Misplaced Pages

Emerald Express

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

#256743

54-634: The Emerald Express (EmX) is a bus rapid transit (BRT) system in the Eugene - Springfield metropolitan area in Oregon , United States . It is provided by the Lane Transit District (LTD) which is the public transit authority in Lane County, Oregon . LTD chose bus rapid transit after a review process in which several transportation options, including light rail , were considered. It

108-518: A busway or transitway , is a trolleybus , electric bus and public transport bus service system designed to have much more capacity , reliability , and other quality features than a conventional bus system. Typically, a BRT system includes roadways that are dedicated to buses , and gives priority to buses at intersections where buses may interact with other traffic; alongside design features to reduce delays caused by passengers boarding or leaving buses, or paying fares . BRT aims to combine

162-621: A "BHLS" (stands for Bus with a High Level of Service ). The term transitway was originated in 1981 with the opening of the OC Transpo transitway in Ottawa , Ontario , Canada. Critics have charged that the term "bus rapid transit" has sometimes been misapplied to systems that lack most or all the essential features which differentiate it from conventional bus services. The term " bus rapid transit creep " has been used to describe severely degraded levels of bus service which fall far short of

216-530: A BRT system to 35,000 passengers per hour. The single-lane roads of Istanbul Metrobus had been frequently blocked by Phileas buses breaking down, causing delays for all the buses in a single direction. After focusing on Mercedes-Benz buses, capacity increased to 45,000 pph. Light rail, by comparison, has reported passenger capacities between 3,500 pph (mainly street running) to 19,000 pph (fully grade-separated ). Federal Transit Administration The Federal Transit Administration ( FTA )

270-428: A low-noise, low-emissions "hush mode" (in which the diesel engine operates but does not exceed idle speed ) when underground. The need to provide electric power in underground environments brings the capital and maintenance costs of such routes closer to those of light rail, and raises the question of building or eventually converting to light rail. In Seattle, the downtown transit tunnel was retrofitted for conversion to

324-540: A planned terminus and turnaround in the Walmart parking lot west of Commerce Street. In spring 2011, the west 6th and 7th to 11th was selected as the locally preferred alternative. Some local businesses and residents opposed the extension, saying that it would be expensive, unnecessary, and could cause a decrease in property values. In June 2013, opponents of the extension filed suit in federal court in Seattle, challenging

378-449: A result, less forced ventilation will be required in tunnels to achieve the same air quality. Another alternative is to use electric propulsion, which Seattle 's Metro Bus Tunnel and Boston 's Silver Line Phase II implemented. In Seattle, dual-mode (electric/diesel electric) buses manufactured by Breda were used until 2004, with the center axle driven by electric motors obtaining power from trolley wires through trolley poles in

432-455: A shared hybrid-bus and light-rail facility in preparation for Seattle's Central Link Light Rail line, which opened in July 2009. In March 2019, expansion of the light rail in the tunnel moved busses back to surface streets. Bi-articulated battery electric buses cause no problems in tunnels anymore but provide BRT capacity. A BRT system can be measured by a number of factors. The BRT Standard

486-419: A static map, featuring services like trip planning, live arrival and departure times, up-to-date line schedules, local station maps, service alerts, and advisories that may affect one's current trip. Transit and Moovit are examples of apps that are available in many cities around the world. Some operators of bus rapid transit systems have developed their own apps, like Transmilenio. These apps even include all

540-480: A total daily ridership), in the developing world this capacity constraint (or rumor of a capacity constraint) was a significant argument in favor of heavy rail metro investments in some venues. When TransMilenio opened in 2000, it changed the paradigm by giving buses a passing lane at each station stop and introducing express services within the BRT infrastructure. These innovations increased the maximum achieved capacity of

594-586: Is a risk of a dangerous gap between bus and platform , and is even greater due to the nature of bus operations. Kassel curbs or other methods may be used to ease quick and safe alignment of the BRT vehicle with a platform. A popular compromise is low-floor buses with a low step at the door, which can allow easy boarding at low-platform stops compatible with other buses. This intermediate design may be used with some low- or medium-capacity BRT systems. The MIO system in Santiago de Cali, Colombia, pioneered in 2009

SECTION 10

#1732775726257

648-739: Is an agency within the United States Department of Transportation (DOT) that provides financial and technical assistance to local public transportation systems. The FTA is one of ten modal administrations within the DOT . Headed by an Administrator who is appointed by the President of the United States , the FTA functions through Washington, D.C. headquarters office and ten regional offices which assist transit agencies in all states,

702-525: Is essential. But at least as important are steps to promote economic efficiency and livability in areas of future development. Our national welfare therefore requires the provision of good urban transportation, with the properly balanced use of private vehicles and modern mass transport to help shape as well as serve urban growth." President Lyndon B. Johnson signed the Urban Mass Transportation Act of 1964 into law, which passed

756-585: Is less complex than rail maintenance. Moreover, buses are more flexible than rail vehicles, because a bus route can be altered, either temporarily or permanently, to meet changing demand or contend with adverse road conditions with comparatively little investment of resources. The first use of a protected busway was the East Side Trolley Tunnel in Providence , Rhode Island . It was converted from trolley to bus use in 1948. However,

810-459: Is today over 18.5 miles long. The OC Transpo BRT system in Ottawa , Canada, was introduced in 1983. The first element of its BRT system was dedicated bus lanes through the city centre, with platformed stops. The introduction of exclusive separate busways (termed 'Transitway') occurred in 1983. By 1996, all of the originally envisioned 31 km Transitway system was in operation; further expansions were opened in 2009, 2011, and 2014. As of 2019,

864-570: The BRT Standard promoted by the Institute for Transportation and Development Policy (ITDP) and other organizations. Compared to other common transit modes such as light rail transit (LRT), bus rapid transit (BRT) service is attractive to transit authorities because it does not cost as much to establish and operate: no track needs to be laid, bus drivers typically require less training and less pay than rail operators, and bus maintenance

918-828: The District of Columbia , and the territories. Until 1991, it was known as the Urban Mass Transportation Administration ( UMTA ). Public transportation includes buses , subways , light rail , commuter rail , monorail , passenger ferry boats, trolleys , inclined railways , and people movers . The federal government, through the FTA, provides financial assistance to develop new transit systems and improve, maintain, and operate existing systems. The FTA oversees grants to state and local transit providers, primarily through its ten regional offices. These providers are responsible for managing their programs in accordance with federal requirements, and

972-597: The House by a vote of 212-129 and cleared the Senate 52–41, creating the Urban Mass Transportation Administration . The agency was charged with providing federal assistance for mass transit projects, including an initial $ 375 million in capital assistance over three years as mandated by the act. In 1991, the agency was renamed the Federal Transit Administration . The current acting Administrator

1026-624: The Indonesian capital city . Bus rapid transit is a mode of mass rapid transit (MRT) and describes a high-capacity urban public-transit system with its own right of way , vehicles at short headways , platform-level boarding, and preticketing. The expression "BRT" is mainly used in the Americas and China; in India, it is called "BRTS" (BRT System); in Europe it is often called a "busway" or

1080-937: The MIO in Cali since November 2008, Metrolinea in Bucaramanga since December 2009, Megabús in Pereira since May 2009. This design is also used in Johannesburg 's Rea Vaya . The term "station" is more flexibly applied in North America and ranges from enclosed waiting areas ( Ottawa and Cleveland ) to large open-sided shelters ( Los Angeles and San Bernardino ). A unique and distinctive identity can contribute to BRT's attractiveness as an alternative to driving cars, (such as Viva, Max, TransMilenio, Metropolitano, Metronit, Select) marking stops and stations as well as

1134-435: The 15,000 to 25,000 range. Research of the Institute for Transportation and Development Policy (ITDP) shows a capacity ranking of MRT modes, based on reported performance of 14 light rail systems, 14 heavy rail systems (just 1-track + 3 2-track-systems "highest capacity") and 56 BRT systems. The study concludes, that BRT-"capacity on TransMilenio exceeds all but the highest capacity heavy rail systems, and it far exceeds

SECTION 20

#1732775726257

1188-480: The EmX corridor a Bronze ranking. The EmX system is made up of sections of dedicated bus lanes for most of the route (60%), with normal roads in between. The vehicles are given signal priority via ground-loop signaling to the traffic control system, with special traffic signals at intersections. The vehicles have two sets of doors on the left and three on the right, allowing loading from platforms on either side. Most of

1242-408: The FTA is responsible for ensuring that grantees follow federal mandates along with statutory and administrative requirements. In 1962, President John F. Kennedy sent a major transportation message to the U.S. Congress . It called for the establishment of a program of federal capital assistance for mass transportation. President Kennedy stated, "To conserve and enhance values in existing urban areas

1296-639: The Franklin Corridor (Green Line), opened on January 14, 2007. It runs between Eugene Station in downtown Eugene and Springfield Station in downtown Springfield, and serves the University of Oregon . It is 4 mi (6.4 km) long and cost $ 25 million to design and build. Compared with the non-BRT service that the Green Line replaced (Route 11), rush hour travel times decreased over 25% from 22 minutes to 16 minutes and ridership doubled in

1350-598: The United States, BRT began in 1977, with Pittsburgh's South Busway , operating on 4.3 miles (6.9 km) of exclusive lanes. Its success led to the Martin Luther King Jr. East Busway in 1983, a fuller BRT deployment including a dedicated busway of 9.1 miles (14.6 km), traffic signal preemption , and peak service headway as low as two minutes. After the opening of the West Busway , 5.1 miles (8.2 km) in length in 2000, Pittsburgh's Busway system

1404-419: The buses. Large cities usually have big bus networks. A map showing all bus lines might be incomprehensible, and cause people to wait for low-frequency buses that may not even be running at the time they are needed. By identifying the main bus lines having high-frequency service, with a special brand and separate maps, it is easier to understand the entire network. Public transit apps are more convenient than

1458-786: The capacity and speed of a light rail transit (LRT) or mass rapid transit (MRT) system with the flexibility, lower cost and simplicity of a bus system. The world's first BRT system was the Runcorn Busway in Runcorn New Town, England, which entered service in 1971. As of March 2018 , a total of 166 cities in six continents have implemented BRT systems, accounting for 4,906 km (3,048 mi) of BRT lanes and about 32.2 million passengers every day. The majority of these are in Latin America , where about 19.6 million passengers ride daily, and which has

1512-601: The center of major arterial roads, in 1980 the Curitiba system added a feeder bus network and inter-zone connections, and in 1992 introduced off-board fare collection, enclosed stations, and platform-level boarding. Other systems made further innovations, including platooning (three buses entering and leaving bus stops and traffic signals at once) in Porto Alegre , and passing lanes and express service in São Paulo . In

1566-605: The central part of the Transitway has been converted to light rail transit , due to the downtown section being operated beyond its designed capacity. In 1995, Quito , Ecuador, opened MetrobusQ its first BRT trolleybuses in Quito , using articulated trolleybuses. The TransMilenio in Bogotá , Colombia, opening in 2000, was the first BRT system to combine the best elements of Curitiba's BRT with other BRT advances, and achieved

1620-584: The concept while sketching on the back of an envelope. The town was designed around the transport system, with most residents no more than five minutes walking distance, or 500 yards (460 m), from the Busway. The second BRT system in the world was the Rede Integrada de Transporte (RIT, integrated transportation network ), implemented in Curitiba , Brazil, in 1974. The Rede Integrada de Transporte

1674-456: The day, with longer headways during the evening and the first hour of the morning. More limited service operates during the weekend. EmX fares are the same as other LTD bus routes; both single-ride ($ 1.75) and passes ($ 3.50 daily, $ 50 monthly) are accepted. Unlike other LTD bus routes, the EmX uses a proof-of-payment system, and fares must be paid prior to boarding at ticket vending machines located on station platforms. The first EmX line,

Emerald Express - Misplaced Pages Continue

1728-679: The extension's approval and funding by the Federal Transit Administration . The suit alleged nine violations of the National Environmental Policy Act and alleged violations of the Administrative Procedure Act . The suit further claimed that LTD had not met requirements for federal funding. The court ruled against the extension's opponents in July 2014, and construction began in March 2015. The Federal Transit Administration awarded $ 75 million to

1782-648: The first BRT system in the world was the Runcorn Busway in Runcorn , England. First conceived in the Runcorn New Town Masterplan in 1966, it opened for services in October 1971 and all 22 kilometres (14 mi) were operational by 1980. The central station is at Runcorn Shopping City where buses arrive on dedicated raised busways to two enclosed stations. Arthur Ling , Runcorn Development Corporation's Master Planner, said that he had invented

1836-436: The first year. In fiscal 2008–09, Green Line ridership was 1.6M. Local artist Linn Cook was selected by a committee of artists and community members to create cast and formed metal railings depicting indigenous plants. Each station features a different plant. The 7.8 mi (12.6 km) Gateway Line extension opened on January 9, 2011, linking downtown Springfield and Sacred Heart Medical Center at RiverBend . It uses

1890-442: The following features: Bus-only lanes make for faster travel and ensure that buses are not delayed by mixed traffic congestion . A median alignment bus-only keeps buses away from busy curb-side side conflicts, where cars and trucks are parking, standing and turning. Separate rights of way may be used such as the completely elevated Xiamen BRT . Transit malls or 'bus streets' may also be created in city centers. Fare prepayment at

1944-662: The green phase or reducing the red phase in the required direction compared to the normal sequence. Prohibiting turns may be the most important measure for moving buses through intersections. The station platforms for BRT systems should be level with the bus floor for quick and easy boarding, making it fully accessible for wheelchairs, disabled passengers and baby strollers, with minimal delays. High-level platforms for high-floored buses makes it difficult to have stops outside dedicated platforms, or to have conventional buses stop at high-level platforms, so these BRT stops are distinct from street-level bus stops. Similar to rail vehicles, there

1998-596: The highest capacity and highest speed BRT system in the world. In January 2004 the first BRT in Southeast Asia, TransJakarta , opened in Jakarta , Indonesia. As of 2015 , at 210 kilometres (130 mi), it is the longest BRT system in the world. Africa's first BRT system was opened in Lagos , Nigeria, in March 2008 but is considered a light BRT system by many people. Johannesburg , South Africa, BRT Rea Vaya ,

2052-450: The highest light rail system." Performance data of 84 systems show More topical are these BRT data After the first BRT system opened in 1971, cities were slow to adopt BRT because they believed that the capacity of BRT was limited to about 12,000 passengers per hour traveling in a given direction during peak demand. While this is a capacity rarely needed in the US (12,000 is more typical as

2106-479: The most cities with BRT systems, with 54, led by Brazil with 21 cities. The Latin American countries with the most daily ridership are Brazil (10.7 million), Colombia (3.0 million), and Mexico (2.5 million). In the other regions, China (4.3 million) and Iran (2.1 million) stand out. Currently, TransJakarta is the largest BRT network in the world, with about 251.2 kilometres (156.1 mi) of corridors connecting

2160-752: The newly constructed Pioneer Parkway corridor and newly-constructed dedicated bus lanes on Martin Luther King Jr. Parkway and RiverBend Drive. The West Eugene Extension added 17 stations west of Eugene Station. It opened on September 17, 2017. LTD conducted environmental analyses and collected public comments as part of the extension's planning process. A number of route alignments were considered, focusing on West 6th, 7th, or 13th Avenues to connect with West 11th Avenue somewhere near Chambers or Garfield Streets. One alternative placed service on West 7th Place instead of West 11th Avenue between Garfield and Seneca Rd. All alternatives continued down West 11th Avenue to

2214-606: The project in September 2015, covering most of its $ 96.5 million total cost. LTD eventually plans to run EmX along all main transportation corridors in the metro area. Their MovingAhead long-range plan includes expansion of EmX service on new corridors. As of 2019, the corridors under consideration for EmX or other expanded bus services are 30th Avenue to serve Lane Community College ; Coburg Road; Highway 99; Martin Luther King Jr. Boulevard; and River Road. Bus rapid transit Bus rapid transit ( BRT ), also referred to as

Emerald Express - Misplaced Pages Continue

2268-496: The right hand side platforms can only accommodate the rear two doors. Riding the Emerald Express was free when it began operations, but now costs regular fare. The articulated buses are equipped with Hybrid drives which allows for a smooth acceleration from stops and through the various road segments. On weekdays, service runs approximately from 6:00   am to 11:00   pm. Buses arrive every 10 minutes throughout

2322-877: The right side of the street. Groups of criteria form the BRT Standard 2016, which is updated by the Technical Committee of the BRT Standard. High-capacity vehicles such as articulated or even bi-articulated buses may be used, typically with multiple doors for fast entry and exit. Double-decker buses or guided buses may also be used. Advanced powertrain control may be used for a smoother ride. Bottleneck BRT stations typically provide loading areas for simultaneous boarding and alighting of buses through multiple doors coordinated via displays and loudspeakers. An example of high-quality stations include those used on TransMilenio in Bogotá since December 2000,

2376-775: The schedules and live arrival times and stations for buses that feed the BRT, like the SITP (Sistema Integrado de Transporte Público or Public Transit Integrated System) in Bogotá . A special issue arises in the use of buses in metro transit structures. Since the areas where the demand for an exclusive bus right-of-way are apt to be in dense downtown areas where an above-ground structure may be unacceptable on historic, logistic, or environmental grounds, use of BRT in tunnels may not be avoidable. Since buses are usually powered by internal combustion engines , bus metros raise ventilation issues similar to those of motor vehicle tunnels. Powerful fans typically exchange air through ventilation shafts to

2430-492: The station, instead of on board the bus, eliminates the delay caused by passengers paying on board. Fare machines at stations also allow riders to purchase multi-ride stored-value cards and have multiple payment options. Prepayment also allows riders to board at all doors, further speeding up stops. Prohibiting turns for traffic across the bus lane significantly reduces delays to the buses. Bus priority will often be provided at signalized intersections to reduce delays by extending

2484-404: The subway, and with the rear axle driven by a conventional diesel powertrain on freeways and streets. Boston is using a similar approach, after initially using trolleybuses pending delivery of the dual-mode vehicles that was completed in 2005. In 2004, Seattle replaced its "Transit Tunnel" fleet with diesel-electric hybrid buses, which operate similarly to hybrid cars outside the tunnel and in

2538-417: The surface; these are usually as remote as possible from occupied areas, to minimize the effects of noise and concentrated pollution. A straightforward way to reduce air quality problems is to use internal combustion engines with lower emissions. The 2008 Euro V European emission standards set a limit on carbon monoxide from heavy-duty diesel engines of 1.5 g/kWh, one third of the 1992 Euro I standard. As

2592-428: The theoretical maximum throughput measured in passengers per hour per direction (PPHPD) for a single traffic lane is some 150,000 passengers per hour (250 passengers per vehicle, one vehicle every 6 seconds). In real world conditions BRT Rio (de Janeiro, BRS Presidente Vargas) with 65.000 PPHPD holds the record, TransMilenio Bogotá and Metrobus Istanbul perform 49,000 – 45,000 PPHPD, most other busy systems operating in

2646-499: The use of dual buses, with doors on the left side of the bus that are located at the height of high-level platforms, and doors on the right side that are located at curb height. These buses can use the main line with its exclusive lanes and high level platforms, located on the center of the street and thus, boarding and leaving passengers on the left side. These buses can exit the main line and use normal lanes that share with other vehicles and stop at regular stations located on sidewalks on

2700-415: Was decided that the BRT option was the best fit for Eugene-Springfield's size and current transportation needs. The first route, named the Green Line, was opened in early 2007, connecting downtown Springfield to downtown Eugene. There are ten stops along the 4-mile (6.4 km) route, including the University of Oregon . Less than a year later, ridership had doubled in the corridor, and the city of Eugene

2754-438: Was developed by the Institute for Transportation and Development Policy (ITDP) to score BRT corridors, producing a list of rated BRT corridors meeting the minimum definition of BRT. The highest rated systems received a "gold" ranking. The latest edition of the standard was published in 2016. Other metrics used to evaluate BRT performance include: Based on this data, the minimum headway and maximum current vehicle capacities,

SECTION 50

#1732775726257

2808-503: Was inspired by the previous transport system of the National Urban Transport Company of Peru (In Spanish: ENATRU ), which only had quick access on Lima downtown , but it would not be considered BRT itself. Many of the elements that have become associated with BRT were innovations first suggested by Carlos Ceneviva, within the team of Curitiba Mayor Jaime Lerner . Initially just dedicated bus lanes in

2862-527: Was nominated for the 2008 Sustainable Transportation Award, and received an honorable mention. An extension was opened on January 9, 2011, connecting EmX to the Gateway Mall as well as Sacred Heart Medical Center at RiverBend and International Way . A second extension to West Eugene opened on September 17, 2017, adding 9 miles (14 km) to the system. The Institute for Transportation and Development Policy (ITDP), under its BRT Standard , has given

2916-669: Was the first true BRT in Africa, in August 2009, carrying 16,000 daily passengers. Rea Vaya and MIO (BRT in Cali , Colombia, opened 2009) were the first two systems to combine full BRT with some services that also operated in mixed traffic, then joined the BRT trunk infrastructure. In 2017 Marrakesh , Morocco, opened its first BRT Marrakesh trolleybus system (BHNS De Marrakesh) trolleybuses Corridors of 8 km (5.0 mi), of which 3 km (1.9 mi) of overhead wiring for operation as trolleybus. BRT systems normally include most of

#256743