Misplaced Pages

Journal Square–33rd Street

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Journal Square–33rd Street is a rapid transit service operated by the Port Authority Trans-Hudson (PATH). It is colored yellow on the PATH service map and trains on this service display yellow marker lights. This service operates from Journal Square in Jersey City , New Jersey by way of the Uptown Hudson Tubes to 33rd Street in Midtown Manhattan , New York . The 5.7-mile (9.2 km) trip takes 22 minutes to complete.

#190809

91-922: This service operates as a direct service from 6 a.m. to 11 p.m. on weekdays. At other times, this service is replaced with the Journal Square-33rd Street (via Hoboken) service. The Journal Square–33rd Street service originated as the Grove Street–33rd Street service operated by the Hudson and Manhattan Railroad (H&M). It started operating between Grove Street in Jersey City, New Jersey and 33rd Street in Manhattan , beginning September 6, 1910. The Newark–Hudson Terminal line between Hudson Terminal and Grove Street also started operating at this time. The Newark line

182-448: A billion dollars, and utility installation around the entire World Trade Center site cost another $ 400 million. Over $ 500 million in cost savings was overlooked. The design was costly, with Calatrava netting $ 80 million in design fees and the overall architectural design being another $ 405.8 million. Speeding up the pace of construction also contributed to the higher cost, with $ 100 million dedicated to building

273-507: A cost of $ 275,000, was designed to have an "aspiring quality," according to architect Bartholomew Voorsanger . That entrance on Church Street was closed in April 2008 when the entrance was relocated once again. On April 1, 2008, the third temporary entrance to the PATH station opened for commuters. The entrance was located on Vesey Street, adjacent to 7 World Trade Center . It was demolished with

364-471: A door on display that has the words "MATF 1 / 9 13" spray-painted on it (a message from Urban Search and Rescue Massachusetts Task Force 1 of Beverly, Massachusetts , who searched the World Trade Center site on September 13, 2001). There is a plaque above the spray-painting, explaining the message on the door. PATH was required to preserve the passageway's original design as per Section 106 of

455-523: A hat dropped by her sister, but lost her balance and fell; it was later revealed that she "was pretending to be flying" while lying on the escalator's handrail. After her death, there was some focus on the height of the 3-foot-4-inch (1.02 m) handrails, and how they could pose a safety risk. The Transportation Hub is designed to connect the PATH subway system to the New York City Subway system. The 1 service, which runs through

546-553: A large transportation station downtown, intended to rival Penn Station and Grand Central Terminal . Calatrava was hired as the architect for this new, $ 2 billion design, and he revealed his plan in January 2004. Calatrava's design called for an above-ground station house (now the Oculus) with curved supports that extended outward, like wings. These wings would run the length of the concourse, which would run from Church Street in

637-488: A new PATH terminal was seen as instrumental in making this happen. In August 2002, the U.S. government allocated $ 4.5 billion to build a terminal linking the subway and PATH stations at the World Trade Center site. Four locations were considered, and it was ultimately decided to build the new terminal four levels underground, along the base of the World Trade Center "bathtub". A large transit station

728-654: A single station is attributed to the extravagant design, which stems from the Port Authority needing to convince the government of New Jersey to pay for a project situated entirely in New York. Originally, the reconstruction was to be funded by the Federal Transit Administration , which gave approximately $ 1.9 billion to the project. The costs of the hub were still expensive, but it was to be finished at budget in 2009. In 2014 dollars,

819-513: A temporary platform and track, as well as the construction of Platform D, the first permanent platform. The fourth phase would consist of the lengthening of the other three platforms, expansion of the mezzanine, and structural completion, while the fifth phase would include the construction of the station house. The complex would be completed by 2009 or 2010 under this plan. The station design received critical acclaim. In 2004, Herbert Muschamp , architecture critic for The New York Times , compared

910-496: A temporary station opened on November 23, 2003. The inaugural train was the same one that had been used for the evacuation. The temporary PATH station was designed by Port Authority chief architect Robert I. Davidson and constructed at a cost of $ 323 million. It was located at the same place as the original station. The station featured a canopy entrance along Church Street and a 118-by-12-foot (36 by 3.7 m) mosaic mural , "Iridescent Lightning," by Giulio Candussio of

1001-491: A three-day maintenance period to divert service to the World Trade Center PATH station. The new PATH station opened on July 6, 1971, west of the original terminal. Larger balloon loops in the PATH station platform allowed 10-car trains; the previous station with its tight loops could only handle trains of up to 6 cars. When the station opened, it had nine high-speed escalators between the platform level and

SECTION 10

#1732776297191

1092-625: A tunnel to Lower Manhattan to provide faster service to John F. Kennedy International Airport . The project was halted in 2008 before an environmental impact statement could be created. As of September 2018 , current services include: The Fulton Street station complex (where the Fulton Center opened in November 2014) is two blocks away to the east and is fully compliant with the Americans with Disabilities Act of 1990 . It features

1183-594: A week, the Port Authority was able to resume PATH service to the World Trade Center. The station was closed on September 11, 2001 , after American Airlines Flight 11 hit the North Tower of the World Trade Center at 8:46 a.m.. In the minutes afterward, three PATH trains pulled into the station. One had arrived from Newark and two others from Hoboken. The first Hoboken train turned around without stopping, not letting off passengers or opening any doors. The second Hoboken train arrived on track 3 at 8:52 a.m. and

1274-1050: Is a rapid transit service operated by the Port Authority Trans-Hudson (PATH) railroad . It is colored yellow and blue on the PATH service map, and trains on this service display both yellow and blue marker lights. This service operates from Journal Square in Jersey City , New Jersey by way of the Uptown Hudson Tubes to 33rd Street in Midtown Manhattan , New York , with trains reversing direction mid-route at Hoboken Terminal . The 6.7-mile (10.8 km) trip takes 26 minutes to complete. This service operates from 11 p.m. to 6 a.m. on weekdays and all day on weekends and holidays. It combines PATH's two services to midtown Manhattan, Journal Square–33rd Street and Hoboken–33rd Street , into one during these off-peak hours. The Hoboken–World Trade Center service does not operate during

1365-428: Is amassing an unusually long list of projects marred by cost overruns, delays and litigation", referring to his other projects around the world that were over budget. Especially because the current station has a ridership of only 46,000 daily passengers compared to 250,000 at Grand Central Terminal, the renovation is sometimes depicted as overpriced and overstylized. According to a writer for Esquire magazine, even if

1456-401: Is located at the far east end of the mezzanine, past the mall's shops. The second mezzanine level contains the entrances to the station, as well as more connections to the subway. The third mezzanine level, located directly above the platform, contains the fare control and access to the platforms. Prior to reconstruction, there was a temporary entrance on Church Street, which opened along with

1547-427: Is near the site of the Hudson and Manhattan Railroad 's (H&M) Hudson Terminal , which opened in 1909. The Port Authority of New York and New Jersey bought the bankrupt H&M system in 1961, rebranded it as PATH, and redeveloped Hudson Terminal as part of the World Trade Center . The World Trade Center station opened on July 6, 1971, as a replacement for Hudson Terminal, which was closed and demolished as part of

1638-976: The Battery Park City Ferry Terminal . Between September 2003 and April 2004, the Lower Manhattan Development Corporation , the Metropolitan Transportation Authority , the Port Authority, and the New York City Economic Development Corporation conducted a feasibility study of the Lower Manhattan–Jamaica/JFK Transportation Project . It would use the Long Island Rail Road 's Atlantic Branch to Downtown Brooklyn and

1729-555: The Fulton Center and Dey Street Concourse opened to the public. The Dey Street Concourse entrance into the Transportation Hub was closed until the Hub opened. On November 22, the last of 114 rafters was installed. Also, by this date, one crane had been disassembled and painting of the hub continued. On May 7, 2015, Platform B and the remaining half of Platform A opened, and Platform C closed. A few weeks later, on May 29,

1820-589: The Hudson River . The H&M went bankrupt in 1954. The state of New Jersey wanted the Port Authority of New York and New Jersey to take over the railroad, but the Port Authority had long viewed it as unprofitable. The Port Authority ultimately took over the H&;M as part of an agreement concerning the construction of the World Trade Center . The Port Authority had initially proposed constructing

1911-547: The National September 11 Memorial & Museum and another $ 24 million to speed up delivery of construction materials. The price of the station was further driven up by Calatrava's architectural decisions. He wanted to import custom-made steel from a northern Italian factory, which cost $ 474 million, and have a columnless, aesthetically based design; skylights in the ground, instead of trees; and large, soaring "wings", or rafters. Another $ 335 million

SECTION 20

#1732776297191

2002-604: The New York metropolitan area . The new station has received mixed reviews: although the hub has been praised for its design, it has also been criticized for its high costs and extended delays. The station has five tracks served by three island platforms and one side platform in a basement four stories underground. Platform A, next to tracks 1 and 2, opened as part of the Transportation Hub on February 25, 2014. Platform B between tracks 2 and 3 opened on May 7, 2015. The other two platforms opened on September 8, 2016. Above

2093-562: The Scuola Mosaicisti del Friuli in Spilimbergo , Italy. The station was also adorned with opaque panel walls inscribed with inspirational quotes attesting to the greatness and resilience of New York City. These panels partially shielded the World Trade Center site from view. Some sections of the station, including the passageway and the signage on the northeast corner, were only lightly damaged on September 11, 2001, during

2184-546: The Vierendeel Truss , one of the hub's key components, began with the installation of a 50 short tons (45 long tons) section of the 271-short-ton (242-long-ton) truss. The truss serves as the mezzanine roof and also acts as a support for the northeast corner of the WTC Memorial. The Oculus's $ 542 million construction contract was awarded to Skanska in summer 2010. The project included steel erection for

2275-439: The collapse of the World Trade Center . These sections of the station were retained in the temporary station, and remained in the new station. Following its reopening and the resumption of Newark–World Trade Center and Hoboken–World Trade Center services, the station quickly reclaimed its status as the busiest station in the PATH system. However, it had several limitations. The temporary station had 8-car-long platforms, whereas

2366-660: The construction of the World Trade Center . Following the September 11 attacks , a temporary PATH station opened in 2003 while the World Trade Center complex was being rebuilt. Work on a permanent station building commenced in 2008. The main station house, the Oculus, opened on March 3, 2016, and the terminal was renamed the World Trade Center Transportation Hub , or "World Trade Center" for short. The station has five tracks and four platforms in

2457-401: The "bird has grown a beak", and that because of the new security features, the station might "now evoke a slender stegosaurus more than it does a bird". The design was further modified in 2008 to eliminate the opening and closing roof mechanism because of budget and space constraints. A Curbed NY reporter wrote in 2015, "The platform's mezzanine level ... is kind of amazing and shows off

2548-540: The Exchange Place station was needed after the attacks. In addition, the downtown Hudson tubes had been flooded, which destroyed the track infrastructure. Modifications to the tracks were also required since the Exchange Place station was not a terminal station. The uptown PATH tubes , ferry routes, and NJ Transit lines across the Hudson River could not handle the displaced ridership on their own, and it

2639-557: The Hoboken station was reopened after repairs were completed, but the line did not resume service until early 2013 due to repairs in other areas of the PATH system. Because of positive train control installation on the Uptown Hudson Tubes , the Journal Square–33rd Street via Hoboken service was mostly suspended on weekends from July to October 2018. Since all stations between Christopher and 33rd Streets were closed during

2730-585: The Hub. In addition, the Dey Street Passageway along Dey Street connects the Transportation Hub east to the Fulton Center , providing access to the 2 , ​ 3 ​, 4 , ​ 5 ​, A , ​ C , ​ E ​, J ​, N , ​ R , ​ W , and Z services. A passageway, known as the West Concourse, connects west to Brookfield Place and

2821-798: The Newark–33rd Street via Hoboken branch. When the Exchange Place station reopened in June 2003, the Newark–33rd Street via Hoboken branch was truncated to Journal Square , but operated during weekends as well. It was renamed the Journal Square–33rd Street (via Hoboken) branch. After Hurricane Sandy flooded the PATH system in October 2012, service on the line was suspended. For most of November, trains ran between Newark Penn Station and 33rd Street. The Journal Square–33rd Street line

Journal Square–33rd Street - Misplaced Pages Continue

2912-442: The Oculus was built to maximize the effect of the autumnal equinox rays (coinciding with the skylight opening on or around September 11 every year). On the actual anniversary of the attacks, the skylight would open for 102 minutes to commemorate the duration between the time the first tower was hit and the collapse of the second tower . If needed, the skylight could also be manually opened to provide air ventilation. As outlined in

3003-428: The Oculus's construction did not begin in earnest until July 8, 2008, when the first prefabricated "ribs" for the pedestrian walkway under Fulton Street were installed on the site. The mezzanine level of the station was undergoing major construction and work on the foundation was underway. By March 2011, over 225 of the 300 steel pieces that make up the roof of the station were installed. Later that month installation of

3094-543: The PATH hub was appropriate for the World Trade Center site, as it would be "a major cultural contribution" to the New York City skyline. A committee for Manhattan Community Board 1 called the station design "beautiful" in 2005. Calatrava described the original design as representative of "a bird being released from a child's hand". However, Calatrava's original soaring spike design was scaled back because of security issues. The New York Times observed in 2005 that

3185-425: The PATH system in late October 2012. As a result, the station was closed for repairs caused by damage to trainsets, mud, rusted tracks, and destroyed critical electrical equipment after approximately 8 feet (2.4 m) of water submerged the tunnels in and around the station. Due to the lengthy amount of time that was necessary to complete the repairs, service on the line was temporarily suspended. On December 19, 2012,

3276-624: The Transportation Hub, was reconstructed under this project to run above the PATH mezzanine. The 1 train's rebuilt WTC Cortlandt station, which opened in September 2018, has direct access into the Hub. There is also a direct access to the Chambers Street–World Trade Center/Park Place/Cortlandt Street station complex. The N , ​ R , and ​ W trains' Cortlandt Street–Church Street station also has direct access into

3367-429: The West Concourse became possible for employees when the tower opened on November 3, 2014. On May 29, 2015, the same day the tower's observatory opened, the entrance to the observation deck opened. The concourse cost $ 225 million to build, and has been described as the most expensive passageway in the world. Construction of the Oculus called for relocation of the World Trade Center cross in April 2006. However,

3458-674: The Westfield World Trade Center entrance opened. To accommodate repairs to the Downtown Hudson Tubes, service on the Newark–World Trade Center line between Exchange Place and World Trade Center was suspended during almost all weekends in 2019 and 2020, except on holiday weekends. Hudson Terminal was built by the Hudson and Manhattan Railroad and opened on July 19, 1909. Hudson Terminal included two 22-story office buildings located above

3549-472: The World Trade Center footprints each September. The plaza would have included a wedge whose lines showed the sun's rays at 8:46 a.m. and 10:28 a.m. on September 11 of each year. These times respectively represented when American Airlines Flight 11 crashed into the North Tower and when it collapsed. In early 2004, the Port Authority, which owns the land, modified the Libeskind plan to include

3640-551: The arrangement of the first and second World Trade Center stations. By 1914, passenger volume at the Hudson Terminal had reached 30,535,500 annually. Volume nearly doubled by 1922, with 59,221,354 passengers that year. Overall ridership on the Hudson and Manhattan Railroad declined substantially from a high of 113 million riders in 1927 to 26 million in 1958, after new automobile tunnels and bridges opened across

3731-408: The closure of the Exchange Place and World Trade Center stations; the former was closed due to severe water damage. A fourth train was sent to the station at 9:10 a.m. to pick up a dozen PATH employees and a homeless individual, leaving the station empty. The station was subsequently destroyed during the collapse of the World Trade Center . With the station destroyed, service to Lower Manhattan

Journal Square–33rd Street - Misplaced Pages Continue

3822-535: The complex on the East River , on the opposite side of Lower Manhattan from Hudson Terminal. As an interstate agency, the Port Authority required approval for its projects from both New Jersey's and New York's state governments, but the New Jersey government objected that the proposed trade center would mostly benefit New York. In late 1961, Port Authority executive director Austin J. Tobin proposed shifting

3913-598: The construction project. On March 3, 2016, the Oculus partially opened to the public, along with new entrances. Only the west end of the Oculus and the Westfield Mall corridor to Four World Trade Center was opened. Two months later, on May 26, 2016, PATH riders received a direct underground link to Fulton Center and the Cortlandt Street–Church Street station through the Oculus. The PATH entrance into 2 World Trade Center opened on June 21, 2016, and

4004-428: The cost of the hub was estimated at $ 4 billion. The hub cost twice as much in 2014 as it should have originally cost in 2004. The West Concourse cost $ 225 million and was billed as the "world's most expensive hallway". Construction, maintenance, and management alone cost $ 635 million; the Port Authority awarded several subcontracts, most of them costly. The fees of the main construction team took up almost

4095-553: The design to the Bethesda Terrace and Fountain in Central Park . He congratulated the Port Authority for hiring Calatrava, and predicted that the new station would be able to impact the city's future. Muschamp continued that the architect's vision "should satisfy those who believe that buildings planned for ground zero must aspire to a spiritual dimension." Another New York Times critic, Michael Kimmelman, wrote that

4186-499: The direct underground link to the New York City Subway's World Trade Center station, at the northeast corner of the complex, reopened. Following the 17th anniversary of the September 11 attacks in 2018, the rubber seal of the Oculus's skylight broke. As a result, for the 18th anniversary in 2019, the skylight was unable to open as scheduled. On October 13, 2016, the first birth inside the Oculus occurred. A woman

4277-435: The disaster. The booth closed in the spring of 2007 to make way for construction at the World Trade Center site . In June 2007, the street entrance to the temporary station was closed and demolished as part of the site construction. A set of new staircases was constructed several feet to the south, and a "tent" structure was added to provide cover from the elements. The tent structure, by Voorsanger Architects and installed at

4368-406: The east to the PATH station under Greenwich Street in the west. The building itself would be located on its own block, bounded clockwise from the north by Fulton, Church, Dey, and Greenwich Streets. A skylight would run the length of the station building. The roof was originally designed to mechanically open to increase light and ventilation to the enclosed space. In a nod to the Libeskind concept,

4459-470: The entrance to the observation deck in the West Concourse was opened on the same day One World Observatory also opened. In late September, the temporary new West Walkway opened with access from the platforms to the West Concourse. The Transportation Hub has been described as either one of the world's most expensive train stations, or the world's single most expensive station, for its massive reconstruction cost of approximately $ 4 billion. By contrast,

4550-417: The first platform of the new station, Platform A, was opened to the public with service to Hoboken. The new platform, an island platform , was fully modernized and contains new lighting, speakers, illuminated signs, escalators, and elevators. The west side of the platform was walled off at the time. On November 3, One World Trade Center opened, as did the PATH entrance from that building. Eight days later,

4641-461: The following services: At the northeast end of the station is the exit to the World Trade Center station of the New York City Subway. The doors and original ADA-accessible ramp, as well as the structure from the first World Trade Center leading into the station, survived the September 11 attacks . The station itself was not damaged, but it was covered by dust and was subsequently closed. The passageway reopened to provide an ADA-connection from

SECTION 50

#1732776297191

4732-583: The ground. The interior of the station house contains two underground floors, which house part of the Westfield World Trade Center mall. The transportation hub connects the various modes of transportation in Lower Manhattan, from the Fulton Center in the east to the Battery Park City Ferry Terminal in the west, and includes connections to various New York City Subway stations. It is the fifth-busiest transportation hub in

4823-464: The hub's cost were disregarded, operating the PATH was itself a waste of money for the Port Authority. In late 2015, the opening was delayed to early 2016 by a leaking roof. When the hub opened in March 2016, the director of the Port Authority , Pat Foye, declined to hold an event to celebrate the opening of the Hub, describing it as "symbol of excess" and noting he was "troubled with the huge cost" of

4914-608: The internal construction, such as paint, turnstiles, and ticket booths, was expected to complete in the end of 2015, with an official opening scheduled for December 17, 2015. On October 23, 2013, the West Concourse opened with access to the World Financial Center, now renamed the Brookfield Place . The storefronts were covered and not yet opened, and the second floor was still closed for construction of One World Trade Center. On February 25, 2014, half of

5005-433: The late-night hours or on weekends. Passengers wishing to travel from Hoboken to World Trade Center at these times must take the southbound Journal Square–33rd Street via Hoboken train from Hoboken and transfer at Grove Street to the northbound Newark–World Trade Center train. The service originated shortly after the September 11 attacks , which destroyed the World Trade Center station. All service to lower Manhattan

5096-499: The mezzanine level. The WTC PATH station was served by Newark–World Trade Center and Hoboken–World Trade Center trains. The station was connected to the World Trade Center towers via an underground concourse and a shopping center . There were also underground connections to the New York City Subway ( A , ​ C , and ​ E trains at World Trade Center , and N , ​ R , and ​ W trains at Cortlandt Street–Church Street ). By 2001,

5187-488: The middle of a turning loop . Trains from New Jersey use the loop to turn around and head back to New Jersey. The platforms are four floors below ground level. The floor immediately above the platforms is occupied by the station's fare mezzanine. The New York City Subway 's WTC Cortlandt station is adjacent to and above the mezzanine. The $ 4 billion Oculus station house, designed by Spanish architect Santiago Calatrava , consists of white ribs that interlock high above

5278-663: The new 365,000-square-foot (33,900 m ) Westfield World Trade Center mall. After the September 11 attacks, officials proposed a $ 7 billion redesign of transit in Lower Manhattan. This included a new PATH terminal, the Fulton Center, the South Ferry/Whitehall Street terminal further downtown, and the reconstruction of the West Side Highway . Other development projects to restart Lower Manhattan's economy were also proposed, and

5369-590: The number of passengers using the station during rush hours, and that any leaks caused the marble floors to become slippery. Kabak also said that "the PATH Hub is shaping up to be an example of design divorced from purpose." Steve Cuozzo of the New York Post described the station in 2014 as it was being built as "a self-indulgent monstrosity" and "a hideous waste of public money". Michael Kimmelman , architecture critic for The New York Times , referred to

5460-402: The opening of the permanent Calatrava-designed station, since it was on the site of the future Performing Arts Center . The World Trade Center Transportation Hub is the Port Authority of New York and New Jersey 's formal name for the new PATH station and the associated transit and retail complex that opened on March 3, 2016. The station's renaming took place when the station reopened. It

5551-506: The original station had 10-car-long platforms. The station frame was also not strong enough to support development above it, and parts of the station were located outdoors in the "bathtub". The temporary station had only one entrance, at Church Street, and disabled patrons needed to take four elevators to go from street level to platform level. The station was also home to a StoryCorps booth, which opened in 2005. Through this program, visitors could arrange to give oral recorded histories of

SECTION 60

#1732776297191

5642-450: The project to Hudson Terminal and taking over the H&M in exchange for New Jersey's agreement. On January 22, 1962, the two states reached an agreement to allow the Port Authority to take over the railroad and build the World Trade Center on the Hudson Terminal site, which was by then deemed obsolete. Groundbreaking on the World Trade Center took place in 1966. The site was on land fill , with bedrock located 213 feet (65 m) below

5733-522: The proposed 2-mile (3.2 km) extension of the Newark–World Trade Center PATH service to Newark Liberty International Airport is projected to cost $ 1.5 billion. The hub was also criticized for its delays, as the hub was completed almost 10 years later than originally projected. However, even the original cost projections for the hub were high, as the original proposal was projected to cost almost $ 2 billion. The high cost for

5824-580: The reconstruction plan, the new terminal would be rebuilt in several stages. The first phase would include the construction of a temporary northern entrance, which would be open between 2005 and 2006. The second phase would entail the construction of an East-West Concourse under the West Side Highway, connecting to the World Financial Center (now Brookfield Place). The third phase would include temporary structural underpinning for

5915-540: The rest of the temporary station in November 2003. With the redevelopment of the World Trade Center site , the entrances and size of the temporary station have changed over time. In 2007, the Church Street entrance was relocated to the south, and the old entrance was closed and demolished. In April 2008, a third and final temporary entrance to the station was located at Vesey Street, facing Greenwich Street and adjacent to 7 World Trade Center . The temporary entrance

6006-480: The station instead of on columns through the station. In 2012, Hurricane Sandy damaged several hundred million dollars worth of materials. Some of the additional cost and delay were due to additions and modifications to the original plan by the Port Authority. Calatrava's original entry pavilion was scaled back for security reasons, for instance. The hub's skyrocketing costs also attracted much controversy. An editor at The New York Times wrote that "Mr. Calatrava

6097-416: The station on the two blocks between Greenwich , Cortlandt , Church , and Fulton Streets. The terminal was designed with ramps to allow pedestrian traffic to flow in and out of the station quickly and easily. The station was served by two single-track tubes connected by a loop to speed train movements. The loop included five tracks and 3 platforms (2 center island and one side) and was somewhat similar to

6188-420: The station was designed to connect the PATH to the New York City Subway system, and to facilitate a below ground east–west passageway that connects to the various modes of transportation in Lower Manhattan, from the Fulton Center to the Battery Park City Ferry Terminal . Furthermore, to replace the lost retail space from the original mall at the World Trade Center, significant portions of the Hub are devoted to

6279-467: The station's soaring ribbed structure", but other reviews derided the station redesign as being more gaudy than utilitarian. In 2014, Benjamin Kabak, a blogger writing for The Atlantic's CityLab , criticized the emphasis placed on form over function, citing design flaws driven by aesthetic choices that detract from the station's usability as a transit hub. He stated that the staircases could not accommodate

6370-598: The station, there are three mezzanine levels. The top two levels contain shops as part of the Westfield World Trade Center . The first mezzanine level below ground also contains the Cortlandt Street–Greenwich Street station for the 1 train and a direct entrance to the northbound platform. A connection to the Cortlandt Street–Church Street station's southbound platform, for the N , ​ R , and ​ W trains,

6461-503: The structure as "a kitsch stegosaurus". In 2015, as the station neared completion, New York magazine referred to the hub as a "Glorious Boondoggle " and, while withholding final judgment on the unfinished structure, did note the "Jurassic" appearance. When the station opened in 2016, the New York Post editorial board called the hub the "world's most obscenely overpriced commuter rail station — and possibly its ugliest", deeming

6552-553: The substructure; construction connecting to the Vehicular Security Center ; the Greenwich Street corridor and the steel and concrete placing under the 1 train's subway box; and preparations for installation of east arch truss. By June 2013, ten pieces of exterior arches were installed for the Oculus. The initial construction was expected to conclude at the end of 2014 or beginning of 2015, and

6643-409: The surface. A new method was used to construct a slurry wall to keep out water from the Hudson River . During excavation of the site and construction of the towers, the original Hudson Tubes remained in service as elevated tunnels. The new station cost $ 35 million to build. At the time, it had a passenger volume of 85,000 daily. The Hudson Terminal station closed on July 2, 1971, to allow

6734-426: The temporary PATH entrance to outside 7 World Trade Center closed five days later. Yet another entrance opened to the public when the Westfield World Trade Center mall was opened on August 16. On September 8, 2016, the restrooms were opened on the south side of the mezzanine. The last two station platforms in the hub, Platforms C and D, were also opened, as was the permanent West Concourse walkway. On December 19,

6825-451: The temporary PATH station to the New York City Subway station, but was closed again when the temporary PATH station closed for a reconstruction. The passageway was then covered in plywood for preservation purposes. The renovated entrance, leading to the New York City Subway station from the Oculus headhouse and the Westfield World Trade Center , opened on December 19, 2016. The newly reopened passageway retained its pre-9/11 design, save for

6916-710: The three weekday services. World Trade Center (PATH station) World Trade Center station is a terminal station on the PATH system, within the World Trade Center complex in the Financial District of Manhattan , New York City . It is served by the Newark–World Trade Center line at all times, as well as by the Hoboken–World Trade Center line on weekdays, and is the eastern terminus of both. The World Trade Center station

7007-730: The transit hub a " white elephant " and "monstrosity", comparing the Oculus to a "giant gray-white space insect". A 600-foot (180 m) pedestrian underpass under the West Side Highway , referred to as the West Concourse and formerly as the East-West Connector, links the WTC station mezzanine with Brookfield Place in Battery Park City , on the west side of the World Trade Center. It contains stores as part of Westfield World Trade Center. The concourse itself opened on October 23, 2013. Access to One World Trade Center from

7098-485: The volume of passengers using the WTC PATH station was approximately 25,000 daily. While the construction of the World Trade Center neared completion, a temporary corridor was provided to take passengers between the station and a temporary entrance on Church Street. The station sustained minor damage during the 1993 World Trade Center bombing ; a section of ceiling in the station collapsed and trapped dozens. Within

7189-638: The weekends, the service was replaced by the Journal Square–World Trade Center (via Hoboken) service (           ) on Saturdays, and the Journal Square–Hoboken service (           ) on Sundays and early Monday mornings. Around weekends, the JSQ–33 (via HOB) would still see an hour of service on Friday nights and an hour on Monday mornings before reverting to

7280-492: Was a one-story building on the south side of Vesey Street. On March 3, 2016, the permanent PATH station building opened and the temporary entrance was closed. The former temporary entrance was demolished later that year to make way for the Performing Arts Center . A connection to Brookfield Place opened on October 27, 2013, through a permanent passageway known as the West Concourse. On August 16, 2016,

7371-482: Was added to the cost overrun because the Port Authority of New York and New Jersey had to build around the New York City Subway's IRT Broadway–Seventh Avenue Line (carrying the 1 train), since the Metropolitan Transportation Authority refused to close the line for fear of inconveniencing commuters from Staten Island taking the Staten Island Ferry . The line had to be supported on a bridge over

7462-559: Was closed in September 1939 during the construction of the IND Sixth Avenue Line in Manhattan, and the 19th Street station was closed on August 1, 1954. The H&M itself was succeeded by Port Authority Trans-Hudson (PATH) in 1962. After the September 11 attacks destroyed the World Trade Center station, service on the Journal Square–33rd Street line was suspended during overnight hours, with all service provided by

7553-410: Was deemed necessary to rebuild the World Trade Center terminal. After the reconfiguration of the Exchange Place station was completed, it was reopened to PATH trains on June 29, 2003. The setup was temporary: passengers at Exchange Place would transfer to ferries to Lower Manhattan until the World Trade Center station could be reopened later that year. PATH service to Lower Manhattan was restored when

7644-487: Was designed by Spanish architect Santiago Calatrava and composed of a train station with a large and open mezzanine under the National September 11 Memorial plaza. This mezzanine is connected to an aboveground head house structure called the Oculus—located between 2 World Trade Center and 3 World Trade Center —as well as to public concourses under the various towers in the World Trade Center complex. In addition,

7735-483: Was extended to Manhattan Transfer on October 1, 1911, then subsequently expanded again. A stop at Summit Avenue (now Journal Square), located between Grove Street and Manhattan Transfer, opened on April 14, 1912, as an infill station on the Newark–Hudson Terminal line. The Summit Avenue station was completed on February 23, 1913, allowing service from 33rd Street to terminate there. The 28th Street station

7826-402: Was not part of the 2003 Memory Foundations master plan for the site by Daniel Libeskind , which called for a smaller station along the lines of the original subterranean station that existed beneath the World Trade Center. Libeskind's design proposed that the current station house's site be left as an open plaza, forming a "Wedge of Light" so that sun rays around the autumnal equinox would hit

7917-482: Was ordered to be evacuated, employees included; the train never left the World Trade Center complex and was found during the 9/11 recovery process. Two lightly damaged cars from that train were subsequently sent to museums. A train from Newark came into the terminal at 8:55 a.m. and stopped only to pick up passengers. After United Airlines Flight 175 hit the South Tower at 9:03 a.m., dispatchers ordered

8008-427: Was suspended for over two years. Exchange Place , the next station on the Newark–World Trade Center line, also had to be closed because it could not operate as a terminal station . Instead, two uptown services (Newark–33rd Street, red on the official PATH map; and Hoboken–33rd Street , blue on the map) and one intrastate New Jersey service (Hoboken–Journal Square, green on the map) were put into operation. Cleanup of

8099-659: Was suspended indefinitely, with two services operating via the Uptown Tubes, Newark-33rd Street and Hoboken-33rd Street. During overnight hours, all service was provided by the Newark–33rd Street (via Hoboken) branch until Exchange Place reopened on June 29, 2003. At that time, the NWK–33 (via HOB) service was truncated to Journal Square and assumed its current name, running on weekends as well. The Hoboken station suffered severe damage from Hurricane Sandy , which devastated

8190-532: Was temporarily extended to cover service on the Newark–World Trade Center line, which was suspended. Regular service on the line between Journal Square and 33rd Street was resumed on November 26, 2012, but full service would not be restored until early 2013. During the first few weeks of service after the hurricane, the stations at Christopher Street and 9th Street were closed due to overcrowding concerns. Journal Square %E2%80%93 33rd Street (via Hoboken) Journal Square–33rd Street (via Hoboken) (JSQ-33 via HOB)

8281-472: Was walking through the station with her husband when she went into labor, eventually giving birth on the floor. Another woman had previously given birth inside the old PATH station in August 2015. A few months later, on February 11, 2017, the first death inside the Oculus occurred. A woman from New Jersey, Jenny Santos, fell to her death from an escalator. News reports initially said she was trying to retrieve

#190809