The Columbia Subdivision is a railroad line owned by CSX Transportation in South Carolina and Georgia . The line runs along CSX's S Line from Columbia, South Carolina , to Savannah, Georgia , for a total of 137.9 miles (221.9 km). At its north end it continues south from the Hamlet Subdivision and at its south end it continues south as the Savannah Subdivision of the Jacksonville Division .
119-706: The Columbia Subdivision runs along CSX's S Line, the former SAL passenger main line. In addition to CSX freight service, the line also hosts Amtrak 's Silver Star (Amtrak train) , which stops in Columbia and Denmark . The Columbia Subdivision was originally built by the South Bound Railroad which opened in 1891. Two years later, the South Bound Railroad was leased by the Florida Central and Peninsular Railroad , which operated
238-430: A "Rocky Mountain canary" so the train's crew had originally planned only enough space for a birdcage; when they found out it was not a bird, the railroad hastily built a pen in the baggage section and bought some hay for it. When asked about the burro, Ralph Budd replied "why not? One more jackass on this trip won't make a difference." The train continued east from Halsted Station to the 1934 Century of Progress fair on
357-718: A "transitional CEO" who would reorganize Amtrak before turning it over to new leadership. On November 17, 2016, the Gateway Program Development Corporation (GDC) was formed for the purpose of overseeing and effectuating the rail infrastructure improvements known as the Gateway Program. GDC is a partnership of the States of New York and New Jersey and Amtrak. The Gateway Program includes the Hudson Tunnel Project, to build
476-687: A catastrophic loss of business with the Great Depression . Originally named the Burlington Zephyr during its demonstration period, it became the Pioneer Zephyr as Burlington expanded its fleet of Zephyr trainsets. On May 26, 1934, it set a speed record for travel between Denver and Chicago when it made a 1,015.4-mile (1,633 km) non-stop "Dawn-to-Dusk" dash in 13 hours 5 minutes at an average speed of almost 78 mph (124 km/h). For one section of
595-593: A crisis in the 1960s. Passenger service route-miles fell from 107,000 miles (172,000 km) in 1958 to 49,000 miles (79,000 km) in 1970, the last full year of private operation. The diversion of most United States Post Office Department mail from passenger trains to trucks, airplanes, and freight trains in late 1967 deprived those trains of badly needed revenue. In direct response, the Atchison, Topeka and Santa Fe Railway filed to discontinue 33 of its remaining 39 trains, ending almost all passenger service on one of
714-766: A head on June 21, 1970, when the Penn Central , the largest railroad in the Northeastern United States and teetering on bankruptcy, filed to discontinue 34 of its passenger trains. In October 1970, Congress passed, and President Richard Nixon signed into law (against the objections of most of his advisors), the Rail Passenger Service Act. Proponents of the bill, led by the National Association of Railroad Passengers (NARP), sought government funding to ensure
833-577: A large overhang of debt from years of underfunding. In the mid-1990s, Amtrak suffered through a serious cash crunch. Under Downs, Congress included a provision in the Taxpayer Relief Act of 1997 that resulted in Amtrak receiving a $ 2.3 billion tax refund that resolved their cash crisis. However, Congress also instituted a "glide path" to financial self-sufficiency, excluding railroad retirement tax act payments. George Warrington became
952-429: A massive 94 billion passenger-miles. After the war, railroads rejuvenated their overworked and neglected passenger fleets with fast and luxurious streamliners. These new trains brought only temporary relief to the overall decline. Even as postwar travel exploded, passenger travel percentages of the overall market share fell to 46% by 1950, and then 32% by 1957. The railroads had lost money on passenger service since
1071-619: A more modern image for the traveling public, to restore profitability to passenger service. One of the railroad presidents who faced this challenge was Ralph Budd , formerly of the Great Northern Railway and from 1932 president of the Chicago, Burlington and Quincy Railroad (the Burlington Route). In 1932 Ralph Budd met Edward G. Budd (no relation), an automotive steel pioneer who was founder and president of
1190-634: A new tunnel under the Hudson River and rehabilitate the existing century-old tunnel, and the Portal North Bridge, to replace a century-old moveable bridge with a modern structure that is less prone to failure. Later projects of the Gateway Program, including the expansion of track and platforms at Penn Station New York, construction of the Bergen Loop and other improvements will roughly double capacity for Amtrak and NJ Transit trains in
1309-650: A party in Mount Pleasant, Iowa , for static display in a town park, but plans for the train's display did not work out; in 2002 car 500 and the Mark Twain Zephyr were stored in Granite City, Illinois , with plans to display it in Fairfield, Iowa . As of 2020, there are plans to restore the trainset to operational condition. MSI displayed the Pioneer Zephyr outdoors, with no protection from
SECTION 10
#17327832264121428-457: A useful life of over 500,000 miles. The problems were most acute under the operating conditions of locomotive, rather than stationary or marine, use. Even with the problems of the Winton 201A, their maintenance regime was significantly lower than for steam locomotives. The Zephyr' s power (leading) car was numbered 9900, the baggage-coach combine car 505, and the coach-observation 570. The train
1547-518: A vast railroad network in Florida and southern Georgia. After leasing the South Bound Railroad, the FC&P would extend its Northern Division to Savannah to connect with the South Bound Railroad and making a continuous route from Columbia to Jacksonville. This extension opened in 1894. The line would be extended north to Camden, South Carolina by the end of the decade (this extension is now part of
1666-567: A year, its highest number since its founding in 1970. Politico noted a key problem: "the rail system chronically operates in the red. A pattern has emerged: Congress overrides cutbacks demanded by the White House and appropriates enough funds to keep Amtrak from plunging into insolvency. But, Amtrak advocates say, that is not enough to fix the system's woes." Joseph H. Boardman replaced Kummant as president and CEO in late 2008. In 2011, Amtrak announced its intention to improve and expand
1785-1022: Is a diesel-powered trainset built by the Budd Company in 1934 for the Chicago, Burlington & Quincy Railroad (CB&Q), commonly known as the Burlington Route. The trainset was the second internal combustion -powered streamliner built for mainline service in the United States (after the Union Pacific Railroad 's M-10000 ), the first such train powered by a diesel engine , and the first to enter revenue service. The trainset consists of one power/storage car, one baggage/ RPO /buffet/coach car, and one coach/observation car. The cars are made of stainless steel , permanently articulated together with Jacobs bogies . The construction incorporated recent advances such as shotwelding (a specialized type of spot welding ) to join
1904-442: Is generally regarded as the first successful streamliner on American railroads. In the early 1930s, the Great Depression caused a catastrophic loss of business for American railroads. Passenger service had been losing ridership to automobile travel since the mid-1920s, making faster, more efficient service imperative for railroads to compete. Railroads needed to lower operating costs of passenger service and boost ridership with
2023-616: Is owned by New York's Metropolitan Transportation Authority and the Connecticut Department of Transportation as the New Haven Line .) This mainline became Amtrak's "jewel" asset, and helped the railroad generate revenue. While the NEC ridership and revenues were higher than any other segment of the system, the cost of operating and maintaining the corridor proved to be overwhelming. As a result, Amtrak's federal subsidy
2142-590: Is powered by overhead lines ; for the rest of the system, diesel-fueled locomotives are used. Routes vary widely in the frequency of service, from three-days-a-week trains on the Sunset Limited to several times per hour on the Northeast Corridor. For areas not served by trains, Amtrak Thruway routes provide guaranteed connections to trains via buses, vans, ferries and other modes. The most popular and heavily used services are those running on
2261-421: Is the largest host to Amtrak routes, with 6.3 million train-miles. Freight rail operators are required under federal law to give dispatching preference to Amtrak trains. However, Amtrak has accused freight railroads of violating or skirting these regulations, resulting in passenger trains waiting for freight traffic to clear the track. Pioneer Zephyr 2 non-motor Jacobs bogies , The Pioneer Zephyr
2380-763: The California Zephyr between Oakland and Chicago via Denver and revived the Auto Train , a unique service that carries both passengers and their vehicles. Amtrak advertised it as a great way to avoid traffic along the I-95 running between Lorton, Virginia (near Washington, D.C.) and Sanford, Florida (near Orlando) on the Silver Star alignment. In 1980s and 1990s, stations in Baltimore, Chicago, and Washington, D.C. received major rehabilitation and
2499-610: The Flying Yankee . Budd and GM delivered the first additional Zephyrs , identical trainsets 9901 and 9902, in time for an April 1935 debut as the Twin Zephyrs , operating between Chicago and Minneapolis - Saint Paul. In all, the Burlington Route ordered eight additional Zephyrs , gradually departing from the semi-permanently coupled design of the Pioneer Zephyr towards regularly coupled cars that could easily be interchanged. The Winton two-stroke diesel engines used in
SECTION 20
#17327832264122618-503: The Pioneer Zephyr were popular with the traveling public but could not reverse the trend. By 1940, railroads held 67 percent of commercial passenger-miles in the United States. In real terms, passenger-miles had fallen by 40% since 1916, from 42 billion to 25 billion. Traffic surged during World War II , which was aided by troop movement and gasoline rationing . The railroad's market share surged to 74% in 1945, with
2737-498: The Budd Company . Edward Budd was demonstrating his new Budd-Michelin rubber-tired rail cars built of stainless steel . Pneumatic-wheeled railcars never found popularity for actual service in the US — they tended to derail — but they demonstrated the successful construction of lightweight stainless steel unibody railcars. Some power-trailer car sets in that series articulated with Jacobs bogies shared between cars embodied
2856-1018: The COVID-19 pandemic , Amtrak continued operating as an essential service. It started requiring face coverings the week of May 17, and limited sales to 50% of capacity. Most long-distance routes were reduced to three weekly round trips in October 2020. In March 2021, following President Joe Biden's American Jobs Plan announcement, Amtrak CEO Bill Flynn outlined a proposal called Amtrak Connects US that would expand state-supported intercity corridors with an infusion of upfront capital assistance. This would expand service to cities including Las Vegas , Phoenix , Baton Rouge , Nashville , Chattanooga , Louisville , Columbus (Ohio) , Wilmington (North Carolina) , Cheyenne , Montgomery , Concord , and Scranton . Also in March 2021, Amtrak announced plans to return 12 of its long-distance routes to daily schedules later in
2975-417: The Great Depression , but deficits reached $ 723 million in 1957. For many railroads, these losses threatened financial viability. The causes of this decline were heavily debated. The National Highway System and airports , both funded by the government, competed directly with the railroads, which, unlike the airline, bus, and trucking companies, paid for their own infrastructure. American car culture
3094-717: The Hamlet Subdivision ). The line would become part of the main line of the Seaboard Air Line Railroad in 1900, after they bought the Florida Central and Peninsular Railroad. The Seaboard Air Line designated the line as the Columbia Subdivision, which it is still known as today. Through various mergers, the company became CSX Transportation by 1986. The line continues to be part of CSX's S Line (the designation given to
3213-634: The High Speed Ground Transportation Act of 1965 to fund pilot programs in the Northeast Corridor , but this did nothing to address passenger deficits. In late 1969, multiple proposals emerged in the United States Congress , including equipment subsidies, route subsidies, and, lastly, a "quasi-public corporation" to take over the operation of intercity passenger trains. Matters were brought to
3332-658: The Highway Trust Fund and Aviation Trust Fund paid for by user fees, highway fuel and road taxes, and, in the case of the General Fund, from general taxation. Gunn dropped most freight express business and worked to eliminate deferred maintenance. A plan by the Bush administration "to privatize parts of the national passenger rail system and spin off other parts to partial state ownership" provoked disagreement within Amtrak's board of directors. Late in 2005, Gunn
3451-551: The Milwaukee Road in 1935 were a direct response to (and directly competed with) the Burlington Route's Zephyrs . On May 26, 1960, the 26th anniversary of the "Dawn-to-Dusk" dash, the original Pioneer Zephyr train (car numbers 9900, 505 and 570) was donated to Chicago's Museum of Science & Industry (MSI). Car number 500, which operated with the train from 1938, went along with Mark Twain Zephyr trainset 9903 to
3570-511: The Northeast Corridor support top speeds of 160 mph (260 km/h). In fiscal year 2022, Amtrak served 22.9 million passengers and had $ 2.1 billion in revenue, with more than 17,100 employees as of fiscal year 2021. Nearly 87,000 passengers ride more than 300 Amtrak trains daily. Nearly two-thirds of passengers come from the 10 largest metropolitan areas and 83% of passengers travel on routes shorter than 400 miles (645 km). In 1916, 98% of all commercial intercity travelers in
3689-514: The Pioneer Zephyr had several key differences, including the use of a diesel powerplant and stainless steel construction, in contrast to the M-10000's gasoline powerplant and aluminum construction. These two design decisions had a profound influence on future streamliners and other passenger trains, which had more in common with the Zephyr than the M-10000. The streamlined Hiawathas launched by
Columbia Subdivision - Misplaced Pages Continue
3808-636: The Railroad Revitalization and Regulatory Reform Act of 1976. A large part of the legislation was directed to the creation of Conrail , but the law also enabled the transfer of the portions of the NEC not already owned by state authorities to Amtrak. Amtrak acquired the majority of the NEC on April 1, 1976. (The portion in Massachusetts is owned by the Commonwealth and managed by Amtrak. The route from New Haven to New Rochelle
3927-548: The Zephyr brand, with perhaps the best known being the California Zephyr . In 1948 and 1949, the Pioneer Zephyr was temporarily removed from service to participate in the Chicago Railroad Fair 's "Wheels A-Rolling" pageant. The fair's purpose was to celebrate 100 years of railroad history west of Chicago, and the Pioneer Zephyr 's role in the pageant was to highlight the latest strides in railroad technology. It resumed regular passenger operations when
4046-490: The Zephyr power units and early EMC designs, while a breakthrough in locomotive power, were an immature technology. Some of their early reliability problems were mitigated with changes to individual parts such as pistons; other solutions had to wait for a differently designed engine. For example, the first generation of pistons in the Winton engine only had about 50,000 miles of useful life, later extended to about 100,000 miles. GM's next generation diesel engine had pistons with
4165-523: The 1936 model year. Northwest Airlines ' promotional materials from the late 1930s referred to their fleet of airliners as "Sky Zephyrs." If advertisers could find a way to cash in on Zephyr-mania, they did. While a revolutionary design, the Pioneer Zephyr was not the first streamliner—that title went to the M-10000 of the Union Pacific Railroad , which made its first trip in February 1934. However,
4284-623: The Burlington capitalized on the Zephyr's success. Many of the Burlington's named passenger trains began operating under the Zephyr brand. After the nine original Zephyr sets were completed during 1934–1939, standard production model diesel passenger locomotives with improved engines became available. Trains consisting of the new locomotives with new streamlined cars of standard size were ordered. Burlington ordered its new EMC E5 passenger diesels with matching stainless-steel fluting and operated their new full-size, long-distance trains under
4403-620: The California corridor trains accounted for a combined 2.35 million passengers in fiscal year 2021. Other popular routes include the Empire Service between New York City and Niagara Falls , via Albany and Buffalo , which carried 613.2 thousand passengers in fiscal year 2021, and the Keystone Service between New York City and Harrisburg via Philadelphia that carried 394.3 thousand passengers that same year. Four of
4522-451: The DOT's analysis was far too optimistic, with director George Shultz arguing to cut the number of routes by around half. Nixon agreed with Shultz, and the public draft presented by Volpe on November 30 consisted of only 16 routes. The initial reaction to this heavily-cut-back proposed system from the public, the press, and congressmen was strongly negative. It made front-page headlines across
4641-467: The Empire Connection tunnel opened in 1991, allowing Amtrak to consolidate all New York services at Penn Station. Despite the improvements, Amtrak's ridership stagnated at roughly 20 million passengers per year, amid uncertain government aid from 1981 to about 2000. In the early 1990s, Amtrak tested several different high-speed trains from Europe on the Northeast Corridor. An X 2000 train
4760-594: The Lake Michigan shore, where it arrived for the "Wings of a Century" pageant on opening day. After its showing on the Wings of a Century stage, and one day on public display at the Fair, the train was taken on a 31-state, 222-city publicity tour. More than two million people saw the train before it entered revenue service. Part of this tour included a test run between Chicago and Minneapolis - Saint Paul , completing
4879-478: The NEC and rises in automobile fuel costs. The inauguration of the high-speed Acela in late 2000 generated considerable publicity and led to major ridership gains. However, through the late 1990s and very early 21st century, Amtrak could not add sufficient express freight revenue or cut sufficient other expenditures to break even. By 2002, it was clear that Amtrak could not achieve self-sufficiency, but Congress continued to authorize funding and released Amtrak from
Columbia Subdivision - Misplaced Pages Continue
4998-642: The NEC, including the Acela and Northeast Regional . The NEC runs between Boston and Washington, D.C. via New York City and Philadelphia. Some services continue into Virginia . The NEC services accounted for 4.4 million of Amtrak's 12.2 million passengers in fiscal year 2021. Outside the NEC the most popular services are the short-haul corridors in California, the Pacific Surfliner , Capitol Corridor , and San Joaquins , which are supplemented by an extensive network of connecting buses. Together
5117-472: The NRPC had hired Lippincott & Margulies to create a brand for it and replace its original working brand name of Railpax. On March 30, L&M's work was presented to the NRPC's board of incorporators, who unanimously agreed on the "headless arrow" logo and on the new brand name "Amtrak", a portmanteau of the words America and trak , the latter itself a sensational spelling of track . The name change
5236-601: The Navy and retired Southern Railway head William Graham Claytor Jr. came out of retirement to lead Amtrak. During his time at Southern, Claytor was a vocal critic of Amtrak's prior managers, who all came from non-railroading backgrounds. Transportation Secretary Drew Lewis cited this criticism as a reason why the Democrat Claytor was acceptable to the Reagan White House. Despite frequent clashes with
5355-697: The Northeast Corridor, some of which connect to it or are extensions from it. In addition to its inter-city services, Amtrak also operates commuter services under contract for three public agencies: the MARC Penn Line in Maryland, Shore Line East in Connecticut, and Metrolink in Southern California. Service on the Northeast Corridor (NEC), between Boston , and Washington, D.C. , as well as between Philadelphia and Harrisburg ,
5474-565: The Northeast Corridor, state-supported short-haul service outside the Northeast Corridor, and medium- and long-haul service known within Amtrak as the National Network. Amtrak receives federal funding for the vast majority of its operations including the central spine of the Northeast Corridor as well as for its National Network routes. In addition to the federally funded routes, Amtrak partners with transportation agencies in 18 states to operate other short and medium-haul routes outside of
5593-462: The November 30th draft. These required routes only had their endpoints specified; the selection of the actual routes to be taken between the endpoints was left to the NRPC, which had just three months to decide them before it was due to start service. Consultants from McKinsey & Company were hired to perform this task, and their results were publicly announced on March 22. At the same time,
5712-472: The Pioneer Zephyr was involved in a head-on collision with a freight train that completely destroyed the cab. Five mail clerks were injured and the engineer was killed, and the accident drove home the advantages for crew safety of the elevated, behind-the-nose cab design of the contemporary EMC E-series locomotives. The train was rebuilt and re-entered revenue service soon afterward. Ralph Budd and
5831-908: The President and Congress to give passenger trains a "last hurrah" as demanded by the public. They expected the NRPC to quietly disappear as public interest waned. After Fortune magazine exposed the manufactured mismanagement in 1974, Louis W. Menk , chairman of the Burlington Northern Railroad , remarked that the story was undermining the scheme to dismantle Amtrak. Proponents also hoped that government intervention would be brief and that Amtrak would soon be able to support itself. Neither view had proved to be correct; popular support allowed Amtrak to continue in operation longer than critics imagined, while financial results made passenger train service returning to private railroad operations infeasible. The Rail Passenger Service Act gave
5950-612: The Reagan administration over funding, Claytor enjoyed a good relationship with Lewis, John H. Riley , the head of the Federal Railroad Administration (FRA), and with members of Congress. Limited funding led Claytor to use short-term debt to fund operations. Building on mechanical developments in the 1970s, high-speed Washington–New York Metroliner Service was improved with new equipment and faster schedules. Travel time between New York and Washington, D.C.
6069-458: The Secretary of Transportation, at that time John A. Volpe , thirty days to produce an initial draft of the endpoints of the routes the NRPC would be required by law to serve for four years. On November 24 Volpe presented his initial draft consisting of 27 routes to Nixon, which he believed would make a $ 24 million profit by 1975. The Office of Management and Budget , however, believed Volpe and
SECTION 50
#17327832264126188-445: The USPTO granted US patents 2,256,493 and 2,256,494 to the Budd Company. The streamlining extended to the undercarriage as well to reduce drag. Budd took the task of naming the train very seriously. He wanted a name that started with the letter Z because this train was intended to be the "last word" in passenger service; Budd and his coworkers looked up the last words in their dictionaries, but neither zymurgy nor zyzzle conveyed
6307-438: The United States moved by rail, and the remaining 2% moved by inland waterways . Nearly 42 million passengers used railways as primary transportation. Passenger trains were owned and operated by the same privately owned companies that operated freight trains. As the 20th century progressed, patronage declined in the face of competition from buses , air travel , and the car . New streamlined diesel-powered trains such as
6426-403: The White House and more conservative members of Congress to support the bill. There were several key provisions: Of the 26 railroads still offering intercity passenger service in 1970, only six declined to join the NRPC. Nearly everyone involved expected the experiment to be short-lived. The Nixon administration and many Washington insiders viewed the NRPC as a politically expedient way for
6545-403: The basic elements of car construction that would be used to build a lightweight streamliner train. Stainless steel provided many benefits over traditional wood and hardened steel for railroad carbodies; it was a lighter and stronger material, and its natural silver appearance and resistance to corrosion meant that it would not have to be painted to protect it from the weather. Since the carbody
6664-433: The busiest, most complex section of the Northeast Corridor. In June 2017, it was announced that former Delta and Northwest Airlines CEO Richard Anderson would become Amtrak's next President & CEO. Anderson began the job on July 12, assuming the title of President immediately and serving alongside Moorman as "co-CEOs" until the end of the year. On April 15, 2020, Atlas Air Chairman, President and CEO William Flynn
6783-412: The continuation of passenger trains. They conceived the National Railroad Passenger Corporation (NRPC), a quasi-public corporation that would be managed as a for-profit organization , but which would receive taxpayer funding and assume operation of intercity passenger trains – while many involved in drafting the bill did not believe the NRPC would actually be profitable, this was necessary in order for
6902-434: The corridor to make it suitable for higher-speed electric trains. The Northend Electrification Project extended existing electrification from New Haven, Connecticut , to Boston to complete the overhead power supply along the 454-mile (731 km) route, and several grade crossings were improved or removed. Ridership increased during the first decade of the 21st century after the implementation of capital improvements in
7021-477: The country and it was quickly leaked that the DOT had wanted a far larger system than the White House would approve of. The ICC produced its own report on December 29, criticising the proposed draft and arguing for the inclusion of fifteen additional routes, giving further ammunition to the congressmen who wanted an expanded system. Further wrangling between the DOT and the White House produced the final list of routes on January 28, 1971, adding five additional routes to
7140-420: The day of the dash, every road grade crossing was staffed by a flagger to stop automobile traffic ahead of the train and to ensure that the crossing was clear. Stations along the route were protected by local police officers and members of the American Legion and the Boy Scouts of America . The train left Denver at 07:04 Central Daylight Time and at 20:09, 13 hours 5 minutes later, broke through
7259-452: The entire train. Budd was familiar with the development of stationary diesel engines, and believed their superior reliability and fuel economy could be an asset for train transport as well. He brought his idea to the Winton Engine Company (a General Motors subsidiary), and together they designed and produced a new 660 horsepower (490 kW) engine small enough to fit inside a train, solving the question of propulsion. The exterior design of
SECTION 60
#17327832264127378-480: The ex- New York Central Railroad 's Water Level Route from New York to Ohio and Grand Trunk Western Railroad 's Chicago to Detroit route. The reduced passenger train schedules created confusion amongst staff. At some stations, Amtrak service was available only late at night or early in the morning, prompting complaints from passengers. Disputes with freight railroads over track usage caused some services to be rerouted, temporarily cancelled, or replaced with buses. On
7497-466: The fair ended on October 2, 1949. The fourth car that was added in 1935 was removed in May 1950. By 1955 the Pioneer Zephyr 's route had been updated to run between Galesburg, Illinois , and Saint Joseph, Missouri ; the trainset had been in continual service since 1934, operating over nearly 3 million miles (4.8 million kilometres). The Pioneer Zephyr 's last revenue run was a trip from Lincoln , Nebraska , to Kansas City , Missouri , (along
7616-501: The first of several Zephyr trainsets built for Burlington, the original trainset was renamed the Pioneer Zephyr once additional named trainsets entered service. After its naming in Philadelphia, the train was taken on a three-week promotional tour of cities in the Northeast and Midwest . The train was open for viewing in several cities, with 24,000 people viewing it in Philadelphia, 50,000 in Rochester, New York, and more than 109,000 viewing it in New York City. In early May 1934,
7735-405: The former Seaboard main line). Amtrak The National Railroad Passenger Corporation , doing business as Amtrak ( / ˈ æ m t r æ k / ; reporting marks AMTK , AMTZ ), is the national passenger railroad company of the United States. It operates inter-city rail service in 46 of the 48 contiguous U.S. states and three Canadian provinces . Amtrak is a portmanteau of
7854-478: The front of the power car. Behind the engine in the power car was a 19-foot long (5.8 m) storage-mail compartment. The second car, measuring 57 feet 8 inches (17.6 m) long, was a combination 30 ft (9.1 m) long express, checked baggage and railway post office section, followed by a short buffet and 20-passenger coach section. The third and final car in the train, measuring 63 feet 6 inches (19.35 m) long as originally built,
7973-413: The full California Zephyr in 1983. Press publicity had apparently first coined the term "Silver Streak". The Pioneer Zephyr' s famous Denver-Chicago dash served as the inspiration for the 1934 film The Silver Streak starring Charles Starrett . In that story, the crew was racing to the Boulder Dam construction site with an iron lung , with only moments to spare. The original Zephyr trainset
8092-411: The heyday of the Burlington's Zephyr service. The Silver Charger , power car of the General Pershing Zephyr , is on display at the National Museum of Transportation in St Louis , and the same train's "diner-parlour and observation car" is now the Silver Star Cafe in Port Hedland , Australia. The Flying Yankee trainset is preserved at the Hobo Railroad in New Hampshire . Also utilizing
8211-462: The high-speed rail corridor from Penn Station in NYC, under the Hudson River in new tunnels, and double-tracking the line to Newark, NJ , called the Gateway Program , initially estimated to cost $ 13.5 billion (equal to $ 18 billion in 2023). From May 2011 to May 2012, Amtrak celebrated its 40th anniversary with festivities across the country that started on National Train Day (May 7, 2011). A commemorative book entitled Amtrak: An American Story
8330-583: The job, he is the second-longest serving head of Amtrak since it was formed more than 40 years ago. On December 9, 2015, Boardman announced in a letter to employees that he would be leaving Amtrak in September 2016. He had advised the Amtrak Board of Directors of his decision the previous week. On August 19, 2016, the Amtrak Board of Directors named former Norfolk Southern Railway President & CEO Charles "Wick" Moorman as Boardman's successor with an effective date of September 1, 2016. During his term, Moorman took no salary and said that he saw his role as one of
8449-449: The largest railroads in the country. The equipment the railroads had ordered after World War II was now 20 years old, worn out, and in need of replacement. As passenger service declined, various proposals were brought forward to rescue it. The 1961 Doyle Report proposed that the private railroads pool their services into a single body. Similar proposals were made in 1965 and 1968 but failed to attract support. The federal government passed
8568-507: The meanings that Budd was looking for. While the word "zephyr" had seen previous use , Budd found his inspiration in The Canterbury Tales , which he had been reading. The story begins with pilgrims setting out on a journey, inspired by the budding springtime and by Zephyrus , the gentle and nurturing west wind. Budd thought that would be an excellent name for a sleek new traveling machine— Zephyr . The first Zephyr (9900)
8687-592: The name, the Minnesota Zephyr was a dinner train located in the historic city of Stillwater, Minnesota , although it was not directly associated with the historic Burlington Zephyr fleet. Dorney Park & Wildwater Kingdom in Allentown, Pennsylvania , has a miniature replica train ride called Zephyr which was built in 1935 and helped the park survive the Great Depression. Due to
8806-405: The need for couplers between each of the carbodies, further reducing the train's weight. The concept was used by Budd engineer Walter B. Dean to build a train consisting of three semi-permanently attached cars. However, this also meant that individual cars could not be removed from or added to the trainset easily, either to adjust to demand or to make repairs to an individual car without sidelining
8925-447: The operations. All other trains along the Zephyr 's route were diverted to sidings and the turnouts were spiked into the proper alignment for the Zephyr 's run. Track and maintenance of way workers checked every spike and bolt along the train's route to ensure that there would not be any problems, and temporary speed signs were installed along the route to warn the Zephyr 's crew of curves that would be dangerous at high speeds. On
9044-532: The other eight members are nominated to serve a term of five years. Amtrak's network includes over 500 stations along 21,400 miles (34,000 km) of track. It directly owns approximately 623 miles (1,003 km) of this track and operates an additional 132 miles of track; the remaining mileage is over rail lines owned by other railroad companies. While most track speeds are limited to 79 mph (127 km/h) or less, several lines have been upgraded to support top speeds of 110 mph (180 km/h), and parts of
9163-607: The other hand, the creation of the Los Angeles–Seattle Coast Starlight from three formerly separate train routes was an immediate success, resulting in an increase to daily service by 1973. Needing to operate only half the train routes that had operated previously, Amtrak would lease around 1,200 of the best passenger cars from the 3,000 that the private railroads owned. All were air-conditioned, and 90% were easy-to-maintain stainless steel. When Amtrak took over, passenger cars and locomotives initially retained
9282-433: The paint schemes and logos of their former owners which resulted in Amtrak running trains with mismatched colors – the "Rainbow Era". In mid-1971, Amtrak began purchasing some of the equipment it had leased, including 286 EMD E and F unit diesel locomotives, 30 GG1 electric locomotives and 1,290 passenger cars. By 1975, the official Amtrak color scheme was painted on most Amtrak equipment and newly purchased locomotives and
9401-416: The problem. The articulated design of some Budd-Michelin cars, with trucks shared between adjacent cars, presented another opportunity for weight saving with the new train. On conventional passenger cars, each carbody rode upon a pair of trucks (pivot-mounted wheel-axle assembly), with one truck at each end. The articulation not only reduced the number of trucks under the train, but it also dispensed with
9520-440: The public in March 2021. In addition to the Pioneer Zephyr , several other legacies remain. An operable Nebraska Zephyr train was donated to IRM. There, powered by one of the large "E" series passenger diesels (an EMC E5 ) with the distinctive and durable stainless-steel fluting, it is still operated on short runs on the museum's substantial trackage, providing train enthusiasts and tourists with an experience reminiscent of
9639-443: The requirement. In early 2002, David L. Gunn replaced Warrington as seventh president. In a departure from his predecessors' promises to make Amtrak self-sufficient in the short term, Gunn argued that no form of passenger transportation in the United States is self-sufficient as the economy is currently structured. Highways, airports, and air traffic control all require large government expenditures to build and operate, coming from
9758-532: The rolling stock began appearing. Amtrak inherited problems with train stations (most notably deferred maintenance ) and redundant facilities from the competing railroads that once served the same communities. Chicago is a prime example; on the day prior to Amtrak's inception, intercity passenger trains used four different Chicago terminals: LaSalle , Dearborn , North Western Station , Central , and Union. The trains at LaSalle remained there, as their operator Rock Island could not afford to opt into Amtrak. Of all
9877-540: The route, including Lincoln, Nebraska, where 21,000 people viewed the train. The tour stopped in 46 cities and had almost 485,000 people view the train at its many stops. The train made a "Dawn-to-Dusk" dash from Denver to Chicago on May 26, 1934, in a publicity stunt timed to coincide with the opening day of the second year of the Century of Progress world's fair in Chicago. The railroad spared no expense in planning
9996-503: The run it reached a speed of 112.5 mph (181 km/h). The historic dash inspired a 1934 film ( " The Silver Streak " ) and the train's nickname, "The Silver Streak". The train entered regular revenue service on November 11, 1934, between Kansas City , Missouri ; Omaha , Nebraska ; and Lincoln, Nebraska . It operated this and other routes until its retirement in 1960, when it was donated to Chicago's Museum of Science & Industry , where it remains on public display. The train
10115-557: The same distance in around 25 hours. Riding the train were Ralph Budd, Edward G. Budd, Harold L. Hamilton, president of the Electro-Motive Corporation , a number of reporters, some Burlington employees, members of the public, and Zeph, a burro that was contributed by a Colorado newspaper, the Rocky Mountain News , as a mascot for the train. The newspaper had described Zeph to the railroad as
10234-406: The schedule. Amtrak uses a sliding scale, with trips under 250 miles (400 km) considered late if they are more than 10 minutes behind schedule, up to 30 minutes for trips over 551 miles (887 km) in length. Outside the Northeast Corridor and stretches of track in Southern California and Michigan, most Amtrak trains run on tracks owned and operated by privately owned freight railroads. BNSF
10353-519: The six busiest stations by boardings are on the NEC: New York Penn Station (first), Washington Union Station (second), Philadelphia 30th Street Station (third), and Boston South Station (fifth). The other two are Chicago Union Station (fourth) and Los Angeles Union Station (sixth). On-time performance is calculated differently for airlines than for Amtrak. A plane is considered on-time if it arrives within 15 minutes of
10472-505: The sixth president in 1998, with a mandate to make Amtrak financially self-sufficient. Under Warrington, the company tried to expand into express freight shipping, placing Amtrak in competition with the "host" freight railroads and the trucking industry . On March 9, 1999, Amtrak unveiled its plan for the Acela Express, a high-speed train on the Northeast Corridor between Washington, D.C. and Boston. Several changes were made to
10591-775: The spring. Most of these routes were restored to daily service in late-May 2021. However, a resurgence of the virus caused by the Omicron variant caused Amtrak to modify and/or suspend many of these routes again from January to March 2022. Amtrak is required by law to operate a national route system. Amtrak has presence in 46 of the 48 contiguous states, as well as the District of Columbia (with only thruway connecting services in Wyoming and no services in South Dakota ). Amtrak services fall into three groups: short-haul service on
10710-444: The stainless steel, and unibody construction and articulation to reduce weight. It was the first of nine similarly built trainsets made for Burlington and its technologies were pivotal in the subsequent dieselization of passenger rail service. Its operating economy, speed, and public appeal demonstrated the potential for diesel-electric-powered trains to revitalize and restore profitability to passenger rail service that had suffered
10829-562: The stainless steel. On August 20, 1932, Earl J. Ragsdale , an engineer at the Budd Company, filed a patent application for a "Method and product of electric welding"; on January 16, 1934, the United States Patent & Trademark Office (USPTO) granted US patent 1,944,106 to the Budd Company. Shotwelding , as Ragsdale termed his method, involved automatic control of the timing of individual spot welds . In spot welding,
10948-431: The system with an aim to reduce costs, speed construction, and improve its corporate image. However, the cash-strapped railroad would ultimately build relatively few of these standard stations. Amtrak soon had the opportunity to acquire rights-of-way. Following the bankruptcy of several northeastern railroads in the early 1970s, including Penn Central, which owned and operated the Northeast Corridor (NEC), Congress passed
11067-454: The tape at the designated finish line at Halsted Street station , 1.8 miles west of Chicago Union Station . The train's average speed from start to finish was 77 mph (124 km/h); and had reached a speed of 112.5 mph (181 km/h). The non-stop 1,015 mile (1,633 km) trip exceeded the railroad's expectations in being 1 hour 55 minutes faster than was scheduled. The Burlington's contemporary passenger trains plied
11186-512: The test trip in just over six hours, besting the Burlington Route's fastest steam-powered service by five hours and convincing the railroad to promptly place orders with Budd and GM for two more Zephyr trainsets. Even before the Burlington Route's new trainsets could be built, east coast railroads Boston and Maine Railroad and Maine Central Railroad ordered a nearly identical copy of the Pioneer Zephyr from Budd and GM, which began service between Boston and Bangor, Maine , in February 1935 as
11305-512: The train received a cosmetic restoration by Northern Rail Car in Milwaukee , Wisconsin , the pit was finally ready to receive the train. The Pioneer Zephyr train is now on display at MSI just outside the main entrance from the museum's underground parking area, where it is one of the more popular exhibits. In November 2019, MSI temporarily closed the exhibit to add new interactive elements and an expanded experience. The exhibit re-opened to
11424-676: The train was driven back westward over the Pennsylvania Railroad 's mainline to Chicago, and some parallel routes, exceeding 100 miles per hour (160 km/h) several times. At its stop in Dayton, Ohio, another 20,000 people viewed the train, and a "never-ending procession of visitors" viewed it on its stop in Indianapolis. It was then driven toward Denver for its last display in preparation for its next big promotion. It made additional promotional stops in other cities along
11543-442: The train was left to aeronautical engineer Albert Gardner Dean (Walter Dean's younger brother) who designed the sloping nose shape, with architects Paul Philippe Cret and John Harbeson , devising a way to strengthen and beautify the sides with the train's horizontal fluting. On April 15, 1936, Colonel Ragsdale, Walter Dean and Albert Dean, filed patent applications for a "Rail Car Front End Construction". On September 23, 1941
11662-410: The train's famous dash, the original Burlington Zephyr was renamed the Pioneer Zephyr to distinguish it as the first of the Burlington's growing Zephyr fleet. In 1938, car 525 was replaced by car number 500, a 40-seat buffet/lounge car, to provide light meals. Car number 505, the baggage-coach combine , was rebuilt at this time into a full baggage car , but it kept its original windows. In 1939
11781-715: The train's regular revenue route) that then continued to Chicago on March 20, 1960. The California Zephyr made its last runs as a full service between California and Chicago in 1970 following the Western Pacific Railroad 's withdrawal, with the Rio Grande and Burlington Route successor Burlington Northern Railroad designating successor trains for their portions of the route under the names Rio Grande Zephyr and California Zephyr Service respectively. Government-formed Amtrak took over most passenger rail services in 1971, and finally succeeded in reviving
11900-581: The trains serving Dearborn Station, Amtrak retained only a pair of Santa Fe trains, which relocated to Union Station beginning with the first Amtrak departures on May 1, 1971. Dearborn Station closed after the last pre-Amtrak trains on the Santa Fe arrived in Chicago on May 2. None of the intercity trains that had served North Western Station became part of the Amtrak system, and that terminal became commuter-only after May 1. The trains serving Central Station continued to use that station until an alternate routing
12019-445: The two pieces of metal that are to be joined are pressed together with an electrode on each side of the joint. A very high electric current is passed through the joint and fuses the two pieces of metal together. If a spot weld is heated too long, heat will spread from the weld at a middling temperature that weakens the stainless steel and compromises its corrosion-resistant properties unacceptably; Ragsdale's precisely-timed welds solved
12138-485: The weather, until 1994. At that time, the steam locomotive that shared the display space with the Zephyr , Santa Fe #2903, was donated to the Illinois Railway Museum (IRM) at Union , west of Chicago, while MSI prepared a new display location for the Zephyr . MSI dug a pit in front of the building and built a new display area for the Zephyr , where it could be displayed year-round. In 1998, after
12257-560: The words America and track. Founded in 1971 as a quasi-public corporation to operate many U.S. passenger rail routes, Amtrak receives a combination of state and federal subsidies but is managed as a for-profit organization . The company's headquarters is located one block west of Union Station in Washington, D.C. Amtrak is headed by a Board of Directors, two of whom are the Secretary of Transportation and CEO of Amtrak, while
12376-467: Was adopted in March 1972. In New York City , Amtrak had to maintain two stations ( Penn and Grand Central ) due to the lack of track connections to bring trains from upstate New York into Penn Station; a problem that was rectified once the Empire Connection was built in 1991. The Amtrak Standard Stations Program was launched in 1978 and proposed to build a standardized station design across
12495-402: Was also on the rise in the post-World War II years. Progressive Era rate regulation limited the railroad's ability to turn a profit. Railroads also faced antiquated work rules and inflexible relationships with trade unions. To take one example, workers continued to receive a day's pay for 100-to-150-mile (160 to 240 km) workdays. Streamliners covered that in two hours. Matters approached
12614-409: Was completed by the Budd Company on April 9, 1934. The first car, which measured 71 feet 5 inches (21.77 m), contained the cab, engine compartment and a mail storage area. The train's engineer sat in a small compartment in the nose of the train, directly in front of the prime mover . The main generator was mounted to the prime mover and sat between the engineer's and fireman's seats in
12733-537: Was configured as half coach (40-passenger seats) and half observation car (12 passenger seats). As built, the train had 72 seats and could carry 50,000 pounds (22.7 tonnes ) of baggage and express freight. After a series of demonstration runs, the trainset was named the Burlington Zephyr on April 18, 1934, at the Pennsylvania Railroad 's Broad Street Station in Philadelphia, Pennsylvania. As
12852-609: Was fired. Gunn's replacement, Alexander Kummant (2006–08), was committed to operating a national rail network, and like Gunn, opposed the notion of putting the Northeast Corridor under separate ownership. He said that shedding the system's long-distance routes would amount to selling national assets that are on par with national parks, and that Amtrak's abandonment of these routes would be irreversible. In late 2006, Amtrak unsuccessfully sought annual congressional funding of $ 1 billion for ten years. In early 2007, Amtrak employed 20,000 people in 46 states and served 25 million passengers
12971-803: Was increased dramatically. In subsequent years, other short route segments not needed for freight operations were transferred to Amtrak. In its first decade, Amtrak fell far short of financial independence, which continues today, but it did find modest success rebuilding trade. Outside factors discouraged competing transport, such as fuel shortages which increased costs of automobile and airline travel, and strikes which disrupted airline operations. Investments in Amtrak's track, equipment and information also made Amtrak more relevant to America's transportation needs. Amtrak's ridership increased from 16.6 million in 1972 to 21 million in 1981. In February 1978, Amtrak moved its headquarters to 400 North Capitol Street NW, Washington D.C. In 1982, former Secretary of
13090-650: Was leased from Sweden for test runs from October 1992 to January 1993, followed by revenue service between Washington, D.C. and New York City from February to May and August to September 1993. Siemens showed the ICE 1 train from Germany, organizing the ICE Train North America Tour which started to operate on the Northeast Corridor on July 3, 1993. In 1993, Thomas Downs succeeded Claytor as Amtrak's fifth president. The stated goal remained "operational self-sufficiency". By this time, however, Amtrak had
13209-485: Was much lighter than similar cars, it would be able to carry a higher revenue load for the same cost. In developing the Budd-Michelin railcars, the Budd Company used the formed steel technology in which they were industry pioneers and solved the most difficult problem in using stainless steel for railcar construction: developing a welding technique that would not compromise the strength and corrosion resistance of
13328-548: Was named Amtrak President and CEO. In addition to Atlas Air, Flynn has held senior roles at CSX Transportation , SeaLand Services and GeoLogistics Corp. Anderson would remain with Amtrak as a senior advisor until December 2020. As Amtrak approached profitability in 2020, the company undertook planning to expand and create new intermediate-distance corridors across the country. Included were several new services in Ohio, Tennessee, Colorado, and Minnesota, among other states. During
13447-515: Was originally a 40-seat coach number 525, but the following June it was switched to Twin Cities service, then back to the Pioneer Zephyr in December. Car 525 remained on the train until June 1938. Just over five years after it was introduced, the Pioneer Zephyr crossed the one million mile mark in regular service on December 29, 1939, near Council Bluffs , Iowa . On the second anniversary of
13566-431: Was placed in regular service between Kansas City , Missouri , Omaha and Lincoln, Nebraska , on November 11, 1934, with the train numbered 21 northbound and 20 southbound. The trainset replaced a pair of steam locomotives and six heavyweight passenger cars , weighing up to eight times as much as the Zephyr . By June 1935, it proved popular enough to add a fourth car, providing additional coach seating. The fourth car
13685-445: Was publicly announced less than two weeks before operations began. Amtrak began operations on May 1, 1971. Amtrak received no rail tracks or rights-of-way at its inception. All of Amtrak's routes were continuations of prior service, although Amtrak pruned about half the passenger rail network. Of the 366 train routes that operated previously, Amtrak continued only 184. Several major corridors became freight-only, including
13804-452: Was published, a documentary was created, six locomotives were painted in Amtrak's four prior paint schemes , and an Exhibit Train toured the country visiting 45 communities and welcoming more than 85,000 visitors. After years of almost revolving-door CEOs at Amtrak, in December 2013, Boardman was named "Railroader of the Year" by Railway Age magazine, which noted that with over five years in
13923-462: Was reduced to under 3 hours due to system improvements and limited stop service. This improvement was cited as a reason why Amtrak grew its share of intercity trips between the cities along the corridor. Elsewhere in the country, demand for passenger rail service resulted in the creation of five new state-supported routes in California, Illinois, Missouri, Oregon and Pennsylvania, for a total of 15 state-supported routes. Amtrak added two trains in 1983,
14042-468: Was so inspired by the dawn-to-dusk run that he chose "Zephyrs" as the mascot for the school. In Galesburg, Illinois, which is 162 rail miles from Chicago, the local high school named all its athletic teams the " Galesburg Silver Streaks " in honor of the train. In 1935, the H. N. White Company changed the name of its top-line saxophones to "King Zephyr." Ford introduced the Lincoln-Zephyr with
14161-610: Was used for the exterior shots in the film, while interior scenes were filmed on a soundstage in Hollywood . For the film, the "Burlington Route" nameplate on the train's nose was replaced with one that read "Silver Streak". With Zephyr-mania sweeping the country, tributes turned up in the names of everything from sports teams to commercial products. In 1934, Father Becker, principal of the St. Mary Catholic High School in Menasha, Wisconsin,
#411588