trains DEMU version. Germany has employed DMUs for both commuter and express services for many decades. The SVT 877 Fliegender Hamburger DMU, introduced in 1933, made the run from Berlin to Hamburg in an astonishing 138 minutes, and its derivative SVT 137 broke the land speed record in 1936. After World War 2, the VT 11.5 DMU was the flagship of the glamorous Trans Europ Express . Since 1968, DB has designated DMUs with class numbers beginning in 6. While DB and regional transport authorities generally prefer electric power for commuter rail, many local and rural lines remain un-electrified, and DMUs are invaluable in providing services to those areas. DMUs in service as of 2021 include
448-758: A 1904 proposal by the Great Northern Railway to electrify its suburban services from London. A short stretch of the ECML in the Newcastle area was electrified with a third rail in 1904, as part of the North Eastern Railway 's suburban Tyneside Electrics scheme. Following the success of this scheme, in 1919 the North Eastern Railway, planned to electrify 80 miles (130 km) of the main line between York and Newcastle;
560-561: A 58 per cent increase in passengers. The programme also electrified the Edinburgh-Carstairs branch of the WCML, to allow InterCity 225 sets to access Glasgow Central , with the added benefit of creating an electrified path to/from Edinburgh on the WCML from the south. In total the electrification programme covered roughly 1,400 single-track miles (2,300 km) and required major infrastructure changes, including resignalling of
672-693: A Cambridge service being held at Hitchin waiting to cross the flat junction. As part of the Thameslink Programme, the Great Northern Route has been connected to the existing Thameslink route via a new junction at Belle Isle (south of the High Speed 1 flyover, just north of London King's Cross). Two single-bore tunnels (known as the Canal Tunnels ) were driven from here to the low-level platforms at St Pancras during
784-628: A WDM-2 or WDM-3A locomotive in the middle. These old trains had the loco controls duplicated in the Driving Trailer coach and all the actuation information reaching the locomotive through thin communication lines. This was called 'push-pull train'. The longest running such push-pull service operated between Diva – Bhiwandi Road and Vasai Road and was recently converted into an MEMU train service in 2018. India's first and largest DMU shed at Jalandhar , Punjab, holds more than 90 units placed in service all over Punjab. First generation DMU: Rated power
896-507: A heavy train over long distances, immediately cut over one hour from the standard London to Edinburgh journey time, from seven hours to under six. Further improvements to the infrastructure meant that by the mid-1970s, another half-hour had been cut from the journey time. In the years following the introduction of the Deltics, sections of the ECML were upgraded for trains running at speeds of up to 100 mph (160 km/h). On 15 June 1965,
1008-562: A junction on the West Anglia Main Line north of Shelford , allowing the reinstatement of through services to Cambridge from London King's Cross via the East Coast Main Line , which was faster than the conventional route from Liverpool Street via the West Anglia Main Line . This electrification was completed in 1988. Later the track between these points was also upgraded with welded joint track instead of
1120-408: A large role in the decision to proceed. Construction began on the second phase in 1985. In 1986 the section to Huntingdon was completed; Leeds was reached in 1988, then York in 1989 and Edinburgh in 1991. Electric services on the full length of the line began on 8 July 1991, eight weeks later than scheduled. Significant traffic increases occurred in the two years after completion; one station recorded
1232-612: A locomotive hauled service. Today, DMUs are widely used throughout Australia's southern states: In Queensland, heritage DMUs are used on the Savannahlander and Gulflander tourist trains. Chinese manufactured (CNR Tangshan) DEMU was introduced in Bangladesh from 25 May 2013. DEMU is the country's first-ever commuter train service starting its journey on the Chittagong–Fouzdarhat line. These DEMUs also operate on
SECTION 10
#17328026300281344-487: A major commuter route into London from Hertfordshire, Cambridgeshire, and eastern Bedfordshire: ridership has grown rapidly over recent years. In 2009, rolling stock was transferred from other lines to allow additional services and longer trains to be run. In early 2018, the line was connected to the Thameslink route via a junction just south of the High Speed 1 bridge, north of King's Cross, allowing through services to
1456-513: A pair of Napier Deltic engines that had been developed for fast torpedo boats. The Class 55 'Deltics' were for a time the fastest and most powerful diesel locomotives in service in Britain, capable of reaching 100 mph (160 km/h) and providing up to 3,300 hp (2,500 kW). When introduced into service in 1961, the Class 55's ability to rapidly accelerate and maintain high speed with
1568-628: A shortened InterCity 125 train of two Class 43 power cars and three coaches during a southbound run from Darlington to York. At least two other trains have subsequently recorded higher speeds, but as of February 2023 the InterCity 125 record remains the highest to have been officially verified. A British speed record for electric locomotives of 161.7 mph (260.2 km/h) was achieved on 17 September 1989, also at Stoke Bank, by Class 91 locomotive number 91010. On 26 September 1991, an InterCity 225 shortened electric locomotive train
1680-493: A special design of overhead wiring was developed for use on the visually-sensitive Royal Border Bridge , as well as the Croxdale and Durham City viaducts . Elsewhere the standard Mk. 3B equipment was deployed. The electrification was completed at a cost of £344.4 million (at 1983 prices, equivalent to £1169.3 million in 2023), a minor overrun against its authorised expenditure of £331.9 million. Of
1792-426: A steady green aspect the driver would reduce speed to no greater than 125 mph, and thus be ready to react to subsequent signals in the same manner as when driving a lower-speed train. The testing found, however, that drivers couldn't be expected to consistently and accurately interpret and respond to lineside signals when driving at the higher speed, and regulations were later changed throughout Britain to require
1904-441: Is a multiple-unit train powered by on-board diesel engines . A DMU requires no separate locomotive , as the engines are incorporated into one or more of the carriages. Diesel-powered single-unit railcars are also generally classed as DMUs. Diesel-powered units may be further classified by their transmission type: diesel–mechanical DMMU , diesel–hydraulic DHMU , or diesel–electric DEMU . The diesel engine may be located above
2016-725: Is carried along its route by several bridges and viaducts which are recognised as architecturally significant listed structures ; the longest of which is the 659-metre-long (2,162 ft) Royal Border Bridge at Berwick-upon-Tweed . Others include Digswell Viaduct , near Welwyn Garden City , at 475 m (1,558 ft), the Ouseburn Viaduct in Newcastle at 280 m (920 ft), Durham Viaduct at 240 m (790 ft), and Chester Burn Viaduct in Chester-le-Street at 230 m (750 ft). The 350-metre-long (1,150 ft) King Edward VII Bridge in Newcastle
2128-548: Is currently limiting speeds to 125 mph. There are currently no plans to retrofit ERTMS equipment to the InterCity 225 fleet, as they are expected to be withdrawn before the removal of the lineside signals; this means they will never reach their design speed of 140 mph (225 km/h) in service. The line is mainly quadruple track from London to Stoke Tunnel, south of Grantham , with two double track sections: one between Digswell Jn & Woolmer Green Jn, where
2240-580: Is on fairly straight track on the flatter, eastern side of England, through Lincolnshire and Cambridgeshire , though there are significant speed restrictions because of the line's curvature particularly north of Darlington and between Doncaster and Leeds. By contrast, the West Coast Main Line crosses the Trent Valley and the mountains of Cumbria , with more curvature and had a lower speed limit of 110 mph (180 km/h). Speeds on
2352-563: Is provided by Hull Trains , Grand Central and Lumo . The ECML is part of Network Rail 's Strategic Route G, which comprises five separate lines: The core route is the main line between King's Cross and Edinburgh, the Hertford Loop is used for local and freight services, and the Northern City Line provides an inner-suburban service to the city. The line has engineers line references (ELR) ECM1 to ECM9. The ECML
SECTION 20
#17328026300282464-488: Is provided by DMU tilting trains " RegioSwinger " (Croatian series 7123) since 2004. Those trains may also cover other lines in the country depending on need and availability. Luxury DMU series 7021 , built in France , started to operate for Yugoslav Railways in 1972 and after 1991 still remained in service of Croatian Railways until 2005. Units 7121 and 7122 (which came as a replacement for 7221 units), together with
2576-725: The Bombardier Voyager , each car is entirely self-contained and has its own engine, generator and electric motors. In other designs, such as the British Rail Class 207 or the Stadler GTW and Stadler FLIRT DMU , some cars within the consist may be entirely unpowered or only feature electric motors, obtaining electric current from other cars in the consist which have a generator and engine. With diesel–electric transmission, some DMU can be no other than an EMU without pantograph or contact shoes (for use on
2688-603: The Chittagong Circular Railway and on the Bangladesh Railway 's service between Dhaka and Narayanganj . Mexican manufacturer Ferrovias Del Bajio supplied in 2019, three DSUs (Diesel Single Unit) to Royal Railway in Cambodia for their airport shuttle service from Phnom Penh international airport to the city central station. The other two units were assigned to long-distance services from
2800-540: The East Midlands , with Yorkshire , the North East and Scotland, and is important to their local economies. It carries commuter traffic in north London as well as cross-country, commuter and local passenger services, and freight . In 1997, operations were privatised. The primary long-distance operator is London North Eastern Railway , but open-access competition on services to Northern England and Scotland
2912-712: The Eastern Region , the North Eastern Region , and the Scottish Region (the former two were merged together in 1967). In the early 1960s, steam locomotives were replaced by diesel-electrics , amongst them the Deltic , a powerful high-speed locomotive developed and built by English Electric . The prototype was successful and a fleet of 22 locomotives were built and put into BR service for express traffic. Designated Class 55 , they were powered by
3024-541: The London, Midland and Scottish Railway (LMS) for long-distance passenger traffic between London and Scotland. The LNER's chief mechanical engineer Nigel Gresley designed iconic Pacific steam locomotives including Flying Scotsman and Mallard , the latter of which achieved a world record speed for a steam locomotive, 126 mph (203 km/h) on the Grantham-to-Peterborough section. In 1948,
3136-681: The Midland Main Line . The infrastructure supported speeds of up to 140 mph, allowing a non-stop run of three hours and 29 minutes between London and Edinburgh on 26 September 1991. As part of testing done to support safe operation the increased maximum speed, BR experimented in 1988 with using a fifth signalling aspect – flashing green – on the fast lines between Peterborough and Stoke Tunnel. The flashing green aspect appeared at signals preceding one displaying an ordinary steady green aspect, and authorised running at up to 140 mph. Upon encountering
3248-503: The National Coal Board to pay for the construction of the 14-mile-long (23 km) Selby Diversion . Construction commenced in 1980, and was completed in late 1983 at a cost of £63 million (equivalent to £214 million in 2023). The new section diverged from the original alignment at Temple Hirst Junction, north of Doncaster, bypassed Selby station and the area to be undermined by coal workings, and then joined
3360-660: The Penmanshiel tunnel collapse in the Scottish Borders in 1979 necessitated urgent works to divert the line around the irreparably-damaged tunnel; ultimately the line was closed for five months and around 1,100 yards (1 km) of the original alignment had to be abandoned. In the late 1970s in the north of England, the development of the Selby Coalfield – and the anticipated subsidence that might result from its workings – led
3472-551: The West Coast Main Line (WCML) and ECML; a detailed plan drawn up in 1957 gave a completion date of 1970 for ECML electrification. However, the East Coast authorities decided that they could not wait over a decade for service improvements, and instead decided to invest in high-speed diesel traction, the Deltic and High Speed Train, as an interim measure to implement improved services, whilst West Coast electrification proceeded, and
Great Northern route - Misplaced Pages Continue
3584-534: The West Coast Main Line (WCML) were increased with the introduction of tilting Pendolino trains and now match the 125 mph speeds on the ECML. The line's current principal operator is London North Eastern Railway (LNER), whose services include regular long-distance expresses between King's Cross, the East Midlands, Yorkshire, the North East of England and Scotland. LNER is operated on behalf of
3696-574: The jointed track that had existed, and the maximum line speed was raised to 90 mph. Rapid growth on the route, especially on the Cambridge Line resulted in consultation on a new service pattern, which was then implemented at the timetable change in Spring 2009. During the peak hours, the route is now saturated and can support no further service improvements. Together with the two-track Digswell Viaduct (Welwyn Viaduct) some ten miles to
3808-518: The national railways ) had been built since the 1920s, the first two streamlined DMUs came in service in 1937, class Kiha 43000 (キハ43000系). The service of several hundreds (in sum even thousands) of diesel railcars and DMUs started in 1950s following the improvement of fuel supply that was critical during World War II . In 2021, Kenya acquired DMUs from France to operate in the Nairobi Metropolitan Area. These trains connect
3920-445: The 'St Pancras Box' phase of the redevelopment works that created St Pancras International station. Trains diverging from the Great Northern Route at Belle Isle will join the 'core' St Pancras - Farringdon - City Thameslink - Blackfriars section of the existing Thameslink route and then serve stations across Surrey , East Sussex , Kent , and West Sussex . On 6 November 2017 the first Thameslink Programme units entered service on
4032-481: The 1960s, Great Northern has been used to describe the suburban part of the East Coast Main Line , south of Peterborough and south of Royston . The Great Northern Railway had proposed electrification of part of the line in 1903, but it was not until 1971 that a scheme to electrify the line from London King's Cross and Moorgate was authorised. The Inner Suburban Lines to Welwyn Garden City and Hertford North were electrified in 1976 with Class 313 EMUs. In 1978
4144-831: The Adtranz Class 612 tilting train ("Regio Swinger"), the Alstom Coradia LINT (Classes 620–623, 640 and 648), the Siemens Desiro (Class 642) and the Bombardier Talent (Class 643/644). From 2001 to 2016 there was even a DMU version of DB's high-speed Intercity Express , the Class 605 ICE TD . In the Republic of Ireland the Córas Iompair Éireann (CIÉ), which controlled the republic's railways between 1945 and 1986, introduced DMUs in
4256-750: The Department for Transport by a consortium of Arup Group , Ernst & Young and SNC-Lavalin Rail & Transit , which took over from Virgin Trains East Coast on 24 June 2018. Other operators of passenger trains on the line are: Eurostar previously held the rights to run five trains a day on the line for services from mainland Europe to cities north of London, as part of the Regional Eurostar plan, which never came to fruition. The overnight Caledonian Sleeper occasionally uses
4368-422: The ECML represented the best value by far. Its in-house forecasts determined that increases in revenue and considerable reductions in energy and maintenance costs would occur by electrifying the line. In 1984, the decision was made to commence the electrification of the rest of the ECML to Edinburgh and Leeds. The Secretary of State for Transport Nicholas Ridley and Minister for Railways David Mitchell played
4480-487: The ECML were offered to bidders as the InterCity East Coast franchise. It was held by Great North Eastern Railway from 1996 until 2007, when the company experienced financial difficulties; the franchise then passed to National Express East Coast until in 2009, when it too encountered financial problems and the government was forced to run the franchise itself as ' East Coast '. Another attempt at returning
4592-509: The ECML when engineering works prevent it from using its normal train path on the WCML. DB Cargo UK , Direct Rail Services , Freightliner and GB Railfreight operate freight services. The ECML is one of the busiest lines on the British rail network and there is insufficient capacity on parts of the line to satisfy all the requirements of both passenger and freight operators. Diesel multiple unit A diesel multiple unit or DMU
Great Northern route - Misplaced Pages Continue
4704-470: The ECML. LNER's 4468 Mallard set the record for a steam locomotive at 126 mph (203 km/h) whilst descending Stoke Bank on 3 July 1938. The record remains standing today, and a trackside sign was erected in July 1998 at the 90 + 1 ⁄ 4 milepost to commemorate the achievement. The world record for diesel-powered trains was set at 148 mph (238 km/h) on 1 November 1987, by
4816-503: The ECML. Where the existing bridge clearance was insufficient, project managers favoured wherever possible the rebuilding of the bridge rather than the lowering of the track, as the latter requires considerable civil works and can create long-term drainage problems. Where listed buildings were to be affected by the programme, BR sought approval for its plans from the Royal Fine Art Commission . Through this process
4928-471: The FRA. This has greatly restricted the development of DMUs within the U.S. as no other country requires the much heavier FRA compliant vehicles, and no export market for them exists. Operations using FRA-compliant vehicles: Operations using non FRA-compliant vehicles: Proposed operations: DMUs were first introduced to Australia in the late mid-20th century for use on quiet branch lines that could not justify
5040-599: The Great Northern fleet consists of Class 387s and Class 717s , the former operating services from London King's Cross and the latter from Moorgate. Class 700s also operate on the route on Thameslink services. Prior to the introduction of Class 387s and Class 717s in 2016 and 2019 respectively, Class 313s , Class 317s , Class 321s , and Class 365s were used. Of these, Class 365s lasted until 15 May 2021, at which point they were replaced by Gatwick Express Class 387/2 units which were being used by Southern while
5152-462: The Great Northern route. 700128 worked the 0656 Peterborough - London King's Cross and 1812 return, while 700125 worked the 0733 Peterborough - London King's Cross and 1742 return. The Great Northern off-peak service pattern, as of June 2024, with frequencies in trains per hour (tph), consists of the following: In addition, Great Northern also runs 4 peak hour extras in each direction between Peterborough and King's Cross every day. As of 2021,
5264-543: The LNER and its West Coast competitor, the London, Midland and Scottish Railway (LMS), produced ever-more-powerful express locomotives. This reached its crescendo in the late 1930s, when the LNER introduced the famous streamlined Class A4 locomotives and the LMS countered with its own streamlined Coronation Class – both of which were capable of reaching speeds in excess of 100 mph (160 km/h). The competition
5376-520: The Leeds–York line of the former York and North Midland Railway at Colton Junction, south-west of York. The old line between Selby and York was dismantled and is now a public cycleway. Mining subsidence discovered in 2001 also necessitated the realignment of 1.8 km (1.1 mi) of line at Dolphingstone in East Lothian , between Prestonpans and Wallyford stations. The new alignment takes
5488-549: The NBR between Berwick and Edinburgh (agreed in 1862 but not exercised until 1869). The entire ECML came under control of the London and North Eastern Railway (LNER) in 1923, under the Railways Act 1921 which 'grouped' many small railway companies into four large ones . The LNER was the second largest railway company in Britain, its routes were located to the north and east of London. The LNER appointed Nigel Gresley (who
5600-758: The PNR in the island of Luzon . Even without active inter-city rail services in the present-day, DMUs are still used on the PNR Metro Commuter Line in Metro Manila and the Bicol Commuter service in the Bicol Region . Three generations of DMUs are in use: second-hand DMUs handed over by JR East such as the KiHa 35 , 52 and 59 series originally built in the 1960s and acquired in
5712-707: The Slovenská strela motor express train led on the Bratislava-Prague route by a motor car of the same name, or the Tatran express from Bratislava to Košice. Representatives of high-speed motor wagons were, for example, motor wagons of the M262 or M286 series, which, however, lost their application in high-speed wagons due to the gradual electrification of main lines and were, like the current wagons currently used for passenger trains. The first significant use of DMUs in
SECTION 50
#17328026300285824-666: The U.S. was the Budd Rail Diesel Car (RDC). The RDC was a single passenger car with two diesel engines and two sets of controls. In the United States, DMU systems must be FRA-compliant to be permitted on freight rail corridors. The Federal Railway Administration has mandated higher coupling strength requirements than European regulators, effectively prohibiting the use of lighter weight European-style inter-city rail DMUs on U.S. main line railways without timesharing with freight operations or special waivers from
5936-530: The US, but new services are evaluated on a case-by-case basis. As a result, several types of lightweight DMUs have been used: Costa Rica has purchased several Apolo 2400 series DMU railcars from the former narrow gauge operator in Spain, which are run in commuter service. 42 X'Trapolis Tsíimin K'áak train sets have been ordered for Tren Maya , 10 of which are DMU and 32 are EDMU. A type of diesel multiple units in
6048-601: The United Kingdom was by the Great Western Railway , which introduced its small but successful series of diesel–mechanical GWR railcars in 1934. The London & North Eastern Railway and London, Midland & Scottish Railway also experimented with DMUs in the 1930s, the LMS both on its own system , and on that of its Northern Irish subsidiary , but development was curtailed by World War II . After nationalisation, British Railways (BR) revived
6160-711: The Widened Lines route and the GWML, where ERTMS complements traditional lineside signals, the southern ECML will have its signals removed once the transition period to ERTMS is complete. This means that all trains running on the route will be required to be fitted with the appropriate onboard equipment. The Class 800 series (LNER Azuma Classes 800 and 801 , Hull Trains Paragon Class 802 , Lumo Class 803 ), Thameslink Class 700 and Great Northern Class 717 fleets are fitted with ERTMS equipment from manufacture. The Great Northern Class 387 fleet are undergoing retrofit, with
6272-471: The central station to Sihanoukville and to Poipet. Royal Railways Cambodia have now acquired eleven carriages DMU from Japan. Model: " Kiha 183 heavy snow ". (キハ183系オホーツク・大雪) Speed: 110 km/h (max) Type: 特急 (Limited Express) Started: 1986 ............ End of Service in Japan 17 March 2023 DMUs (DEMUs) are widely used in India. DEMUs in India are used in both the eight-coach format and the four-coach format. These trains replaced many (up to 10 car) trains with
6384-466: The city with settlements outside Nairobi, Jomo Kenyatta International Airport and the Nairobi Terminus. The Keretapi Tanah Melayu (KTM) has a total of 13 DMU KTM Class 61 ordered from CRRC for the West Coast Line and are assembled locally at CRRCs Batu Gajah factory from 2016 to 2020. The first scheduled service is expected from 1 September along the Gemas-Johor Bahru route, replacing old non-automotive stock. The Philippine National Railways (PNR)
6496-411: The completion of the Thameslink Programme , many services on the route became part of the Thameslink network, running through central London to destinations south of the River Thames . The term Great Northern is related to the Great Northern Railway , the original builders of the line. The July 1922 Bradshaw's Railway Guide stated a typical rail service on the Cambridge Line as follows: Since
6608-418: The concept in the early 1950s. At that time there was an urgent need to move away from expensive steam traction which led to many experimental designs using diesel propulsion and multiple units . The early DMUs proved successful, and under BR's 1955 Modernisation Plan the building of a large fleet was authorised. These BR "First Generation" DMUs were built between 1956 and 1963. BR required that contracts for
6720-480: The country depending on need and availability too. Also, the DMUs were manufactured for foreign carriers. The tables of cars and units are divided into vehicles operated until 1987, when the ČSD used the series designations proposed by Vojtěch Kryšpín , and vehicles created after this date, which no longer have Kryšpín's designations (with some exceptions). In addition, these new cars are the new vehicles are already different in both countries. Elron has since 2015
6832-400: The crossing with a flyover or tunnel, which would increase capacity on both lines, have been proposed on several occasions but are complicated by costs and spatial constraints at the site. With most of the line rated for 125 mph (200 km/h) operation, the ECML was the fastest main line in the UK until the opening of High Speed 1 . The high speeds are possible because much of the line
SECTION 60
#17328026300286944-408: The design and manufacture of new locomotives and rolling stock be split between numerous private firms as well as BR's own workshops, while different BR Regions laid down different specifications. The result was a multitude of different types, one of which was: In 1960, British Railways introduced its Blue Pullman high-speed DEMUs. These were few in number and relatively short-lived, but they paved
7056-430: The driver, as in the great majority of first-generation British Rail DMUs, but in most applications, gears are changed automatically. In a diesel–hydraulic multiple unit (DHMU), a hydraulic torque converter , a type of fluid coupling, acts as the transmission medium for the motive power of the diesel engine to turn the wheels. Some units feature a hybrid mix of hydraulic and mechanical transmissions, usually reverting to
7168-547: The electrification was complete to Royston with Class 312 EMUs providing the service. The route was then promoted as the Great Northern Electrics . The route between Hertford and Langley Junction, south of Stevenage , was also electrified but not regularly used by electric trains until 1979, when one Moorgate - Hertford service per hour was extended to Letchworth Garden City ; prior to this DMUs provided an infrequent service over this route, running between Hertford and Huntingdon / Peterborough. From 1979 until 1987 DMUs provided
7280-444: The fastest London–Edinburgh timing down by another hour, to 4 + 1 ⁄ 2 hours. They operated most express passenger services on the line until electrification was completed in 1991, after which they continued in use on services that run off the ECML and onto non-electrified lines. Generally popular with the public, and considered by some to be iconic, they ran on the ECML for 41 years, before being withdrawn in 2019. In 1973,
7392-494: The few remaining unelectrified lines. As electrification progresses, the DMUs become less and less important. Diesel multiple units cover large number of passenger lines in Croatia which are operated by the national passenger service operator HŽ Putnički Prijevoz . On Croatian Railways, DMUs have important role since they cover local, regional and distant lines all across the country. The country's two largest towns, Zagreb and Split , are connected with an inter-city service that
7504-543: The first length of high-speed line, a 17 miles (27 km) stretch between Peterborough and Grantham, was completed. The next section was 12 miles (19 km) of line between Grantham and Newark and more sections were upgraded to enable high speeds along much of the line. Continuing demand for reduced journey times led British Rail to introduce a successor to the Deltics, the InterCity 125 High Speed Train (HST) between 1978 and 1979. These could reach speeds up to 125 mph (201 km/h) on existing infrastructure, bringing
7616-411: The first train sent to Worksop Depot in October 2022. Following its return to service in July 2023, the remaining trains will be retrofitted in Hornsey Depot. The introduction of in-cab signaling will allow the ECML line speed to be increased to 140 mph in some places. The Class 800 series trains were designed to reach this speed, but minor modifications will be required to remove the equipment that
7728-438: The form of a gentle curve of up to 77 m (253 ft) towards the south, supported by concrete slabs and other ground stabilisation and reinforcement techniques, and is designed to avoid the need for a permanent speed restriction. It came into use in the last week of April 2003, at a cost of £56 million (equivalent to £92 million in 2023). World speed records for both steam and diesel traction have been set on
7840-410: The former Bedford to Hitchin Line , a section of which was cleared of vegetation and made progressively higher, to form a short ramp. The track is carried over the East Coast Main Line on a newly constructed viaduct and onto a new embankment to join the present Cambridge Line at the newly created Hitchin East Junction, closer to Letchworth. Although this takes trains over a longer distance, it removes
7952-444: The former British Rail Southern Region ), which "is substituted" by one or more on-board diesel generators ; this kind of DEMU can be potentially upgraded to electro-diesel multiple unit (EDMU), becoming a bi-mode multiple units train (BMU), just adding one or two pantographs or contact shoes (with opportune converters, if necessary) and related modifications on the electric system. NMBS/SNCB uses its NMBS/SNCB Class 41 DMUs on
8064-432: The frame in an engine bay or under the floor. Driving controls can be at both ends, on one end, or in a separate car. DMUs are usually classified by the method of transmitting motive power to their wheels. In a diesel–mechanical multiple unit (DMMU), the rotating energy of the engine is transmitted via a gearbox and driveshaft directly to the wheels of the train, like a car . The transmissions can be shifted manually by
8176-603: The franchise to private-sector operation was made by Virgin Trains East Coast in 2015, but this failed in 2018, and thus since then it has been run by the public sector through the government's operator of last resort procedure under the London North Eastern Railway brand. The route of the ECML has been altered or diverted several times, beginning with the opening of the King Edward VII Bridge in Newcastle upon Tyne in 1906. Later,
8288-404: The further electrification of the East Coast Main Line between 1986 and 1988, electric services could be extended to Peterborough and the outer suburban service was changed from Class 312 to Class 317 , some of which were cascaded from the newly created Thameslink route, with the remainder newly built. In 1984 it was decided to electrify the line between Royston and Shepreth Branch Junction,
8400-410: The latter at higher operating speeds as this decreases engine RPM and noise. In a diesel–electric multiple unit (DEMU), a diesel engine drives an electrical generator or an alternator which produces electrical energy . The generated current is then fed to electric traction motors on the wheels or bogies in the same way as a conventional diesel–electric locomotive . On some DEMUs, such as
8512-518: The line from Temple Hirst Junction (near Selby in Yorkshire) to the Scottish border; the construction of new signalling centres at Niddrie, York, and Newcastle; the commissioning of ten new connections to the national electricity grid; and structure clearance and electrical immunisation works along the length of the line. Included in the structure clearance works were the 127 overbridges that crossed
8624-612: The line passes over the Digswell Viaduct , Welwyn North station and the two Welwyn tunnels; and one between Fletton Junction (south of Peterborough) and Holme Junction, south of Holme Fen. The route between Holme Junction and Huntingdon is mostly triple track, with the exception of a southbound loop between Conington and Woodwalton. North of Grantham the line is double track except for quadruple-track sections at Retford , around Doncaster, between Colton Junction (south of York), Thirsk and Northallerton , and Newcastle. The line
8736-513: The line. Services were operated using "East Coast Joint Stock" until 1922. The trains were hauled by GNR locomotives between King's Cross and York, which entailed utilisation of GNR running powers over the NER between Shaftholme Junction and York (which had been agreed in 1849 and exercised from the opening of the GNR in 1850); and by NER locomotives between York and Edinburgh, using NER running powers over
8848-528: The line. The line is a key transport artery on the eastern side of Great Britain running broadly parallel to the A1 road . The main line acts as a 'spine' for several diverging branches, serving destinations such as Cambridge , Leeds , Hull , Sunderland and Lincoln , all with direct services to London. In addition, a few ECML services extend beyond Edinburgh to serve other Scottish destinations, such as Stirling , Inverness , Aberdeen or Glasgow Central , although
8960-598: The lineside signalling system on the southern ECML between London King's Cross and the Stoke Tunnel was commissioned in 1977 and as such was up for renewal between 2020 and 2029. Instead of renewing the current lineside signalling, it was decided to upgrade this section of the ECML to ERTMS in-cab signalling. This will not be the first instance of ERTMS on the UK rail network; it is in use on the Cambrian Line (where it
9072-478: The mid '80s, British Rail embarked upon its so called "Sprinterisation" programme, to replace most of the first generation DMUs and many locomotive-hauled trains with three new families of DMU: Following the impact of the privatisation of British Rail in the late 1990s, several other DMU families have been introduced: In 2018, the first bi and tri-mode electro-diesel multiple units were introduced: Canada generally follows similar buffer strength requirements to
9184-591: The mid-1950s and they were the first diesel trains on many main lines. DMUs are used mostly on shorter or less frequently travelled routes in remote areas. The national railway company CFR still uses, along with other DMU models, Class 77 and 78 DMUs, locally built by Malaxa between the 1930s and 50s and refurbished in the 70s. The main DMU in use is the Class 96 Siemens Desiro aka Săgeata Albastră (The Blue Arrow). Private operators also largely use DMU units, mainly purchased from various French and German operators. In
9296-571: The need for them to dwell at Hitchin – sometimes for several minutes – awaiting a path across the tracks of the main London-Peterborough route, thus decreasing the overall journey time to Cambridge in many instances. The scheme improves the punctuality and reliability of both the London-Cambridge and London-Peterborough routes, because Peterborough-bound stopping trains are no longer delayed if running closely behind
9408-514: The newest series 7022 and 7023 built in 2010s Croatia, cover many of the country's local and regional services on unelectrified or partly electrified lines. Diesel multiple units also cover large number of passenger lines in the Czech Republic which are operated by the national operator České dráhy . They have important role since they cover local, regional and distant lines all across the country. Those trains may also cover other lines in
9520-562: The power cars were later reclassified as locomotives under Class 43 . HSTs started being replaced in 2017, but as of October 2022 some are still in use. By the early 1980s, many of the surviving First Generation units were reaching the end of their design life, leading to spiralling maintenance costs, poor reliability and a poor public image for the railway. A stopgap solution was to convert some services back to locomotive haulage, as spare locomotives and hauled coaching stock were available, but this also increased operating costs. Commencing in
9632-588: The present, several types of DMUs operate in Slovakia. Was the most common type in Slovakia is a Class 812 ZSSK based on the ČD Class 810 . These are used almost exclusively for hauling passenger trains on non-electrified regional lines and these trains often excel in low travel speeds. In the past, however, in Slovakia there were a number of express trains driven by motor coaches , which often overcame heavier trains driven by steam locomotives at cruising speed, and classic sets. A typical example can be, for example,
9744-477: The principal London-Glasgow route is the West Coast Main Line (WCML). The line was built during the 1840s by three railway companies, the North British Railway , the North Eastern Railway , and the Great Northern Railway . In 1923, the Railways Act 1921 led to their amalgamation to form the London and North Eastern Railway (LNER) and the line became its primary route. The LNER competed with
9856-471: The programme to be abandoned. The land stood empty for many years, but has since been used to provide new housing. A new plan and subsequent application for an order to build a flyover was approved, and construction was completed in June 2013. The scheme has created a new single-track line that diverges from the northbound slow line at a new junction just beyond Hitchin station, using a short embankment section of
9968-402: The prototype HST British Rail Class 41 recorded a top speed of 143 mph (230 km/h) in a test run on the line. There had been proposals to electrify all or parts of the ECML as far back as the early 1900s, but no significant scheme was implemented until the 1970s and 1980s, with the entire line being electrified in two stages between 1976 and 1991. Early proposed schemes included
10080-454: The railways were nationalised and operated by British Railways . In the early 1960s, steam was replaced by diesel-electric traction , including the Deltics , and sections of the line were upgraded so that trains could run at speeds of up to 100 mph (160 km/h). With the demand for higher speed, British Rail introduced InterCity 125 high-speed trains between 1976 and 1981. In 1973,
10192-408: The scheme progressed as far as a prototype locomotive , however it was cancelled on financial grounds after 1923 when the NER was grouped into the LNER, and the new management had no interest in pursuing the scheme. In the early-1930s, studies were conducted into electrifying sections or all of the ECML. British Rail 's 1955 modernisation plan placed equal importance on electrification of both
10304-428: The service between Hitchin and Huntingdon/Peterborough. DMUs also provided a shuttle service between Royston and Cambridge between 1978 and 1988, connecting with the electric trains and replacing the former through Cambridge buffet expresses between Kings Cross and the university city. In 1982 Watton-at-Stone station was reopened between Hertford and Stevenage. A new station also opened at Welham Green in 1986. With
10416-632: The service was suspended. Govia Thameslink Railway issued a tender in April 2023 for between 21 and 30 four-coach 100 mph (160 km/h) trains, with an estimated value of £48.6 million. On 12 March 2024 it was announced that Great Northern would lease 30 Class 379 units from Porterbrook. Trains formerly used on the Great Northern Route include, but are not limited to, the following: The Varsity Line connected Cambridge with Oxford via Sandy and Bedford ("Varsity" being slang for "University", those termini being major university towns). It
10528-518: The services became part of West Anglia Great Northern , becoming their sole route in 2004 when the West Anglia services were transferred to 'one' . In April 2006 the services became the responsibility of First Capital Connect . In September 2014, the Department for Transport transferred the new Thameslink, Southern and Great Northern franchise to Govia Thameslink Railway . In 2018, with
10640-496: The south of London. Since September 2014, the services have been operated by Govia Thameslink Railway (GTR). The Thameslink and Great Northern service brands were maintained and separated from each other. The network consists of all services on these lines: And some services on these lines: Additionally, the main service on the Fen Line is provided as part of the route. All services are provided by EMUs . At privatisation
10752-541: The south, the flat junction just north of Hitchin was a major bottleneck , as northbound trains diverging from the East Coast Main Line towards Letchworth and thence to Cambridge had to cross one northbound (fast) line and two southbound (fast and slow) lines to access the Cambridge Line. Proposals as part of the original electrification work envisaged a new underpass here and land was set aside for its construction. However, budgetary constraints forced this part of
10864-649: The total cost, 60 per cent was for the electrification process itself, while the remaining 40 per cent covered rolling stock, including the new InterCity 225 trains procured specially for the route. These were introduced in 1989 to operate express services. They were developed by the General Electric Company (GEC), as the winners of a competitive tender process. The InterCity 225 sets were used alongside other rolling stock, including Class 90 locomotives and Class 317 electric multiple units. The displaced diesel trains were reallocated predominantly to
10976-420: The use of in-cab signalling whenever running service trains at speeds above 125 mph. Nevertheless, the fifth aspect was not removed from signals in the test area , and the relevant track Sectional Appendix continued to list the capability to run special test trains in excess of 125 mph as recently as 2008. As part of the privatisation of British Rail in the mid-1990s, passenger operations on
11088-440: The way for the very successful InterCity 125 or High Speed Train (HST) units, which were built between 1975 and 1982 to take over most principal express services on non-electrified routes. These 125 mph (201 km/h) trains run with a streamlined power car at each end and (typically) seven to nine intermediate trailer cars. Although originally classified as DEMUs, the trailer cars are very similar to loco-hauled stock, and
11200-633: Was 700 HP and had three or six coaches, made first by ICF. Transmission was Voith-hydraulic. Max speed 100 km/h. Second generation DMU: Rated power is 1400 HP and have eight coaches. Max speed is 105 km/h. Transmission is DC electric. Made at ICF and RCF . Third generation DMU: Rated power is 1,600 HP and have ten coaches. Max speed is 110 km/h. Transmission is AC electric. Made at ICF . State-owned company PT.INKA builds several type of DMU, some of which operate in urban and suburban areas. In Japan, where gasoline-driven railbuses (on small private lines) and railmotors ( Kihani 5000 of
11312-779: Was authorised in 1971 for the benefit of London suburban services as part of the Great Northern Suburban Electrification Project , using Mk. 3A equipment. The scheme electrified 70 route miles (110 km), including the Hertford Loop Line , part of the Cambridge Line from Hitchin to Royston , and incorporated the Northern City Line to Moorgate . In the late 1970s, a working group of British Rail and Department for Transport officials convened and determined that, of all options for further electrification,
11424-652: Was authorised to reach speeds up to 140mph completing the London to Edinburgh journey in 3 hours 29 minutes. In November 2021, as part of the Integrated Rail Plan , the DfT announced a major upgrade of the line. The upgrade is set to include major track improvements and digital signalling, leading to higher speeds, reduced journey times and increases in seat capacity. The power supply will also be upgraded to allow longer and more frequent trains. The last refresh of
11536-497: Was closed in 1968 but there are now plans to restore this route. East Coast Main Line The East Coast Main Line ( ECML ) is a 393-mile long (632 km) electrified railway between its northern terminus at Edinburgh Waverley and southern terminus at London King's Cross station . The key towns and cities of Peterborough , Doncaster , York , Darlington , Durham and Newcastle are on
11648-569: Was connected to the Lancashire and Yorkshire Railway , a short section of which was used to reach the NER at Knottingley . In 1871, the line was shortened when the NER opened a direct line from an end-on junction, with the GNR, at Shaftholme, just south of Askern to Selby and over Selby Bridge on the Leeds - Hull line direct to York . Through journeys were important and lucrative for the companies and in 1860 they built special rolling stock for
11760-547: Was constructed by three independent railway companies. During the 1830s and 1840s, each company built part of the route to serve its own area, but also intending to link with other railways to form the through route that would become the East Coast Main Line. From north to south, the companies were: The GNR established an end-on connection with the NER at Askern , famously described by the GNR's chairman as in "a ploughed field four miles north of Doncaster". Askern
11872-528: Was curtailed soon thereafter by the coming of World War II . In the aftermath of the war, Clement Attlee 's Labour Government nationalised the LNER and the other three major railway companies in Great Britain with the passage of the Transport Act 1947 , and with effect from 1 January 1948 merged them into British Railways (BR). The ECML came under the control of three of BR's regions ;
11984-407: Was engaged in long running rivalry with the West Coast Main Line (WCML), the other main trunk route between London and Scotland. At various points in the late 19th century, highly publicised but unofficial races occurred between express trains on the two routes, most notably in 1888 and 1895. These races were ended over concerns over safety, but later the rivalry resumed in the 1920s and 1930s as both
12096-541: Was first piloted), on the Thameslink core Widened Lines route (with an ATO overlay), and on the Heathrow branch of the Great Western Main Line . However, it is the most complex application yet; never before in the UK has ERTMS been used on such a busy, mixed-traffic line, with freight , commuter , regional and InterCity services sharing as little as two tracks in the tightest sections. Unlike
12208-518: Was knighted in 1937) as its Chief Mechanical Engineer, and under his tenure, Pacific steam locomotives were developed as the standard express locomotive to work the line, several of which became famous, these included the Class A3 , including 4472 Flying Scotsman , and the later Class A4 , including 4468 Mallard . During this time Mallard set a new world-record speed for a steam locomotive (see § Speed records ). The East Coast Main Line
12320-422: Was largely complete by 1974. During the period when Richard Beeching was chairman of British Rail, WCML electrification with a spur from Carstairs to Edinburgh was seen as possible justification for the truncation of the ECML at Newcastle. British Rail carried out electrification of the southern part of the ECML with 25 kV AC overhead lines from London King's Cross to Hitchin between 1976 and 1977. This
12432-575: Was one of the first adopters of diesel multiple unit trains in Asia. Initially built as gasoline-powered railmotors, the locally assembled Manila Railroad RMC class of 1929 was the first to be powered by diesel traction. Some units were also converted to streamliner units by 1932 for first-class services on the South Main Line between Manila and Legazpi, Albay . Since then, generations of DMUs were used chiefly for short-distance commuter services by
12544-686: Was opened in 1906, replacing the older High Level Bridge as the main railway crossing of the River Tyne . Newark flat crossing , where the ECML crosses the Nottingham–Lincoln line on the same level just north of Newark Northgate station, is one of only two remaining flat crossings in Britain, the other being on the Cambrian Line where it intersections with the Welsh Highland Railway . Plans for grade separating
#27972