Lim Chu Kang is a planning area located in the northwestern part of the North Region of Singapore , bordering the Western Water Catchment to the west and south, Sungei Kadut to the east and the Straits of Johor to the north.
84-579: Buona Vista MRT station is a Mass Rapid Transit (MRT) interchange station on the East West line and Circle line in Queenstown , Singapore. This station is close to one-north , a high technology business park for the biomedical science, infocomm technology and media industries. It is located near the junction of North Buona Vista Road, Commonwealth Avenue and Commonwealth Avenue West. Buona Vista station opened on 12 March 1988, as part of Phase 1B of
168-556: A circle-radial topology . Two more lines and 46 stations are currently under construction, in addition to ongoing extension works on existing lines. In total, this will schedule the network to double in length to about 460 km (290 mi) by 2040. Further studies are ongoing on potential new alignments and lines, as well as infill stations in the Land Transport Authority 's (LTA) Land Transport Masterplan 2040. The island-wide heavy rail network interchanges with
252-468: A eucalyptus tree located at the nearby Kent Ridge Park that has been digitally edited to create an effect similar to David Hockney 's photo montages. The tree also represents the jungle greenery which used to exist next to the above-ground station and is a result of the deep impression left on the artist of the landscape and view of the area. There is also a mural as part of the heritage-themed Comic Connect public art display by SMRT. Created by David Liew,
336-607: A cumulative S$ 150 billion in 2021, making the network one of the world's costliest on both a per-kilometre and absolute basis. The system is managed in conformity with a semi-nationalised hybrid regulatory framework; construction and procurement fall under the purview of the Land Transport Authority (LTA), a statutory board of the government that allocates operating concessions to the for-profit private corporations SMRT and SBS Transit . These operators are responsible for asset maintenance on their respective lines, and also run bus services, facilitating operational synchronicity and
420-567: A few days of the weekend. The nightly closures are used for maintenance. During the COVID-19 pandemic across the country , train services ended earlier from 7 April 2020 to 1 June 2020 and service extensions on the eves of public holidays ceased from 7 April 2020 until 28 September 2024 except New Year's Eve. Train service extensions were reinstated back to before the pandemic began in 2020 as mentioned earlier. Train frequencies are 2 - 3 mins during peak hours and 5 - 6 mins during off-peak hours. If
504-694: A few paintings or sculptures representing the recent past of Singapore, mounted in major stations. The opening of the Woodlands Extension introduced bolder pieces of artwork, such as a 4,000 kg sculpture in Woodlands . With the opening of the North East Line in 2003, a series of artworks under a programme called "Art in Transit" were commissioned by the Land Transport Authority (LTA). Created by 19 local artists and integrated into
588-556: A plan to introduce dual speeds to escalators along the North–South and East–West lines, to make it safer for senior citizens using them. As a result, all escalators on the two lines, through a refurbishment programme, will be able to operate at a different speed of 0.5 m/s during off-peak hours, with completion being targeted for 2022. All stations constructed before 2001 initially lacked barrier-free facilities and wider AFC faregates such as lifts, ramps and tactile guidance systems for
672-678: A preference. The Land Transport Authority (LTA) had considered other naming methods in June 2007, whether by name, colour or numbers. After the survey, however, the naming scheme was retained and used for subsequent future MRT lines. Except for the partly at-grade Bishan MRT station ( North–South Line ), the entirety of the MRT is either elevated or underground. Most below-ground stations are deep and hardened enough to withstand conventional aerial bomb attacks and to serve as bomb shelters . Mobile phone, 3G, 4G and 5G services are available in every part of
756-580: A series of automated guideway transit networks localised to select suburban towns — collectively known as the Light Rail Transit (LRT) system — which, along with public buses , complement the mainline by providing a last mile link between MRT stations and HDB public housing estates . The MRT is the oldest, busiest, and most comprehensive metro system in Southeast Asia . Capital expenditure on its rail infrastructure reached
840-499: A station interlocking system. The ATO drives the train in automatic mode, providing the traction and braking control demands to the train rolling stock system, adjusts its speed upon approaching the station, and provides the control of opening and closing of train and platform screen doors once the train has stopped at the station. The ATP ensures safe train separation by using the ATP track circuit status and by location determination, monitors
924-518: A two-year contract for consultancy in November 1982. The Mass Rapid Transit Corporation (MRTC)—later renamed SMRT Corporation—was established on 14 October 1983 and took over the roles and responsibilities of the former provisional Mass Rapid Transit Authority. On 7 November 1987, the first section of the North–South Line started operations, consisting of five stations over six kilometres. Within
SECTION 10
#17328014028551008-561: A workers' quarters and military training ground. Neo Tiew is named after Neo Ao Tiew (梁後宙, a prominent Chinese businessman. Neo is credited with the development of the Lim Chu Kang area, where he built roads, houses and a seaport. He was also the founder and sheriff of Lim Chu Kang Village. In 1967, the British colonial government named a 3.5 km stretch of road "Neo Tiew Road" or "Neo Tiew Lane" in recognition of his contributions to
1092-489: A year, 20 more stations had been added to the network and a direct service existed between Yishun and Lakeside stations, linking up Central Singapore to Jurong in the west by the end of 1988. The direct service was eventually split into the North–South and East–West lines after the latter's completion of the eastern sector to Tanah Merah station. By the end of 1990, the Branch line has further linked Choa Chu Kang to
1176-588: Is able to support bidirectional train operations on a single track, enabling trains to be diverted onto another track in the event of a fault on one track. The CBTC system also permits for improved braking performance in wet weather as compared to the original fixed-block ATC. All new MRT lines built since the North East Line in 2003 were equipped with CBTC from the outset, and have the capability to be completely driverless and automated, requiring no on-board staffing. Operations are monitored remotely from
1260-769: Is currently used for the Downtown line . While major operations were shifted to the main Gali Batu Depot in 2015, the Tai Seng Facility Building resumed stabling operations with the extension of the Downtown line in 2017. It currently operates independently from Kim Chuan Depot. Gali Batu Depot is the first MRT depot in Singapore to achieve the certification of Building and Construction Authority (BCA) Green Mark Gold. In August 2014, plans for
1344-491: Is planned to begin operations in 2026, adding an additional 2.2 kilometres (1.4 miles) and 2 stations to the line, terminating at Sungei Bedok and interchanging with the Thomson–East Coast Line. Upon opening, the entire line will be 44 kilometres (27 miles) long and have 37 stations in total. A proposal has been further mooted to extend the line from Bukit Panjang towards Sungei Kadut which will interchange with
1428-509: Is situated between Holland Village and one-north stations. Its other official station code is “CC22”. The station consists of one island platform, with doors opening on the right. The seats are dots in matrices, spelling the station's name. The artwork featured under the Art in Transit programme is The Tree of Life by Gilles Massot. Located on the lift shaft in the CCL station, the artwork depicts
1512-602: The East Coast Integrated Depot , the world's first four-in-one train and bus depot were announced. It will be built at Tanah Merah beside the original Changi Depot site to serve the East–West , Downtown , and Thomson–East Coast lines. The new 36 ha depot can house about 220 trains and 550 buses and integrating the depot for both buses and trains will help save close to 66.12 acres (26.76 ha), or 60 football fields of land. The Tengah Depot for
1596-700: The Jurong Region Line will be situated at the western perimeter of Tengah , and an additional depot facility will be added near Peng Kang Hill station to support the operations of the JRL. Rolling stock for the Jurong Region Line will be stabled at both facilities. Tengah Depot will house the JRL Operations Control Centre and have a bus depot integrated with it to optimise land use. The Changi East Depot will serve
1680-541: The Kranji MRT station . The Ama Keng Chinese Temple (亞媽宮) in Lim Chu Kang was built in 1900 to worship Mazu , the holy mother, a goddess of peace and happiness. Ama means "grandmother" in Teochew and Hokkien , and keng means " temple ". The "incense ashes" of this temple were brought in from Wak Hai Cheng Bio Temple (粵海清廟), the oldest Teochew temple in Singapore. The first temple was made of attap . The temple
1764-664: The National Fire Protection Association in the United States . Full-height platform screen doors were already installed in underground stations since 1987, supplied by Westinghouse . There were calls for platform screen doors to be installed at elevated stations after several incidents in which passengers were killed by oncoming trains when they fell onto the railway tracks at elevated stations. The authorities initially rejected such calls by casting doubts over functionality and concerns about
SECTION 20
#17328014028551848-482: The forested core and the rural northwestern region – in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the country's public transportation system , averaging a daily ridership of 3.45 million in 2023. The MRT network encompasses approximately 241 km (150 mi) of grade-separated route on standard gauge . As of 2024, there are currently 141 operational stations dispersed across six operational lines arrayed in
1932-461: The initialism MRT , is a rapid transit system in Singapore and the island country's principal mode of railway transportation . The system commenced operations in November 1987 after two decades of planning with an initial 6 km (3.7 mi) stretch consisting of five stations. The network has since grown to span the length and breadth of the country's main island – with the exception of
2016-516: The 25 March 2005 accident, the Land Transport Authority (LTA) made the decision in 2008 to install platform screen doors in this station, whereby operations commenced on 10 June 2011. With the construction of the Circle line from 11 January 2005, the bridge was demolished and replaced with a newer one. The second level of the East West line station was also converted into a transfer level between
2100-481: The Christmas and New Year's Eve falls on the weekday, train frequencies will remain the same as weekdays only during morning peak whereas it will become 5 - 6 mins until 3pm and standardised to 5 min frequency throughout the whole period until the last train. Early stages of the MRT's construction paid scant attention to station design, with an emphasis on functionality over aesthetics. This is particularly evident in
2184-777: The East–West Line with its own maintenance facility, while Mandai Depot services trains for the Thomson–East Coast line. The underground Kim Chuan Depot houses trains for the Circle and Downtown lines, now jointly managed by the two MRT operators. SBS Transit has three depots: Sengkang Depot houses trains for the North East line , the Sengkang LRT line , and the Punggol LRT line . Tai Seng Facility Building , connected to and located east of Kim Chuan Depot ,
2268-498: The Founders' Memorial in 2028. In addition, this line and Canberra MRT station were the first to use top-up kiosks (TUK) that only allows cashless payments, while GTMs were retained for traditional modes of payment. In addition to the previously announced alignment of the Thomson–East Coast Line, an extension has been proposed to connect it to Changi Airport , with the line passing through Terminal 5 , and eventually absorbing
2352-513: The MRT line which runs from Outram Park to Clementi . The station was initially planned to be linked to a Light Rail Transit line that would have served residents living near the area, as well as students from the National University of Singapore and Singapore Polytechnic , as announced by Singapore's then-Communications Minister Mah Bow Tan . However, it was eventually not built due to its lack of economic viability. Following
2436-538: The Marina Bay Extension on 14 January 2012. Stage 1 of Downtown line opened on 22 December 2013 with its official opening made on 21 December 2013 by Prime Minister Lee Hsien Loong . Stage 2 opened on 27 December 2015, after being officially opened on 26 December by Prime Minister Lee. The Tuas West Extension of the East–West Line, consisting of Gul Circle , Tuas Crescent , Tuas West Road , and Tuas Link stations, opened on 18 June 2017. Stage 3,
2520-593: The Marina Line Architectural Design Competition, which was jointly organised by the Land Transport Authority and the Singapore Institute of Architects. The competition did not require any prior architectural experience from competitors and is acknowledged by the industry as one of the most impartial competitions held in Singapore to date. The winner of both stations was WOHA . In 2009, "Best Transport Building"
2604-683: The Mass Rapid Transit (MRT) were derived from a forecast by the country's planners back in 1967 which stated the need for a rail-based urban transport system by 1992. In 1972, a study was conducted by the American firms Wilbur Smith and Associates, Parsons Brinckerhoff, Tudor, and Bechtel, which was accounted for by the World Bank on behalf of the United Nations Development Programme . The study
Buona Vista MRT station - Misplaced Pages Continue
2688-546: The North–South Line. The extension is expected to be completed by the mid-2030s. Stage 5 from Bedok South to Sungei Bedok is planned to be operational by 2026. The northern terminus of Woodlands North is expected to interchange with the Johor Bahru–Singapore Rapid Transit System for greater connectivity between Johor Bahru and Woodlands , while Founders' Memorial station is an infill station along Stage 4, scheduled to open in tandem with
2772-494: The Sungei Gedong Camp's military training area in 2000s. On 11 July 2001, SAF took possession of the entire Sungei Gedong for military training area. In the 1980s, Lim Chu Kang Road End Bus Terminal was served by Services 172 (to Shenton Way Bus Terminal and later shortened to loop at Jalan Anak Bukit) and 206 (to Jurong Bus Interchange and later amended to Boon Lay Bus Interchange .) On 3 January 1993, route 172
2856-406: The area. On 17 February 2011, most parts of Neo Tiew became a military training area. In the 1960s, Sungei Gedong Road was lined with shophouses and cinemas. A major plan by the government to move residents into HDB flats have seen the decline of the small town. A small HDB estate which was opposite Lim Chu Kang Road was built in the early 1980s, but had been cleared by the late 1990s and expanded
2940-540: The assets owned by the Land Transport Authority , a statutory board of the Government of Singapore . The network was planned to be constructed and opened in stages, even as plans had already indicated the decision for two main arterial lines. The North–South Line was given priority because it passed through the Central Area that has a high demand for public transport. De Leuw Cather was appointed to undertake
3024-516: The bustling farming site to serve as the main food production centre. In 1980s, residents of the Ama Keng were resettled and all eventually moved out to Jurong West, Choa Chu Kang and Yew Tee. After the last resident left, on 10 April 2002, the SAF took possession of the entire Ama Keng for military training use. On 27 September 2012, an SAF serviceman died during training in the camp. After the removal of
3108-418: The deaths of four workers. On 15 November 2017, two trains, one being empty, collided at low speed at Joo Koon station due to a malfunction with the communications-based train control (CBTC). Prior to the 2020 circuit breaker measures during the early stages of the COVID-19 pandemic , the public transport operators and LTA were criticised by some commuters for its delayed actions of crowd control and
3192-517: The doors and are operational. These doors prevent suicides and unauthorised access to restricted areas. There were a few major incidents in the history of the MRT, which opened in 1987. On 5 August 1993, two trains collided at Clementi station because of an oil spillage on the track, which resulted in 132 injuries. During the construction of the Circle Line on 20 April 2004, a tunnel being constructed under Nicoll Highway collapsed and led to
3276-675: The early network is elevated above ground on concrete viaducts , with a small portion running at-grade; newer lines are largely subterranean, incorporating several of the lengthiest continuous subway tunnel sections in the world. A number of underground stations double as purpose-built air raid shelters under the operational authority of the Singapore Civil Defence Force (SCDF); these stations incorporate deep-level station boxes cast with hardened concrete and blast doors fashioned out of reinforced steel to withstand conventional aerial and chemical ordnance. The origins of
3360-403: The elderly and disabled. A retrofitting programme was completed in 2006, with every station provided with at least one barrier-free access route. Over the years, additional barrier-free facilities have been constructed in stations. Since 2020, newer MRT stations have been fitted with a minimum of two lifts. Operators and authorities have stated that numerous measures had been taken to ensure
3444-533: The enforcement of social distancing on public transport. In response, the LTA rolled out a series of precautionary measures, such as social distancing measures and making the wearing of masks in public transport mandatory. Social distancing markers were progressively implemented in the MRT trains and stations which commuters must adhere to; enforced by auxiliary officers and transport ambassadors. The significant reduction of commuters as remote work increased resulted in
Buona Vista MRT station - Misplaced Pages Continue
3528-421: The exception of selected periods, such as New Year's Eve , Chinese New Year , Deepavali , Hari Raya , Christmas , eves of public holidays and special occasions such as the state funeral of Lee Kuan Yew (2015), when most of the lines stay open throughout the night or extended till later (before the COVID-19 pandemic began in 2020). Additionally, some stretches of the line end earlier, open later and close on
3612-572: The existing Changi Airport branch on the East–West Line . With such an extension, there would be a direct connection between Changi Airport and the city. This extension is expected to start operating by 2040. Tunneling works are tendered out by the Land Transport Authority (LTA) Singapore and Shanghai Tunnel Engineering Corporation was awarded with the tunneling package for Terminal 5. Lim Chu Kang Lim Chu Kang Village
3696-548: The final stage of the Downtown Line, opened on 21 October 2017 with its official opening made on 20 October 2017 by Coordinating Minister for Infrastructure and Minister for Transport Khaw Boon Wan . The second infill station, Canberra station opened on 2 November 2019. Stage 1 of the Thomson–East Coast Line opened on 31 January 2020. Stage 2 of the Thomson–East Coast Line opened on 28 August 2021, extending
3780-546: The first few stages of the North–South and East–West lines that opened between 1987 and 1988 from Yio Chu Kang to Clementi . An exception to this was Orchard , chosen by its designers to be a "showpiece" of the system and built initially with a domed roof. Architectural themes became more important only in subsequent stages, and resulted in such designs as the cylindrical station shapes on all stations between Kallang and Pasir Ris except Eunos , and west of Boon Lay , and
3864-577: The first line operated by SBS Transit, opened on 20 June 2003, is one of the first fully automated heavy rail lines in the world. On 15 January 2006, after intense two-and-a-half years lobbying by the public, Buangkok station was opened, followed by Woodleigh station much later on 20 June 2011. The Boon Lay Extension of the East–West Line, consisting of Pioneer and Joo Koon stations, opened on 28 February 2009. The Circle Line opened in four stages with Stage 3 on 28 May 2009, Stages 1 and 2 on 17 April 2010, Stages 4 and 5 on 8 October 2011 and
3948-535: The future Cross Island Line , and the depot is to be placed at the eastern end of the line. A Singapore Rail Test Centre (formerly known as Integrated Train Testing Centre) with several test tracks for different situations and workshops for maintenance and refurbishment is also to be built at Tuas by 2022, with the main function being to test trains and integrated systems robustly before they are deployed on operational lines. The following table lists
4032-581: The government's intentions for the future of the transport network in Singapore. The latest plan, the Land Transport Master Plan 2040, was announced on 25 May 2019, and provides for line extensions to the Downtown and Thomson–East Coast lines, a new MRT line under study, and 2 new stations on the North–South Line . Hume is an infill station between Hillview and Beauty World and expected to open by 2025. An extension from Expo
4116-400: The government's intentions to greatly expand the system. It called for the expansion of the 67 kilometres of track in 1995 to 360 in 2030. It was expected that daily ridership in 2030 would grow to 6.0 million from the 1.4 million passengers at that time. New lines and extensions are mostly announced as part of the Land Transport Master Plan, which is announced every five years and outlines
4200-421: The high installation costs. Nevertheless, the LTA reversed its decision and made plans to install half-height platform screen doors in all elevated stations on 25 January 2008. The first platform screen doors by ST Electronics were installed at Jurong East , Pasir Ris , and Yishun stations in 2009 under trials to test their feasibility. By 14 March 2012, all elevated stations have been retrofitted with
4284-421: The horizontal integration of the broader public transportation network. The MRT is fully automated and has an extensive driverless rapid transit system . Asset renewal works are periodically carried out to modernise the network and ensure its continued reliability; all stations feature platform screen doors , Wi-Fi connectivity , lifts , climate control , and accessibility provisions, among others. Much of
SECTION 50
#17328014028554368-506: The initial construction of the system. An MRT System Designs Option Study was also conducted to refine the technical details and the recommended measures for the MRT system - these include: Singapore's MRT infrastructure is built, operated, and managed in accordance with a hybridised quasi- nationalised regulatory framework called the New Rail Financing Framework (NRFF), in which the lines are constructed and
4452-505: The introduction of the Light Rail Transit (LRT) lines connecting with the MRT network. On 6 November 1999, the first LRT trains on the Bukit Panjang LRT went into operation. The Expo and Changi Airport stations were opened on 10 January 2001 and 8 February 2002 respectively. The very first infill station of the MRT network to be built on an existing line, Dover station opened on 18 October 2001. The North East Line ,
4536-699: The largest audiences in Asia of the BBC World Service from Kranji. Closure of the site was announced in July 2023. Today, Lim Chu Kang is still largely rural and is located in close proximity with the Western Water Catchment . Lim Chu Kang is served by two main roads known as Lim Chu Kang Road and Old Choa Chu Kang Road . As this area is still undeveloped, its land use primarily consists of military training areas, agriculture , farms ,
4620-418: The length of the station platform. This complements a smaller 40-metre reflective stainless-steel disc overlapping the titanium ellipse and visually floats over a glass elevator shaft and the main entrance. The other station with similar architecture is Dover . Changi Airport station, the easternmost station on the MRT network, has the widest platform in any underground MRT station in Singapore. In 2011, it
4704-472: The line from Woodlands South to Caldecott. Stage 3 of the Thomson–East Coast Line opened on 13 November 2022, extending the line from Caldecott to Gardens by the Bay. On 23 June 2024, the line was extended eastwards terminating at Bayshore. The lines are named based on their directions and/or locations. The names were envisioned to be user-friendly, as shown in a survey in which 70% of the respondents expressed such
4788-405: The major ones, have additional amenities and services, such as retail shops and kiosks, supermarkets, convenience stores, automatic teller machines, and self-service automated kiosks for a variety of services. Most heavy-duty escalators at stations carry passengers up or down at a rate of 0.75 m/s, which is 50% faster than conventional escalators. The Land Transport Authority (LTA) announced
4872-502: The military training area in Tengah by 2016, it became the largest training ground for the Lim Chu Kang and Keat Hong camps. In the 1960s and 1970s, Ama Keng was well-served by shops, a police station as well as a maternity and child welfare centre. All these were closed down by 1990. The Ama Keng English School was founded in 1951 and was moved to Choa Chu Kang in 1990 and renamed to South View Primary School. The old school building became
4956-539: The mural depicts Buona Vista's history from the 1930's to the 1970's including the Singapore Motor Club, its various former military bases, and the Ghim Moh Estate. 01°18′26.4″N 103°47′24.1″E / 1.307333°N 103.790028°E / 1.307333; 103.790028 Mass Rapid Transit (Singapore) [REDACTED] The Mass Rapid Transit system, locally known by
5040-550: The network while the inauguration of Boon Lay station on 6 July 1990 marked the completion of the initial system two years ahead of schedule. The MRT has been continuously expanded ever since. On 10 February 1996, a S$ 1.2 billion expansion of the North–South Line into Woodlands was completed, merging the Branch Line into the North–South Line and joining Yishun and Choa Chu Kang stations. The concept of having rail lines that bring people almost directly to their homes led to
5124-417: The network. Underground stations and trains are air-conditioned, while above-ground stations have ceiling fans installed. Every station is equipped with Top Up Kiosk (TUKs), a Passenger Service Centre and LED or plasma displays that show train service information and announcements. All stations are equipped with restrooms and payphones; some restrooms are located at street level. Some stations, especially
SECTION 60
#17328014028555208-484: The only remaining cemeteries in Singapore (due to exhumations in others to make way for new developments) and a major cinerarium . There are also side-roads, like Jalan Sungei Poyan , Lim Chu Kang Road Track 11/13 and Jalan Bahtera. The area will not be used for residential purposes in the near future or in the Land Use Plan 2030. Rather, it will largely retain its agricultural and military value. The 62 farms in
5292-437: The operations control centre of the respective lines. Trains are equipped with intercoms to allow passengers to communicate with staff during emergencies. SMRT Corporation has six train depots: Bishan Depot is the central maintenance depot for the North–South Line with train overhaul facilities, while Changi Depot and Ulu Pandan Depot inspect and house trains overnight. The newer Tuas Depot , opened in 2017, provides
5376-593: The perched roofs at Boon Lay, Lakeside , Chinese Garden , Bukit Batok , Bukit Gombak , Choa Chu Kang , Khatib , Yishun , and Eunos stations. Expo station , located on the Changi Airport branch of the East–West Line , is adjacent to the 100,000-square-metre Singapore Expo exhibition facility. Designed by Foster and Partners and completed in January 2001, the station features a large, pillarless, titanium-clad roof in an elliptical shape that sheathes
5460-418: The programme due to financial grounds and concerns of jobs saturation in the construction industry. Dr Goh instead endorsed the idea of an all-bus system recommended by Harvard University specialists, who argued this would reduce the cost by 50% compared to the proposed MRT system. Public opinion was split on the matter: several expressed concerns about the high cost while others were more focused on increasing
5544-400: The safety of passengers, and SBS Transit publicised the safety precautions on the driverless North East Line before and after its opening. Safety campaign posters are highly visible in trains and stations, and the operators frequently broadcast safety announcements to passengers and to commuters waiting for trains. Fire safety standards are consistent and equivalent with the guidelines of
5628-597: The signalling system on the MRT is the automatic train control (ATC) system, which in turn is made up of two sub-systems: the automatic train operation (ATO) and automatic train protection (ATP). The ATC has trackside and trainborne components working together to provide safe train separation by using train detection, localisation, and end of authority protection. It also provides safe train operation and movement by using train speed determination, monitoring, over-speed protection and emergency braking. The safety of alighting and departing passengers will also be provided by using
5712-430: The speed of the train to maintain safe braking distance, and initiate emergency braking in the event of overspeed. The MRT also uses an automatic train supervision system to supervise the overall operation of the train service according to a prescribed timetable or train interval. The oldest lines, the North–South Line and East–West Line , were the only lines running with fixed block signalling . The North–South Line
5796-403: The standard of living. Following a debate on whether a bus-only system would be more cost-effective, Communications Minister Ong Teng Cheong came to the conclusion that an all-bus system would be inadequate, as it would have to compete for road space in a land-scarce country. Ong was an architect and town planner by training and through his perseverance and dedication became the main figure behind
5880-481: The stations' interior architecture, these works aim to promote the appreciation of public art in high-traffic environments. The artwork for each station is designed to suit the station's identity. Subsequently, all stations on the North East, Circle and Downtown lines have taken part in this programme during their construction, with additional artworks installed at stations on other MRT lines. A key component of
5964-492: The transport operators reducing train frequencies and closing stations earlier from 17 April. However, train frequencies were shortly reverted to normal upon review and feedback from the public. Since June 2020, the MRT system has resumed pre-circuit breaker operations. Regulations for social distancing on public transport are no longer applicable by law. Social distancing stickers on seats have been removed. MRT lines operate from 5:30 am to 1:00 am daily, with
6048-409: The two lines. The Circle line platforms were opened on 8 October 2011, while the two new exits share the same location as the original one. The station is located along Buona Vista Road, near The Star . The station is situated between Commonwealth and Dover stations. Its official station code is “EW21”. The station consists of an island platform , with doors opening on the right. The station
6132-454: The upcoming lines and stations that have been officially announced: The MRT system relied on its two main lines, the North–South and East–West lines, for more than a decade until the opening of the North East Line in 2003. While plans for these lines as well as those currently under construction were formulated long before, the Land Transport Authority's publication of a White Paper titled " A World Class Land Transport System " in 1996 galvanised
6216-499: The village. Neo Tiew Road is named after him. The area was originally noted for its numerous pepper and gambier plantations. Later there were rubber plantations, e.g. Namazie-Cashin rubber estates. Lim Chu Kang was one of the locations where the Imperial Japanese Army first landed on the north-western coastline on 8 February 1942, catching the defending 22nd Brigade Australian soldiers by surprise. The battle
6300-485: The western part of Lim Chu Kang are being cleared progressively from April 2020 and completing in December 2022, to make way for military training areas. Various types of farms where sustainable agriculture is practiced such as vegetable, goat and crocodile farms give city dwellers an insight on nature. It has also been an increasingly popular exploration for tourists in recent years, due in part to its close proximity to
6384-597: Was amended to Boon Lay Interchange. On 18 July 1993, new service 175 was introduced from Lim Chu Kang to Upper Bukit Timah Road (Loop) replacing route 206 which was withdrawn. In 2005 service 175 was shortened to Bukit Panjang, amended to loop at the Lim Chu Kang Road End and renumbered service 975. The bus stop is renamed as Police Coast Guard. In 1978 the BBC Far Eastern Relay Station began broadcasting radio programmes addressing
6468-538: Was awarded to the designers at WOHA Architects at the World Architecture Festival for their design of Bras Basah station. Many MRT stations have specially commissioned artworks in a wide variety of art styles and mediums, including sculptures, murals and mosaics. With over 300 art pieces across 80 stations, it is Singapore's largest public art programme. In the early stages of the MRT, artworks were seldom included; primarily consisting of
6552-540: Was eventually demolished. In 1979, a Housing Development Board estate was constructed in Neo Tiew. In addition to public housing units, a wet market and an old playground were also constructed in this estate. In 2002, the entire estate was sold back to the government in an en-bloc sale; its residents moved to newly built housing units in Jurong West . The remains of the old housing estate are currently used by
6636-604: Was fought over the night between the Imperial Japanese Army and Australian soldiers, which saw some 360 Australian soldiers killed despite having inflicted heavy casualties on the Japanese soldiers. Ama Keng Village (亞媽宮村) was one of the three villages in the Lim Chu Kang, together with Neo Tiew and Sungei Gedong. It takes its name from the Mazu, the goddess of the sea in 1900. In the 1950s, the government developed
6720-520: Was founded by Neo Ao Tiew ( Chinese : 梁後宙 ; pinyin : Liáng Hòuzhòu ; 1884 - 1975), a Chinese immigrant from Fujian who was the sheriff of the village. "Lim" was taken from Lim Chwee Chian who was the kangchu , or leader, of the area. The village is on the banks of the Sungei Kranji and was controlled by the Lim clan . Neo Tiew also set up a primary school and health centre in
6804-477: Was rated 10 out of 15 most beautiful subway stops in the world by BootsnAll. Various features have been incorporated into the design to make the station aesthetically pleasing to travellers. The station is designed by architectural firm Skidmore, Owings and Merrill , featuring a large interior space and an illuminated 150-metre (490 ft) link bridge spanning over the island platform. Two Circle Line stations— Bras Basah and Stadium —were commissioned through
6888-406: Was renovated in 1943 with a zinc roof and timber . In 1965, it was redeveloped with a tiled roof, and the renovations cost S$ 16,000. The temple holds wayang performances a few times a year. In the late 1980s, the government acquired the temple's land for military purposes. The temple committee, residents and devotees attempted to petition against the acquisition without success, and the temple
6972-460: Was undertaken for eight years, including the phases of the study in 1974 and 1977. In 1979, to prepare the third phase of the study, Halcrow , a British firm, was appointed to craft the system; meanwhile, a third phase of the study was published in 1981. However, opposition from the government on the feasibility of the MRT from prominent ministers, among them Finance Minister Goh Keng Swee and Trades and Industry Minister Tony Tan , nearly shuttered
7056-577: Was upgraded to moving block / CBTC in 2017, and the East–West line upgraded in 2018. As of 27 May 2018, all MRT lines use the CBTC/moving block system in normal daily operations and from 2 January 2019, the old signalling system ceased operations. In comparison to the original fixed block system, the CBTC can reduce train intervals from 120 seconds to 100 seconds, allowing for a 20% increase in capacity and
#854145