Misplaced Pages

Southern Hempstead Branch

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#786213

110-629: The Southern Hempstead Branch was a branch of the Long Island Rail Road from Valley Stream to Hempstead . It was established in 1870 and abandoned in May 1879, and is not the same route as the current West Hempstead Branch . Hempstead residents were annoyed with the bad service provided by the LIRR on their Hempstead Branch , and planned the New York and Hempstead Plains Railroad , which

220-614: A contactless fare payment system. Fare payment would be made using Apple Pay , Google Pay , debit/credit cards with near-field communication enabled, or radio-frequency identification cards. As part of the implementation of OMNY, the MTA also plans to use the system in the Long Island Rail Road and Metro-North Railroad. In December 2022, the MTA announced the launch of an additional fare for use on journeys that utilize both of its railroad systems via Grand Central. The fare

330-437: A proof of concept report in 2015. At the time of the report, express bus riders from Southeast Queens had some of the longest commutes in the city, with their commutes being 96 minutes long, yet they paid a premium fare of $ 6.50. Riders who take the dollar van to the subway paid $ 4.75 to get to Manhattan in 65 minutes; riders who only took the bus and subway paid $ 2.75 to get to Manhattan in 86 minutes; and riders who took

440-425: A LIRR spur to Grand Central Terminal that will run in part via the lower level of the existing 63rd Street Tunnel . The East Side Access project added a new eight-track terminal called Grand Central Madison underneath the existing Grand Central Terminal. The project was first proposed in the 1968 Program for Action , but due to various funding shortfalls, construction did not start until 2007. As of April 2018 ,

550-569: A complete overhaul as part of the Enhanced Station Initiative and would be entirely closed for up to 6 months. Updates would include cellular service, Wi-Fi, USB charging stations, interactive service advisories, and maps. The Harlem and Hudson lines and the Park Avenue mainline to Grand Central were previously owned by Midtown TDR Ventures LLC, who bought them from the corporate successors to Penn Central. The MTA had

660-622: A diesel train powered by Brookville BL20-GH locomotives. Electric service on the Hudson and Harlem lines uses M3 and M7 MU cars. The New Haven Line is unique in that trains use both third rail and 12.5 kV AC from overhead catenary . The line from Grand Central Terminal to Mount Vernon East uses third rail, while the section from Pelham east to New Haven State Street, which is 58 miles (93 km), uses overhead catenary. These electrification systems overlap between Mount Vernon East and Pelham stations and trains change power systems from one to

770-530: A family ticket for children who are accompanied by an 18-year-old for $ 0.75 if bought from the station agent or TVM, $ 1.00 on the train. Senior citizen/disabled passengers traveling during the morning peak hours are required to pay the AM peak senior citizen/disabled rate. This rate is not charged during PM peak hours. Commuters can also buy a peak or off-peak ten trip ride, a weekly unlimited or an unlimited monthly pass. Monthly passes are good on any train regardless of

880-666: A joint agreement between MTA and CTDOT, with the agencies paying for 33.3% and 66.7% of costs respectively. CTDOT pays more because most of the line is in Connecticut. The New Haven Line has three branches in Connecticut: the New Canaan Branch , Danbury Branch and Waterbury Branch . At New Haven, CTDOT runs two connecting services, the Shore Line East connecting service continues east to New London , and

990-726: A lease extending to the year 2274 and an option to buy starting in 2017. The MTA exercised their option to buy what was now Argent Ventures' rail assets on November 13, 2018. Under the terms of the deal, the MTA purchased Grand Central Terminal, as well as the Hudson Line from Grand Central to a point 2 miles (3.2 km) north of Poughkeepsie, and the Harlem Line from Grand Central to Dover Plains. Most services running into Grand Central Terminal are electrically powered. Diesel trains into Grand Central use General Electric P32AC-DM electro-diesel locomotives capable of switching to

1100-600: A public commuter rail service, with its freight operations contracted to the New York and Atlantic Railway . With an average weekday ridership of 354,800 passengers in 2016, it is the busiest commuter railroad in North America. It is also one of the world's few commuter systems that runs 24/7 year-round. It is publicly owned by the Metropolitan Transportation Authority , which refers to it as MTA Long Island Rail Road . In 2023,

1210-639: A pure electric mode. These locomotives have contact shoes compatible with Metro-North's under-running 750 V DC third rail power distribution system. Shoreliner series coaches are used in push-pull operation. On the Hudson Line, local trains between Grand Central and Croton–Harmon are powered by third rail. Through trains to Poughkeepsie are diesel powered and do not require a change of locomotive at Croton-Harmon. The Harlem Line has third rail from Grand Central Terminal to Southeast and trains are powered by diesel north to Wassaic . At most times, passengers between Southeast and Wassaic must change at Southeast to

SECTION 10

#1732783602787

1320-720: Is a suburban commuter rail service operated by the Metropolitan Transportation Authority (MTA), a public authority of the U.S. state of New York . Metro-North serves the New York Metropolitan Area , running service between New York City and its northern suburbs in New York and Connecticut , including Port Jervis , Spring Valley , Poughkeepsie , Yonkers , New Rochelle , Mount Vernon , White Plains , Southeast and Wassaic in New York and Stamford , New Canaan , Danbury , Bridgeport , Waterbury , and New Haven in Connecticut. Service in Connecticut

1430-726: Is also not valid for travel to the Elmont station or the special event only Belmont Park station, which are just barely east of the Queens-Nassau border and thus are within Zone 4. In late 2017, the MTA was slated to launch a pilot that will allow LIRR, bus and subway service to use one ticket. The proposal for the ticket, called the "Freedom Ticket," was initially put forth by the New York City Transit Riders Council (NYCTRC) in 2007. The NYCTRC wrote

1540-645: Is diesel only. Power is collected from the bottom of the third rail as opposed to the top, used by other third rail systems, including the Long Island Rail Road and New York City Subway. This system is known as the Wilgus-Sprague third rail, and the SEPTA Market–Frankford Line in Philadelphia and Metro-North are the only two systems in North America that use it. It allows the third rail to be completely insulated from above, thus decreasing

1650-875: Is operated under contract with the Connecticut Department of Transportation . Metro-North works under contract with New Jersey Transit for the west-of-hudson lines located in New Jersey and New York in Metro-North also provides local rail service within the New York City boroughs of Manhattan and the Bronx . Metro-North is the descendant of commuter rail services dating back as early as 1832. By 1969, they had all been acquired by Penn Central . MTA acquired all three lines by 1972, but Penn Central continued to operate them under contract. Service

1760-435: Is priced as $ 8 more than an adult off-peak ticket from an origin station on one system to Grand Central. It is valid on both peak and off-peak trains. The LIRR is relatively isolated from the rest of the national rail system despite operating out of Penn Station, the nation's busiest rail terminal. It connects with other railroads in just two locations: All LIRR trains have an engineer (driver in non-US English) who operates

1870-735: Is the case with the Montauk Branch, which is known as the Babylon Branch service in the electrified portion of the line between Jamaica and Babylon, while the diesel service beyond Babylon to Montauk is referred to as Montauk Branch service. All branches except the Port Washington Branch pass through Jamaica ; the trackage west of Jamaica (except the Port Washington Branch ) is known as the City Terminal Zone . The City Terminal Zone includes portions of

1980-672: Is valid for travel within zones 1 and 3 on the Long Island Railroad. CityTickets can only be bought before boarding, except at Willets Point where they can be purchased on board, and they must be used on the day of purchase. CityTicket was originally not valid for travel to Far Rockaway because the station is in Zone 4 (despite being within the city limits) and the Far Rockaway Branch passes through Nassau County . In May 2023, MTA officials announced that they would expand CityTicket to Far Rockaway. CityTicket

2090-611: The Hartford Line service continues north to Hartford , and Springfield, Massachusetts . Amtrak operates inter-city rail service along the New Haven and Hudson Lines. The New Haven Line is part of Amtrak's Northeast Corridor . Amtrak's Northeast Regional runs from New Rochelle to New Haven, while Stamford and New Haven are also served by the high-speed Acela . At New Haven, the New Haven Line connects to

2200-614: The Hartford and New Haven Railroad , which provided routes to Hartford , Springfield, Massachusetts, and eventually Boston . The two roads merged in 1872 to become the NYNH&;H, growing into the largest passenger and commuter carrier in New England. In the early 20th century, the NYNH&H came under the control of J.P. Morgan . Morgan's bankroll allowed the NYNH&H to modernize by upgrading steam power with both electric (along

2310-548: The Jamaica station is a major hub station and transfer point in Jamaica, Queens . It has ten tracks and six platforms, plus yard and bypass tracks. Passengers can transfer between trains on all LIRR lines except the Port Washington Branch . The sixth platform opened in February 2020, and exclusively serves Atlantic Branch shuttle trains to Brooklyn. Transfer is also made to separate facilities for three subway services at

SECTION 20

#1732783602787

2420-593: The Laurelton , Locust Manor , Rosedale , and St. Albans stations in Queens. Riders, under the pilot, would be able to purchase one-way, weekly, or monthly passes that will be valid on the LIRR, on buses, and the subway. The fare will be higher than the price of a ride on the MetroCard , but it will be lower than the combined price of an LIRR ticket and a MetroCard, and it will allow unlimited free transfers between

2530-1042: The Pascack Valley Line . The Port Jervis Line is accessed from two NJ Transit lines, the Main Line and the Bergen County Line . The Port Jervis Line terminates in Port Jervis, New York, and the Pascack Valley line in Spring Valley, New York, in Orange and Rockland Counties, respectively. Trackage on the Port Jervis Line north of the Suffern Yard is leased from the Norfolk Southern Railway by

2640-639: The Sutphin Boulevard–Archer Avenue–JFK Airport station ( E ​, ​ J , and ​ Z trains), a number of bus routes, and the AirTrain automated people mover to JFK Airport . The railroad's headquarters are next to the station. The Long Island Rail Road system has eleven passenger branches, three of which are main trunk lines: There are eight minor branches. For scheduling and advertising purposes some of these branches are divided into sections; this

2750-474: The 1850s and 1860s, was originally part of the Erie's mainline from Jersey City to Buffalo, New York. The Pascack Valley Line was built by the New Jersey and New York Railroad , which became a subsidiary of the Erie. Trains that service Port Jervis formerly continued to Binghamton and Buffalo, New York (today used only by freight trains), while Pascack Valley service continued to Haverstraw, New York . In 1956,

2860-406: The 20th century, the LIRR did not begin using signals with color lights on its above ground sections until 2006. Some portions of the railway lack automatic signals and cab signals completely, instead train and track car movements are governed only by timetable and verbal/written train orders , although these areas are gradually receiving modern signals. Many other signals and switching systems on

2970-664: The Amtrak New Haven–Springfield Line . The Hudson Line is part of the Empire Corridor , and the Yonkers, Croton-Harmon, and Poughkeepsie stations are all served by Amtrak as well as Metro-North. Freight trains operate over Metro-North lines, though the company itself does not operate freight services. The Hudson Line connects with the Oak Point Link and is the main route for freight to and from

3080-586: The Boston and Albany to Albany , Boston , Vermont , and Canada . On April 1, 1873, the New York and Harlem Railroad was leased by Cornelius Vanderbilt , who added the railroad to his complex empire of railroads , which were run by the NYC. Grand Central Depot, built in 1871, served as the southern terminus of NYC's Harlem and Hudson Divisions; it would be replaced by Grand Central Station in 1900, and by Grand Central Terminal in 1913. The Boston and Albany came under

3190-544: The Bronx and Long Island. Freight railroads CSX , CP Rail , P&W , and Housatonic Railroad have trackage rights on sections of the system. See Rail freight transportation in New York City and Long Island . Metro-North provides service west of the Hudson River on trains from Hoboken Terminal , New Jersey, jointly run with NJ Transit under contract. There are two branches: the Port Jervis Line and

3300-580: The Brooklyn waterfront and Jamaica opened on April 18, 1836) and having operated continuously since then, it is the oldest railroad in the United States still operating under its original name and charter. There are 126 stations and more than 700 miles (1,100 km) of track on its two main lines running the full length of the island and eight major branches, with the passenger railroad system totaling 319 route miles (513 km). As of 2018 ,

3410-678: The Erie Railroad began coordinated service with rival Delaware, Lackawanna, and Western Railroad , and in 1960 they formed the Erie Lackawanna . Trains were rerouted to the Lackawanna's Hoboken Terminal in 1956–1958. Passenger rail in the United States began to falter after World War II. Commuter services historically had always been unprofitable, and were usually subsidized by long-distance passenger and freight services. As these profits disappeared, commuter services usually were

Southern Hempstead Branch - Misplaced Pages Continue

3520-589: The Hamptons and Montauk on the Cannonball can reserve a seat in the all-reserved Parlor Cars. Prior to November 2021, passengers going to Belmont Park had to buy a special ticket to go from Jamaica to Belmont Park (or vice versa). Weekly and monthly passes were not accepted at Belmont Park. With the opening of Elmont station in November 2021, Belmont Park and Elmont were placed into fare zone 4. In 2003,

3630-617: The Harlem, Hudson and New Haven Lines on January 1, 1983 and merged them into the Metro-North Commuter Railroad. Metro-North took over the former Erie Lackawanna services west of the Hudson and north of the New Jersey state line. Since those lines are physically connected to NJ Transit, operations were contracted to NJ Transit with Metro-North subsidizing the service and supplying equipment. In preparation for

3740-553: The Hudson River in New York are owned and operated by Metro-North, except Suffern , which is owned and operated by NJ Transit. In partnership with NY Waterway, Metro-North also provides ferry service across the Hudson River to Ossining station and Beacon station , with the Haverstraw–Ossining Ferry and Newburgh–Beacon Ferry respectively. Most of the trackage east of the Hudson River and in New York State

3850-435: The LIRR and Metro-North started a pilot program in which passengers traveling within New York City were allowed to buy one-way tickets for $ 2.50. The special reduced-fare CityTicket, proposed by the New York City Transit Riders Council, was formally introduced in 2004. The discounted fares were initially only available for travel on Saturdays and Sundays. In March 2022, it was expanded to include all off-peak trains throughout

3960-616: The LIRR are being modernized and upgraded as part of the Main Line's Third Track Project, most notably at Mineola, where the system is being completely redone and modernized. On portions of the railroad equipped with ASC, engineers consult the speed display unit, which is capable of displaying seven speed indications. As a result of a December 1, 2013, train derailment in the Bronx on the Metro-North Railroad, railroads with similar cab signal systems to Metro-North, such as

4070-662: The LIRR are under the control of the Movement Bureau in Jamaica, which gives orders to the towers that control a specific portion of the railroad. Movements in Amtrak territory are controlled by Penn Station Control Center or PSCC, run jointly by the LIRR and Amtrak. The PSCC controls as far east as Harold Interlocking , in Sunnyside, Queens . The PSCC replaced several towers. The Jamaica Control Center, operational since

4180-636: The LIRR paid $ 10 to get to Manhattan in 35 minutes. Unlike the CityTicket, the Freedom Ticket would be valid for off-peak and multidirectional travel; have free transfers to the subway and bus system; and be capped at $ 215 per month. At the time, monthly CityTickets cost $ 330 per month. The Freedom Ticket will initially be available for sale at the Atlantic Terminal , Nostrand Avenue , and East New York stations in Brooklyn and at

4290-620: The LIRR would procure new M9 railcars from Kawasaki . A 2014 MTA forecast indicated that the LIRR would need 416 M9 railcars; 180 to replace the outdated M3 railcars and an additional 236 railcars for the additional passengers expected once the East Side Access project is complete. The first M9s entered revenue service on September 11, 2019. The LIRR also uses 134 C3 bilevel coaches powered by 24 DE30AC diesel-electric locomotives and 20 DM30AC dual-mode locomotives . They are used mostly on non-electrified branches, including

4400-488: The LIRR's budget for expenditures was $ 1.6 billion plus $ 450 million for debt service, which it supports through the collection of fares (which cover 43% of total expenses) along with dedicated taxes and other MTA revenue. The Long Island Rail Road Company was chartered in 1834 to provide a daily service between New York City and Boston via a ferry connection between its Greenport, New York , terminal on Long Island's North Fork and Stonington, Connecticut . This service

4510-469: The LIRR, buses, and subway. The former head of the MTA, Thomas Prendergast, announced at the January 2017 board meeting that the plan would be explored in a field study to determine fares and the impact on existing service. The plan is intended to fill approximately 20,000 unused seats of existing trains to Atlantic Terminal and Penn Station (or about 50% to 60% of peak trains in each direction), while at

Southern Hempstead Branch - Misplaced Pages Continue

4620-554: The LIRR, were ordered to modify the systems to enforce certain speed limit changes, which has resulted in lower average speeds and actual speed limits across the LIRR. The LIRR's electrified lines are powered via a third rail at 750 volts DC . The LIRR's electric fleet consists of 836 M7 and 170 M3 electric multiple unit cars in married pairs, meaning each car needs the other one to operate, with each car containing its own engineer's cab. The trainsets typically range from 6 to 12 cars long. In September 2013, MTA announced that

4730-586: The LIRR. The New Haven Railroad's trustees initially opposed New York Central's takeover of the New Haven Line, as they felt that the $ 140 million offer for the New Haven Line was too low. After some discussion, the trustees decided to continue operating the New Haven Line, but only until June 1967. In 1968, following the Erie Lackawanna's example, the NYC and its rival the Pennsylvania Railroad formed Penn Central Transportation with

4840-929: The Long Island Rail Road fare system is based on the distance a passenger travels, as opposed to the New York City Subway and the area's bus systems, which charge a flat rate. The railroad is broken up into eight non-consecutively numbered fare zones. Zone 1, the City Terminal Zone , includes Penn Station, Grand Central, all stations in Brooklyn, all stations in Queens west of Jamaica on the Main Line, and Mets–Willets Point. Zone 3 includes Jamaica as well as all other stations in eastern Queens except Far Rockaway. Zones 4 and 7 include all stations in Nassau County, plus Far Rockaway and Belmont Park in Queens. Zones 9, 10, 12 and 14 include all stations in Suffolk County. Each zone contains many stations, and

4950-599: The Long Island Rail Road operated trains over portions of the Brooklyn Rapid Transit (BRT) elevated and subway lines until 1917. In addition to its daily commuter patronage, the LIRR also offers the following services: Penn Station offers connections with Amtrak intercity trains and NJ Transit commuter trains, as well as the PATH , New York City Subway , and New York City Bus systems. Grand Central offers connections with Metro-North Railroad, as well as

5060-420: The MTA also entered into a long-term lease of Penn Central's Hudson, Harlem, and New Haven Lines. Penn Central continued to operate the now-subsidized lines under contract to the MTA. In April 1970, Rockefeller proposed that the state take over the Hudson and Harlem Lines, and the next month, he signed a bond issue that provided $ 44.4 million in funding to these lines. The MTA and ConnDOT took over ownership of

5170-425: The MTA and the United Transportation Union (UTU) broke off, Metro-North employees went on strike. Commuters were left to carpool or use shuttle buses running to subway stations in the Bronx. Metro-North wanted to eliminate minimum staffing requirements and wanted the complete freedom to assign crews–a demand that the employees would not agree to. This was the first strike to shut down the New Haven, Harlem, and Hudson at

5280-470: The MTA's "Mail&Ride" program where monthly passes are delivered by mail. There is a discount for buying tickets online and through Mail&Ride. A surcharge is added if a ticket is purchased on a train. Ticket types available include One-way, Round-trip (two One-way tickets), 10-trip, Weekly (unlimited travel for one calendar week), Monthly (unlimited travel for one calendar month), and special student and disabled fare tickets. MetroCards are available on

5390-408: The MTA, but NJ Transit owns all of the Pascack Valley Line, including the portion in Rockland County, New York . Most stops for the Port Jervis and Pascack Valley Lines are in New Jersey, so NJ Transit provides most of the rolling stock and all the staff; Metro-North supplies some equipment. Metro-North equipment has been used on other NJ Transit lines on the Hoboken division. All stations west of

5500-434: The MTA. Three lines provide passenger service on the east side of the Hudson River to Grand Central Terminal in Manhattan : the Hudson , Harlem , and New Haven Lines . The Beacon Line is a freight line owned by Metro-North but is not in service. The Hudson and Harlem Lines terminate in Poughkeepsie and Wassaic , New York, respectively. The New Haven Line is operated through a partnership between Metro-North and

5610-409: The Main Line, Atlantic, and Montauk Branches, as well as the Amtrak -owned East River Tunnels to Penn Station. The railroad has dropped a number of branches due to lack of ridership over the years. Part of the Rockaway Beach Branch became part of the IND Rockaway Line of the New York City Subway , while others were downgraded to freight branches, and the rest abandoned entirely. Additionally,

SECTION 50

#1732783602787

5720-438: The Main Line. On the western end it provides service on the surviving freight-only tracks of the LIRR: the Bay Ridge and Bushwick branches; the "Lower Montauk" between Jamaica and Long Island City; and to an interchange connection at Fresh Pond Junction in Queens with the CSX , Canadian Pacific , and Providence and Worcester railroads. Some non-electrified lines are used only for freight: The East Side Access project built

5830-460: The NYC, the NYNH&H, and the Erie Lackawanna had to maintain service on these lines. Mergers between railroads were seen as a way to curtail these issues by combining capital and services and creating efficiencies. In February 1965, New York Governor Nelson Rockefeller and Connecticut Governor John N. Dempsey jointly suggested that operations of the New Haven Line, the New Haven Railroad 's struggling commuter rail operation, be transferred to

5940-518: The New Haven Line in January 1971. In May 1972, the MTA also gained ownership of the Hudson and Harlem Lines. Penn Central continued to operate all three routes under contract. As part of its plan to modernize the commuter lines, the MTA ordered high-speed "Cosmopolitan" railcars for the New Haven Line as well as for the Hudson and Harlem Lines. After a series of delays and derailments in mid-1972, which involved Penn Central trains near Grand Central Terminal, Chairman Ronan expressed his disapproval of

6050-400: The New Haven Line) and diesel power (branches and lines to eastern and northern New England). The NYNH&H saw much profitability throughout the 1910s and 1920s until the Great Depression of the 1930s forced it into bankruptcy. Commuter services west of the Hudson River, today's Port Jervis and Pascack Valley lines, were initially part of the Erie Railroad . The Port Jervis Line, built in

6160-405: The New Haven Line, including the New Canaan, Danbury, and Waterbury branches, was owned by the New York, New Haven and Hartford Railroad (NYNH&H). These branches were started in the 1830s with horse-drawn cars, later replaced by steam engines, on a route that connected Lower Manhattan to Harlem . Additional lines started in the mid-19th century included the New York and New Haven Railroad and

6270-436: The New York Central Railroad as part of a plan to prevent the New Haven Railroad from going bankrupt. If the operational merger occurred, the proposed Metropolitan Commuter Transit Authority (MCTA; now Metropolitan Transportation Authority, or MTA) and the existing Connecticut Department of Transportation (ConnDOT) would contract with New York Central to operate the New Haven Line to Grand Central Terminal. Due to growing debts,

6380-453: The New York State Department of Transportation announced that the Newburgh–Beacon Shuttle would be developed in conjunction with Metro-North, running from the Beacon station on the Hudson Line to the Newburgh park-and-ride on Route 17K . Metro-North spent the better part of its early days updating and repairing its infrastructure. Stations, track, and rolling stock all needed to be repaired, renovated, or replaced. The railroad succeeded and by

6490-425: The PRR to stop subsidizing the LIRR, and the LIRR went into receivership in 1949. The State of New York , realizing how important the railroad was to Long Island's future, began to subsidize the railroad in the 1950s and 1960s. In June 1965, the state finalized an agreement to buy the LIRR from the PRR for $ 65 million. The LIRR was placed under the control of a new Metropolitan Commuter Transit Authority . The MCTA

6600-404: The Port Jefferson, Oyster Bay, Montauk, Central, and Greenport Branches. There are also 23 MP15AC locomotives in use as work trains and yard switchers. For most of its history LIRR has served commuters, but it had many named trains, some with all-first class seating, parlor cars, and full bar service. Few of them lasted past World War II, but some names were revived during the 1950s and 1960s as

6710-428: The State of Connecticut. The Connecticut Department of Transportation (CTDOT) owns the tracks and stations within Connecticut, and finances and performs capital improvements. MTA owns the tracks and stations and handles capital improvements within New York State. MTA performs routine maintenance and provides police services for the entire line, its branches and stations. New cars and locomotives are typically purchased in

SECTION 60

#1732783602787

6820-410: The chances of a person being electrocuted by coming in contact with the rail. It also reduces the impact of icing in winter. The Hudson, Harlem and New Haven lines and the New Canaan branch and all passenger rolling stock is equipped with cab signalling , which displays the appropriate block signal in the engineer's cab. All rolling stock is equipped with Automatic Train Control (ATC), which enforces

6930-427: The federal government, the same year. Many of the other Northeastern railroads, including the Erie Lackawanna, followed Penn Central into bankruptcy, and so they had been merged into Conrail. However, the handover to private owners did not happen. In March 1981, the administration of President Ronald Reagan suggested that struggling Conrail commuter operations across five states be transferred to state agencies. At

7040-438: The first to be affected. Many railroads began to gradually discontinue their commuter lines after the war. By 1958, the NYC had already suspended service on its Putnam Division, while the newly formed Erie Lackawanna, in an effort to make a successful merger, began to prune some of its commuter services. Most New Yorkers still chose the train as their primary means of commuting, making many of the other lines heavily patronized. Thus

7150-416: The hope of revitalizing their fortunes. In 1969 the bankrupt NYNH&H was also combined into Penn Central by the Interstate Commerce Commission . However, this merger eventually failed, due to large financial costs, government regulations, corporate rivalries, and lack of a formal merger plan. In 1970 Penn Central declared bankruptcy, at the time the largest corporate bankruptcy ever declared. The same year,

7260-457: The line eastward into what is today North Massapequa . Reliant on the South Side, the two companies often shared equipment. A railroad supplier named Pusey became president in 1871, but failed to do what he had promised and was soon discharged. Without notifying the company, the bondholders illegally appointed receiver Seaman Snediker , a friend of Pusey's, under foreclosure , and they took the railroad on January 8, 1872. The owners discovered this

7370-442: The little hamlet and station of Bridgeport. The track then paralleled Cornwell Avenue exactly, crossing Hempstead Avenue, where was located the tiny settlement and station of Norwood. The Pine Brook was crossed on a little bridge only a foot or two above water level. At Woodfield Avenue and Oak Place was Woodfield depot. Immediately to the east the track crossed the Schodack Brook on an embankment and culvert about five or six feet above

7480-426: The mid 90s gained both respect and monetary success, according to the MTA's website. 2006 was the best year for the division, with a 97.8% rate of on-time trains, record ridership (76.9 million people), and a passenger satisfaction rating of 92%. In December 2017, the MTA announced that the Metro-North Railroad stations at White Plains , Harlem–125th Street , Crestwood , Port Chester , and Riverdale , would receive

7590-586: The need for better railroad freight service in New York City and on Long Island . Both areas are primarily served by trucking for freight haulage, an irony in a region with the most extensive rail transit service in the Americas, as well as the worst traffic conditions. Proposals for a Cross-Harbor Rail Tunnel for freight have existed for years to alleviate these issues, and, in recent years, there have been many new pushes for its construction by officials. Financial issues, as well as bureaucracy, remain major hurdles in constructing it. In May 1997, freight service

7700-470: The next few years commuter lines under the control of Conrail were gradually taken over by state agencies such as the newly formed NJ Transit in New Jersey, the established SEPTA in southeastern Pennsylvania, and Massachusetts Bay Transportation Authority in Boston. In March 1982, the MTA announced it would take over the Harlem, Hudson, and New Haven Lines as long as there was no extra operating cost involved. The MTA and ConnDOT officially took control of

7810-409: The next morning and took control of the railroad's only locomotive and two cars had been taken away by bank creditors. The South Side leased the NY&HP in June 1873. The railroad left the South Side Valley Stream station at Fifth Street and struck out northeastward. It crossed Franklin Avenue, Malverne, close to the present little stream between Wheeler Avenue and Cornwell Avenue; here was situated

7920-537: The north of Peekskill, such as Poughkeepsie, were considered to be long-distance services. The other major commuter line was the Putnam Division running from 155th Street in upper Manhattan (later from Sedgwick Avenue in the Bronx ) to Brewster, New York . Passengers would transfer to the IRT Ninth Avenue Line for midtown and lower Manhattan . From the mid-19th century until 1969,

8030-528: The only official reporting marks registered and recognized on AEI scanner tags is 'MNCW'. Rolling stock owned by the Connecticut Department of Transportation bears the CTDOT seal and either the New Haven ("NH") logo or the MTA logo and is identified using the reporting mark 'CNDX'. Metro-North offers many different ticket types and prices depending on the frequency of travel and distance of

8140-401: The other while running between the stations. Multi-system M8 railcars equipped with third rail shoes and pantographs are used for electric service on the line. The New Canaan Branch also uses overhead catenary. The Danbury Branch was electrified, but became a diesel line in 1961. The Waterbury Branch, the only east-of-Hudson Metro-North service which has no direct service to Grand Central,

8250-531: The ownership of NYC in 1914. NYC's four-track Water Level Route paralleled the Hudson River, Erie Canal, and Great Lakes on a route from New York to Chicago via Albany. It was fast and popular due to the lack of any significant grades. The section between Grand Central and Peekskill, New York , the northernmost station in Westchester County , became known as the NYC's Hudson Division, with frequent commuter service in and out of Manhattan. Stations to

8360-420: The passenger railroad system totaling 385 miles (620 km) of route . It is the second busiest commuter railroad in North America in terms of annual ridership, behind the Long Island Rail Road and ahead of NJ Transit (both of which also serve New York City). As of 2018 , Metro-North's budgetary burden for expenditures was $ 1.3 billion, which it supports through the collection of taxes and fees. In 2023,

8470-536: The pilot program has led the MTA to extend the program up to the summer of 2020 and renewed calls for the program to be implemented within New York City, where the fare for the Freedom Ticket—if approved—would cost US$ 2.75 and include free transfers between the LIRR & Metro-North, bus, and subway. In 2017, it was announced that the MetroCard fare payment system, used on New York City-area rapid transit and bus systems, would be phased out and replaced by OMNY ,

8580-613: The project was expected to cost $ 11.1 billion and was tentatively scheduled to start service in December 2022. It opened on January 25, 2023, with limited shuttle service between Jamaica and Grand Central. Full service to Grand Central began on February 27, 2023. Metro-North Railroad [REDACTED] Map of the entire Metro-North Railroad system. This schematic is not to scale. The Metro-North Commuter Railroad Company ( reporting mark MNCW ), also branded as MTA Metro-North Railroad and commonly called simply Metro-North ,

8690-489: The railroad $ 1.3 million. Richard Ravitch, the MTA Chairman, asked President Reagan to seek legislation to place the dispute under the law of New York State. Even though Metro-North was a state agency, the workers remained under federal law because Conrail was a federal agency. Reagan had turned down a request by Governor Mario Cuomo to intervene, but indicated that he would listen if a congressionally approved proposal

8800-442: The railroad expanded its east end parlor car service with luxury coaches and Pullman cars from railroads that were discontinuing their passenger trains. The LIRR and other railroads that became part of the system have always had freight service, though this has diminished. The process of shedding freight service accelerated with the acquisition of the railroad by New York State. In the 21st century, there has been some appreciation of

8910-401: The railroad utilizes a variety of wayside railroad signals including position light, color light and dwarf signals. In addition, much of the LIRR is equipped with a bi-directional Pulse code cab signaling called automatic speed control (ASC), though portions of the railway still retain single direction, wayside-only signaling. Unlike other railroads, which began using color-light signals in

9020-529: The railroad would have to cease operating passenger trains on the New Haven Line if nothing was done. A joint report from both agencies, released in September of that year, recommended that the line be leased to New York Central for 99 years, with the MCTA and CTA acting as agents for both states. In October, the MCTA found that the New Haven Line's stations and infrastructure were even more decrepit than those of

9130-424: The ride. While the fare policies of the east of Hudson and west of Hudson divisions are essentially the same, west of Hudson trains are operated by NJ Transit using its ticketing system. Tickets may be bought from a ticket office at stations, ticket vending machines (TVMs), online through the "WebTicket" program or through apps for iOS and Android devices, or on the train. Monthly tickets may be bought through

9240-493: The same fare applies for travel between any station in the origin zone and any station in the destination zone. Peak fares are charged during the week on trains that arrive at western terminals between 6 AM and 10 AM, and for trains that depart from western terminals between 4 PM and 8 PM. Any passenger holding an off-peak ticket on a peak train is required to pay a step up fee. Passengers can buy tickets from ticket agents or ticket vending machines (TVMs) or on

9350-598: The same time providing affordable service to people with long commutes. The details were to be announced in spring 2017, and the pilot would last six months. The MTA Board voted to approve a six-month pilot for a similar concept, the Atlantic Ticket, in May 2018. The Atlantic Ticket is similar in that it would allow LIRR riders in southeast Queens to purchase a one-way ticket to or from Atlantic Terminal for $ 5. The Atlantic Ticket would start in June 2018. The success of

9460-488: The same time since January 1961. The UTU also went on strike against NJ Transit, which took over Conrail lines in New Jersey, and against SEPTA in Philadelphia. Two weeks into the strike, Metro-North President Peter Stangl estimated that it lost $ 80,000 a week due to the strike. The chairman of the MTA's finance committee, Stephen Berger, feared that Metro-North would lose 5% of its pre-strike ridership of 90,000–costing

9570-614: The speed dictated by the cab signal by a penalty brake application should the engineer fail to obey it. There are no intermediate wayside signals between interlockings: operation is solely by cab signal. Wayside signals remain at interlockings. These are a special type of signal, a go, a slow or a stop signal. They do not convey information about traffic in the blocks ahead – the cab signal conveys block information. Metro-North began upgrading its Operations Control Center in Grand Central Terminal in 2008. All control hardware

9680-496: The stream bed. As the track approached Hempstead village, it crossed the Horse Brook or Rockaway Brook on a small bridge and then paralleled the brook a few blocks, terminating at a little station on the west side of Greenwich Street midway between Front Street and Prospect Street. Here there was a short stretch of double track but no turntable. Service was maintained with about six trains a day in each direction. The entire line

9790-537: The subway and bus systems. Additionally, almost all stations in Brooklyn and Queens offer connections with the New York City Bus system, and several stations also have transfers to New York City Subway stations. Transfers to Nassau Inter-County Express and Suffolk County Transit buses are available at many stations in Nassau and Suffolk counties, respectively. Like Metro-North Railroad and NJ Transit,

9900-494: The system had a ridership of 60,569,700, or about 235,300 per weekday as of the third quarter of 2024. The MTA has jurisdiction, through Metro-North, over railroad lines on the western and eastern portions of the Hudson River in New York. Service on the western side of the Hudson is operated by NJ Transit under contract with the MTA. Additionally, connecting ferry service is operated by NY Waterway , also under contract with

10010-495: The system had a ridership of 75,186,900, or about 276,800 per weekday as of the third quarter of 2024. The LIRR logo combines the circular MTA logo with the text Long Island Rail Road , and appears on the sides of trains. The LIRR is one of two commuter rail systems owned by the MTA, the other being the Metro-North Railroad in the northern suburbs of the New York area. Established in 1834 (the first section between

10120-446: The takeover, Metro-North was created as a division of the MTA, with Peter Stangl as president. Once under the MTA's control, the agency planned to phase in capital improvements over the following five years. As part of the transition, the MTA needed to negotiate new labor contracts with the 17 unions representing 5,000 Conrail employees who would become MTA employees and had to negotiate the transfer of most of Conrail's assets. Much work

10230-514: The third quarter of 2010, controls the area around Jamaica terminal by direct control of interlockings. This replaced several towers in Jamaica including Jay and Hall towers at the west and east ends of Jamaica station respectively. At additional locations, line side towers control the various switches and signals in accordance with the timetable and under the direction of the Movement Bureau in Jamaica. Today's LIRR signal system has evolved from its legacy Pennsylvania Railroad (PRR)-based system, and

10340-503: The time of day, within the fare zones specified on the pass. The LIRR charged off-peak fares at all times during the COVID-19 pandemic . Peak fares were reinstated on March 1, 2022, and several new discounts and ticket options were introduced at the same time. During the summer the railroad offers special summer package ticket deals to places such as Long Beach, Jones Beach, the Hamptons, Montauk, and Greenport. Passengers traveling to

10450-495: The time, Conrail was being floated by the federal government as a private for-profit freight-only carrier. Even with state subsidies, the federal government did not want Conrail to take on the operating costs of the commuter lines, which it was relieved from by the Northeast Rail Service Act of 1981 . Thus, it became essential that state-owned agencies both operate and subsidize their commuter services. Over

10560-427: The train from conductors, but will incur an on-board penalty fee for doing so. This fee is waived for customers boarding at a station without a ticket office or ticket machine, senior citizens, people with disabilities or Medicare customers. There are several types of tickets: one way, round trip, peak, off-peak, AM peak or off-peak senior/disabled, peak child, and off-peak child. On off-peak trains, passengers can buy

10670-441: The train, and a conductor who is responsible for the safe movement of the train, fare collection and on-board customer service. In addition, trains may have one or more assistant conductors to assist with fare collection and other duties. The LIRR is one of the last railroads in the United States to use mechanical interlocking control towers to regulate rail traffic. As of 2016 , the LIRR has 8 active control towers. All movements on

10780-448: The way Penn Central was running its railroads. He said that the proportion of trains running on schedule had declined after Penn Central had inherited the Hudson, Harlem, and New Haven Lines in 1968. In 1976, Congress awarded the MTA "temporary" funding so the LIRR and Penn Central commuter routes could be handed over to local private operators. The bankrupt Penn Central's commuter routes were taken over by Conrail , an entity created by

10890-470: The week for $ 5. The MTA announced plans in December 2022 to allow CityTickets to be used on peak trains as well; governor Kathy Hochul confirmed these plans the next month. The peak CityTickets, as announced in July 2023, would cost $ 7 each. As part of a one-year pilot program starting in July 2024, monthly tickets for LIRR trips entirely within New York City would also receive a 10% discount. CityTicket

11000-440: Was abandoned in 1879. Long Island Rail Road [REDACTED] Gray lines represent freight-only branches, and other colors represent the corresponding passenger branches. The Long Island Rail Road ( reporting mark LI ), or LIRR , is a railroad in the southeastern part of the U.S. state of New York , stretching from Manhattan to the eastern tip of Suffolk County on Long Island . The railroad currently operates

11110-614: Was franchised on a 20-year term to the New York and Atlantic Railway (NYAR), a short line railroad owned by the Anacostia and Pacific Company . It has its own equipment and crews, but uses the rail facilities of the LIRR. To the east, freight service operates to the end of the West Hempstead Branch, to Huntington on the Port Jefferson Branch, to Bridgehampton on the Montauk Branch, and to Riverhead on

11220-558: Was issued. The strike lasted six weeks, and ended on April 18 when the two sides agreed to binding arbitration. The first major project undertaken by Metro-North was the extension of the third-rail electrification on the Harlem line from North White Plains to a new station at Brewster North (since renamed Southeast ). This was completed in 1984. During the late 1980s and early 1990s, all wayside signals that did not protect switches and interlockings north of Grand Central were removed and replaced by modern cab signaling . In October 1998,

11330-617: Was needed in reorganization, as significant business success would not appear for at least two decades, following the faltering railroad industry in the 1970s. Conrail and later Metro-North had decided to trim whatever services they felt were unnecessary. A significant portion of the old New York Central Central Harlem line between Millerton and Chatham , New York was abandoned by Conrail, leaving northeastern Dutchess and Columbia counties with no rail transportation. Most commuter lines were kept in service although they were in much need of repair. On March 7, 1983, after labor negotiations between

11440-482: Was rebranded the Metropolitan Transportation Authority in 1968 when it incorporated several other New York City-area transit agencies. With MTA subsidies the LIRR modernized further, continuing to be the busiest commuter railroad in the United States. The LIRR is one of the few railroads that has survived as an intact company from its original charter to the present. The LIRR operates out of four western terminals in New York City. These terminals are: In addition,

11550-872: Was replaced and software upgrades were performed. The new OCC at Grand Central opened over the weekend of July 18, 2010. Most of the rolling stock on west-of-Hudson lines consists of Metro-North owned and marked Comet V cars, although occasionally other NJ Transit (NJT) cars are used as the two railroads pool equipment. The trains are also usually handled by EMD GP40FH-2 , GP40PH-2 , F40PH-3C , Alstom PL42AC , or Bombardier ALP-45DP locomotives, although any Metro-North or NJ Transit diesel can show up. Metro-North owned and marked equipment operated by NJ Transit can also be seen on other NJ Transit lines. The Metro-North Railroad uses an electric fleet of M3A , M7A , and M8 electric multiple units . Multiple diesel locomotives and push-pull coaches are in use as well. Although Metro-North uses many abbreviations (MNCR, MNR, MN, etc.)

11660-461: Was superseded in 1849 by the land route through Connecticut that became part of the New York, New Haven and Hartford Railroad . The LIRR refocused its attentions towards serving Long Island, in competition with other railroads on the island. In the 1870s, railroad president Conrad Poppenhusen and his successor, Austin Corbin acquired all the railroads and consolidated them into the LIRR. The LIRR

11770-893: Was to cross the South Side Railroad at Valley Stream and end at the 65th Street Ferry in Bay Ridge, Brooklyn , but only built east of Valley Stream. Prior to the establishment of the NY&;H, the SSRLI established a short-lived subsidiary named the Hempstead and Rockaway Railroad designed to connect the Far Rockaway Branch Railroad to the Southern Hempstead Branch. The H&R was dissolved in 1871. There were also plans to extend

11880-528: Was transferred to Conrail in 1976, when it absorbed most of Penn Central's railroad functions after Penn Central's bankruptcy. The system took its current form in 1983, when the MTA took over direct operation of Conrail's commuter services in the northern portion of the Tri-State Area and formed Metro-North to run them. There are 124 stations on Metro-North Railroad's five active lines, which operate on more than 787 miles (1,267 km) of track, with

11990-659: Was under the control of the New York Central Railroad (NYC). The NYC initially operated three commuter lines, two of which ran into Grand Central Depot (now Grand Central Terminal ). Metro-North's Harlem Line was initially a combination of trackage from the New York and Harlem Railroad and the Boston and Albany Railroad , running from Manhattan to Chatham, New York in Columbia County . At Chatham, passengers could transfer to long-distance trains on

12100-439: Was unprofitable for much of its history. In 1900, the Pennsylvania Railroad (PRR) bought a controlling interest as part of its plan for direct access to Manhattan which began on September 8, 1910. The wealthy PRR subsidized the LIRR during the first half of the new century, allowing expansion and modernization. Electric operation began in 1905. After World War II , the railroad industry's downturn and dwindling profits caused

#786213