Misplaced Pages

Ion rapid transit

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#181818

106-636: Ion , stylized as ION , is an integrated public transportation network in the Regional Municipality of Waterloo in Ontario , Canada. It is operated by Keolis and is part of the Grand River Transit (GRT) system, partially replacing GRT's Route 200 iXpress bus service. The section of the bus route serving Cambridge has been renamed "Ion Bus", and renumbered as 302. The first phase commenced operations on June 21, 2019, between

212-719: A Crown agency that manages and integrates road and public transportation in the Greater Toronto and Hamilton Area (GTHA). It was created as the Greater Toronto Transportation Authority on June 22, 2006, and adopted its present name as a brand name in 2007 and eventually as the legal name in 2009. It is headquartered at Union Station in Toronto . Metrolinx serves as the central procurement agency on behalf of Ontario municipalities for local transit vehicles, equipment and services. It

318-454: A guideway . This is an uncommon mode of transportation (excluding elevators ) due to the complexity of automation. A fully implemented system might provide most of the convenience of individual automobiles with the efficiency of public transit. The crucial innovation is that the automated vehicles carry just a few passengers, turn off the guideway to pick up passengers (permitting other PRT vehicles to continue at full speed), and drop them off to

424-582: A $ 4.9 million plan was announced to double the size of Bike Share Toronto by 2016. The bicycles and docking stations will be owned by Metrolinx, while the system will continue to be operated by the Toronto Parking Authority . In 2021, Metrolinx dropped its hydrail program. Metrolinx has been criticized for not having enough executive power in planning transit outside of municipal politics, despite being established to take political delay out of transportation planning. After Rob Ford

530-543: A body of water. A foot-passenger ferry with many stops is sometimes called a water bus . Ferries form a part of the public transport systems of many waterside cities and islands, allowing direct transit between points at a capital cost much lower than bridges or tunnels, though at a lower speed. Ship connections of much larger distances (such as over long distances in water bodies like the Mediterranean Sea ) may also be called ferry services. A report published by

636-420: A decline in public transport usage. A number of sources attribute this trend to the rise in popularity of remote work, ride-sharing services, and car loans being relatively cheap across many countries. Major cities such as Toronto, Paris, Chicago, and London have seen this decline and have attempted to intervene by cutting fares and encouraging new modes of transportation, such as e-scooters and e-bikes. Because of

742-552: A few stops per city. These services may also be international. High-speed rail is passenger trains operating significantly faster than conventional rail—typically defined as at least 200 kilometres per hour (120 mph). The most predominant systems have been built in Europe and East Asia, and compared with air travel, offer long-distance rail journeys as quick as air services, have lower prices to compete more effectively and use electricity instead of combustion. Urban rail transit

848-533: A frequency of every 10 minutes from 6   am to 10   pm on weekdays and 15 minutes at other times. The route is properly known as 301 ION Light Rail . The maximum operating speed of Ion light rail vehicles is 50 km/h (31 mph) along city streets and 70 km/h (43 mph) along railway rights of way. However, in areas where there is high pedestrian traffic, the operating speed will be as low as 20–25 km/h (12–16 mph). The 19-kilometre (12 mi) trip from Conestoga Mall to Fairview Park Mall

954-803: A joint agreement with Metrolinx and Bombardier in July 2013 for 14 LRVs, as well as an option to buy up to 14 more. Under the original agreement, the first vehicle was to be delivered no later than August 2016, and the final vehicle by December 2016. On May 20, 2016, Bombardier announced that to avoid further delays it would shift construction of the vehicles for the Ion system from its Thunder Bay plant to another plant in Kingston, Ontario . The first vehicle, number 501 (its ends are labelled 501A and 501B), arrived in Waterloo Region on February 24, 2017. However, it

1060-549: A mix of on-road and off-road (in various existing rights-of-way) configurations. On December 2, 2017, the Kitchener-Waterloo Record reported the local economy had already been stimulated through the construction of new buildings near the route, in both Kitchener–Waterloo and Cambridge. On-road sections keep the LRVs in dedicated lanes that do not mix with general traffic. In February 2017, after limitations in

1166-575: A new logo in printed and electronic communications. The Metrolinx Act, 2006 , formerly known as the Greater Toronto Transportation Authority Act, 2006 , describes two of Metrolinx's primary responsibilities as being: The Big Move : Transforming Transportation in the Greater Toronto and Hamilton Area was one of Metrolinx's first deliverables. It is a Regional Transportation Plan (RTP) including

SECTION 10

#1732797428182

1272-519: A property on Dutton Drive in Waterloo, bordering the rail-line corridor where the LRT is planned to be installed, was purchased to serve as a maintenance and storage yard for the system's LRVs. The site, which was purchased for $ 6 million, will contain three buildings: the largest is 75,000 square feet (7,000 m) and will house the operations centre and a repair shop; one will include a washing system; and

1378-676: A railway with freight trains . A rapid transit railway system (also called a metro, underground, heavy rail, or subway) operates in an urban area with high capacity and frequency, and grade separation from other traffic. Heavy rail is a high-capacity form of rail transit, with 4 to 10 units forming a train, and can be the most expensive form of transit to build. Modern heavy rail systems are mostly driverless, which allows for higher frequencies and less maintenance cost. Systems are able to transport large numbers of people quickly over short distances with little land use. Variations of rapid transit include people movers , small-scale light metro and

1484-625: A rolling five-year capital plan and Investment Strategy for the GTHA. The plan builds on 52 GO train, subway, light rail and bus rapid transit projects proposed by the Government of Ontario in its MoveOntario 2020 plan announced on June 15, 2007, and includes new projects to support them. A draft version of the Big Move was provided to Metrolinx on September 26, 2008, and a final version was approved on November 27, 2008. Planning and construction

1590-416: A series of 24 recommendations as part of a four-part plan to integrate transportation, growth and land use planning in the GTHA, maximize the value of public infrastructure investment, optimize system and network efficiencies, and dedicate new revenue sources for transit and transportation. These recommendations included revenue tools and policy recommendations. Metrolinx also advised that funds raised by all

1696-480: A set of trolley poles for mobility. Online Electric Vehicles are buses that run on a conventional battery, but are recharged frequently at certain points via underground wires. Certain types of buses, styled after old-style streetcars, are also called trackless trolleys, but are built on the same platforms as a typical diesel , CNG , or hybrid bus; these are more often used for tourist rides than commuting and tend to be privately owned. Passenger rail transport

1802-412: A single (or return) trip, or valid within a certain area for a period of time (see transit pass ). The fare is based on the travel class, either depending on the traveled distance, or based on zone pricing . The tickets may have to be shown or checked automatically at the station platform or when boarding, or during the ride by a conductor . Operators may choose to control all riders, allowing sale of

1908-413: A smaller suburban or town center. The stations are often combined with shuttle bus or park and ride systems. Frequency may be up to several times per hour, and commuter rail systems may either be part of the national railway or operated by local transit agencies. Common forms of commuter rail employ either diesel electric locomotives, or electric multiple unit trains. Some commuter train lines share

2014-577: A staged implementation plan for its rapid transit system: Stage 1 – Implementation of LRT north of Fairview Park Mall and adapted Bus Rapid Transit south of Fairview Park Mall, including: The stage 1 route is 19 kilometres (12 mi) long. Stage 2 – Completion of a light rail transit system from Fairview Park in Kitchener to Ainslie Street in Cambridge. Commencement of Stage 2 to follow completion of Stage 1 as closely as possible. Out of

2120-574: A station and exchange passengers. There is often a potential conflict between this objective and optimising the utilisation of vehicles and drivers. The main sources of financing are ticket revenue, government subsidies and advertising. The percentage of revenue from passenger charges is known as the farebox recovery ratio . A limited amount of income may come from land development and rental income from stores and vendors, parking fees, and leasing tunnels and rights-of-way to carry fiber optic communication lines. Most—but not all—public transport requires

2226-431: A tram line. Light rail lines are, thus, essentially modernized interurbans . Unlike trams, light rail trains are often longer and have one to four cars per train. Somewhere between light and heavy rail in terms of carbon footprint , monorail systems usually use overhead single tracks, either mounted directly on the track supports or put in an overhead design with the train suspended. Monorail systems are used throughout

SECTION 20

#1732797428182

2332-552: A week, and are predicted to eliminate 1.5 million car trips annually. The duration of this trip is approximately 25 minutes. The line uses a Metrolinx-owned railway rail corridor now used by GO Transit , as part of the Georgetown South Project to allow for additional train traffic. The UP Express shares the same path as trains on the Kitchener line , before splitting off onto a separate subdivision just west of

2438-423: Is 88 km/h (55 mph) but the average travel speed is unlikely to exceed 50 km/h (31 mph). The vehicles are numbered with a three-digit unit number in the 5xx series beginning with 501. This fleet number is displayed prominently on the end modules of each vehicle followed by a single letter to denote which end module the fleet number is on (e.g. 503A, 507B). The vehicles are being used for testing at

2544-659: Is a system of transport for passengers by group travel systems available for use by the general public unlike private transport , typically managed on a schedule, operated on established routes, and that may charge a posted fee for each trip. There is no rigid definition of which kinds of transport are included, and air travel is often not thought of when discussing public transport—dictionaries use wording like "buses, trains, etc." Examples of public transport include city buses , trolleybuses , trams (or light rail ) and passenger trains , rapid transit (metro/subway/underground, etc.) and ferries . Public transport between cities

2650-507: Is a term used for buses operating on dedicated right-of-way, much like a light rail. Coach services use coaches (long-distance buses) for suburb-to-CBD or longer-distance transportation. The vehicles are normally equipped with more comfortable seating, a separate luggage compartment, video and possibly also a toilet. They have higher standards than city buses, but a limited stopping pattern. Trolleybuses are electrically powered buses that receive power from overhead power line by way of

2756-496: Is a transit technology that moves people in motor-less, engine-less vehicles that are propelled by a steel cable. There are two sub-groups of CPT— gondola lifts and cable cars (railway) . Gondola lifts are supported and propelled from above by cables, whereas cable cars are supported and propelled from below by cables. While historically associated with usage in ski resorts , gondola lifts are now finding increased consumption and utilization in many urban areas—built specifically for

2862-707: Is also responsible for operating the GO Transit system, the Presto card used across the GTHA and by OC Transpo in Ottawa and the Union Pearson Express airport rail link to Toronto Pearson International Airport . Metrolinx is also responsible for the construction of transit expansion projects worth nearly $ 30 billion in Toronto  – including Line 5 Eglinton , the Ontario Line ,

2968-421: Is an all-encompassing term for various types of local rail systems, such as these examples trams , light rail , rapid transit , people movers , commuter rail , monorail , suspension railways and funiculars . Commuter rail is part of an urban area's public transport. It provides faster services to outer suburbs and neighboring satellite cities . Trains stop at train stations that are located to serve

3074-484: Is common with roads for automobiles. Interchanges are locations where passengers can switch from one public transport route to another. This may be between vehicles of the same mode (like a bus interchange), or e.g. between bus and train. It can be between local and intercity transport (such as at a central station or airport). Timetables (or 'schedules' in North American English ) are provided by

3180-400: Is completely road-separated. At street intersections, Ion light rail vehicles do not use the traditional automotive green-yellow-red traffic signals for road traffic, but rather the traditional two-aspect transit signals that show a vertical white bar for "go" and a horizontal white bar for "stop". Ion light rail vehicles have transit signal priority at intersections. Where a street crosses

3286-654: Is delivered through local transportation management associations. Originally conducted under the Ontario Ministry of Transportation in 2006, the Transit Procurement Initiative involves Metrolinx assisting municipal transit operators with the procurement of vehicles, equipment, technologies, facilities and related supplies. The goal of the program is to reduce per unit cost, increase unit quality, and provide an open and transparent procurement process for municipal transit operators. To date,

Ion rapid transit - Misplaced Pages Continue

3392-610: Is dominated by airlines , coaches , and intercity rail . High-speed rail networks are being developed in many parts of the world. Most public transport systems run along fixed routes with set embarkation/disembarkation points to a prearranged timetable, with the most frequent services running to a headway (e.g.: "every 15 minutes" as opposed to being scheduled for any specific time of the day). However, most public transport trips include other modes of travel, such as passengers walking or catching bus services to access train stations. Share taxis offer on-demand services in many parts of

3498-430: Is especially valuable in cases where there are capacity problems for private transport. Investments in infrastructure are expensive and make up a substantial part of the total costs in systems that are new or expanding. Once built, the infrastructure will require operating and maintenance costs, adding to the total cost of public transport. Sometimes governments subsidize infrastructure by providing it free of charge, just as

3604-727: Is in the Vaughan riding of the then-transportation minister, Steven Del Duca , and Lawrence East in Scarborough is part of Toronto mayor John Tory's " SmartTrack " plan, his signature campaign promise. Both stations were not recommended to be constructed in the near term by an external consultant, AECOM , hired by Metrolinx. However, they were both shortlisted to begin construction. Ontario's auditor general found that Metrolinx incurred about $ 436 million "in sunk and additional" – unrecoverable – costs between 2009 and 2018 due to numerous changes in transit plans. In Ottawa, where Metrolinx

3710-523: Is only involved in fare collection, Jim Watson , the former mayor of Ottawa , has criticized Metrolinx for wanting to increase the fee it collects from 2% to 10%, and characterized it as a monopoly. Metrolinx used to be governed by a board consisting of various appointees from the Ontario government and the regions within the GTHA. After the passage of the Greater Toronto and Hamilton Area Transit Implementation Act, 2009 merging Metrolinx and GO Transit,

3816-656: Is reasonably comfortable (seats, toilets, services), and can thus be scheduled and used pleasurably, productively or for (overnight) rest. Chauffeured movement is enjoyed by many people when it is relaxing, safe, but not too monotonous. Waiting, interchanging, stops and holdups, for example due to traffic or for security, are discomforting. Jet lag is a human constraint discouraging frequent rapid long-distance east–west commuting, favoring modern telecommunications and VR technologies. An airline provides scheduled service with aircraft between airports. Air travel has high speeds, but incurs large waiting times before and after travel, and

3922-406: Is scheduled take about 46 minutes for an average speed of about 25 km/h (16 mph). As a comparison, the average speed of Toronto's light rail Line 5 Eglinton will be 28 kilometres per hour (17 mph) and the average speed of subway Line 2 Bloor–Danforth is 32 kilometres per hour (20 mph). Note that while Ion operates completely on the surface, Line 5 is half underground, and Line 2

4028-436: Is still running. Northbound Ion LRVs wait at Waterloo Public Square and southbound Ion LRVs wait at Northfield for the freight train to pass. The southbound return trip takes the reverse path and must return before Ion service starts at 5 am or they will have to wait until the next evening. This trip usually occurs Monday and Thursday nights but as with most freight schedules it can sometimes vary. Since freight cars are wider than

4134-444: Is the conveyance of passengers by means of wheeled vehicles specially designed to run on railways. Trains allow high capacity at most distance scales, but require track , signalling , infrastructure and stations to be built and maintained resulting in high upfront costs. Intercity rail is long-haul passenger services that connect multiple urban areas. They have few stops, and aim at high average speeds, typically only making one of

4240-508: Is the minimum number required to do an adequate test of the system. A CBC report on December 21, 2017, indicated that the fourth vehicle was expected to be delivered before year-end. Six others were in final production and four were still in the assembly process. After the fourth vehicle was received in January, the first one was returned to Kingston for some additional work. At that time, five others were being tested by Bombardier. According to

4346-721: Is therefore often only feasible over longer distances or in areas where a lack of surface infrastructure makes other modes of transport impossible. Bush airlines work more similarly to bus stops; an aircraft waits for passengers and takes off when the aircraft is full. Bus services use buses on conventional roads to carry numerous passengers on shorter journeys. Buses operate with low capacity (compared with trams or trains), and can operate on conventional roads, with relatively inexpensive bus stops to serve passengers. Therefore, buses are commonly used in smaller cities, towns, and rural areas, and for shuttle services supplementing other means of transit in large cities. Bus rapid transit (BRT)

Ion rapid transit - Misplaced Pages Continue

4452-610: Is underway for some projects supporting the Regional Transportation Plan . The three levels of government have provided $ 16 billion toward the first wave of projects, which are already underway. The next wave of projects were still in the planning phase at the time of the Big Move's release, and still subject to funding. Some of these projects have since attained approved funding, while others have not. The Metrolinx Investment Strategy, released in May 2013, proposes

4558-476: The Greater Golden Horseshoe . GO carries over 65 million passengers a year using an extensive network of train and bus services; rail service is provided by diesel locomotives pulling trains of unpowered double-deck passenger cars , while most bus service is provided by inter-city coaches . Canada's first such public system, GO Transit began regular passenger service on May 23, 1967, under

4664-660: The Line 1 subway extension into Richmond Hill in York Region , and the Line 2 extension  – following a 2020 agreement with the City of Toronto . The Greater Toronto Transportation Authority was created by legislation and introduced in the Legislative Assembly of Ontario on April 24, 2006. The bill was passed and received royal assent on June 22, 2006. In April 2007, a transition team seconded from

4770-482: The stagecoaches traveling a fixed route between coaching inns , and the horse-drawn boat carrying paying passengers, which was a feature of European canals from the 17th century onwards. The canal itself as a form of infrastructure dates back to antiquity. In ancient Egypt canals were used for freight transportation to bypass the Aswan cataract. The Chinese also built canals for water transportation as far back as

4876-851: The warring States period which began in the 5th century BCE. Whether or not those canals were used for for-hire public transport remains unknown; the Grand Canal in China (begun in 486 BCE) served primarily the grain trade . The bus , the first organized public transit system within a city, appears to have originated in Paris in 1662, although the service in question, Carrosses à cinq sols (English: five-sol coaches), which have been developed by mathematician and philosopher Blaise Pascal , lasted only fifteen years until 1677. Buses are known to have operated in Nantes in 1826. The public bus transport system

4982-767: The Ainslie Terminal. (At least one journalist has pointed out the similarity between this plan and the electric Grand River Railway of the early 1900s.) More detailed rendering of the route became available in October 2019, indicating elevated sections would be used to cross Fairway Road, the Grand River, Fountain Street and the Speed River, and the CP Rail line by Eagle Street. The Region approved

5088-600: The Etobicoke North Station. It stops at the existing Bloor and Weston GO Stations. The Presto card, originally known as the GTA Farecard, is a smartcard -based fare payment system for public transit systems in Ontario, including those in the Greater Toronto and Hamilton Area and Ottawa . The Presto system is designed to support the use of one common farecard for fare payment on various public transit systems, through electronic readers that calculate

5194-482: The GTHA and Ottawa. By January 2017, Presto had been fully implemented on the following 11 transit systems: Smart Commute is a program that, with the support of local municipalities, endeavours to fight climate change by reducing traffic congestion and increasing transit efficiency. Employers and employees in the GTHA can explore and have assistance with different commuting options, such as carpooling , transit, cycling, walking, remote work , and flextime . The program

5300-516: The Ion Operations, Maintenance and Storage Facility (OMSF) located on Dutton Drive in Waterloo. The design of each of the stops was focused on an 'anchor wall', a 4 metres (13 ft) square panel subdivided into smaller tiles of glass, ceramic or stone; each station has a unique wall design based on the surrounding architecture, landmarks and social character. Ion light rail vehicles are in service between 5   am and midnight daily with

5406-534: The Ion tracks located either along a railway right of way or along the side of a cross road, the crossing is protected by traditional railway crossing signals: drop gates, flashing red lights and a bell. Crossings so protected are (from north to south) at Northfield Drive, Bearinger Road, Columbia Street, University Avenue, Seagram Drive and Erb Street in Waterloo, and at Ottawa Street, Mill Street, Hayward Avenue, Block Line Road, Courtland Avenue and Wilson Avenue in Kitchener. Canadian National Railway freight trains use

SECTION 50

#1732797428182

5512-533: The LRVs, there are gauntlet tracks at the southbound track of Ion stations along the Waterloo Spur to keep freight trains from striking the station platforms. To further protect station platforms and the Ion catenary system, there is a safety system to detect oversized freight cars and automatically stop the train using derailers . The detectors are located at Willow Street and just north of Northfield Drive. The route approved by Regional Council travels in

5618-521: The Lakeshore rail lines run every 30 minutes, making the biggest expansion in GO Transit history. The Union Pearson Express (UP Express) airport rail link service began operation on June 6, 2015, linking Union Station in downtown Toronto with Pearson International Airport in the city of Mississauga , roughly 23.3 km (14.5 mi) away. The trains run every fifteen minutes, seven days

5724-620: The Metrolinx board structure was changed, with politicians specifically prohibited from serving. The Metrolinx president and CEO is Phil Verster (April 2020), who also serves as a member of the board of directors. Metrolinx's board of directors is composed of not more than 15 persons (including the CEO) appointed by the Ontario's lieutenant governor on the recommendation of the Ontario Minister of Transportation. As of January 2018,

5830-515: The Netherlands many individuals use e-bikes to replace their car commutes. In major American cities, start-up companies such as Uber and Lyft have implemented e-scooters as a way for people to take short trips around the city. All public transport runs on infrastructure, either on roads, rail, airways or seaways. The infrastructure can be shared with other modes, freight and private transport, or it can be dedicated to public transport. The latter

5936-580: The Ontario Public Service began work at the GTTA's headquarters at 20 Bay Street in Toronto. On December 4, 2007, the GTTA adopted the name 'Metrolinx' for public use. At the same time, it launched a new web site, and released the first of its series of green papers on transportation issues, part of the process of creating the Regional Transportation Plan. From June 2008, Metrolinx began using

6042-482: The Region for dealing with this challenge would be to have light rail vehicles (LRVs) share space with traffic within core areas, somewhat resembling the streetcar network of nearby Toronto. A bus rapid transit line would also face the challenge of the cramped core areas, and thus would also likely share space with traffic in core areas. In late 2011, planning was well underway and preparations were being made. In October,

6148-535: The Region of Waterloo, the Ion network is named after the atom , which it describes as being “always in motion”. In 2004, the Regional Municipality began an Individual Environmental Assessment to study the feasibility of constructing a rapid transit line to provide higher-order public transit service to the Region and to encourage more compact urban growth along the corridor. The EA took a broader approach to studying possible routes and stations for

6254-543: The UK National Infrastructure Commission in 2018 states that "cycling is mass transit and must be treated as such." Cycling infrastructure is normally provided without charge to users because it is cheaper to operate than mechanised transit systems that use sophisticated equipment and do not use human power . Many cities around the world have introduced electric bikes and scooters to their public transport infrastructure. For example, in

6360-571: The auspices of the Ontario Ministry of Transportation . Over time it has been constituted in a variety of public-sector configurations, but it became an operating division of Metrolinx in 2009. New and improved GO service is a top transit priority listed in the regional transportation plan. Since 2009, GO Transit has introduced seasonal train service to Barrie and Niagara Falls, extended service to Kitchener and Lake Simcoe, opened four new stations at Acton, Guelph Central, Allandale Waterfront, and Hamilton West Harbour. Since June 2013, GO Trains along

6466-422: The beginning of October 2017, the second LRV had arrived. The schedule then called for delivery of another each 15 days, for a total of 14 by year end. The year end target was missed. On November 7, 2017, unpowered vehicle testing began on the tracks between Northfield Drive and Erb Street. An LRV was towed to check track clearances including along station platforms and to ensure continuous pantograph contact with

SECTION 60

#1732797428182

6572-713: The commuter rail hybrid S-Bahn . More than 160 cities have rapid transit systems, totalling more than 8,000 km (4,971 mi) of track and 7,000 stations. Twenty-five cities have systems under construction. People movers are a special term for grade-separated rail which uses vehicles that are smaller and shorter in size. These systems are generally used only in a small area such as a theme park or an airport. Trams (also known as streetcars or trolleys) are railborne vehicles that originally ran in city streets, though over decades more and more dedicated tracks are used. They have higher capacity than buses, but must follow dedicated infrastructure with rails and wires either above or below

6678-457: The correct fare and deduct it from a preloaded balance. Presto will also centralize its operational logistics, such as farecard procurement, reporting services, and a customer call centre. The system was trialled from June 25, 2007, to September 30, 2008. Full implementation began in November 2009. It will be rolled out across the province in stages. Presto now serves over a million customers in

6784-447: The day or part of the day (known as clock-face scheduling ). Often, more frequent services or even extra routes are operated during the morning and evening rush hours . Coordination between services at interchange points is important to reduce the total travel time for passengers. This can be done by coordinating shuttle services with main routes, or by creating a fixed time (for instance twice per hour) when all bus and rail routes meet at

6890-590: The expedited process. For that reason, Phase 3 of the Individual EA would not be completed. On June 24, 2009, Regional Council approved the initiative and continued discussions with Provincial and Federal governments to obtain funding for the $ 790-million project. Light Rail Transit (LRT) was short-listed as the technology for the new rapid transit system. The Region decided on a staged approach, building light rail from Conestoga Mall to Fairview Park Mall , passing through Uptown Waterloo and Downtown Kitchener on

6996-418: The following month, on June 21, 2019; service across all of Grand River Transit, both LRT and bus, was to be free of charge for 11 days, until Canada Day. In August 2020, it was confirmed that part of a compensation package from Bombardier to settle shipping delays would be a fifteenth unit, provided free of charge, for the Ion fleet. It was delivered early March 2021. The Ion fleet is stored and maintained at

7102-452: The light rail proposal focused on its relative service infrequency when compared with rapid transit systems in other cities (though it would still outperform the Region's best bus services in its overall service capacity, and the frequency of many routes); the projected service frequency will be approximately 7.5 minutes. In addition, a light rail line would be limited by the narrow main streets of key downtown areas. A feasible proposal raised by

7208-456: The location of their choice (rather than at a stop). Conventional transit simulations show that PRT might attract many auto users in problematic medium-density urban areas. A number of experimental systems are in progress. One might compare personal rapid transit to the more labor-intensive taxi or paratransit modes of transportation, or to the (by now automated) elevators common in many publicly accessible areas. Cable-propelled transit (CPT)

7314-400: The lost time and statistically higher risk of accident in private transport , together with the initial, running and parking costs. Loss of control , spatial constriction, overcrowding , high speeds/accelerations, height and other phobias may discourage use of public transport. Actual travel time on public transport becomes a lesser consideration when predictable and when travel itself

7420-412: The maintenance facility and all 19 km (12 mi) of the completed track. Production of the new vehicles was expected to begin in 2015 with the first to be delivered no later than August 2016 and all vehicles were to be received by the end of 2016. On April 13, 2016, it was reported that Bombardier had informed the transit authority that delivery of the vehicles would be delayed. The region entered

7526-549: The more suburban stretches of the line, from Laird Drive to Kennedy Station, should be built at street level instead of a more costly underground alignment. Metrolinx was criticized after a Toronto Star investigation found that the agency has approved two transit stations, Kirby and Lawrence East, for the GO Regional Express Rail expansion due to political pressure from the Ministry of Transportation. Kirby

7632-414: The new taxes would be put in a dedicated transportation trust fund, one that would be administered by a board separate from Metrolinx. The Investment Strategy was given to the government for consideration in 2013. As of May 2024 , Metrolinx is managing the following public transit projects: GO Transit is the inter-regional public transit system serving the Greater Toronto and Hamilton Area and

7738-569: The north end of Waterloo and the south end of Kitchener . A future extension of light rail to the downtown Galt area of Cambridge (Phase 2) is planned but construction may not begin on that line until 2028. In 2023, Ion LRT had an annual ridership of 4.3 million, and a daily ridership of 11,780. In 2009, an Environmental Assessment (EA) began to create a proposal of electrically powered light rail transit through Kitchener and Waterloo, and adapted bus rapid transit from Kitchener to Cambridge. On June 24, 2009, Regional Council voted to approve

7844-639: The original route design came to light, a new preliminary preferred route plan was published. This would no longer use the CPR line south of Fairway; instead, it would travel to the east of it, along the River Rd extension and across Hwy 8; along King St into the Sportsworld area and under Hwy 401; along Shantz Hill Rd into Preston, and crossing the Speed River on a dedicated bridge. The subsequent plan, rejected by Cambridge City Council in July 2017, indicated that

7950-448: The overhead electrical wiring. On December 19, 2017, GrandLinq had its first successful test of a Flexity Freedom running under its own power at the Ion maintenance facility. The two-hour test was done at the speed of 10 km/h (6.2 mph) and "apparently went quite well", according to Coun. Tom Galloway. In 2018, testing beyond the maintenance facility was scheduled to start. By this date, Waterloo Region had three LRVs on site, which

8056-434: The program has supported 21 municipalities and transit agencies, has purchased over 400 buses, and has saved an estimated $ 5 million. Metrolinx also seeks partnerships with individuals and the community, and offers financial support for proposed projects that support transit. Smart Commute includes various programs for commuters, including carpool ride-matching, walking and cycling, and teleworking programs. In July 2015,

8162-506: The project, subject to funding from higher levels of government, which was in turn approved by council on June 15, 2011. This was followed by a community building strategy to guide development, identify key destinations, and strengthen regional connections. The strategy, led by Urban Strategies Inc. of Toronto, consulted hundreds of individuals and stakeholders from Cambridge, Kitchener, and Waterloo. Construction began in August 2014 and service

8268-413: The province of Ontario, and $ 265 million (or up to 1/3 of the full cost) from the federal government. The provincial figure was disappointing to supporters, as the provincial government had previously promised to pay 2/3 of the cost. Regional council debated funding the remaining $ 200–300 million required for the project to go ahead as planned. During public consultation for the project, concerns related to

8374-492: The public transport leg of their journey and how close it leaves them to their desired destination. Timeliness is how long they must wait for the vehicle. Directness records how far a journey using public transport deviates from a passenger's ideal route. In selecting between competing modes of transport , many individuals are strongly motivated by direct cost (travel fare/ ticket price to them) and convenience , as well as being informed by habit . The same individual may accept

8480-481: The purchase of a ticket to generate revenue for the operators. Tickets may be bought either in advance, or at the time of the journey, or the carrier may allow both methods. Passengers may be issued with a paper ticket, a metal or plastic token , or a magnetic or electronic card ( smart card , contactless smart card ). Sometimes a ticket has to be validated, e.g. a paper ticket has to be stamped, or an electronic ticket has to be checked in. Tickets may be valid for

8586-619: The purposes of mass transit. Many, if not all, of these systems are implemented and fully integrated within existing public transportation networks. Examples include Metrocable (Medellín) , Metrocable (Caracas) , Mi Teleférico in La Paz , Portland Aerial Tram , Roosevelt Island Tramway in New York City, and the London Cable Car . A ferry is a boat used to carry (or ferry ) passengers, and sometimes their vehicles, across

8692-544: The rapid transit line, examining several options such as utilizing existing tracks/roads and constructing new facilities. In keeping with legislation, the Environmental Assessment also examined ten possible transport technologies, including monorails and subways. The EA as planned consisted of three phases: Phase 1: Determine a preferred transportation strategy from options such as road expansion, improved conventional transit, and rapid transit. Phase 1

8798-615: The reduced emissions and other environmental impacts of using public transportation over private transportation, many experts have pointed to an increased investment in public transit as an important climate change mitigation tactic. Conveyances designed for public hire are as old as the first ferry service . The earliest public transport was water transport . Ferries appear in Greek mythology writings. The mystical ferryman Charon had to be paid and would only then take passengers to Hades . Some historical forms of public transport include

8904-447: The region would be purchasing 14 LRVs, with an option to buy 16 more. The 14 vehicles are estimated to cost $ 92.4 million, an average of $ 6.6 million per vehicle. The cost breakdown is: Each 30-metre (98 ft)-long, 30-tonne vehicle has 56 seats and a standing capacity of 144 passengers. The body is constructed of five sections, in an accordion-like configuration to allow for sharp turns. It can be driven from either end. The top speed

9010-512: The schedule, the fourteenth and last LRV was expected to be delivered in February 2018 with full LRT service expected to start in spring 2018; however, this later became a June final delivery, with service start in December, then later to June 21, 2019. The final LRVs were delivered on December 6, 2018. At a Regional council meeting on May 8, 2019, it was announced that the service would launch

9116-414: The service's staging, feeling that running only buses to that city does them a disservice. The Province of Ontario had promised to fund up to two thirds of the cost of the construction of a light rail or bus rapid transit system in Waterloo Region. However, in the summer of 2010, actual funding commitments from higher levels of government for the combined LRT and aBRT system were announced: $ 300 million from

9222-606: The seven groups that showed an interest in the project, by December 18, 2013, three consortiums had submitted bids to design, build, finance, operate and maintain the Ion system: The winning bid was selected at a committee meeting on March 4, 2014. GrandLinq is the preferred bidder. The final approval of the GrandLinq bid came at a full council meeting on March 19, and financial close was made May 9. Public transport Public transport (also known as public transportation , public transit , mass transit , or simply transit )

9328-402: The shared portion of the Waterloo Spur between 11   pm and 5   am. After crossing King Street, the northbound freight train joins the northbound Ion track at Caroline Street, cross over to the southbound Ion track just north of Erb Street and then continue north on the southbound track until just south of Northfield Drive. This train typically heads north just after 11pm while Ion service

9434-471: The smoke filled subway tunnels from the steam engines. In 1894, Boston built the first subway in the United States, an electric streetcar line in a 1.5-mile tunnel under Tremont Street's retail district. Other cities quickly followed, constructing thousands of miles of subway in the following decades. In March 2020, Luxembourg abolished fares for trains, trams and buses and became the first country in

9540-450: The technology for rapid transit in Waterloo Region. Regional Council also approved a recommendation to implement the system in stages because ridership, development potential and capital and operating costs vary along the route. The light rail system was approved by Regional Council with a vote of 15–1. Cambridge mayor Doug Craig cast the dissenting vote. Other Cambridge-area representatives joined Craig in voting against subsequent motions on

9646-440: The third is a 15,000 square feet (1,400 m) wayside maintenance building that will house the repair truck fleet. On July 10, 2013, it was reported that a deal was finalized with Metrolinx to join its contract with Bombardier Transportation for the purchase of 14 Flexity Freedom LRVs to form the system's initial fleet, with an option to purchase up to 14 more as the need arises. A further report on July 12, 2013, stated that

9752-401: The ticket at the time of ride. Alternatively, a proof-of-payment system allows riders to enter the vehicles without showing the ticket, but riders may or may not be controlled by a ticket controller ; if the rider fails to show proof of payment, the operator may fine the rider at the magnitude of the fare. Metrolinx Metrolinx is a transportation agency in Ontario , Canada . It is

9858-527: The track would take Eagle St toward Hespeler, but to avoid conflicts with rail corridors and reduce traffic impacts at Eagle/Pinebush, would travel along the freight spur to Hespeler Rd. As previously, Hespeler Rd would be followed toward the Delta intersection, but to avoid traffic impacts it would veer east along the rail corridor behind Norfolk Ave, then transition to an abandoned railway corridor behind Grantham and Beverly Sts, before coming into downtown Galt near

9964-504: The track, limiting their flexibility. In the United States, trams were commonly used prior to the 1930s, before being superseded by the bus. In modern public transport systems, they have been reintroduced in the form of the light rail. Light rail is a term coined in 1972 and uses mainly tram technology. Light rail has mostly dedicated right-of-ways and less sections shared with other traffic and usually step-free access. Light rails line are generally traversed with increased speed compared to

10070-517: The transport operator to allow users to plan their journeys. They are often supplemented by maps and fare schemes to help travelers coordinate their travel. Online public transport route planners help make planning easier. Mobile apps are available for multiple transit systems that provide timetables and other service information and, in some cases, allow ticket purchase, some allowing to plan your journey, with time fares zones e.g. Services are often arranged to operate at regular intervals throughout

10176-408: The use and extent of public transport. The International Association of Public Transport (UITP) is the international network for public transport authorities and operators, policy decision-makers, scientific institutes and the public transport supply and service industry. It has over 1,900 members from more than 100 countries from all over the globe. In recent years, some high-wealth cities have seen

10282-424: The way. Adapted Bus Rapid Transit (aBRT) would be built from Fairview Park Mall to Ainslie Street terminal in Cambridge utilizing shoulder bypass lanes along Highways 8 and 401 during heavy traffic where speeds are often 40 km/h (25 mph) or less. As of June 2019, there is still no specific timeline for replacing the aBRT service to Cambridge with light rail. On June 24, 2009, Regional Council approved LRT as

10388-536: The world (especially in Europe and east Asia , particularly Japan ), but apart from public transit installations in Las Vegas and Seattle, most North American monorails are either short shuttle services or privately owned services (With 150,000 daily riders, the Disney monorail systems used at their parks may be the most famous in the world). Personal rapid transit is an automated cab service that runs on rails or

10494-544: The world to make all public transport free. The Encyclopædia Britannica specifies that public transportation is within urban areas, but does not limit its discussion of the topic to urban areas. Seven criteria estimate the usability of different types of public transport and its overall appeal. The criteria are speed, comfort, safety, cost, proximity, timeliness and directness. Speed is calculated from total journey time including transfers. Proximity means how far passengers must walk or otherwise travel before they can begin

10600-745: The world, which may compete with fixed public transport lines, or complement them, by bringing passengers to interchanges. Paratransit is sometimes used in areas of low demand and for people who need a door-to-door service. Urban public transit differs distinctly among Asia, North America, and Europe. In Asia, profit-driven, privately owned and publicly traded mass transit and real estate conglomerates predominantly operate public transit systems. In North America, municipal transit authorities most commonly run mass transit operations. In Europe, both state-owned and private companies predominantly operate mass transit systems. For geographical, historical and economic reasons, differences exist internationally regarding

10706-787: Was built for 11 miles of track for the Union Passenger Railway in Tallahassee, Florida, in 1888. Electric streetcars could carry heavier passenger loads than predecessors, which reduced fares and stimulated greater transit use. Two years after the Richmond success, over thirty two thousand electric streetcars were operating in America. Electric streetcars also paved the way for the first subway system in America. Before electric streetcars, steam powered subways were considered. However, most people believed that riders would avoid

10812-608: Was completed in July 2006. Phase 2: Phase 3: Design an implementation plan for the rapid transit system. In June 2008, the Province of Ontario announced a new expedited Transit Project Assessment Process (Ontario Regulation 231/08). In August 2008, the Region notified the Ministry of the Environment (MOE) to advise that it would transition from the Individual Environmental Assessment to

10918-542: Was elected mayor of Toronto in December 2010, he declared Transit City , the provincially funded transit expansion plan of light rail lines, dead. These lines were a large component of Metrolinx's 2008 Big Move . Metrolinx was again criticized when, in January 2012, its CEO declared that it would bend to what Toronto City Council wanted regarding how the Eglinton-Scarborough Crosstown LRT line should be built. The issue centred on whether

11024-410: Was expected to begin in late 2017; however, because of delays in the manufacture and delivery of rolling stock , the introduction of the light rail service was significantly delayed. The total cost of the system was estimated at $ 818 million, but in December 2017, the overruns were estimated to total approximately $ 50 million. The Province was expected to provide $ 25 million of that amount. According to

11130-666: Was introduced to London in July 1829. The first passenger horse-drawn vehicle opened in 1806. It ran along the Swansea and Mumbles Railway . In 1825 George Stephenson built the Locomotion No 1 for the Stockton and Darlington Railway in northeast England, the first public steam railway in the world. The world's first steam-powered underground railway opened in London in 1863. The first successful electric streetcar

11236-555: Was not ready for testing as its operating software was incomplete. By mid-March 2017, the second to fifth vehicles were seen by a CTV reporter as under construction in the Kingston plant. Testing of vehicle 501 was scheduled to commence in May 2017 on the line between Northfield Drive and Silver Lake. In early April 2017, the Region expected to receive a second LRV in June or July, but that was postponed to late August or early September. By

#181818